DAFTAR HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA

(Sudah termasuk overhead dan profit, belum termasuk PPN)


(Tahun 2019, Semester 2)
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp)

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN Pebruari 2020


-
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH -
-
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI -
-
A.4.1.1 HARGA SATUAN PEKERJAAN BETON -
1 m3 lantai kerja beton mutu fc' = 7,4 MPa (K 100), slump (3-6) cm, w/c = 087
dihit A.4.1.1.4.c m3 1,033,861.00
(Readymix) tanpa alat Pompa beton
dihit A.4.1.1.5.c 1 m3 beton mutu fc’= 14.5 MPa (K 175) Readymix tanpa alat Pompa beton m3 1,074,301.00
dihit A.4.1.1.5.d 1 m3 beton mutu fc’= 14.5 MPa (K 175) Readymix dengan alat Pompa beton m3 1,101,669.00
dihit A.4.1.1.7.c 1 m3 beton mutu fc’= 19,3 MPa (K 225) Readymix tanpa alat Pompa beton m3 1,127,359.00
dihit A.4.1.1.7.d 1 m3 beton mutu fc’= 19,3 MPa (K 225) Readymix dengan alat Pompa beton m3 1,154,727.00
dihit A.4.1.1.8.c 1 m3 beton mutu fc’= 21.7 MPa (K 250) Readymix tanpa alat Pompa beton m3 1,152,285.00
dihit A.4.1.1.8.d 1 m3 beton mutu fc’= 21.7 MPa (K 250) Readymix dengan alat Pompa beton m3 1,179,653.00
dihit A.4.1.1.9.c 1 m3 beton mutu fc’= 24,0 MPa (K 275) Readymix tanpa alat Pompa beton m3 1,168,697.00
dihit A.4.1.1.9.d 1 m3 beton mutu fc’= 24,0 MPa (K 275) Readymix dengan alat Pompa beton m3 1,206,737.00
dihit A.4.1.1.10.c 1 m3 beton mutu fc’= 26.4 MPa (K 300) Readymix tanpa alat Pompa beton m3 1,200,818.00
dihit A.4.1.1.10.c 1 m3 beton mutu fc’= 26.4 MPa (K 300) Readymix dengan alat Pompa beton m3 1,228,186.00
dihit A.4.1.1.12.c 1 m3 beton mutu fc’= 31.2 MPa (K 350) Readymix tanpa alat Pompa beton m3 1,245,685.00
dihit A.4.1.1.12.d 1 m3 beton mutu fc’= 31.2 MPa (K 350) Readymix dengan alat Pompa beton m3 1,273,053.00
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.1.1 m3 1,242,833.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.1.2 m3 1,205,374.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.1.3 m3 1,229,009.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.1.4 m3 1,190,451.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.2.1 m3 1,244,094.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.2.2 m3 1,205,126.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.2.3 m3 1,229,286.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.2.4 m3 1,190,088.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.3.1 m3 1,245,082.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.3.2 m3 1,205,292.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.3.3 m3 1,230,135.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.3.4 m3 1,190,114.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.4.1 m3 1,246,964.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.4.2 m3 1,206,077.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.4.3 m3 1,231,840.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.4.4 m3 1,190,724.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.5.1 m3 1,250,275.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.5.2 m3 1,207,854.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.5.3 m3 1,234,917.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.5.4 m3 1,192,265.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.6.1 m3 1,256,089.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.6.2 m3 1,211,365.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.6.3 m3 1,240,393.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp)

Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.6.4 m3 1,195,439.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.7.1 m3 1,266,907.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan
dihit A.4.1.1.38.7.2 m3 1,218,346.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.7.3 m3 1,250,668.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan
dihit A.4.1.1.38.7.4 m3 1,201,878.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan
dihit A.4.1.1.38.8.1 m3 1,207,823.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars, L = 3 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan
dihit A.4.1.1.38.8.2 m3 1,166,131.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars, L = 3 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan
dihit A.4.1.1.38.9.1 m3 1,206,430.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars, L = 3,5 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan
dihit A.4.1.1.38.9.2 m3 1,165,834.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars, L = 3,5 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan
dihit A.4.1.1.38.10.1 m3 1,205,835.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars, L = 4 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan
dihit A.4.1.1.38.10.2 m3 1,166,061.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars, L = 4 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan
dihit A.4.1.1.38.11.1 m3 1,205,771.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars, L = 4,5 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan
dihit A.4.1.1.38.11.2 m3 1,166,637.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars, L = 4,5 m

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


-
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM -

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING -


-
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN -

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


-
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp)

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) -


-
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP -
-
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU -
-
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA -
-
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN -
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp)

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


-
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DILUAR GEDUNG -
-
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp)

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA -


-
A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA -
-
A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA -
-
A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA -
-
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp)

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL -


-
AD.1 HARGA SATUAN PEKERJAAN SANITASI DILUAR GEDUNG -
dihit AD.1.12 U-Ditch 20 x 20 cm, K - 350, Fabrikasi ( terpasang ) m¹ 248,896.00
dihit AD.1.13 U-Ditch 30 x 30 cm, K - 350, Fabrikasi ( terpasang ) m¹ 313,574.00
dihit AD.1.14 U-Ditch 40 x 40 cm, K - 350, Fabrikasi ( terpasang ) m¹ 480,089.00
dihit AD.1.15 U-Ditch 50 x 50 cm, K - 350, Fabrikasi ( terpasang ) m¹ 624,608.00
dihit AD.1.16 U-Ditch 60 x 60 cm, K - 350, Fabrikasi ( terpasang ) m¹ 856,314.00
dihit AD.1.17 U-Ditch 60 x 80 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,122,792.00
dihit AD.1.18 U-Ditch 80 x 80 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,232,429.00
dihit AD.1.19 U-Ditch 80 x 100 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,536,029.00
dihit AD.1.20 U-Ditch 100 x 100 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,594,342.00
dihit AD.1.20a U-Ditch 100 x 120 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,867,582.00
dihit AD.1.21 U-Ditch 120 x 120 cm, K - 350, Fabrikasi ( terpasang ) m¹ 2,028,241.00
dihit AD.1.21a U-Ditch 140 x 140 cm, K - 350, Fabrikasi ( terpasang ) m¹ 4,015,392.00
dihit AD.1.24 Tutup U-Ditch 40 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 233,299.00
dihit AD.1.24.a Tutup U-Ditch 40 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 297,791.00
dihit AD.1.32 Tutup U-Ditch 120 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 726,933.00
dihit AD.1.33 Tutup U-Ditch 120 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 28,433.00
dihit AD.1.34 Tutup U-Ditch 140 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 1,099,100.00
dihit AD.1.35 Tutup U-Ditch 140 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 28,433.00
dihit AD.1.36 Box Culvert 80 x 80 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 2,040,591.00
dihit AD.1.37 Box Culvert 80 x 80 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 3,008,554.00
dihit AD.1.38 Box Culvert 100 x 100 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 3,045,184.00
dihit AD.1.39 Box Culvert 100 x 100 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 3,722,795.00
dihit AD.1.40 Box Culvert 120 x 120 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 4,329,585.00
dihit AD.1.41 Box Culvert 120 x 120 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 5,295,585.00
-
AD.2 HARGA SATUAN PEKERJAAN LANGSIRAN -
-
AD.3 HARGA SATUAN PEKERJAAN PAGAR BETON DAN BESI -
-
AD.4 HARGA SATUAN PEKERJAAN SUMUR DALAM / AIR TANAH & AIR BERSIH -
-
AD.5 HARGA SATUAN PEKERJAAN PERTAMANAN -

AD.6 HARGA SATUAN PEKERJAAN LAIN - LAIN -


TAHUN 2021 KENAIKAN UMR TAHUN 2022
A B C
C= A x (1+B)
Rp2,261,775.00 3.27% Rp2,340,000.00

HARGA PER-JAM
PEKERJA
FAKTOR PENGALI D
D= 1/175 x UMR
TAHUN 2022
Pekerja Rp13,371.43
Tukang 1.3 x PER-JAM PEKERJA Rp17,382.86
Mandor 1.6 x PER-JAM PEKERJA Rp21,394.29
Operator 1.3 x PER-JAM PEKERJA Rp17,382.86
Pembantu Operator 1 x PER-JAM PEKERJA Rp13,371.43
Sopir / Driver 1.3 x PER-JAM PEKERJA Rp17,382.86
Pembantu Sopir / Driver 1 x PER-JAM PEKERJA Rp13,371.43
Mekanik 1.3 x PER-JAM PEKERJA Rp17,382.86
Pembantu Mekanik 1 x PER-JAM PEKERJA Rp13,371.43
Kepala Tukang 1.37 x PER-JAM PEKERJA Rp18,318.86
Pekerja masak aspal 1.3 x PER-JAM PEKERJA Rp17,382.86
SHEET INI TIDAK DICETAK
DATA LINK | UMK
Surat Keputusan Gubernur Jawa Tengah | tentang Upah
Minimum pada 35 Kabupaten/ Kota di Provinsi Jawa No ……
Tengah

3.27% ##)

2022 2022

UMP: 1,798,978.89 10,399.00

UMK: Per-Bulan Per-Jam *)

BPJ SEMARANG: 2,803,780.50 16,207.00


1 KOTA SEMARANG 2,803,780.50 16,207.00
2 KAB. DEMAK 2,511,526.40 14,517.00
3 KAB. KENDAL 2,340,000.00 13,371.00
4 KAB. SEMARANG 2,302,797.08 13,311.00
5 KOTA SALATIGA 2,101,456.72 12,147.00

BPJ MAGELANG: 2,108,773.40 12,189.00


19 KOTA MAGELANG 1,913,593.10 11,061.00
20 KAB. MAGELANG 2,108,773.40 12,189.00
21 KAB. PURWOREJO 1,905,331.50 11,013.00

BPJ WONOSOBO: 1,919,789.30 11,097.00


22 KAB. TEMANGGUNG 1,884,884.04 10,895.00
23 KAB. WONOSOBO 1,919,789.30 11,097.00
27 KAB. BANJARNEGARA 1,805,159.60 10,434.00

BPJ CILACAP: 2,228,904.29 12,884.00


24 KAB. KEBUMEN 1,895,004.50 10,954.00
25 KAB. BANYUMANS 1,962,130.00 11,342.00
26 KAB. CILACAP 2,228,904.29 12,884.00
28 KAB. PURBALINGGA 2,004,264.16 11,585.00

BPJ TEGAL: 1,987,947.50 11,491.00


33 KOTA TEGAL 1,987,947.50 11,491.00
34 KAB. TEGAL 1,957,999.20 11,318.00
35 KAB. BREBES 1,866,722.98 10,790.00

BPJ PEKALONGAN: 2,139,754.40 12,369.00


29 KAB. BATANG 2,129,117.59 12,307.00
30 KOTA PEKALONGAN 2,139,754.40 12,369.00
31 KAB. PEKALONGAN 2,084,154.86 12,047.00
32 KAB. PEMALANG 1,925,985.50 11,133.00

BPJ PURWODADI: 1,893,971.80 10,948.00


6 KAB. GROBOGAN 1,889,841.00 10,924.00
7 KAB. BLORA 1,893,971.80 10,948.00
15 KAB. SRAGEN 1,875,294.39 10,840.00

BPJ PATI: 2,290,994.35 13,243.00


8 KAB. KUDUS 2,290,994.35 13,243.00
9 KAB. JEPARA 2,106,708.00 12,178.00
10 KAB. PATI 1,952,835.70 11,288.00
11 KAB. REMBANG 1,860,925.40 10,757.00

BPJ SURAKARTA: 2,054,040.30 11,873.00


12 KAB. BOYOLALI 2,006,019.75 11,595.00
13 KOTA SURAKARTA 2,020,167.74 11,677.00
14 KAB. SUKOHARJO 2,001,372.60 11,569.00
16 KAB. KARANGANYAR 2,054,040.30 11,873.00
17 KAB. WONOGIRI 1,855,761.90 10,727.00
18 KAB. KLATEN 2,011,514.75 11,627.00

*) Keputusan Menteri Tenaga Kerja dan Transmigrasi No 102/MEN/VI/2004 Tanggal 25 Juni 2004; Tentang Waktu K
Upah Kerja Lembur; Pasal 8 : Upah sejam = 1/173 x Upah sebulan

Kenaikan UMP Jateng 2021 = 3,27% thdp TA 2020. Sumber : Instagram Kominfo Jateng 30 Okt 2020

Cukup. Di bawah ini untuk system link

HARGA DASAR SATUAN UPAH

No. URAIAN KODE

1. Pekerja L.01
2. Tukang L.02
3. Mandor L.04
4. Operator L.05
5. Pembantu Operator L.06
6. Sopir / Driver L.07
7. Pembantu Sopir / Driver L.08
8. Mekanik L.09
9. Pembantu Mekanik L.10
10. Kepala Tukang L.03
11. Pekerja masak aspal --

@TX: di bawah ini dari mastr file V-5 Jakarta --------- AB

12 Tenaga Ahli Muda S1 (1 Tahun) (L11) Jam


13 Tenaga Ahli Muda S1 (5 Tahun) (L12) Jam
14
15
16
17 CAD / CAM OPERATOR (L16) Jam
18 SOFTWARE PROGRAMMER / IMPLEMENTER (L17) Jam
19 HARDWARE TECHNICIAN (L18) Jam
20 FACILITATOR (L19) Jam
21 SENIOR ASSISTANT PROFESSIONAL STAFF (L20) Jam
22 ASSISTANT PROFESSIONAL STAFF (L21) Jam
23 SPECIAL TECHNICIAN / INSPECTOR (L22) Jam
24 TECHNICIAN (L23) Jam
25 INSPECTOR (L24) Jam
26 SURVEYOR (L25) Jam
27
28
29
30
31
@TX : di bawah ini sekedar contoh | dari Master File Ver
CONTOH ANALISIS UMP DKI Jakarta (Pekerja)
Pekerja: Knek; Tk.Babat Rumput; Tk
No, Perolehan
Aspal
1 Berdasarkan Pergub DKI Per bulan
2 Keputusan Dewan Pengurus Nasional, INKINDO No:
Per Minggu
69/SK/DPN/XI/2018, DKI Jakarta
3 Bila tenaga didatangkan dari luar daerah (luar lokasi),
maka diperhitungkan biaya transport dan biaya tempat
menginap sementara selama kegiatan pekerjaan berjalan Per hari
per bulan

No. URAIAN KODE SATUAN

1. Pekerja (L01) OB
2. Tukang (L02) OB
3. Mandor (L03) OB
4. Operator (L04) OB
5. Pembantu Operator (L05) OB
6. Sopir / Driver (L06) OB
7. Pembantu Sopir / Driver (L07) OB
8. Mekanik (L08) OB
9. Pembantu Mekanik (L09) OB
10. Kepala Tukang (L10) OB
11.
12 Tenaga Ahli Muda S1 (1 Tahun) OB
13 Tenaga Ahli Muda S1 (5 Tahun) OB
14 Tenaga Ahli Muda S1 (1 Tahun)
15 Tenaga Ahli Muda S1 (1 Tahun)
16
17 CAD / CAM OPERATOR OB
18 SOFTWARE PROGRAMMER / IMPLEMENTER OB
19 HARDWARE TECHNICIAN OB
20 FACILITATOR OB
21 SENIOR ASSISTANT PROFESSIONAL STAFF OB
22 ASSISTANT PROFESSIONAL STAFF OB
23 SPECIAL TECHNICIAN / INSPECTOR OB
24 TECHNICIAN OB
25 INSPECTOR OB
26 SURVEYOR OB
27
28
29
30
31

HARGA SATUAN DASAR (HSD) TENAGA KERJA TAHUN 2018


Keputusan Dewan Pengurus Nasional, INKINDO No: 69/SK/DPN/XI/2018

Pedoman Standar Minimal Tahun 2019


Biaya Langsung Personil dan Non-Personil untuk Penyusunan RAB dan HPS
KUALIFIKASI TENAGA AHLI DAN TAHUN PENGALAMAN

1
TENAGA AHLI (TIDAK PUNYA SKA / SKK) ►
2
1 3
AHLI MUDA ►
2 4
AHLI 1 3 5
MADYA 2 4 6
► 3 5 7
1 4 6 8
2 5 7 9
3 6 8 10
4 7 9 11
5 8 10 12
6 9 11 13
7 10 12 14
AHLI 8 11 13 15
UTA 9 12 14 16
MA ### 13 15 17
► ### 14 16 18
### 15 17 19
### 16 18 20
### 17 19 21
### 18 20 22
### 19 21 23
### 20 22 24
### 21 23 25
Billing Rate sesuai Permen PUPR 2017
Biaya Langsung Personil (Remuneration / Billing Rate) Tahun 2018

PROVINSI DKI JAKARTA


Indeks = 1,000
NO PERSONIL
1. CAD / CAM OPERATOR
2. SOFTWARE PROGRAMMER / IMPLEMENTER
3. HARDWARE TECHNICIAN
4. FACILITATOR
5. SENIOR ASSISTANT PROFESSIONAL STAFF
6. ASSISTANT PROFESSIONAL STAFF
7. SPECIAL TECHNICIAN / INSPECTOR
8. TECHNICIAN
9. INSPECTOR
10. SURVEYOR
*)
Referensi Biaya Minimal Tahun 2018 (benchmarking DKI Jakarta dengan Indeks = 1,000).
Biaya Langsung Personil untuk Provinsi lain (diluar DKI Jakarta) dikalikan dengan Indeks Biaya Langsung Personil
per Provinsi

Tunjangan-tunjangan untuk Tenaga Kerja


No Uraian Jml Bln/Tahun
1 Tunjangan Hari raya per tahun
2 Transport lokal selama hari kerja 12
3 Sewa rumah per tahun
4 Tunjangan keluarga per tahun
5 Tunjangan pengobatan keluarga
6 Gaji ke 13 (Rata-rata seluruh Tenaga Kerja) 12
7 Tunjangan lainnya

Rata-rata per tahun


Rata-rata per bulan
Rata-rata per hari kerja
Sel kuning di kolom ini di-
edit jika data UMK Th
2022 belum ada

2021 2021

1,742,015.00 10,069.45

Per-Bulan Per-Jam *)

2,715,000.00 15,694.00 Berikut ini daftar UMK jawa tengah:2020


2,715,000.00 15,693.64 1. Kota Semarang: Rp 2.715.000
2,432,000.00 14,057.80 2. Kabupaten Demak: Rp 2.432.000
2,261,775.00 13,073.84 3. Kabupaten Kendal: Rp 2.261.775
2,229,880.00 12,889.48 4. Kabupaten Semarang: Rp2.229.880
2,034,915.00 11,762.51 5. Kota Salatiga: Rp 2.034.915

2,218,451.00 12,823.00
1,853,000.00 10,710.98 19. Kota Magelang: Rp 1.853.000
2,042,000.00 11,803.47 20. Kabupaten Magelang: Rp 2.042.000
1,845,000.00 10,664.74 21. Kabupaten Purworejo: Rp 1.845.000

2,218,451.00 12,823.00
1,825,200.00 10,550.29 22. Kabupaten Temanggung: Rp 1.825.200
1,859,000.00 10,745.66 23. Kabupaten Wonosobo: Rp 1.859.000
1,748,000.00 10,104.05 27. Kabupaten Banjarnegara: Rp 1.748.000

2,218,451.00 12,823.00
1,835,000.00 10,606.94 24. Kabupaten Kebumen: Rp 1.835.000
1,900,000.00 10,982.66 25. Kabupaten Banyumas: Rp 1.900.000
2,158,327.00 12,475.88 26. Kabupaten Cilacap: Rp 2.158.327
1,940,800.00 11,218.50 28. Kabupaten Purbalingga: Rp 1.940.800

2,218,451.00 12,823.00
1,925,000.00 11,127.17 33. Kota Tegal: Rp 1.925.000
1,896,000.00 10,959.54 34. Kabupaten Tegal: Rp 1.896.000
1,807,614.00 10,448.64 35. Kabupaten Brebes: Rp 1.807.614

2,218,451.00 12,823.00
2,061,700.00 11,917.34 29. Kabupaten Batang: Rp 2.061.700
2,072,000.00 11,976.88 30. Kota Pekalongan: Rp 2.072.000
2,018,161.00 11,665.67 31. Kabupaten Pekalongan: Rp 2.018.161
1,865,000.00 10,780.35 32. Kabupaten Pemalang: Rp 1.865.000

2,218,451.00 12,823.00
1,830,000.00 10,578.03 6. Kabupaten Grobogan: Rp 1.830.00p
1,834,000.00 10,601.16 7. Kabupaten Blora: Rp 1.834.000
1,815,914.00 10,496.61 15. Kabupaten Sragen: Rp 1.815.914

2,218,451.00 12,823.00
2,218,451.00 12,823.42 8. Kabupaten Kudus: Rp 2.218.451
2,040,000.00 11,791.91 9. Kabupaten Jepara: Rp 2.040.000
1,891,000.00 10,930.64 10. Kabupaten Pati: Rp 1.891.000
1,802,000.00 10,416.18 11. Kabupaten Rembang: Rp 1.802.000

1,989,000.00 11,497.00
1,942,500.00 11,228.32 12. Kabupaten Boyolali: Rp 1.942.500
1,956,200.00 11,307.51 13. Kota Surakarta: Rp 1.956.200
1,938,000.00 11,202.31 14. Kabupaten Sukoharjo: Rp 1.938.000
1,989,000.00 11,497.11 16. Kabupaten Karanganyar: Rp 1.989.000
1,797,000.00 10,387.28 17. Kabupaten Wonogiri: Rp 1.797.000
1,947,821.00 11,259.08 18. Kabupaten Klaten: Rp 1.947.821

Tanggal 25 Juni 2004; Tentang Waktu Kerja Lembur dan

minfo Jateng 30 Okt 2020

R SATUAN UPAH
BPJ Wilayah: KENDAL
HARGA
SATUAN YG DIGUNAKAN KETERANGAN
( Rp.)

Jam 13,371.00 Pekerja


Jam 17,382.00 Tukang
Jam 21,394.00 Mandor
Jam 17,382.00 Operator
Jam 13,371.00 Pembantu Operator
Jam 17,382.00 Sopir / Driver
Jam 13,371.00 Pembantu Sopir / Driv
Jam 17,382.00 Mekanik
Jam 13,371.00 Pembantu Mekanik
Jam 18,318.00 Kepala Tukang
Jam 17,382.00 Pekerja masak aspal

ari mastr file V-5 Jakarta --------- ABAIKAN

114,523.81 801,666.67 20,041,666.67 OB


151,666.67 1,061,666.67 26,541,666.67 OB

64,071.43 448,500.00 11,212,500.00 OB


75,214.29 526,500.00 13,162,500.00 OB
64,071.43 448,500.00 11,212,500.00 OB
64,071.43 448,500.00 11,212,500.00 OB
81,714.29 572,000.00 14,300,000.00 OB
77,071.43 539,500.00 13,487,500.00 OB
75,214.29 526,500.00 13,162,500.00 OB
64,071.43 448,500.00 11,212,500.00 OB
64,071.43 448,500.00 11,212,500.00 OB
57,571.43 403,000.00 10,075,000.00 OB
dari Master File Ver 5.0 / 2019

Lama bekerja efektif dalam


Sebulan Seminggu Sehari
25 Hari 6 Hari 7 Jam
3,941,075 945,858 157,643

Rata-rata 157,643
Hasil:
Diambil

HARGA HARGA
/ BULAN SATUAN KETERANGAN
( Rp.) ( Rp.)

3,941,075.00 157,643.00 Sesuai dengan peraturan


4,168,225.00 166,729.00 dan ketentuan yang
4,856,850.00 194,274.00 berlaku
4,856,850.00 194,274.00 (Perpres yg berlaku)
4,168,225.00 166,729.00 contoh :
4,856,850.00 194,274.00 Pergub DKI No. 6 Tahun 2019
4,168,225.00 166,729.00
4,566,900.00 182,676.00
4,168,225.00 166,729.00
4,566,900.00 182,676.00

18,500,000.00 740,000.00
24,500,000.00 980,000.00

10,350,000.00 414,000.00
12,150,000.00 486,000.00
10,350,000.00 414,000.00
10,350,000.00 414,000.00
13,200,000.00 528,000.00
12,450,000.00 498,000.00
12,150,000.00 486,000.00
10,350,000.00 414,000.00
10,350,000.00 414,000.00
9,300,000.00 372,000.00

RUPIAH PER BULAN


S1 / Setara S2 / Setara S3 / Setara
**) 23,750,000 30,250,000
**) 25,500,000 32,250,000
18,500,000 27,250,000 34,250,000
20,000,000 29,250,000 36,250,000
21,500,000 31,000,000 38,250,000
23,000,000 33,000,000 40,250,000
24,500,000 34,750,000 42,250,000
26,000,000 36,500,000 44,250,000
27,500,000 38,250,000 46,250,000
29,000,000 40,250,000 48,250,000
30,500,000 42,000,000 50,250,000
32,000,000 43,750,000 52,250,000
33,500,000 45,750,000 54,250,000
35,000,000 47,500,000 56,250,000
36,500,000 49,250,000 58,250,000
38,000,000 51,250,000 60,250,000
39,500,000 53,000,000 62,250,000
41,000,000 54,750,000 64,250,000
42,500,000 56,750,000 66,250,000
44,000,000 58,500,000 68,250,000
45,500,000 60,250,000 70,250,000
47,000,000 62,250,000 72,250,000
48,500,000 64,000,000 74,250,000
50,000,000 65,750,000 76,250,000
51,500,000 67,750,000 78,250,000
RUPIAH PER
BULAN
10,350,000
12,150,000
10,350,000
10,350,000
13,200,000
12,450,000
12,150,000
10,350,000
10,350,000
9,300,000
000).
ks Biaya Langsung Personil

Jml hari /Bulan Besar Tunj Baya per tahun


500,000 asumsi
25 10,000 3,000,000 asumsi
5,000,000 asumsi
3,600,000 asumsi
2,000,000 asumsi
-
1,000,000 asumsi

15,100,000
1,258,333
50,333
147

aftar UMK jawa tengah:2020


arang: Rp 2.715.000
n Demak: Rp 2.432.000
n Kendal: Rp 2.261.775 13,371.43
n Semarang: Rp2.229.880
tiga: Rp 2.034.915

gelang: Rp 1.853.000
en Magelang: Rp 2.042.000
en Purworejo: Rp 1.845.000

en Temanggung: Rp 1.825.200
en Wonosobo: Rp 1.859.000
en Banjarnegara: Rp 1.748.000

en Kebumen: Rp 1.835.000
en Banyumas: Rp 1.900.000
en Cilacap: Rp 2.158.327
en Purbalingga: Rp 1.940.800

gal: Rp 1.925.000
en Tegal: Rp 1.896.000
en Brebes: Rp 1.807.614

en Batang: Rp 2.061.700
kalongan: Rp 2.072.000
en Pekalongan: Rp 2.018.161
en Pemalang: Rp 1.865.000

n Grobogan: Rp 1.830.00p
n Blora: Rp 1.834.000
en Sragen: Rp 1.815.914

n Kudus: Rp 2.218.451
n Jepara: Rp 2.040.000
en Pati: Rp 1.891.000
en Rembang: Rp 1.802.000

en Boyolali: Rp 1.942.500
akarta: Rp 1.956.200
en Sukoharjo: Rp 1.938.000
en Karanganyar: Rp 1.989.000
en Wonogiri: Rp 1.797.000
en Klaten: Rp 1.947.821

1 SEMARANG MAGELANG WONOSOBO CILACAP


Faktor 2
Pengali 3
4 16,207.00 12,189.00### 11,097.00### 12,884.00###
1.3 5 21,069.00 15,846.00 14,426.00 16,749.00
1.6 6 25,931.00 19,502.00 17,755.00 20,614.00
1.3 7 21,069.00 15,846.00 14,426.00 16,749.00
1 8 16,207.00 12,189.00 11,097.00 12,884.00
1.3 9 21,069.00 15,846.00 14,426.00 16,749.00
1 10 16,207.00 12,189.00 11,097.00 12,884.00
1.3 11 21,069.00 15,846.00 14,426.00 16,749.00
1 12 16,207.00 12,189.00 11,097.00 12,884.00
1.37 13 22,204.00 16,699.00 15,203.00 17,651.00
1.3 14 21,069.00 15,846.00 14,426.00 16,749.00
TEGAL PEKALONGAN PATI PURWODADI SURAKARTA

11,491.00### 12,369.00### 13,243.00### 10,948.00### 11,873.00


14,938.00 16,080.00 17,216.00 14,232.00 15,435.00
18,386.00 19,790.00 21,189.00 17,517.00 18,997.00
14,938.00 16,080.00 17,216.00 14,232.00 15,435.00
11,491.00 12,369.00 13,243.00 10,948.00 11,873.00
14,938.00 16,080.00 17,216.00 14,232.00 15,435.00
11,491.00 12,369.00 13,243.00 10,948.00 11,873.00
14,938.00 16,080.00 17,216.00 14,232.00 15,435.00
11,491.00 12,369.00 13,243.00 10,948.00 11,873.00
15,743.00 16,946.00 18,143.00 14,999.00 16,266.00
14,938.00 16,080.00 17,216.00 14,232.00 15,435.00
KENDAL

13,371.00
17,382.00
21,394.00
17,382.00
13,371.00
17,382.00
13,371.00
17,382.00
13,371.00
18,318.00
17,382.00
HARGA SATUAN UPAH
BIDANG SUMBER DAYA AIR, BINA MARGA DAN CIPTA KARYA
TAHUN 2022 SEMESTER 1

HARGA SURVEY HARGA SATUAN HARGA SATUAN


URAIAN SATUAN KODE KODE 2021 SEMESTER 2 2022 SEMESTER 1 2022 SEMESTER 1
SELISIH
SDA DAN CK BM (Rp.) (Rp.) (Rp.)
1 2 3 4 4
TENAGA JAM HARI
1 Pekerja Rp 13,371.00 OH L.01 (L01) Rp 93,429.00 Rp 93,597.00 NAIK Rp 93,597.00
2 Tukang Batu Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
3 Tukang Kayu Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
4 Tukang Besi Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
5 Tukang Besi Konstruksi Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
6 Tukang Pipa Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
7 Tukang bor Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
8 Tukang Las Biasa Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
9 Tukang Las Konstruksi Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
10 Tukang Cat Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
11 Tukang Vibrator Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
12 Tukang erection Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
13 Tukang Khusus Alumunium Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
14 Tukang gali Rp 17,382.00 OH L.02 (L02) Rp 135,000.00 Rp 121,674.00 TURUN Rp 121,674.00
15 Tukang aspal Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
16 Tukang listrik Rp 17,382.00 OH L.02 (L02) Rp 150,000.00 Rp 121,674.00 TURUN Rp 121,674.00
17 Penganyam Bronjong Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
18 Kepala Tukang Rp 18,318.00 OH L.03 (L03) Rp 127,995.00 Rp 128,226.00 NAIK Rp 128,226.00
19 Mandor Rp 21,394.00 OH L.04 (L04) Rp 149,485.00 Rp 149,758.00 NAIK Rp 149,758.00
20 Juru ukur Rp 21,394.00 OH L.04 (L04) Rp 149,485.00 Rp 149,758.00 NAIK Rp 149,758.00
21 Operator alat berat Rp 17,382.00 OH L.05 (L05) Rp 175,000.00 Rp 121,674.00 TURUN Rp 121,674.00
22 Operator pompa Rp 17,382.00 OH L.05 (L05) Rp 93,429.00 Rp 121,674.00 NAIK Rp 121,674.00
23 Mekanik alat berat Rp 13,371.00 OH L.08 (L08) Rp 93,429.00 Rp 93,597.00 NAIK Rp 93,597.00
24 Pembantu Juru ukur Rp 13,371.00 OH L.06 (L06) Rp 121,457.00 Rp 93,597.00 TURUN Rp 93,597.00
25 Pembantu operator alat berat Rp 13,371.00 OH L.06 (L06) Rp 121,457.00 Rp 93,597.00 TURUN Rp 93,597.00
26 Pembantu mekanik alat berat Rp 13,371.00 OH L.06 (L06) Rp 121,457.00 Rp 93,597.00 TURUN Rp 93,597.00
27 Pembantu driller Rp 13,371.00 OH L.10 (L10) Rp 121,457.00 Rp 93,597.00 TURUN Rp 93,597.00
28 Pembantu Rp 13,371.00 OH L.10 (L10) Rp 121,457.00 Rp 93,597.00 TURUN Rp 93,597.00
29 Pengatur lalu lintas (Flagman) Rp 17,382.00 OH L.09 (L09) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
30 Koordinator / Pengatur Rp 21,394.00 OH L.04 (L04) Rp 149,485.00 Rp 149,758.00 NAIK Rp 149,758.00
31 Ahli geologist OH L.11 (L11) Rp 350,000.00 Rp 350,000.00 TETAP Rp 350,000.00
32 Ahli muda OH L.11 (L11) Rp 100,000.00 Rp 100,000.00 TETAP Rp 100,000.00
33 Koordinator bor Rp 21,394.00 OH L.04 (L04) Rp 149,485.00 Rp 149,758.00 NAIK Rp 149,758.00
34 Administrasi bor Rp 17,382.00 OH L.02 (L02) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
35 Sopir / Driver Rp 17,382.00 OH L.07 (L07) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
36 Sopir kendaraan < 2 ton (termasuk sedan) Rp 17,382.00 OH L.07 (L07) Rp 121,457.00 Rp 121,674.00 NAIK Rp 121,674.00
37 Pembantu Sopir / Driver Rp 13,371.00 OH L.08 (L08) Rp 93,429.00 Rp 93,597.00 NAIK Rp 93,597.00
38 Driller Rp 13,371.00 OH L.10 (L10) Rp 93,429.00 Rp 93,597.00 NAIK Rp 93,597.00
39 crew driller Rp 13,371.00 OH L.10 (L10) Rp 93,429.00 Rp 93,597.00 NAIK Rp 93,597.00

