HANDBOOK
Tools for Improving Meetings Tools for Problem Solving with Numbers Tools for Problem Solving with Ideas
Sprint Quality
1998, Sprint and MarshalloQualtec. No portion of this document may be distributed or reproduced without the express permission of Sprint and MarshalloQualtec.
Icons
To help you navigate through this handbook, we have used several graphic icons as informational signposts. These icons will help identify when and how to use the various Sprint Quality tools to improve meetings, to problemsolve with numbers and to problem-solve with ideas. Following are the icons and the use that they signify:
Tools for Improving Meetings Tools for Problem Solving with Numbers Tools for Problem Solving with Ideas A Note about the Examples
The various tools and techniques that make up Sprint Quality can be valuable resources in our business activities and work assignments. Likewise, these same tools and techniques can be useful in our personal lives from helping a son or daughter choose the right college, to chairing a committee, to running the PTAs rummage sale. To illustrate this point and to make this handbook entertaining as well as educational, the examples involve a fictional couple, George and Betty, who both work at Sprint. Betty and George have a track record of bad vacations, linked to inadequate planning and poor communication. Their vacation blunders are impressive a Caribbean beach resort during the height of hurricane season, forgetting to pack hiking boots for a backpacking trip, a visit to relatives where everyone argued, and even sampling the delights of a remote tropical locale while a revolution was under way. Last years vacation was the worst of all. One evening as they lingered over coffee, Betty came up with a brilliant idea she and George would use Sprint Quality tools to plan and carry out their next vacation. As you look through this handbook, you can see just how Sprint Quality tools helped George and Betty plan the best vacation ever and how these same tools can help you at work and at home.
World-Class
Thats easy to say, a lot harder to achieve. But when the rewards are exceptional customer satisfaction, inspired innovative and empowered employees, and superior financial results, you may decide that taking steps to get there is worth some extra effort. This newly revised Sprint Quality Handbook can help make your journey easier. Youll find sections on meeting tools, number tools and idea tools all illustrated entertainingly with examples involving George and Betty, a couple who have saved enough time and made enough money by using Sprint Quality tools that they have the luxury of planning a perfect vacation. Youve probably already been using some quality tools. If so, this guide can be a double-check to make sure youre getting all that you can out of them. Other tools may sound vaguely familiar. Now is the time to satisfy your curiosity by finding out just what they are and how they can work for you. And there may be tools that youve never heard of. Take a few minutes to browse and stop at the ones that could make a difference in how you do business. Just as some people see the glass as half empty others as half full so will some associates see this handbook as so big that its overwhelming, while others will see it as so big that it offers enormous potential for moving ahead at Sprint.
Table of Contents
Introduction
Introduction to Sprint Quality
1 2 9 10 11 21 22 24 27 28 31 32 33 34 35 36 37 38 39 40 42 43
Tools for Problem Solving with Numbers (cont.) Histogram Mean Pareto Chart Process Indicators Quality Indicators Scatter Diagram Sigma Standard Deviation Targets Valid Customer Requirements
69 76 77 79 80 81 83 86 87 88
45 46 48 58 60 61 62 63
Table of Contents
Tools for Problem Solving with Ideas (cont.) Matrix Diagram Potential Improvements Matrix Prioritization Matrix Problem Statement Process Process Block Diagram Process Decision Program Chart Process Decomposition Diagram Process Improvement Process Maturity Process Workbench QI Story Checklist QI Storyboard Seven Management and Planning Tools Seven Quality Control Tools Task-on-Arrow Theme Selection Matrix Tree Diagram
120 122 125 128 130 131 133 135 137 140 142 150 151 152 155 156 157 159
Appendix
Courses on Sprint Quality Enrolling at the University of Excellence Ordering Sprint Quality Materials Sprint Quality Reading List Sprint Quality Handbook Evaluation Form
Mission Multivoting PAL Pareto Chart Parking Lot Plus/Delta Potential Improvements Matrix Prioritization Matrix Problem Statement Process Process Block Diagram Process Decision Program Chart Process Decomposition Diagram Process Indicators Process Improvement Process Maturity Process Workbench Quality Indicators QI Story Checklist QI Storyboard Scatter Diagram Seven Management and Planning Tools Seven Quality Control Tools Sigma Standard Deviation Targets Task-on-Arrow Theme Selection Matrix Tree Diagram Valid Customer Requirements
38 39 40 77 42 43 122 125 128 130 131 133 135 79 137 140 142 80 150 151 81 152 155 83 86 87 156 157 159 88
Introduction
Introduction
To successfully run a business like Sprint, we must do many things well we must create and communicate a vision for the entire company, establish overarching goals and Sprints Vision: values, establish and execute business strategies, develop To be a world-class telecomproducts and services that meet munications company the the needs of our customers, hire standard by which others and train employees, solve dayare measured. to-day problems, and more. Sprint Quality addresses how we should accomplish such tasks. A companys vision statement is the most fundamental expression of how it will grow profitable market share. Our vision is supported by the mission statements of each of our business units and corporate departments. Achieving our vision will rely on the successful pursuit of our goals and values. Our desire to be the standard by which others are measured implies that we will continually redefine our industry by setting new standards for a telecommunications companys image, products and services, and business practices ... something we have been doing for years.
Goals
Customers Employees Shareholders
Essentials
Teamwork
Strategic Integration
Principles
Th
Goals
The top of the diamond underscores Sprints Goals:
Sprints Goals:
Exceptional Customer Satisfaction Inspired, Innovative and Empowered Employees Superior Financial Results
In all our decision making in fact, in everything we do to conduct business we must attempt to keep a balance between the three goals. It has been shown that companies maintaining this balance outperform other companies that focus on only one or two of the three goals (Corporate Culture and Performance. John P. Kotter and James L. Heskett. New York, N.Y.: The Free Press, 1992).
Exceptional Customer Satisfaction occurs when we deliver precisely what the customer expects more often, it occurs when we delight our customers.
Delighting a customer can cost very little. Often the personal initiative of an inspired, innovative and empowered employee can lead to a delighted customer, with no increase in cost to us or the customer. In our efforts to delight the customer, we must take care not to spend resources on things that fail to add value for the customer. Well-intentioned but inappropriately overzealous service can cost more than the value perceived by the customer. We call this situation gold-plated quality and, of course, want to avoid it. Measures of customer satisfaction come from several sources surveys directly evaluate customer satisfaction; complaints indicate customer dissatisfaction; and process measures (such as cycle time and defects) can often predict customer satisfaction. In our efforts to measure customer satisfaction, it is critical to remember that there is only one true measure of customer satisfaction the ultimate report card, if you will and that is market share growth.
Introduction
In a free economy, customers buy from companies that make the best overall offer and that provide the best overall value. We must be careful not to become so focused on surveys that we forget they only indicate aspects of customer satisfaction. Market share growth is the key direct measure of overall satisfaction. For continued success, we must profitably increase our share of the markets where weve chosen to compete. And we grow market share by keeping existing customers, by selling more to existing customers and by acquiring new customers.
Inspired, Innovative and Empowered Employees At Sprint, our greatest
asset is our employees. We hold a deep belief that if we are to be successful as a company, we must have employees who are truly inspired, innovative and empowered. We foster teamwork, encourage open communication, provide a feedback-rich environment, give employees individual responsibility and authority to act, and provide rewards and recognition that support our goals. We provide training, education and development to enable employees to achieve their full potential. As with everything that is important, we gauge our progress toward this goal by using direct measures, such as the annual Employee Attitude Survey, together with indirect measures, such as voluntary turnover.
Superior Financial Results As a public corporation, we are entrusted with the money that shareholders have invested in our company. It is essential that we achieve superior financial returns for our shareholders.
We are proud of the fact that our total return to shareholders for the 10+ years ended December 31, 1997, exceeded stock market averages and the results of our major competitors.
Essentials
At the next level of the diamond, we find the three Sprint Quality Essentials:
effectively. This handbook includes tools and techniques that help teams work effectively.
Strategic Integration is our method of meeting customer needs. It is
essential for us to determine what our customers want, honestly evaluate what we currently provide them and gain insight into any gap between the two. We then work toward closing this gap by improving our key processes.
Continuous Quality Improvement depends on individual and team efforts, since improvement often results from thousands of small efforts and a few breakthroughs.
We need to continuously improve every aspect of our business. It is not acceptable to rest on a plateau or be merely good enough. If we stop improving or even slow down while our competitors continue to improve, we are essentially falling behind.
Introduction
Principles
In addition to its Goals and Essentials, Sprint Quality includes four guiding beliefs or Principles. Found in the lower half of the Sprint Quality Diamond, these four Principles are:
Customer Focus Becoming successful requires focusing on customers and understanding their needs. Respect for People People deserve respect and exhibit far higher performance when they receive it. Management by Fact Basing decisions and actions on fact, rather than speculation, produces far better business results. Structured Problem Solving Solving problems in an organized, systematic way greatly improves the chances of finding the best solution. (See Structured Problem Solving in your handbook.)
Sprints Values:
Our values provide guidance to help us set priorities and make decisions.
The values we share at Sprint are tremendously important to all of us. By creating a set of values, we dont have to write policies and procedures for every possible situation that we will face in our business lives at Sprint.
Customer First We anticipate, understand, meet and exceed our customers
customers and each other. This caring is a unique source of our companys energy, strength and excellence.
Growth Through Change We will grow as a company, as individuals and as
of our communities.
Productive Work Environment We provide a safe and accessible work
environment.
Representative Work Force We recruit and develop individuals who reflect
Plan-Do-Check-Act
Sprint Quality tools and techniques can be most helpful when theyre used within a problem-solving structure. There are two general methods you might consider: PDCA and the QI Story. PDCA Plan-DoCheck-Act will work for most of the problems you encounter. Heres how you use PDCA:
Plan your improvements. Who will handle the improvements? When
will they take place? How will you check your progress?
Do it. Try out your improvements on a small scale to make sure
they work.
Check what you did. Compare the Plan and the Do. Did you meet your objectives? What did you do well, and what could be improved? What did you learn? Act to further improve what you did. Document and standardize the improvements that worked. Apply these improvements wherever they would be helpful.
When you use PDCA, be sure that you understand the current situation, recognize the possible negative consequences of your improvements and identify the resources you need to implement your improvements. PDCA can be a fast, ongoing way to make sure your processes are constantly getting better.
Research for themes: Review departmental processes and indicators. Survey external/internal customers. Identify what the team already knows (brainstorm). Interview associates from the work area. Determine clear management ownership for process(es) being considered as themes (Checkpoint #1). Document the as is process(es) used in the problem areas (Checkpoint #2). Consider customer needs to help select the theme (Checkpoint #3). Set an indicator to track the theme (Checkpoint #4). Determine how much improvement is needed using data (Checkpoint #5). Demonstrate the impact the theme will have if improved. Schedule QI Story activities. Consider the urgency of solving the problem when establishing the schedule (Checkpoint #6).
Helpful Tools/Techniques
Brainstorming/Multivoting Brown Paper, Process Flowchart (As Is), Process Workbench, Task-on-Arrow Control Charts Control System Graphs and Check Sheet Interrelationship Diagram Theme Selection Matrix
Examples
Graph Flow Chart
Good
Target
Collect data on all aspects of the theme. Stratify the theme to a level specific enough to permit analysis (Checkpoint #7). Select a problem from the themes subgroups. Identify the Valid Customer Requirements (Checkpoint #8). Write a clear problem statement that addresses the gap between the current and targeted values (Checkpoint #9). Establish a method for setting goals or targets (Checkpoint #10). Present theme and problem statement to management and/or sponsor.
Helpful Tools/Techniques
Check Sheet Control Charts Graphs Histogram Pareto Chart Problem Statement Matrix
Examples
Pareto Chart Graph
Good
Target
Analyze the problems causes and effects (Checkpoint #11). Continue analysis to the level of actionable root causes (Checkpoint #12). Select the root causes with greatest probable impact (Checkpoint #13). Verify the selected root causes with data (Checkpoint #14).
Helpful Tools/Techniques
Check Sheet Drivers and Restrainers Graphs Histogram Ishikawa Diagram Pareto Chart Scatter Diagram
Examples
Ishikawa Diagram Pareto Chart Scatter Diagram
Develop and evaluate potential improvements which: Attack verified root causes (Checkpoint #15). Meet Valid Customer Requirements (Checkpoint #16). Are cost beneficial (Checkpoint #17). Develop an action plan that: Answers who, what, when, where, and how (Checkpoint #18). Reflects the forces (Drivers and Restrainers) impacting successful implementation (Checkpoint #19). Present potential improvements to management and/or sponsor to gain their approval and cooperation. Test or pilot the potential improvements on a small scale.
