Anstruk - BC 100X100x100 t20 SBP
Anstruk - BC 100X100x100 t20 SBP
x Pt
Beban Pedestrian
wq= 0,0 t/m2
Confidential
by. PT. SURYA BETON PRECAST 23/10/2023 Page 1
PT SURYA BETON PRECAST
2 Analisa Stabilitas Terhadap Gaya Angkat
Analisa stabilitas thd gaya angkat dihitung berdasarkan kondisi saluran kosong dan Kondisi Terbalik
3 Perhitungan gaya
Kandisi 1: Saluran kosong
Confidential
by. PT. SURYA BETON PRECAST 23/10/2023 Page 2
PT SURYA BETON PRECAST
4 Perhitungan Kebutuhan Penulangan
(1) Pada dinding bagian bawah
1) Momen retak
Cek Mf & Mc 1.7*Mf > Mc, jika benar cek momen ultimate
1.7*Mf = 0,867570721 tf.m Aman
Mc= 1,456085845 tf.m 1.5*Mf < Mc Tidak perlu cek Momen Ultimate = Aman
3) Momen Ultimate
4) Kebutuhan Tulangan
Cek M1 > Mf M1= 15,1682143 tf.m M1 > Mf : Hanya tulangan tarik saja `--> Cukup Single
Mf= 0,51033572 tf.m
Confidential
by. PT. SURYA BETON PRECAST 23/10/2023 Page 3
PT SURYA BETON PRECAST
(b) Tulangan tekan, bila M1<Mf
Mf 0,51034 tf.m/m
S 1,26 tf/m x=kd
ss = Mf/(As*j*d) 672,01 kgf/cm2 < ssa ok h d
sc = 2*Mf/(k*j*b*d^2) 20,06 kgf/cm2 < sca ok
tm = S/(b*j*d) 1,135 kgf/cm2 < ta ok As
d1
p=As/(b*d) 0,006231258 b= 117 cm
k={(n*p)^2+2*n*p}^0.5 - n*p 0,417429215 d= 11 cm Ilustrasi Tegangan pada Tul.Single
j= 1-k/3 0,860856928 n= 24
Mf 0,51034 tf.m
b
S 1,26 tf
d2
sc = Mf/(b*d^2*Lc) 20,06323262 kgf/cm2 < sca ok
ss = n*sc*(1-k)/k 672,0135194 kgf/cm2 < ssa ok
As' x=kd
ss' = n*sc*(k-d2/d)/k -147,6812002 kgf/cm2 < ssa ok
h d
tm = S/(b*j*d) 1,135 kgf/cm2 < ta ok
As
p=As/(bd) 0,0062313
p'=As'/(bd2) 0 d1
k={n^2(p+p')^2+2n(p+p'*d2/d)}^05-n(p+p') 0,4174292
Lc=(1/2)k(1-k/3)+(np'/k)(k-d2/d)(1-d2/d) 0,1796734 Ilustrasi Tegangan Pada Ru;. Double
j=(1-d2/d)+k^2/{2*n*p*(1-k)}*(d2/d-k/3) 0,8608569
Mf 0,16667 tf.m
S 0,50 tf
sc = Mf/(b*d^2*Lc) 6,982762152 kgf/cm2 < sca ok
ss = n*sc*(1-k)/k 28,14806349 kgf/cm2 < ssa ok
ss' = n*sc*(k-d2/d)/k -191,2600261 kgf/cm2 < ssa ok
tm = S/(b*j*d) 0,145 kgf/cm2 < ta ok
p=As/(bd) 0,0285755
p'=As'/(bd) 0,011424
k={n^2(p+p')^2+2n(p+p'*d2/d)}^05-n(p+p') 0,8561925
Lc=(1/2)k(1-k/3)+(np'/k)(k-d2/d)(1-d2/d) 0,5666738
j=(1-d2/d)+k^2/{2*n*p*(1-k)}*(d2/d-k/3) 4,919467
Confidential
by. PT. SURYA BETON PRECAST 23/10/2023 Page 4
PT SURYA BETON PRECAST