1
K
E
C
A
M
P
A
HARGA SATUAN BAHAN T
T
A
M
N
BIDANG SUMBER DAYA AIR, BINA MARGA DAN CIPTA KARYA U
A
B
TAHUN 2022 SEMESTER 1
R
R
D
A
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 N
No URAIAN SATUAN A
P
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I G
E
S
IR
O
B
D
MATERIAL TANAH DAN BATUAN N
U
A
G
1 Batu blondos (quarry) m3 M.1.a (M02) Rp. 148,000.00 Rp. 240,000.00
### N
2 Batu blondos (quarry - lokasi pekerjaan) m3 M.1.b Rp. 200,000.00 ### A
Rp. 253,848.00
3 Batu belah (quarry) m3 M.2.a (M06) Rp. 380,000.00 Rp. 401,280.00
###
4 Batu belah (quarry) - lokasi pekerjaan m3 M.2.b M.03.g.1 Rp. 396,666.67 Rp. 418,880.00
###
5 Batu belah hitam (quarry) - lokasi pekerjaan M.03.f.1 Rp. 325,000.00
6 Abu Batu m3 M.01.1) Rp. 237,000.00
7 Pasir urug (quarry) m3 M.4.a Rp. 155,000.00 Rp. 185,714.29
###
8 Pasir urug (quarry - lokasi pekerjaan) m3 M.4.b M.05.e.1 M44 Rp. 252,500.00 Rp. 266,640.00
9 Sirtu (quarry) m3 M.5.a M.07.1) Rp. 137,000.00 Rp. 164,038.00
###
10 Sirtu (quarry - lokasi pekerjaan) m3 M.5.b (M09) Rp. 228,333.33 Rp. 241,120.00
###
11 Tanah biasa (quarry) m3 M.6.a M08 Rp. 120,000.00 Rp. 126,720.00
12 Tanah biasa (quarry - lokasi pekerjaan) m3 M.6.b Rp. 120,000.00 Rp. 126,720.00
13 Tanah padas (quarry) m3 M.7.a M.7.a Rp. 120,000.00 Rp. 75,000.00
###
14 Tanah padas (quarry - lokasi pekerjaan) m3 M.7.b M.7.b Rp. 235,000.00 Rp. 248,160.00
15 Tanah liat (quarry) m3 M.8.a Rp. 63,800.00 Rp. 67,372.80
16 Tanah liat (quarry - lokasi pekerjaan) m3 M.8.b Rp. 110,000.00 Rp. 116,160.00
17 Tanah biasa/tanah liat berpasir m3 M.08.a.1 Rp. 73,500.00
18 Tanah liat/lempung m3 M.08.b.1 Rp. 105,000.00
19 Tanah keras/cadas/batuan lunak untuk urugan m3 M.08.c.1 (EI-241) Rp. 84,000.00
20 Tanah urug di Borrrow Area m3 M.08.d.1 Rp. 136,500.00
21 Tanah pilihan grosok (Ex tahunan/prigi) m3 M.08.e.1 Rp. 175,000.00
22 Pasir Pasang Muntilan (quarry - lokasi pekerjaan) m3 M.8.c M01c Rp. 250,000.00 Rp. 300,000.00
###
23 Pasir Pasang Sumurpitu (quarry - lokasi pekerjaan) m3 M.8.c1 Rp. 250,000.00
24 Pasir Pasang Wonosobo (quarry - lokasi pekerjaan) m3 M.8.c2 Rp. 300,000.00
25 Pasir Beton (muntilan) m3 M.9.c (M01) Rp. 360,222.22 Rp. 339,234.40
###
26 Pasir Beton (muntilan) kg M.9.b Rp. 226.16
27 Pasir Beton (muntilan) (quarry - lokasi pekerjaan) m3 M.9.a1 M.05.a.1 Rp. 376,777.78 Rp. 397,877.33
28 Pasir Beton (non muntilan) m3 M.9.a M01b Rp. 269,000.00 Rp. 284,064.00
29 Pasir Beton (non muntilan) (quarry - lokasi pekerjaan) m3 M.9.c1 Rp. 299,000.00 Rp. 315,744.00
30 Pasir kasar / pasir beton / ex.Begawan solo m3 M.05.a.2 Rp. 297,660.00
31 Pasir Pasang Kali / Gunung / ex. Begawan Solo m3 M.05.b.1 Rp. 267,630.00
32 Pasir halus/plester m3 M.05.c.1 (M01c) Rp. 267,630.00
33 Pasir teras/plester m3 M.05.d.1 Rp. 267,630.00
34 Batu pecah 0,5 m3 M.10.a (M91) Rp. 177,231.40 Rp. 245,674.00
###
35 Batu pecah 1-2 m3 M.10.b M92 Rp. 232,636.36 Rp. 245,664.00
###
36 Batu pecah 2-3 m3 M.10.c M93 Rp. 207,479.34 Rp. 241,413.33
###
37 Batu pecah 3-5 m3 M.10.d M89c Rp. 223,030.30 Rp. 287,500.00
###
38 Batu pecah 5-7 m3 M.10.e Rp. 223,571.43 Rp. 350,000.00
###
39 Batu pecah 1/2 , 1/1 , 0.5 m3 M89b Rp. 350,000.00
40 Agregat Kasar m3 (M03) Rp. 232,636.36
41 Agregat Pengunci m3 M92 Rp. 232,636.36
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
42 Debu Marmer m3 (M05) Rp. 122.09 UA
43 Koral bulat m3 M.11.a Rp. 235,000.00 Rp. 248,160.00 N
44 Koral beton m3 M.11.b Rp. 376,666.67 Rp. 397,760.00 A
45 Kerikil Kg M.12 Rp. 350.00 Rp. 300.00
###
46 Kerakal /cobble, batu ukuran > 6 cm - 25 cm m3 M.04.a.1 Rp. 182,000.00
47 Kerikil /gravel, batu ukuran > 3,5 cm - 6 cm m3 M.04.b.1 Rp. 296,700.00
48 Agregat beton/split > 2 - 3,5 cm m3 M.04.c.1 Rp. 297,660.00
49 Agregat beton/split > 0,5 - 2 cm m3 M.04.d.1 M.04.d.1 Rp. 297,660.00
50 Agr Pch Mesin 5-10 & 10-15 m3 (M92) Rp. 232,636.36
51 Agr Pch Mesin 0 - 5 m3 (M91) Rp. 177,231.40
52 Timbunan/urugan Porous m3 (EI241) Rp. 509,811.00
53 Lapis Resap Pengikat liter (EI611) Rp. 17,787.32
54 LPA klas A m3 M.568.a (M26) Rp. 242,243.75 Rp. 255,809.40
###
55 LPA Klas B m3 M.568.b (M27) Rp. 233,000.00 Rp. 246,048.00
56 LPA Klas S m3 M.568.c M29 Rp. 207,000.00 Rp. 218,592.00
57 Chipping m3 (M41) Rp. 350,000.00 Rp. 369,600.00
58 Basecoarse m3 M.568.d Rp. 125,000.00 Rp. 132,000.00
59 Batu Alam Andesit Biasa tebal 1,2 cm (Ukuran 30x30 cm) m2 Rp. 120,000.00
###
60 Batu Alam Andesit Biasa tebal 1,2 cm Ukuran 30x60 cm m2 Rp. 135,000.00
###
61 Batu Alam Andesit Biasa tebal 1,2 cm Ukuran 15x30 cm m2 Rp. 110,000.00
###
62 Batu Alam Andesit Biasa tebal 1,2 cm Ukuran 15x15 cm m2 Rp. 95,000.00
###
63 Batu Alam Andesit Biasa tebal 1,2 cm Ukuran 10x10 cm m2 Rp. 85,000.00
###
64 Batu Alam Andesit Biasa tebal 2 cm Ukuran 30x30 cm m2 Rp. 165,000.00
###
65 Batu Alam Andesit Biasa tebal 2 cm Ukuran 30x60 cm m2 Rp. 185,000.00
###
66 Batu Alam Andesit Biasa tebal 2 cm Ukuran 15x30 cm m2 Rp. 140,000.00
###
67 Batu Alam Andesit Biasa tebal 2 cm Ukuran 15x15 cm m2 Rp. 125,000.00
###
68 Batu Alam Andesit Biasa tebal 2 cm Ukuran 10x10 cm m2 Rp. 120,000.00
###
69 Batu Alam Andesit Bintik tebal 1,2 cm Ukuran 30x30 cm m2 Rp. 170,000.00
###
70 Batu Alam Andesit Bintik tebal 1,2 cm Ukuran 30x60 cm m2 Rp. 190,000.00
###
71 Batu Alam Andesit Bintik tebal 1,2 cm Ukuran 15x30 cm m2 Rp. 145,000.00
###
72 Batu Alam Andesit Bintik tebal 1,2 cm Ukuran 15x15 cm m2 Rp. 125,000.00
###
73 Batu Alam Andesit Bintik tebal 1,2 cm Ukuran 10x10 cm m2 Rp. 120,000.00
###
74 Batu Alam Andesit Bintik tebal 2 cm Ukuran 30x30 cm m2 Rp. 205,000.00
###
75 Batu Alam Andesit Bintik tebal 2 cm Ukuran 30x60 cm m2 Rp. 220,000.00
###
76 Batu Alam Andesit Bintik tebal 2 cm Ukuran 15x30 cm m2 Rp. 180,000.00
###
77 Batu Alam Andesit Bintik tebal 2 cm Ukuran 15x15 cm m2 Rp. 155,000.00
###
78 Batu Alam Andesit Bintik tebal 2 cm Ukuran 10x10 cm m2 Rp. 140,000.00
###
79 Batu Alam Andesit Hitam tebal 1,5 cm Ukuran 30x30 cm m2 Rp. 160,000.00
###
80 Batu Alam Andesit Hitam tebal 1,5 cm Ukuran 30x60 cm m2 Rp. 170,000.00
###
81 Batu Alam Andesit Hitam tebal 1,5 cm Ukuran 15x30 cm m2 Rp. 140,000.00
###
82 Batu Alam Andesit Hitam tebal 1,5 cm Ukuran 15x15 cm m2 Rp. 125,000.00
###
83 Batu Alam Andesit Hitam tebal 1,5 cm Ukuran 10x10 cm m2 Rp. 120,000.00
###
84 Batu Alam Marmo Bakar (merah) tebal 1,2 cm Ukuran 30x30 cm m2 Rp. 145,000.00
###
85 Batu Alam Marmo Bakar (merah) tebal 1,2 cm Ukuran 30x60 cm m2 Rp. 170,000.00
###
86 Batu Alam Marmo Bakar (merah) tebal 1,2 cm Ukuran 15x30 cm m2 Rp. 120,000.00
###
87 Batu Alam Marmo Bakar (merah) tebal 1,2 cm Ukuran 15x15 cm m2 Rp. 110,000.00
###
88 Batu Alam Marmo Bakar (merah) tebal 1,2 cm Ukuran 10x10 cm m2 Rp. 100,000.00
###
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
U
A
MATERIAL KAYU N
1 Kayu jati (balok) m3 M.15.a Rp. 22,000,000.00 Rp. 22,000,000.00 A
2 Kayu jati (papan) m3 M.15.b Rp. 22,000,000.00 Rp. 22,000,000.00
3 Kayu balok kelas I Jati Kampung/Kruing m3 M.44.a Rp. 9,000,000.00
4 Kayu papan kelas I Jati Kampung/Kruing m3 M.44.b Rp. 10,500,000.00
5 Kayu Jati balok kualitas tinggi Kelas I m3 M.45.a Rp. 14,000,000.00
6 Kayu Jati balok kualitas sedang Kelas II m3 M.45.b Rp. 6,200,000.00
7 Kayu Jati papan kualitas tinggi Kelas I m3 M.45.c Rp. 10,000,000.00
8 Kayu Jati papan kualitas sedang Kelas II m3 M.45.d Rp. 7,000,000.00
9 Kayu balok kelas II (Kamper Banjar) m3 M.46.a Rp. 9,000,000.00
10 Kayu gelondongan ø 18 - 20 cm m' M.47.b Rp. 350,000.00
11 Kayu papan bekisting kelas 3 m3 M.48.a Rp. 1,800,000.00
12 Kayu papan kelas II (Kamper Banjar) m3 M.48.b Rp. 10,500,000.00
13 Kayu kamper (balok) m3 M.16.a Rp. 10,500,000.00 Rp. 11,088,000.00
14 Kayu kamper (papan) m3 M.16.b Rp. 10,850,000.00 Rp. 11,457,600.00
15 Kayu bengkirai (balok) m3 M.17.a Rp. 11,700,000.00 Rp. 11,812,500.00
###
16 Kayu bengkirai (papan) m3 M.17.b Rp. 12,500,000.00 Rp. 13,230,000.00
###
17 Kayu kruing (balok) m3 M.18.a Rp. 6,850,000.00 Rp. 7,525,000.00
###
18 Kayu kruing (papan) m3 M.18.b Rp. 6,000,000.00 Rp. 8,505,000.00
###
19 Kayu kelapa m3 M.19 Rp. 2,000,000.00 Rp. 2,112,000.00
20 Kayu bekisting m3 M.20 (M19) Rp. 2,708,333.33 Rp. 2,860,000.00
21 Kayu Kelas 1 m3 (M142) Rp. 22,000,000.00
22 Kayu kelas II untuk cerucuk ø 2", pjg 2,5 m batang M.49.a Rp. 54,500.00
23 Kayu kelas II untuk cerucuk ø 3", pjg 2,5 m batang M.49.b Rp. 100,000.00
24 Kayu kelas II untuk cerucuk ø 4", pjg 2,5 m batang M.49.c Rp. 112,500.00
25 Kayu kelas II untuk cerucuk ø 6", pjg 2,5 m batang M.49.d Rp. 120,000.00
26 Perancah/ formwoks batang (M195) Rp. 64,285.71
27 Kayu usuk/kaso/perancah m3 M.50.e Rp. 50,000.00
28 Bahan turap kayu tanpa pengawetan M3/M' (M192) Rp. 1,300,000.00
29 Cerucuk dolken diameter 8 - 10 cm M1 (M61) Rp. 4,291.67
30 Kayu perancah (balok) M19 Rp. 2,708,333.33
31 Kayu perancah (papan) M19 Rp. 2,708,333.33
32 Dowel Dia 32 mm Kg (M173) Rp. 12,320.00
33 Dolken kayu galam Ø 8-10 cm, panjang 4 m batang M.21.a Rp. 49,000.00 Rp. 51,744.00
34 Dolken kayu Ø 15-20 cm, panjang 4 m batang M.21.b Rp. 47,500.00 Rp. 50,160.00
35 Dolken kayu galam ø 6 - 8 cm, pjg-3m m' M.41.a Rp. 60,000.00
36 Dolken kayu galam ø 8 - 10 cm, pjg-3m m' M.41.b Rp. 94,500.00
37 Dolken atau kayu klas I ø 12 –15 cm, pjg-3 m Jati Kampung m' M.41.f Rp. 75,000.00
38 Gedeg bambu 1 m x 1 m m2 M.42.a Rp. 18,600.00
39 Bambu Ø 6 - 8 cm, panjang 400 Cm batang M.23.a Rp. 11,333.33 Rp. 11,968.00
40 Bambu ø 6 - 8 cm, pjg 6 m m' M.40.a Rp. 20,000.00
41 Bambu gombong ø 8 - 10 cm, pjg 6 - 8 m m' M.40.b Rp. 26,000.00
42 Bambu Ø 6 - 8 cm m' M.23.a1 Rp. 2,833.33 Rp. 2,992.00
43 Bambu Ø 10 cm panjang 400 Cm batang M.23.b Rp. 13,333.33 Rp. 14,080.00
44 Bambu Ø 10 cm m' M.23.b1 Rp. 3,333.33 Rp. 3,520.00
45 Bambu cerucuk Petung Ø 10 cm panjang 400 Cm batang M.24.a Rp. 17,166.67 Rp. 33,000.00
46 Bambu cerucuk Petung Ø 10 cm m' M.24.a1 Rp. 4,291.67 Rp. 8,250.00
47 Bambu cerucuk Petung Ø 15 cm panjang 400 Cm batang M.24.b Rp. 31,500.00 Rp. 50,000.00
48 Bambu cerucuk Petung Ø 15 cm m' M.24.b1 Rp. 7,875.00 Rp. 12,500.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
49 Bahan Graut m3 (M141) Rp. 119,175,000.00 UA
50 Grauting berbahan dasar semen kg M269 Rp 350,000.00 N
51 Ijuk tebal 5 cm kg M.43 Rp. 6,000.00 A
52 Acuan, Multipleks m2 (M130) Rp. 39,062.50
53 Kayu bengkirai (kaso 5x7) m3 M.25.a Rp. 10,214,285.71 Rp. 10,840,408.14
###
54 Kayu bengkirai (kaso 4x6) m3 M.25.b Rp. 9,520,833.33 Rp. 10,054,000.00
55 Kayu bengkirai (reng 2x3) m3 M.25.c Rp. 8,100,000.00 Rp. 9,083,333.33
###
56 Kayu bengkirai (reng 3x4) m3 M.25.d Rp. 7,975,000.00 Rp. 9,337,261.86
###
57 Kayu kamper (kaso 5x7) m3 M.26.a Rp. 8,200,000.00 Rp. 7,200,000.00
###
58 Kayu kamper (reng 2x3) m3 M.26.b Rp. 7,862,500.00 Rp. 4,170,000.00
###
59 Kayu kamper (reng 3x4) m3 M.26.c Rp. 7,400,000.00 Rp. 7,814,400.00
60 Kayu kruing (kaso 5x7) m3 M.27.a Rp. 4,750,000.00 Rp. 5,016,000.00
61 Kayu kruing (kaso 4x6) m3 M.27.b Rp. 5,625,000.00 Rp. 5,940,000.00
62 Kayu kruing (reng 2x3) m3 M.27.c Rp. 3,250,000.00 Rp. 3,432,000.00
63 Kayu kruing (reng 3x4) m3 M.27.d Rp. 3,250,000.00 Rp. 3,432,000.00
64 Kayu Sengon (papan) m3 M.28.a Rp. 2,100,000.00 Rp. 2,217,600.00
65 Kayu Sengon (balok) m3 M.28.b Rp. 1,950,000.00 Rp. 2,059,200.00
66 Kayu Meranti (balok) m3 M.29.a Rp. 4,250,000.00 Rp. 4,488,000.00
67 Kayu Meranti (papan) m3 M.29.b Rp. 4,850,000.00 Rp. 5,121,600.00
68 List kayu profil 32 x 32 mm m' M.30.a Rp. 4,000.00 Rp. 4,224.00
69 List kayu profil 64 x 12 mm m' M.30.b Rp. 6,666.67 Rp. 7,040.00
70 Teakwood 3mm 120 x 240 lembar M.54.a Rp. 135,000.00
71 Teakwood 3mm Pintu lembar M.54.b Rp. 125,000.00
72 Teakwood 4mm Pintu lembar M.54.d Rp. 67,500.00
73 Teakwood 4 mm (90x220) lembar M.31.a Rp. 75,000.00 Rp. 105,000.00
###
74 Teakwood 4 mm (120x240) lembar M.31.b M.54.c Rp. 112,000.00
75 Teakwood 9 mm (122x244) lembar M.31.c Rp. 118,000.00 Rp. 124,608.00
76 Plywood 4 mm (120x240) (ukuran = 2440 x 1220 cm) lembar M.32.a Rp. 67,000.00 Rp. 70,752.00
77 Plywood 6 mm (120x240) lembar M.32.b Rp. 76,000.00 Rp. 80,256.00
78 Plywood 9 mm (120x240) lembar M.32.c Rp. 115,000.00 Rp. 100,800.00
###
79 Plywood 12 mm (120x240) lembar M.32.d M.32.d Rp. 147,500.00 Rp. 147,250.00
###
80 Phenol film 12mm (1 muka) lembar M.33.a Rp. 215,000.00 Rp. 227,040.00
81 Phenol film 12mm (2 muka) lembar M.33.b Rp. 287,500.00 Rp. 303,600.00
82 Tripleks t= 4 mm, 120x240 cm lembar M.34 Rp. 75,000.00 Rp. 62,300.00
###
83 Multiflex/Triflex t=3mm lembar M.52.e Rp. 50,000.00
84 Multiflex/Triflex t=4mm lembar M.52.f Rp. 66,000.00
85 Multipleks t= 6 mm lembar M.35.a M.52.a Rp. 83,750.00 Rp. 80,833.33
###
86 Multipleks t= 8 mm lembar M.35.b Rp. 100,000.00 Rp. 105,600.00
87 Multipleks t= 9 mm lembar M.35.c Rp. 112,500.00 Rp. 115,833.33
###
88 Multipleks t= 12 mm lembar M.35.d Rp. 152,500.00 Rp. 161,040.00
89 Multipleks t= 15 mm lembar M.35.e Rp. 195,000.00 Rp. 205,920.00
90 Multipleks t= 18 mm lembar M.35.f Rp. 215,000.00 Rp. 217,000.00
###
91 Tiang Pancang kayu kelas II ø 8-10 cm atau kotak m M.55.a Rp. 47,500.00
92 Tiang Pancang kayu kelas II ø 15-20 cm atau kotak m M.55.c Rp. 95,000.00
MATERIAL PIPA PVC
1 Pipa PVC tipe AW Ø 1/2" panjang 4 m batang M.40.a Rp. 34,687.50 Rp. 33,800.00
###
2 Pipa PVC tipe AW Ø 3/4" panjang 4 m batang M.40.b Rp. 40,285.71 Rp. 42,541.71
3 Pipa PVC tipe AW Ø 1" panjang 4 m batang M.40.c Rp. 49,857.14 Rp. 52,649.14
4 Pipa PVC tipe AW Ø 1 1/2" panjang 4 m batang M.40.d Rp. 78,900.00 Rp. 96,375.00
###
5 Pipa PVC tipe AW Ø 2" panjang 4 m batang M.40.e (M.40.e) Rp. 104,250.00 Rp. 107,000.00
###
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
6 Pipa PVC tipe AW Ø 2 1/2" panjang 4 m batang M.40.f Rp. 136,416.67 Rp. 144,056.00 UA
7 Pipa PVC tipe AW Ø 3" panjang 4 m batang M.40.g Rp. 169,642.86 Rp. 198,000.00
### N
8 Pipa PVC tipe AW Ø 4" panjang 4 m batang M.40.h Rp. 280,571.43 ### A
Rp. 330,000.00
9 Pipa PVC tipe AW Ø 5" panjang 4 m batang M.40.i Rp. 499,750.00 Rp. 527,736.00
10 Pipa PVC tipe AW Ø 6" panjang 4 m batang M.40.j Rp. 742,250.00 Rp. 710,000.00
###
11 Pipa PVC tipe AW Ø 8" panjang 4 m batang M.40.k Rp. 949,234.29 Rp. 1,002,391.41
12 Pipa PVC tipe AW Ø 10" panjang 4 m batang M.40.l Rp. 1,477,470.00 Rp. 1,560,208.32
13 Pipa PVC tipe AW Ø 12" panjang 4 m batang M.40.m Rp. 2,064,440.00 Rp. 2,350,000.00
###
14 Pipa PVC tipe AW Ø 16" panjang 4 m batang M.40.n Rp. 3,622,000.00 Rp. 3,824,832.00
15 Pipa PVC tipe D Ø 1 1/4" panjang 4 m batang M.41.a Rp. 56,500.00 Rp. 59,664.00
16 Pipa PVC tipe D Ø 1 1/2" panjang 4 m batang M.41.b Rp. 52,875.00 Rp. 56,625.00
###
17 Pipa PVC tipe D Ø 2" panjang 4 m batang M.41.c Rp. 68,500.00 Rp. 72,336.00
18 Pipa PVC tipe D Ø 2 1/2" panjang 4 m batang M.41.d Rp. 98,000.00 Rp. 103,488.00
19 Pipa PVC tipe D Ø 3" panjang 4 m batang M.41.e Rp. 140,200.00 Rp. 148,051.20
20 Pipa PVC tipe D Ø 4" panjang 4 m batang M.41.f Rp. 189,875.00 Rp. 200,508.00
21 Pipa PVC tipe D Ø 5" panjang 4 m batang M.41.g Rp. 281,500.00 Rp. 297,264.00
22 Pipa PVC tipe D Ø 6" panjang 4 m batang M.41.h Rp. 391,000.00 Rp. 412,896.00
23 Pipa PVC tipe D Ø 8" panjang 4 m batang M.41.i Rp. 662,000.00 Rp. 699,072.00
24 Pipa PVC tipe D Ø 10" panjang 4 m batang M.41.j Rp. 602,402.86 Rp. 636,137.42
25 Pipa PVC tipe D Ø 12" panjang 4 m batang M.41.k Rp. 841,966.67 Rp. 889,116.80

MATERIAL PIPA GALVANIS


1 Pipa galvanis medium B Ø 1/2" panjang 6 m batang M.43.a Rp. 128,000.00 Rp. 135,168.00
###
2 Pipa galvanis medium B Ø 3/4" panjang 6 m batang M.43.b Rp. 160,000.00 Rp. 168,960.00
3 Pipa galvanis medium B Ø 1" panjang 6 m batang M.43.c Rp. 215,000.00 Rp. 227,040.00
4 Pipa galvanis medium B Ø 1 1/2" panjang 6 m batang M.43.d Rp. 330,000.00 Rp. 348,480.00
5 Pipa galvanis medium B Ø 2" panjang 6 m batang M.43.e Rp. 410,000.00 Rp. 432,960.00
6 Pipa galvanis medium B Ø 3" panjang 6 m batang M.43.f Rp. 580,000.00 Rp. 612,480.00
7 Pipa galvanis medium B Ø 4" panjang 6 m batang M.43.g Rp. 740,000.00 Rp. 781,440.00
8 Pipa galvanis medium B Ø 5" panjang 6 m batang M.43.h (M132a) Rp. 1,100,000.00 Rp. 1,161,600.00
9 Pipa galvanis medium B Ø 6" panjang 6 m batang M.43.i Rp. 1,350,000.00 Rp. 1,425,600.00
10 Pipa galvanis medium B Ø 8" panjang 6 m batang M.43.j Rp. 1,817,500.00 Rp. 1,919,280.00
11 Pipa galvanis medium A Ø 1/2" panjang 6 m batang M.44.a Rp. 255,000.00 Rp. 269,280.00
12 Pipa galvanis medium A Ø 3/4" panjang 6 m batang M.44.b Rp. 320,000.00 Rp. 337,920.00
13 Pipa galvanis medium A Ø 1" panjang 6 m batang M.44.c Rp. 500,000.00 Rp. 528,000.00
14 Pipa galvanis medium A Ø 1 1/2" panjang 6 m batang M.44.d Rp. 750,000.00 Rp. 792,000.00
15 Pipa galvanis medium A Ø 2" panjang 6 m batang M.44.e Rp. 1,020,000.00 Rp. 1,077,120.00
16 Pipa galvanis medium A Ø 3" panjang 6 m batang M.44.f Rp. 1,120,000.00 Rp. 1,182,720.00
17 Pipa galvanis medium A Ø 4" panjang 6 m batang M.44.g Rp. 1,795,000.00 Rp. 1,895,520.00
18 Pipa galvanis medium A Ø 5" panjang 6 m batang M.44.h Rp. 2,235,000.00 Rp. 2,360,160.00
19 Pipa galvanis medium A Ø 6" panjang 6 m batang M.44.i Rp. 2,415,000.00 Rp. 2,550,240.00
20 Pipa galvanis medium A Ø 8" panjang 6 m batang M.44.j Rp. 4,625,000.00 Rp. 4,884,000.00
21 Pipa Porus diameter 4" m' (M25) Rp. 60,776.00 Rp. 64,179.46
22 Pelat Rambu (Eng. Grade) buah (M26) Rp. 455,927.00 Rp. 481,458.91
23 Pelat Rambu (High I. Grade) buah (M27) Rp. 609,793.00 Rp. 643,941.41
24 Rel Pengaman m' (M36) Rp. 639,400.00 Rp. 675,206.40
25 Pipa Alderon Ø 3/4" panjang 6 m batang M.44.k Rp. 22,000.00 Rp. 23,232.00
MATERIAL BESI DAN BAJA
1 Baja tulangan polos U-8 BjTP.280 KS Kg M.46.a (M39) Rp. 12,320.00 Rp. 12,344.68
###
2 Baja tulangan polos U-10 BjTP.280 KS Kg Rp. 12,320.00 Rp. 12,348.82
###
3 Baja tulangan polos U-12 BjTP.280 KS Kg Rp. 12,320.00 Rp. 12,380.43
###
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
4 Baja tulangan polos U-16 BjTP.280 KS Kg Rp. 12,320.00 Rp. 12,923.57
### UA
5 Baja tulangan polos U-19 BjTP.280 KS Kg Rp. 12,320.00 Rp. 11,793.18
### N
6 Baja tulangan polos U-22 BjTP.280 KS Kg Rp. 12,320.00 ### A
Rp. 11,809.13
7 Baja tulangan polos U-24 BjTP.280 KS Kg M.60.d (M39a) Rp. 12,320.00 Rp. 11,521.35
###
8 Baja tulangan polos U-25 BjTP.280 KS Kg Rp. 12,320.00 Rp. 11,787.43
###
9 Baja tulangan polos U-29 BjTP.280 Kg Rp. 12,320.00 Rp. 11,787.43
10 Baja tulangan polos U-32 BjTP.280 Kg M.60.e Rp. 12,320.00 Rp. 12,098.26
###
11 Baja tulangan polos U-36 BjTP.280 Kg Rp. 12,320.00 Rp. 12,098.26
12 Baja tulangan ulir U-8 BjTS.420 Kg M.46.b Rp. 11,865.00 Rp. 11,606.20
###
13 Baja tulangan ulir U-10 BjTS.420 KS Kg Rp. 11,865.00 Rp. 12,312.20
###
14 Baja tulangan ulir U-13 BjTS.420 KS Kg Rp. 11,865.00 Rp. 12,867.89
###
15 Baja tulangan ulir U-16 BjTS.420 KS Kg Rp. 11,865.00 Rp. 11,746.33
###
16 Baja tulangan ulir U-19 BjTS.420 KS Kg Rp. 11,865.00 Rp. 11,793.18
###
17 Baja tulangan ulir U-22 BjTS.420 KS Kg Rp. 11,865.00 Rp. 11,809.13
###
18 Baja tulangan ulir U-25 BjTS.420 KS Kg Rp. 11,865.00 Rp. 11,787.43
###
19 Baja tulangan ulir U-29 BjTS.420 KS Kg Rp. 11,865.00 Rp. 11,787.43
20 Baja tulangan ulir U-32 BjTS.420 KS Kg M.60.a M13 Rp. 11,865.00 Rp. 12,098.26
###
21 Baja tulangan sirip BjTS 280 kg (M254) Rp. 15,383.76
22 Baja tulangan kg (M57a) Rp. 12,320.00
23 Baja Tulangan (angkur) kg (M267) Rp. 12,320.00
24 Baja Tulangan (angkur) penggantung/hanger L60.60.6 kg (M134) Rp. 3,120.00
25 Baja (ducting, klem) kg (M267) Rp. 12,000.00 Rp. 12,672.00
26 Baja (ulir) U-48 BjTS.420 KS Kg M.46.d Rp. 12,100.00 Rp. 12,777.60
27 Baja Tulangan Polos BjTP 280 Kg (M57a) Rp. 12,320.00
28 Baja Tulangan Sirip BjTS 280 kg (M57a) Rp. 12,320.00
29 Baja Tulangan Sirip BjTS 420 A kg (M57a) Rp. 12,320.00
30 Baja Tulangan Sirip BjTS 420 B kg (M57a) Rp. 12,320.00
31 Baja Struktur BJ 37 (Titik Leleh 240 Mpa) Buah (M47) Rp. 18,000.00
32 Baja Struktur Grade 250 (Kuat Leleh 250 Mpa) Buah (M48) Rp. 18,000.00
33 Baja Struktur Grade 345 (Kuat Leleh 345 Mpa) Buah (M48a) Rp. 18,000.00
34 Baja Struktur Grade 485 (Kuat Leleh 485 Mpa) Buah (M48b) Rp. 18,000.00
35 Allumunium pelat tebal 0,8 mm m2 M.57.a Rp. 400,000.00
36 Allumunium pelat tebal 1 mm m2 M.57.b Rp. 500,000.00
37 Allumunium pelat tebal 2 mm m2 M.57.c Rp. 937,500.00
38 Allumunium pelat tebal 3 mm m2 M.57.d Rp. 1,406,250.00
39 Allumunium profil siku m2 M.57.e Rp. 60,000.00
40 Allumunium profil lainnya m2 M.57.f Rp. 43,300.00
41 Anchorage buah (M113) Rp. 255,750.00
42 Baja prategang kg (M56) Rp. 539,870.00
43 Baja Pelat tebal 2 mm kg M.58.a Rp. 200,000.00
44 Baja Pelat tebal 3 mm kg M.58.b Rp. 250,000.00
45 Baja Pelat tebal 5 mm kg M.58.c Rp. 400,000.00
46 Baja Pelat tebal 6 mm kg M.58.d Rp. 500,000.00
47 Baja Pelat tebal 8 mm kg M.58.e Rp. 650,000.00
48 Baja Pelat setrip kg M.58.f Rp. 16,500.00
49 Baja Profil IWF Ex. Jepang kg M.59.a Rp. 16,000.00
50 Baja Profil IWF Ex. DN SII kg M.59.b Rp. 16,000.00
51 Baja Profil CNP kg M.59.c Rp. 15,000.00
52 Baja Profil DN SII kg M.59.d Rp. 15,000.00
53 Baja Profil Ex. Luar Negeri kg M.59.e Rp. 15,000.00
54 Baja Profil INP kg M.59.f Rp. 15,000.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
55 Baja Profil Siku kg M.59.i Rp. 15,000.00 UA
56 Baja profil L=149x125 dan profil C=75x45x15x2,3 kg (M122) Rp. 30,000.00 N
57 Bout dia 23 mm kg (M223) Rp. 26,285.71 A
58 Kunci Torsi jam (E74) Rp. 38,357.64
59 Baja Pelat kg M.59.j Rp. 16,500.00
60 Besi Beton Polos kg M.60.f M13 Rp. 12,000.00
61 Besi Beton Ulir kg M.60.g Rp. 13,500.00
62 Besi profil Kg M.46.e Rp. 8,583.11 Rp. 17,600.00
63 Besi siku Kg M.46.f Rp. 17,716.55 Rp. 17,600.00
64 Besi strip kg M.46.g Rp. 18,500.00 Rp. 17,600.00
65 Besi plat kg M.46.h Rp. 17,666.67 Rp. 17,600.00
66 Besi IWF kg M.46.i Rp. 17,000.00 Rp. 17,600.00
67 Besi UNP kg M.46.j M.59.g Rp. 16,988.10 Rp. 17,600.00
###
68 Besi Canal kg M.46.k Rp. 12,718.64 Rp. 17,600.00
69 Elastomer bearing pad; (450x500x50) mm3 Buah (M264) Rp. 3,240,000.00
70 Elastomer sintetis elastomer jenis 3; (400x500x50) mm3 Buah (M74c) Rp. 3,240,000.00
71 Perletakan Strip Buah (M81) Rp. 41,666.67
72 Besi angkur/mur/baut (kg) kg M.46.l Rp. 3,120.00 Rp. 3,294.72
73 Besi angkur/mur/baut buah M.46.M Rp. 26,285.71 Rp. 30,000.00
###
74 Besi hollow 50.50.3 m M.47.a Rp. 32,316.67 Rp. 34,126.40
75 Besi hollow 50.50.3 (Kg) Kg M.47.b Rp. 5,900.00 Rp. 6,230.40
76 Besi hollow 40.40.4 6m m M.47.c Rp. 37,916.67 Rp. 40,040.00
77 Besi hollow 30.30.3 6m m M.47.d Rp. 30,382.14 Rp. 32,083.54
78 Besi hollow 20.40.4 m M.47.e Rp. 30,416.67 Rp. 32,120.00
79 Besi square tube (Hollow) m' M.47.f Rp. 15,500.00 Rp. 16,368.00
80 Besi hollow 20.40.2 m M.47.g Rp. 19,166.67 Rp. 20,240.00
81 Jaring Kawat Dilas Kg M.48.a (M258) Rp. 25,000.00 Rp. 26,400.00
82 Besi hollow 40.40.2 m M.47.h Rp. 25,833.33 Rp. 27,280.00
83 Besi hollow 40.60.2 m M.47.i Rp. 35,000.00 Rp. 36,960.00
84 Wire mesh 4 mm (M4), kotak 15 x 15 cm 5,4 x 2,1 m m2 M.49.a M.61.a Rp. 18,280.00 Rp. 19,303.68
85 Wire mesh 5 mm (M5), kotak 15 x 15 cm 5,4 x 2,1 m m2 M.49.b M.61.b Rp. 25,520.00 Rp. 26,949.12
86 Wire mesh 6 mm (M6), kotak 15 x 15 cm 5,4 x 2,1 m m2 M.50.a M.61.c Rp. 35,273.37 Rp. 37,248.68
87 Wire mesh 7 mm (M7), kotak 15 x 15 cm 5,4 x 2,1 m m2 M.50.b M.61.d Rp. 50,264.55 Rp. 53,079.37
88 Wire mesh 8 mm (M8), kotak 15 x 15 cm 5,4 x 2,1 m m2 M.50.c M.61.e Rp. 67,019.40 Rp. 70,772.49
89 Baja Wiremesh M9 ; ∅ 9,7 mm; 2,1 m x 5,4 m (SNI); 78.21 kg m2 M.61.f Rp. 1,126,375.00
90 Wire mesh 10 mm (M10), kotak 15 x 15 cm 5,4 x 2,1 m m2 M.50.d M.61.g Rp. 107,142.86 Rp. 113,142.86
91 Baja Wiremesh M12; ∅ 11,7 mm; 2,1 m x 5,4 m (SNI);140.62kg m2 M.61.h Rp. 1,800,000.00
92 Baja Tahan Karat ( Stainless Steel ) kg M.51 Rp. 62,500.00 Rp. 66,000.00
93 Kawat galvanis Ø 3 mm 50 kg/ROL kg M.52.a Rp. 35,000.00 Rp. 30,000.00
###
94 Kawat galvanis Ø 4 mm 50 kg/ROL kg M.52.b Rp. 35,000.00 Rp. 36,960.00
95 Kawat galvanis Ø 5 mm 50 kg/ROL kg M.52.c Rp. 35,000.00 Rp. 36,960.00
96 Kawat bronjong Ø 2,7 mm Rol / kg kg M.53.a Rp. 35,454.55 Rp. 37,440.00
97 Kawat bronjong Ø 3 mm Rol / kg kg M.53.b Rp. 35,454.55 Rp. 37,440.00
98 Kawat bronjong Ø 4 mm Rol / kg kg M.53.c Rp. 37,272.73 Rp. 39,360.00
99 Kawat bronjong Ø 5 mm Rol / kg kg M.53.d Rp. 38,181.82 Rp. 40,320.00
100 Kawat bronjong / Pabrikasi Ø 3 mm Rol / kg m2 M.53.e Rp. 55,714.29 Rp. 58,834.29
101 Plat Baja Kg (M48) Rp. 8,583.11
102 Turap baja Kg (M52) Rp. 15,835.25
103 Turap beton M3 (M244) Rp. 2,274,733.00
104 Bronjong Kawat (Fab.) 1 m3 (tipe 2), galvanized 2,7 mm Buah M.64.a Rp. 340,000.00
105 Bronjong Kawat (Fab.) 1 m3 (tipe 2), galvanized 3,0 mm Buah M.64.b Rp. 375,100.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
106 Bronjong dengan kawat dilapisi galvanis kg (M15a) Rp. 35,454.55 UA
107 Bronjong dengan kawat dilapisi PVC kg (M15b) Rp. 21,000.00 N
108 Dynabol/raamset ø 8 mm panjang 4-5 cm Buah M.65.a Rp. 5,000.00 A
109 Kabel baja/sling kg M.69 Rp. 30,000.00
110 Kabel prestress kg M.70 Rp. 36,500.00
111 Kawat tali beton / Bendrat kg M.72 Rp. 17,000.00
112 Kawat bronjong ø 2 - 4 mm kg M.73 Rp. 25,000.00
113 Kawat las listrik kg M.74 M51 Rp. 28,000.00
114 Kawat seng 3mm kg M.75 Rp. 25,000.00
115 Tipe A – Ukuran 200 x 100 x 50(cm) : kawat sisi 3,4mm – kawat anyam 2,7mm Mesh atau lub lbr Rp. 258,720.00
116 Tipe B – Ukuran 200 x 100 x 50(cm) : kawat sisi 3,4mm – kawat anyam 2,7mm Mesh atau lub lbr Rp. 253,000.00
117 Tipe C – Ukuran 200 x 100 x 50(cm) : kawat sisi 4mm – kawat anyam 3mm Mesh atau lubang lbr Rp. 378,048.00
118 Tipe D – Ukuran 200 x 100 x 50(cm) : kawat sisi 4mm – kawat anyam 3mm Mesh atau lubang lbr Rp. 370,000.00
119 Kawat beton kg M.54 (M14) Rp. 20,333.33 Rp. 21,472.00
120 Kawat duri m' M.55.b Rp. 28,333.33 Rp. 29,920.00
121 Kawat Las Dos (M51)
122 Paku tripleks kg M.56.a Rp. 26,000.00 Rp. 19,166.67
###
123 Paku 2,5 cm kg M.56.b M.77.a Rp. 21,500.00 Rp. 22,704.00
124 Paku 3,5 cm kg M.56.c M.77.b Rp. 21,000.00 Rp. 22,176.00
125 Paku 5 cm kg M.56.d M.77.b Rp. 20,500.00 Rp. 21,648.00
126 Paku 7 cm kg M.56.e Rp. 22,000.00 Rp. 23,232.00
###
127 Paku biasa campuran 4 cm - 7 cm kg M.77.d Rp. 22,704.00
128 Paku 10 cm kg M.56.f M18 Rp. 23,428.57 Rp. 24,740.57
129 Paku 12 cm kg M.56.g Rp. 20,500.00 Rp. 21,648.00
130 Paku beton 5 cm buah M.56.h Rp. 425.00 Rp. 448.80
131 Paku beton 7 cm buah M.56.h.1 Rp. 615.00 Rp. 649.44
132 Paku plafon kg M.56.i Rp. 38,333.33 Rp. 40,480.00
133 Paku sekrup buah M.56.j Rp. 315.00 Rp. 5,208.75
###
134 Paku payung kg M.56.k M.77.h Rp. 34,375.00 Rp. 40,130.00
###
135 Paku Ramset buah M.56.l Rp. 250.00 Rp. 264.00
136 Paku pancing 6x23 kg M.56.m Rp. 12,000.00 Rp. 12,672.00
137 Selongsong (duct) diameter 54 mm m' (M117) Rp. 98,400.00
138 Paku hak panj 15cm kg M.56.n Rp. 12,000.00 Rp. 12,672.00
139 Skrup fixer buah M.56.o Rp. 733.33 Rp. 774.40
140 Sekrup kait / roofing buah M.56.p Rp. 683.33 Rp. 721.60
141 Kawat las listrik kg M.57 Rp. 14,250.00 Rp. 31,500.00
###
142 Kawat las stainless steel (NC.36 / NC.39) kg M.57.a Rp. 203,500.00 Rp. 214,896.00
143 Kawat nyamuk plastik / PVC m2 M.58 Rp. 21,333.33 Rp. 22,528.00
144 Kawat nyamuk nylon m2 M.59.a Rp. 22,500.00 Rp. 23,760.00
145 Saringan pasir m' M.61 Rp. 28,000.00 Rp. 29,568.00
146 Baut dan Mur Buah (M223) Rp. 26,285.71
147 Baut mutu tinggi A325 Tipe 1 diameter M25 Buah (M210) Rp. 15,000.00
148 Skyliftcrane Truck, 16 m, 1 Ton jam E78 Rp. 179,835.98
149 Baut Mutu Tinggi A490 Tipe 1 diameter M25 Buah (M211) Rp. 19,500.00
150 Baut Biasa Grade A diameter M25 Buah Rp. 14,000.00
151 Baut Biasa Grade B diameter M25 buah (M13) Rp. 11,865.00
152 Baut Biasa Grade C untuk anchor bolts diameter M25 buah (M14) Rp. 15,000.00
153 Baut ø 10 mm panjang 5 cm Buah M.62.b Rp. 2,400.00
154 Baut ø 10 mm panjang 10 cm Buah M.62.c Rp. 3,400.00
155 Baut ø 10 mm panjang 15 cm Buah M.62.d Rp. 4,500.00
156 Baut ø 12 mm panjang 5 cm Buah M.62.e Rp. 5,900.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
157 Baut ø 12 mm panjang 10 cm Buah M.62.f Rp. 9,100.00 UA
158 Baut ø 12 mm panjang 20 cm Buah M.62.h Rp. 11,100.00 N
A
MATERIAL PINTU AIR
1 Besi Profil (pintu air) Kg M.70.a Rp. 30,000.00 Rp. 17,600.00
2 Besi Plat (pintu air) Kg M.70.b Rp. 30,000.00 Rp. 17,600.00
3 Besi As Drat Kg M.70.c Rp. 35,000.00 Rp. 36,960.00
4 Mur Brons Type Skep Kg M.70.d Rp. 183,000.00 Rp. 193,248.00
5 Blok Besi cor Type Skep buah M.70.e Rp. 918,000.00 Rp. 969,408.00
6 Kontra Mur Type Skep buah M.71.a Rp. 262,000.00 Rp. 276,672.00
7 Lager Type Skep buah M.71.b Rp. 603,000.00 Rp. 636,768.00
8 Stang Pemutar Type Skep buah M.71.c Rp. 551,000.00 Rp. 581,856.00
9 Karet perapat / Rubber seal m' M.72 Rp. 1,575,000.00 Rp. 1,663,200.00
10 Plat penjepit karet m' M.73.a Rp. 448,500.00 Rp. 473,616.00
11 Plat peluncur kuningan m' M.73.c Rp. 425,000.00 Rp. 448,800.00
12 Roda gigi piringan buah M.74.a Rp. 1,522,000.00 Rp. 1,607,232.00
13 Roda gigi nanasan buah M.74.b Rp. 892,000.00 Rp. 941,952.00
14 Mur baut buah M.75.e Rp. 13,000.00 Rp. 13,728.00
15 Dynabolt dia 12mm (10-15cm) buah M.75.f Rp. 5,000.00 Rp. 5,280.00
16 Penyetelan dan Centering Pintu m¹ M.79 Rp. 3,000,000.00 Rp. 3,168,000.00
17 Mur Brons Ronsel Kg M.82.b Rp. 183,000.00 Rp. 193,248.00
18 Lager Type Ronsel buah M.82.c Rp. 787,000.00 Rp. 831,072.00
19 Blok Besi cor Type Ronsel buah M.82.d Rp. 1,312,000.00 Rp. 1,385,472.00
20 Kontra Mur Type Ronsel buah M.82.e Rp. 299,000.00 Rp. 315,744.00
21 Pen Spindel Type Ronsel buah M.82.f Rp. 89,000.00 Rp. 93,984.00
22 Stang Pemutar Type Ronsel buah M.82.g Rp. 997,000.00 Rp. 1,052,832.00
23 Kopel / Universal Joint buah M.82.h Rp. 472,000.00 Rp. 498,432.00
24 Penyangga Roda Gigi buah M.82.i Rp. 472,000.00 Rp. 498,432.00
25 Buis Brons buah M.82.j Rp. 367,000.00 Rp. 387,552.00
26 Mur Baut 1/2" x 4" buah M.82.k Rp. 14,000.00 Rp. 14,784.00
27 Mur Baut 5/8" x 4" buah M.82.l Rp. 17,000.00 Rp. 17,952.00
28 Mur Baut M8 stainless buah M.82.m Rp. 17,000.00 Rp. 17,952.00
29 Plat Peluncur Kg M.82.n Rp. 183,000.00 Rp. 193,248.00
30 Grease Kg M.82.o Rp. 59,000.00 Rp. 62,304.00
31 Stang Gembok buah M.82.p Rp. 68,000.00 Rp. 71,808.00
32 Pintu Angkat Type I.B = 0,30 m; H= 0,5 m; H1= 0,65 m unit M.83.a Rp. 3,670,000.00 Rp. 3,875,520.00
33 Pintu Angkat Type I.B = 0,40 m; H= 0,5 m; H1= 0,95 m unit M.83.b Rp. 4,323,000.00 Rp. 4,565,088.00
34 Pintu Angkat B = 0,30 m; H = 0,40 m; H1 = 0,65 m; TR = 1,20 m unit M.80.a Rp. 2,969,000.00
35 Pintu Angkat B = 0,30 m; H = 0,50 m; H1 = 0,65 m; TR = 1,20 m unit M.80.b Rp. 3,059,000.00
36 Pintu Angkat B = 0,50 m; H = 0,50 m; H1 = 0,65 m; TR = 1,20 m unit M.80.c Rp. 3,405,000.00
37 Pintu Sorong Baja; B = 0,60 m; H= 0,8 m; H1= 1,2 m unit M.84.a Rp. 11,454,000.00 Rp. 12,095,424.00
38 Pintu Sorong Baja; B = 0,80 m; H= 1,0 m; H1= 1,2 m unit M.84.b Rp. 13,089,000.00 Rp. 13,821,984.00
39 Pintu sorong baja dengan roda gigi (stang tunggal)
B = 1,0; H = 1,20; H1 = 1,70; TR = 2,50 m unit M.85.a Rp. 24,383,000.00 Rp. 25,748,448.00
40 Pintu sorong baja dengan roda gigi (stang tunggal)
B = 1,2; H = 1,20; H1 = 4,20; TR = 5,00 m unit M.85.b Rp. 30,889,000.00 Rp. 32,618,784.00
41 Pintu sorong baja dengan roda gigi (stang ganda)
B = 1,2; H = 1,20; H1 = 4,20; TR = 5,00 m unit M.85.c Rp. 44,826,000.00 Rp. 47,336,256.00
42 Pintu sorong baja dengan roda gigi (stang ganda)
B = 1,5; H = 1,20; H1 = 4,20; TR = 5,00 m unit M.86.b Rp. 47,365,000.00 Rp. 50,017,440.00
43 Pintu Sorong Baja (satu draad) stang
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
B = 0,50, h = 0,50, H1 = 1,20, Tr = 2,00 Buah M.81.h Rp. 11,610,000.00 UA
44 Pintu Sorong Baja (satu draad) stang N
B = 0,60, h = 0,60, H1 = 1,20, Tr = 2,00 Buah M.82.b Rp. 12,360,000.00 A
45 Pintu Sorong Baja (satu draad) stang
B = 0,70, h = 0,70, H1 = 1,20, Tr = 2,00 Buah M.82.e Rp. 13,020,000.00
46 Pintu Sorong Baja (satu draad) stang
B = 0,80, h = 0,80, H1 = 1,20, Tr = 2,00 Buah M.82.h Rp. 13,720,000.00
47 Pintu Sorong Baja (dua draad) stang
b = 2,00, h = 2,00, H1 = 8,20, Tr = 9,00 Buah M.87.c Rp. 14,140,300.00
48 Pintu Air
49 P= 2m; L 70cm unit M.87.a Rp. 940,000.00 Rp. 992,640.00
50 Stang draft diameter 2,5" + mur baut m' M.77.a Rp. 3,937,500.00 Rp. 4,158,000.00
51 Stang Pemutar Type A (bulat+dudukan+mb) m' M.77.b Rp. 2,100,000.00 Rp. 2,217,600.00
52 Stang Pemutar Type B m' M.77.c Rp. 1,575,000.00 Rp. 1,663,200.00
53 Stel ring m' M.78 Rp. 393,800.00 Rp. 415,852.80
54 AS transmisi m' M.80.a Rp. 2,887,500.00 Rp. 3,049,200.00
55 As ulir pintu air m¹ M.80.b Rp. 950,000.00 Rp. 1,003,200.00
56 Gear box pintu air (lengkap) set M.81 Rp. 13,200,000.00 Rp. 13,939,200.00
57 Gembok buah M.82.a Rp. 89,000.00 Rp. 93,984.00
Harga Profil aluminium natural lebih mahal dari profil aluminium warna (coating). Dilapangan harga natural lebih murah.
Harga Kusen aluminium putih (3" / 4") lebih mahal dari Kusen aluminium warna gelap (3" / 4"). Dilapangan harga putih/natural lebih murah.
MATERIAL PAVING
1 Paving block 6 cm abu-abu K-250 650000/RIT m² M.90.a Rp. 88,000.00 Rp. 92,928.00
2 Paving block 6 cm warna K-250 m² M.90.b Rp. 123,000.00 Rp. 129,888.00
3 Paving block 6 cm abu-abu K-300 m² M.90.c Rp. 91,000.00 Rp. 90,000.00
###
4 Paving block 6 cm warna K-300 m² M.90.d Rp. 126,000.00 Rp. 105,000.00
###
5 Paving block 8 cm abu-abu K-300 m² M.90.e M.90.e Rp. 124,750.00 Rp. 120,000.00
###
6 Paving block 8 cm warna K-300 m² M.90.f Rp. 168,000.00 Rp. 135,000.00
###
7 Paving block 8 cm abu-abu K-400 m² M.90.g Rp. 132,800.00 Rp. 140,236.80
8 Paving block 8 cm warna K-400 m² M.90.h Rp. 172,000.00 Rp. 181,632.00
9 Kanstin K-200, 10x20x50 cm 760000/RIT buah M.91.a Rp. 18,500.00 Rp. 12,000.00
###
10 Kanstin K-200, 40x30x25 cm buah M.91.aa Rp. 37,000.00 Rp. 39,072.00
11 Kanstin Taman 40x20x10 buah M.91.b Rp. 38,000.00 Rp. 40,128.00
12 Kanstin Trotoar 40x25x15x13 buah M.91.c Rp. 28,000.00 Rp. 29,568.00
13 Kanstin Trotoar 40x28x15x13 buah M.91.d Rp. 29,500.00 Rp. 31,152.00
14 Kanstin tali air Tipe S-40x30x15x8 buah M.91.e Rp. 30,500.00 Rp. 32,208.00
15 Kanstin 60x25x22x18 buah M.91.f Rp. 54,500.00 Rp. 57,552.00
16 Kanstin 60x15x22 buah M.91.g Rp. 39,000.00 Rp. 41,184.00
17 Kerb (13/16x30x50) K-200 tipe A buah M.92.a M.92.a Rp. 52,000.00 Rp. 54,912.00
18 Kerb (18/21x30x50) K-200 tipe B buah M.92.b Rp. 60,000.00 Rp. 63,360.00