Helpful Tools/Techniques
Action Plan Cost/Benefit Analysis Drivers and Restrainers Potential Improvements Matrix Tree Diagram
Examples
Potential Improvements Matrix
3 3 1 3 2 2 1 3 1 2 6 3 3 3 4
Action Plan
Step 5: Verification
Verify that you have reduced a problem and its root causes and/or improved a process, and confirm that you have met the target for improvement. If what you tried didnt work or didnt work as well as you expected, study what worked and didnt work, and go through Step 3 and Step 4 again.
Key Activities
Confirm the effects of potential improvements, making sure the root causes have been reduced (Checkpoint #20). Confirm you used the same tracking indicator you used in Step 1 (Checkpoint #21). Compare the results to the target established in Step 2, and verify that the results met or exceeded the target (Checkpoint #22). Implement additional improvements if results are not satisfactory.
Helpful Tools/Techniques
Effect
Target Before After
Before
After
Make your improvements part of daily work (Checkpoint #23): Create/revise the work process. Create/revise standards. Train employees on the revised process and/or standards. Establish periodic checks with assigned responsibilities to monitor the improvements (Checkpoint #24). Consider other areas for implementation (Checkpoint #25). Present the results of your improvement to management and/or sponsor with recommendations on other areas that might benefit from the improvements.
Helpful Tools/Techniques
Control Chart
Analyze and evaluate any remaining problems related to the theme (Checkpoint #26). Plan further actions, if necessary. Review what youve learned relating to problem-solving skills and group dynamics (i.e., team effectiveness) (Checkpoint #27). What was done well? What could you improve? What could you have done differently?
Helpful Tools/Techniques
Action Plan
An Action Plan is a prioritized list of what needs to be done, when it needs to be done and who needs to do it.
Use
You can use an Action Plan to help explain an improvement plan and clarify roles, responsibilities and deadlines. You can review the Action Plan at any time or at the end of PDCA or QI Story steps to determine whether the plan is on track or needs to be changed.
Example
To prepare the house for their absence during their vacation, George and Betty made an Action Plan of everything they needed to do before they left.
Action Plan
Prepared by George Date 5/16/97 Page 1 of 1 (Review daily; file for future reference) Location/Project Vacation Period Summer No. Task/Project 1 2 3 4 5 Ask Janice to feed cat Call Bruno to get mail & newspaper Ask Horace to check on house Get rid of spoilable food Turn off airconditioning Due Date 6/30/97 6/30/97 6/30/97 7/11/97 7/12/97 Assigned to Betty George Betty George Betty Date Assigned 5/16/97 5/16/97 5/16/97 5/16/97 5/16/97 Status/Remarks Tell her about cats medicine He can recycle newspapers Tell him security alarm code Give to local shelter This will save money
Steps
1. Break down the task into steps. 2. Consider the hardware, software, people and other resources involved in each step. 3. Brainstorm, if necessary, for other items of possible significance. 4. Add to the list until you feel it is complete. Although an Action Plan may have different formats, it should answer: Who What When Where How
Brainstorming
Brainstorming is a technique used to quickly generate, clarify and evaluate a large list of ideas, problems and issues. Team members tap into their creativity to find the best solutions for problem solving and decision making. Brainstorming facilitates respect for people on the team by allowing everyone to contribute to the problemsolving process and to be heard without criticism or judgment.
Use
Use Brainstorming as a technique to: Collect improvement opportunities and/or problem areas. Identify possible causes when constructing an Ishikawa (or Fishbone) Diagram. Suggest Potential Improvements. Identify Drivers and Restrainers. Collect comments when creating a Plus/Delta chart.
Steps
First Phase: Generation
1. State the topic to be brainstormed in specific terms, and write it on a flip chart.
2. Select a recorder to capture ideas on the flip chart. 3. Generate ideas, with each team member taking a turn, until all ideas are exhausted.
Note: An alternative is the popcorn approach, in which team members speak out whenever they have an idea. Second Phase: Clarification
4. Go over the brainstormed list as a team to eliminate duplication and make sure everyone understands all of the items.
Third Phase: Evaluation
5. Evaluate ideas and select those for further action by using Multivoting, a Prioritization Matrix or other Consensus techniques.
Code of Conduct
A Code of Conduct reinforces the Sprint Quality Principle of Respect for People in meetings and in daily communication with others. You may use the Code of Conduct shown below or modify the Code to best suit your needs.
T HE WAY W E RUN O UR B USINESS
SPRINT QUALITY
CODE OF CONDUCT
>Respect Each Person >Share Responsibility >Question and Participate >Attend All Meetings; Be on Time >Listen Courteously >Keep an Open Mind > > > >
Consensus
Consensus is a method of group decision making in which a group actively discusses the issues and supports a common decision.
Use
Use Consensus to: Eliminate a we-they feeling. Reach a win-win decision this guarantees that nobody will lose. Develop ownership of the decision and support for implementation of the decision. Focus on the problem, not on personalities. Pool knowledge and experience. Gain support of entire group. Integrate ideas and feelings of all group members. Make better quality decisions.
Steps
1. Prior to the meeting, prepare your position using your knowledge of the problem. 2. Express and explain opinions so the group knows how each person feels and benefits from everyones thoughts. 3. Listen to everyones opinions and feelings. Then apply logic and understanding to modify individual positions. 4. Avoid using techniques such as voting or simply giving in to save time; realize that differences in opinion help reach a better decision.
More
Consensus is not the same as voting, as shown by the comparison below:
Consensus Voting
Everyone agrees (to varying degrees) on solution. Win/win method. Ensures commitment by all to course of action. Time-consuming, can be frustrating. Useful when quality and acceptance of decision both important.
Majority wins, others lose. Win/lose method, unless unanimous. Ensures commitment by majority to course of action. Done within a limited period. Useful when large numbers of people must be involved in decision.
Both methods of making a decision can be useful, but the differences should be well understood. Voting is clear-cut in its results and can be done within a limited time period, making it the most efficient way of arriving at a decision. Furthermore, when a large number of people are involved and want some voice, voting may be the only workable system. Consensus requires that all decision-makers discuss an issue until everyone agrees to some degree on a solution. Consensus does not mean that everyone shares an equal degree of enthusiasm; it simply means that everyone is at least willing, in good conscience, to go along with the decision. No one should have reservations serious enough to stop the decision or take a different course of action after the meetings conclusion.
Consensus is a win-win method. It guarantees that no one will lose badly because it requires that the decision not be made until everyone can, at a minimum, live with that decision.
Note: The purpose of Consensus is to allow a team to agree on a general course of action based on facts presented through discussion. Consensus does not necessarily imply or require absolute agreement; in fact, attempting to achieve absolute agreement on every issue can paralyze a team and consume an unreasonable amount of time. Rather, the intent of consensus is to ensure that team members agree enough with the decision to fully support it.
Use
Consider the following categories when using Drivers and Restrainers: People Environment Dollars Time Methods Materials
Drivers
George loves the menu Good view of the ocean Comfortable atmosphere Recommended by travel agent
Restrainers
Betty only so-so about the menu George gets seasick easily Entrees rather pricey Storm blowing in, rough waves Long wait to get seated
Steps
1. List reasons that support taking an action (Drivers) and compare them to the reasons that hold you back from taking the action (Restrainers). 2. Once this tool has helped you choose a plan of action, decide how you will overcome (or minimize) the Restrainers and maximize the Drivers.
Meetings
Meetings provide an arena for employees to identify problems, investigate their causes and develop workable solutions.
Use
Meetings foster improved levels of communication and cooperation among team members.
Components of a Meeting
Select appropriate meeting time and location to maximize member participation. Prepare and distribute PAL (written agenda) before meeting. Have meeting recorder take minutes and note action items, responsibilities and expected completion dates. Distribute minutes as soon as possible after meeting. Post minutes, if appropriate. Evaluate meetings using Plus/Delta or Meeting Evaluation Form. Designate recorder to capture ideas on flip chart or other group visual tool. Designate timekeeper to work with team leader to ensure that all agenda items are covered in allotted time. Develop team Code of Conduct.
1 1
2 2
3 3
4 4
5 5
Adapted from The 1981 Annual Handbook for Group Facilitators, University Associates.
TEAM MEMBERS
PRESENT
TEAM MEMBERS
PRESENT
TOPICS DISCUSSED, ACTION ITEMS AND DECISIONS REACHED (Data, Lists, Matrices, etc.)
1.
2.
3.
4.
5.
5.
6. Shows concern 7. Encourages others 8. Expresses own feelings 9. Solicits others feelings 10. Attempts to reconcile disagreement 11. Checks with group to determine agreement 12. Offers compromise idea at risk of own
Why is the team meeting today? What would you like to see the team accomplish? Can all of that realistically be done at the meeting?
The Meeting Agenda
Review the agenda you have planned. If none, plan one now. How much time is planned for each item? Is there sufficient time at the end to critique the meeting itself?
The Team Leader Role
How do you intend to open the meeting? What quality improvement techniques will you use? Do you feel comfortable using them? If not, where can you get help?
The Team Member Role
Do you have any specific task or people worries concerning the meeting? What can be done about them in this meeting? What can you or they do about them in the long term?
The Facilitator Role
Is there anything specific you still need from your facilitator before the meeting? When can you spend time with your facilitator after the meeting?
Did you notice which members contributed and how? Were you satisfied with how the team interacted? What would you like to see changed? How can that change be brought about?
Observing Effective Performance
Describe the effective behavior. Explain the importance of the behavior. What can be done to reinforce the behavior?
The Team Leaders Impact
How do you feel about how you led the meeting? What, if anything, would you do differently?
Improving Ineffective Performance
Describe any evident problem behaviors. What alternate behaviors would help the situation?
Facilitators Role
How do you feel about your facilitators role at the meeting? (Appropriate? Timely? Helpful? Supportive to your leadership?) Were there times when you would have liked your facilitator to do something differently? (When? How? Why?)
The Sprint Quality Handbook 37
Mission
A Mission statement states the core reason for existence of an organization, a department or a process. Every organization, department and process should have its own Mission statement, and each Mission statement should meet the following criteria: States core reason for organization, department or process to exist. Supports strategic direction of entire organization. Describes strategy of organization, department or process in achieving the vision (What we do). Reflects organization, department or process distinctive competence (How we do it). Externally focused identifies customer (For whom). Clear and understandable. Serves as an energy force/is compelling. Actionable. Able to be measured. Dynamic. Broad enough to be flexible. Serves as decision-making template.
Example
George and Bettys Mission is shown below:
To organize fun vacations by planning ahead and staying within our budget. We will do this by using Sprint Quality tools and techniques.
Multivoting
The Multivoting technique uses a structured series of votes by a team to help reduce a large number of ideas to a manageable few (usually three to five).
Use
Multivoting is often used after a team has discussed items on a Brainstorm list, and the list is still too lengthy for everything to be addressed.
Steps
1. First vote: Team members vote for as many items as they wish but vote only once per item. Members agree on the number of votes that determines whether an item should remain on the list. They circle the items receiving a higher number of votes than the other items. Example: A team of eight members generates a list of 14 items after round one. The team decides to circle items receiving six or more votes. In this example, the team circles eight items. 2. Second vote: Each person should vote a number of times equal to half the circled items. Example continued: Each person gets to vote four times during the second vote. 3. Continue the Multivoting until the list is reduced to three to five items. Never Multivote down to only one item, because this reduces the process to a one winner scenario and creates a win/lose situation. Multivoting reduces the list to a workable number for group discussion and helps a group reach Consensus.
PAL
PAL is an acronym to help remember the three key points to planning and managing a meeting: P Purpose A Agenda L Limits
Use
A PAL tells participants what they are supposed to accomplish in a meeting and helps them complete the activities that will lead them toward that accomplishment. A PAL can also include the date of the meeting, a list of the attendees and the exact location of the meeting.
Purpose: Establishing the purpose in advance lets everyone know the
expected outcome of the meeting. If the meeting gets off track, suggest a relevancy check to get it back on track. If the issue being discussed is irrelevant, stop discussing it. If the issue is important but not part of the agenda, either put the issue in the Parking Lot or gain agreement from the participants to change the purpose of the meeting.
Agenda: Create an agenda with as much detail as appropriate to help keep the meeting on track. Meeting minutes should reflect action items and decisions resulting from the meeting agenda. (Hint: creating a PAL in advance often makes it easier to record meeting minutes.) Limits: Establishing a specific meeting length in advance is respectful of
people. Starting on time and ending on time is a golden rule of meeting management. If you need more time to complete the agenda, negotiate with the meeting attendees and gain their agreement to continue beyond the original time limits.
Note: Providing the PAL to attendees in advance of the meeting will
Example
George and Betty made a PAL to make sure all of their questions were answered and needs were communicated during a meeting with their travel agent.
Parking Lot
A Parking Lot is a tool to keep meetings, classes, etc., on track while allowing flexibility to deal with unanticipated issues.
Use
A Parking Lot provides an easy way for participants to keep the meeting focused on the proper agenda items.