(2) Pada dinding bagian tengah
1) Momen retak
Cek Mf & Mc 1.7*Mf > Mc, jika benar cek momen ultimate
1.7*Mf = 0,867570721 tf.m
Mc= 1,292957242 tf.m 1.7*Mf > Mc Tidak perlu cek momen ultimate
3) Ultimate Bending Moment
4) Kebutuhan Tulangan
Cek M1 > Mf M1= 12,5357143 tf.m M1 > Mf : Hanya tulangan tarik saja
Mf= 0,51034 tf.m
Confidential
by. PT. SURYA BETON PRECAST 23/10/2023 Page 5
PT SURYA BETON PRECAST
(b) Tulangan tekan, bila M1<Mf
Cukup Single
d= 10,0 cm M1= 12,535714 tf.m Tidak Di perhitungkan
d2= 6,0 cm Mf= 0,5103357 tf.m
ssa= 0 kgf/cm2
Mf 0,04779 tf.m/m
S -0,125 tf/m x=kd
ss = Mf/(As*j*d) 69,63 kgf/cm2 < ssa ok h d
sc = 2*Mf/(k*j*b*d^2) 2,21 kgf/cm2 < sca ok
tm = S/(b*j*d) -0,125 kgf/cm2 < ta ok As
d1
p=As/(b*d) 0,006854384 b= 117 cm
k={(n*p)^2+2*n*p}^0.5 - n*p 0,432212806 d= 10 cm
j= 1-k/3 0,855929065 n= 24
Mf 0,04779 tf.m
S -0,125 tf
b
sc = Mf/(b*d^2*Lc) 2,208341956 kgf/cm2 < sca ok
d2
ss = n*sc*(1-k)/k 69,62505141 kgf/cm2 < ssa ok
ss' = n*sc*(k-d2/d)/k -20,57494806 kgf/cm2 < ssa ok
As' x=kd
tm = S/(b*j*d) -0,125 kgf/cm2 < ta ok
h d
p=As/(bd) 0,0068544
As
p'=As'/(bd) 0
k={n^2(p+p')^2+2n(p+p'*d2/d)}^05-n(p+p') 0,4322128 d1
Lc=(1/2)k(1-k/3)+(np'/k)(k-d2/d)(1-d2/d) 0,1849718
j=(1-d2/d)+k^2/{2*n*p*(1-k)}*(d2/d-k/3) 0,8559291
Mf 0,020833333 tf.m
MASTER
S 0,125 tf
CALCULATION SHEET
sc = Mf/(b*d^2*Lc) 0,974332737 kgf/cm2 < sca ok
ss = n*sc*(1-k)/k 8,219380761 kgf/cm2 < ssa ok
ss' = n*sc*(k-d2/d)/k -29,28829173 kgf/cm2 < ssa ok
tm = S/(b*j*d) 0,009 kgf/cm2 < ta ok
p=As/(bd) 0,0031481
p'=As'/(bd) 0,011424
k={n^2(p+p')^2+2n(p+p'*d2/d)}^05-n(p+p') 0,7399207
Lc=(1/2)k(1-k/3)+(np'/k)(k-d2/d)(1-d2/d) 0,5076485
j=(1-d2/d)+k^2/{2*n*p*(1-k)}*(d2/d-k/3) 19,115081
Confidential
by. PT. SURYA BETON PRECAST 23/10/2023 Page 6
PT SURYA BETON PRECAST
(3) Tumpuan pelat bawah (Momen Maksimum :Dinding)
1) Momen retak
Momen Rencana Mf (Kondisi 1) 0,51034 tf.m Menggunakan Momen pada pelat bawah : kondisi 1 Mf= 0,51034
Cek Mf & Mc 1.7*Mf > Mc, jika benar cek momen ultimate
1.7*Mf = 0,867570721 tf.m
Mc= 1,318310973 tf.m 1.7*Mf < Mc Tidak perlu cek momen ultimate
3) Momen Ultimate
4) Kebutuhan Tulangan
Cek M1 > Mf M1= 19,5870536 tf.m M1 > Mf : Hanya tulangan tarik saja