MATERIAL DRAINASE
1 Buis beton Ø 20 cm buah M.95.a Rp. 85,000.00 Rp. 89,760.00
2 Buis beton Ø 30 cm buah M.95.b Rp. 110,000.00 Rp. 116,160.00
3 Buis beton Ø 40 cm buah M.95.c Rp. 140,000.00 Rp. 147,840.00
4 Buis beton Ø 50 cm buah M.95.d Rp. 180,000.00 Rp. 190,080.00
5 Buis beton Ø 60 cm buah M.95.e Rp. 165,000.00 Rp. 174,240.00
6 Buis beton Ø 80 cm @50 cm buah M.95.f Rp. 217,500.00 Rp. 229,680.00
7 Buis beton Ø 100 cm @50 cm buah M.95.g Rp. 260,000.00 Rp. 274,560.00
8 Got Normal U-15 buah M.96.a Rp. 40,000.00 Rp. 42,240.00
9 Got Normal U-20 buah M.96.b Rp. 50,000.00 Rp. 52,800.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
10 Got Normal U-30 buah M.96.c Rp. 72,500.00 Rp. 76,560.00 UA
11 Got Normal U-40 buah M.96.d Rp. 90,000.00 Rp. 95,040.00 N
12 Got Normal U-60 buah M.96.e Rp. 180,000.00 Rp. 190,080.00 A
13 Got Normal U-80 @50 cm buah M.96.f Rp. 180,000.00 Rp. 190,080.00
14 U - Ditch 20 x 20, panjang 120 cm, K-350, fabrikasi. unit M.97.a Rp. 220,000.00 Rp. 232,320.00
15 U - Ditch 30 x 30, panjang 120 cm, K-350, fabrikasi. unit M.97.b M.97.b Rp. 279,742.42 Rp. 295,408.00
16 U - Ditch 40 x 40, panjang 120 cm, K-350, fabrikasi. unit M.97.c M.97.c Rp. 340,833.33 Rp. 359,920.00
17 U - Ditch 40 x 60, panjang 120 cm, K-350, fabrikasi. M.97.d Rp. 557,000.00
18 U - Ditch 50 x 50, panjang 120 cm, K-350, fabrikasi. unit M.97.d M.97.e Rp. 477,803.03 Rp. 504,560.00
19 U - Ditch 60 x 60, panjang 120 cm, K-350, fabrikasi. unit M.97.e M.97.f Rp. 631,681.82 Rp. 667,056.00
20 U - Ditch 60 x 80, panjang 120 cm, K-350, fabrikasi. unit M.97.f M.97.g Rp. 895,000.00 Rp. 945,120.00
21 U - Ditch 80 x 80, panjang 120 cm, K-350, fabrikasi. unit M.97.g M.97.h Rp. 995,000.00 Rp. 1,050,720.00
22 U - Ditch 80 x 100, panjang 120 cm, K-350, fabrikasi. unit M.97.h M.97.i Rp. 1,295,000.00 Rp. 1,367,520.00
23 U - Ditch 100 x 100, panjang 120 cm, K-350, fabrikasi. unit M.97.i M.97.j Rp. 1,315,000.00 Rp. 1,388,640.00
24 U - Ditch 100 x 120, panjang 120 cm, K-350, fabrikasi. unit M.97.j M.97.k Rp. 1,585,000.00 Rp. 1,673,760.00
25 U - Ditch 120 x 120, panjang 120 cm, K-350, fabrikasi. unit M.97.k M.97.l Rp. 1,735,000.00 Rp. 1,832,160.00
26 U - Ditch 140 x 140, panjang 120 cm, K-350, fabrikasi. unit M.97.l M.97.l Rp. 3,689,000.00 Rp. 3,895,584.00
27 Penutup U - Ditch 30, P= 60 cm, K-350, beban ringan (fabrikasi) unit M.98.b M.98.b Rp. 74,772.73 Rp. 78,960.00
28 Penutup U - Ditch 30, P= 60 cm, K-350, beban berat (fabrikasi) unit M.98.c Rp. 97,500.00 Rp. 102,960.00
29 Penutup U - Ditch 40, P= 60 cm, K-350, beban ringan (fabrikasi) unit M.98.d M.98.c Rp. 99,318.18 Rp. 104,880.00
30 Penutup U - Ditch 40, P= 60 cm, K-350, beban berat (fabrikasi) unit M.98.e M.98.c Rp. 131,181.82 Rp. 138,528.00
31 Penutup U - Ditch 50, P= 60 cm, K-350, beban ringan (fabrikasi) unit M.98.f M.98.d Rp. 130,954.55 Rp. 138,288.00
32 Penutup U - Ditch 50, P= 60 cm, K-350, beban berat (fabrikasi) unit M.98.g M.98.e Rp. 182,727.27 Rp. 192,960.00
33 Penutup U-Ditch 60, P= 60 cm, beban ringan unit M.98.h M.98.f Rp. 159,318.18 Rp. 168,240.00
34 Penutup U-Ditch 60, P= 60 cm, beban berat unit M.98.i M.98.g Rp. 243,787.88 Rp. 257,440.00
35 Penutup U-Ditch 80, P= 60 cm, beban ringan unit M.98.j M.98.h Rp. 219,363.64 Rp. 231,648.00
36 Penutup U-Ditch 80, P= 60 cm, beban berat unit M.98.k M.98.i Rp. 409,090.91 Rp. 432,000.00
37 Penutup U-Ditch 100, P= 60 cm, beban berat unit M.98.m M.98.k Rp. 390,000.00 Rp. 411,840.00
38 Box Culvert 80 x 80, P= 100 cm, K-350, beban ringan unit / m M.99.a M.99.a Rp. 1,489,090.91 Rp. 1,572,480.00
39 Box Culvert 80 x 80, P= 100 cm, K-350, beban berat unit / m M.99.b M.99.b Rp. 2,286,161.62 Rp. 2,414,186.67
40 Box Culvert 100 x 100, P= 100 cm, K-350, beban ringan unit / m M.99.d M.99.d Rp. 2,286,363.64 Rp. 2,414,400.00
41 Box Culvert 100 x 100, P= 100 cm, K-350, beban berat unit / m M.99.e M.99.e Rp. 2,844,343.43 Rp. 3,003,626.67
42 Box Culvert 120 x 120, P= 100 cm, K-350, beban ringan unit / m M.99.g M.99.g Rp. 3,336,363.64 Rp. 3,523,200.00
43 Box Culvert 120 x 120, P= 100 cm, K-350, beban berat unit / m M.99.h M.99.h Rp. 4,131,818.18 Rp. 4,363,200.00
44 Box Culvert 140 x 140, P= 100 cm, K-350, beban berat M.99.j Rp. 4,743,000.00
45 Box Culvert 150 x 150, P= 100 cm, K-350, beban ringan unit / m M.99.k M.99.k Rp. 5,900,000.00 Rp. 6,230,400.00
46 Box Culvert 150 x 150, P= 100 cm, K-350, beban berat unit / m M.99.l M.99.l Rp. 6,516,363.64 Rp. 6,881,280.00
47 Box Culvert 200 x 200, P= 100 cm, K-350, beban ringan unit / m M.99.m M.99.m Rp. 7,997,000.00 Rp. 8,444,832.00
48 Box Culvert 200 x 200, P= 100 cm, K-350, beban berat unit / m M.99.n M.99.n Rp. 8,938,000.00 Rp. 9,438,528.00
49 Lapis Drainase m3 M3 Rp. 338,585.00
50 Deck drain baja diameter 150 mm Unit (M239) Rp. 100,000.00

MATERIAL BETON PRACETAK PRATEGANG


1 PC I Girder L=16,6; H=0,90;CTC=1,4 m terpasang + diafragma, deckplat, elastomer buah M.100.a (M185) Rp. 100,956,000.00 Rp. 106,609,536.00
2 PC I Girder L=20,6; H=1,25;CTC=1,85 m terpasang + diafragma, deckplat, elastomer buah M.100.b Rp. 147,275,000.00 Rp. 155,522,400.00
3 PC I Girder L=22,6; H=1,25;CTC=1,4 m terpasang + diafragma, deckplat, elastomer buah M.100.c (M185) Rp. 161,896,000.00 Rp. 170,962,176.00
4 Tiang pancang pratekan pracetak spun piles Ø 300 mm m' M.101.a Rp. 308,000.00 Rp. 325,248.00
5 Tiang pancang pratekan pracetak spun piles Ø 350 mm m' M.101.b Rp. 374,000.00 Rp. 394,944.00
6 Tiang pancang pratekan pracetak spun piles Ø 400 mm m' M.101.c Rp. 480,000.00 Rp. 506,880.00
7 Tiang pancang pratekan pracetak spun piles Ø 450 mm m' M.101.d Rp. 570,000.00 Rp. 601,920.00
8 Tiang pancang pratekan pracetak spun piles Ø 500 mm m' M.101.e Rp. 700,000.00 Rp. 739,200.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
9 Tiang pancang pratekan pracetak spun piles Ø 600 mm m' M.101.f Rp. 1,000,000.00 Rp. 1,056,000.00 UA
10 Tiang pancang pratekan pracetak square piles 200x200 mm 6m m' M.101.h1 Rp. 104,247.50 Rp. 110,085.36 N
11 Tiang baja galvanis lengan tunggal dia. 6" panjang 11 m bh M.94.h Rp. 6,695,800.00 A
12 Tiang baja galvanis lengan ganda dia. 6" panjang 11 m M.94.i Rp. 7,570,000.00
13 Sheetpile type FPC.220.500 10S-B m' M.102.a Rp. 627,000.00 Rp. 662,112.00
14 Sheetpile type FPC.320.500 16S-B m' M.102.b Rp. 913,000.00 Rp. 964,128.00
15 Sheetpile type CCSP W.325.1000 Kelas A m' M.102.c Rp. 814,000.00 Rp. 859,584.00
16 Sheetpile type CCSP W.325.1000 Kelas B m' M.102.d Rp. 869,000.00 Rp. 917,664.00
17 Sheetpile type CCSP W.350.1000 Kelas A m' M.102.e Rp. 968,000.00 Rp. 1,022,208.00
18 Sheetpile type CCSP W.350.1000 Kelas B m' M.102.f Rp. 1,023,000.00 Rp. 1,080,288.00
19 Sheetpile type CCSP W.400.1000 Kelas A m' M.102.g Rp. 1,056,000.00 Rp. 1,115,136.00
20 Sheetpile type CCSP W.400.1000 Kelas B m' M.102.h Rp. 1,166,000.00 Rp. 1,231,296.00
21 Sheetpile type CCSP W.450.1000 Kelas A m' M.102.i Rp. 1,199,000.00 Rp. 1,266,144.00
22 Sheetpile type CCSP W.450.1000 Kelas B m' M.102.j Rp. 1,309,000.00 Rp. 1,382,304.00
23 Sheetpile type CCSP W.500.1000 Kelas A m' M.102.k Rp. 1,331,000.00 Rp. 1,405,536.00
24 Sheetpile type CCSP W.500.1000 Kelas B m' M.102.l Rp. 1,485,000.00 Rp. 1,568,160.00
25 Sheetpile type CCSP W.600.1000 Kelas A m' M.102.m Rp. 1,529,000.00 Rp. 1,614,624.00
26 Sheetpile type CCSP W.600.1000 Kelas B m' M.102.n Rp. 1,815,000.00 Rp. 1,916,640.00
27 Triangle Pile 200 mm m' M.103.a Rp. 109,000.00 Rp. 115,104.00
28 Triangle Pile 250 mm m' M.103.b Rp. 162,000.00 Rp. 171,072.00
29 Triangle Pile 280 mm m' M.103.c Rp. 200,000.00 Rp. 211,200.00
30 Triangle Pile 300 mm m' M.103.d Rp. 241,000.00 Rp. 254,496.00
31 Triangle Pile 320 mm m' M.103.e Rp. 250,000.00 Rp. 264,000.00
32 Minipile kotak 20x20 cm, K.500 m' M.104.a Rp. 200,000.00 Rp. 211,200.00
33 Minipile kotak 25x25 cm, K.500 m' M.104.b Rp. 290,000.00 Rp. 306,240.00
34 Minipile kotak 30x30 cm, K.500 m' M.104.c Rp. 370,000.00 Rp. 390,720.00
35 Minipile kotak 35x35 cm, K.500 m' M.104.d Rp. 510,000.00 Rp. 538,560.00
36 Minipile kotak 40x40 cm, K.500 m' M.104.e Rp. 630,000.00 Rp. 665,280.00
37 Minipile kotak 45x45 cm, K.500 m' M.104.f Rp. 800,000.00 Rp. 844,800.00
38 Minipile kotak 50x50 cm, K.500 m' M.104.g Rp. 960,000.00 Rp. 1,013,760.00
39 Rapid Setting Material (Beton Semen Fast Track < 24 jam) m3 (M183) Rp. 2,740,163.00
40 Kabel Prategang kg Mpt Rp. 193,000.00
41 Berat H Beam kg (M193) Rp. 8,583.11

MATERIAL JALAN DAN JEMBATAN


1 Elastomeric bearings jenis 1 (300 x 400 x 50) buah M.106.a Rp. 1,940,000.00 Rp. 2,048,640.00
2 Elastomeric bearings jenis 2 (350 x 400 x 50) buah M.106.b Rp. 2,270,000.00 Rp. 2,397,120.00
3 Elastomeric bearings jenis 3 (400 x 500 x 50) buah M.106.c Rp. 3,240,000.00 Rp. 3,421,440.00
4 Elastomeric bearings jenis 4 (450 x 500 x 50) buah M.106.d Rp. 3,640,000.00 Rp. 3,843,840.00
5 Cat marka (thermoplastic) kg M.109.b (M17b) Rp. 27,250.00 Rp. 28,776.00
6 Cat marka (non thermoplastic) (M17c) Rp. 22,300.00
7 Glass Bead kg M.110 M.110 Rp. 21,000.00 Rp. 22,176.00
8 Plastik cor/Polytene 125 mikron kg M.112 (M97) Rp. 44,090.91 Rp. 46,560.00
9 Aspal curah (Kendal Atas) kg M.113.a M.123 (M10) Rp. 6,730.00 Rp. 15,244.00
10 Aspal drum (Kendal Atas) kg M.113.b M.113.b Rp. 8,174.00 Rp. 13,252.12
11 Aspal Emulsi (Kendal Atas) CSS-PC kg M.113.c (M31) Rp. 9,140.00 Rp. 10,617.02
12 Aspal Emulsi (Kendal Atas) CRS-1 kg M.113.d Rp. 9,240.00 Rp. 10,733.18
13 Aspal Emulsi (Kendal Atas) CRS-2 kg M.113.e Rp. 9,930.00 Rp. 11,534.69
14 Aspal Emulsi (Kendal Atas) CSS-1 kg M.113.f Rp. 8,990.00 Rp. 10,442.78
15 Aspal Emulsi (Kendal Atas) CSS-1h kg M.113.g Rp. 9,960.00 Rp. 11,569.54
16 Aspal Emulsi Modifikasi Polimer 1h Kg (M31c) Rp. 17,300.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
17 Aspal Emulsi Modifikasi Polimer 2h Kg (M31d) Rp. 12,300.00 U A
18 AC-WC (terkirim ) (Kendal Atas) Ton M.114 M.114 Rp. 1,240,800.00 Rp. 1,514,100.00
### N
19 AC-BC (terkirim ) (Kendal Atas) Ton M.115 M.115 Rp. 1,210,800.00 ### A
Rp. 1,453,410.00
20 AC-Base (terkirim ) (Kendal Atas) ton M.116 M.116 Rp. 1,204,500.00 Rp. 1,361,535.00
###
21 ATB (terkirim ) (Kendal Atas) Ton M.117.b M.117.b Rp. 1,255,000.00 Rp. 1,457,808.00
22 HRS (terkirim ) (Kendal Atas) Ton M.118.a Rp. 1,394,000.00 Rp. 1,619,270.40
23 Sand Sheet / LATASIR ) (terkirim ) (Kendal Atas) Ton M.118.b Rp. 1,461,750.00 Rp. 1,697,968.80
24 HRS-WC (terkirim ) (Kendal Atas) Ton M.118.c M.118.c Rp. 1,409,000.00 Rp. 1,665,615.00
###
25 HRS-Base (terkirim) (Kendal Atas) Ton M.118.d Rp. 1,409,000.00 Rp. 1,636,694.40
26 Prime Coat (Kendal Atas) Ltr M.119 M.119 Rp. 15,696.67 Rp. 14,542.50
###
27 Tack Coat (Kendal Atas) Ltr M.120 M.120 Rp. 15,360.00 Rp. 14,385.00
###
28 Aspal curah (Kendal Bawah) kg M.113.a (M10)-b Rp. 6,730.00 Rp. 14,244.00
29 Aspal drum (Kendal Bawah) kg M.113.b M.113.b-b Rp. 8,174.00 Rp. 12,621.07
###
30 Aspal Emulsi (Kendal Bawah) CSS-PC kg M.113.c (m31)-b Rp. 9,140.00 Rp. 9,651.84
31 Aspal Emulsi (Kendal Bawah) CRS-1 kg M.113.d Rp. 9,240.00 Rp. 9,757.44
32 Aspal Emulsi (Kendal Bawah) CRS-2 kg M.113.e Rp. 9,930.00 Rp. 10,486.08
33 Aspal Emulsi (Kendal Bawah) CSS-1 kg M.113.f Rp. 8,990.00 Rp. 9,493.44
34 Aspal Emulsi (Kendal Bawah) CSS-1h kg M.113.g Rp. 9,960.00 Rp. 10,517.76
35 AC-WC (terkirim ) (Kendal Bawah) Ton M.114 M.114-b Rp. 1,240,800.00 Rp. 1,442,000.00
###
36 AC-BC (terkirim ) (Kendal Bawah) Ton M.115 M.115-b Rp. 1,210,800.00 Rp. 1,384,200.00
###
37 AC-Base (terkirim ) (Kendal Bawah) ton M.116 M.116-b Rp. 1,204,500.00 Rp. 1,296,700.00
###
38 ATB (terkirim ) (Kendal Bawah) Ton M.117.b M.117.b-b Rp. 1,255,000.00 Rp. 1,325,280.00
39 HRS (terkirim ) (Kendal Bawah) Ton M.118.a Rp. 1,394,000.00 Rp. 1,472,064.00
40 Sand Sheet / LATASIR ) (terkirim ) (Kendal Bawah) Ton M.118.b M.118.b Rp. 1,461,750.00 Rp. 1,543,608.00
41 HRS-WC (terkirim ) (Kendal Bawah) Ton M.118.c M.118.c-b Rp. 1,409,000.00 Rp. 1,586,300.00
###
42 HRS-Base (terkirim) (Kendal Bawah) Ton M.118.d Rp. 1,409,000.00 Rp. 1,487,904.00
43 Prime Coat (Kendal Bawah) Ltr M.119 M.119-b Rp. 15,696.67 Rp. 13,850.00
###
44 Tack Coat (Kendal Bawah) Ltr M.120 M.120-b Rp. 15,360.00 Rp. 13,700.00
###

MATERIAL PENUTUP ATAP


1 Genteng beton buah M.125 Rp. 8,214.29 Rp. 8,674.29
2 Genteng decra bond / Versabond (1,32 x 0,41 m) buah M.126 Rp. 101,500.00 Rp. 107,184.00
3 Genteng kodok buah M.127.a Rp. 2,800.00 Rp. 2,956.80
4 Genteng kodok glazuur buah M.127.b Rp. 7,250.00 Rp. 7,656.00
5 Genteng metal lembar M.128.a Rp. 50,000.00 Rp. 52,800.00
6 Genteng metal berpasir (Tipis) lembar M.128.b Rp. 35,000.00 Rp. 36,960.00
7 Genteng metal berpasir (Tebal) lembar M.128.c Rp. 37,000.00 Rp. 39,072.00
8 Genteng palentong buah M.129.a Rp. 1,500.00 Rp. 1,584.00
9 Genteng palentong super buah M.129.b Rp. 2,775.00 Rp. 2,930.40
10 Genteng Keramik buah Rp. 20,000.00 Rp. 21,120.00
11 Genteng Keramik Glazur Morando buah M.129.c Rp. 3,125.00 Rp. 3,300.00
12 Genteng Keramik Glazur Kanmuri buah M.129.d Rp. 12,000.00 Rp. 12,672.00
13 Genteng press jatiwangi kecil natural buah M.130.a Rp. 2,200.00 Rp. 2,323.20
14 Genteng pres jatiwangi besar natural buah M.130.b Rp. 3,042.86 Rp. 3,213.26
15 Genteng pres jatiwangi besar Glazuur buah M.130.c Rp. 4,162.50 Rp. 4,395.60
16 Genteng Keramik M-Class buah M.131 Rp. 11,000.00 Rp. 11,616.00
17 Genteng aspal (Onduvilla) lembar M.132.a Rp. 53,000.00 Rp. 55,968.00
18 Genteng aspal (Onduline) lembar M.132.b Rp. 170,000.00 Rp. 179,520.00
19 Bitumen tekstur genteng lembar M.132.c Rp. 63,000.00 Rp. 66,528.00
20 Genteng Bubungan Keramik Warna Standar buah M.133 Rp. 18,500.00 Rp. 19,536.00
21 Bubung Genteng press jatiwangi kecil natural buah M.134.a Rp. 8,500.00 Rp. 8,976.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
22 Bubung Genteng press jatiwangi besar natural buah M.134.b Rp. 7,000.00 Rp. 7,392.00 UA
23 Bubung Genteng press jatiwangi besar Glazuur buah M.134.c Rp. 11,250.00 Rp. 11,880.00 N
24 Bubung genteng kodok glazuur buah M.134.d Rp. 11,750.00 Rp. 12,408.00 A
25 Bubung genteng palentong buah M.134.e Rp. 9,750.00 Rp. 10,296.00
26 Bubung genteng meteseh (Lokal) buah M.134.f Rp. 7,666.67 Rp. 8,096.00
27 Bubung beton press buah M.134.g Rp. 11,000.00 Rp. 11,616.00
28 Bubung asbes kecil buah M.134.h Rp. 35,000.00 Rp. 36,960.00
29 Bubung asbes besar buah M.134.i Rp. 75,000.00 Rp. 79,200.00
30 Nok genteng beton buah M.135.a Rp. 32,000.00 Rp. 33,792.00
31 Nok stel gelombang lembar M.135.b Rp. 45,000.00 Rp. 47,520.00
32 Nok genteng metal lembar M.135.c Rp. 31,000.00 Rp. 32,736.00
33 Nok genteng aspal lembar M.135.d Rp. 65,000.00 Rp. 68,640.00
34 Nok standar 40x18 lembar M.135.e Rp. 5,000.00 Rp. 5,280.00
35 Nok paten 92 cm lembar M.135.f Rp. 55,000.00 Rp. 58,080.00
36 Nok paten 105 cm lembar M.135.g Rp. 44,000.00 Rp. 46,464.00
37 Seng gelombang 3"-5" lembar M.137.a Rp. 110,000.00 Rp. 116,160.00
38 Seng gelombang bljs 30 lembar M.137.b Rp. 49,000.00 Rp. 51,744.00
39 Seng gelombang bjls 28 lembar M.137.c Rp. 50,000.00 Rp. 52,800.00
40 Seng gelombang uk. 0.9 x 1.8 t=0.02 lembar M.137.d Rp. 52,000.00 Rp. 54,912.00
41 Seng gelombang 0,7 x 1,8, t=0,02 lembar M.88.a Rp. 40,000.00
42 Seng gelombang 0,7 x 1,8, t=0,025 lembar M.88.b Rp. 45,000.00
43 Seng gelombang 0,7 x 1,8, t=0,03 lembar M.88.c Rp. 52,000.00
44 Seng gelombang 0,7 x 1,8, t=0,05 lembar M.88.d Rp. 64,000.00
45 Seng pelat BJLS-26 lebar 0,6 m' m' M.89.a Rp. 21,000.00
46 Seng pelat BJLS-26 lebar 0,9 m' m' M.89.b Rp. 27,000.00
47 Seng pelat lebar 0,9 m' t=0,02 m' M.90.a Rp. 22,000.00
48 Seng pelat lebar 0,9 m' t=0,025 m' M.90.b Rp. 26,250.00
49 Seng pelat lebar 0,9 m' t=0,03 m' M.90.c Rp. 29,000.00
50 Seng pelat lebar 0,9 m' t=0,04 m' M.90.d Rp. 29,000.00
51 Seng pelat lebar 0,9 m' t=0,05 m' M.90.e Rp. 35,000.00
52 PA: Stang besi polos ø 12 mm; PINTU AIR Buah M.93.a Rp. 63,000.00
53 PA: Stang besi ulir ø 16 mm buah M.93.b Rp. 136,000.00
54 PA: Stang besi ulir ø 16 mm + gear buah M.93.c Rp. 189,000.00
55 PA: Stang besi ulir ø 20 mm buah M.93.d Rp. 267,000.00
56 PA: Stang ulir ø 20 mm + gear buah M.93.e Rp. 325,000.00
57 Tiang pancang baja ø 30 cm m' M.94.c Rp. 630,000.00
58 Seng plat 3" x 6" bjls 28 lembar M.137.e Rp. 68,000.00 Rp. 71,808.00
59 Seng plat bjls 28 lembar M.137.f Rp. 41,666.67 Rp. 44,000.00
60 Seng plat bjls 30 lembar M.137.g Rp. 50,000.00 Rp. 52,800.00
61 Asbes 1,00 x 1,00 m lembar M.138.a Rp. 112,833.33 Rp. 119,152.00
62 Asbes gelombang besar 5mm (250x102cm) lembar M.138.b Rp. 140,000.00 Rp. 147,840.00
63 Asbes gelombang besar 5mm (225x102cm) lembar M.138.c Rp. 100,000.00 Rp. 105,600.00
64 Asbes gelombang besar 5mm (200x102cm) lembar M.138.d Rp. 93,000.00 Rp. 98,208.00
65 Asbes gelombang besar 5mm (180x102cm) lembar M.138.e Rp. 62,000.00 Rp. 65,472.00
66 Asbes gelombang kecil 4mm (300x105) lembar M.138.f Rp. 93,071.43 Rp. 98,283.43
67 Asbes gelombang kecil 4mm (270x105) lembar M.138.g Rp. 89,600.00 Rp. 94,617.60
68 Asbes gelombang kecil 4mm (240x105) lembar M.138.h Rp. 72,428.57 Rp. 76,484.57
69 Asbes gelombang kecil 4mm (210x105) lembar M.138.i Rp. 60,100.00 Rp. 63,465.60
70 Asbes gelombang kecil 4mm (180x105) lembar M.138.j Rp. 57,250.00 Rp. 60,456.00
71 Asbes gelombang kecil 4mm (150x105) lembar M.138.k Rp. 42,500.00 Rp. 44,880.00
72 Asbes gelombang besar 6mm (300x102) lembar M.138.l Rp. 129,000.00 Rp. 136,224.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
73 Asbes gelombang besar 6mm (270x102) lembar M.138.m Rp. 115,000.00 Rp. 121,440.00 UA
74 Asbes gelombang besar 6mm (240x102) lembar M.138.n Rp. 127,500.00 Rp. 134,640.00 N
75 Asbes gelombang besar 6mm (210x102) lembar M.138.o Rp. 85,000.00 Rp. 89,760.00 A
76 Asbes gelombang besar 6mm (180x102) lembar M.138.p Rp. 80,000.00 Rp. 84,480.00
77 Fibre glass (jabes) 180x105 cm lembar M.139.a Rp. 60,000.00 Rp. 63,360.00
78 Fibre glass (jabes) 210x105 cm lembar M.139.b Rp. 67,500.00 Rp. 71,280.00
79 Fibre glass (jabes) 240x105 cm lembar M.139.c Rp. 76,500.00 Rp. 80,784.00
80 Serat Fiberglass m2 M.140 Rp. 4,250.00 Rp. 4,488.00
81 Sirap kayu lembar M.141 Rp. 2,800.00 Rp. 2,956.80
82 Atap Transparan Gelombang 180 x 80 cm lembar M.142.a Rp. 61,500.00 Rp. 64,944.00
83 Atap transparan gelombang 240 x 850 cm Lembar M.142.b Rp. 85,000.00 Rp. 89,760.00
84 Alumunium gelombang tebal 0,55 buah M.143 Rp. 110,000.00 Rp. 116,160.00
85 Galvalum gelombang, t= 0.25 mm, L= 80 cm m' M.144.a Rp. 35,750.00 Rp. 37,752.00
86 Galvalum gelombang, t= 0.3 mm, L= 80 cm m' M.144.b Rp. 45,000.00 Rp. 47,520.00
87 Polycarbonate , 2,1 m x 11,8 m x 4 mm Lembar M.145 Rp. 1,800,000.00 Rp. 1,900,800.00
88 Polycarbonate , 2,1 m x 11,8 m x 5 mm Lembar M.145.a Rp. 1,800,000.00 Rp. 1,900,800.00
89 Polycarbonate , 2,1 m x 11,8 m x 6 mm Lembar M.145.b Rp. 2,000,000.00 Rp. 2,112,000.00
90 Polycarbonate , 2,1 m x 11,8 m x 10 mm Lembar M.145.c Rp. 3,300,000.00 Rp. 3,484,800.00
91 Profil “H” warna hitam untuk sambungan, P= 6m buah M.146.a Rp. 76,000.00 Rp. 80,256.00
92 Profil “H” warna putih untuk sambungan, P= 6m buah M.146.b Rp. 65,000.00 Rp. 68,640.00
93 Profil “U” warna hitam untuk sisi terluar, P= 6m buah M.147.a Rp. 34,000.00 Rp. 35,904.00
94 Profil “U” warna putih untuk sisi terluar, P= 6m buah M.147.b Rp. 35,000.00 Rp. 36,960.00

MATERIAL PLAFOND
1 Akustik ukuran 30 x 30 cm lembar M.150.a Rp. 21,000.00 Rp. 22,176.00
2 Akustik ukuran 30 x 60 cm lembar M.150.b Rp. 30,500.00 Rp. 32,208.00
3 Akustik 60 x 120 cm tebal 15 mm Lembar M.150.c Rp. 55,000.00 Rp. 58,080.00
4 Akustik 60 x 60 cm tebal 15 mm Lembar M.150.d Rp. 45,000.00 Rp. 47,520.00
5 Gypsum Board (120 cm x 240 cm x 9 mm) lembar M.151.a Rp. 58,333.33 Rp. 61,600.00
6 Gypsum Board (120 cm x 240 cm x 12 mm) lembar M.151.b Rp. 72,500.00 Rp. 76,560.00
7 Pelat asbes tebal 3,5 mm lembar M.152.a Rp. 62,000.00 Rp. 65,472.00
8 GRC board (120 cm x 240 cm x 6 mm) lembar M.153.a Rp. 100,000.00 Rp. 105,600.00
9 GRC board (120 cm x 240 cm x 3 mm) M.153.b Rp. 69,000.00 Rp. 72,864.00
10 Listplang GRC (20 cm x 244 cm x 9 mm ) buah M.154 Rp. 43,500.00 Rp. 45,936.00
11 Listplang tekstur kayu buah M.155 Rp. 84,000.00 Rp. 88,704.00
12 Listplang papan kalsiboard buah M.156 Rp. 51,000.00 Rp. 53,856.00
13 List Profil Gipsum lebar 8 cm m¹ M.157.a Rp. 6,500.00 Rp. 6,864.00
14 List Profil Gipsum lebar 10 cm m¹ M.157.b Rp. 7,500.00 Rp. 7,920.00
15 List Profil Gipsum lebar 12 cm m¹ M.157.c Rp. 8,500.00 Rp. 8,976.00
16 List Profil Gipsum lebar 15 cm m¹ M.157.d Rp. 9,375.00 Rp. 9,900.00
17 List Profil Gipsum lebar 20 cm m¹ M.157.e Rp. 10,000.00 Rp. 10,560.00
18 Papan Semen 122 x 244 cm tebal 4 mm Lembar M.158 Rp. 62,500.00 Rp. 66,000.00
19 Papan Semen 9 mm x 30 cm x 244 cm cm M.158.b Rp. 2,643.44 Rp. 2,791.48
20 Papan Semen 8 mm x 20 cm x 405 cm cm M.158.c Rp. 1,296.30 Rp. 1,368.89
21 Plat Alumunium Berlubang 60 x 60 cm m² M.159.a Rp. 113,000.00 Rp. 119,328.00
22 Plat Alumunium Spandrill lebar 10 cm m² M.159.b Rp. 21,666.67 Rp. 22,880.00
23 Plat Alumunium Spandrill lebar 12 cm m² M.159.c Rp. 27,500.00 Rp. 29,040.00
24 Plat Alumunium Spandrill lebar 15 cm m² M.159.d Rp. 30,166.67 Rp. 31,856.00
25 Plat PVC 122 x 244 cm tebal 5 mm Lembar M.160.a Rp. 69,000.00 Rp. 72,864.00
26 Plat PVC 400 x 20 cm tebal 8 mm Lembar M.160.b Rp. 89,000.00 Rp. 93,984.00
27 Profil Alumunium "T" warna m¹ M.162.c Rp. 53,000.00 Rp. 55,968.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
28 Profil Alumunium "T" natural / Silver m¹ M.162.d Rp. 30,000.00 Rp. 31,680.00 UA
29 Calsiboard 122 x 244 cm tebal 3,5 mm Lembar M.163 Rp. 42,500.00 Rp. 44,880.00 N
30 Hollow Alumunium 23 x 34,5 mm T = 0,5 4 m/btg M.164.a Rp. 18,000.00 Rp. 19,008.00 A
31 Hollow Alumunium 40 x 40 mm 6 m/btg M.164.b Rp. 27,250.00 Rp. 28,776.00
32 Metal Furing 20 x 20 x 0,40 mm 4 m/btg M.165.a Rp. 82,000.00 Rp. 86,592.00
33 Metal Furing 40 x 40 x 0,40 mm 4 m/btg M.165.b Rp. 38,500.00 Rp. 40,656.00
34 Metal Stud 34x100x 0,4 mm 3 m/btg M.165.c Rp. 26,000.00 Rp. 27,456.00
35 Metal Stud 34x50x0,4 mm 3 m/btg M.165.d Rp. 24,500.00 Rp. 25,872.00
36 Metal Stud 34x76x0,4 mm 3 m/btg M.165.e Rp. 25,850.00 Rp. 27,297.60