Steps
1. If an item not covered on the agenda is being discussed and the group needs to move on, write the issue on a sticky note and place it in the Parking Lot. The Parking Lot can be a blank flip chart page, a paper on a wall, a desktop, etc. 2. Revisit the Parking Lot after the agenda items have been completed. 3. If there is not enough time to discuss the Parking Lot issues, plan a second meeting, if appropriate. 4. If the Parking Lot items should be handled by another group, pass the information to the appropriate department.
Plus/Delta
The Plus/Delta technique determines the positive features of meetings, projects or other events, and it can help identify changes that would make future events more effective. Plus/Delta also provides an easy way to perform the Check step in PDCA (see Structured Problem Solving).
Use
Plus/Delta is used in meetings and can be used to critique and improve projects and processes as well.
Example
After they returned home from their vacation, Betty and George created a Plus/Delta to evaluate their experience:
+
Great travel agency George learned to water-ski Didnt overpack Great food _ chose
restaurants well shoes
Much better trip than last year Feel completely rested and
almost ready for work
Steps
1. Using a flip chart, draw a line down the middle from top to bottom. On the top left-hand side, put a +. On the top right-hand side, put a (the Greek letter delta the symbol for change).
2. Ask the participants to provide their feedback on the positive features of the event. List these comments on the left-hand side of the flip chart under +. 3. Ask participants which features need to be changed and what the changes should be to enhance the effectiveness and efficiency of the next event. List on the right-hand side of the flip chart under . Using Plus/Delta provides valuable feedback and is part of the PDCA process. Plan Meeting purpose, agenda and limits (PAL) Do Conduct the meeting Check Plus/Delta Act Modify next meeting to improve on Deltas and retain Pluses
Note: Plus/Delta is useful if you review it before your next meeting.
Check Sheet
A Check Sheet (as opposed to a Checklist) is a simple form on which data are recorded using tick marks.
Use
Design the Check Sheet to display the different kinds of data that you will collect. Determine categories of data by asking fact-finding questions:
What (what happens)? Who (who does it, who receives it, who is responsible)? Where (what place, what part, what section)? When (what time of day/month, how often)? How (how does it happen, how much, how long)?
The Check Sheet should clearly indicate who collected the data and where, when and how it was collected.
Example
Led astray one time too many by incompetent travel agents, Betty and George were determined to find a good agency. Convinced that managing by fact would help them, they collected data on several agencies to find one with a reputation for providing exceptional satisfaction. To do this, they determined how many times an agency was mentioned positively and negatively in several local publications.
MAGAZINES
Jan-Feb 1997 Jan-Feb 1997 Jan-Feb 1997
AGENCIES U Travel, We Book Baldrige Travel Positive Negative Positive Negative Funtime Travel Positive Negative
Travelers Journal
Journey Companion
Totals 3 4 12 0 1 6
DATA COLLECTED George and Betty January-February 1997 their home FORMULA: N/A
Control Charts
Control Charts are line graphs used to track the performance of a process over time. Process results fall into statistically predictable patterns, called distributions. A bell-shaped curve, in which most observations fall in the center and fewer and fewer observations fall evenly on either side of the center, is an example of a normal distribution. Control Charts illustrate the variability of a process within a pair of statistically calculated limits called control limits. All processes are subject to variation, and Control Charts help determine how much variation is acceptable and what kinds of variation are controllable and, therefore, can be improved. The measure of the variation in a set of data is called range, which is calculated by subtracting the lowest value in the set of data from the highest. There are two main sources of variation: A common cause is a source of variation that is always present, a part of the random variation inherent in the process itself. A special cause is a source of variation that is not always present; it is sometimes called an assignable cause. A special cause is identified by a point beyond the control limits or by a non-random pattern within the control limits. Statistical control occurs when all special causes have been removed from a process. This condition is illustrated on a Control Chart by the absence of points beyond the control limits and by the presence of only random patterns within the control limits. When the fluctuations within the process occur in a non-random pattern or go outside a control limit, the process is out of statistical control.
Control limits are statistically derived from samples of a stable process. They are not to be confused with specification limits, which are determined by Valid Customer Requirements, regardless of what the process is capable of achieving. Ideally, the control limits are well within the specification limits, so there is confidence in the reliability of the process. If the control limits are very close to or outside the specification limits, the process is indicating that it may not be reliable in achieving the customers needs.
Use
Control Charts monitor the performance of an ongoing process and determine answers to the following questions: Is the process in statistical control? Does action need to be taken to keep the process in control or bring it back into control? Is the variation a result of common causes, special causes or both? Does an opportunity for process or system improvement exist? Have implemented potential improvements truly improved the process? Control Charts are used throughout PDCA and the QI Story process and can be particularly helpful in identifying problem areas and tracking results.
Important Note:
Control Charts are most useful when they are created while the process is operating. In this way, the process can be controlled in near-real time. Creating a Control Chart after the fact will indicate if a process produced excessive variation in the past, but there is no way to eliminate the defects produced by that variation.
Examples
Control Charts can be classified into two main groups, depending on the type of data generated from the process. The chart below summarizes the types of Control Charts discussed on the following pages.
DATA
VARIABLE
ATTRIBUTE
MEASURABLE
DEFECTS
DEFECTIVE UNITS
U CHART
NP CHART P CHART
P CHART
A Variable Control Chart deals with quantitative data characteristics which can be measured. An example of variable data might be the number of days it takes Bettys postcard to get to her friend, Janice, or the weight in pounds of Georges suitcase. You can construct an X , R or X, MR chart to record data of this type. An Attribute Control Chart deals with qualitative data that can be counted for recording and analysis. An example of attribute data might be whether or not Bettys postcard got to her friend or the presence or absence of luggage tags on Georges suitcase. When the results are recorded in a simple yes/no fashion, you can construct c, u, np or p charts. For additional information on Attribute Control Charts, you may want to refer to pages 61-85 of Guide to Quality Control by Kaoru Ishikawa, available from the Sprint Corporate Research Center.
complexity, you may want to contact a Statistical Process Control (SPC) specialist if you need help. Variable Control Charts X (X-bar), R Chart This two-part Control Chart monitors processes with variable data. The data used on these charts are reported in small subgroups containing at least two (at most five) individual data readings. Example: George and Betty sent five postcards per day. When they got home, they called their friends to find out when their cards arrived. On an X Chart, George and Betty plotted the average number of days it took a particular days cards to get through the mail. They did this for each day of their vacation. They also computed the range in number of days it took each days cards to reach their friends. The X Chart tracks how the process average varies from one point to another. The R (or range) chart tracks the variation that occurs.
X, MR (Moving Range) Chart This two-part Control Chart also monitors processes with variable data. This is similar to the X , R Chart, except that it observes one item at a time. In other words, the X, MR Chart tracks how each process data point varies from another.
Example: George and Betty plotted the number of days it took each card to reach its destination.
Steps
1. Decide on a measure to use in monitoring performance. Put this on the vertical axis. 2. Choose a time interval for taking measurements. Put this on the horizontal axis. 3. Calculate control limits. First, find the average and standard deviation for the data. The upper control limit (UCL) is the average plus approximately three standard deviations, while the lower control limit (LCL) is the average minus approximately three standard deviations. Mark these control limits on the vertical axis and draw a line for each horizontally along the length of the chart. Be aware that the upper and lower control limits are not the same as the customer specification limits. 4. Enter your measurements (data points) chronologically on the chart. 5. Draw a line connecting the data points.
After constructing the Control Chart, examine it to see where the data points are located. If the process continues to be fairly consistent and stable, most of the data points will randomly fall within the established control limits. Fluctuations within the process that occur in a non-random pattern or points that fall outside one of the control limits should be reported or investigated as special causes.
More
Components of Control Charts
Be sure to include these lines on your control chart 1. A Mean (X) represents the average value of the process. 2. An Upper Control Limit (UCL) drawn at a calculated distance (approximately three standard deviations) above the central line represents the maximum variation that can be expected if only common causes of variation are present. 3. A Lower Control Limit (LCL) drawn at a calculated distance (approximately three standard deviations) below the central line represents the minimum variation that can be expected if only common causes of variation are present. The horizontal axis tracks time or sequential order, and the vertical axis tracks the factor being studied.
UCL
Vertical Axis
LCL
Horizontal Axis
All of the following patterns indicate that something is occurring in the process that should be investigated. These patterns indicate that the variation results from a special cause.
Points Outside the Limit:
Control limits are calculated to measure the natural variability of a process. Any point on or outside the limits indicates a special cause of variation and requires investigation.
UCL
LCL
Run:
A Control Chart shows a run when points occur continually on one side of the center line. A run of seven points is considered abnormal. Also considered abnormal are 10 out of 11, 12 out of 14, or 16 out of 20 points on one side of the center line.
UCL
LCL
Trending:
LCL
Cycling (periodicity):
Fourteen or more points which alternate up and down are considered abnormal and require investigation.
UCL
LCL
On a Control Chart, hugging the center line (X ) occurs when most points fall very close to the center line. This circumstance usually means that different kinds of data have become mixed with the data of the test group; the data then must be resorted before constructing another graph. To determine if your Control Chart exhibits hugging, try drawing one line halfway between the center line and the UCL, and one line halfway between the center line and the LCL. If most of the points on your Control Chart appear between these lines and the center line, your Control Chart is probably hugging the center line.
A line may also hug the control limits. If you draw one line that is two-thirds of the way between X and the UCL, and one line that is two-thirds of the way between X and the LCL, and if two out of three points (or three out of seven points or four out of 10 points) graphed lie between the drawn lines and the closest control limit, your graph exhibits hugging of the control limits.
UCL 2/3 UCL
Note: Control Charts can be powerful diagnostic tools. If special causes are detected, determine root causes and correct the problems. If no special causes are present, it is not generally productive to investigate the causes of individual data points on the Control Chart. Instead, look at the entire process and improve the process using Flow Charts and other Process Improvement tools and techniques.
Cost/Benefit Analysis
Use
Cost/Benefit Analysis is a technique for determining the dollar impact of problems and potential improvements. This knowledge helps you prioritize and select improvements. It is not necessary to have detailed accounting data in order to get a general idea of the financial impact of a problem or issue; it is all right to make some assumptions and verify them as you gather data.
Steps
There are two approaches to estimating costs: the bottom-up approach and the top-down approach.
Bottom-up Approach: Start with smaller units and build the estimate
toward an overall amount. 1. Estimate how many times the problem occurs per unit of time. (Example: 12 occurrences/week) 2. Estimate cost per occurrence. (Example: $200 per occurrence) 3. Estimate total time involved. (Example: 52 weeks) 4. Calculate total annual cost by multiplying above factors. (Example: 12 X $200 X 52 = $124,800)
Top-down Approach: Start with the overall cost of some budget item
or other known variable and an estimate of the percentage of the total which represents the problem. Then calculate unit cost as shown below. 1. Estimate the percentage of some expenditure that applies to the problem area (for example, percent of total labor devoted to the problem, percent of total downtime attributed to the problem). 2. Multiply the percentage by the budgeted annual cost to get the estimated amount spent on the problem in one year. (Example: 10% of total labor x $185,000/year budgeted = $18,500/year) 3. Divide by unit of time. (Example: $18,500/year divided by 52 weeks/year = approximately $356/week)
Cost of Quality
The Cost of Quality is the amount a company, division or department spends for overall quality. Estimates put the Cost of Quality at 15% 30% of revenue for the average company.
Cost of Quality Consists of Three Components:
The Cost of Conformance is the money and time spent to ensure that Valid Customer Requirements are being met. It includes money and time spent on both prevention (finding mistakes before they happen) and inspection (finding mistakes after they happen but before delivery). The Cost of Lost Opportunity is the profit impact of lost revenues that result from failure to meet customer requirements. If a company loses business because it has a reputation for poor quality, it loses revenue. The profit it could have made on that revenue is the cost of lost opportunity. The Cost of Nonconformance is the money spent to fix products and services that do not meet Valid Customer Requirements. This cost includes money spent on warranties, credits and other customer concessions paid as a result of poor product or service performance.
Cycle Time
Cycle Time is the time that elapses from the moment a process begins to the moment the process ends. Reducing Cycle Time can lead to a competitive advantage.
Use
Cycle Time reduction can affect such areas as new product development, production and delivery. Goals are frequently expressed in multiples (for example, Motorolas 10X program, which aims to reduce cycle times by 10 times).
Data
Data are facts or figures from which conclusions can be drawn, a basis of reasoning, discussion or calculation. Data, when properly organized and analyzed, provide useful information and serve as the basis for decision-making and action.
Use
Data can be organized as follows:
Words
There are two kinds of numerical, objective data: Attribute and Variable.
Attribute Data:
When characteristics are identified only by name or label, rather than by numeric value, they are called Attribute Data. For example, during a test of circuit breakers, the breakers either pass or fail; there are no possible values between classifications. The important point is that the situation is either go or no-go, green or not green, over $150 or not over $150.