Mf= 0,51033572 tf.m
Confidential
by. PT. SURYA BETON PRECAST 23/10/2023 Page 7
PT SURYA BETON PRECAST
(b) Tulangan tekan, bila M1<Mf `--->
Mf 0,51034 tf.m
S 0,39075 tf x=kd
ss = Mf/(As*j*d) 586,97 kgf/cm2 < ssa ok h d
sc = 2*Mf/(k*j*b*d^2) 16,17 kgf/cm2 < sca ok
tm = S/(b*j*d) 0,308 kgf/cm2 < ta ok As
d1
p=As/(b*d) 0,005483507 b= 117 cm
k={(n*p)^2+2*n*p}^0.5 - n*p 0,398044771 d= 12,5 cm
j= 1-k/3 0,86731841 n= 24
Mf 0,510335718 tf.m
S 0,39075 tf b
sc = Mf/(b*d^2*Lc) 16,17221796 kgf/cm2 < sca ok d2
ss = n*sc*(1-k)/k 586,9662041 kgf/cm2 < ssa ok
ss' = n*sc*(k-d2/d)/k 76,10141172 kgf/cm2 < ssa ok x=kd
As'
tm = S/(b*j*d) 0,308 kgf/cm2 < ta ok h d
p=As/(bd) 0,0054835 As
p'=As'/(bd) 0
d1
k={n^2(p+p')^2+2n(p+p'*d2/d)}^05-n(p+p') 0,3980448
Lc=(1/2)k(1-k/3)+(np'/k)(k-d2/d)(1-d2/d) 0,1726158
j=(1-d2/d)+k^2/{2*n*p*(1-k)}*(d2/d-k/3) 0,8673184
Confidential
by. PT. SURYA BETON PRECAST 23/10/2023 Page 8
PT SURYA BETON PRECAST
(4) Lapangan pelat bawah
1) Momen retak
Momen Rencana Mf (Kondisi 2) 0,29757 tf.m Mf pada pelat bawah, kondisi 2 = -0,29757
Momen negatif, tulangan sisi atas sebagai tulangan tarik
Cek Mf & Mc 1.7*Mf > Mc, jika benar cek momen ultimate
1.7*Mf = 0,505865458 tf.m
Mc= 1,353235973 tf.m 1.7*Mf < Mc Tidak perlu cek momen ultimate
3) Momen Ultimate
4) Bar Arrangement
Cek M2 > Mf M2= 19,5871 tf.m M2 > Mf : Hanya tulangan tarik saja Cukup Single
Mf= 0,2976 tf.m
Confidential
by. PT. SURYA BETON PRECAST 23/10/2023 Page 9
PT SURYA BETON PRECAST
(b) Tulangan tekan, bila M2<Mf
Mf 0,29757 tf.m
S 0,00000 tf x=kd
ss = Mf/(As*j*d) 441,41 kgf/cm2 < ssa ok h d
sc = 2*Mf/(k*j*b*d^2) 10,3 kgf/cm2 < sca ok
tm = S/(b*j*d) 0 kgf/cm2 < ta ok As
d1
p=As/(b*d) 0,00418879 b= 117 cm
k={(n*p)^2+2*n*p}^0.5 - n*p 0,35899967 d= 12,5 cm
j= 1-k/3 0,880333443 n= 24
MASTER
(b) Tulangan tarik dan tulangan tekan
CALCULATION SHEET
Mf 0,297567917 tf.m
S 0 tf
b
sc = Mf/(b*d^2*Lc) 10,30075273 kgf/cm2 < sca ok
d2
ss = n*sc*(1-k)/k 441,4122756 kgf/cm2 < ssa ok
ss' = n*sc*(k-d2/d)/k 26,85635628 kgf/cm2 < ssa ok
As' x=kd
tm = S/(b*j*d) 0 kgf/cm2 < ta ok
h d
p=As/(bd) 0,0041888
As
p'=As'/(bd) 0
k={n^2(p+p')^2+2n(p+p'*d2/d)}^05-n(p+p') 0,3589997 d1
Lc=(1/2)k(1-k/3)+(np'/k)(k-d2/d)(1-d2/d) 0,1580197