MATERIAL PENUTUP LANTAI DAN DINDING


1 Porselin dinding 11 x 11 cm dos M.170 Rp. 59,250.00 Rp. 62,568.00
2 Keramik 10 x 20 cm (putih) 50 Buah M.171 Rp. 1,300.00 Rp. 1,372.80
3 Keramik 20 x 20 cm (putih) 25 Buah M.172.a Rp. 2,140.00 Rp. 2,259.84
4 Keramik 20 x 20 cm motif dos M.172.b Rp. 56,000.00 Rp. 59,136.00
5 Keramik 20 x 25 cm (putih) dos M.173.a Rp. 56,000.00 Rp. 59,136.00
6 Keramik 20 x 25 cm motif dos M.173.b Rp. 55,500.00 Rp. 58,608.00
7 Keramik 25 x 25 cm (putih) dos M.174.a Rp. 49,000.00 Rp. 51,744.00
8 Keramik 25 x 25 cm motif dos M.174.b Rp. 40,000.00 Rp. 42,240.00
9 Keramik 25 x 40 cm motif dos M.174.c Rp. 43,000.00 Rp. 45,408.00
10 Keramik 25 x 40 cm (putih) dos M.174.d Rp. 66,750.00 Rp. 70,488.00
11 Keramik 30 x 30 cm (putih) dos M.175.a Rp. 43,000.00 Rp. 45,408.00
12 Keramik 30 x 30 cm motif dos M.175.b Rp. 46,833.33 Rp. 49,456.00
13 Keramik 40 x 40 cm (putih) dos M.176.a Rp. 47,000.00 Rp. 49,632.00
14 Keramik 40 x 40 cm motif dos M.176.b Rp. 51,750.00 Rp. 54,648.00
15 Keramik 50 x 50 cm motif dos M.177.a Rp. 72,000.00 Rp. 76,032.00
16 Keramik 50 x 50 cm (putih) dos M.177.b Rp. 66,750.00 Rp. 70,488.00
17 Keramik 60 x 60 cm motif dos M.178.a Rp. 125,750.00 Rp. 132,792.00
18 Keramik 60 x 60 cm (putih) dos M.178.b Rp. 133,500.00 Rp. 140,976.00
19 Keramik 25 x 33 cm 12 Buah M.179 Rp. 8,055.56 Rp. 8,506.67
20 Keramik 30 x 60 cm 6 Buah M.180 Rp. 17,083.33 Rp. 18,040.00
21 Keramik 25 x 50 cm 8 Buah M.181 Rp. 10,000.00 Rp. 10,560.00
22 Keramik 20 x 40 cm 13 Buah M.182 Rp. 5,307.69 Rp. 5,604.92
23 Keramik 20 x 60 cm 8 Buah M.183 Rp. 6,960.00 Rp. 7,349.76
24 Keramik 32.5 x 65.5 cm 5 Buah M.184 Rp. 27,500.00 Rp. 29,040.00
25 Keramik 33 x 33 cm 9 Buah M.185 Rp. 8,259.26 Rp. 8,721.78
26 Keramik Artistik 10 cm x 20 cm 50 Buah M.186.a Rp. 1,800.00 Rp. 1,900.80
27 Keramik Artistik 20 cm x 20 cm 25 Buah M.186.b Rp. 3,666.67 Rp. 3,872.00
28 Keramik Artistik 5 cm x 20 cm Buah M.186.c Rp. 4,500.00 Rp. 4,752.00
29 Keramik Step Tile 30 x 120 cm 2 Buah M.187.a Rp. 106,750.00 Rp. 112,728.00
30 Keramik Step Tile 30 x 30 cm 11 Buah M.187.b Rp. 12,600.00 Rp. 13,305.60
31 Keramik Step Tile 30 x 60 cm 6 Buah M.187.c Rp. 13,422.00 Rp. 14,173.63
32 Keramik Border 10 x 40 cm Buah M.188.a Rp. 17,500.00 Rp. 18,480.00
33 Keramik Border 10 x 50 cm Buah M.188.b Rp. 18,000.00 Rp. 19,008.00
34 Keramik Border 10 x 60 cm Buah M.188.c Rp. 18,450.00 Rp. 19,483.20
35 Keramik Border 5-8 x 20 cm Buah M.188.d Rp. 6,500.00 Rp. 6,864.00
36 Keramik Border 5-8 x 25 cm Buah M.188.e Rp. 11,200.00 Rp. 11,827.20
37 Keramik Homogenous 40 x 40 cm 6 Buah M.189.a Rp. 34,300.00 Rp. 36,220.80
38 Keramik Homogenous 60 x 30 cm 6 Buah M.189.b Rp. 26,666.67 Rp. 28,160.00
39 Keramik Homogenous 60 x 60 cm 3 Buah M.189.c Rp. 50,700.00 Rp. 53,539.20
40 Keramik Homogenous 80 x 80 cm 2 Buah M.189.d Rp. 236,800.00 Rp. 250,060.80
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
41 Ubin keramik mozaik 30 cm x 30 cm 11 Buah M.190 Rp. 10,200.00 Rp. 10,771.20 UA
42 Granit tile 60 x 60 cm( double loading ) 3 Buah M.191.a Rp. 56,222.22 Rp. 59,370.67 N
43 Granit tile 40 x 40 cm ( double loading ) 6 Buah M.191.b Rp. 38,250.00 Rp. 40,392.00 A
44 Granit tile 30 x 30 cm ( double loading ) 12 Buah M.191.c Rp. 28,541.67 Rp. 30,140.00
45 Granit tile unpolish / anti skid m2 M.191.d Rp. 180,000.00 Rp. 190,080.00
46 Granit tile 30 x 60 cm ( double loading ) 6 buah M.191.e Rp. 41,000.00 Rp. 43,296.00
47 Ubin Teraso 30 cm x 30 cm Buah M.194.a Rp. 25,775.00 Rp. 27,218.40
48 Ubin Teraso 40 cm x 40 cm Buah M.194.b Rp. 58,075.00 Rp. 61,327.20
49 Ubin Teralux 30 cm x 30 cm Buah M.195.a Rp. 25,775.00 Rp. 27,218.40
50 Ubin Teralux 40 cm x 40 cm Buah M.195.b Rp. 58,075.00 Rp. 61,327.20
51 Ubin Teralux Marmer 30 cm x 30 cm Buah M.196.a Rp. 38,600.00 Rp. 40,761.60
52 Ubin Teralux Marmer 40 cm x 40 cm Buah M.196.b Rp. 49,750.00 Rp. 52,536.00
53 Ubin Teralux Marmer 60 cm x 60 cm Buah M.196.c Rp. 90,000.00 Rp. 95,040.00
54 Ubin alur 20x20 cm difabel (tuna netra) 25 Buah M.197.a Rp. 22,000.00 Rp. 23,232.00
55 Ubin alur 30x30 cm difabel (tuna netra) 11 Buah M.197.b Rp. 21,092.57 Rp. 22,273.75
56 Plint ubin PC abu - abu 10 cm x 30 cm Buah M.198.a Rp. 5,875.00 Rp. 6,204.00
57 Plint ubin PC abu - abu 10 cm x 40 cm Buah M.198.b Rp. 6,000.00 Rp. 6,336.00
58 Plint granit 10cm x 40cm buah M.201.a Rp. 30,000.00 Rp. 31,680.00
59 Plint granit 10cm x 30cm buah M.201.b Rp. 2,800.00 Rp. 2,956.80
60 Plint ubin Teralux Kerang 10 cm x 30 cm buah M.202.a Rp. 16,000.00 Rp. 16,896.00
61 Plint ubin Teralux Kerang 10 cm x 40 cm buah M.202.b Rp. 17,000.00 Rp. 17,952.00
62 Plint ubin Teralux Marmer 10 cm x 30 cm buah M.203.a Rp. 15,500.00 Rp. 16,368.00
63 Plint ubin Teralux Marmer 10 cm x 40 cm buah M.203.b Rp. 16,000.00 Rp. 16,896.00
64 Plint ubin Teralux Marmer 10 cm x 60 cm buah M.203.c Rp. 17,000.00 Rp. 17,952.00
65 Plint keramik 10 x 20 cm buah M.204.a Rp. 8,500.00 Rp. 8,976.00
66 Plint keramik 10 x 10 cm buah M.204.b Rp. 6,250.00 Rp. 6,600.00
67 Plint keramik 5 x 20 cm buah M.204.c Rp. 3,500.00 Rp. 3,696.00
68 Plint keramik 10 x 30 cm buah M.204.d Rp. 16,700.00 Rp. 17,635.20
69 Plint hospital 30 cm buah M.205.a Rp. 30,000.00 Rp. 31,680.00
70 Plint hospital 40 cm buah M.205.b Rp. 45,000.00 Rp. 47,520.00
71 Step Nosing Allumunium Karet buah M.206.a Rp. 250,000.00 Rp. 264,000.00
72 Step Nosing Alumunium SWP buah M.206.b Rp. 230,000.00 Rp. 242,880.00
73 Step Nosing Granit 10x60 cm Buah M.206.c Rp. 22,500.00 Rp. 23,760.00
74 Step Nosing Karet Buah M.206.d Rp. 57,750.00 Rp. 60,984.00
75 Step Nosing Keramik 10x40 cm Buah M.206.e Rp. 17,000.00 Rp. 17,952.00
76 Kuku Macan 10 cm buah M.207 Rp. 3,625.00 Rp. 3,828.00
77 Internal Cove buah M.209 Rp. 11,666.67 Rp. 12,320.00
78 Floordeck; t = 1,0 mm; L = 1,0 m m' M.210 Rp. 127,777.78 Rp. 134,933.33
79 Marmer m2 M.211 Rp. 1,000,000.00 Rp. 1,056,000.00
80 Lantai Vynil m2 M.212 Rp. 137,500.00 Rp. 145,200.00
81 Plint Vynil m2 M.213 Rp. 150,000.00 Rp. 158,400.00
82 Parquet jati m2 M.214 Rp. 230,000.00 Rp. 242,880.00
83 Carpet m2 M.215 Rp. 13,500.00 Rp. 14,256.00
84 High Pressure Laminated (HPL) Uk. 244 x 122 cm warna polos Lembar M.216.a Rp. 120,000.00 Rp. 126,720.00
85 High Pressure Laminated (HPL) Uk. 244 x 122 cm warna kayu Lembar M.216.b Rp. 140,000.00 Rp. 147,840.00
86 ACP Coating PE (Indoor) seven 122X244 lembar M.217.a Rp. 675,000.00 Rp. 712,800.00
87 ACP Coating PVDF (Outdoor) seven 122X244 lembar M.217.b Rp. 850,000.00 Rp. 897,600.00
88 Bata merah 5 x 11 x 22 cm buah M.218.a Rp. 818.57 Rp. 864.41
89 Bata merah 5 x 11 x 22 cm (m3) m3 M.218.b Rp. 750,000.00 Rp. 792,000.00
90 Bata tempel buah M.219 Rp. 2,900.00 Rp. 3,062.40
91 Bata Ekspos 4x22 buah M.219a Rp. 9,500.00 Rp. 10,032.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
92 Roster/terawang buah M.220 Rp. 9,500.00 Rp. 10,032.00 UA
93 Bata berongga / Roster 12x11 buah M.221.a Rp. 6,125.00 Rp. 6,468.00 N
94 Bata berongga / Roster 20x20 buah M.221.b Rp. 8,000.00 Rp. 8,448.00 A
95 Bata berongga / Roster 40x20 buah M.221.c Rp. 9,833.33 Rp. 10,384.00
96 Bata berongga / Roster dengan jaring kawat buah M.221.d Rp. 9,000.00 Rp. 9,504.00
97 Bata berongga / Roster genteng kecil 23 x 11.5 x 7 cm buah M.221.e Rp. 3,000.00 Rp. 3,168.00
98 Bata berongga / Roster genteng sedang 18 x 18 x 7 cm buah M.221.f Rp. 5,000.00 Rp. 5,280.00
99 Bata berongga / Roster genteng besar 23 x 23 x 7 cm buah M.221.g Rp. 13,500.00 Rp. 14,256.00
100 Bata berongga / Roster keramik 20 x 20 cm buah M.221.h Rp. 49,166.67 Rp. 51,920.00
101 Bata berongga / Roster keramik 30 x 30 cm buah M.221.i Rp. 68,833.33 Rp. 72,688.00
102 Bata berongga / Roster GRC m² M.221.j Rp. 850,000.00 Rp. 897,600.00
103 HB.10 - Batako (ukuran 40x20x10) buah M.222.a Rp. 2,500.00 Rp. 2,640.00
104 HB-10 m3 M.222.b Rp. 307,750.00 Rp. 324,984.00
105 HB.12 - Batako (ukuran 40x20x12) buah M.223.a Rp. 4,000.00 Rp. 4,224.00
106 HB-12 m3 M.223.b Rp. 935,000.00 Rp. 987,360.00
107 HB.15 - Batako (ukuran 40x20x15) buah M.224.a Rp. 6,900.00 Rp. 7,286.40
108 HB-15 m3 M.224.b Rp. 1,002,200.00 Rp. 1,058,323.20
109 HB.20 - Batako (ukuran 40x20x20) buah M.225.a Rp. 10,000.00 Rp. 10,560.00
110 HB-20 m3 M.225.b Rp. 1,080,400.00 Rp. 1,140,902.40
111 Batu paras m² M.226 Rp. 105,000.00 Rp. 110,880.00
112 Batu tempel hitam m² M.227 Rp. 129,500.00 Rp. 136,752.00
113 Batu alam andesit non bakar m² M.228.a Rp. 120,000.00 Rp. 126,720.00
114 Batu alam andesit polos bakar m² M.228.b Rp. 122,500.00 Rp. 129,360.00
115 Batu Alam Andesit Alur Bakar m² M.228.c Rp. 133,333.33 Rp. 140,800.00
116 Batu Alam Andesit Bintik Bakar m² M.228.d Rp. 125,000.00 Rp. 132,000.00
117 Batu Alam Andesit Motif m² M.228.e Rp. 125,000.00 Rp. 132,000.00
118 Batu Candi Warna m² M.229 Rp. 97,500.00 Rp. 102,960.00
119 Batu candi m² M.230 Rp. 250,000.00 Rp. 264,000.00
120 Batu sikat kg M.231 M.231 Rp. 3,150.00 Rp. 3,326.40
121 Batu putih m² M.232 Rp. 56,500.00 Rp. 59,664.00
122 Batu putih breksi m² M.233 Rp. 100,000.00 Rp. 105,600.00
123 Batu Wall Cladding m² M.234 Rp. 175,000.00 Rp. 184,800.00
124 Hebel Block (ukuran 60x20x7,5 cm) buah M.235.a Rp. 6,764.00 Rp. 7,142.78
125 Hebel Block (ukuran 60x20x10 cm) buah M.235.b Rp. 7,403.33 Rp. 7,817.92
126 Glass block buah M.236 Rp. 25,000.00 Rp. 26,400.00
127 Lantai Decking kayu 15 x 90 cm( double loading ) buah M.216.c Rp. 54,810.81 Rp. 57,880.22
128 Tako White 15 x 17 cm (double loading ) buah M.216.d Rp. 5,258.43 Rp. 5,552.90
129 Lantai Teraso tebal 2 cm m2 Rp. 270,000.00
###
130 Lantai Teraso tebal 3 cm m2 Rp. 365,200.00
###
131 Lantai Teraso tebal 4 cm m2 Rp. 425,500.00
###
132 Kansteen L m' Rp. 268,000.00
###
133 Kansteen I m' Rp. 310,000.00
###
134 Kansteen I unit Rp. 160,000.00
###
135 Kansteen R m' Rp. 310,000.00
###
136 Bak Sampah / Trascan unit Rp. 2,728,000.00
###
137 Tutup Bak Sampah Aluminium unit Rp. 1,900,000.00
###
138 Dot Tile Difabel Aluminium biji Rp. 5,050.00
###
139 Tack Tile Difabel Aluminium biji Rp. 13,600.00
###
140 Poles teraso gird 1000# m2 Rp. 60,000.00
###
141 Ongkos angkutan m2 Rp. 20,000.00
###
142 Lemkra Doof m2 Rp. 2,971.00
###
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
143 Lemkra Wet Look m2 Rp. 3,107.00
### UA
144 DuGrid/anti jamur m2 Rp. 1,500.00
### N
145 DG Waterproofing CT (Coating Teraso) 20 liter ### A
Rp. 575,000.00
MATERIAL BETON DAN ADUKAN PASANGAN
1 Perekat plesteran (Semen MU 100) 1 zak = …………..Kg kg M.240.a Rp. 2,250.00 Rp. 2,376.00
2 Perekat acian (Semen MU 200) 1 zak = …………..Kg kg M.240.b Rp. 2,958.33 Rp. 3,124.00
3 perekat kg (M125) Rp. 30,000.00
4 Mortar fast track kg (M226) Rp. 1,337.45
5 Pengisi bata ringan (Semen MU 380) 1 zak = …………..Kg kg M.240.c Rp. 2,583.33 Rp. 2,728.00
6 Flexible waterproofing setara Aquaproof kg M.241 Rp. 52,500.00 Rp. 55,440.00
7 Semen merah kg M.242 Rp. 450.00 Rp. 21,116.67
###
8 Semen nat kg M.243 Rp. 16,000.00 Rp. 16,896.00
9 Semen warna kg M.244 Rp. 15,000.00 Rp. 18,666.67
###
10 Semen 40 Kg zak M.245.b Rp. 45,166.67 Rp. 55,727.27
###
11 Semen kg M.245.a (M12) Rp. 1,150.00 Rp. 1,375.00
12 Semen 50 Kg zak M.245.c M.23 Rp. 61,500.00 Rp. 72,416.67
###
13 Semen putih 40 Kg zak M.246.a Rp. 94,000.00 Rp. 101,450.00
###
14 Semen grout sika 215 = 25 kg kg M.247 Rp. 5,900.00 Rp. 6,230.40
15 Grouting non shrinkage wcR 0,45 kg (M119) Rp. 6,759.00
16 Accelerator Kg (M256) Rp. 17,500.00
17 Screening kg M.248 Rp. 300.00 Rp. 316.80
18 Floor Harderner kg M.249 Rp. 3,500.00 Rp. 3,696.00
19 Mutu beton B0 Ready mix m3 Rp. 715,000.00
###
20 Mutu beton fc' 7,4 Mpa (K 100) Ready mix m3 M.250.a M.250.a Rp. 747,857.14 Rp. 733,666.67
###
21 Mutu beton fc' 10 Mpa (K 125) Ready mix m3 M.250.b M.250.b Rp. 756,000.00 Rp. 754,857.14
###
22 Mutu beton fc' 14.5 Mpa (K 175) Ready mix m3 M.250.c M.250.c Rp. 804,125.00 Rp. 768,142.86
###
23 Mutu beton fc' 16,9 Mpa (K 200) Ready mix m3 M.250.d M.250.d Rp. 819,875.00 Rp. 792,142.86
###
24 Mutu beton fc' 19,3 Mpa (K 225) Ready mix m3 M.250.e M.250.e Rp. 840,166.67 Rp. 813,375.00
###
25 Mutu beton fc' 21.7 Mpa (K 250) Ready mix m3 M.250.f M.250.f Rp. 867,312.50 Rp. 834,625.00
###
26 Mutu beton fc' 24 Mpa (K 275) Ready mix m3 M.250.g M.250.g Rp. 891,666.67 Rp. 857,714.29
###
27 Volume beton silinder fc' 25 MPa M3 (M253) Rp. 2,172,803.00
28 Mutu beton fc' 26.4 Mpa (K 300) Ready mix m3 M.250.h Rp. 914,000.00 Rp. 876,000.00
###
29 Mutu beton fc' 28,8 Mpa (K 325) Ready mix m3 M.250.i Rp. 922,000.00 Rp. 896,666.67
###
30 Mutu beton fc' 31.2 Mpa (K 350) Ready mix m3 M.250.j (M59) Rp. 964,333.33 Rp. 914,250.00
###
31 Mutu beton fc' 35 Mpa (K 400) Ready mix m3 M.250.k M.250.k Rp. 995,000.00 Rp. 947,250.00
###
32 Mutu beton fc' 45 Mpa (K 500) Ready mix m3 M.250.l Rp. 1,126,250.00 Rp. 1,013,500.00
###
33 Mutu beton FS 45 Ready mix m3 M.250.m M.250.m Rp. 1,087,000.00 Rp. 1,163,033.33
###
34 Beton 40 Mpa termasuk perancah m3 (M69) Rp. 2,321,575.00
35 Bonding Agent kg (M198) Rp. 40,000.00
36 Compound gypsum kg M.251 Rp. 3,318.75 Rp. 3,504.60
37 Tembakan Semen Grouting buah M.251.a Rp. 250,000.00 Rp. 264,000.00
38 Tabung Injeksi Grouting buah M.251.b Rp. 4,900,000.00 Rp. 5,174,400.00
39 Curing compound liter M.252 (M98) Rp. 26,000.00 Rp. 37,833.33
###
40 Formtie/penjaga jarak bekesting/spacer buah M.253 Rp. 8,600.00 Rp. 9,081.60
41 Additive liter M.254 Rp. 21,750.00 Rp. 49,250.00
###
42 Densifier A-01 pail M.256 Rp. 1,550,000.00
43 Densifier B-01 pail M.256.a Rp. 1,700,000.00
44 Densifier L-01 pail M.256.b Rp. 2,100,000.00
45 Densifier EC - 1008 pail M.256.c Rp. 1,800,000.00
46 Sealer (EC-S02) kg M.257 Rp. 2,700,000.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
47 Batu bata / merah bakar kw biasa buah M.25.c (M198) Rp. 650.00 UA
48 Batu bata / merah bakar pres / Ekspose buah M.25.d Rp. 1,750.00 N
49 Batu candi m2 M.26.a Rp. 122,500.00 A
50 Batu muka m2 M.26.b Rp. 47,000.00
51 Box Culvert 800 x 800 x 150 m' M.29.d Rp. 3,135,000.00
52 Box Culvert 1000 x 1000 x 150 m' M.29.e Rp. 3,795,000.00
53 Box Culvert 1200 x 1200 x 150 m' M.29.f Rp. 4,455,000.00
54 Box Culvert 1500 x 1500 x 150 m' M.29.g Rp. 5,445,000.00
55 Buis Beton ø 20 cm, pjg 1 m m' M.30.a Rp. 55,000.00
56 Buis Beton ø 30 cm, pjg 1 m m' M.30.b Rp. 70,000.00
57 Buis Beton ø 40 cm, pjg 1 m m' M.30.c Rp. 90,000.00
58 Buis Beton ø 80 cm, pjg 1m m' M.30.g Rp. 310,000.00
59 Buis Beton ø 100 cm, pjg 1m m' M.30.h Rp. 370,000.00
60 U-Ditch 1000 x 1200 x 1200 mm buah M.39.o Rp. 998,400.00
61 U-Ditch 1200 x 1400 x 1200 mm buah M.39.q Rp. 1,280,000.00
62 Mortar M3 Mrt Rp. 431,372.33
MATERIAL CAT
1 Cat dasar (cat kayu) kg M.260.a M.128.b (M224) Rp. 42,000.00 Rp. 50,388.89
###
2 Cat penutup (cat kayu) kg M.260.b Rp. 75,000.00 Rp. 54,000.00
###
3 Cat dasar (cat besi) kg M.261.a M.128.a M202 Rp. 42,666.67 Rp. 59,450.00
###
4 Cat antara (cat besi) kg M.261.b M.261.c Rp. 70,000.00 Rp. 74,333.33
###
5 Cat penutup (cat besi) kg M.261.c Rp. 74,000.00 Rp. 48,500.00
###
6 Cat Duco kg M.261.d Rp. 71,000.00 Rp. 74,976.00
7 Cat anti karat kg M.262 (M95) Rp. 57,000.00 Rp. 78,000.00
###
8 Expansion Cap m2 (M96) Rp. 6,050.00
9 Cat dasar (cat tembok interior) setara mowilex kg M.263.a M.128.d Rp. 110,800.00 Rp. 117,004.80
10 Cat penutup (cat tembok interior) setara mowilex kg M.263.b M.128.e M.128.e Rp. 124,500.00 Rp. 131,472.00
11 Cat dasar (cat tembok exterior) setara mowilex kg M.263.c M.128.d Rp. 220,000.00 Rp. 232,320.00
12 Cat penutup (cat tembok exterior) setara mowilex kg M.263.d M.128.e Rp. 116,566.67 Rp. 123,094.40
13 Cat dasar (cat tembok interior) setara Catylac kg M.263.e M.128.d Rp. 44,588.64 Rp. 47,085.60
14 Cat penutup (cat tembok interior) setara Catylac kg M.263.f Rp. 36,000.00 Rp. 38,016.00
15 Cat dasar (cat tembok exterior) setara Catylac kg M.263.g M.128.d Rp. 69,525.00 Rp. 73,418.40
16 Cat penutup (cat tembok exterior) setara Catylac kg M.263.h M.128.e Rp. 40,000.00 Rp. 42,240.00
17 Cat tembok kedap air ( water base) kg M.263.i Rp. 44,588.64 Rp. 47,085.60
18 Cat Protektif Kayu kg (M225) Rp. 75,000.00
19 Bahan anti pengelupasan Kg (M66) Rp. 76,000.00
20 Cat coating liter M.264 Rp. 110,000.00 Rp. 85,714.29
###
21 Cat genteng kg M.265 Rp. 31,625.00 Rp. 33,396.00
22 Cat kolam 1/2 kg M.266 Rp. 42,000.00 Rp. 44,352.00
23 Cat kapal kg M.267 Rp. 95,000.00 Rp. 100,320.00
24 Epoxy Kg (M166) Rp. 350,000.00
25 Meni kayu kg M.268.a M.128.c Rp. 28,000.00 Rp. 36,000.00
###
26 Meni besi kg M.268.b M.128.c Rp. 37,500.00 Rp. 37,714.29
###
27 Dempul kg M.269.a Rp. 31,000.00 Rp. 32,736.00
28 Dempul jadi kg M.269.b Rp. 35,000.00 Rp. 36,960.00
29 Cat Waterproofing kg M.270 Rp. 56,500.00 Rp. 59,664.00
30 Ampelas lembar M.271 Rp. 5,477.78 Rp. 5,350.00
###
31 Kuas 4" buah M.272.a Rp. 16,625.00 Rp. 16,625.00
32 Kuas 3" buah M.272.b Rp. 11,250.00 Rp. 11,880.00
33 Kuas 2" buah M.272.c Rp. 8,250.00 Rp. 8,712.00
34 Kuas 1" buah M.272.d Rp. 5,000.00 Rp. 5,280.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
35 Plamir kayu kg M.273.a Rp. 22,000.00 Rp. 23,232.00 UA
36 Plamir tembok kg M.273.b Rp. 30,000.00 Rp. 31,680.00 N
37 Politur liter M.274.a Rp. 61,666.67 Rp. 65,120.00 A
38 Politur jadi liter M.274.b Rp. 75,833.33 Rp. 80,080.00
39 Vernis liter M.275 Rp. 57,500.00 Rp. 60,720.00
40 Pengencer cat kayu/besi kg M.276.a M.276.a Rp. 22,500.00 Rp. 26,500.00
###
41 Thinner A liter M.276.b M.141.e (M33) Rp. 21,333.33 Rp. 19,500.00
###
42 Thinner B liter M.276.c Rp. 18,000.00 Rp. 19,008.00
43 Shanding kg M.277 Rp. 97,000.00 Rp. 102,432.00
44 Wood filler kg M.278 Rp. 51,500.00 Rp. 54,384.00
45 Melamic kg M.279 Rp. 6,500.00 Rp. 6,864.00
46 Kalkarium kg M.280 Rp. 6,500.00 Rp. 6,864.00
MATERIAL KUNCI DAN ENGSEL
1 Door closer buah M.300 Rp. 85,000.00 Rp. 89,760.00
2 Door holder buah M.301 Rp. 120,340.00 Rp. 127,079.04
3 Door stop buah M.302 Rp. 32,500.00 Rp. 34,320.00
4 Engsel angin buah M.303 Rp. 24,000.00 Rp. 25,344.00
5 Engsel jendela buah M.304 Rp. 17,333.33 Rp. 18,304.00
6 Engsel pintu (kw 2) buah M.305.a Rp. 20,500.00 Rp. 21,648.00
7 Engsel pintu (kw 1) buah M.305.b Rp. 150,000.00 Rp. 158,400.00
8 Engsel kupu-kupu buah M.306 Rp. 3,500.00 Rp. 3,696.00
9 Engsel lengan jendela buah M.307 Rp. 15,000.00 Rp. 15,840.00
10 Kait angin buah M.308 Rp. 16,166.67 Rp. 17,072.00
11 Kunci lemari buah M.309 Rp. 16,666.67 Rp. 17,600.00
12 Kunci selot buah M.310 Rp. 19,583.33 Rp. 20,680.00
13 Kunci silinder buah M.311 Rp. 46,000.00 Rp. 48,576.00
14 Kunci tanam antik buah M.312.a Rp. 87,000.00 Rp. 91,872.00
15 Kunci tanam biasa buah M.312.b Rp. 55,625.00 Rp. 58,740.00
16 Kunci tanam kamar mandi buah M.312.c Rp. 40,000.00 Rp. 42,240.00
17 Spring knip buah M.313 Rp. 27,500.00 Rp. 29,040.00
18 Grendel Biasa buah M.314.a Rp. 6,666.67 Rp. 7,040.00
19 Grendel Rantai buah M.314.b Rp. 21,333.33 Rp. 22,528.00
20 Grendel 4" kuning/silver buah M.314.c Rp. 89,000.00 Rp. 93,984.00
21 Selot Tanam 6" kuning/silver buah M.314.d Rp. 121,666.67 Rp. 128,480.00
22 Handle pintu stainless jumbo (besar) buah M.315.a Rp. 165,000.00 Rp. 174,240.00
23 Handle pintu (medium) buah M.315.b Rp. 119,214.29 Rp. 125,890.29
24 Handle pintu (kecil) buah M.315.c Rp. 76,000.00 Rp. 80,256.00
25 Handle jendela alumunium buah M.315.d Rp. 14,875.00 Rp. 15,708.00
26 Rel pintu sorong buah M.316 Rp. 260,000.00 Rp. 274,560.00
27 Top Patch Fitting set M.317.a Rp. 540,000.00 Rp. 570,240.00
28 Bottom Patch Fitting set M.317.b Rp. 536,000.00 Rp. 566,016.00
29 Floor Hinges (Engsel Lantai) set M.318 Rp. 817,500.00 Rp. 863,280.00
30 Casement 12" buah M.319 Rp. 52,000.00 Rp. 54,912.00
31 Casement 8" buah M.320 Rp. 48,000.00 Rp. 50,688.00
32 Over panel set M.321 Rp. 179,333.33 Rp. 189,376.00
33 Bottom Lock Fitting solid set M.322 Rp. 682,750.00 Rp. 720,984.00

MATERIAL KACA
1 Profil kaca m¹ M.350 Rp. 16,250.00 Rp. 17,160.00
2 Jendela nako buah M.351.a Rp. 19,600.00 Rp. 20,697.60
3 Jendela nako (rangka + kaca 5 mm) m2 M.351.b Rp. 200,000.00 Rp. 211,200.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
4 Nako per daun buah M.351.c Rp. 17,500.00 Rp. 18,480.00 UA
5 Kaca polos 3 mm m2 M.352.a Rp. 90,000.00 Rp. 95,040.00 N
6 Kaca polos 5 mm m2 M.352.b Rp. 130,000.00 Rp. 137,280.00 A
7 Kaca polos 8 mm m2 M.352.c Rp. 250,000.00 Rp. 264,000.00
8 Kaca Bening/Polos 5 mm (warna) m² M.353 Rp. 125,500.00 Rp. 132,528.00
9 Kaca Es ( Buram ) 5 mm m² M.354.a Rp. 145,000.00 Rp. 153,120.00
10 Kaca buram 12 mm m2 M.354.b Rp. 346,666.67 Rp. 366,080.00
11 Kaca cermin 5 mm m2 M.355.a Rp. 100,000.00 Rp. 105,600.00
12 Kaca cermin 6 mm m2 M.355.b Rp. 269,333.33 Rp. 284,416.00
13 Kaca cermin 8 mm m2 M.355.c Rp. 257,333.33 Rp. 271,744.00
14 Kaca patri 5 mm m2 M.356 Rp. 225,000.00 Rp. 237,600.00
15 Kaca Ray Band 3 mm m2 M.358.a Rp. 80,000.00 Rp. 84,480.00
16 Kaca Ray Band 5 mm m2 M.358.b Rp. 150,000.00 Rp. 158,400.00
17 Kaca Ray Band 8 mm m² M.358.c Rp. 168,333.33 Rp. 177,760.00
18 Kaca gravire 5 mm m2 M.359.a Rp. 486,000.00 Rp. 513,216.00
19 Kaca gravire putih 5 mm m2 M.359.b Rp. 358,000.00 Rp. 378,048.00
20 Kaca lukis alur 5 mm m2 M.360 Rp. 940,000.00 Rp. 992,640.00
21 Kaca Flat Tempered 5 mm m2 M.361.a Rp. 232,500.00 Rp. 245,520.00
22 Kaca Flat Tempered 8 mm m2 M.361.b Rp. 407,500.00 Rp. 430,320.00
23 Kaca Flat Tempered 10 mm m2 M.361.c Rp. 545,000.00 Rp. 575,520.00
24 Kaca Flat Tempered 12 mm m² M.361.d Rp. 623,500.00 Rp. 658,416.00
25 Kaca OneWay 5 mm m² M.362.a Rp. 300,000.00 Rp. 316,800.00
26 Pull Handle (untuk pintu kaca) set M.362.b Rp. 396,250.00 Rp. 418,440.00
27 Sticker Sandblast m² M.363 Rp. 130,000.00 Rp. 137,280.00

MATERIAL SANITAIR
1 Bak cuci stainless steel (Kecil) buah M.370.a Rp. 147,333.33 Rp. 155,584.00
2 Bak cuci stainless steel (Besar) buah M.370.b Rp. 393,000.00 Rp. 415,008.00
3 Bak cuci fiberglass 66 x 66 x 70 cm (oval) buah M.371.a Rp. 205,000.00 Rp. 216,480.00
4 Bak cuci fiberglass 66 x 66 x 70 cm (kotak) buah M.371.b Rp. 457,000.00 Rp. 482,592.00
5 Bak mandi fiberglass 55x55x66 cm (oval) buah M.372.a Rp. 205,000.00 Rp. 216,480.00
6 Bak mandi fiberglass 55x55x66 cm (kotak) buah M.372.b Rp. 457,000.00 Rp. 482,592.00
7 Tandon Reservoir fibreglass (kapasitas 650 liter) buah M.373.a Rp. 1,110,625.00 Rp. 1,172,820.00
8 Tandon Reservoir fibreglass (kapasitas 1050 liter) buah M.373.b Rp. 1,850,000.00 Rp. 1,953,600.00
9 Tandon Reservoir fibreglass (kapasitas 1200 liter) buah M.373.c Rp. 1,830,000.00 Rp. 1,932,480.00
10 Tandon Reservoir fibreglass (kapasitas 1550 liter) buah M.373.d Rp. 2,716,666.67 Rp. 2,868,800.00
11 Tandon Reservoir fibreglass (kapasitas 2000 liter) buah M.373.e Rp. 2,470,000.00 Rp. 2,608,320.00
12 Tandon Reservoir fibreglass (kapasitas 2200 liter) buah M.373.f Rp. 3,885,000.00 Rp. 4,102,560.00
13 Tandon Reservoir Polyethylene (kapasitas 4 liter) buah M.373.g Rp. 5,814,000.00
14 Tandon Reservoir Polyethylene (kapasitas 4 liter) buah M.373.h Rp. 9,477,000.00
15 Tandon Reservoir Polyethylene (kapasitas 4 liter) buah M.373.i Rp. 21,169,000.00
16 Septic Tank Bio Filter Volume 500 Liter Kapastas 3-5 Orang unit M.374.a Rp. 2,997,000.00
17 Septic Tank Bio Filter Volume 700 Liter Kapastas 4-6 Orang unit M.374.b Rp. 3,025,000.00 Rp. 3,194,400.00
18 Septic Tank Bio Filter Volume 900 Liter Kapastas 5-7 Orang unit M.374.c Rp. 3,750,000.00 Rp. 3,960,000.00
19 Septic Tank Bio Filter Volume 1000 Liter Kapastas 2-4 Orang unit M.374.d Rp. 4,100,000.00 Rp. 4,329,600.00
20 Septic Tank Bio Filter Volume 1200 Liter Kapastas 7-10 Orang unit M.374.e Rp. 4,800,000.00 Rp. 5,068,800.00
21 Septic Tank Bio Filter Volume 1850 Liter Kapastas 4-6 Orang unit M.374.f Rp. 5,250,000.00 Rp. 5,544,000.00
22 Septic Tank Bio Filter Volume 2145 Liter Kapastas 6-8 Orang unit M.374.g Rp. 6,000,000.00 Rp. 6,336,000.00
23 Septic Tank Bio Filter Volume 3000 Liter Kapastas 8-12 Orang unit M.374.h Rp. 6,183,000.00 Rp. 6,529,248.00
24 Floor drain stainles steel buah M.375.a Rp. 83,333.33 Rp. 88,000.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
25 Floor drain plastik buah M.375.b Rp. 12,833.33 Rp. 13,552.00 UA
26 Kloset duduk/monoblok (biasa / KW) buah M.376.a Rp. 1,086,783.33 Rp. 1,147,643.20 N
27 Kloset duduk/monoblok (Ina) tanpa jet washer buah M.376.b Rp. 1,725,033.33 Rp. 1,821,635.20 A
28 Kloset duduk/monoblok (Ina) dengan jet washer buah M.376.c Rp. 2,111,111.11 Rp. 2,229,333.33
29 Kloset jongkok porselen (biasa) buah M.377.a Rp. 130,000.00 Rp. 137,280.00
30 Kloset jongkok porselen (Ina) buah M.377.b Rp. 160,000.00 Rp. 168,960.00
31 Kran air (Plastik) buah M.378.a Rp. 13,575.00 Rp. 28,500.00
###
32 Kran Air (Onda) buah M.378.b Rp. 13,575.00 Rp. 28,666.67
###
33 Kran air (stainles steel) buah M.378.c Rp. 34,666.67 Rp. 36,608.00
34 Shower kamar mandi buah M.378.c Rp. 62,600.00 Rp. 66,105.60
35 Urinoir (kecil) buah M.379.a Rp. 313,333.33 Rp. 330,880.00
36 Urinoir (Besar) buah M.379.b Rp. 1,310,000.00 Rp. 1,383,360.00
37 Wastafel (persegi) buah M.380.a Rp. 390,000.00 Rp. 411,840.00
38 Wastafel (Oval / lingkaran) buah M.380.b Rp. 331,500.00 Rp. 350,064.00
39 Waterstop Lebar 150 mm m' M.381.a Rp. 76,175.00 Rp. 80,440.80
40 Waterstop Lebar 200 mm m' M.381.b Rp. 104,368.76 Rp. 110,213.41
41 Waterstop lebar 320 m' M.381.c Rp. 189,612.52 Rp. 200,230.82
42 Water drain + asesories set M.382 Rp. 60,000.00 Rp. 63,360.00
43 Tempat sabun gantung buah M.383 Rp. 81,571.43 Rp. 86,139.43
44 Tempat sabun tanam buah M.384 Rp. 40,625.00 Rp. 42,900.00
45 kloset duduk Merk TOTO COUPLED TOILET CW 631 J / SW 631 J buah M.376.d Rp. 1,086,783.33 Rp. 1,147,643.20

MATERIAL MINYAK
1 Minyak cat kg M.390 Rp 17,500.00 Rp. 13,857.14
###
2 Residu liter M.391 Rp 21,150.00 Rp. 10,000.00
###
3 Teak oil liter M.392 Rp 30,900.00 Rp. 32,630.40
4 Solar (industri) liter M.393.a M.125.c M.125.c Rp 10,600.00 Rp. 11,193.60
5 Solar liter M.394.b M.125.d Rp 9,400.00 Rp. 9,926.40
6 Premium (industri) liter M.395.a Rp 10,200.00 Rp. 10,771.20
7 Pertalite liter M.395.b Rp 7,650.00 Rp. 8,078.40
8 Minyak tanah liter M.396 M.396 Rp 12,200.00 Rp. 12,883.20
9 Minyak bekisting liter M.397 Rp 17,000.00 Rp. 17,952.00
10 Minyak Pelumas liter M.398 Rp 28,000.00 Rp. 29,568.00
11 Oli mesin liter M.399.a Rp 38,000.00 Rp. 40,128.00
12 Oli hidrolis liter M.399.b Rp 30,200.00 Rp. 31,891.20
13 Steamvet Liter M.400 Rp 49,900.00 Rp. 52,694.40
14 Strorox - 100 kg M.401 Rp 136,250.00 Rp. 143,880.00
15 Bentonit liter M.402 Rp 10,400.00 Rp. 10,982.40

MATERIAL PINTU ALUMINIUM DAN BESI


1 Pintu aluminium m¹ M.425 Rp. 528,611.11 Rp. 558,213.33
2 Profil aluminium natural m¹ M.426.a Rp. 270,000.00 Rp. 285,120.00
3 Profil aluminium warna m¹ M.426.b Rp. 117,000.00 Rp. 123,552.00
4 Siku aluminium natural m¹ M.426.c Rp. 7,666.67 Rp. 8,096.00
5 Siku aluminium warna m¹ M.426.d Rp. 11,666.67 Rp. 12,320.00
6 Profil rangka pintu U PVC putih setara Bosca m¹ M.427.a Rp. 182,500.00 Rp. 192,720.00
7 Profil Kusen pintu U PVC putih setara Bosca m¹ M.427 Rp. 187,250.00 Rp. 197,736.00
8 Profil rangka jendela U PVC putih setara Bosca m¹ M.427.b Rp. 175,000.00 Rp. 184,800.00
9 Aluminium strip m¹ M.428 Rp. 10,000.00 Rp. 10,560.00
10 Pintu lipat (folding door) alumunium m2 M.429 Rp. 550,000.00 Rp. 580,800.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
11 Rolling door besi m2 M.430 Rp. 251,000.00 Rp. 265,056.00 UA
12 Sliding pintu J4 m2 M.431 Rp. 302,500.00 Rp. 319,440.00 N
13 Pintu lipat besi m2 M.432 Rp. 550,000.00 Rp. 580,800.00 A
14 Kusen alumunium 3" putih YKK m¹ M.433.a Rp. 110,000.00 Rp. 116,160.00
15 Kusen alumunium 4" putih YKK m¹ M.433.b Rp. 125,000.00 Rp. 132,000.00
16 Kusen alumunium 3" warna gelap YKK m¹ M.433.c Rp. 95,000.00 Rp. 100,320.00
17 Kusen alumunium 4" warna gelap YKK m¹ M.433.d Rp. 105,000.00 Rp. 110,880.00
18 Kusen alumunium 3" warna urat kayu m¹ M.433.e Rp. 137,333.33 Rp. 145,024.00
19 Kusen alumunium 4" warna urat kayu m¹ M.433.f Rp. 184,000.00 Rp. 194,304.00
20 Sunscreen aluminium m2 M.434 Rp. 350,000.00 Rp. 369,600.00
21 Rolling door aluminium m2 M.435 Rp. 400,000.00 Rp. 422,400.00
22 C channel galvanis lebar 40 mm, t= 0,45 mm m' M.436.a Rp. 20,833.33 Rp. 22,000.00
23 C channel galvanis lebar 75 mm, t= 0,75 mm m' M.436.b Rp. 21,666.67 Rp. 22,880.00
24 C channel galvanis lebar 75 mm, t= 0,75 mm (kg) kg M.436.c Rp. 24,166.67 Rp. 25,520.00
25 C channel galvanis lebar 75 mm, t= 1,0 mm m' M.436.d Rp. 25,000.00 Rp. 26,400.00
26 C channel galvanis lebar 75 mm, t= 1,0 mm (kg) kg M.436.e Rp. 15,000.00 Rp. 15,840.00
27 Hollow galvanis 20x40x0,4 mm m' M.437.a Rp. 18,000.00 Rp. 19,008.00
28 Hollow galvanis 40x40x0,4 mm m' M.437.b Rp. 27,750.00 Rp. 29,304.00
29 Talang galvalum lebar 50 cm tebal 0,4 mm m' M.438 Rp. 60,000.00 Rp. 63,360.00
30 Talang galvalum lebar 60 cm tebal 0,4 mm m' M.439 Rp. 125,000.00 Rp. 132,000.00
31 Rangka metal hollow 40.40.1,2 mm m' M.440 Rp. 25,000.00 Rp. 26,400.00
MATERIAL PAGAR BRC & PAGAR PANEL BETON
1 Pagar BRC 120 5 mm lembar M.96.a Rp. 290,000.00
2 Pagar BRC 90 5 mm lembar M.96.b Rp. 210,000.00
3 Pagar BRC 60 K1, Tebal 5 mm lembar M.450.a
4 Pagar BRC 60 K2, Tebal 5 mm lembar M.450.b Rp. 550,000.00 Rp. 580,800.00
5 Pagar BRC 60 K3, Tebal 5 mm lembar M.450.c Rp. 500,000.00 Rp. 528,000.00
6 Pagar BRC 90 K1, Tebal 6 mm lembar M.450.d Rp. 700,000.00 Rp. 739,200.00
7 Pagar BRC 90 K2, Tebal 6 mm lembar M.450.e Rp. 650,000.00 Rp. 686,400.00
8 Pagar BRC 90 K3, Tebal 6 mm lembar M.450.f Rp. 600,000.00 Rp. 633,600.00
9 Pagar BRC 120 K1, Tebal 6 mm lembar M.450.g Rp. 800,000.00 Rp. 844,800.00
10 Pagar BRC 120 K2, Tebal 6 mm lembar M.450.h Rp. 750,000.00 Rp. 792,000.00
11 Pagar BRC 120 K3, Tebal 6 mm lembar M.450.i Rp. 700,000.00 Rp. 739,200.00
12 Pagar BRC 150 K1, Tebal 7 mm lembar M.450.j Rp. 900,000.00 Rp. 950,400.00
13 Pagar BRC 150 K2, Tebal 7 mm lembar M.450.k Rp. 850,000.00 Rp. 897,600.00
14 Pagar BRC 150 K3, Tebal 7 mm lembar M.450.l Rp. 800,000.00 Rp. 844,800.00
15 Pagar BRC 175 K1, Tebal 7 mm lembar M.450.m Rp. 1,000,000.00 Rp. 1,056,000.00
16 Pagar BRC 175 K2, Tebal 7 mm lembar M.450.n Rp. 849,000.00 Rp. 896,544.00
17 Pagar BRC 175 K3, Tebal 7 mm lembar M.450.o Rp. 610,000.00 Rp. 644,160.00
18 Pagar BRC 190 K1, Tebal 7 mm lembar M.450.p Rp. 1,100,000.00 Rp. 1,161,600.00
19 Pagar BRC 190 K2, Tebal 7 mm lembar M.450.q Rp. 845,000.00 Rp. 892,320.00
20 Pagar BRC 190 K3, Tebal 7 mm lembar M.450.r Rp. 650,000.00 Rp. 686,400.00
HARGA TIANG sudah Include ACCESSORIES (BAUT, MUR, PENUTUP ATAS & U-CLIP)
1 Tiang BRC lengkap P 60 Ø 1,5" T T= 75, TP= 60 batang M.451.a Rp. 120,000.00 Rp. 126,720.00
2 Tiang BRC lengkap P 90 Ø 1,5" T T= 120, TP= 90 batang M.451.b Rp. 135,000.00 Rp. 142,560.00
3 Tiang BRC lengkap P 120 Ø 1,5" T T= 150, TP= 120 batang M.451.c Rp. 143,333.33 Rp. 151,360.00
4 Tiang BRC lengkap P 150 Ø 1,5" T T= 200, TP= 150 batang M.451.d Rp. 156,666.67 Rp. 165,440.00
5 Tiang BRC lengkap P 175 Ø 1,5" T T= 225, TP= 175 batang M.451.e Rp. 176,666.67 Rp. 186,560.00
6 Tiang BRC lengkap P 190 Ø 1,5" T T= 240, TP= 190 batang M.451.f Rp. 185,000.00 Rp. 195,360.00
7 Tiang BRC lengkap P 60 Ø 2,0" T T= 75, TP= 60 batang M.451.g Rp. 130,000.00 Rp. 137,280.00
8 Tiang BRC lengkap P 90 Ø 2,0" T T= 120, TP= 90 batang M.451.h Rp. 137,500.00 Rp. 145,200.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
9 Tiang BRC lengkap P 120 Ø 2,0" T T= 150, TP= 120 batang M.451.i Rp. 187,666.67 Rp. 198,176.00 UA
10 Tiang BRC lengkap P 150 Ø 2,0" T T= 200, TP= 150 batang M.451.j Rp. 185,000.00 Rp. 195,360.00 N
11 Tiang BRC lengkap P 175 Ø 2,0" T T= 225, TP= 175 batang M.451.k Rp. 195,000.00 Rp. 205,920.00 A
12 Tiang BRC lengkap P 190 Ø 2,0" T T= 240, TP= 190 batang M.451.l Rp. 214,000.00 Rp. 225,984.00
HARGA ACCESSORIES (BAUT, MUR, PENUTUP ATAS & U-CLIP)
1 U-Clip Galvanis Ø 1,5" buah M.452 Rp. 2,000.00 Rp. 2,112.00
2 Tutup Galvanis Ø 1,5" buah M.453.a Rp. 12,500.00 Rp. 13,200.00
3 Tutup Galvanis Ø 2" buah M.453.b Rp. 15,000.00 Rp. 15,840.00
4 Mur & baut galvanis pendek buah M.454.a Rp. 2,000.00 Rp. 2,112.00
5 Mur & baut galvanis panjang buah M.454.b Rp. 2,500.00 Rp. 2,640.00
6 Kolom beton pracetak 225 x 18 x 17 cm buah M.455.a Rp. 283,666.67 Rp. 299,552.00
7 Kolom beton pracetak 280 x 18 x 17 cm buah M.455.b Rp. 350,333.33 Rp. 369,952.00
8 Kolom beton pracetak 320 x 18 x 17 cm buah M.455.c Rp. 395,000.00 Rp. 417,120.00
9 Kolom beton pracetak 350 x 18 x 17 cm buah M.455.d Rp. 382,000.00 Rp. 403,392.00
10 Kolom beton pracetak 370 x 18 x 17 cm buah M.455.e Rp. 474,166.67 Rp. 500,720.00
11 Panel beton pracetak 240 x 40 x 5 cm buah M.456.a Rp. 137,062.50 Rp. 144,738.00
12 Panel beton pracetak 240 x 45 x 5 cm buah M.456.b Rp. 153,833.33 Rp. 162,448.00
13 Panel beton pracetak 240 x 50 x 5 cm buah M.456.c Rp. 160,000.00 Rp. 168,960.00