Variable Data:
When it is important to identify, rank and precisely measure the distribution (the distance or interval between items), we collect Variable Data. Variable Data are strictly quantitative; they are concerned with measurements (length of a board in meters, rate of disabling accidents in accidents/week, etc.). These types of data are usually more expensive to collect, but they provide much more information about the subject.
Use
Use graphs to display data, to aid in understanding and interpreting data, and to manage with facts. You may also use graphs to illustrate targets, goals and benchmarks.
Bar Charts make it easier to recognize small differences in quantities
and to compare one category with another. They are easy to construct.
Line Graphs make trends and data variations over time easy to track.
They highlight change and can track more than one set of data at a time.
Pie Charts show relative proportion of each category to the whole. Elements of Good Graphs
In general, good line graphs have the elements shown in the chart below:
Title Y
N= or n=
Frequency
Target = Benchmark =
= Good
X
Units
Every Graph should indicate: When the data were gathered. Where the data were gathered. Who gathered the data. Whether they are raw data, percentages, or averages. How the data were calculated (a formula).
Steps
1. The scale used in a Graph can be adjusted to show the situation: it can be expanded to emphasize variation or compressed to show control. All graphs should indicate the total number of data points represented. If all the data points (the population) are represented, this is indicated by a capital N =____. A sample number is indicated by a lowercase n =____. 2. It is generally considered good practice to include the 0 (zero) point. If you want to magnify some portion of the graph to show detailed variation, show the 0 (zero) point and indicate a departure from the scale with some wavy lines. 3. If there is a good direction, indicate this with an arrow. (For example, an arrow pointed up would indicate that a high mark on the Y-axis is desirable, perhaps indicative of large profits.)
Checklist for a Complete Graph
Title Vertical axis labeled Horizontal axis labeled Zero shown for both axes Good direction indicated Goal or target, if applicable Benchmarks or comparisons Forecast of likely future trend Data collection information Population or sample size
Example
George and Betty love watching pelicans and are hoping to see some on their trip. They asked the Sprintsville Beach Chamber of Commerce for information on how many pelicans had visited the beach during July in the last three years. The Chamber sent its reply in a bar chart format:
Pelicans 93-96
150 125
Number of Pelicans Sighted
Good
1995
1996
Steps
1. The horizontal axis shows the items being compared using vertical bars of uniform width. 2. The vertical axis indicates the quantities by the heights of the bars.
Example
At George and Bettys request, the Sprintsville Beach Quality Resort analyzed how many satisfied customers had stayed at their resort over the past four years as compared to two of its competitors. The Quality Resort sent George and Betty a line graph to display this data.
Number of Satisfied Customers Per Year 120 N = 552 100
Good
80 60 40
Data Collected:
QR = 274 SI = 52 SS = 226
By: Paul Rogers On: 3/8/97 At: Quality Resort
20 0 94 95 96 97
Formula: N/A
Steps
1. Use a trend line to display some variable over a period of time. 2. If using multiple lines, use some method (dashes, dots, etc.) to distinguish between them. The solid black line should receive the greatest emphasis, representing your own department or actual data. 3. If the Line Graph tracks over a period of time, show the most recent data when presenting results. 4. When possible, include a forecast of the likely future trend for your data and for your comparison data.
Example
To see how they spent their money on vacation, George and Betty constructed a Pie Chart as shown below:
Hotel 46%
Data Collected: By: George and Betty On: 8/1/97 At: Home Formula: N/A
Steps
1. Divide a circle (pie) into a number of wedges so that each wedge represents a proportion of the total number of items. 2. Calculate the proportion of the item by dividing the item by the total. For example, the proportion for Gifts and Souvenirs shown on the previous page is $220 in gifts divided by $2,000 total expenses = 0.11, or 11%. 3. Convert the proportions into wedges by multiplying the proportions by 360 degrees (example: 0.11 x 360 = 39.6 degrees). 4. Start with the largest wedge, beginning at the vertical position and going in a clockwise direction. Measure off the wedge sizes with a protractor. 5. When using pie charts, follow these rules: Order your categories from largest to smallest. The other category, if one exists, is last, regardless of its size. Begin your first wedge with a starting line at the 12 oclock position. Construct the remaining wedges in descending order by size and in a clockwise direction with other last.
Histogram
A Histogram, also called a frequency distribution, is a visual representation of the distribution of data. It is a special case of a bar chart. For example, a Histogram might show the height, in inches, of 36 tourists. Information in a Histogram is represented by rectangles or bars of equal width. The heights of these bars indicate the relative number of data points in each class. To evaluate a Histogram, you need to know the central tendency (where most values fall), as well as the dispersion of the data.
10
N = 36
Mean 68.94"
Mode 70" 8
8 Median 6 6 6 69.5"
Number of Tourists
4 3 Central Tendency 2
(The calculations shown below use the data from the Histogram on the previous page.)
Mean (average) The sum of all the measured data divided by the total
number of data points. In the example, all the data points added together equal 2,482 divided by 36 = 68.94 inches.
Mode The value repeated most often in the raw data. In this example, it is 70 inches. Median The middle of all the measured or counted data points. For
example, in the data of 36 measurements, the median is the average of the middle values (69 + 70 = 139 divided by 2 = 69.5 inches).
Measures of Dispersion Range The maximum value minus the minimum value. Standard Deviation (SD) or Sigma A measurement that shows how widely
dispersed any set of data is from the mean (average) of the entire data distribution. The standard deviation takes into account all the data points. It is far less sensitive to the addition of another data point than is the range, so it is a more consistent measure of variability.
Use
Use a Histogram to provide information on the degree of variation of data and to indicate the distribution pattern. Drawing a curve around the heights of the bars of a Histogram shows the general shape of the distribution. Depending on the subject on which data have been collected, dispersion of data can produce a variety of Histogram shapes. Some of the more common shapes are shown on the following pages.
Most values fall toward the center of the distribution with the variation balanced on both sides of the center.
Center
Precipiced
Most of the values appear on one side of the center line, as shown below. This type of distribution could occur where there is a natural barrier, or in cases where the data have been sorted. Precipiced distribution could occur when products which do not meet a particular specification limit have been removed from the data set.
Center
Skewed
A skewed shape has a long tail on one side. There is more variation on one side than on the other, indicating a shift of some variable during the process.
Center
Bi-Modal
In a bi-modal (or twin-peaked) shape, two peaks (modes) appear. This usually occurs when two different data groups are mixed (for example, a population of very short people is added to a population of extremely tall people). In effect, there are two Histograms pushed together.
Center
Example
After packing their luggage, George thought the suitcases felt abnormally heavy. To reassure him, Betty called their airline and asked for weights of typical customers suitcases. In response, the airline sent data which George and Betty used to create this Histogram.
12 n = 36
10
Mode = 39 lbs
8 7 Number of Suitcases 6 6 5 4 3 2 5
48.5
DATA COLLECTED Max and Lulu, baggage handlers 7/8/97 QualitAir FORMULA: N/A
Weight (lbs)
George and Betty saw that their suitcases, each weighing 38 pounds, were about average, and that George had nothing to worry about.
Steps
1. To construct a Histogram, draw horizontal and vertical axes. The horizontal (X-axis) shows class intervals; the vertical (Y-axis) shows frequencies. 2. Draw a bar to represent the frequency of data in each class. The bars should be touching.
STEP
Start with an unorganized set of at least 30 data points.
EQUATION
EXAMPLE
35, 34, 46, 31, 42, 39, 39, 36, 43, 40, 32, 38, 31, 41, 44, 32, 39, 45, 33, 46, 38, 34, 41, 43, 35, 39, 41, 31, 34, 43, 37, 35, 38, 39, 37, 46 31, 31, 31, 32, 32, 33, 34, 34, 34, 35, 35, 35, 36, 37, 37, 38, 38, 38, 39, 39, 39, 39, 39, 40, 41, 41, 41, 42, 43, 43, 43, 44, 45, 46, 46, 46
N = 36
The range (R) of the set is the largest (maximum) data point minus the smallest (minimum) data point.
R=MAX-MIN
R = 46-31 = 15
The class (K) is used to calculate the number of bars. Class equals the square root of N. As a rule of thumb, K is a number from 6 to 12. The class width (H) is used to calculate the width of the bars. It is calculated by dividing the range by the class. To begin constructing the Histogram, establish the starting point for the first class. This is equal to the minimum data point minus (the measurement unit divided by 2).
K=
K=
36 = 6 (round up)*
H = R/K
31 = 1/2 = 30.5
* It is important to round numbers up to ensure that all data points will fall between the lines on the Histogram. ** A measurement unit (M) adds precision to the development of a Histogram. If the data being measured have values of 4.53, measurement unit is 0.01. If the data values are whole numbers, the measurement unit is 1. If the data values are in tenths, the measurement unit is 0.1.
Now that you have established the starting point for the first class, construct a frequency table:
STEP
In Column 1 of the frequency table, add the class width (H) to your starting point.
EQUATION
Starting point + H
EXAMPLE
30.5 + 3 = 33.5, so class limits are 30.5 to 33.5, 33.5 to 36.5, etc. 30.5 + 33.5 = 32 2 = midpoint of first class Suitcase weights fall within first class
In Column 2, calculate the midpoint of each class. In Column 3, go back to your original set of data points and tally the number of points that fall within each class. In Column 4, add the tallies from Column 3 and record them as the frequencies of their class.
Frequency Table Class Limits 30.5 to 33.5 33.5 to 36.5 36.5 to 39.5 39.5 to 42.5 42.5 to 45.5 45.5 to 48.5 Class Midpoint 32 35 38 41 44 47 Tally Frequency 6 7 10 5 5 3
Mean
Use
Use a Mean when you want one number to represent many different numbers or when you need to know the central tendency of a group of data.
Steps
1. Add up the data points. 2. Divide the sum by the total number of data points.
X=
Pareto Chart
A Pareto Chart is a type of bar chart in which the bars are arranged in descending order from the left. The basis for Pareto analysis is the 80-20 rule 80 percent of the problems result from 20 percent of the causes.
Use
Because it organizes data to show what major factors cause the problem being analyzed, use the Pareto Chart to highlight the vital few, not the the trivial many.
Example
One day during their vacation, George and Betty strolled past a flower shop where exquisite daffodils were on display. Since Betty loves daffodils, she and George stopped to talk with the shop owner. He expressed concern that very few of his daffodil bulbs had survived long enough to bloom. Aha! thought George and Betty. Heres a chance for some Sprint Quality problem solving! The shop owner explained that there are three reasons for failed blooms too much water, too little water or a rare plant disease called daffodilli killi. But I dont know which of these is causing the most problems, explained the shop owner, so I dont know which one to correct. George and Betty went to the garden and examined all of the daffodil bulbs that hadnt bloomed. After determining which problem killed each bulb, they created the Pareto Chart on the next page.
60 50 40
N = 68 bulbs
25%
0%
Problems
The Pareto Chart showed that too much water represented 87% of the overall problem.
Steps
1. Define categories (defects by shift, location, type, etc.) and sort the data into the categories. 2. If possible, further stratify the data. (Shift may be broken down into day, night, and graveyard.) 3. Make a Bar Graph with the bars ordered in decreasing frequency from the left. Verify that the following items are done: Bars touching. Cumulative line from zero. Left axis for actual data. Right axis for percentage of total. 4. Check the chart for the Pareto pattern. A flat Pareto (i.e., categories with similar percentages) may indicate the need for different stratification of data. Or, a flat Pareto Chart may indicate that no special causes of variation are present.
Note: If an other category is used, this is placed last (farthest to the
right) on the Pareto. The rule for the other category is that it should not be larger than any of the labeled bars on the Pareto.
78 The Sprint Quality Handbook
Process Indicators
Process Indicators are in-process measures of conformance to process requirements.
Use
Process indicators determine if a process is on track to meet the target of an end-of-process indicator. Process indicators help signal whether Valid Customer Requirements will be met.
Example
Must book tickets by 2/97. Must plan activities by 5/97. Must pack by 7/10/97. This will meet the Quality Indicator of Completely prepared for vacation on 7/11/97.
Frequently, Process Indicators are dates by which you must complete certain processes. For example, if an end-of-process indicator is to produce bills on time, then Process Indicators are specific times and dates by which certain jobs in the billing process must be completed.
Quality Indicators
Quality Indicators (often called end-of-process indicators) are measures of how well the customers needs and reasonable expectations are being met. They measure conformance to valid requirements.
Use
Select Quality Indicators and establish the current status (baseline). Improve the indicator by improving specific processes. When conformance to Valid Customer Requirements is above 80%, you should then focus on nonconformance to aid your improvement efforts. By focusing on nonconformance, you maintain constant pressure to improve. When measurements show that you have attained 95.6% goodness, there is less motivation to improve than if your measure shows that at 95.6% you still have 7,522 defects per month. Your focus must be on eliminating the 7000+ defects (assuming that it is cost-effective and adds value for the customer to do so), not on how good you are.
