Anda di halaman 1dari 1

proyek sanur casa wira serfisan cat

TOTAL
NAMA JABATAN TANGGAL UPAH TOTAL GAJI
HARI
S M S S R K J
GUNAWAN MANDOR 1 1 1 1 1 1 1 7 190.000 1.330.000
1 timbul TUKANG 1 1 1 1 1 1 1 7 150.000 1.050.000
2 hadi tukang 1 1 1 1 1 1 1 7 150.000 1.050.000
joe villa oasis 16/03/2024 17/03/2024 18/03/2024 19/03/2024 20/03/2024 21/03/2024 22/03/2024 14 T0TAL 3.430.000

Anda mungkin juga menyukai