MATERIAL LISTRIK
1 Pipa listrik 5/8” buah M.475 Rp. 8,944.44 Rp. 9,445.33
2 T Dus (Putih) buah M.476.a Rp. 2,100.00 Rp. 2,217.60
3 T Dus (biasa) buah M.476.b Rp. 1,800.00 Rp. 1,900.80
4 L Bow buah M.478 Rp. 1,187.50 Rp. 1,254.00
5 Las Dop 100 buah M.479 Rp. 1,000.00 Rp. 1,056.00
6 Klem Pipa Listrik buah M.480 Rp. 6,833.33 Rp. 7,216.00
7 Mongkok (Listrik) buah M.481 Rp. 1,833.33 Rp. 1,936.00
8 Saklar Tunggal biasa buah M.482.a Rp. 13,666.67 Rp. 14,432.00
9 Saklar Tunggal sekualitas Broco buah M.482.b Rp. 17,250.00 Rp. 18,216.00
10 Saklar Tunggal sekualitas Broco, clipsal buah M.482.c Rp. 16,833.33 Rp. 17,776.00
11 Saklar Ganda biasa buah M.483.a Rp. 16,000.00 Rp. 16,896.00
12 Saklar Ganda sekualitas Broco buah M.483.b Rp. 18,600.00 Rp. 19,641.60
13 Saklar Ganda sekualitas Broco, clipsal buah M.483.c Rp. 24,250.00 Rp. 25,608.00
14 Saklar Triple sekualitas Broco buah M.484.a Rp. 32,000.00 Rp. 33,792.00
15 Saklar Triple sekualitas Broco, clipsal buah M.484.b Rp. 47,000.00 Rp. 49,632.00
16 Stop Kontak biasa buah M.485.a Rp. 13,666.67 Rp. 14,432.00
17 Stop Kontak sekualitas Broco buah M.485.b Rp. 17,250.00 Rp. 18,216.00
18 Stop Kontak sekualitas Broco, clipsal buah M.485.c Rp. 20,500.00 Rp. 21,648.00
19 Stop Kontak AC, Sekualtas Broco buah M.486.a Rp. 90,000.00 Rp. 95,040.00
20 Stop Kontak AC, Sekualtas Broco, clipsal buah M.486.b Rp. 60,500.00 Rp. 63,888.00
21 Stop Kontak AC, Sekualtas schneider, clipsal buah M.486.c Rp. 95,000.00 Rp. 100,320.00
22 Lampu SL 32 watt buah M.487.a Rp. 35,000.00 Rp. 36,960.00
23 Lampu SL 42 watt buah M.487.b Rp. 60,000.00 Rp. 63,360.00
24 Lampu SL 65 watt buah M.487.c Rp. 90,000.00 Rp. 95,040.00
25 Lampu LED 100 watt (komplit set) buah M.488.a Rp. 470,000.00
26 Lampu LED 240 watt (Komplit set + Tiang oktagonal 9 m) buah M.488.a Rp. 6,200,000.00 Rp. 6,547,200.00
27 Lampu LED 50 watt (Komplit set) buah M.488.b Rp. 203,000.00 Rp. 214,368.00
28 Lampu LED 100 watt (Komplit set) buah M.488.c Rp. 470,000.00 Rp. 496,320.00
29 Lampu TL 40 W / 220 V buah M.489 Rp. 18,000.00 Rp. 19,008.00
30 Lampu pijar 5 W / 220 V buah M.490 Rp. 5,000.00 Rp. 5,280.00
31 Lampu HPL 125 W / 220 V buah M.491.a Rp. 45,000.00 Rp. 47,520.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
32 Lampu HPS.T 70 W / 220 V buah M.492.a Rp. 120,000.00 Rp. 126,720.00 UA
33 Lampu HPS.T 150 W / 220 V buah M.492.b Rp. 126,962.67 Rp. 134,072.58 N
34 Lampu HPS.T 250 W / 220 V buah M.492.c Rp. 147,500.00 Rp. 155,760.00 A
35 Lampu HPS.T 400 W / 220 V buah M.492.d Rp. 147,500.00 Rp. 155,760.00
36 Lampu merkuri 50 watt (komplit set) buah M.492.e Rp. 192,000.00 Rp. 202,752.00
37 Lampu merkuri 100 watt (komplit set) buah M.492.f Rp. 230,000.00 Rp. 242,880.00
38 Lampu merkuri 250 watt (komplit set) buah M.492.g M.492.g Rp. 393,500.00 Rp. 415,536.00
39 Lampu tipe merkuri 400 watt (komplit set) buah M.492.h Rp. 428,500.00
40 Lampu Hias Lombok (5 m) buah M.493 Rp. 35,875.00 Rp. 37,884.00
41 Lampu Hias Selang m¹ M.494 Rp. 28,540.00 Rp. 30,138.24
42 Traffo SON.T 70 W / 220V Philips buah M.496 Rp. 153,500.00 Rp. 162,096.00
43 Traffo SON.T 150 W / 220V Philips buah M.497 Rp. 202,500.00 Rp. 213,840.00
44 Traffo SON.T 250 W / 220V Philips buah M.498 Rp. 295,000.00 Rp. 311,520.00
45 Traffo TL 40 W / 220 V Philips buah M.499.a Rp. 34,250.00 Rp. 36,168.00
46 Traffo HPL 125 W Philips buah M.499.b Rp. 114,750.00 Rp. 121,176.00
47 Traffo HPL 250 W buah M.499.c Rp. 265,000.00 Rp. 279,840.00
48 Traffo HPI.T 250 W (Philips) Philips buah M.499.d Rp. 265,000.00 Rp. 279,840.00
49 MCB 6 A, 1 Phase Schneider buah M.500.a Rp. 25,000.00 Rp. 26,400.00
50 MCB 10 A, 1 Phase Schneider buah M.500.b Rp. 63,083.33 Rp. 66,616.00
51 MCB 10 A, 3 Phase Schneider buah M.500.c Rp. 123,400.00 Rp. 130,310.40
52 MCB 25 A, 3 Phase Schneider buah M.500.d Rp. 131,000.00 Rp. 138,336.00
53 MCB 32 A, 3 Phase Schneider buah M.500.e Rp. 134,600.00 Rp. 142,137.60
54 MCB 40 A, 3 Phase buah M.500.f Rp. 340,000.00 Rp. 359,040.00
55 MCB 16 A, 1 Phase buah M.500.g Rp. 150,000.00 Rp. 158,400.00
56 Kapasitor 12.5 uF Philips Philips buah M.501.a Rp. 30,000.00 Rp. 31,680.00
57 Kapasitor 8 mF Philips buah M.501.b Rp. 27,500.00 Rp. 29,040.00
58 Ignitor SI 51 Philips buah M.502 Rp. 55,000.00 Rp. 58,080.00
59 Konektor buah M.503.a Rp. 30,000.00 Rp. 31,680.00
60 Konektor / terminal 6 mm Legrand buah M.503.b Rp. 45,000.00 Rp. 47,520.00
61 Konektor / terminal 10 mm Legrand buah M.503.c Rp. 50,000.00 Rp. 52,800.00
62 Konektor / terminal 16 mm Legrand buah M.503.d Rp. 65,000.00 Rp. 68,640.00
63 Konektor / terminal 25 mm Legrand buah M.503.e Rp. 150,000.00 Rp. 158,400.00
64 Kabel NYM 2 x 1.5 mm2 Supreme m¹ M.504.a Rp. 10,435.00 Rp. 11,019.36
65 Kabel NYM 2 x 2.5 mm2 Supreme m¹ M.504.b Rp. 11,200.00 Rp. 11,827.20
66 Kabel NYM 2 x 4 mm2 Supreme m¹ M.504.c Rp. 18,500.00 Rp. 19,536.00
67 Kabel NYM 3 x 1.5 mm2 Supreme m¹ M.504.d Rp. 12,200.00 Rp. 12,883.20
68 Kabel NYM 3 x 2.5 mm2 Supreme m¹ M.504.e Rp. 16,900.00 Rp. 17,846.40
69 Kabel NYM 3 x 4 mm2 Supreme m¹ M.504.f Rp. 30,000.00 Rp. 31,680.00
70 Kabel NYM 3 x 6 mm2 m¹ M.504.g Rp. 30,000.00 Rp. 31,680.00
71 Kabel NYM 3 x 10 mm2 m¹ M.504.h Rp. 65,000.00 Rp. 68,640.00
72 Kabel NYY 2 x 16 mm2 m¹ M.505.a Rp. 11,800.00 Rp. 12,460.80
73 Kabel NYY 3 x 1.5 mm2 Supreme m¹ M.505.b Rp. 12,466.67 Rp. 13,164.80
74 Kabel NYY 3 x 2.5 mm2 Supreme m¹ M.505.c Rp. 17,850.00 Rp. 18,849.60
75 Kabel NYY 3 x 4 mm2 Supreme m¹ M.505.d Rp. 28,435.00 Rp. 30,027.36
76 Kabel NYY 3 x 6 mm2 Supreme m¹ M.505.e Rp. 39,000.00 Rp. 41,184.00
77 Kabel NYY 3 x 10 mm2 Supreme m¹ M.505.f Rp. 57,000.00 Rp. 60,192.00
78 Kabel NYY 4 x 4 mm2 Supreme m¹ M.505.g Rp. 33,000.00 Rp. 34,848.00
79 Kabel NYY 4 x 6 mm2 Supreme m¹ M.505.h Rp. 42,000.00 Rp. 44,352.00
80 Kabel NYY 4 x 10 mm2 Supreme m¹ M.505.i Rp. 68,000.00 Rp. 71,808.00
81 Kabel LVTC 3 x 16 mm2 m¹ M.506 Rp. 15,300.00 Rp. 16,156.80
82 Kabel NYA 1.5 mm Supreme m¹ M.507.a Rp. 4,266.67 Rp. 4,505.60
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
83 Kabel NYA 2.5 mm Supreme m¹ M.507.b Rp. 7,250.00 Rp. 7,656.00 UA
84 Kabel NYA F 6 mm m¹ M.507.c Rp. 12,000.00 Rp. 12,672.00 N
85 Kabel NYA F 10 mm m¹ M.507.d Rp. 20,000.00 Rp. 21,120.00 A
86 Kabel DX 2 x 10 mm m¹ M.508.a Rp. 5,500.00 Rp. 5,808.00
87 Kabel DX 2 x 16 mm m¹ M.508.b Rp. 9,000.00 Rp. 9,504.00
88 Fitting Gantung buah M.509.a Rp. 9,600.00 Rp. 10,137.60
89 Fitting DK E 27 / Keramik buah M.509.b Rp. 12,000.00 Rp. 12,672.00
90 Fitting DK E 40 buah M.509.c Rp. 23,500.00 Rp. 24,816.00
91 Box Panel 30 x 40 x 15 cm (standar) unit M.510.a Rp. 160,000.00 Rp. 168,960.00
92 Box Panel 30 x 40 x 20 cm (standar) Pyramid unit M.510.b Rp. 248,333.33 Rp. 262,240.00
93 Box Panel 40 x 50 x 20 cm (standar) Pyramid unit M.510.c Rp. 409,333.33 Rp. 432,256.00
94 Box Panel 30 x 40 x 15 cm (Bertopi) Pyramid unit M.510.d Rp. 230,666.67 Rp. 243,584.00
95 Box Panel 40 x 50 x 20 cm (Bertopi) Pyramid unit M.510.e Rp. 560,000.00 Rp. 591,360.00
96 Box Panel 50 x 60 x 20 mm Pyramid unit M.510.f Rp. 440,000.00 Rp. 464,640.00
97 Box panel 80x60x30 cm Pyramid unit M.510.g Rp. 950,000.00 Rp. 1,003,200.00
98 Box Panel 80 x 100 cm unit M.510.h Rp. 58,600.00 Rp. 61,881.60
99 Box Panel 60 x 80 cm unit M.510.i Rp. 58,300.00 Rp. 61,564.80
100 Box Panel 50 x 70 cm unit M.510.j Rp. 775,000.00 Rp. 818,400.00
101 Begel steel box panel buah M.511.a Rp. 58,600.00 Rp. 61,881.60
102 Begel steel infoor buah M.511.b Rp. 58,300.00 Rp. 61,564.80
103 Magnetic Contactor SN.65 /ST-65 Mitsubishi buah M.512 Rp. 775,000.00 Rp. 818,400.00
104 Pipa infoor galvanis Ø 2" batang M.513 Rp. 258,000.00 Rp. 272,448.00
105 Pipa flexibel m M.514 Rp. 4,000.00 Rp. 4,224.00
106 Kawat BC - 6 mm m M.515 Rp. 11,000.00 Rp. 11,616.00
107 Ground rood 5/8" 4 m unit M.516 Rp. 880,000.00 Rp. 929,280.00
108 T. infooring buah M.517 Rp. 34,000.00 Rp. 35,904.00
109 Begel stang buah M.518 Rp. 27,000.00 Rp. 28,512.00
110 Begel stang Ø 2",8" mm (medium A) buah M.519 Rp. 67,833.00 Rp. 71,631.65
111 Stang Ø 1" x 2 m (caping) buah M.520 Rp. 358,500.00 Rp. 378,576.00
112 Pipa Subduct HDPE 40 mm x 34 mm2 buah M.521 Rp. 15,000.00 Rp. 15,840.00
113 Photocell 6 A buah M.522.a Rp. 115,000.00 Rp. 121,440.00
114 Photocell 10 A buah M.522.b Rp. 170,000.00 Rp. 179,520.00
115 Amperemeter buah M.523 Rp. 91,750.00 Rp. 96,888.00
116 Bandead alcoa buah M.524 Rp. 7,000.00 Rp. 7,392.00
117 Multimeter buah M.525 Rp. 174,500.00 Rp. 184,272.00
118 Isolasi (hitam) buah M.526 Rp. 8,500.00 Rp. 8,976.00
119 Kawat Las UK.32 kg M.527 Rp. 31,250.00 Rp. 33,000.00
###
120 Timer Theben (a) ORI buah M.528.a Rp. 450,000.00 Rp. 475,200.00
121 Timer Theben (b) KW buah M.528.b Rp. 185,000.00 Rp. 195,360.00
122 Stainless ROL m¹ M.529 Rp. 7,000.00 Rp. 7,392.00
123 Assesoris panel buah M.530 Rp. 63,000.00 Rp. 66,528.00
124 Besi Canal (untuk Box Panel) m M.531 Rp. 29,750.00 Rp. 31,416.00
125 Penangkal Petir Konvensional 2 AIP- BC 25 mm (termasuk biaya pemasangan) unit M.540.a Rp. 2,500,000.00 Rp. 2,640,000.00
126 Penangkal Petir Konvensional 3 AIP- BC 25 mm (termasuk biaya pemasangan) unit M.540.b Rp. 41,500.00 Rp. 43,824.00
127 Penangkal Petir Konvensional 4 AIP- BC 25 mm (termasuk biaya pemasangan) unit M.540.c Rp. 3,900,000.00 Rp. 4,118,400.00
128 Penangkal Petir Elektrostatis Kurn R 35 M - BC 50 mm (termasuk biaya pemasangan) unit M.540.d Rp. 6,700,000.00 Rp. 7,075,200.00
129 Penangkal Petir Elektrostatis Kurn R 85 M - BC 50 mm (termasuk biaya pemasangan) unit M.540.e Rp. 8,300,000.00 Rp. 8,764,800.00
130 Penangkal Petir Elektrostatis Kurn R 150 M - BC 50 mm (termasuk biaya pemasangan) unit M.540.f Rp. 8,900,000.00 Rp. 9,398,400.00
131 Ampere Meter + CT 200 / 5A set M.541 Rp. 365,000.00 Rp. 385,440.00
132 Volt Meter bh M.541.a Rp. 155,000.00 Rp. 163,680.00
133 Selector Volt bh M.541.b Rp. 122,000.00 Rp. 128,832.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
134 Pilot Lamp + Fuse set M.541.c Rp. 60,000.00 Rp. 63,360.00 UA
135 Busbar RST set M.541.d Rp. 1,250,000.00 Rp. 1,320,000.00 N
136 MCCB 200 A 3 Phasa ex Schneider bh M.541.e Rp. 2,750,000.00 Rp. 2,904,000.00 A
137 MCCB 100 A 3 Phasa ex Schneider bh M.541.f Rp. 1,350,000.00 Rp. 1,425,600.00
138 Saklar Tunggal Panasonic bh M.541.g Rp. 30,000.00 Rp. 31,680.00
139 Lampu Downlight 8watt (Philip Komplit set) bh M.541.h Rp. 70,000.00 Rp. 73,920.00
140 Saklar Ganda Panasonic bh M.541.i Rp. 64,800.00 Rp. 68,428.80
141 Saklar Triple Panasonic bh M.541.j Rp. 96,000.00 Rp. 101,376.00
142 Stop Kontak 2 gang Panasonic bh M.541.k Rp. 146,000.00 Rp. 154,176.00
143 Stop Kontak lantai Panasonic bh M.541.l Rp. 430,000.00 Rp. 454,080.00
144 Kabel LVTC 3 x 70 m¹ M.541.m Rp. 98,000.00 Rp. 103,488.00

MATERIAL LAIN-LAIN
1 Air m³ M.550.a Rp. 3,850.00 Rp. 4,065.60
2 Air, Liter M.550.b (M170) Rp. 15.00 Rp. 15.84
3 Plasticizer m³ (M171) Rp. 40,000.00
4 Gebalan Rumput Jenis rumput gajah m² M.551 M32 Rp. 35,000.00 Rp. 36,960.00
5 Ijuk kg M.552.a Rp. 5,500.00 Rp. 5,808.00
6 Ijuk (m2) m² M.552.b Rp. 16,500.00 Rp. 17,424.00
7 Geotekstil Woven m² M.553 Rp. 5,977.50 Rp. 6,312.24
8 Geotekstil non-Woven m² M.553.b Rp. 10,302.30 Rp. 10,879.23
9 Geomembran m² M.553.c Rp. 35,101.44 Rp. 37,067.12
10 Karung goni/plastik buah M.554 M.554 Rp. 5,500.00 Rp. 5,808.00
11 Sesek bambu ukuran (200 X 150) m² M.555.a M.555.a Rp. 5,000.00 Rp. 5,280.00
12 Sesek bambu lembar M.555.b Rp. 30,000.00 Rp. 31,680.00
13 Tali ijuk kg M.556 Rp. 10,000.00 Rp. 10,560.00
14 Formika lembar M.557 Rp. 61,000.00 Rp. 64,416.00
15 Sabun Kg M.558 Rp. 12,000.00 Rp. 12,672.00
16 Seal tape buah M.559 Rp. 20,800.00 Rp. 5,750.00
###
17 Aluminium foil m2 M.560 Rp. 24,000.00 Rp. 25,344.00
18 Soda api 1/2 kg M.561 Rp. 21,000.00 Rp. 22,176.00
19 Serat Selulosa Kg (M158) Rp. 22,500.00
20 Sealant kaca (kecil) tube M.562.a Rp. 13,666.67 Rp. 14,432.00
21 Sealant kaca (tanggung) tanggung tube M.562.b Rp. 24,250.00 Rp. 25,608.00
22 Sealant kaca (besar) besar kg M.562.c (M126) Rp. 42,000.00 Rp. 44,352.00
23 Sealant Tuang Dingin Kg/m (M180) Rp. 65,333.00
24 Sealant Tuang Panas Kg/m (M178) Rp. 28,985.00
25 Backer Rod Kg (M165) Rp. 10,833.00
26 Kapur m3 M.563 Rp. 263,000.00 Rp. 277,728.00
27 Screen low carbon ø 4" m¹ M.564.a Rp. 901,444.44 Rp. 951,925.33
28 Screen low carbon ø 6" m¹ M.564.b Rp. 1,172,833.33 Rp. 1,238,512.00
29 Screen stainless steel ø 4" m¹ M.565 Rp. 1,200,000.00 Rp. 1,267,200.00
30 Pipa screen pvc Ø 4" m¹ M.566 Rp. 95,000.00 Rp. 100,320.00
31 Recorder paper set M.567 Rp. 165,000.00 Rp. 174,240.00
32 Expansion Cap m² (M96) Rp. 6,050.00
33 Joint Sealent kg M.569 (M94) Rp. 45,000.00 Rp. 47,520.00
34 Insulasi m2 (M257) 360,000.00
35 Curing Membrane m2 (M259) Rp. 200,000.00
36 Plastic aerator buah M.570 Rp. 15,900.00 Rp. 16,790.40
37 Venetions blinds dan vertical blinds (tirai) m² M.571 Rp. 131,000.00 Rp. 138,336.00
38 Lem kayu kg M.572 Rp. 28,250.00 Rp. 29,832.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
39 Lem vinyl kg M.573 Rp. 29,625.00 Rp. 31,284.00 UA
40 Lem Aibon kg M.574 Rp. 27,500.00 Rp. 29,040.00 N
41 Lem Gipsum Kg M.575 Rp. 5,150.00 Rp. 5,438.40 A
42 Perekat untuk wallpaper kg M.576 Rp. 33,750.00 Rp. 35,640.00
43 Perekat untuk HPL kg M.577 Rp. 37,375.00 Rp. 39,468.00
44 Underlayer m2 M.578 Rp. 51,428.57 Rp. 54,308.57
45 Pisau gerinda buah M.580 Rp. 61,333.33 Rp. 64,768.00
46 Wallpaper m2 M.581 Rp. 45,000.00 Rp. 47,520.00
47 U PVC Gelombang 300 x 80 cm tebal 1,4 mm Lembar M.583 Rp. 60,000.00 Rp. 63,360.00
48 Talang PVC 1/2 Lingkaran 6" batang M.584 Rp. 90,000.00 Rp. 95,040.00
49 Pintu lipat (folding door) bahan plastik/PVC m² M.585 Rp. 55,000.00 Rp. 58,080.00
50 Talang PVC Persegi Abu-abu 4" batang M.586 Rp. 144,000.00 Rp. 152,064.00
51 Rubber Karet m2 M.587 Rp. 50,000.00 Rp. 52,800.00
52 Metal Bond #30 set M.588 Rp. 945,000.00
53 Metal Bond #60 set M.588.a Rp. 945,000.00
54 Metal Bond #120 set M.588.b Rp. 945,000.00
55 Resin Pad #50 set M.589 Rp. 1,350,000.00
56 Resin Pad #100 set M.589.a Rp. 1,350,000.00
57 Resin Pad #200 set M.589.b Rp. 1,350,000.00
58 Resin Pad #400 set M.589.c Rp. 1,350,000.00
59 Resin Pad #800 set M.589.d Rp. 1,575,000.00
60 Burnish #1500 pcs M.590 Rp. 470,000.00
61 Buffing pcs M.591 Rp. 150,000.00
62 pipa AC 1/2 x 1/4 m¹ M.592 Rp. 176,000.00 Rp. 185,856.00
63 pipa AC 5/8 x 1/4 m¹ M.592.a Rp. 203,000.00 Rp. 214,368.00
64 Tabung FRP 1054 (10 inci) 1000 gr unit M.593 Rp. 1,122,000.00 Rp. 1,184,832.00
65 Pasir silika 20 k pkt M.594 Rp. 735,000.00 Rp. 776,160.00
66 carbon active 25 kg pkt M.595 Rp. 957,500.00 Rp. 1,011,120.00
67 3 way manual valve set M.596 Rp. 316,000.00 Rp. 333,696.00
68 Pemipaan 3/4 m' M.597 Rp. 30,242.00 Rp. 31,935.55
69 25 ltr Cation resin Purolite @25 kg krg M.598 Rp. 2,844,000.00 Rp. 3,003,264.00
70 Garam krosok 10 kg pkt M.599 Rp. 255,000.00 Rp. 269,280.00
71 Wastafel Merk KOHLER K-90012T-053010000 unit M.599.a Rp. 3,070,800.00 Rp. 3,242,764.80
72 Wastafel MERK TOTO VESSEL CONTER LAVATORY LW 574 J (BODY OLY) unit M.599.b Rp. 3,070,800.00 Rp. 3,242,764.80
73 Kran Merk TOTO 116 LEVAN unit M.599.c Rp. 2,775,000.00 Rp. 2,930,400.00
74 Kran Merk KOHLER K-18872 K unit M.599.d Rp. 4,095,000.00 Rp. 4,324,320.00
75 Kran Merk KOHLER 32640000 unit M.599.e Rp. 5,640,600.00 Rp. 5,956,473.60
76 Kran Merk Toto tx 443 MMA unit M.599.f Rp. 4,564,000.00 Rp. 4,819,584.00
77 Shower Merk TOTO SHOWER SPRAY TX 403 SMCRB unit M.599.g Rp. 452,200.00 Rp. 477,523.20
78 Shower Merk KOHLER 26238000 unit M.599.h Rp. 8,676,000.00 Rp. 9,161,856.00
79 Shower Merk Kohler 264254000 unit M.599.i Rp. 1,341,000.00 Rp. 1,416,096.00
80 Bathcuip porselen MERK TOP BATH TP-TC-S52-1 unit M.599.j Rp. 35,591,600.00 Rp. 37,584,729.60
81 Adaptor set M.599.k Rp. 16,000.00 Rp. 16,896.00
82 Double Seal Tape m¹ M.599.l Rp. 6,600.00 Rp. 6,969.60
83 Lampu Led Strip m¹ M.599.m Rp. 8,500.00 Rp. 8,976.00
84 Pompa Shimizu PS 130 unit M.599.n Rp. 725,000.00 Rp. 765,600.00
85 Pompa Shimizu PS 230 unit M.599.o Rp. 1,075,000.00 Rp. 1,135,200.00
86 Heater Ariston 30 ltr unit M.599.p Rp. 3,384,000.00 Rp. 3,573,504.00
87 Contactor pump unit M.599.q Rp. 375,000.00 Rp. 396,000.00
88 Rangka shadowline (10x10x25,t=0.3 mm - 3m) btg M.599.r Rp. 23,000.00 Rp. 24,288.00
89 Rockwool 5cm dsb 60 m3 m2 M.599.s Rp. 85,000.00 Rp. 89,760.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
90 Lem Rubber Crumb Kg M.599.t Rp. 105,000.00 Rp. 110,880.00 UA
91 Tactile Stainless Steel unit M.599.y Rp. 18,000.00 Rp. 19,008.00 N
92 Tactile Alumunium unit M.599.z Rp. 17,000.00 Rp. 17,952.00 A
PERPIPAAN
1 Pipa baja Ø 63 mm sch.40 spindo m¹ M.600.a Rp. 105,151.52 Rp. 111,040.00
2 Pipa baja Ø 100 mm sch.40 spindo m¹ M.600.b Rp. 251,818.18 Rp. 265,920.00
3 Pipa baja Ø 125 mm sch.40 spindo m¹ M.600.c Rp. 403,787.88 Rp. 426,400.00
4 Pipa baja Ø 150 mm sch.40 spindo m¹ M.600.d M.600.d Rp. 438,636.36 Rp. 463,200.00
5 Pipa baja Ø 200 mm sch.40 spindo m¹ M.600.e Rp. 708,674.00 Rp. 748,359.74
6 Pipa baja Ø 800 mm m¹ M.600.f Rp. 981,000.00 Rp. 1,035,936.00
7 Pipa baja Ø 900 mm m¹ M.600.g Rp. 1,259,700.00 Rp. 1,330,243.20
8 Pipa Baja Gelombang (M46) Rp. 12,500.00
9 Pipa SS304 Ø 1/2" m¹ M.601.a Rp. 27,500.00 Rp. 29,040.00
10 Pipa SS304 Ø 3/4" m¹ M.601.b Rp. 40,750.00 Rp. 43,032.00
11 Pipa SS304 Ø 1" m¹ M.601.c Rp. 53,000.00 Rp. 55,968.00
12 Pipa SS304 Ø 1.1/2" m¹ M.601.d Rp. 80,250.00 Rp. 84,744.00
13 Pipa SS304 Ø 2" m¹ M.601.e Rp. 108,500.00 Rp. 114,576.00
14 Pipa SS304 Ø 2.1/2" m¹ M.601.f Rp. 134,750.00 Rp. 142,296.00
15 Pipa SS304 Ø 3" m¹ M.601.g Rp. 162,000.00 Rp. 171,072.00
16 Pipa SS304 Ø 3.1/2" m¹ M.601.h Rp. 183,013.00 Rp. 193,261.73
17 Pipa SS304 Ø 4" m¹ M.601.i Rp. 215,000.00 Rp. 227,040.00
18 Tutup Pipa SS304 Ø 2" buah M.601.j Rp. 17,500.00 Rp. 18,480.00
19 Pipa HDPE Ø 63 mm (SDR 17) 0.73 m¹ M.603.a Rp. 44,520.00 Rp. 58,037.50
###
20 Pipa HDPE Ø 75 mm (SDR 17) 1.08 m¹ M.603.n Rp. 62,040.00 Rp. 91,575.00
###
21 Pipa HDPE Ø 90 mm (SDR 17) 1.5 m¹ M.603.o Rp. 95,520.00 Rp. 117,972.50
###
22 Pipa HDPE Ø 110 mm (SDR 17) 2.21 m¹ M.603.b Rp. 174,000.00 Rp. 166,432.50
###
23 Pipa HDPE Ø 125 mm (SDR 17) 2.8 m¹ M.603.c Rp. 277,200.00 Rp. 204,450.00
###
24 Pipa HDPE Ø 160 mm (SDR 17) 4.65 m¹ M.603.d Rp. 277,200.00 Rp. 315,725.00
###
25 Pipa HDPE Ø 200 mm (SDR 17) 7.23 m¹ M.603.e Rp. 436,800.00 Rp. 538,747.50
###
26 Pipa HDPE Ø 250 mm (SDR 17) 11.31 m¹ M.603.f Rp. 712,800.00 Rp. 801,825.00
###
27 Pipa HDPE Ø 315 mm (SDR 17) 18.17 m¹ M.603.g Rp. 1,115,425.00 Rp. 1,345,700.50
###
28 Pipa HDPE Ø 400 mm (SDR 17) 29.52 m¹ M.603.h Rp. 1,790,000.00 Rp. 2,204,277.50
###
29 Pipa HDPE Ø 450 mm (SDR 17) 37.42 m¹ M.603.i Rp. 2,276,000.00 Rp. 3,001,250.00
###
30 Pipa HDPE Ø 500 mm (SDR 17) 46.24 m¹ M.603.j Rp. 2,754,000.00 Rp. 4,063,337.50
###
31 Pipa HDPE Ø 630 mm (SDR 17) 73.35 m¹ M.603.k Rp. 4,356,275.00 Rp. 6,264,837.50
###
32 Pipa HDPE Ø 710 mm (SDR 17) m¹ M.603.l Rp. 6,662,776.20 Rp. 8,737,475.00
###
33 Pipa HDPE Ø 800 mm (SDR 17) m¹ M.603.M Rp. 9,707,084.34 Rp. 13,874,350.00
###
34 Pipa Galvanis DN 20 ( ½" ) 6 m/btg M.605.a Rp. 141,750.00 Rp. 149,688.00
35 Pipa Galvanis DN 25 ( ¾" ) 6 m/btg M.605.b Rp. 182,200.00 Rp. 192,403.20
36 Pipa Galvanis DN 32 ( 1" ) 6 m/btg M.605.c Rp. 273,000.00 Rp. 288,288.00
37 Pipa Galvanis DN 50 ( 1½" ) 6 m/btg M.605.d Rp. 413,200.00 Rp. 436,339.20
38 Pipa Galvanis DN 63 ( 2" ) 6 m/btg M.605.e Rp. 563,300.00 Rp. 594,844.80
39 Pipa Galvanis DN 75 ( 2½" ) 6 m/btg M.605.f Rp. 719,250.00 Rp. 759,528.00
40 Pipa Galvanis DN 90 ( 3" ) 6 m/btg M.605.g Rp. 929,250.00 Rp. 981,288.00
41 Pipa PVC Ø 32 mm (SNI S-12,5 / 10 BAR) SCJ m¹ M.606.a Rp. 41,965.15 Rp. 44,315.20
42 Pipa PVC Ø 50 mm (SNI S-12,5 / 10 BAR) SCJ m¹ M.606.b Rp. 45,115.15 Rp. 47,641.60
43 Pipa PVC Ø 63 mm (SNI S-12,5 / 10 BAR) SCJ m¹ M.606.c Rp. 48,815.15 Rp. 51,548.80
44 Pipa PVC Ø 75 mm (SNI S-12,5 / 10 BAR) SCJ m¹ M.606.d Rp. 60,815.15 Rp. 64,220.80
45 Pipa PVC Ø 90 mm (SNI S-12,5 / 10 BAR) SCJ m¹ M.606.e Rp. 88,656.25 Rp. 93,621.00
46 Pipa PVC Ø 110 mm (SNI S-12,5 / 10 BAR) SCJ m¹ M.606.f Rp. 128,145.45 Rp. 135,321.60
47 Pipa PVC Ø 160 mm (SNI S-12,5 / 10 BAR) SCJ m¹ M.606.g M.606.g Rp. 258,500.00 Rp. 272,976.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
48 Pipa PVC Ø 200 mm (SNI S-12,5 / 10 BAR) SCJ m¹ M.606.h Rp. 346,294.00 Rp. 365,686.46 UA
49 Pipa PVC Ø 250 mm (SNI S-12,5 / 10 BAR) SCJ m¹ M.606.i Rp. 537,034.00 Rp. 567,107.90 N
50 Pipa PVC Ø 315 mm (SNI S-12,5 / 10 BAR) SCJ m¹ M.606.j Rp. 850,888.00 Rp. 898,537.73 A
51 Pipa PVC Ø 400 mm (SNI S-12,5 / 10 BAR) SCJ m¹ M.606.k Rp. 1,254,888.00 Rp. 1,325,161.73
PIPA RRJ (Perlu karet sambung / Rubber Ring) panjang 6 m
1 Pipa PVC Ø 63 mm (SNI S-12,5 / 10 BAR) RRJ m¹ M.607.a Rp. 50,615.15 Rp. 53,449.60
2 Pipa PVC Ø 75 mm (SNI S-12,5 / 10 BAR) RRJ m¹ M.607.b Rp. 52,545.00 Rp. 55,487.52
3 Pipa PVC Ø 90 mm (SNI S-12,5 / 10 BAR) RRJ m¹ M.607.c Rp. 94,056.25 Rp. 99,323.40
4 Pipa PVC Ø 110 mm (SNI S-12,5 / 10 BAR) RRJ m¹ M.607.d Rp. 134,945.45 Rp. 142,502.40
5 Pipa PVC Ø 160 mm (SNI S-12,5 / 10 BAR) RRJ m¹ M.607.e Rp. 268,800.00 Rp. 283,852.80
6 Pipa PVC Ø 200 mm (SNI S-12,5 / 10 BAR) RRJ m¹ M.607.f Rp. 402,625.00 Rp. 425,172.00
7 Pipa PVC Ø 250 mm (SNI S-12,5 / 10 BAR) RRJ m¹ M.607.g Rp. 616,066.67 Rp. 650,566.40
8 Pipa PVC Ø 315 mm (SNI S-12,5 / 10 BAR) RRJ m¹ M.607.h Rp. 968,500.00 Rp. 1,022,736.00
9 Pipa PVC Ø 400 mm (SNI S-12,5 / 10 BAR) RRJ m¹ M.607.i Rp. 1,570,575.00 Rp. 1,658,527.20
PIPA WAVINLITE
1 Pipa tanah Ø 90 mm SDR-41 (air limbah) m¹ M.608.a Rp. 224,950.00 Rp. 237,547.20
2 Pipa tanah Ø 110 mm SDR-41 (air limbah) m¹ M.608.b Rp. 355,425.00 Rp. 375,328.80
3 Pipa tanah Ø 160 mm SDR-41 (air limbah) m¹ M.608.c Rp. 40,750.00 Rp. 43,032.00
4 Pipa tanah Ø 200 mm SDR-41 (air limbah) m¹ M.608.d Rp. 75,375.00 Rp. 79,596.00
5 Pipa tanah Ø 250 mm SDR-41 (air limbah) m¹ M.608.e Rp. 552,500.00 Rp. 583,440.00
6 Pipa tanah Ø 315 mm SDR-41 (air limbah) m¹ M.608.f Rp. 148,600.00 Rp. 156,921.60
7 Pipa tanah Ø 400 mm SDR-41 (air limbah) m¹ M.608.g Rp. 817,100.00 Rp. 862,857.60
8 Pipa tanah Ø 500 mm SDR-41 (air limbah) m¹ M.608.h Rp. 1,271,100.00 Rp. 1,342,281.60
9 Pipa tanah Ø 600 mm SDR-41 (air limbah) m¹ M.608.i Rp. 2,108,300.00 Rp. 2,226,364.80
10 Pipa Carbon Steel / Hitam Ø 1,5 " (3,3 mm) btg M.609.a M.104.d Rp. 280,000.00 Rp. 295,680.00
11 Pipa Carbon Steel / Hitam Ø 2 " (3,4 mm) btg M.609.b M.104.f Rp. 382,000.00 Rp. 403,392.00
12 Pipa Carbon Steel / Hitam Ø 3 " (3,8 mm) btg M.609.c M.104.g Rp. 630,000.00 Rp. 665,280.00
13 Pipa Carbon Steel / Hitam Ø 6 " (4,6 mm) btg M.609.d M.104.i Rp. 1,460,000.00 Rp. 1,541,760.00
14 Pipa Black Steel ø 1/2" m' M.104.a Rp. 25,833.33
15 Pipa Black Steel ø 3/4" m' M.104.b Rp. 30,833.33
16 Pipa Black Steel ø 1" m' M.104.c Rp. 41,666.67
17 Pipa Black Steel ø 2,5" m' M.104.e Rp. 99,166.67
18 Pipa Black Steel ø 4" m' M.104.h Rp. 185,833.33
19 Pipa Black Steel ø 8" m' M.104.j Rp. 466,666.67
ACCESSORIES PIPA PVC
1 Tee PVC Ø 63 mm ( SCJ ) buah M.610.f Rp. 57,600.00 Rp. 60,825.60
2 Tee PVC Ø 90 mm ( SCJ ) buah M.610.g Rp. 155,850.00 Rp. 164,577.60
3 Tee PVC Ø 110 mm ( SCJ ) buah M.610.h Rp. 341,800.00 Rp. 360,940.80
4 Tee PVC Ø 160 mm ( SCJ ) buah M.610.a Rp. 993,600.00 Rp. 1,049,241.60
5 Tee PVC Ø 63 mm (RRJ ) buah M.610.b Rp. 380,650.00 Rp. 401,966.40
6 Tee PVC Ø 90 mm ( RRJ ) buah M.610.c Rp. 530,350.00 Rp. 560,049.60
7 Tee PVC Ø 110 mm ( RRJ ) buah M.610.d Rp. 603,250.00 Rp. 637,032.00
8 Tee PVC Ø 160 mm ( RRJ ) buah M.610.e Rp. 1,278,950.00 Rp. 1,350,571.20
9 Valve PVC Ø 63 mm ( SCJ ) buah M.611.a Rp. 33,550.00 Rp. 35,428.80
10 Valve PVC Ø 90 mm ( SCJ ) buah M.611.c Rp. 104,600.00 Rp. 110,457.60
11 Valve PVC Ø 110 mm ( SCJ ) buah M.611.d Rp. 328,800.00 Rp. 347,212.80
12 Bend PVC SCJ Ø 0.5"x90' buah M.611.i Rp. 3,500.00 Rp. 3,696.00
13 Bend PVC SCJ Ø 0.5"x90' buah M.611.k Rp. 7,500.00 Rp. 7,920.00
14 Dop PVC SCJ Ø 0.5" buah M.611.l Rp. 5,675.00 Rp. 2,833.33
###
15 Dop PVC SCJ Ø 2" buah M.611.m Rp. 18,166.67 Rp. 4,666.67
###
16 Dop PVC SCJ Ø 3" buah M.611.n Rp. 31,966.67 Rp. 7,200.00
###
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
17 Faucet socket PVC SCJ Ø 2" buah M.611.o Rp. 45,850.00 Rp. 7,000.00
### UA
18 Faucet socket PVC SCJ Ø 3" buah M.611.p Rp. 131,950.00 Rp. 7,500.00
### N
19 Flange socket PVC SCJ Ø 4" buah M.611.q Rp. 194,750.00 Rp. 205,656.00 A
20 Long bend double sock (SCJ) PVC Ø 2"x90' buah M.611.r Rp. 61,300.00 Rp. 64,732.80
21 Long bend double sock (SCJ) PVC Ø 3"x90' buah M.611.s Rp. 127,700.00 Rp. 134,851.20
22 Nipple Ø 2"x0.5" buah M.611.t Rp. 13,000.00 Rp. 13,728.00
23 Socket PVC Ø 3" buah M.611.u Rp. 42,600.00 Rp. 44,985.60
24 Water meter Ø 1/2" meglio, amico buah M.611.j Rp. 265,000.00 Rp. 279,840.00
25 Lem PVC kg (M237) Rp. 34,166.67
ACCESSORIES PIPA HDPE
1 Tee HDPE Ø 63 mm buah M.611.v Rp. 217,500.00 Rp. 229,680.00
2 Tee HDPE Ø 90 mm buah M.611.w Rp. 383,370.00 Rp. 404,838.72
3 Tee HDPE Ø 110 mm buah M.611.x Rp. 723,340.00 Rp. 763,847.04
4 Tee HDPE Ø 160 mm buah M.611.y Rp. 872,300.00 Rp. 921,148.80
5 Tee HDPE Ø 200 mm buah M.611.z Rp. 950,000.00 Rp. 1,003,200.00
6 Tee HDPE Ø 250 mm buah M.611.aa Rp. 1,768,000.00 Rp. 1,867,008.00
7 Tee HDPE Ø 315 mm buah M.611.ab Rp. 3,010,000.00 Rp. 3,178,560.00
8 Valve HDPE Ø 63 mm buah M.611.e Rp. 437,500.00 Rp. 462,000.00
9 Valve HDPE Ø 75 mm buah M.611.f Rp. 928,300.00 Rp. 980,284.80
10 Valve HDPE Ø 90 mm buah M.611.g Rp. 1,271,600.00 Rp. 1,342,809.60
11 Valve HDPE Ø 110 mm buah M.611.h Rp. 1,199,700.00 Rp. 1,266,883.20
12 Socket HDPE Ø 1" buah M.611.ay Rp. 12,125.00 Rp. 12,804.00
13 Socket HDPE Ø 2" buah M.611.ac Rp. 40,625.00 Rp. 42,900.00
14 Socket HDPE Ø 3" buah M.611.ad Rp. 98,625.00 Rp. 104,148.00
15 Socket HDPE Ø 4" buah M.611.ae Rp. 240,000.00 Rp. 253,440.00
16 Elbow 90° / Bend 90° HDPE Ø 1" buah M.611.af Rp. 13,500.00 Rp. 14,256.00
17 Elbow 90° / Bend 90° HDPE Ø 2" buah M.611.ag Rp. 42,625.00 Rp. 45,012.00
###
18 Elbow 90° / Bend 90° HDPE Ø 3" buah M.611.ah Rp. 77,250.00 Rp. 81,576.00
###
19 Elbow 90° / Bend 90° HDPE Ø 4" buah M.611.ai Rp. 186,166.67 Rp. 196,592.00
###
20 Flange HDPE Ø 2" buah M.611.aj Rp. 210,000.00 Rp. 221,760.00
21 Flange HDPE Ø 3" buah M.611.ak Rp. 335,000.00 Rp. 353,760.00
22 Flange HDPE Ø 4" buah M.611.al Rp. 465,000.00 Rp. 491,040.00
23 Clamp saddle HDPE 110 mm x Ø 1" buah M.611.am Rp. 75,785.71 Rp. 80,029.71
24 Clamp saddle HDPE 110 mm x Ø 2" buah M.611.an Rp. 119,000.00 Rp. 125,664.00
25 Clamp saddle HDPE 200 mm x Ø 3" buah M.611.ao Rp. 753,300.00 Rp. 795,484.80
26 Mur baut Ø 63 mm buah M.611.ap Rp. 37,100.00 Rp. 39,177.60
27 Mur baut Ø 90 mm buah M.611.aq Rp. 77,500.00 Rp. 81,840.00
28 Mur baut Ø 110 mm buah M.611.ar Rp. 85,500.00 Rp. 90,288.00
29 Mur baut Ø 160 mm buah M.611.as Rp. 307,400.00 Rp. 324,614.40
30 Mur baut Ø 200 mm buah M.611.at Rp. 331,300.00 Rp. 349,852.80
31 Mur baut Ø 250 mm buah M.611.au Rp. 461,200.00 Rp. 487,027.20
32 Mur baut Ø 315 mm buah M.611.av Rp. 575,900.00 Rp. 608,150.40
33 Lubricant botol M.611.aw Rp. 70,000.00 Rp. 73,920.00
34 Lem kaleng M.611.ax Rp. 34,166.67 Rp. 36,080.00
ACCESSORIES PIPA GIP
1 Bend all flange GI Ø 2"x45' buah M.611.a1 Rp. 221,900.00 Rp. 234,326.40
2 Bend all flange GI Ø 2"x90' buah M.611.a2 Rp. 187,000.00 Rp. 197,472.00
3 Bend GI Ø 2"x90' buah M.611.a3 Rp. 94,000.00 Rp. 99,264.00
4 Bend GI Ø 3"x45' buah M.611.a4 Rp. 134,200.00 Rp. 141,715.20
5 Bend GI Ø 3"x90' buah M.611.a5 Rp. 132,000.00 Rp. 139,392.00
6 Box meter buah M.611.a6 Rp. 42,500.00 Rp. 90,000.00
###
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
7 Box valve 60/60 cm buah M.611.a7 Rp. 158,300.00 Rp. 167,164.80 UA
8 Chek valve Ø 2" buah M.611.a9 Rp. 646,000.00 Rp. 682,176.00 N
9 Chek valve Ø 1/2" Kuningan (Onda) A
10 Clamp saddle GI Ø 2"x0.5" buah M.611.a10 Rp. 32,000.00 Rp. 33,792.00
11 Clamp saddle GI Ø 3"x0.5" buah M.611.a11 Rp. 53,000.00 Rp. 55,968.00
12 Double nipple GI Ø 0.5" buah M.611.a12 Rp. 15,000.00 Rp. 8,000.00
###
13 Plug Kran GI Ø 0.5" Kuningan (Onda)
14 Double nipple GI Ø 2" buah M.611.a13 Rp. 29,500.00 Rp. 37,500.00
###
15 Elbouw GI Ø 1"x90' buah M.611.a14 Rp. 19,500.00 Rp. 20,592.00
16 Elbouw GI Ø 2"x90' buah M.611.a15 Rp. 41,750.00 Rp. 44,088.00
17 Flange GI Ø 2" buah M.611.a16 Rp. 110,000.00 Rp. 116,160.00
18 Flange GI Ø 3" buah M.611.a17 Rp. 162,000.00 Rp. 171,072.00
19 Gate valve all flange Ø 2" buah M.611.a18 Rp. 1,250,000.00 Rp. 1,320,000.00
20 Gate valve Ø 2" buah M.611.a19 Rp. 592,500.00 Rp. 574,500.00
###
21 Gate valve Ø 3" buah M.611.a20 Rp. 732,500.00 Rp. 1,637,500.00
###
22 Pipa GI medium A Ø 0.5" m' M.611.a21 Rp. 60,500.00 Rp. 63,888.00
23 Pipa GI medium A Ø 2" m' M.611.a22 Rp. 240,000.00 Rp. 253,440.00
24 Pipa GI medium A Ø 3" m' M.611.a23 Rp. 394,000.00 Rp. 416,064.00
25 Reducer GI Ø 3"x2" buah M.611.a24 Rp. 117,500.00 Rp. 124,080.00
26 Socket GI Ø 3" buah M.611.a25 Rp. 93,000.00 Rp. 98,208.00
27 Stop kran GI Ø 0.5" M.611.a26 Rp. 415,000.00 Rp. 438,240.00
28 Stop kran GI Ø 0.5" kuningaan (Onda) buah M.611.a27 Rp. 817,900.00 Rp. 70,000.00
###
29 Stop kran GI Ø 2" buah M.611.a28 Rp. 415,000.00 Rp. 415,000.00
30 Stop kran GI Ø 3" buah M.611.a29 Rp. 817,900.00 Rp. 863,702.40
31 Street box Ø 4" buah M.611.a30 Rp. 81,700.00 Rp. 86,275.20
32 Tee GI Ø 0.5" buah M.611.a31 Rp. 3,000.00 Rp. 7,666.67
###
33 Tee GI Ø 2" buah M.611.a32 Rp. 103,500.00 Rp. 109,296.00
34 Tee GI Ø 3" buah M.611.a33 Rp. 200,000.00 Rp. 211,200.00
35 Tee GI Ø 2"x1/2" buah M.611.a34 Rp. 184,000.00 Rp. 194,304.00
36 Tee all flange GI Ø 2" buah M.611.a35 Rp. 232,200.00 Rp. 245,203.20
37 Ongkos melubangi flange unit M.611.a36 Rp. 25,100.00 Rp. 26,505.60
38 Ongkos las pipa GI Ø 0.5" unit M.611.a37 Rp. 5,900.00 Rp. 6,230.40
39 Ongkos las pipa GI Ø 1" unit M.611.a38 Rp. 11,900.00 Rp. 12,566.40
40 Ongkos las pipa GI Ø 2" unit M.611.a39 Rp. 23,700.00 Rp. 25,027.20
41 Ongkos las pipa GI Ø 3" unit M.611.a40 Rp. 35,500.00 Rp. 37,488.00
42 Ongkos las pipa GI Ø 4" unit M.611.a41 Rp. 47,300.00 Rp. 49,948.80
43 Wall pipe all flange pipa GI Ø 2" - 50 cm unit M.611.a42 Rp. 290,000.00 Rp. 306,240.00
44 Wall pipe all flange pipa GI Ø 3" - 50 cm unit M.611.a43 Rp. 505,000.00 Rp. 533,280.00
45 Wall pipe all flange pipa GI Ø 4" - 50 cm unit M.611.a44 Rp. 663,300.00 Rp. 700,444.80
46 Ongkos drat pipa Ø 1/2" s/d Ø 2" unit M.611.a45 Rp. 10,100.00 Rp. 10,665.60
47 Ongkos drat pipa Ø 3" s/d Ø 4" unit M.611.a46 Rp. 15,100.00 Rp. 15,945.60
48 Manometer unit M.611.a47 Rp. 115,000.00 Rp. 121,440.00
49 Pressure Switch unit M.611.a48 Rp. 165,000.00 Rp. 174,240.00
50 Pressure Tank Ø 0,5" unit M.611.a49 Rp. 130,000.00 Rp. 137,280.00
RUBBER RING PIPA
1 Rubber Ring Ø 63 mm buah M.612.a Rp. 9,100.00 Rp. 9,609.60
2 Rubber Ring Ø 90 mm buah M.612.b Rp. 12,800.00 Rp. 13,516.80
3 Rubber Ring Ø 110 mm buah M.612.c Rp. 16,800.00 Rp. 17,740.80
4 Rubber Ring Ø 160 mm buah M.612.d Rp. 30,400.00 Rp. 32,102.40
5 Rubber Ring Ø 200 mm buah M.612.e Rp. 44,200.00 Rp. 46,675.20
6 Rubber Ring Ø 250 mm buah M.612.f Rp. 66,900.00 Rp. 70,646.40
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
7 Rubber Ring Ø 315 mm buah M.612.g Rp. 119,300.00 Rp. 125,980.80 UA
8 Rubber Ring Ø 400 mm buah M.612.h Rp. 259,700.00 Rp. 274,243.20 N
9 Rubber Ring Ø 500 mm buah M.612.i Rp. 427,600.00 Rp. 451,545.60 A