Example
For George and Betty, examples of their Quality Indicators are: Variance from budget. Overall satisfaction with vacation. Amount of knowledge gained. Degree of improvement over last vacation.
Scatter Diagram
A Scatter Diagram shows the relationship between two variables (for example: speed and gas consumption, hours worked and production output). It provides an easy way to analyze data. A Scatter Diagram clearly shows if there is a correlation between two variables:
Positive correlation: as X increases, so does Y. Negative correlation: as X increases, Y decreases. No correlation: one quantity has no particular relation to the other.
Use
Scatter Diagrams are typically used to verify a root cause theory.
Examples of Scatter Diagrams
Example 1
Example 2
Y N = 31
N = 42
Example 3
N = 72
Steps
1. Collect at least 30 pairs of data (X and Y) or at least enough to observe a significantly long trend. 2. Find the lowest and highest values for X and Y. Determine the scales for the axes. (Try to have between three and 10 graduations.) 3. Arrange the axes so the suspected driving factor (independent variable) is on the X-axis and the one influenced by it (the dependent variable) is on the Y-axis. 4. Plot the data on the chart point by point. Be sure to complete the chart with the title, dates, places, etc. 5. Identify the degree of correlation between the two variables by observing the pattern formed by the points.
Sigma
Sigma is a measure of the capability of a process to produce perfect work. A defect is any mistake that results in customer dissatisfaction. Sigma indicates how often defects are likely to occur. The higher the Sigma level, the lower the defect rate. The lower the defect rate, the higher the quality. The mean (average) value of a distribution is usually designed to be as close as possible to what the customer requires. One measure of variation around the mean is standard deviation or Sigma. By mathematical derivation, 68.26% (about two-thirds) of a normal distribution will be within the first standard deviation (1 Sigma; see chart below); 95.44% will be within 2 Sigma; etc. This relation is used to express the number of defects expected in the products of a process. In a one Sigma process, 32% of the output would be defective. In a two Sigma process, 5% of the output would be defective. In a six Sigma process, only .0000002% of the output would be defective.
= Sigma
-6
-5
-4
-3
-2
+1
+2
+3
+4
+5
+6
95.44% of all items 99.73% of all items 99.9937% of all items 99.999943% of all items 99.9999998% of all items
Taking the natural variation of even well-controlled processes into account, we define a six Sigma process as one that is 99.99966% defect-free. This means that a six Sigma process generates 3.4 defects per million opportunities.
Use
Helps compare different products and services on an apples to apples basis. Provides a common basis for benchmarking between Sprint and others. Measures how well an operation is performing. The higher the Sigma level, the better the performance. (Also see Standard Deviation in this section.)
This table shows that for any level of defect occurrence, there is a mathematically associated Sigma level.
Number of Defects Per Million Opportunities for Error Associated Sigma Level
66,810 38,950 22,750 11,870 6,210 2,890 1,350 560 233 86 32 10.5
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50 5.75
3.4 6.00 Note that the magnitude of improvement is not linear between Sigma levels: 3 Sigma to 4 Sigma requires a 10-times improvement. 4 Sigma to 5 Sigma requires a 30-times improvement. 5 Sigma to 6 Sigma requires a 70-times improvement.
Standard Deviation
Standard Deviation is a measure of how close data come to the mean (average). Standard Deviation is represented by (Sigma).
Use
Use Standard Deviation to summarize and/or compare certain characteristics of data. Use it to construct a Control Chart to determine the upper and lower control limits of a process. Use it also as part of the checking stage in the PDCA cycle after you have gathered the data.
Steps
1. Start with a group of data. 2. Compute the mean (X). 3. From each data point (x1, x2, .....xN), subtract the value of the mean (X). 4. Square each of these values and add together. 5. Divide by the number of data points less one (N-1). 6. Take the square root of this result. This is the Standard Deviation for this group of data.
{(x1-X)2+(x2-X)2+...(xN-X)2}
(N-1)
N = number of data points
Targets
Targets are milestones, places of evaluation on the way to accomplishing a larger goal.
Example
Indicator Target
Target
Plan next vacation four months in advance. For next vacation, take two suitcases and two carry-ons. For next vacation, save enough money to stay 21/2 weeks.
Goal
Goal
Plan vacation six months in advance. Take one suitcase and two carry-ons. Save enough money to stay three weeks.
Steps
Targets should be challenging but achievable during a reasonable amount of time normally not more than a year. In setting Targets: 1. Consider the needs and reasonable expectations of the customer. If the customers needs are not immediately achievable, they should be kept as an ultimate goal. 2. Consider the performance of similar operations or competitors. Compare this Target to your present performance to see if it is achievable. If not, it may become a goal. Set interim Targets to ultimately achieve this goal. 3. Past performance can be used to set a Target. If your performance was once significantly better, set that as a Target and discover what has changed to make performance worse. 4. Set a Target by analyzing processes for waste. For example, if you break a process down into its components (i.e., processing, reviewing, shipping and waiting), you could try to reduce the waiting time, since it may not be necessary to the process.
Use
As a supplier, negotiate the Valid Customer Requirements with your customers. Start by asking them to identify their needs and desires. Through questioning and consensus, agree on those requirements they need and can reasonably expect. Once established, the Valid Customer Requirements serve as a goal for producing quality products and services.
Use
It can reduce the amount of time needed to develop a plan by allowing changes to be made easily during early planning stages. Use the Activity Network Diagram to establish a finely tuned plan. It can also help you to recognize dependencies or conflicts quickly, and adjust accordingly.
Example
George and Betty created an Activity Network Diagram to schedule their vacation plans.
1 Choose vacation site and date 1 week 2/97
Research: library , bookstores, Internet, travel agencies, ask others 3/97 1 month 4/97
8 1 week
Pack 7/97
Steps
1. Record all of the tasks necessary to complete the plan. This list could come from a Tree Diagram or a Brainstorming session. 2. Write each task in the upper right-hand portion of a job card.
Job Card Example:
3. Arrange the job cards in sequential and parallel order. Ask: Which tasks must be completed before this task? Which tasks can be completed while this task is being completed? A. Remove duplicate cards or add new ones as necessary. B. When the cards are arranged, assign each task a number and write it on the job card. C. Draw arrows from each job card to the one immediately following it. 4. Estimate how long it will take to complete each job. 5. Record the estimated time to complete each task on the bottom-left of the job card (Duration). 6. Determine the critical path by finding which path has the longest completion time from start to finish. This tells you how long it will take to complete the project. 7. Beginning at the start node, calculate the earliest start time (EST) for each task, given its predecessors. Write the EST number on the job card. 8. Beginning at the end node, determine the latest start time (LST) each task could be started to still finish the project on schedule. Write that number below the EST. 9. Schedule dates for final plan.
Affinity Diagram
An Affinity Diagram is a collection of ideas and/or issues organized into related groups for analysis.
Use
It aids in decision-making.
Determined to make their vacation a success, Betty and George brainThey organized their responses into an Affinity Diagram.
Service
Better hotel service
Example how we can make this vacation better than last years. stormed on
Travel Preparation
Bring something to do if it rains
Site Planning
Go someplace with better climate; not so hot
Personal Attitudes
Fight less
Stay healthy
Pack less
Steps
1. Choose a recorder. 2. Write the problem or issue on a flip chart. All members should agree on this statement before the group proceeds. 3. Generate ideas about the problem or issue by open discussion, brainstorming or generating ideas silently. If you discuss or brainstorm, write down members responses as stated (one per sticky note or index card). Members should write their own responses if they generate ideas silently. 4. Put the sticky notes onto the wall or flip chart in any order. If you are using index cards, spread them out on a table. 5. Silently, team members should move similar sticky notes/index cards into clusters. Move a response as many times as necessary until you find a permanent home for it. A cluster may have only one item in it. Collect items that do not fit into any clusters and form a miscellaneous cluster. 6. Label each cluster with a header card through team discussion. The label can be one of the responses in the cluster, but it does not have to be. Once clusters are labeled, the team should review the items in the miscellaneous cluster to determine if they fit within an identified group. 7. Identify clusters. If you are using sticky notes, draw a circle around each cluster. If you are using index cards, tape the clusters to the flip chart paper, and then draw a circle around each cluster. 8. Discuss each cluster, its individual items and the relationship of the clusters to the problem to gain a better understanding of the issues and plan future steps.
1 Leadership
7 Business Results
6 Process Management
Benchmarking
Benchmarking is the process of searching for the best methods and processes, learning about them and using that knowledge to improve your own processes.
Use
Use Benchmarking as part of process improvement. Examine the practices of companies that perform at higher levels than Sprint. Benchmarking can be conducted within the same industry, but sometimes the most innovative improvements result from studying completely different industries. Benchmarking allows organizations to: See a need for change (compare company performance to other companies performance). Develop a vision for the future (and understand operations within those other companies). Know what needs to be changed (adapt practices from those companies exhibiting higher performance).
Sprint Benchmarking
Develop Action Plans Implement and monitor Focus on continuous improvement Determine what process to study Understand own process, measurements and current performance Plan Benchmarking project
A
Determine performance gap and goals (current and future) Identify enabling practices Select and recommend improvements
P D
The Benchmarking code of conduct is used by many high-performing companies to ensure a mutually beneficial relationship between the organizations involved in the Benchmarking.
Rules for Benchmarking Legality Avoid discussions or actions that might lead to or imply
you request.
Confidentiality Treat interchanges as something confidential to the
companies themselves.
Contact Make contacts through proper channels. Preparation Be prepared at each step in the Benchmarking process, particularly at initial company contact.
More
Sprint has a corporate Benchmarking office that serves as the Benchmarking educational, consulting and coordinating resource for the entire company. If you wish to learn more about pursuing Sprint Benchmarking or if you are being contacted about participating in Benchmarking, contact the corporate Benchmarking office for information and assistance.
Note: It is highly recommended that Sprint management and associates
contact the Benchmarking department before contacting any external company. Benchmarking with external companies requires substantial preparation and coordination to gain the desired results.
Brown Paper
A Brown Paper is a flowchart technique. Teams draw a process on large paper that is taped to a wall. Then they review and change the process to make it operate as effectively as possible.
Use
The Brown Paper technique is used to: Document steps, forms, interfaces, tools, decision points and information sources of a process. Show the big picture: the forest and the trees. Improve understanding of a process. Train people. Encourage participation and feedback. Define conditions such as: As is (actual process in use today). Should be (improved process). Could be (ideal process).
Steps
1. Assemble the people who perform the process. 2. Identify one stream of activity and flow it from start to finish. (Its confusing to try to understand and document several different flows at once.) 3. Gather facts: ask why and evaluate the information after the Brown Paper is complete. 4. Understand that different people often perform the same process differently try to incorporate all ways of performing the process.
5. Ask questions to cover all areas: What high-level processes do we perform? What causes the process to begin? How do we perform the processes? Where does the service or material come from? To whom do we send materials or provide service? When do we do this? What decisions do we make? What forms do we use? 6. Start process steps with an action verb. 7. Each time the process can split into more than one path, document how often each path is taken.
More
Here are some additional tips for creating an effective Brown Paper: Place paper pieces 6"- 8" apart because: Theyre easier to read. Details might be forgotten and will need to be added later. Feedback from others is encouraged and comments can be added. Flow in a horizontal direction. Use different colors of markers for short alternative paths. Do not draw flow arrows until the Brown Paper is finished. Post in a public area and encourage comments.
Checklist
A Checklist (as opposed to a Check Sheet) is a list of items that need attention or steps that need action. For example: the QI Story Review Form is a Checklist for the QI Story process.
Use
You can use a technique such as Brainstorming to generate a good list.
Example
Recalling how annoying it was to arrive with no toothpaste or mascara, Betty made a Checklist of her toiletries to pack.
Pack the Following Completed
1. Toothbrush 2. Toothpaste 3. Contacts 4. Contact solution 5. Face soap 6. Razor 7. Shampoo 8. Conditioner 9. Comb 10. Brush 11. Makeup
Control System
A Control System combines a process flow chart (see Flowcharts) with information such as measurements, responsibilities, time, standards or procedures, etc.
Use
Use a Control System to document procedures. Make entries corresponding to the appropriate steps and decision points. Each entry describes a Process Indicator (P1, P2, etc.) or a Quality Indicator (QI1, QI2, etc.).
Example
For a more detailed layout of their process for researching Sprintsville Beach, George and Betty created a Control System.
Step George and Betty Library Bookstore Travel Agency
START
2
NO
Need to buy?
Complete research
QI1, QI2
Make reservations
Process Indicator
Limit or Target
Criteria
Frequency
Responsibility
$40
Total spent
Per vacation
Summarize checkbook
$0
Daily
1 per day
30 days
Flowcharts
Flowcharts are graphic representations of a process that show how it proceeds.