j=(1-d2/d)+k^2/{2*n*p*(1-k)}*(d2/d-k/3) 0,8803334
Confidential
by. PT. SURYA BETON PRECAST 23/10/2023 Page 10
PT SURYA BETON PRECAST
Rekapitulasi Penulangan dan Kontrol Tegangan
Uraian simbol unit Bagian bawah Bagian tengah Tumpuan pelat bwh Lap pelat bawah
Kondisi Perhitungan Kantilever Kantilever Balok persegi Balok persegi
Dimensi utaman
Kekuatan tekan rencana beton sck kgf/m2 350 350 350 350
Lebar efektif potongan b cm 117 117 117 117
Tinggi potongan h cm 17,0 16,0 16,5 16,5
Selimut beton (bag tarik) d1 cm 6,0 6,0 4,0 4,0
Selimut beton (bag tekan) d2 cm - - - -
Tinggi efektif potongan d cm 11,0 10,0 12,5 12,5
Tegangan ijin beton sca kgf/m2 350 350 350 350
baja ssa kgf/m2 1400 1400 1400 1400
geser beton ta kgf/m2 5,5 5,5 5,5 5,5
Titik leleh baja tulangan ssy kgf/cm2 3400 3400 3400 3400
Penulangan
Tulangan tarik kebutuhan As req. cm2 4,64 (sisi luar) 5,10 (sisi luar) 4,08 (sisi bwh) 2,38 (sisi atas)
dipakai As cm2 8,02 D12@165 8,02 D12@165 8,02 D12@165 6,13 D10@150
Compressive Bar Required As' req. cm2 0,00 0,00 0,00 0,00
Designed As' cm2 0,00 0,00 0,00 0,00
Beban Rencana
Momen rencana Mf tf.m 0,510 0,048 0,510 0,298
MASTER
Gaya aksial rencana Nd tf 2,000 2,000 0,000 1,270
CALCULATION SHEET
Gaya geser rencana S tf 1,257 0,266 0,391 0,000
Confidential
by. PT. SURYA BETON PRECAST 23/10/2023 Page 11
PT SURYA BETON PRECAST
Perhitungan tulangan bagi
d1
Dinding Bagian Bawah d2
1) Penulangan bagian bawah sampai ke tengah d1= 60 mm
d2= - mm
(a) Tulangan pokok F1/F2(Tarik) - UTAMA
f= 12 @ 165 mm F3
F1/F2
Luas tulangan As = 6,854384 cm2 ok
F5
(b) Tulangan Bagi F4 = PEMBAGI F4 F7
Kebutuhan tulangan 1/ 6 of F1
Luas yg diperlukan Ast req= 1,1423973 cm2
dipakai f = 8,00 @ 150 mm ilustrasi
Luas yg dipakai As = 3,3510322 cm2 ok
Catatan: jarak antar tulangan <=150cm Tulangan minimal As min= 3,0 cm2
(c) Tulangan sudut F7
f= 12 @ 330 mm
40
(d) Tulangan pokok tekan F3 (Tekan)
f= 0 @ 0 mm `---> TIDAK DIPERHITUNGKAN
Luas tulangan As = 0 cm2
Pelat dasar
1) Penulangan tumpuan pelat bawah d3= 40 mm B3 B6
d4= - mm
(a) Tulangan pokok B1/B2
d4
f= 12 @ 165 mm sama dengan F1
Luas tulangan As = 6,854384 cm2 d3
ARIEF RAHMAN H
TEKNIK
Confidential
by. PT. SURYA BETON PRECAST 23/10/2023 Page 12