SEWA PERALATAN KAPASITAS


1 Asphalt mixing plant 50 T/jam jam alat 1 Rp. 6,713,342.83 Rp. 7,089,290.02
2 Asphalt distributor 4000 ℓ 4000 Lt jam alat 2 E41 Rp. 340,258.00 Rp. 359,312.45
3 Asphalt finisher 5 ton jam alat 3 Rp. 853,195.12 Rp. 900,974.05
4 Asphalt sprayer 850 ℓ 850 Lt jam alat 4 Rp. 83,726.91 Rp. 88,415.61
5 Asphalt liquid mixer 1000 ℓ 1000 Lt jam alat 5 Rp. 53,300.00 Rp. 56,284.80
6 Bridging Plate PL 125 x 6 kg (M261) Rp. 15,500.00
7 Asphaltic plug (40 x 7,5 x 100) cm3 kg (M255) Rp. 41,000.00
8 Bar Cutter 32 mm jam alat 6 Rp. 48,841.00 Rp. 51,576.10
9 Blending equipment 30 T/jam jam alat 7 Rp. 258,029.00 Rp. 272,478.62
10 Bore pile machine 2000 m jam alat 8 alat 8 Rp. 969,085.25 Rp. 1,023,354.02
11 Bulldozer 70-80 HP jam alat 9.a E04 Rp. 710,289.63 Rp. 750,065.84
12 Chain saw jam alat 10 alat 10 E53a Rp. 60,386.00 Rp. 63,767.62
13 Cold milling machine 1000 m jam alat 11 (E36) Rp. 914,260.97 Rp. 965,459.58
14 Cold Paint Spray Machine jam (E37) Rp. 50,042.37
15 Compressor 4000-6500 ℓ\m 5000 L/m (1/2 PK) jam alat 12 E05 Rp. 226,028.24 Rp. 238,685.83
16 Concrete Cutter jam (E76) Rp. 450,000.00
17 Concrete Fix form Finisher jam (E42a) Rp. 210,000.00
18 Compressor AHX-10, 10 HP jam (E05) Rp. 114,004.04
19 Concrete mixer 350 ℓ 350 Lt jam alat 13 (E06) Rp. 200,000.00 Rp. 211,200.00
20 Concrete mixer 350 ℓ (hari) 350 Lt hari alat 14 Rp. 825,122.80 Rp. 871,329.68
21 Concrete mixer 500 ℓ 500 Lt jam alat 15 Rp. 120,000.00 Rp. 126,720.00
22 Concrete mixer truck 5 m³ 5 m3 jam alat 16 E49 Rp. 665,219.00 Rp. 702,471.26
23 Concrete pan mixer 600 Lt jam alat 17 (E43) Rp. 578,154.70 Rp. 610,531.36
24 Concrete pump 40 m3 jam alat 18 E28 Rp. 138,888.89 Rp. 146,666.67
25 Concrete slip form paver 3m jam alat 19 Rp. 429,943.34 Rp. 454,020.16
26 Concrete vibrator jam alat 20 (E20) Rp. 71,428.57 Rp. 75,428.57
27 Crane on track 35 ton 35 T jam alat 21 alat 21 Rp. 573,206.25 Rp. 605,305.80
28 Crane on wheel 10-15 ton 15 T jam alat 22 (E07) Rp. 832,679.69 Rp. 879,309.75
29 Crane On Mobile 7 Ton; 260 HP jam (E07b) Rp. 175,000.00
30 Crane On mobile 70 Ton jam E51 Rp. 900,000.00
31 Dump truck 40 ton 40 T jam alat 23 Rp. 785,000.00 Rp. 828,960.00
32 Dump truck 20 ton 20 T jam alat 23.a E.13.d Rp. 595,679.00 Rp. 629,037.02
33 Dump truck 10 ton 10 T jam alat 23.b E.13.c E09 Rp. 507,687.85 Rp. 536,118.37
34 Dump truck 3,5 ton 3,5 T jam alat 23.c (E08) Rp. 332,104.00 Rp. 350,701.82
35 Dump truck 7 ton 7T jam alat 23.d E.13.b Rp. 405,000.00 Rp. 427,680.00
36 Douzer D21 jam alat 24 Rp. 110,000.00 Rp. 116,160.00
37 Douzer D31 jam alat 24.a Rp. 125,000.00 Rp. 132,000.00
38 Douzer D65 jam alat 24.b Rp. 200,000.00 Rp. 211,200.00
39 Douzer D155/6+Ripper jam alat 24.c Rp. 500,000.00 Rp. 528,000.00
40 Excavator 70-80 HP jam alat 27.a Rp. 137,500.00 Rp. 145,200.00
41 Excavator 80-140 HP 1 m3 jam alat 27 E10 Rp. 584,943.63 Rp. 584,943.63
###
42 Excavator PC 200 (20Ton) jam alat 27.b Rp. 584,943.63 Rp. 614,943.63
43 Excavator PC 300 (30Ton) jam alat 27.c Rp. 00.00 Rp. 00.00
44 Excavator Long Arm PC 200 (20Ton) jam alat 27.d Rp. 280,000.00 Rp. 295,680.00
45 Mini Excavator 40-60 HP (E10a) Rp. 214,589.65
46 Flat bed truck 3-4 m³ 4 m3 jam alat 28 E11 Rp. 490,148.95 Rp. 517,597.29
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
47 Generator set 135 KVA 180 KVA jam alat 29 E12 Rp. 471,589.64 Rp. 497,998.66 UA
48 Jack hammer 16 Kg jam alat 30 (E26) Rp. 53,651.25 Rp. 56,655.72 N
49 Chain Saw E.09.d Rp. 60,386.00 A
50 Excavator PC-50 (Mini) < 6 ton; 40 - 50 HP jam E.15.a Rp. 142,857.14
51 Excavator PC-75 (Midi) 6 - < 10 ton; 60 - 70 HP jam E.15.b Rp. 178,571.43
52 Excavator PC-100 (Standar) 10 - < 20 ton; 75 - 80 HP jam E.15.c Rp. 130,000.00
53 Excavator PC-200 (Standar) 20 - < 29 ton; 120 - 130 HP jam E.15.d Rp. 140,000.00
54 Excavator PC-360 (Standar) 35 - < 40 ton; 335 - 375 HP jam E.15.f Rp. 170,000.00
55 Excavator PC-400 (Standar) 40 - < 50 ton; 380 - 420 HP jam E.15.g Rp. 340,000.00
56 Grouting Pump injection am (E56) Rp. 300,000.00
57 Fulvi mixer jam (E27) Rp. 813,230.35
58 Motor Grader 135 HP jam E.17.a (E13) Rp. 708,439.63
59 Jack Stressing jam E.20 (E62) Rp. 270,000.00
60 Track Loader 75-100 Hp jam E14 Rp. 287,667.75
61 Thermoplastic spreading machine jam E15 Rp. 63,859.77
62 Pile Hammer, 2,5 Ton jam (E61) Rp. 48,335.89
63 Rock Drill Breaker jam (E37) Rp. 390,377.63
64 Roller, Tandem 8- 10 Ton jam E.50.c (E17) Rp 454,777.13
65 Trailler 15 Ton jam (E35a) Rp. 321,656.93
66 Trailer 20 Ton (12-20); 3,0 x 7,0 m2 jam E.55.b E29 Rp. 345,197.82
67 Trailler Tronton 30 T; 200 HP jam (E35) Rp. 490,148.95
68 Vibrator beton (portable), 45 mm; 5 HP jam To.42.a Rp. 708,439.63 Rp. 748,112.24
69 Waterpass jam To.43 Rp. 131,085.52 Rp. 138,426.31
70 Pedestrian Roller / Baby roller 1T jam alat 32 E24 Rp. 131,085.52
71 Pile driver + hammer 2,5 ton 3T jam alat 33 Rp. 222,033.06 Rp. 234,466.91
72 Pneumatic tire roller 8-10 ton 10 T jam alat 34 E18 Rp. 624,349.61 Rp. 659,313.19
73 Stone crusher 50 T/jam jam alat 35 Rp. 620,307.00 Rp. 655,044.19
74 Power Broom jam E03 Rp. 55,600.35
75 Tandem roller 6-8 ton 8T jam alat 36 E17 Rp. 454,777.13 Rp. 480,244.64
76 Three wheel roller 6-8 ton 8T jam alat 37 alat 37 Rp. 319,769.31 Rp. 337,676.39
77 Trailer 20 ton 20 T jam alat 38 Rp. 483,930.97 Rp. 511,031.10
78 Vibratory plate tamper 1T jam alat 39 Rp. 77,380.40 Rp. 81,713.70
79 Vibratory roller 5-8 ton 8T jam alat 40 (E19) Rp. 220,000.00 Rp. 250,000.00
###
80 Vibratory roller 10-15 ton 15 T jam alat 41 Rp. 376,000.00 Rp. 397,056.00
81 Sheep Foot Roller jam (E16a) Rp. 195,000.00
82 Water pump 70-100 mm jam alat 42 (E22) Rp. 69,644.37 Rp. 73,544.45
83 Water tanker truck 3000-4000 ℓ 4000 Lt jam alat 43 (E23) Rp. 299,058.29 Rp. 315,805.55
84 Wheel Loader jam E15 Rp. 414,835.07 Rp. 414,835.07
85 Wheel loader 1,0-1,6 m³ 1,5 m3 jam alat 44 (E15) Rp. 414,835.07 Rp. 414,835.07
86 Stamper Kuda jam (E81) Rp. 322,121.00 Rp. 46,017.29
87 Stamper 1T jam alat 45 (E25) Rp. 77,380.40 Rp. 81,713.70
88 Mesin gilas 2 roda 6 - 10 ton 10 T jam alat 46 alat 46 Rp. 240,000.00 Rp. 253,440.00
89 Mesin gilas 3 roda 6 - 10 ton 10 T jam alat 47 alat 47 Rp. 242,000.00 Rp. 255,552.00
90 Mesin gilas roda karet 8 - 10 ton 10 T jam alat 48 Rp. 245,000.00 Rp. 258,720.00
91 Alat bantu set alat 49 Rp. 50,000.00 Rp. 52,800.00
92 Logging unit alat 53 Rp. 280,000.00 Rp. 295,680.00
93 Mesin kerek unit alat 54 Rp. 50,000.00 Rp. 52,800.00
94 Mesin bor hari alat 55 E71 Rp. 450,000.00 Rp. 475,200.00
95 Pompa injeksi jam alat 58 Rp. 300,000.00 Rp. 316,800.00
96 Sewa Crane jam alat 61 Rp. 214,285.71 Rp. 226,285.71
97 Sewa alat las 230 Amp jam alat 62 alat 62 Rp. 71,400.00 Rp. 75,398.40
98 Sewa Scaffolding : alat 63 Rp. 64,285.71 Rp. 67,885.71
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
99 - Main frame T-190 bulan alat 64 Rp. 6,000.00 Rp. 6,336.00 UA
100 - Main frame T-170 bulan alat 65 Rp. 5,500.00 Rp. 5,808.00 N
101 - Leader frame T-90 bulan alat 66 Rp. 5,000.00 Rp. 5,280.00 A
102 - Cross brass T-220 bulan alat 67 Rp. 4,500.00 Rp. 4,752.00
103 - Cross brass T-193 bulan alat 68 Rp. 4,500.00 Rp. 4,752.00
104 - Joint pin bulan alat 69 Rp. 1,300.00 Rp. 1,372.80
105 - Jack base T-40 bulan alat 70 Rp. 4,500.00 Rp. 4,752.00
106 - Jack base T-60 bulan alat 71 Rp. 4,500.00 Rp. 4,752.00
107 - U head jack T-40 bulan alat 72 Rp. 4,500.00 Rp. 4,752.00
108 - U head jack T-60 bulan alat 73 Rp. 4,500.00 Rp. 4,752.00
109 - Pipe support bulan alat 74 Rp. 9,000.00 Rp. 9,504.00
110 - Horizontal frame bulan alat 75 Rp. 7,500.00 Rp. 7,920.00
111 - Cat walk bulan alat 76 Rp. 42,500.00 Rp. 44,880.00
112 - Swipel clamb bulan alat 79 Rp. 5,000.00 Rp. 5,280.00
113 - Roda custer (satu set) bulan alat 80 Rp. 100,000.00 Rp. 105,600.00
114 Mesin molen (per hari) hari alat 81 Rp. 350,000.00 Rp. 369,600.00
115 Tripod tinggi 5 m hari alat 82 Rp. 250,000.00 Rp. 264,000.00
116 Alat pancang Hammer 0.5 ton hari alat 83 Rp. 350,000.00 Rp. 369,600.00
117 Alat penyambung tiang pancang dolken buah alat 84 Rp. 55,000.00 Rp. 58,080.00
118 Sewa mobil crane hari alat 85 Rp. 1,450,000.00 Rp. 1,531,200.00
119 Pompa Air, diesel 5 KW hari alat 86 Rp. 250,000.00 Rp. 264,000.00
120 Pompa Air, diesel 10 KW hari alat 87 Rp. 500,000.00 Rp. 528,000.00
121 Pompa Air, diesel 20 KW hari alat 88 Rp. 1,000,000.00 Rp. 1,056,000.00
122 Pompa submersible hari alat 89 Rp. 400,000.00 Rp. 422,400.00
123 Pompa sub mersible (SP7 - 12) Kapasitas 7 m3/jam, total head = 54 m' skw Grundfos alat 89.a Rp. 40,199,500.00 Rp. 42,450,672.00
124 Pompa sub mersible (SP9 - 10) Kapasitas 9 m3/jam, total head = 52 m' skw Grundfos alat 89.b Rp. 54,978,000.00 Rp. 58,056,768.00
125 Pompa Sentrifugal 2 PK ( Grundfos NS 30-18 ) alat 89.c Rp. 7,770,000.00 Rp. 8,205,120.00
126 Elektroda Massa Rp. 100,000.00 Rp. 105,600.00
127 Truck Crane 5 ton jam alat 95 (E07a) Rp. 500,000.00 Rp. 528,000.00
128 Theodolith hari alat 96 Rp. 250,000.00 Rp. 264,000.00
129 Waterpass hari alat 97 Rp. 200,000.00 Rp. 211,200.00
130 Ponton jam alat 98 E64 Rp. 150,000.00 Rp. 158,400.00
131 Bekisting plat besi (sewa) set alat 99 alat 99 Rp. 18,000.00 Rp. 19,008.00
132 Sewa Tripot/Tackel & handle crane 2 T hari alat 100 Rp. 300,000.00 Rp. 316,800.00
133 Cutting machine / concrete Cutter hari alat 101 alat 101 Rp. 450,000.00 Rp. 475,200.00
134 Pipe Cutter hari alat 102 Rp. 372,302.00 Rp. 393,150.91
135 Hammer 1 - 2 ton (manual) hari alat 103 Rp. 442,862.00 Rp. 467,662.27
TANAMAN
1 Adam hawa Pohon T.01 Rp. 5,000.00 Rp. 5,280.00
2 Adas Pohon T.02 Rp. 3,000.00 Rp. 3,168.00
3 agave americana Pohon T.03 Rp. 50,000.00 Rp. 52,800.00
4 aglonema butherfly Pohon T.04 Rp. 50,000.00 Rp. 52,800.00
5 aglonema Dona karmen Pohon T.05 Rp. 63,000.00 Rp. 66,528.00
6 aglonema milky way Pohon T.06 Rp. 10,000.00 Rp. 10,560.00
7 aglonema sithipong Pohon T.07 Rp. 10,000.00 Rp. 10,560.00
8 aglonema snow white Pohon T.08 Rp. 90,000.00 Rp. 95,040.00
9 air mancur Pohon T.09 Rp. 10,000.00 Rp. 10,560.00
10 airis Pohon T.10 Rp. 5,000.00 Rp. 5,280.00
11 Akalipa brokoli Pohon T.11 Rp. 10,000.00 Rp. 10,560.00
12 alamanda kuning Pohon T.12 Rp. 75,000.00 Rp. 79,200.00
13 alpukat sambung Pohon T.13 Rp. 50,000.00 Rp. 52,800.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
14 alpukat seedling ( batang bawah ) Pohon T.14 Rp. 60,000.00 Rp. 63,360.00 UA
15 andong merah Pohon T.15 Rp. 5,000.00 Rp. 5,280.00 N
16 Andong mini Pohon T.16 Rp. 15,000.00 Rp. 15,840.00 A
17 anggrek bulan Pohon T.17 Rp. 150,000.00 Rp. 158,400.00
18 anggrek dendrobium Pohon T.18 Rp. 125,000.00 Rp. 132,000.00
19 anggrek macan Pohon T.19 Rp. 200,000.00 Rp. 211,200.00
20 anggrek tanah Pohon T.20 Rp. 75,000.00 Rp. 79,200.00
21 anggur laut Pohon T.21 Rp. 125,000.00 Rp. 132,000.00
22 angsana Pohon T.22 Rp. 35,000.00 Rp. 36,960.00
23 anting putri 20 cm Pohon T.23 Rp. 800,000.00 Rp. 844,800.00
24 aralea Pohon T.24 Rp. 15,000.00 Rp. 15,840.00
25 Asoka holand Pohon T.25 Rp. 15,000.00 Rp. 15,840.00
26 Asoka india Pohon T.26 Rp. 15,000.00 Rp. 15,840.00
27 asoka javanika daun besar Pohon T.27 Rp. 15,000.00 Rp. 15,840.00
28 asoka singapure Pohon T.28 Rp. 15,000.00 Rp. 15,840.00
29 Polibag 25 buah T.29 Rp. 1,000.00 Rp. 1,056.00
30 Polibag 30 buah T.30 Rp. 1,000.00 Rp. 1,056.00
31 bakung putih Pohon T.31 Rp. 25,000.00 Rp. 26,400.00
32 bakung ungu Pohon T.32 Rp. 25,000.00 Rp. 26,400.00
33 bambu air Pohon T.33 Rp. 35,000.00 Rp. 36,960.00
34 bambu rejeki hijau Pohon T.34 Rp. 35,000.00 Rp. 36,960.00
35 bambu rejeki kuning Pohon T.35 Rp. 35,000.00 Rp. 36,960.00
36 bambu rejeki putih Pohon T.36 Rp. 35,000.00 Rp. 36,960.00
37 bayam merah Pohon T.37 Rp. 5,000.00 Rp. 5,280.00
38 belimbing wuluh Pohon T.38 Rp. 35,000.00 Rp. 36,960.00
39 beringin Pohon T.39 Rp. 150,000.00 Rp. 158,400.00
40 beringin dolar Pohon T.40 Rp. 150,000.00 Rp. 158,400.00
41 beringin putih Pohon T.41 Rp. 150,000.00 Rp. 158,400.00
42 binahong hijau Pohon T.42 Rp. 15,000.00 Rp. 15,840.00
43 binahong merah Pohon T.43 Rp. 15,000.00 Rp. 15,840.00
44 bintaro hijau Pohon T.44 Rp. 300,000.00 Rp. 316,800.00
45 bintaro ungu Pohon T.45 Rp. 300,000.00 Rp. 316,800.00
46 blimbing demak Pohon T.46 Rp. 40,000.00 Rp. 42,240.00
47 Bogenville Pohon T.47 Rp. 35,000.00 Rp. 36,960.00
48 bonsai anting putri 1 m Pohon T.48 Rp. 1,000,000.00 Rp. 1,056,000.00
49 bonsai beringin dolar Pohon T.49 Rp. 3,000,000.00 Rp. 3,168,000.00
50 bromelia Pohon T.50 Rp. 95,000.00 Rp. 100,320.00
51 bromelia lipstik Pohon T.51 Rp. 95,000.00 Rp. 100,320.00
52 bromelia mawar Pohon T.52 Rp. 95,000.00 Rp. 100,320.00
53 bromelia putih Pohon T.53 Rp. 95,000.00 Rp. 100,320.00
54 bromelia trotol Pohon T.54 Rp. 95,000.00 Rp. 100,320.00
55 buby blue Pohon T.55 Rp. 3,500.00 Rp. 3,696.00
56 Bunga kupu kuning Pohon T.56 Rp. 15,000.00 Rp. 15,840.00
57 bunga kupu kupu Pohon T.57 Rp. 15,000.00 Rp. 15,840.00
58 bunga sapu tangan Pohon T.58 Rp. 35,000.00 Rp. 36,960.00
59 bunga trompet putih mini Pohon T.59 Rp. 15,000.00 Rp. 15,840.00
60 bungur Pohon T.60 Rp. 10,000.00 Rp. 10,560.00
61 calatea bangkok Pohon T.61 Rp. 35,000.00 Rp. 36,960.00
62 calatea batik hijau Pohon T.62 Rp. 35,000.00 Rp. 36,960.00
63 calatea daun besar Pohon T.63 Rp. 35,000.00 Rp. 36,960.00
64 calatea lurik Pohon T.64 Rp. 35,000.00 Rp. 36,960.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
65 calatea mini Pohon T.65 Rp. 35,000.00 Rp. 36,960.00 UA
66 calatea silver Pohon T.66 Rp. 35,000.00 Rp. 36,960.00 N
67 calatea varigata Pohon T.67 Rp. 75,000.00 Rp. 79,200.00 A
68 candana india Pohon T.68 Rp. 800,000.00 Rp. 844,800.00
69 cemara golden Pohon T.69 Rp. 50,000.00 Rp. 52,800.00
70 cemara kipas Pohon T.70 Rp. 50,000.00 Rp. 52,800.00
71 cemara papua Pohon T.71 Rp. 125,000.00 Rp. 132,000.00
72 cemara udang Pohon T.72 Rp. 150,000.00 Rp. 158,400.00
73 ceplok piring hiaju Pohon T.73 Rp. 35,000.00 Rp. 36,960.00
74 ceplok piring varigata Pohon T.74 Rp. 50,000.00 Rp. 52,800.00
75 dadap merah Pohon T.75 Rp. 800,000.00 Rp. 844,800.00
76 daun ungu Pohon T.76 Rp. 35,000.00 Rp. 36,960.00
77 difenbachia lipstik Pohon T.77 Rp. 10,000.00 Rp. 10,560.00
78 difenbachia sebra Pohon T.78 Rp. 25,000.00 Rp. 26,400.00
79 dolar pacar tembok daun besar Pohon T.79 Rp. 20,000.00 Rp. 21,120.00
80 Dolar/ pacar tembok daun kecil Pohon T.80 Rp. 20,000.00 Rp. 21,120.00
81 Dracaena florida beauty Pohon T.81 Rp. 25,000.00 Rp. 26,400.00
82 dracaena milky way Pohon T.82 Rp. 25,000.00 Rp. 26,400.00
83 Dracaena song of india polibag 30 Pohon T.83 Rp. 12,000.00 Rp. 12,672.00
84 Dracaena song Of Jamaika polibag 20 Pohon T.84 Rp. 6,000.00 Rp. 6,336.00
85 dracaena song of jamaika polibag 30 Pohon T.85 Rp. 12,000.00 Rp. 12,672.00
86 Dracaena tricollor Pohon T.86 Rp. 40,000.00 Rp. 42,240.00
87 duku Pohon T.87 Rp. 150,000.00 Rp. 158,400.00
88 durian montong Pohon T.88 Rp. 150,000.00 Rp. 158,400.00
89 durian musang king Pohon T.89 Rp. 57,500.00 Rp. 60,720.00
90 ekor kuda Pohon T.90 Rp. 25,000.00 Rp. 26,400.00
91 ekor tupai Pohon T.91 Rp. 5,000.00 Rp. 5,280.00
92 erpah Pohon T.92 Rp. 15,000.00 Rp. 15,840.00
93 erpah mini Pohon T.93 Rp. 15,000.00 Rp. 15,840.00
94 erpah putih Pohon T.94 Rp. 750,000.00 Rp. 792,000.00
95 flamboyan Pohon T.95 Rp. 300,000.00 Rp. 316,800.00
96 glodogan pecut 4 m Pohon T.96 Rp. 600,000.00 Rp. 633,600.00
97 glodogan ranting 4 m Pohon T.97 Rp. 600,000.00 Rp. 633,600.00
98 heliconia strata Pohon T.98 Rp. 25,000.00 Rp. 26,400.00
99 heliconia tegak Pohon T.99 Rp. 3,000.00 Rp. 3,168.00
100 hema Pohon T.100 Rp. 500.00 Rp. 528.00
101 Iler Pohon T.101 Rp. 2,000.00 Rp. 2,112.00
102 jabodikaba Pohon T.102 Rp. 15,000.00 Rp. 15,840.00
103 jahe merah Pohon T.103 Rp. 15,000.00 Rp. 15,840.00
104 jahe putih Pohon T.104 Rp. 35,000.00 Rp. 36,960.00
105 jambu air Pohon T.105 Rp. 50,000.00 Rp. 52,800.00
106 jambu kristal Pohon T.106 Rp. 155,000.00 Rp. 163,680.00
107 jeruk dekopon Pohon T.107 Rp. 260,000.00 Rp. 274,560.00
108 jeruk keprak batu 55 Pohon T.108 Rp. 305,000.00 Rp. 322,080.00
109 jeruk kip Pohon T.109 Rp. 50,000.00 Rp. 52,800.00
110 jeruk lemon Pohon T.110 Rp. 25,000.00 Rp. 26,400.00
111 jeruk lemon kalifornia Pohon T.111 Rp. 260,000.00 Rp. 274,560.00
112 jeruk nagami Pohon T.112 Rp. 40,000.00 Rp. 42,240.00
113 jeruk nipis jawa Pohon T.113 Rp. 35,000.00 Rp. 36,960.00
114 jeruk purut Pohon T.114 Rp. 35,000.00 Rp. 36,960.00
115 jeruk siem Pohon T.115 Rp. 150,000.00 Rp. 158,400.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
116 kamboja bali 1 m Pohon T.116 Rp. 300,000.00 Rp. 316,800.00 UA
117 kamboja bali 2 m Pohon T.117 Rp. 300,000.00 Rp. 316,800.00 N
118 kamboja bali 3 m Pohon T.118 Rp. 625,000.00 Rp. 660,000.00 A
119 kamboja bali 4 m Pohon T.119 Rp. 400,000.00 Rp. 422,400.00
120 kamboja jepang Pohon T.120 Rp. 30,000.00 Rp. 31,680.00
121 kana bangkok Pohon T.121 Rp. 75,000.00 Rp. 79,200.00
122 kana hijau Pohon T.122 Rp. 16,000.00 Rp. 16,896.00
123 kana kuning Pohon T.123 Rp. 51,000.00 Rp. 53,856.00
124 karet kebo Pohon T.124 Rp. 150,000.00 Rp. 158,400.00
125 kelapa hibrida Pohon T.125 Rp. 510,000.00 Rp. 538,560.00
126 kelapa sawit Pohon T.126 Rp. 760,000.00 Rp. 802,560.00
127 kembang sepatu merah Pohon T.127 Rp. 35,000.00 Rp. 36,960.00
128 kembang sepatu varigata 20 Pohon T.128 Rp. 25,000.00 Rp. 26,400.00
129 kembang sepatu varigata 30 Pohon T.129 Rp. 75,000.00 Rp. 79,200.00
130 kemuning Pohon T.130 Rp. 15,000.00 Rp. 15,840.00
131 kenari Pohon T.131 Rp. 15,000.00 Rp. 15,840.00
132 kencur Pohon T.132 Rp. 5,000.00 Rp. 5,280.00
133 Kencuran Pohon T.133 Rp. 5,000.00 Rp. 5,280.00
134 kepel Pohon T.134 Rp. 150,000.00 Rp. 158,400.00
135 ketapang kencana Pohon T.135 Rp. 75,000.00 Rp. 79,200.00
136 kolbanda Pohon T.136 Rp. 5,000.00 Rp. 5,280.00
137 krokot kuning Pohon T.137 Rp. 5,000.00 Rp. 5,280.00
138 Krokot merah Pohon T.138 Rp. 5,000.00 Rp. 5,280.00
139 kucai mini Pohon T.139 Rp. 15,000.00 Rp. 15,840.00
140 kumis kucing Pohon T.140 Rp. 15,000.00 Rp. 15,840.00
141 kunir Pohon T.141 Rp. 15,000.00 Rp. 15,840.00
142 kurma Pohon T.142 Rp. 76,000.00 Rp. 80,256.00
143 kusandra polibag 20 Pohon T.143 Rp. 5,000.00 Rp. 5,280.00
144 lavender Pohon T.144 Rp. 5,000.00 Rp. 5,280.00
145 lavenia Pohon T.145 Rp. 76,000.00 Rp. 80,256.00
146 leak Pohon T.146 Rp. 76,000.00 Rp. 80,256.00
147 lidi air Pohon T.147 Rp. 31,000.00 Rp. 32,736.00
148 lili brazil hijau Pohon T.148 Rp. 51,000.00 Rp. 53,856.00
149 lili brazil putih Pohon T.149 Rp. 51,000.00 Rp. 53,856.00
150 lili paris Pohon T.150 Rp. 6,000.00 Rp. 6,336.00
151 lili pink Pohon T.151 Rp. 26,000.00 Rp. 27,456.00
152 lili putih Pohon T.152 Rp. 16,000.00 Rp. 16,896.00
153 liquanyu Pohon T.153 Rp. 8,500.00 Rp. 8,976.00
154 lohansung Pohon T.154 Rp. 150,000.00 Rp. 158,400.00
155 mangga besar Pohon T.155 Rp. 2,000,000.00 Rp. 2,112,000.00
156 mangga kecil Pohon T.156 Rp. 35,000.00 Rp. 36,960.00
157 Maranta lurik Pohon T.157 Rp. 26,000.00 Rp. 27,456.00
158 Mata kucing Pohon T.158 Rp. 26,000.00 Rp. 27,456.00
159 matamori Pohon T.159 Rp. 26,000.00 Rp. 27,456.00
160 matoa Pohon T.160 Rp. 151,000.00 Rp. 159,456.00
161 Melati jepang Pohon T.161 Rp. 15,000.00 Rp. 15,840.00
162 Mirten Pohon T.162 Rp. 400,000.00 Rp. 422,400.00
163 Pacar tembok Pohon T.163 Rp. 6,000.00 Rp. 6,336.00
164 pachira Pohon T.164 Rp. 76,000.00 Rp. 80,256.00
165 pacing Pohon T.165 Rp. 76,000.00 Rp. 80,256.00
166 pagoda 1,5 m Pohon T.166 Rp. 250,000.00 Rp. 264,000.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
167 pagoda 3 m Pohon T.167 Rp. 500,000.00 Rp. 528,000.00 UA
168 palem botol Pohon T.168 Rp. 112,500.00 Rp. 118,800.00 N
169 palem ekor ikan Pohon T.169 Rp. 100,000.00 Rp. 105,600.00 A
170 palem ekor tupai Pohon T.170 Rp. 301,000.00 Rp. 317,856.00
171 palem jepang Pohon T.171 Rp. 201,000.00 Rp. 212,256.00
172 palem kamedorea Pohon T.172 Rp. 100,000.00 Rp. 105,600.00
173 palem kipas Pohon T.173 Rp. 151,000.00 Rp. 159,456.00
174 palem kuning Pohon T.174 Rp. 51,000.00 Rp. 53,856.00
175 palem merah Pohon T.175 Rp. 601,000.00 Rp. 634,656.00
176 palem putri Pohon T.176 Rp. 150,000.00 Rp. 158,400.00
177 palem siagrus Pohon T.177 Rp. 500,000.00 Rp. 528,000.00
178 palem waregu Pohon T.178 Rp. 40,000.00 Rp. 42,240.00
179 pandan bali kecil Pohon T.179 Rp. 400,000.00 Rp. 422,400.00
180 pandan hias variegata Pohon T.180 Rp. 15,000.00 Rp. 15,840.00
181 pandan mini kuning Pohon T.181 Rp. 25,000.00 Rp. 26,400.00
182 pandan sayur Pohon T.182 Rp. 15,000.00 Rp. 15,840.00
183 papirus Pohon T.183 Rp. 15,000.00 Rp. 15,840.00
184 Patah tulang Pohon T.184 Rp. 35,000.00 Rp. 36,960.00
185 peperomia Pohon T.185 Rp. 5,000.00 Rp. 5,280.00
186 philodendron bullmaks Pohon T.186 Rp. 35,000.00 Rp. 36,960.00
187 philodendron gergaji Pohon T.187 Rp. 35,000.00 Rp. 36,960.00
188 philodendron hijau Pohon T.188 Rp. 35,000.00 Rp. 36,960.00
189 Philodendron kuning Pohon T.189 Rp. 3,000.00 Rp. 3,168.00
190 philodendron lemon squash Pohon T.190 Rp. 10,000.00 Rp. 10,560.00
191 philodendron linet Pohon T.191 Rp. 10,000.00 Rp. 10,560.00
192 philodendron marbel Pohon T.192 Rp. 10,000.00 Rp. 10,560.00
193 philodendron tangkai merah Pohon T.193 Rp. 10,000.00 Rp. 10,560.00
194 pinisium Pohon T.194 Rp. 50,000.00 Rp. 52,800.00
195 Pisang bali Pohon T.195 Rp. 15,000.00 Rp. 15,840.00
196 pohon rainboy Pohon T.196 Rp. 100,000.00 Rp. 105,600.00
197 polisias cikra cikri Pohon T.197 Rp. 25,000.00 Rp. 26,400.00
198 Polisias lokal Pohon T.198 Rp. 15,000.00 Rp. 15,840.00
199 polisias mini Pohon T.199 Rp. 15,000.00 Rp. 15,840.00
200 polisias variegata Pohon T.200 Rp. 25,000.00 Rp. 26,400.00
201 pucuk merah Pohon T.201 Rp. 10,000.00 Rp. 10,560.00
202 pucuk putih Pohon T.202 Rp. 50,000.00 Rp. 52,800.00
203 puki anjing Pohon T.203 Rp. 50,000.00 Rp. 52,800.00
204 pule Pohon T.204 Rp. 200,000.00 Rp. 211,200.00
205 purina cokwei Pohon T.205 Rp. 6,000.00 Rp. 6,336.00
206 rambutan Pohon T.206 Rp. 35,000.00 Rp. 36,960.00
207 Roelia pendek Pohon T.207 Rp. 150,000.00 Rp. 158,400.00
208 Roelia tegak Pohon T.208 Rp. 7,500.00 Rp. 7,920.00
209 rombusa kuning Pohon T.209 Rp. 10,000.00 Rp. 10,560.00
210 rumput akar wangi per meter Pohon T.210 Rp. 50,000.00 Rp. 52,800.00
211 rumput arap hijau Pohon T.211 Rp. 2,000.00 Rp. 2,112.00
212 rumput arap merah Pohon T.212 Rp. 2,000.00 Rp. 2,112.00
213 rumput bermuda per meter Pohon T.213 Rp. 55,000.00 Rp. 58,080.00
214 rumput ekor kuda Pohon T.214 Rp. 35,000.00 Rp. 36,960.00
215 rumput gajah lokal per meter Pohon T.215 Rp. 35,000.00 Rp. 36,960.00
216 rumput gajah mini m2 T.216 Rp. 30,000.00 Rp. 31,680.00
217 rumput golf m2 T.217 Rp. 150,000.00 Rp. 158,400.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
218 rumput irian m2 T.218 Rp. 3,000.00 Rp. 3,168.00 UA
219 rumput jepang m2 T.219 Rp. 35,000.00 Rp. 36,960.00 N
220 rumput lamuran per meter m2 T.220 Rp. 17,000.00 Rp. 17,952.00 A
221 rumput sintetis per meter m2 T.221 Rp. 150,000.00 Rp. 158,400.00
222 rumput suwis per meter m2 T.222 Rp. 45,000.00 Rp. 47,520.00
223 sabrina polibag 20 Pohon T.223 Rp. 2,000.00 Rp. 2,112.00
224 sabrina polibag 25 Pohon T.224 Rp. 5,000.00 Rp. 5,280.00
225 sabrina polibag 30 Pohon T.225 Rp. 5,000.00 Rp. 5,280.00
226 sakura Pohon T.226 Rp. 50,000.00 Rp. 52,800.00
227 salam Pohon T.227 Rp. 35,000.00 Rp. 36,960.00
228 Sambang darah Pohon T.228 Rp. 20,000.00 Rp. 21,120.00
229 santos lemon Pohon T.229 Rp. 75,000.00 Rp. 79,200.00
230 sawo kecik besar Pohon T.230 Rp. 250,000.00 Rp. 264,000.00
231 sawo kecik kecil Pohon T.231 Rp. 95,000.00 Rp. 100,320.00
232 sepatufilum Pohon T.232 Rp. 25,000.00 Rp. 26,400.00
233 sikas rovoluta Pohon T.233 Rp. 3,075,000.00 Rp. 3,247,200.00
234 sikas zamia Pohon T.234 Rp. 1,025,000.00 Rp. 1,082,400.00
235 sikat botol 2 m Pohon T.235 Rp. 150,000.00 Rp. 158,400.00
236 sirih belanda hijau belang Pohon T.236 Rp. 25,000.00 Rp. 26,400.00
237 sirih belanda kuning Pohon T.237 Rp. 25,000.00 Rp. 26,400.00
238 sirih belanda putih Pohon T.238 Rp. 25,000.00 Rp. 26,400.00
239 sirih hijau Pohon T.239 Rp. 15,000.00 Rp. 15,840.00
240 sirih kuning Pohon T.240 Rp. 25,500.00 Rp. 26,928.00
241 sirih merah Pohon T.241 Rp. 15,000.00 Rp. 15,840.00
242 sirsak Pohon T.242 Rp. 35,000.00 Rp. 36,960.00
243 spoto dea Pohon T.243 Rp. 75,000.00 Rp. 79,200.00
244 stek mini / lagestrus Pohon T.244 Rp. 5,000.00 Rp. 5,280.00
245 Stevanut Pohon T.245 Rp. 10,000.00 Rp. 10,560.00
246 sukun Pohon T.246 Rp. 35,000.00 Rp. 36,960.00
247 sutra bombai Pohon T.247 Rp. 6,500.00 Rp. 6,864.00
248 tabebuya kuning Pohon T.248 Rp. 801,500.00 Rp. 846,384.00
249 tabebuya pink Pohon T.249 Rp. 801,500.00 Rp. 846,384.00
250 Taiwan beauty Pohon T.250 Rp. 6,500.00 Rp. 6,864.00
251 tanjung Pohon T.251 Rp. 800,000.00 Rp. 844,800.00
252 teratai Pohon T.252 Rp. 35,000.00 Rp. 36,960.00
253 trembesi Pohon T.253 Rp. 150,000.00 Rp. 158,400.00
254 trembesi 4 m Pohon T.254 Rp. 350,000.00 Rp. 369,600.00
255 tumbergia Pohon T.255 Rp. 10,000.00 Rp. 10,560.00
256 wali songo daun besar Pohon T.256 Rp. 150,000.00 Rp. 158,400.00
257 wali songo daun lima Pohon T.257 Rp. 35,000.00 Rp. 36,960.00
258 Wali songo hijau Pohon T.258 Rp. 75,000.00 Rp. 79,200.00
259 Wali songo kuning Pohon T.259 Rp. 35,000.00 Rp. 36,960.00
260 zodiak Pohon T.260 Rp. 25,000.00 Rp. 26,400.00
261 Media tanah + pupuk kandang zak (8kg) T.261 Rp. 10,000.00 Rp. 10,560.00
262 Sekam bakar zak (8kg) T.262 Rp. 15,000.00 Rp. 15,840.00