Use
Flowcharts help you: Identify how, when, or where to measure an existing process to see if it complies with valid requirements. Document or describe an existing process. Develop modifications to an existing process or investigate where problems might occur. Design an entirely new process. Think of a Flowchart as a map of steps for completing a task or job. Specific symbols are used to indicate certain activities:
Oval Line or Arrow Square or Rectangle Diamond
or
Triangle
Document
Continuation
Continuation
A
Indicates establishment of file and process of filing something; identify different files with letters Indicates documents and number of copies Means continued on same page
1
Means continued on other page
START
YES
Check on prices
END
NO
YES
NO
YES
Steps
1. Identify the department and define the process to be flowcharted. 2. Determine where the process begins and who starts the process. If others participate in the process, arrange for them to be interviewed. 3. Identify and list process steps, extending detail at this time only to the level needed for understanding. 4. Continue and complete all steps of the process. 5. Use a draft Flowchart for review and corrections, if needed. The final Flowchart may be used for improvements to the system. Draw a Flowchart of the improved process for future use.
More
Flowchart Variations
Some variations of Flowcharts are Brown Papers, Control Systems, Process Flowcharts and Task-on-Arrow diagrams. A Process Flowchart indicates who or what department is responsible for each step. Headings for each department are located across the top of the page. Time is represented by the process steps, shown running down the left-hand side of the flowchart. The process flows from left to right and from top to bottom.
Below is a flowchart showing the process George and Betty used to select Sprintsville Beach as their vacation destination.
Step George and Betty Library Bookstore Travel Agency
START
YES
2
NO
Need to buy?
Purchase books
Complete research
Make reservations
Note: See Brown Paper, Control System and Task-on-Arrow for more
information.
The Sprint Quality Handbook 107
Interrelationship Diagram
An Interrelationship Diagram is a creative process that shows how every idea can be logically linked with more than one other idea at a time. It takes a central idea, issue, or problem and maps out sequential links among related items.
Use
Use the Interrelationship Diagram to develop policies, implement improvements, promote group activities, rework departmental processes, etc.
Example
An Affinity Diagram helped George and Betty answer the question What would make this years vacation better? but they also wanted to find out the key cause-and-effect factors for creating a better vacation. To do that, they created an Interrelationship Diagram.
3/3 Personal Attitudes 2/2 Travel Preparation
How can we make this years vacation better than last years?
3/2 Service
After studying their diagram, George and Betty discovered that site planning was the key cause of their past horrible vacation, and personal attitudes was the key effect.
Steps
1. After generating an Affinity Diagram, place the problem or issue in the middle of a flip chart, drawing a double-lined circle around the problem. 2. Arrange the header cards from the Affinity Diagram in a circle around the problem. 3. Draw an arrow connecting related ideas. The idea with the arrow pointing to it is the effect, and the idea with the arrow pointing away from it is the cause. 4. Once all cause-and-effect relationships have been established, count the number of arrows pointing away from and toward each card. Place these numbers on top of the idea card (i.e., number away/number toward). 5. Identify the key cause by determining the idea card with the most arrows pointing away from it. Draw a double box around this idea card. 6. Identify the key effect by determining the idea card with the most arrows pointing toward it. 7. Figure out the sequence of intermediate causes between the key causal and key effect factors.
More
To create variations of an Interrelationship diagram: Construct an Interrelationship Diagram using one header card from the Affinity Diagram and the cards listed under it. This method focuses the Interrelationship Diagram on the relationships between the ideas that comprise one of the basic building blocks of the problem. You may want to Brainstorm for more ideas to fill in any gaps about the problem. Construct an Interrelationship Diagram using all the cards from the Affinity Diagram. This method focuses the Interrelationship Diagram on all aspects of the problem, although it may yield a cumbersome diagram because of the number of items involved. Use a problem statement from a source other than an Affinity Diagram. If you use this method, you will need to Brainstorm for ideas related to the problem statement and write them on individual cards/sticky notes. Use these ideas to construct the Interrelationship Diagram.
Ishikawa Diagram
(Cause-and-Effect or Fishbone)
An Ishikawa Diagram (also known as a Cause-and-Effect Diagram or a Fishbone Diagram) is a picture composed of lines and words designed to show a meaningful relationship between an effect and its causes. This tool is often used after you have constructed a Pareto Chart to better define a problem area.
Use
This tool helps you identify a problems root causes so that you can take corrective action.
B A
Effect
D C
Example:
To avoid making the same mistakes again, George and Betty analyzed their last vacation to see what went wrong. To help them determine root causes, they constructed an Ishikawa Diagram.
Methods
Poor hotel service We chose poorly Not enough research into lodgings George got sick Drank contaminated water
Tired/irritable
People
Fought all the time
Disagreed on what to do Not enough time to prepare Didnt discuss expectations beforehand
Too hot Delayed flights Didnt bring right clothes Didnt check weather Plane malfunctions Didnt know wed need one No car
Environment
Machines
Materials
Steps
1. Draw the Ishikawa Diagram. Starting at the right, build the major categories (bones) toward the left. 2. Write the problem statement in the head box of the Ishikawa Diagram. 3. Determine the major categories of the Ishikawa Diagram that relate to the effect. Here are three ways to determine the categories: A. Review the generic categories of: People Methods Machines Materials Environment Match them, if possible, with major contributors to the problem. For example, George and Betty wanted to figure out the root causes for last years unsatisfactory vacation, so they used transportation, the weather and the other examples shown below as the major bones of their Fishbone:
Generic Categories: Major Contributors:
B. Break down the process into its major activities by creating a Flowchart. Then assign each activity a major bone. C. Brainstorm possible causes of the problem. Review in detail at least one instance of the problem. Be sure to understand how it occurred and what the situation was when it occurred. After generating the list, segment the ideas into major categories and use as major bones.
Note: Before attempting to draw the actual Ishikawa Diagram, it
is helpful to use Brainstorming techniques and record the feedback on flip charts. This method frequently reduces rework.
4. Prioritize the major categories in descending order, beginning with the category that has the highest likelihood of producing a root cause. Position the categories with the highest priority closest to the effect.
B A
Effect
D C
In the Ishikawa Diagram with four major categories or bones shown above, the prioritization order would be A, C, B, D. (A is the major bone aligned most closely to the head of the fish, followed by C, B and D.) 5. Once you establish the major categories, begin with the category youve identified as most likely to produce the actionable root cause (the category aligned most closely to the head of the fish) and begin to ask why: Why does this occur? Why does this condition exist? Show the answers to these why questions as smaller bones off the main bone. Try to break each bone into at least five sub-bones to get to the root of the problem.
Be sure to check the logic of your diagram in both directions, as shown below. (Item a1 is caused by a2, which is caused by a3. Then, in reverse, a3 caused a2, which caused a1.) Errors in logic often will not surface until you try the second direction.
B
a1 a2 a3 a4 a5
Effect
Now revisit each sub-bone for additional causes; move back to a2 and ask again, Why does a2 occur? Next, ask, Why does a1 occur? Continue this process of asking why back to the major bone. 6. Complete the entire Ishikawa Diagram before moving to the next step. 7. Identify the likely, actionable root cause(s) and circle (or cloud) the last element in the chain. 8. Collect data to verify the most likely root cause.
Transportation problems
Delayed flights No car
Too hot
Didnt bring right clothes
Alternative Ishikawa Diagramming Process Chart A flip chart for the category of fought all the time.
Tired/irritable
Disageed on what to do
Levels of Quality
We can think of quality as consisting of three levels that, when combined, determine the degree to which an organization can achieve performance excellence. The three levels are:
Organizational Quality where top management identifies the traits required to be competitive, determines an appropriate strategy and establishes the necessary policies, budgets, goals and measures. Process Quality where service is produced, including design,
COMPONENTS
Establish Organization Strategy Describe Operational System
OUTPUTS
Vision & Mission Statements Objectives Based on Customer Requirements Organizational Chart Key Responsibilities/Job Descriptions (Led by your senior level management) Process Identification and Assessment Process/Subprocess Owners Established Improvement Opportunities Ranking Process Improvement Teams
As is Process Assessment Improving Opportunity and Appropriate Methodology Selection Business Review Document/QI Stories Business Review Meetings Measurements Documented Standards (Led by your middle management) Job Responsibility/Process Matrix Job Responsibility/Standards Performance Expectations Employee Performance Measures Management Support Performance Assessment Development Plan Performance Improvement Resource Monitoring System Appropriate Budget Performance Monitoring System Performance Review Employee Survey Action Plans Assessment Career Development Plan
Communicate Expectations
Provide Resources
Provide Feedback
Matrix Diagram
A Matrix Diagram is a chart that helps identify the most important items within a large quantity of information.
Use
Use the Matrix Diagram to clarify responsibilities and to identify priorities for improvements.
Example
One part of their last vacation that George and Betty particularly disliked was the number of fights they had. To figure out what they could do to reduce disagreements, they constructed a Matrix Diagram.
Friends Travel Agent Betty George Problem Major Causes Details Assignable Tasks Ask travel agent
Didnt discuss expectations beforehand Disagreed on which activities to do Research areas activities Bring guidebook
Library
Bookstores
Steps
1. Select a problem or issue. 2. Identify the specific issues and their interrelationships that you will study. 3. Decide on the matrix format. 4. Place details about the issues on the Matrix Diagram so that they form the axes of the matrix. (These may come from Tree Diagrams.) 5. Draw in the lines of the matrix. 6. Determine the symbols you will use to illustrate relationships. Include a legend of the symbols on the Matrix Diagram. The most common symbols used to depict functional responsibilities are: Primary Responsibility Secondary Responsibility Tertiary Responsibility The most common symbols used to depict relationships between quality characteristics are: Extremely Important Important Less Important 7. Enter the appropriate symbol in each cell of the Matrix Diagram. The symbol should describe the nature of the relationship between the idea on the horizontal axis and the idea on the vertical axis. 8. Analyze the matrix by: Studying and understanding the relationships between the problems. Locating and plugging any holes between the issues being studied.
Example
After George and Betty created their Ishikawa Diagram and figured out the root causes of their terrible vacation last year, they wanted to pin down specific actions to make this years vacation better. To help themselves decide which improvements to make, they constructed a Potential Improvements Matrix.
Practical Methods Potential Improvement
Get more sleep Take nap during day
Root Cause
Low energy made us cranky
Go to sleep earlier
Problem
Had a horrible vacation
After studying their Potential Improvements Matrix, George and Betty decided to go to sleep earlier and start planning the vacation six months in advance.
Effectiveness
Feasibility
Effectiveness x Feasibility
Action
15
25
12
25
Steps
1. After verifying the significant root causes, fill in the first two columns of the matrix (problem and root cause). 2. Next, identify potential improvements that address each of the root causes. 3. In the practical methods column, list specific tasks to accomplish the potential improvement. 4. Consider the likely effectiveness and feasibility of each potential improvement and rate it accordingly. Assign higher ratings to those potential improvements that are more effective and more feasible. 5. Multiply the ratings and rank the potential improvements for implementation. 6. Determine how many of the potential improvements should be implemented. They should be within your resources and allow you to achieve your target. 7. Write yes or no in the action column to indicate if the potential improvement will be implemented.
Note: When determining the ratings for effectiveness and feasibility, it
helps to come to Consensus on the ratings rather than using an average of each participants ratings.
Prioritization Matrix
A Prioritization Matrix helps evaluate several alternatives based on three or more quality dimensions.
Example
George and Betty researched several hotels in the Sprintsville Beach area. To help choose where to stay, they created a Prioritization Matrix.
Alternatives
Quality Dimensions A. Price Sand N Surf Motel 3 Quality Resort 4 Stopawhile Inn 5 Beachhead Resort 2
D. Room Size
108
2000
30
800
After looking at each hotels score, George and Betty decided to stay at the Quality Resort.
Steps
1. Identify the quality dimensions that are important. 2. Describe an ideal item that would satisfy these quality dimensions. 3. Rate the alternatives against each of the specified quality dimensions using a scale of 1 to 5, with 5 being closest to ideal. Do this by collecting actual data if it exists or by rating the alternatives subjectively. 4. Summarize the data in a table. 5. Compute an overall score by multiplying individual ratings down the columns. For an alternate display of the information, plot the data from the Prioritization Matrix. With spokes representing the quality dimensions, plot each of the alternatives score and connect the dots. (See next page for an example.)
Example
For an alternate display of their Prioritization Matrix, George and Betty constructed a plot of the hotel data they had compiled.
A E
B
D
Criteria A. Price B. Proximity to Beach C. Service Reputation D. Room Size E. Variety of Activities Offered
C
Hotel Sand N Surf Motel Quality Resort Stopawhile Inn Beachhead Resort
George and Betty knew that an ideal Prioritization Matrix Plot would show a line hitting the outer end of all five spokes of the plot. The Quality Resort came the closest to resembling this ideal.
Prioritization Matrix: The dimensions are independent of each other. The dimensions are equally important to the problem under study. It is possible to describe an ideal item with respect to the dimensions under study.
Problem Statement
A Problem Statement defines a problem using facts and data. It describes the present undesirable situation in specific, concrete terms. A good Problem Statement includes the following: It states the effect. It states what is wrong and defines the actual problem rather than the symptoms. It focuses on the gap between what is and what should be. The gap may be a deviation from the standard or the customers expectation. It is measurable. It says how often, how much and when. It is specific. It avoids ambiguous words like some, sometimes, a few, many, etc. It is a statement. It does not pose problems as questions. It focuses on the pain. The Problem Statement highlights areas of discomfort, hurt or annoyance.
Example
To make sure they improve this years vacation, George and Betty developed some Problem Statements about their dissatisfaction with last years vacation.
Last years vacation resulted in our feeling that we were rushed, overpacked, poorly informed about the areas activities, and we booked reservations at a shoddy hotel. On last years vacation, our wallets were stolen and we lost $500.
Use a Problem Statement Checklist to evaluate Problem Statements. Problem Statements do not need to meet all six categories, but the more categories each potential Problem Statement meets, the clearer it is likely to be.
Problem Statement It asks Who, What, When, Where - but NOT Why. (A) (B) (C) (D) (E) (F)
It focuses on It is specific It is stated It is the gap avoids avoids measurable. between what ambiguous questions. is and what words. should be.
Process
A Process is a sequence of activities using specific inputs to produce desired outputs. Processes involve one or more of these components: People Machines (tools, equipment, PCs, etc.) Methods (procedures, policies, technology, etc.) Materials (forms, software, wire, etc.) Environment Process analysis is the study of a process to identify and understand its inputs, components and outputs. Process capability is a measure of the ability of a process to produce a consistent product or service. A Process owner is an individual who, using a team approach, coordinates a process and is ultimately accountable for its effectiveness.
Use
You can use a Process Block Diagram to: Break a complex process down into subprocesses for more manageable analysis. Give a big picture view of how processes fit together. Trace various paths that materials and information can take from supplier input to final output. Show the hand-off points between sub-processes. Establish process ownership.
Example
George and Betty have made a final decision to stay at the Quality Resort in Sprintsville Beach. They made a Process Block Diagram for the travel reservation process:
Make Plane and Hotel Reservations
George and Betty Travel Agent Airline Agent Hotel Agent
Call travel agent; give dates for travel and hotel stay
Steps
1. Getting Started Questions to keep in mind: What activity triggers the process? What major job activities are performed? What other organizations are involved? Who owns those pieces of the process? What products or services are you accountable for? What are the activities you perform to produce these products or services? 2. Process Naming Use the verb-noun format. Avoid the words for, in, or with. (These may show goals or objectives.) Example: Reserve Rooms Use present tense verbs. Dont use -ing, -tion, or -ment. (These may show function rather than process.) Avoid multiple verbs and nouns joined by and or or. (These may indicate hidden sub-processes.) Identify what is being performed, not how or why.
Use
The PDPC can be used to set up LINK objectives, map out contingencies, plan projects or implement improvements.
Example
To investigate and prepare for problems that could arise during their vacation, George and Betty constructed a Process Decision Program Chart:
Cant agree Choose vacation site All sites already full
Star t discussing sites early
Cant get time off work Make basic choices Choose vacation date Planning a vacation Research Will choose same date as everyone else crowds Make arrangements for absence All hotels already full Develop budget Choose hotel Wont be able to find quality hotel in site area
Go to site with many hotels to choose from
Steps
1. Lay out the basic flow of planned activities using a Tree Diagram. 2. Working with each branch of the Tree Diagram and starting with the left-most item, Brainstorm the answer to What are the potential problems that could arise while completing this action item? 3. Record the problems on a new set of branches on the right side of the Tree Diagram. 4. Brainstorm causes for each problem. Add these to the diagram. 5. When you have broken down the problems into root causes, Brainstorm contingency plans for each of them. Record the contingency plans opposite the appropriate spot on the Tree Diagram. Enclose the contingency plans in small clouds. 6. Continue in this manner, moving to the right, until you have analyzed all branches of the Tree Diagram.
Use
The Process Decomposition Diagram is used to: Break down a complex process for easier analysis. Give a big picture view of how processes fit together. Provide a foundation for process ownership.
Example
When Betty expressed interest in the Quality Resorts process of providing lodging, the part-time desk clerk, who was studying quality in college, used a Tree Diagram to draw up a Process Decomposition Diagram for her.
Tier 1 Process Tier 2 Process
Book room reservations
Tier 3 Process
Bill customers
Provide lodging
Housekeeping staff
Activities staff
Beach staff
Steps
1. Getting Started Questions to keep in mind: What is your assigned purpose? What major job activities do you perform? What are your major roles and responsibilities? What products or services are you accountable for? What are the activities you perform to produce these products or services? 2. Process Naming Decompose to the lowest economical level that establishes accountability, responsibility and control. You probably will not need to identify elementary processes such as open the mail or turn on the computer.
Remember:
Decomposition Diagrams depict hierarchy not sequence, decision matrices or organization charts. Follow the 5-to-9 guideline: Normally, a process should not be decomposed into more than nine sub-processes or less than five sub-processes. Avoid one-to-one relationships. If a process has multiple sets of procedures, then multiple subprocesses may exist. If a process has one procedure step, then the process has been decomposed too much.
Process Improvement
Process Improvement is a systematic way to analyze and improve Sprints processes, thereby improving the way Sprint operates. See Levels of Quality in this handbook for an approach to Process Improvement.
Use
Process Improvement helps: Reduce time devoted to crisis management and fire-fighting. Clarify work priorities. Eliminate rework and complexity. Identify and remove root causes. Process Improvement addresses: How a process does work. How a process should work. Unnecessary steps and errors. Variation in inputs and outputs. Process Improvement will improve: Customer Satisfaction Effectiveness Efficiency Morale Adaptability Process Improvement will reduce: Cost Cycle Time Variation Bureaucracy
Senior management selects high-level, high-impact processes that affect customers and the business and that need to be improved. Senior management selects these processes using a type of process selection matrix that consists of: Customer Impact Willingness to Change Current Performance Business Impact Cost of Nonconformance Organizations should consider quality issues not only in their own work areas, but also throughout all areas covered by the process. They should also be familiar with the three levels of quality shown below. Organizational Process Individual Before you can improve a process, you must bring it into control. Control Charts provide an excellent tool for observing the state of a process. If the process is out of control, you should form teams to solve the problems that are responsible for the special causes those points that fall outside the upper and lower control limits (or which indicate a special cause pattern) on a Control Chart. Challenge or quality teams could tackle these special causes.
If the process is in control, the next question is: Is the process producing the desired output? A process may be in control but still may not provide the output desired by the customer. For example, Cycle Time may be in control but may take too long for a particular customer. Or, defects may be in control but may be too great to meet the Valid Customer Requirements. At this point, form teams to perform Process Improvement (vs. problem solving). There is a small but significant distinction here: Problem solving works to eliminate the special causes of variation, while Process Improvement works to improve a process that has no special cause variation, only common cause variation.
Process Maturity
Process Maturity is a tool that helps processes become more stable and reliable. Process Maturity provides a foundation for continuous quality improvement.
Use
The Process Maturity Measurement Model is used to analyze the status of a process and the level of user knowledge about that process. The model: Identifies process accountability, ownership and responsibility. Sets the grounds for measurement. The Process Maturity model has five levels: Level 1 Level 2 Level 3 Level 4 Level 5 Initial Repeatable Defined Managed Optimized
The five levels and their characteristics are shown in the figure on the next page. The steps required to move to higher levels of Process Maturity are described in Process Workbench.
Developed by Watts Humphrey at Carnegie Mellon University, Software Engineering Institute, for the Department of Defense Level 2 - Repeatable Unstable but can repeat previously mastered tasks.
Formalize procedures.
Level Characteristics
IN
Identify roles and responsibilities.
CR
I AS
NG
C RO
ES
AB ST
IL
IT
Process Workbench
A Process Workbench is a tool for: Analyzing and documenting processes. Negotiating Valid Customer Requirements. Determining vendor/supplier requirements. Defining roles and responsibilities. Defining standards, procedures and measurements for quality control.
Use
There are three views of the Process Workbench to consider: the customers view, the suppliers view and the producers view. The customer views the Process Workbench from the output side (right side of the diagram). Exit criteria define the quality of the output in measurable terms based on the Valid Customer Requirements. The supplier views the Process Workbench from the input side (left side of the diagram). Entrance criteria define the required quality of the input in measurable terms. This is how the supplier knows what is required of his or her organization. The producer views the Process Workbench from the inside. This person produces the end product or the output. Work procedures inform the producer about: Receiving input from the supplier(s) Verifying the quality of input using the entrance criteria Rejecting input that fails to pass the entrance criteria Converting the input into the desired output, including which tools to use and when Verifying the quality of output using the exit criteria (standards) Reworking or otherwise properly handling output that fails to pass verification Delivering output to the customer(s)
The steps of the procedure need to be detailed enough to identify all the tasks required by the process, but not detailed to the extent of defining every technical task.
Example
George and Betty wondered whether they had covered every aspect of the research process to find out what types of activities Sprintsville Beach has to offer. To help them fully define their process, they created a Process Workbench.
Process Name: Researching activities at Sprintsville Beach Process Purpose: To identify activities Process Owners: George and Betty Producers: George and Betty Last Updated: 3/15/97 By: George and Betty
REJECT
REWORK
Work Procedures
Tools Suppliers: 1. Library 2. Bookstores 3. Internet 4. Travel agency 5. Other people Process Indicators: 1. PI1 Number of books that provide useful info 2. PI2 Money spent on travel books 3. PI3 Time spent researching Inputs: 1. Destination 2. Budget 3. Expectations 4. Time schedule Outputs: 1. Activities
Entrance Criteria: 1. Destination one where both George and Betty want to go 2. Budget not in excess of vacation savings 3. Expectations clearly expressed 4. Time schedule fits work vacation schedule Standards: 1. Total spending is less than or equal to budget 2. Rating on vacation compared to last year Tools: 1. Books 2. Itineraries 3. Brochures 4. Surveys Required Quality Attributes: 1. Effectiveness 2. Satisfaction 3. Timeliness
Customer View
Producer View
Inputs:
Outputs:
Step 1 Identify process name, purpose, producer and owner. Step 2 Identify outputs. Step 3 Identify inputs.
mastered tasks.
Components:
Step 1 Identify customers (recipients of output). Step 2 Identify suppliers (providers of input). Step 3 Identify as is process flow (steps, sequence, decision points, alternate paths and repetitive steps).
Note: Since Valid Customer Requirements concerning output have not
been negotiated at this point, costly rework may become part of the process if and when the customer rejects output.
Inputs:
Work Procedures
Outputs:
Output requirements (exit criteria) as perceived by producer and input requirements (entrance criteria). Documentation of steps necessary (work procedures) to perform process, including any required tools.
reworked in work procedures by producer until criteria can be negotiated with supplier, which occurs in the Level 4 (Managed) process.
Step 1 Identify output requirements (exit criteria). Step 2 Identify input requirements (entrance criteria). Step 3 Document work procedures (including necessary tools to execute them) and communicate them to all who perform work procedures. Step 4 Train producers on following work procedures.
Note: Even though entrance criteria have been identified, they may not
have been negotiated or communicated to suppliers. Therefore, producer will probably do some rework as part of work procedures. Although exit criteria have been established by producer, they have not been negotiated with customer. As such, customer will return certain amount of output to producer for rework.
Inputs:
Work Procedures
Outputs:
Tools
Entrance Criteria:
Standards
Exit Criteria:
Exit criteria negotiated with customer. Standards developed from exit criteria to be measured against output. Process measurements developed to identify and record occurrences and conditions of defects and rework.
Step 1 Negotiate exit criteria with customer, establishing Valid Customer Requirements. (See Valid Customer Requirements.) Step 2 Develop product standards based on Valid Customer Requirements. Step 3 Using quality checkpoints within work procedures, identify and eliminate defects. Step 4 Enforce entrance criteria after negotiating with suppliers. Step 5 Return input to supplier if it does not meet entrance criteria. Step 6 Develop process measurements to identify and record occurrences and conditions of rework.
148 The Sprint Quality Handbook
Producer View
REJECT REWORK
Inputs:
Work Procedures
Outputs:
Tools
Standards
Exit Criteria:
Entrance Criteria:
Step 1 Implement continuous analysis of measurement data. Step 2 Use measurement data to determine root cause for rework. Step 3 Implement process improvements. Step 4 Use process and quality indicators to verify improvement.
QI Story Checklist
The Quality Improvement (QI) Story Checklist contains all of the steps, tools and checkpoints used in the QI Story.
Team Number
QI Story Checklist
Team Name: Problem Statement: QI Story Steps Tools/Techniques
(enter appropriate checkpoint no.)
Objective/Checkpoints
Comments
To identify general problem area and the reason for working on it.
1 Reason for Improvement
Brainstorming/ Multivoting Graph Control Chart Flow Chart Theme Selection Matrix Other
2 Problem Identification
Control Chart Histogram Graph Pareto Chart Checksheet Problem Statement Matrix Other Cause & Effect Analysis Histogram Graph Pareto Chart Scatter Diagram Checksheet Other
4 Potential Improvements
5 Verification
1. Management ownership of the process(es) was clearly established. 2. As Is process(es) were documented. 3. The criteria for selection were customer oriented. 4. The indicator correctly represented the theme. 5. The need for improvement was demonstrated using data. 6. A schedule for completing the QI Story steps was developed. To select a problem and set a target for improvement. 7. The situation was stratified to a component level specific enough to analyze. 8. Customer valid requirements were identified. 9. Problem statement addressed the gap between the current and targeted values. 10. The methodology in establishing goals/target was identified. To identify and verify the root causes of the problem. 11. Cause-and-effect analysis was performed on the problem. 12. Root causes were taken to an actionable level. 13. Root causes with probable greatest impact were selected. 14. Data was used to verify the problem. To plan and implement potential improvements that will correct the root causes of the problem. 15. Selected options attacked verified root causes. 16. Options were consistent with meeting customer valid requirements. 17. Options were cost beneficial. 18. Action plan answered who, what, when, where, & how. 19. Action plan reflected the Drivers & Restrainers necessary for successful implementation. To confirm that the problem and its root causes have been decreased and the target for improvement has been met. 20. Root causes have been reduced. 21. Tracking indicator was the same one used in Step 1. 22. Results met or exceeded target. (If not, cause was addressed.)
6 Full Implementation
To prevent the problem and its root causes from recurring. 23. Method to assure solution becomes part of daily work was developed (include applicable training). 24. Periodic checks were put in place with assigned responsibility to monitor the solution. 25. Specific areas for replication were considered. To plan what to do about any remaining problems and to evaluate the problem-solving process. 26. Any remaining problems of the theme will be addressed. 27. Applied PDCA to lessons learned.
7 Future Plans
MarshallxQualtec
QI Storyboard
A Quality Improvement (QI) Storyboard is used to illustrate the steps taken by a team in the improvement process. It provides a standard way of communicating team progress.
Quality Improvement Story
Team Information
Project Planning Worksheet
2 Problem Identification
Pareto Chart Graph
Good
Flow Chart
Target
4 Potential Improvements
3 3 1 3 2
5 Verification
Pareto Chart Graph
Good Effect Target
2 1 3 1 2
6 3 3 3 4
7 Future Plans
6 Full Implementation
Control System
A C
P D
Before
After
Before
After
MarshalloQualtec
information about the improvement process: a photo that tells who is doing the improvement, team meeting minutes that tell what and when, and the project planning worksheet that outlines how the team intends to improve the process.
Use
These tools help formulate plans to close the gap between customer needs and process performance. You can use these tools in a threephase process as illustrated on the following page.
Phase Two
Tree Diagram
Prioritization Matrix
Matrix Diagram
Phase Three
Steps
1. Phase One Identify the problem. You can begin with either the Affinity Diagram or the Interrelationship Diagram to narrow your focus to a few issues for study. While the Affinity Diagram uses Consensus to identify broad categories, the Interrelationship Diagram uses cause-and-effect arrows to identify root causes and the relationships between the problems parts. 2. Phase Two Determine actions to resolve the problems discovered in Phase One. Use the Tree Diagram to break the issue into greater implementation detail and generate solutions. You can use a Prioritization Matrix to compare the options (what could be done about the problem) listed on the lowest level of the Tree Diagram. If the lowest level of your Tree lists actions (what must be done about the problem), you can use the Matrix Diagram to identify key items or responsibilities. The Matrix Diagram also works after the Prioritization Matrix.
3. Phase Three Develop an implementation plan for the actions developed in Phase Two. After you complete the Matrix Diagram, you have two options: the Process Decision Program Chart (PDPC) can anticipate potential problems, while the Activity Network Diagram can map out a sequence of tasks with time intervals for each. Both are helpful in forming a complete management plan.
Task-on-Arrow
Task-on-Arrow (TOA) is a technique used to illustrate a sequence of tasks (represented by solid arrows) and outcomes (represented by circles). TOA is an alternative to other process documentation methods, such as Brown Papers, Process Flowcharts and Process Workbenches. Typically, TOA process models are developed with professional facilitation.
Use
TOA models are used as a communication tool between executive process owners, process owners, subject matter experts, suppliers, and internal and external customers. Overlays show current or future information systems, employee roles, activity-based accounting, failure points, and performing locations, for example.
(Re
qui
red
50
for
60
Leave directions (for Janice)
Directions left food/meds left
50)
START
Call vet
Vet called
Medicine picked up
20
Pick up medicine
40
30
Use
The matrix is used after the team, through Multivoting, has decided upon a list of three to five themes. The potential themes should then be placed on the matrix, and the team should complete the remaining categories to help gain Consensus on the most appropriate theme for study.
Example
After they got back from Sprintsville Beach, George and Betty used a Theme Selection Matrix to decide what could make their next vacation better.
Theme More comfortable shoes for Betty More money for gifts Create gift budget Use sunscreen daily Research activities further Impact on George and Bettys Satisfaction 5 2 4 4 4
X
= Overall Score 20 6 20 16 8
X X X X
Using the Theme Selection Matrix, George and Betty decided to work on getting more comfortable shoes for Betty and creating a gift budget.
The four sections of the matrix are: Themes Teams should consider only themes within their responsibility and control.
Impact on Customer A rating based on the teams present knowledge and judgment of the direct effect this theme has on customer satisfaction. Give higher ratings to themes which have a more direct effect on customers. Need to Improve A rating based on the teams present knowledge and
judgment of the difference between the present performance and the Valid Customer Requirements. Give higher ratings to themes with a greater need to improve.
Overall Impact on Customer multiplied by Need to Improve.
Tree Diagram
A Tree Diagram presents a map of the tasks you need to accomplish to solve a problem, achieve a goal or resolve an issue.
Use
Use a Tree Diagram to deploy plans, generate problem-solving ideas and develop policies, objectives and improvement plans.
Example
George and Betty constructed a Tree Diagram to help them avoid all the fights they had on previous vacations.
Problem Major Causes Details Assignable Tasks Both get immunized Betty call health agency, check safety of areas water
Didnt discuss expectations beforehand Disagreed on which activities to do Didnt know full range of activities available
Steps
1. Write the problem or issue on a sticky note or index card. 2. Generate a list of details and tasks to better understand the problem. Helpful questions include Will xxx result in yyy? Write each idea on a sticky note or index card. 3. Place the problem statement on the left side of a flip chart page. 4. Locate the ideas most closely related to the problem statement by asking questions such as What must happen to achieve yyy? or What causes yyy? Place them next to the problem statement card. 5. If no existing idea card provides the information needed to continue the flow on the Tree Diagram, brainstorm for new ideas. Write these on sticky notes/cards and arrange them on the Tree Diagram in their appropriate places. 6. Repeat Steps 4 and 5 for each of the rightmost assignable task idea cards. Continue the process until all idea cards have been placed on the Tree Diagram. Repeat as many times as necessary to create a complete path between the problem or issue under study and ideas that are specific enough to be assignable tasks and action items.
Note: Items generated while developing an Affinity Diagram may be
Appendix
3998 5323 5370 4422 40311 40313 5319 5320 5318 5321 2106 8210 8205 8211
Achieving Extraordinary Customer Relations Chairmans Quality Award Overview Chairmans Quality Award Self-Assessment Training Conflict Management Constructing Control Charts (CBT - Macintosh) Constructing Control Charts (CBT - Windows) Customer Relations: Clarify Needs Customer Relations: Diffuse Conflict Customer Relations: Maximize Effectiveness Customer Relations: Negotiate Demands Facilitative Leadership Fundamentals of Fourth Generation Management UE Lead Fundamentals of Fourth Generation Management Manager Lead Fundamentals of Fourth Generation Management Participant Workbook for Manager Lead
Appendix
Course Number
Course Name
3472-IL 6449-SP 6450-SP 5714 5851 196 4028 4032 192 3789 202 4027 5146 232 4030 198 3919
Fundamentals of Sprint Quality Fundamentals of Sprint Quality (CBT - Macintosh) Fundamentals of Sprint Quality (CBT - Windows) Internal Consulting Skills Leading and Managing Change Leading Others Effectively Leading Sprint Quality LINK: Performance Management National Management Practices Negotiate to Yes Problem Solving and Decision Making Process Analysis and Maturity Quality Team Training Seven Habits of Highly Effective People Statistical Process Control Valuing Diversity Working Together
Instruction Formats
The University of Excellence provides training in three forms: Self-paced Learning The University of Excellence provides a variety of independent study options that include workbooks, audio/video materials, hands-on learning, or personal computer-based exercises. Distance Learning Distance learning is the live broadcast of instructorled programs to remote classrooms, providing two-way interaction between instructor and participants. Instructor-led Learning The University of Excellence offers many programs presented in a classroom environment. Many instructor-led programs can be taught on location to accommodate work-group and scheduling requirements. Questions? Call 800-775-8633.
Appendix
Books
A History of Managing for Quality: The Evolution, Trends, and Future Directions of Managing for Quality. J. M Juran, editor-in-chief. Milwaukee, Wisc.: ASQC Quality Press, 1995. Business Process Improvement. H. James Harrington. New York, N.Y.: McGraw-Hill, Inc., 1991. Corporate Culture and Performance. John P. Kotter and James L. Heskett. New York, N.Y.: The Free Press, 1991. Corporate Strategy. Michael E. Porter. New York, N.Y.: The Free Press, 1991. Deming Guide to Quality and Competitive Position, The. Howard S. and Shelly J. Gitlow. Englewood Cliffs, N.J.: Prentice Hall, Inc., 1987. Deming Management Method, The. Mary Walton. New York, N.Y.: Perigee Books, 1986. Deming Route to Quality and Productivity, The. William W. Scherkenbach. Washington, D.C.: CEEPress Books, George Washington University, 1986. Flawless Consulting A Guide to Getting Your Expertise Used. Peter Block. San Diego, Calif.: University Associates, Inc., 1981. Fourth Generation Management: The New Business Consciousness. Brian L. Joiner. New York, N.Y.: McGraw-Hill, Inc., 1994. Goal, The. Eliyahu M. Goldratt and Jeff Cox. Croton-on-Hudson, N.Y.: North River Press, 1986. Guide to Quality Control. Kaoru Ishikawa. White Plains, N.Y.: Unipub Quality Resources, 1986.
Appendix
I Know It When I See It. John Guaspari. New York, N.Y.: American Management Association, 1985. Improvement Process, The. H. James Harrington. New York, N.Y.: McGraw-Hill Book Company, 1987. In Search of Excellence. Thomas J. Peters and Robert H. Waterman, Jr. New York, N.Y.: Harper and Row, 1982. Juran on Leadership for Quality An Executive Handbook. J.M. Juran. New York, N.Y.: The Free Press, 1989. Kaizen. Masaeld Imai. New York, N.Y.: Random House, 1986. Leadership is an Art. Max DePree. New York, N.Y.: Doubleday, 1989. Managing Quality. David A. Garvin. New York, N.Y.: The Free Press, 1986. Memory Jogger Plus, The. Michael Brassard. Methuen, Mass.: GOAL/QPC, 1989. Out of the Crisis. W. Edwards Deming. Massachusetts Institute of Technology Center for Advanced Engineering Study, 1986. Power of Ethical Management, The. Kenneth Blanchard and Norman Vincent Peale. New York, N.Y.: William Morrow and Company, 1988. PIMS Principle Linking Strategy to Performance, The. Robert D. Bozzell and Bradley T. Gail. New York, N.Y.: The Free Press A Division of MacMillan, Inc., 1987. Quality or Else. Lloyd Dobyns and Clare Crawford-Mason. Boston, Mass.: Houghton Mifflin Company, 1991. Quality is Free. Philip B. Crosby. New York, N.Y.: McGraw-Hill Book Company, 1979. Race, The. Eliyahu M. Goldratt and Jeff Cox. Croton-on-Hudson, N.Y.: North River Press, 1986.
Service America Doing Business in the New Economy. Homewood, Ill.: Dow Jones-Irwin, 1985. Theory Why. John Guaspari. New York, N.Y.: American Management Association, 1986. Thriving on Chaos. Thomas J. Peters. New York, N.Y.: Alfred J. Knopf, Inc., 1987. Winning with Quality. John J. Hudiberg. White Plains, N.Y.: Quality Resources, 1991.
Tapes
Malcolm Baldrige National Quality Award Winners. American Society of Quality (videotapes). 800-248-1946 The Quest of Excellence, An Executive Conference Featuring Winners of the Malcolm Baldrige National Quality Award. La Crescenta Calif.: Audio Archives International (multiple audio tapes). 818-957-0874
Appendix