POMPA AIR UNTUK PENYEDIAAN AIR BERSIH


POMPA SUBMERSIBLE MOTOR CELUP SETARA GRUNDFOS
1 MOTOR POMPA 1 PHASE / 1 x 220 Tot.head
a Kapasitas 3 m3/jam 25.m Unit
39 m Unit Rp. 17,150,000.00 Rp. 18,110,400.00
P
T

M
U
A
R
D
A
O
KODE CIPTA KODE SUMBER KODE BINA HARGA SURVEY 2021 HARGA SURVEY 2022 A
P
No URAIAN SATUAN
KARYA DAYA AIR MARGA SEMESTER II SEMESTER I E
IR
B
D
52 m Unit Rp. 18,600,000.00 Rp. 19,641,600.00 UA
61 m Unit Rp. 21,000,000.00 Rp. 22,176,000.00 N
78 m Unit Rp. 21,700,000.00 Rp. 22,915,200.00 A
96 m Unit Rp. 24,250,000.00 Rp. 25,608,000.00
108 m Unit Rp. 24,900,000.00 Rp. 26,294,400.00
128.m Unit Rp. 39,600,000.00 Rp. 41,817,600.00
144.m Unit Rp. 41,427,000.00 Rp. 43,746,912.00

Tot.head
b Kapasitas 17 m3/jam 23.m Rp. 30,500,000.00 Rp. 32,208,000.00
31 m Rp. 30,595,000.00 Rp. 32,308,320.00

2 MOTOR POMPA 3 PHASE / 3 x 380 Tot.head


a Kapasitas 3 m3/jam 52 m Rp. 18,800,000.00 Rp. 19,852,800.00
61 m Rp. 21,290,000.00 Rp. 22,482,240.00
78 m Rp. 21,900,000.00 Rp. 23,126,400.00
96 m Rp. 24,490,000.00 Rp. 25,861,440.00
108 m Rp. 25,160,000.00 Rp. 26,568,960.00
128.m Rp. 40,000,000.00 Rp. 42,240,000.00

Tot.head
b Kapasitas 14 m3/jam 46 m Rp. 34,088,000.00 Rp. 35,996,928.00
60 m
100 m
115 m Rp. 67,800,000.00 Rp. 71,596,800.00

Tot.head
c Kapasitas 17 m3/jam 48 m Rp. 45,472,000.00 Rp. 48,018,432.00
55 m Rp. 50,366,000.00 Rp. 53,186,496.00
65 m Rp. 52,412,000.00 Rp. 55,347,072.00
72 m' Rp. 54,549,000.00 Rp. 57,603,744.00
79 m' Rp. 69,719,000.00 Rp. 73,623,264.00
89 m' Rp. 71,724,000.00 Rp. 75,740,544.00
96 m' Rp. 71,724,000.00 Rp. 75,740,544.00

3 MOTOR POMPA 3 PHASE / 3 x 400 Tot.head


a Kapasitas 5 m3/jam 48 m Rp. 18,400,000.00 Rp. 19,430,400.00
67 m Rp. 20,790,000.00 Rp. 21,954,240.00
85 m Rp. 23,650,000.00 Rp. 24,974,400.00
100 m Rp. 24,580,000.00 Rp. 25,956,480.00
130 m Rp. 32,100,000.00 Rp. 33,897,600.00
155 m Rp. 58,500,000.00 Rp. 61,776,000.00
173 m Rp. 61,300,000.00 Rp. 64,732,800.00
210 m Rp. 77,500,000.00 Rp. 81,840,000.00

Tot.head
b Kapasitas 8 m3/jam 41 m Rp. 24,000,000.00 Rp. 25,344,000.00
62 m Rp. 27,800,000.00 Rp. 29,356,800.00
LAMPIRAN III : PERATURAN BUPATI KENDAL
NOMOR :
TANGGAL :

BIDANG CIPTA KARYA

I. PEKERJAAN PENDAHULUAN, MELIPUTI :

1 Direksikeet / brak kerja


2 Mobilisasi dan Demobilisasi
3 Papan nama pekerjaan
4 Pekerjaan lain-lain apabila dibutuhkan

II. BIAYA DIREKSI KEET


Volume Harga Satuan Biaya Tarif ke Kasda
No Nilai Pekerjaan
(M2) (Rp) (Rp) (Rp)
1 < 75 juta - - - -
2 75 juta s/d 100 juta 12 200,000.00 2,400,000.00 1,200,000.00
3 101 juta s/d 200 juta 16 200,000.00 3,200,000.00 1,600,000.00
4 201 juta s/d 300 juta 20 200,000.00 4,000,000.00 2,000,000.00
5 > 300 juta 24 200,000.00 4,800,000.00 2,400,000.00

III. PAPAN NAMA PEKERJAAN

1 Biaya papan nama kegiatan Rp. 275.000,- /unit


2 Nilai pekerjaan ≤ Rp. 200.000.000,- dibutuhkan 1 unit papan nama kegiatan
3 Nilai pekerjaan > Rp. 200.000.000,- dibutuhkan 2 unit papan nama kegiatan

IV. MOBILISASI DAN DEMOBILISASI


IV.A. BERDASARKAN TOPOGRAFI
1 Daerah Atas, meliputi Kecamatan:
a. Boja e. Sukorejo
b. Limbangan f. Plantungan
c. Singorojo g. Pageruyung
d. Patean

2 Daerah Bawah, meliputi Kecamatan:


a. Kendal h. Cepiring
b. Kaliwungu i. Weleri
c. Kaliwungu Selatan j. Gemuh
d. Brangsong k. Kangkung
e. Patebon l. Rowosari
f. Pegandon m.Ringinarum
g. Ngampel

1
IV.B. BERDASARKAN JENIS ALAT
1 Daerah Atas, biaya Mobilisasi dan Demobilisasi Alat:
a. Mesin Gilas 3 roda besi Rp. 3,000,000.00
b. Mesin Tandem roda 2 Rp. 3,000,000.00
c. Mesin Gilas roda karet Rp. 3,000,000.00
d. Mesin Penghampar Aspal Rp. 3,000,000.00
e. Mesin Penyemprot Aspal Rp. 1,500,000.00
f. Mesin Compresor Rp. 1,500,000.00
g. Mesin Pengaduk Beton Rp. 900,000.00
h. Mesin Vibrator Rp. 700,000.00
i. Mesin Pancang beton Rp. 6,500,000.00
j. Back Hoe / Excavator Rp. 5,000,000.00
k. Bulldozer Rp. 5,000,000.00
l. Mesin pemotong /cuting beton Rp. 700,000.00
m. Vibratory plat tamper Rp. 700,000.00
n. Jack Hammer Rp. 700,000.00

2 Daerah Bawah, biaya Mobilisasi dan Demobilisasi Alat:


a. Mesin Gilas 3 roda besi Rp. 2,500,000.00
b. Mesin Tandem roda 2 Rp. 2,500,000.00
c. Mesin Gilas roda karet Rp. 2,500,000.00
d. Mesin Penghampar Aspal Rp. 2,500,000.00
e. Mesin Penyemprot Aspal Rp. 1,300,000.00
f. Mesin Compresor Rp. 1,300,000.00
g. Mesin Pengaduk Beton Rp. 850,000.00
h. Mesin Vibrator Rp. 650,000.00
i. Mesin Pancang beton Rp. 6,100,000.00
j. Back Hoe / Excavator Rp. 4,000,000.00
k. Bulldozer Rp. 4,000,000.00
l. Mesin pemotong /cuting beton Rp. 650,000.00
m. Vibratory plat tamper Rp. 650,000.00
n. Jack Hammer Rp. 650,000.00

2
2
DAFTAR HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA 0
(Sudah termasuk overhead dan profit, belum termasuk PPN) 1
9
(Tahun 2022, Semester 1)
HARGA SATUAN (
(Rp) 2
No KODE ANALISA URAIAN PEKERJAAN SATUAN
)
2022 (1) /
2
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
0
1 A.2.2.1.1. (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter m' 288,242.00 2
2 dihit A.2.2.1.2.1 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter m2 213,071.00 1
3 dihit A.2.2.1.2.2 Pembuatan 1 m2 pagar sementara dari sasak bambu, tinggi 2,00 meter m2 107,934.00
4 dihit A.2.2.1.2.3 Pembuatan 1 m2 pagar sementara dari MMT, tinggi 2,00 meter m2 89,659.00 (
5 A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter m2 955,465.00 1
)
6 A.2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank m' 97,235.00
7 A.2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran m2 2,599,616.00
8 A.2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu ) m2 2,894,196.00
9 A.2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan m2 2,431,140.00
10 A.2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja m2 2,500,371.00
11 A.2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan m2 19,374.00
12 A.2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu m2 445,052.00
13 A.2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x 50cm x 25cm buah 147,348.00
14 A.2.2.1.12. Pembuatan 1 m2 jalan sementara m2 220,880.00
15 A.2.2.1.13. Pembongkaran 1 m3 beton bertulang m3 319,731.00
16 dihit A.2.2.1.13.a Pembongkaran 1 m3 pasangan batu m3 189,065.00
17 dihit A.2.2.1.14. Pembongkaran 1 m3 dinding tembok bata m3 129,143.00
18 A.2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm m2 16,868.00

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1. Menggali 1 m3 tanah biasa sedalam 1 m m3 85,032.00
2 A.2.3.1.2. Menggali 1 m3 tanah biasa sedalam 2 m m3 104,622.00
3 A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m m3 124,557.00
4 A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m m3 113,147.00
5 A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m m3 171,788.00
6 A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m m3 136,913.00
7 dihit A.2.3.1.6.a Menggali 1 m3 Tanah Berbatu Lunak (dengan excavator) m3 16,475.00
8 dihit A.2.3.1.6.b Menggali 1 m3 Batu (dengan excavator ) m3 19,133.00
9 A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter m2 6,242.00
10 A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter m3 37,242.00
11 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah (1/3 Galian; Tanah Biasa Sedalam 1 M) m3 28,344.00
12 A.2.3.1.10.a (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) manual m3 62,429.00
13 A.2.3.1.10.b Pemadatan tanah 1 m3 tanah ( per 20 cm) dengan stamper m3 67,127.00
14 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 382,463.00
15 dihit A.2.3.1.11.a Pengurugan 1 m3 dengan tanah merah untuk taman m3 165,159.00
16 A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL m3 487,558.00
17 A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan m2 58,804.00
18 A.2.3.1.14. Pengurugan 1 m3 sirtu padat (tanpa alat pemadat) m3 363,960.00
19 dihit A.2.3.1.15. 1 m3 urugan batu pecah 5/7 cm m3 487,859.00
20 dihit A.2.3.1.16. 1 m3 urugan batu pecah 3/5 cm m3 401,609.00
Pengurugan 1 m3 dengan tanah padas setempat dengan pemadat stamper (per 20
21 dihit A.2.3.1.17. m3 330,393.00
cm)
Pengurugan 1 m3 dengan tanah padas sepanjang jalan dengan pemadat alat berat &
22 dihit A.2.3.1.18. m3 141,260.00
dump truck ( per 20 cm)
Pengurugan 1 m3 dengan tanah padas sepanjang jalan dengan pemadat alat berat
23 dihit A.2.3.1.19. m3 327,652.00
( per 20cm)
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP m3 1,377,049.00
2 A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP m3 1,329,035.00
3 A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP m3 1,295,704.00
4 A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP m3 1,272,292.00
5 A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP m3 1,240,152.00
6 A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP m3 1,055,634.00
7 A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP m3 1,203,774.00
8 A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP m3 1,179,132.00
9 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 861,516.00
(K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan
10 A.3.2.1.10. m3 3,126,673.00
40% batu belah
11 A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm m3 1,261,883.00
12 dihit A.3.3.1.12. Pengadaan & Pasang sheetpile type FPC.220.500 m' 859,922.00
13 dihit A.3.3.1.12.1 Pengadaan & Pemancangan Cerucuk bambu apus Ø 10 cm, sedalam 2 meter titik 34,372.00

14 dihit A.3.3.1.12.2 Pengadaan & Pemancangan Cerucuk bambu petung Ø 10 cm, sedalam 2 meter titik 34,372.00

15 dihit A.3.3.1.13.1 Pengadaan & Pemancangan Minipile / Triangle Pile 200x200x200 mm (drop hammer) m' 291,388.00

16 dihit A.3.3.1.13.2 Pengadaan & Pemancangan Minipile / Triangle Pile 200x200x200 mm (mekanis) m' 183,332.00

17 dihit A.3.3.1.13.3 Pengadaan & Pemancangan Minipile / Triangle Pile 250x250x250 mm (drop hammer) m' 348,010.00

18 dihit A.3.3.1.13.4 Pengadaan & Pemancangan Minipile / Triangle Pile 250x250x250 mm (mekanis) m' 254,149.00

19 dihit A.3.3.1.13.5 Pengadaan & Pemancangan Minipile / Triangle Pile 280x280x280 mm (drop hammer) m' 389,739.00

20 dihit A.3.3.1.13.6 Pengadaan & Pemancangan Minipile / Triangle Pile 280x280x280 mm (mekanis) m' 302,105.00

21 dihit A.3.3.1.13.7 Pengadaan & Pemancangan Minipile / Triangle Pile 300x300x300 mm (drop hammer) m' 464,998.00

22 dihit A.3.3.1.13.8 Pengadaan & Pemancangan Minipile / Triangle Pile 300x300x300 mm (mekanis) m' 354,625.00

23 dihit A.3.3.1.13.9 Pengadaan & Pemancangan Minipile / Triangle Pile 320x320x320 mm (drop hammer) m' 447,180.00

24 dihit A.3.3.1.13.10 Pengadaan & Pemancangan Minipile / Triangle Pile 320x320x320 mm (mekanis) m' 367,120.00

25 dihit A.3.3.1.13.11 Pengadaan & Pemancangan Minipile / kotak 300x300 mm K.500 (drop hammer) m' 626,355.00

26 dihit A.3.3.1.13.12 Pengadaan & Pemancangan Minipile / kotak 300x300 mm K.500 (mekanis) m' 515,983.00

27 dihit A.3.3.1.13.13 Pengadaan & Pemancangan Minipile / kotak 400x400 mm K.500 (drop hammer) m' 662,699.00

28 dihit A.3.3.1.13.14 Pengadaan & Pemancangan Minipile / kotak 400x400 mm K.500 (mekanis) m' 553,759.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


Membuat 1 m3 beton mutu fc' = 7,4 MPa (K 100) manual slump (12± 2) cm w/c =
1 A.4.1.1.1 m3 1,199,652.00
0,87
2 dihit A.4.1.1.1.a Membuat 1 m3 Rabat Beton (manual) setara campuran 1 PC : 3 PS : 5 Kr m3 1,148,574.00
Membuat 1 m3 beton mutu fc’= 9,8 MPa (K 125) manual slump (12± 2) cm w/c =
3 A.4.1.1.2 m3 1,239,330.00
0,87
Membuat 1 m3 beton mutu fc’= 12,2 MPa (K 150) manual slump (12± 2) cm w/c =
4 A.4.1.1.3 m3 1,269,881.00
0,87
Membuat 1 m3 lantai kerja beton mutu fc' = 7,4 MPa (K 100), slump (3-6) cm, w/c =
5 A.4.1.1.4 m3 1,188,399.00
087 (manual)
1 m3 lantai kerja beton mutu fc' = 7,4 MPa (K 100), slump (3-6) cm, w/c = 087
6 dihit A.4.1.1.4.c m3 1,033,861.00
(Readymix) tanpa alat Pompa beton
Membuat 1 m3 beton mutu fc’ = 14.5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
7 A.4.1.1.5. m3 1,306,572.00
(manual)
8 dihit A.4.1.1.5.c 1 m3 beton mutu fc’= 14.5 MPa (K 175) Readymix tanpa alat Pompa beton m3 1,074,301.00
9 dihit A.4.1.1.5.d 1 m3 beton mutu fc’= 14.5 MPa (K 175) Readymix dengan alat Pompa beton m3 1,101,669.00
Membuat 1 m3 beton mutu fc’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
10 A.4.1.1.6 m3 1,340,832.00
(manual)
Membuat 1 m3 beton mutu fc’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c =
11 A.4.1.1.7. m3 1,367,813.00
0,58 (manual)
12 dihit A.4.1.1.7.c 1 m3 beton mutu fc’= 19,3 MPa (K 225) Readymix tanpa alat Pompa beton m3 1,127,359.00
13 dihit A.4.1.1.7.d 1 m3 beton mutu fc’= 19,3 MPa (K 225) Readymix dengan alat Pompa beton m3 1,154,727.00
Membuat 1 m3 beton mutu fc’= 21.7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
14 A.4.1.1.8. m3 1,384,049.00
(manual)
15 dihit A.4.1.1.8.c 1 m3 beton mutu fc’= 21.7 MPa (K 250) Readymix tanpa alat Pompa beton m3 1,152,285.00
16 dihit A.4.1.1.8.d 1 m3 beton mutu fc’= 21.7 MPa (K 250) Readymix dengan alat Pompa beton m3 1,179,653.00
17 dihit A.4.1.1.9.c 1 m3 beton mutu fc’= 24,0 MPa (K 275) Readymix tanpa alat Pompa beton m3 1,168,697.00
18 dihit A.4.1.1.9.d 1 m3 beton mutu fc’= 24,0 MPa (K 275) Readymix dengan alat Pompa beton m3 1,206,737.00
19 dihit A.4.1.1.10.c 1 m3 beton mutu fc’= 26.4 MPa (K 300) Readymix tanpa alat Pompa beton m3 1,200,818.00
20 dihit A.4.1.1.10.c 1 m3 beton mutu fc’= 26.4 MPa (K 300) Readymix dengan alat Pompa beton m3 1,228,186.00
21 dihit A.4.1.1.12.c 1 m3 beton mutu fc’= 31.2 MPa (K 350) Readymix tanpa alat Pompa beton m3 1,245,685.00
22 dihit A.4.1.1.12.d 1 m3 beton mutu fc’= 31.2 MPa (K 350) Readymix dengan alat Pompa beton m3 1,273,053.00
23 A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox - 100 m3 1,318,755.00
24 A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm m' 108,747.00
25 A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm m' 147,310.00
26 A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm - 320 mm m' 257,265.00
27 A.4.1.1.17.a Pembesian 1 kg dengan besi tulangan polos kg 17,181.00
28 A.4.1.1.17.b Pembesian 1 kg dengan besi tulangan ulir kg 16,289.00
29 A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) 10 kg 320,954.00
30 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi m2 212,752.00
31 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof m2 225,503.00
32 dihit A.4.1.1.21.b Pemasangan 1 m2 bekisting untuk sloof pasang kembali m2 261,387.00
33 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom m2 457,809.00
34 dihit A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom pasang kembali m2 193,583.00
35 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok m2 496,062.00
36 dihit A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok pasang kembali m2 312,388.00
37 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai m2 541,273.00
38 dihit A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai pasang kembali m2 186,830.00
39 dihit A.4.1.1.24.b Pemasangan 1 m2 bekisting untuk lantai dengan floordeck (JAP ≤ 0,6 m) m2 279,826.00
40 dihit A.4.1.1.24.c Pemasangan 1 m2 bekisting untuk lantai dengan floordeck (JAP ≤ 0,8 m) m2 279,041.00
41 dihit A.4.1.1.24.d Pemasangan 1 m2 bekisting untuk lantai dengan floordeck (JAP ≤ 1,2 m) m2 263,730.00
40 dihit A.4.1.1.24.e Pemasangan 1 m2 bekisting untuk lantai dengan Scaffolding T.3,8 m m2 487,758.00
41 dihit A.4.1.1.24.f Pemasangan 1 m2 bekisting untuk lantai dengan Scaffolding T.3,4 m m2 469,358.00
42 A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding m2 566,781.00
43 dihit A.4.1.1.25.a Pemasangan 1 m2 bekisting untuk dinding pasang kembali m2 196,291.00
44 A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga m2 444,025.00
45 A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton m2 117,750.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

46 A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm (termasuk bekisting) m' 173,125.00
47 dihit A.4.1.1.35.a Membuat 1 m’ kolom praktis beton bertulang (12 x 12) cm (termasuk bekisting) m' 193,297.00
48 dihit A.4.1.1.35.b Pemasangan 1 m' bekisting untuk kolom praktis m' 115,091.00
49 dihit A.4.1.1.35.c Bongkar 1 m2 bekisting secara biasa m2 4,994.00
50 dihit A.4.1.1.35.d Bongkar 1 m2 bekisting secara hati-hati (untuk dipakai kembali) m2 7,491.00
51 A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm (termasuk bekisting) m' 147,819.00
52 dihit A.4.1.1.36.a Pemasangan 1 m' bekisting untuk ring balok pasang kembali m2 83,595.00
Membuat 1 m’ ring balok beton bertulang (15 x 20) cm (tulangan pokok 4Ø10, begel
53 dihit A.4.1.1.36.b m' 249,169.00
Ø6-150 termasuk bekisting)
Membuat 1 m’ ring balok beton bertulang (15 x 20) cm (tulangan pokok 4Ø12, begel
54 dihit A.4.1.1.36.c m' 266,080.00
Ø6-150 termasuk bekisting)
55 dihit A.4.1.1.37 Pemasangan 1 m Papan Dilatasi Pada Cor Jalan Beton m' 36,774.00
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
56 dihit A.4.1.1.38.1.1 m3 1,242,833.00
1x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
57 dihit A.4.1.1.38.1.2 m3 1,205,374.00
2x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
58 dihit A.4.1.1.38.1.3 m3 1,229,009.00
1x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
59 dihit A.4.1.1.38.1.4 m3 1,190,451.00
2x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
60 dihit A.4.1.1.38.2.1 m3 1,244,094.00
1x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
61 dihit A.4.1.1.38.2.2 m3 1,205,126.00
2x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
62 dihit A.4.1.1.38.2.3 m3 1,229,286.00
1x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
63 dihit A.4.1.1.38.2.4 m3 1,190,088.00
2x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
64 dihit A.4.1.1.38.3.1 m3 1,245,082.00
1x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
65 dihit A.4.1.1.38.3.2 m3 1,205,292.00
2x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
66 dihit A.4.1.1.38.3.3 m3 1,230,135.00
1x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
67 dihit A.4.1.1.38.3.4 m3 1,190,114.00
2x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
68 dihit A.4.1.1.38.4.1 m3 1,246,964.00
1x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
69 dihit A.4.1.1.38.4.2 m3 1,206,077.00
2x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
70 dihit A.4.1.1.38.4.3 m3 1,231,840.00
1x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
71 dihit A.4.1.1.38.4.4 m3 1,190,724.00
2x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
72 dihit A.4.1.1.38.5.1 m3 1,250,275.00
1x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
73 dihit A.4.1.1.38.5.2 m3 1,207,854.00
2x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
74 dihit A.4.1.1.38.5.3 m3 1,234,917.00
1x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
75 dihit A.4.1.1.38.5.4 m3 1,192,265.00
2x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
76 dihit A.4.1.1.38.6.1 m3 1,256,089.00
1x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
77 dihit A.4.1.1.38.6.2 m3 1,211,365.00
2x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
78 dihit A.4.1.1.38.6.3 m3 1,240,393.00
1x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
79 dihit A.4.1.1.38.6.4 m3 1,195,439.00
2x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
80 dihit A.4.1.1.38.7.1 m3 1,266,907.00
1x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
81 dihit A.4.1.1.38.7.2 m3 1,218,346.00
2x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
82 dihit A.4.1.1.38.7.3 m3 1,250,668.00
1x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
83 dihit A.4.1.1.38.7.4 m3 1,201,878.00
2x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
82 dihit A.4.1.1.38.8.1 m3 1,207,823.00
1x pakai, tanpa tulangan dowel & tiebars, L = 3 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
83 dihit A.4.1.1.38.8.2 m3 1,166,131.00
2x pakai, tanpa tulangan dowel & tiebars, L = 3 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
84 dihit A.4.1.1.38.9.1 m3 1,206,430.00
1x pakai, tanpa tulangan dowel & tiebars, L = 3,5 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
85 dihit A.4.1.1.38.9.2 m3 1,165,834.00
2x pakai, tanpa tulangan dowel & tiebars, L = 3,5 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
86 dihit A.4.1.1.38.10.1 m3 1,205,835.00
1x pakai, tanpa tulangan dowel & tiebars, L = 4 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
87 dihit A.4.1.1.38.10.2 m3 1,166,061.00
2x pakai, tanpa tulangan dowel & tiebars, L = 4 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
88 dihit A.4.1.1.38.11.1 m3 1,205,771.00
1x pakai, tanpa tulangan dowel & tiebars, L = 4,5 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
89 dihit A.4.1.1.38.11.2 m3 1,166,637.00
2x pakai, tanpa tulangan dowel & tiebars, L = 4,5 m

90 dihit A.4.1.1.38.11.3 Pekerjaan Supercrete Premium Full Agregate m2 171,327.00

91 dihit A.4.1.1.38.11.4 Pekerjaan Supercrete Cream Finish m2 160,013.00

92 dihit A.4.1.1.38.11.5 Pekerjaan Stamping System (SYS) m2 225,753.00


HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


(K3) Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump
1 A.4.1.2.1. m2 37,731,295.00
(120±20)mm
(K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump
2 A.4.1.2.2. m2 47,164,134.00
(120±20)mm
(K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump
3 A.4.1.2.3. m2 56,596,857.00
(120±20)mm
(K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump
4 A.4.1.2.4. m2 70,746,213.00
(120±20)mm
5 A.4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak (5 kali pakai) m2 166,984.00
6 A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai) m2 56,144.00
7 A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai) m2 51,681.00
8 A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak buah 9,084.00
9 A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak buah 14,638.00
10 A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak buah 11,861.00
11 A.4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak buah 76,526.00
12 A.4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak buah 78,626.00
13 A.4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak buah 70,879.00
14 A.4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m) buah 94,625.00
15 A.4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak titik 68,636.00
16 A.4.1.2.23. Pemasangan 1 titik Bekisting join pracetak titik 159,033.00
17 A.4.1.2.24. Upah 1 titik Join dengan Sling titik 87,141.00

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


1 A.4.2.1.1. Pemasangan 1 kg besi profil kg 39,531.00
2 A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF kg 39,531.00
3 A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan 100 kg 46,637.00
4 A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku m2 4,470,198.00
5 dihit A.4.2.1.4.1 Pembuatan 1 m Rangka Pintu Alluminium Warna Natural/Silver m' 397,944.00
6 dihit A.4.2.1.4.2 Pembuatan 1 m Rangka Pintu Alluminium Warna Powder coating m' 198,904.00
7 dihit A.4.2.1.4.3 Pembuatan 1 m Rangka Pintu U PVC Warna Putih m¹ 270,816.00
8 dihit A.4.2.1.4.4 Pemasangan 1 m Kusen Pintu U PVC Warna Putih m¹ 265,325.00
9 dihit A.4.2.1.4.5 Pemasangan 1 Unit Pintu PVC + Sticker Kaca Oval Polos Untuk KM/WC unit 966,038.00
10 dihit A.4.2.1.4.6 Pemasangan 1 Unit Pintu Alluminium Panil Kaca Hias Untuk KM/WC unit 1,426,038.00
11 A.4.2.1.5. Pengerjaan 1 cm pengelasan dengan las listrik Cm 1,168.40
12 dihit A.4.2.1.5.1 Pengerjaan 1 cm pengelasan stainless steel Cm 2,012.00
13 A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube/Pipa kotak (25 x 5) cm m2 3,863,805.00
14 dihit A.4.2.1.6.1 Pembuatan 1 m Rangka Jendela Alluminium Warna Natural/Silver m2 397,944.00
15 dihit A.4.2.1.6.2 Pembuatan 1 m Rangka Jendela Alluminium Warna Powder coating m2 198,904.00
16 dihit A.4.2.1.6.3 Pembuatan 1 m Rangka Jendela U PVC Warna Putih m¹ 260,797.00
17 A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi m2 620,616.00
18 A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC m2 185,996.00
19 dihit A.4.2.1.8.a Pemasangan 1 m2 pintu lipat (folding door) bahan alluminium m2 787,124.00
20 A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium m2 558,076.00
21 A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium m2 756,678.00
22 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium 3" warna Natural / Silver m' 163,424.00
23 dihit A.4.2.1.11.1 Pemasangan 1 m kusen pintu alluminium 3" warna Powder coating m' 142,093.00
24 dihit A.4.2.1.11.2 Pemasangan 1 m kusen pintu alluminium 4" warna Powder coating m' 155,452.00
25 dihit A.4.2.1.11.3 Pemasangan 1 m kusen pintu alluminium 4" warna Natural / Silver m' 182,168.00
26 dihit A.4.2.1.11.4 Pemasangan 1 m Kusen Pintu Alluminium Urat Kayu 3" m' 198,644.00
27 dihit A.4.2.1.11.5 Pemasangan 1 m Kusen Pintu Alluminium Urat Kayu 4" m' 260,983.00
28 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm m2 788,091.00
29 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium m2 287,174.00
30 A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan Vertical blinds (mewah) m2 253,994.00
31 dihit A.4.2.1.14.a Pemasangan 1 m2 venetions blinds dan Vertical blinds (sedang) m2 253,994.00
32 dihit A.4.2.1.14.b Pemasangan 1 m2 venetions blinds dan Vertical blinds (standar) m2 253,994.00
33 A.4.2.1.15. Pemasangan 1 m2 teralis besi strip (20 x 3) mm m2 5,241,134.00
34 A.4.2.1.16. Pemasangan 1 m2 Kawat nyamuk plastik / PVC m2 2,003,704.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

35 A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis m2 521,382.00


36 A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm m' 291,989.00
37 A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm m' 127,435.00
38 A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.0,4 mm, modul 60 x 120 cm, dinding par m2 344,091.00
39 A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.0,4 mm, modul 60 x 60 cm, plafon m2 325,137.00
40 A.4.2.1.22 (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75 (tebal 1 m2 216,339.00
Pemasangan 1 m2 atap pelana rangka atap baja canal dingin profil C75 (tebal 0,75
41 dihit A.4.2.1.22.a m2 297,793.00
mm)
(K3) Pemasangan 1 m2 atap jurai rangka atap baja canal dingin profil C75 (tebal
42 A.4.2.1.23 m2 223,490.00
1mm)
Pemasangan 1 m2 atap jurai rangka atap baja canal dingin profil C75 (tebal 0,75
43 dihit A.4.2.1.23.a m2 336,742.00
mm)
Pemasangan 1 M2 pasang kuda-kuda baja ringan + reng untuk atap genteng
44 A.4.2.1.24 m2 408,011.00
biasa/metal

45 dihit A.4.2.1.24.a Pemasangan 1 M2 pasang kuda-kuda baja ringan + reng untuk atap asbes / spandek m2 355,246.00

46 Ls Pemasangan 1 m2 Rangka atap baja ringan + reng (Bluescope lysaght) m2 225,000.00


- Truss C75.070 BMT ; Reng TS35.045 BMT (TS35.050 TCT) ; Jarak kuda-kuda 110
cm
47 Ls Pemasangan 1 m2 Rangka atap baja ringan + reng (Galvasteel)
- Profil Z95 (tebal 0.80), Z75 (tebal 0.80), W75 (tebal 0.80) DAN PROFIL C65 (tebal
0.80) ; Bentuk Atap = Pelana ; Jarak Kuda - kuda 120 cm
Jarak Usuk Jarak Reng
700 mm 225 mm m2 170,000.00
800 mm m2 167,000.00
900 mm m2 164,000.00
1000 mm m2 161,000.00
1100 mm m2 158,000.00
1200 mm m2 155,000.00
700 mm 255 mm m2 167,000.00
800 mm m2 164,000.00
900 mm m2 161,000.00
1000 mm m2 158,000.00
1100 mm m2 155,000.00
1200 mm m2 152,000.00
- Profil Z95 (tebal 0.80), Z75 (tebal 0.80), W75 (tebal 0.80) DAN PROFIL C65 (tebal
0.80) ; Bentuk Atap = Limas ; Jarak Kuda - kuda 120 cm
Jarak Usuk Jarak Reng
700 mm 225 mm m2 175,000.00
800 mm m2 173,000.00
900 mm m2 171,000.00
1000 mm m2 169,000.00
1100 mm m2 167,000.00
1200 mm m2 165,000.00
700 mm 255 mm m2 172,000.00
800 mm m2 170,000.00
900 mm m2 168,000.00
1000 mm m2 166,000.00
1100 mm m2 164,000.00
1200 mm m2 162,000.00
48 Ls Pemasangan 1 m2 Rangka atap baja ringan + reng (Gigasteel) m2
- Profil Z95 ( tebal 0.75 ), Z75 ( tebal 0.75 ), CN 75( tebal 0.75 ) DAN PROFIL CN 65 (
tebal 0.75 ) ; Bentuk Atap = Pelana ; Jarak Kuda - kuda 120 cm
Jarak Usuk Jarak Reng
700 mm 225 mm m2 125,000.00
800 mm m2 122,000.00
900 mm m2 119,000.00
1000 mm m2 116,000.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

1100 mm m2 113,000.00
1200 mm m2 110,000.00
700 mm 255 mm m2 122,000.00
800 mm m2 119,000.00
900 mm m2 116,000.00
1000 mm m2 113,000.00
1100 mm m2 110,000.00
1200 mm m2 107,000.00
- Profil Z95 ( tebal 0.75 ), Z75 ( tebal 0.75 ), CN 75( tebal 0.75 ) DAN PROFIL CN 65 (
tebal 0.75 ) ; Bentuk Atap = Limas ; Jarak Kuda - kuda 120 cm
Jarak Usuk Jarak Reng
700 mm 225 mm m2 130,000.00
800 mm m2 128,000.00
900 mm m2 126,000.00
1000 mm m2 124,000.00
1100 mm m2 122,000.00
1200 mm m2 120,000.00
700 mm 255 mm m2 127,000.00
800 mm m2 125,000.00
900 mm m2 123,000.00
1000 mm m2 121,000.00
1100 mm m2 119,000.00
1200 mm m2 117,000.00
Pemasangan Daun Pintu Rangka Alumunium warna natural / silver, Panil Kaca Rayban
49 dihit A.4.2.1.25 buah 3,044,829.00
5 mm Ukuran 70/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna Powder Coating, Panil Kaca
50 dihit A.4.2.1.26 buah 1,985,937.00
Rayban 5 mm Uk.70/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna natural / silver, Panil Kaca Rayban
51 dihit A.4.2.1.27 buah 3,168,171.00
5 mm Ukuran 80/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna Powder Coating, Panil Kaca
52 dihit A.4.2.1.28 buah 2,069,470.00
Rayban 5 mm Ukuran 80/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna natural / silver, Panil Kaca Rayban
53 dihit A.4.2.1.29 buah 3,291,512.00
5 mm Ukuran 90/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna Powder Coating, Panil Kaca
54 dihit A.4.2.1.30 buah 2,153,004.00
Rayban 5 mm Ukuran 90/210 cm
Pemasangan Daun Jendela Rangka Alumunium warna natural / silver, Panil Kaca
55 dihit A.4.2.1.31 buah 1,416,904.00
Rayban 5 mm Ukuran 50/100 cm
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Kaca
56 dihit A.4.2.1.32 buah 847,650.00
Rayban 5 mm Ukuran 50/100 cm
Pemasangan Daun Jendela Rangka Alumunium warna natural / silver, Panil Kaca
57 dihit A.4.2.1.33 buah 1,701,702.00
Rayban 5 mm Ukuran 60/120 cm
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Kaca
58 dihit A.4.2.1.34 buah 1,013,024.00
Rayban 5 mm Ukuran 60/120 cm
Pemasangan Daun Jendela Rangka Alumunium warna natural / silver, Panil Kaca
59 dihit A.4.2.1.35 buah 2,005,330.00
Rayban 5 mm Ukuran 70/140 cm
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Kaca
60 dihit A.4.2.1.36 buah 1,197,228.00
Rayban 5 mm Ukuran 70/140 cm
Pemasangan Daun Jendela Rangka Alumunium warna natural / silver, Panil Kaca
61 dihit A.4.2.1.37 buah 1,334,125.00
Rayban 5 mm Ukuran 60/80 cm
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Kaca
62 dihit A.4.2.1.38 buah 804,679.00
Rayban 5 mm Ukuran 60/80 cm
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
63 dihit A.4.2.1.39 buah 879,211.00
50/40 cm
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
64 dihit A.4.2.1.40 buah 966,548.00
60/40 cm
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
65 dihit A.4.2.1.41 buah 1,053,885.00
70/40 cm
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran


66 dihit A.4.2.1.42 buah 1,141,221.00
80/40 cm
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
67 dihit A.4.2.1.43 buah 1,228,558.00
90/40 cm
Pemasangan Daun Pintu Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 70/210
68 dihit A.4.2.1.44 buah 2,738,572.00
cm
Pemasangan Daun Pintu Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 80/210
69 dihit A.4.2.1.45 buah 3,038,831.00
cm
Pemasangan Daun Pintu Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 90/210
70 dihit A.4.2.1.46 buah 3,339,090.00
cm
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 50/100
71 dihit A.4.2.1.47 buah 1,405,581.00
cm
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 60/120
72 dihit A.4.2.1.48 buah 1,723,632.00
cm
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
73 dihit A.4.2.1.49 buah 2,094,065.00
70/140 cm
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 60/80
74 dihit A.4.2.1.50 buah 1,405,410.00
cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
75 dihit A.4.2.1.51 buah 979,822.00
50/40 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
76 dihit A.4.2.1.52 buah 1,033,186.00
60/40 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
77 dihit A.4.2.1.53 buah 1,086,550.00
70/40 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
78 dihit A.4.2.1.54 buah 1,139,913.00
80/40 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
79 dihit A.4.2.1.55 buah 1,193,277.00
90/40 cm
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2
1 A.4.4.1.1. m2 336,237.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3
2 A.4.4.1.2. m2 323,350.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4
3 A.4.4.1.3. m2 313,920.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5
4 A.4.4.1.4. m2 310,146.00
PP
Pemasangan 1 m2 dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6
5 A.4.4.1.5. m2 311,196.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP :
6 A.4.4.1.6 m2 296,487.00
3KP : 10PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :
7 A.4.4.1.7 m2 163,001.00
2PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :
8 A.4.4.1.8 m2 156,449.00
3PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran
9 A.4.4.1.9 m2 152,945.00
1SP :4PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5
10 A.4.4.1.10 m2 150,758.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6
11 A.4.4.1.11 m2 149,987.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8
12 A.4.4.1.12 m2 147,454.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :
13 A.4.4.1.13 m2 149,082.00
3KP :10PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM :
14 A.4.4.1.14 m2 131,913.00
1KP :1PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM :
15 A.4.4.1.15 m2 134,080.00
1KP :2PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu dengan semen
16 dihit A.4.4.1.15.1 m2 220,316.00
instan
17 A.4.4.1.16 Pemasangan 1 m2 dinding conblock HB20 campuran 1SP : 3PP m2 518,851.00
18 A.4.4.1.17 Pemasangan 1 m2 dinding conblock HB20 campuran 1SP:4PP m2 522,046.00
19 A.4.4.1.18 Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :3PP m2 390,184.00
20 A.4.4.1.19 Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP m2 394,045.00
21 A.4.4.1.20 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP m2 241,818.00
22 A.4.4.1.21 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :4PP m2 245,306.00
23 A.4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP : 3PP m2 425,914.00
24 A.4.4.1.23 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP : 4PP m2 425,914.00
25 dihit A.4.4.1.23.1 Pemasangan 1 m2 dinding terawang (rooster) 20 x 20 cm campuran 1SP : 4PP m2 303,104.00
26 dihit A.4.4.1.23.2 Pemasangan 1 m2 dinding terawang (rooster) 40 x 20 cm campuran 1SP : 4PP m2 210,721.00
27 dihit A.4.4.1.23.3 Pemasangan 1 m2 dinding terawang (rooster) genteng kecil m2 203,804.00
28 dihit A.4.4.1.23.4 Pemasangan 1 m2 dinding terawang (rooster) genteng sedang m2 250,828.00
29 dihit A.4.4.1.23.5 Pemasangan 1 m2 dinding terawang (rooster) genteng besar m2 369,345.00
30 dihit A.4.4.1.23.6 Pemasangan 1 m2 dinding terawang (rooster) keramik 20 x 20 cm m2 1,552,924.00
31 dihit A.4.4.1.23.7 Pemasangan 1 m2 dinding terawang (rooster) keramik 30 x 30 cm m2 1,058,179.00
32 dihit A.4.4.1.23.8 Pemasangan 1 m2 dinding terawang (rooster) GRC m2 1,086,929.00
33 A.4.4.1.24 Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1SP:3PP m2 611,926.00
34 A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai. m2 170,271.00
35 A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai m2 176,138.00
36 dihit A.4.4.1.27 Pemasangan 1m2 Glass Block 20x20 cm m2 825,153.00
37 dihit A.4.4.1.28 Pasang Partisi Dobel Gipsum Board 9 mm Rangka Hollow Meni 4 x 4 cm m2 398,864.00
38 dihit A.4.4.1.29 Pasang Partisi Dobel Plywood 6 mm Rangka Hollow Meni 4 x 4 cm m2 415,253.00

39 dihit A.4.4.1.30 Pemasangan 1 m2 Penutup Dinding / Pintu dg HPL Lapis Plywood 9 mm warna polos m2 416,907.00

Pemasangan 1 m2 Penutup Dinding / Pintu dg


40 dihit A.4.4.1.31 m2 425,340.00
HPL Lapis Plywood 9 mm warna kayu
41 dihit A.4.4.1.32 Pasang Partisi Dobel GRC Board 6 mm Rangka Hollow Meni 4 x 4 cm m2 437,517.00
42 dihit A.4.4.1.33 Pasang Partisi Dobel Gipsum Board 9 mm Rangka Metal Stud / Alumunium m2 301,764.00
43 dihit A.4.4.1.34 Pasang Partisi Dobel Plywood 6 mm Rangka Metal Stud / Alumunium m2 318,153.00
44 dihit A.4.4.1.35 Pasang Partisi Dobel GRC Board 6 mm Rangka Metal Stud / Alumunium m2 340,417.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm. m2 88,110.00
2 A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. m2 81,141.00
3 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. m2 78,305.00
4 A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm m2 76,221.00
5 A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm m2 46,364.00
6 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. m2 74,372.00
7 A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm m2 73,958.00
8 A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm m2 73,544.00
9 A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm m2 74,960.00
10 A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm m2 73,650.00
11 A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm m2 108,648.00
12 A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm m2 88,248.00
13 A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. m2 101,973.00
14 A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm m2 100,782.00
15 A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm m2 99,508.00
16 A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm m2 46,364.00
17 A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm m2 76,443.00
18 A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm m2 499,834.00
19 A.4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm m2 473,959.00
20 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP m2 59,242.00
21 A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah m2 34,111.00
22 A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose m2 16,240.00
23 A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. m2 72,240.00
24 A.4.4.2.27. Pemasangan 1 m2 acian. m2 43,855.00
25 A.4.4.2.28. Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP) m2 112,722.00
26 A.4.4.2.29. Pemasangan 1 m2 Acian dengan mortar siap pakai (MSP) m2 45,901.00

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 dihit A.4.4.3.8.a Pemasangan 1 m2 lantai ubin granit ukuran 60cm x 60cm m2 323,684.00
2 A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40cm x 40cm m2 415,452.00
3 A.4.4.3.10. Pemasangan 1 m2 lantai ubin granit ukuran 30cm x 30cm m2 525,295.00
4 dihit A.4.4.3.10.a Pemasangan 1 m2 lantai ubin granit unpolish / anti skid m2 329,987.00
5 A.4.4.3.11. Pemasangan 1 m2 lantai ubin teralux ukuran 40cm x 40cm m2 575,072.00
6 A.4.4.3.12. Pemasangan 1 m2 lantai ubin teralux ukuran 30cm x 30cm m2 485,413.00
7 A.4.4.3.13. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 60cm x 60cm m2 448,182.00
8 A.4.4.3.14. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40cm x 40cm m2 508,044.00
9 A.4.4.3.15. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30cm x 30cm m2 670,285.00
10 A.4.4.3.17. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm m' 52,649.00
11 A.4.4.3.18. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm m' 46,773.00
12 A.4.4.3.24. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm m' 125,997.00
13 A.4.4.3.25. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm m' 41,456.00
14 A.4.4.3.26. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm m' 83,748.00
15 A.4.4.3.27. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm m' 98,042.00
16 A.4.4.3.28. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm m' 64,549.00
17 A.4.4.3.29. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm m' 80,943.00
18 A.4.4.3.30. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm m' 95,898.00
19 dihit A.4.4.3.30.1 Pemasangan 1 m’ plint kaca rayben tinggi 10cm m' 47,479.00
20 dihit A.4.4.3.30.2 Pemasangan 1 m Plint Hospital 8 x 30 cm m' 163,172.00
21 dihit A.4.4.3.30.3 Pemasangan 1 m Plint Hospital 10 x 40 cm m' 179,870.00
22 A.4.4.3.31. Pemasangan 1 m2 lantai teraso cor di tempat, tebal 3cm m2 87,154.00
23 A.4.4.3.32. Pemasangan 1 m2 lantai keramik artistik 10cm x 20cm (Setara Roman) m2 338,870.00
Pemasangan 1 m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm (Setara
24 A.4.4.3.33. m2 811,945.00
Roman)
Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm (putih) (Setara Milan, Roman,
25 dihit A.4.4.3.34.1 m2 349,837.00
Platinum)
Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm (putih) (Setara Mulia, Asia
26 dihit A.4.4.3.34.1a m2 282,246.00
Tile, KIA)
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm (motif) (Setara Mulia, Asia
27 dihit A.4.4.3.34.2 m2 339,955.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 50cm x 50cm (putih) (Setara Mulia, Asia
28 dihit A.4.4.3.34.3 m2 264,723.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 50cm x 50cm (motif) (Setara Mulia, Asia
29 dihit A.4.4.3.34.4 m2 271,418.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm (putih) (Setara Mulia, Asia
30 dihit A.4.4.3.34.5 m2 239,540.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm (motif) (Setara Mulia, Asia
31 dihit A.4.4.3.34.6 m2 245,596.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm (putih) (Setara Mulia, Asia
32 A.4.4.3.35. m2 232,409.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm (motif) (Setara Mulia, Asia
33 dihit A.4.4.3.35.1 m2 239,327.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 25cm x 25cm (putih) (Setara Mulia, Asia
34 dihit A.4.4.3.35.2 m2 242,090.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 25cm x 25cm (motif) (Setara Mulia, Asia
35 dihit A.4.4.3.35.3 m2 230,614.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm (putih) (Setara Mulia, Asia
36 A.4.4.3.36. m2 180,940.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm (motif) (Setara Mulia, Asia
37 dihit A.4.4.3.36.1 m2 251,648.00
Tile, KIA)
38 A.4.4.3.37. Pemasangan 1 m2 Lantai keramik ukuran 10cm x 40 cm untuk variasi/border m2 1,029,568.00
39 A.4.4.3.38. Pemasangan 1 m2 lantai keramik mozaik ukuran 30cm x 30cm m2 361,303.00
40 A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm m' 86,385.00
41 A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm m' 112,667.00
42 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m' 52,527.00
43 A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm m' 283,349.00
44 A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm m2 1,454,124.00
45 A.4.4.3.44. Pemasangan 1 m2 lantai karpet m2 75,045.00
46 A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet) m2 109,776.00
47 A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu m2 449,369.00
48 A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor m2 542,492.00
49 A.4.4.3.48. Pemasangan 1 m2 dinding porslen 11cm x 11cm m2 300,782.00
50 A.4.4.3.49. Pemasangan 1 m2 dinding porslen 10cm x 20cm m2 337,845.00
51 A.4.4.3.50. Pemasangan 1 m2 dinding porslen 20cm x 20cm (putih) m2 304,355.00
52 A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm (Setara Roman) m2 367,841.00
53 A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm (Setara Roman) m2 825,733.00
54 A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10cm x 20cm (Setara Milan, Roman, KIA) m2 336,267.00
55 A.4.4.3.54. Pemasangan 1 m2 dinding keramik artistik 20cm x 20cm (Setara Roman) m2 352,558.00
56 dihit A.4.4.3.54.1a Pemasangan 1 m2 dinding keramik 20cm x 25cm (putih) (Setara Milan, Roman, KIA) m2 302,135.00

57 dihit A.4.4.3.54.1b Pemasangan 1 m2 dinding keramik 20cm x 25cm (motif) (Setara Milan, Roman, KIA) m2 301,497.00

58 dihit A.4.4.3.54.2.a Pemasangan 1 m2 Dinding Keramik 20 x 40 cm (Setara Milan, Roman, KIA) m2 317,745.00

59 dihit A.4.4.3.54.2.b Pemasangan 1 m2 Dinding Keramik 25 x 40 cm (putih) (Setara Milan, Roman, KIA) m2 1,041,340.00

60 dihit A.4.4.3.54.2.c Pemasangan 1 m2 Dinding Keramik 25 x 40 cm (motif) (Setara Milan, Roman, KIA) m2 752,920.00

61 dihit A.4.4.3.54.3 Pemasangan 1 m2 Dinding Keramik 25 x 50 cm (Setara Milan, Roman, KIA) m2 340,024.00
62 dihit A.4.4.3.54.4 Pemasangan 1 m2 Dinding Keramik 20 x 60 cm (Setara Milan, Roman, KIA) m2 311,024.00
63 dihit A.4.4.3.54.5 Pemasangan 1 m2 Dinding Keramik 30 x 60 cm (Setara Milan, Roman, KIA) m2 365,577.00
64 dihit A.4.4.3.54.6 Pemasangan 1 m2 Dinding Keramik 25 x 33 cm (Setara Milan, Roman, KIA) m2 362,794.00

65 dihit A.4.4.3.54.7 Pemasangan 1 m2 Dinding Keramik 32,5 x 65,5 cm (Setara Milan, Roman, KIA) m2 397,708.00

66 dihit A.4.4.3.54.8 Pemasangan 1 m Step Tile 30x30 cm m¹ 113,928.00


67 dihit A.4.4.3.54.9 Pemasangan 1 m Step Tile 30x60 cm m¹ 88,898.00
68 dihit A.4.4.3.54.10 Pemasangan 1 m Step Tile 30x120 cm m¹ 173,806.00
69 dihit A.4.4.3.54.11 Pemasangan 1 m Step Nosing Keramik 10x40 cm m' 92,256.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

70 dihit A.4.4.3.54.12 Pemasangan 1 m Step Nosing Granit 10x60 cm m' 83,300.00


71 dihit A.4.4.3.54.13 Pemasangan 1 m Step Nosing Allumunium m' 342,726.00
72 dihit A.4.4.3.54.14 Pemasangan 1 m Step Nosing Karet m' 124,883.00
73 dihit A.4.4.3.54.15 Pemasangan 1 m Step Nosing Allumunium Karet m' 381,698.00
74 dihit A.4.4.3.54.16 Pemasangan 1 m2 Kuku Macan 10 cm m2 81,294.00
75 dihit A.4.4.3.54.17.a Pemasangan 1 m Keramik Border Dinding 5/25 cm m2 86,320.00
76 dihit A.4.4.3.54.17.b Pemasangan 1 m Keramik Border Dinding 5-8/20 cm m2 69,956.00
77 dihit A.4.4.3.54.18 Pemasangan 1 m Keramik Border Dinding 10/40 cm m2 85,895.00
78 dihit A.4.4.3.54.19 Pemasangan 1 m Keramik Border Dinding 10/50 cm m2 74,419.00
79 dihit A.4.4.3.54.20 Pemasangan 1 m Keramik Border Dinding 10/60 cm m¹ 67,725.00
80 dihit A.4.4.3.54.21 Pemasangan 1 m Keramik Homogenous 40 x 40 cm (setara Granito) m¹ 472,632.00
81 dihit A.4.4.3.54.22 Pemasangan 1 m2 Keramik Homogenous 60 x 30 cm (setara Granito) m2 376,377.00
82 dihit A.4.4.3.54.23 Pemasangan 1 m2 Keramik Homogenous 60 x 60 cm (setara Granito) m2 391,310.00
83 dihit A.4.4.3.54.24 Pemasangan 1 m2 Keramik Homogenous 80 x 80 cm (setara Granito) m2 624,093.00
84 A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100cm x 100cm m2 1,656,603.00
85 A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm m2 502,783.00
86 A.4.4.3.57. Pemasangan 1 m2 dinding batu paras m2 306,426.00
87 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam m2 339,154.00
88 dihit A.4.4.3.58.1 Pemasangan 1 m2 Batu Alam Andesit Polos Bakar m2 331,382.00
89 dihit A.4.4.3.58.2 Pemasangan 1 m2 Batu Alam Andesit Bintik Bakar m2 334,722.00
90 dihit A.4.4.3.58.3 Pemasangan 1 m2 Batu Alam Andesit Alur Bakar m2 345,854.00
91 dihit A.4.4.3.58.4 Pemasangan 1 m2 Batu Alam Andesit Motif m2 334,722.00
92 dihit A.4.4.3.58.5 Pemasangan 1 m2 Batu Candi Hitam m2 340,733.00
93 dihit A.4.4.3.58.6 Pemasangan 1 m2 Batu Candi Warna m2 297,986.00
94 dihit A.4.4.3.58.7 Pemasangan 1 m2 Batu Wall Clading m2 401,514.00
95 dihit A.4.4.3.58.8 Pemasangan 1 m2 Batu Sikat (batu mozaik) m2 295,609.00
96 A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm m2 2,034,783.00
97 A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm m2 195,483.00
98 A.4.4.3.61. Pemasangan 1 m2 floor harderner m2 53,762.00
99 A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm m' 589,114.00
100 A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm m' 78,453.00
Pemasangan 1 m2 paving block natural tebal 6 cm (K.250)(alas dengan pasir
101 A.4.4.3.64. m2 242,173.00
muntilan)

102 dihit A.4.4.3.64.a Pemasangan 1 m2 paving block natural tebal 6 cm (K.250)(alas dengan pasir urug) m2 240,522.00

Pemasangan 1 m2 paving block natural tebal 8 cm (K.300)(alas dengan pasir


103 dihit A.4.4.3.65.a m2 319,026.00
muntilan)

104 dihit A.4.4.3.65.b Pemasangan 1 m2 paving block natural tebal 8 cm (K.300)(alas dengan pasir urug) m2 313,825.00

Pemasangan 1 m2 paving block berwarna tebal 6 cm (K.250)(alas dengan pasir


105 A.4.4.3.66. m2 289,394.00
muntilan)

106 dihit A.4.4.3.66.a Pemasangan 1 m2 paving block berwarna tebal 6 cm (K.250)(alas dengan pasir urug) m2 289,430.00

Pemasangan 1 m2 paving block berwarna tebal 8 cm (K.300)(alas dengan pasir


107 dihit A.4.4.3.67.a m2 338,190.00
muntilan)

108 dihit A.4.4.3.67.b Pemasangan 1 m2 paving block berwarna tebal 8 cm (K.300)(alas dengan pasir urug) m2 332,990.00

109 dihit A.4.4.3.68.a Pemasangan 1 m2 Penutup Dinding Dalam Ruangan dg ACP Rangka Allumunium m2 834,633.00
110 dihit A.4.4.3.68.b Pemasangan 1 m2 Penutup Dinding Luar Ruangan dg ACP Rangka Allumunium m2 892,630.00
111 dihit A.4.4.3.69.a Pemasangan 1m2 Ubin/Tegel Untuk Jalur Difabel 30 x 30 cm (Motif) m2 418,171.00
112 dihit A.4.4.3.69.b Pemasangan 1m2 Ubin/Tegel Untuk Jalur Difabel 20 x 20 cm (Motif) m2 866,309.00
113 dihit A.4.4.3.70. Perbaikan 1 m2 paving block (tanpa alat pemadat) m2 67,955.00
114 dihit A.4.4.3.71. Pemasangan 1 m Kansteen Tipe S / tali air m¹ 164,079.00
115 dihit A.4.4.3.72. Pemasangan 1 m Kansteen Taman m¹ 189,126.00
116 dihit A.4.4.3.73. Pemasangan 1 m Kansteen Trotoar 1 m¹ 155,730.00
117 dihit A.4.4.3.74. Pemasangan 1 m Kansteen Trotoar 2 m¹ 160,739.00
118 dihit A.4.4.3.75. Pemasangan 1 m Kansteen 60x25x22x18 cm m¹ 183,560.00
119 dihit A.4.4.3.76. Pemasangan 1 m Kansteen 60x15x22 cm m¹ 149,051.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


1 A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm m2 165,692.00
2 A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm m2 339,641.00
3 A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm m2 248,439.00
4 A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm m2 128,381.00
5 dihit A.4.5.1.4.1 Pemasangan 1 m2 Langit-Langit Akustik Ukuran (60 x 60) cm m2 179,993.00
6 dihit A.4.5.1.4.2 Pemasangan 1 m2 Langit - Langit Calsiboard, Uk. (120 x 240) cm Tebal 3,5 mm m2 35,956.00
7 dihit A.4.5.1.4.3 Pemasangan 1 m2 Langit - Langit GRC board, Uk. (120 x 240) cm Tebal 4 mm m2 44,797.00
8 dihit A.4.5.1.4.4 Pemasangan 1 m2 Langit - Langit Plat Lembaran Aluminium (spandril) m2 532,647.00
9 dihit A.4.5.1.4.5 Pemasangan 1 m2 Langit - Langit PVC setara Shunda m2 359,089.00
10 dihit A.4.5.1.4.6 Pemasangan 1 m2 Langit - Langit Plat Metal Berpori -Pori m2 271,773.00
Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm &
11 A.4.5.1.5. m2 54,619.00
6 mm
12 A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm m2 445,172.00
Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9
13 A.4.5.1.7. m2 45,802.00
mm
Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka
14 A.4.5.1.8. m2 4,772,150.00
alluminium
15 A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil m2 18,987.00
16 A.4.5.1.10. Pemasangan 1 m2 Plafond PVC m2 263,534.00
Pemasangan 1 m2 Rangka Plafon Holo Galvanis Uk. 40 x 40 / 20 x 40 Tebal ± 0,4
17 dihit A.4.5.1.10.2 m2 196,250.00
mm, modul 60 x 60 cm
18 dihit A.4.5.1.10.4 Pemasangan 1 m2 Rangka Plafon Dengan Bahan Metal Furing m2 246,086.00
19 dihit A.4.5.1.10.5 Pemasangan 1 m2 Rangka Plafon Dengan Bahan Metal Stud m2 204,214.00
20 dihit A.4.5.1.10.6 Pemasangan 1 m2 Rangka Plafon Dengan Bahan profil " T " Alumunium m2 193,001.00
21 dihit A.4.5.1.11. Pemasangan 1 m2 List PVC m2 73,411.00
22 dihit A.4.5.1.11.1 Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar ± 8 cm m2 21,982.00
23 dihit A.4.5.1.11.2 Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar ± 10 cm m2 23,257.00
24 dihit A.4.5.1.11.3 Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar ± 15 cm m2 25,648.00
25 dihit A.4.5.1.12. Pemasangan 1 m2 rangka langit-langit besi hollow 40.40.1,1 mm (A.4.2.1.21) m2 246,707.00

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil m2 74,663.00
2 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur m2 249,307.00
3 A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super m2 69,636.00
4 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong m2 157,225.00
5 A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur m2 169,369.00
6 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar m2 145,384.00
7 A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90x180 m2 73,800.00
8 A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm m2 114,877.00
9 A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm m2 102,733.00
10 A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm m2 96,613.00
11 A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm m2 85,319.00
12 A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm m2 68,409.00
13 A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm m2 74,550.00
14 A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm m2 67,551.00
15 A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm m2 66,072.00
16 A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm m2 70,139.00
17 A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm m2 86,813.00
18 A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm m2 81,919.00
19 A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm m2 100,074.00
20 A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm m2 79,430.00
21 A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm m2 84,227.00
22 A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92m m2 196,233.00
23 A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05m m' 179,839.00
24 A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08m m' 174,374.00
25 A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92m m' 138,549.00
26 A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05m m' 129,198.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

27 A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08m m' 129,198.00


28 A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92m m' 143,769.00
29 A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05m m' 123,855.00
30 A.4.5.2.30. Pemasangan 1 m2 genteng beton m2 149,299.00
31 A.4.5.2.31. Pemasangan 1 m2 genteng aspal (Onduvilla,106Cm x 40Cm x 3mm) m2 302,451.00
32 dihit A.4.5.2.31.a Pemasangan 1 m2 genteng aspal (Onduline, 200Cm x 95Cm x 3mm) m2 245,520.00
33 A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana m2 117,300.00
34 A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap Jurai m2 159,804.00
35 A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu m2 165,023.00
36 A.4.5.2.35. Pemasangan 1 m’ nok genteng beton m' 257,273.00
37 A.4.5.2.36. Pemasangan 1 m’ nok genteng aspal m' 255,956.00
38 A.4.5.2.37. Pemasangan 1 m’ nok genteng metal m' 94,059.00
39 A.4.5.2.38. Pemasangan 1 m’ nok sirap m' 75,945.00
40 A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang 105cm x 180cm m2 65,406.00
41 A.4.5.2.40. Pemasangan 1 m’nok atap seng m' 53,823.00
42 A.4.5.2.41. Pemasangan 1 m2 atap alumunium m' 180,965.00
43 dihit A.4.5.2.41.a Pemasangan 1 m2 Atap Galvalum (tanpa rangka atap) m2 61,775.00
43 A.4.5.2.42. Pemasangan 1 m’ nok alumunium m' 181,623.00
44 A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation m2 55,859.00
45 dihit A.4.5.2.44. Pemasangan 1 m2 genteng Press Jatiwangi Kecil Natural m2 95,989.00
46 dihit A.4.5.2.45. Pemasangan 1 m2 Atap Genteng Press Jatiwangi Besar Natural m2 95,711.00
47 dihit A.4.5.2.46. Pemasangan 1 m2 Atap Genteng Press Jatiwangi Besar Glazur m2 120,186.00
48 dihit A.4.5.2.47. Pemasangan 1 m’ Bubung Genteng Jatiwangi Kecil Natural m' 151,079.00
49 dihit A.4.5.2.48. Pemasangan 1 m’ Bubung Genteng Jatiwangi Besar Natural m' 133,470.00
50 dihit A.4.5.2.49. Pemasangan 1 m’ Bubung Genteng Jatiwangi Besar Glazur m' 154,115.00
51 dihit A.4.5.2.50. Pemasangan 1 m2 Atap Fibre glass (jabes) m2 206,656.00
52 dihit A.4.5.2.51. Pemasangan 1 m2 Atap Genteng Keramik M-Class m2 216,214.00
53 dihit A.4.5.2.51.a Pemasangan 1 m2 Atap Genteng Keramik Glazur Morando m2 105,097.00
54 dihit A.4.5.2.51.b Pemasangan 1 m2 Atap Genteng Keramik Glazur Kanmuri m2 233,216.00
55 dihit A.4.5.2.52. Pemasangan 1 m’ Bubung Genteng Keramik m2 189,332.00
56 dihit A.4.5.2.54. Pemasangan 1 m2 Atap U PVC Gelombang m2 190,134.00
57 dihit A.4.5.2.55. Pemasangan 1 m2 Atap Transparan Gelombang m2 213,269.00

58 dihit A.4.5.2.56.a Pemasangan 1 m2 rangka atap Carport & penutup atap Polycarbonate , t = 4 mm m2 517,733.00

59 dihit A.4.5.2.56.b Pemasangan 1 m2 rangka atap Carport & penutup atap Polycarbonate , t = 5 mm m2 517,733.00

60 dihit A.4.5.2.56.c Pemasangan 1 m2 rangka atap Carport & penutup atap Polycarbonate , t = 6 mm m2 528,025.00

61 dihit A.4.5.2.56.d Pemasangan 1 m2 rangka atap Carport & penutup atap Polycarbonate , t = 10 mm m2 594,919.00

Pemasangan 1 m2 rangka atap Carport & penutup atap Galvalum gelombang, t= 0.3
62 dihit A.4.5.2.56.e m2 459,618.00
mm, L= 80 cm
63 dihit A.4.5.2.57 Pemasangan 1 m2 Atap Genteng Asbes ( Asbes Motif Genteng ) m2 234,733.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

1 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I (jati) m3 31,961,697.00

Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
2 A.4.6.1.2. m3 19,852,686.00
(Bengkirai)

3 A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II (Bengkirai) m2 813,093.00

4 A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III (kruing) m2 595,743.00

5 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II (Bengkirai) m2 1,205,994.00
6 dihit A.4.6.1.5.a Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I (Jati) m2 1,609,414.00

7 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II (Bengkirai) m2 839,648.00

8 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas II (Bengkirai) m2 1,571,142.00

Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (Lebar
9 A.4.6.1.8. m2 885,846.00
s/d 90 cm)

10 A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas II (Bengkirai) m2 953,001.00

11 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas II (Bengkirai) m2 1,355,939.00


12 A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I (jati) m2 1,228,534.00
Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas III
13 A.4.6.1.12. m2 923,844.00
(kruing)

14 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter m3 17,706,869.00

15 A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I (jati) m3 34,690,761.00


16 A.4.6.1.15. Pemasangan 1 m3 konstruksi gording, kayu kelas II (Bengkirai) m3 16,713,724.00
17 dihit A.4.6.1.16.a Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II (Bengkirai) m2 246,502.00
18 dihit A.4.6.1.17.a Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II (Bengkirai) m2 269,051.00
19 A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II (Bengkirai) m2 2,279,275.00
20 A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas III (kruing) m2 214,074.00
21 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III (kruing) m2 217,386.00
22 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas II (Bengkirai) m' 209,547.00
23 dihit A.4.6.1.21.a Pemasangan 1 m’ lisplank ukuran (2 x 20) cm, kayu kelas II (Bengkirai) m' 118,260.00
24 A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas II (Bengkirai) m' 211,254.00
25 dihit A.4.6.1.22.a Pemasangan 1 m’ lisplank ukuran (2 x 30) cm, kayu kelas II (Bengkirai) m' 153,439.00
26 dihit A.4.6.1.22.b Pemasangan 1 m Lisplank Profil Beton Pracetak L 20 cm m¹ 86,247.00
27 dihit A.4.6.1.22.c Pemasangan 1 m Lisplank Profil Beton Pracetak L 30 cm m¹ 150,669.00
28 dihit A.4.6.1.22.d Pemasangan 1 m Lisplank Urat Kayu 20 cm m¹ 51,725.00
29 dihit A.4.6.1.22.e Pemasangan 1 m Lisplank Urat Kayu 30 cm m¹ 72,220.00

30 A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas III (kruing) m2 333,437.00

31 A.4.6.1.24. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas III (kruing) m2 463,417.00

32 A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas III (kruing) m2 451,550.00

33 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari Kayu Papan kayu kelas II (Bengkirai) m2 458,228.00

34 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm m2 48,388.00
35 A.4.6.1.28. Pemasangan 1 m2 dinding bilik bambu, rangka kayu kelas III (kruing) m2 149,946.00
36 dihit A.4.6.1.29. Pembuatan dan pemasangan 1 m3 Kusen pintu dan jendela kayu Kruing m3 13,932,250.00
37 dihit A.4.6.1.30. Pembuatan dan Pemasangan 1 m2 Daun Pintu Panel, Kayu Kruing m2 973,206.00
38 dihit A.4.6.1.31. Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kaca Kayu Kruing m2 709,238.00
Pembuatan dan Pemasangan 1 m2 Pintu Plywood Rangkap Rangka Kayu Kruing (L
39 dihit A.4.6.1.32. m2 784,558.00
s/d 90 cm)
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

Pembuatan dan Pemasangan 1 m2 Pintu Plywood Rangkap Rangka Expose Kayu


40 dihit A.4.6.1.33. m2 848,452.00
Kruing
Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda-Kuda Konvensional Kayu Kruing
41 dihit A.4.6.1.34. m3 12,283,181.00
Bentang 6 m
42 dihit A.4.6.1.35. Pemasangan 1 m3 Konstruksi Gording, Kayu Kruing m3 13,785,158.00
43 dihit A.4.6.1.36. Pemasangan 1 m2 Rangka Atap Genteng Keramik, Kayu Kruing m2 133,017.00
44 dihit A.4.6.1.37. Pemasangan 1 m2 Rangka Atap Genteng Beton, Kayu Kruing m2 128,281.00
Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda - Kuda Konfensional Kayu Lokal
45 dihit A.4.6.1.38. m3 5,368,944.00
6m
46 dihit A.4.6.1.39. Pemasangan 1 m2 Rangka Atap Genteng Kecil, Kayu Lokal m2 63,863.00
47 dihit A.4.6.1.40. Pemasangan 1 m3 Rangka Dinding Pemisah (60x120) cm Kayu Lokal m3 157,439.00
48 dihit A.4.6.1.41.a Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kaca Kayu Lokal m2 535,706.00
49 dihit A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati panel Kaca m2 1,081,700.00
50 dihit A.4.6.1.42. Pembuatan dan Pemasangan 1 m2 Kusen Pintu dan Jendela Kayu Lokal m2 6,390,964.00

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 A.4.6.2.1. Pemasangan 1 buah kunci tanam antik buah 205,430.00
2 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa buah 146,824.00
3 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi buah 126,966.00
4 A.4.6.2.4. Pemasangan 1 buah kunci silinder buah 134,252.00
5 A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 207,112.00
6 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu buah 20,879.00
7 A.4.6.2.7. Pemasangan 1 buah engsel angin buah 70,929.00
8 dihit A.4.6.2.7.a Pemasangan 1 buah floor hinge set 1,017,724.00
9 dihit A.4.6.2.7.b Pemasangan 1 buah Patch fitting set ( top , bottom, lock fitting & overpanel ) set 2,859,767.00
10 A.4.6.2.8. Pemasangan 1 buah spring knip buah 59,588.00
11 A.4.6.2.9. Pemasangan 1 buah kait angin buah 45,825.00
12 A.4.6.2.10. Pemasangan 1 buah door closer buah 186,458.00
13 A.4.6.2.11. Pemasangan 1 buah kunci slot buah 57,041.00
14 A.4.6.2.12. Pemasangan 1 buah Door holder buah 229,374.00
15 A.4.6.2.13. Pemasangan 1 buah door stop buah 56,872.00
16 A.4.6.2.14. Pemasangan 1 buah Rel pintu sorong buah 415,521.00
17 A.4.6.2.15. Pemasangan 1 buah kunci lemari buah 61,822.00
18 A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm m2 147,728.00
19 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm m2 201,162.00
20 A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm m2 365,809.00
21 A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm m2 508,244.00
22 A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm m2 159,776.00
23 A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm m2 373,430.00
24 A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm m2 329,307.00
25 dihit A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 227,879.00
26 dihit A.4.6.2.24.b Pemasangan 1 m2 kaca ray band tebal 8 mm m2 252,369.00
27 dihit A.4.6.2.25. Pemasangan 1 m2 Kaca Bening Warna tebal 5 mm m2 195,151.00
28 dihit A.4.6.2.26. Pemasangan 1 m2 Kaca Buram/Es/Kabur tebal 5 mm m2 224,508.00
29 dihit A.4.6.2.27. Pemasangan 1 m2 Kaca Hias Lukis tebal 5 mm m2 1,283,192.00
30 dihit A.4.6.2.28. Pemasangan 1 m2 Kaca Bening Polos tebal 5 mm Lapis Sandblast m2 399,757.00
31 dihit A.4.6.2.29. Pemasangan 1 m2 Kaca Oneway tebal 5 mm m2 428,255.00
32 dihit A.4.6.2.30.a Pemasangan 1 m2 Kaca Tempered tebal 5 mm m2 338,086.00
33 dihit A.4.6.2.30.b Pemasangan 1 m2 Kaca Tempered tebal 8 mm m2 576,204.00
34 dihit A.4.6.2.30.c Pemasangan 1 m2 Kaca Tempered tebal 10 mm m3 759,882.00
35 dihit A.4.6.2.30.d Pemasangan 1 m2 Kaca Tempered tebal 12 mm m2 878,049.00
36 dihit A.4.6.2.31. Pemasangan 1 Buah Selot Tanam Pintu Tinggi 6" buah 181,011.00
37 dihit A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" buah 141,340.00
38 dihit A.4.6.2.33. Pemasangan 1 Buah Grendel Rantai (Door Guard) buah 59,166.00
39 dihit A.4.6.2.34. Pemasangan 1 Pasang Tarikan Pintu Panjang ± 30 cm pasang 125,553.00
40 dihit A.4.6.2.35. Pemasangan 1 Pasang Tarikan Pintu Panjang ± 40 cm pasang 178,032.00
41 dihit A.4.6.2.36. Pemasangan 1 Pasang Tarikan Pintu Panjang ± 50 cm pasang 233,635.00
42 dihit A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 149,841.00
43 dihit A.4.6.2.38. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 12" pasang 159,556.00
44 dihit A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 34,693.00
45 dihit A.4.6.2.40. Pemasangan 1 m2 Sticker Kaca m2 195,407.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.1. Pengikisan/pengerokan 1 m2 permukaan cat lama m2 17,937.00
2 A.4.7.1.2. Pencucian 1 m2 bidang permukaan tembok yang pernah dicat m2 17,390.00
3 A.4.7.1.3. Pengerokan 1 m2 karat pada permukaan baja cara manual m2 18,213.00
Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
4 A.4.7.1.4. m2 50,685.00
penutup)
Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat
5 A.4.7.1.5. m2 69,451.00
Penutup)
6 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil m2 35,719.00
7 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 73,373.00
8 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter m2 15,821.00
9 A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis m2 55,457.00
Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
10 A.4.7.1.10. penutup) Interior setara Mowilex (Decorcryl, Dulux Pentalite, Vinilex) m2 68,822.00

Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Interior
11 dihit A.4.7.1.10.a setara Mowilex (Decorcryl, Dulux Pentalite, Vinilex) m2 65,279.00

Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
12 dihit A.4.7.1.10.b penutup) Exterior setara Mowilex (Decorcryl, Dulux Pentalite, Vinilex) m2 79,679.00

Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior
13 dihit A.4.7.1.10.c setara Mowilex (Decorcryl, Dulux Pentalite, Nippon / Vinilex) m2 76,035.00

Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
14 dihit A.4.7.1.10.d penutup) Interior setara Catylac (Vinilex, Property, Danacryl, Avitex) m2 32,938.00

Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Interior
15 dihit A.4.7.1.10.e setara Catylac (Vinilex, Property, Danacryl, Avitex) m2 29,295.00

Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
16 dihit A.4.7.1.10.f penutup) Exterior setara Catylac (Vinilex, Property, Danacryl, Avitex) m2 37,229.00

Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior
17 dihit A.4.7.1.10.g setara Catylac (Vinilex, Property, Danacryl, Avitex) m2 33,586.00

Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Interior setara
18 A.4.7.1.11. m2 53,388.00
Mowilex (Decorcryl, Dulux Pentalite, Nippon / Vinilex)
Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior setara
19 dihit A.4.7.1.11.a m2 67,667.00
Mowilex (Decorcryl, Dulux Pentalite, Nippon / Vinilex)
Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Interior setara
20 dihit A.4.7.1.11.b m2 24,493.00
Catylac (Vinilex, Property, Danacryl, Avitex)
Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior setara
21 dihit A.4.7.1.11.c m2 29,002.00
Catylac (Vinilex, Property, Danacryl, Avitex)
22 A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium m2 10,816.00
23 A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih m2 21,945.00
24 A.4.7.1.14. Pelaburan 1 m2 tembok dengan kapur sirih m2 13,064.00
25 A.4.7.1.16. Pengecatan 1 m2 permukaan besi / baja dengan menie besi m2 37,915.00
26 A.4.7.1.17. Pengecatan 1 m2 permukaan besi / baja dengan menie besi dengan perancah m2 68,654.00
27 A.4.7.1.18. Pengecatan 1 m2 permukaan besi / baja galvanis secara manual 4 lapis m2 86,072.00
Pengecatan 1 m2 permukaan besi / baja galvanis secara manual sistem 1 lapis cat
28 A.4.7.1.19. m2 34,297.00
mutakhir
29 A.4.7.1.20. Pengecatan 1 m2 permukaan besi / baja galvanis secara manual sistem 3 lapis m2 197,175.00
Pengecatan 1 m2 permukaan besi / baja galvanis secara semprot sistem 3 lapis cat
30 A.4.7.1.21. m2 171,865.00
mutakhir
31 A.4.7.1.22. Plituran 10 m2 dengan plitur melamic 10 m2 2,585,587.00
32 dihit A.4.7.1.23. Pengecatan 1 m2 kerb dengan cat genteng m2 38,931.00
33 dihit A.4.7.1.24. Pengecatan 1 m2 Kerb dengan cat besi m2 42,446.00
34 dihit A.4.7.1.25. Pelapisan 1 m2 dengan cat coating (Natural / Hitam / Gloss) m2 47,813.00
35 dihit A.4.7.1.26. Pengecatan 1 m2 Tembok Dengan Cat Waterproofing ( 3 Lapis ) m2 44,076.00
36 dihit A.4.7.1.27.a Pengecatan 1 m2 Plat Atap/Talang Dengan Lapisan Membran Waterproofing m2 49,653.00
37 dihit A.4.7.1.27.b Pengecatan 1 m2 Plat Atap/Talang Dengan Cat Waterproofing ( 3 lapis ) m2 43,975.00
38 dihit A.4.7.1.28. 1 m2 pengecatan tembok dengan cat mengkilap m2 43,691.00

39 dihit A.4.7.1.29. 1 m2 pengecatan permukaan besi dan baja dengan cat besi 3 lapis cat penutup m2 55,978.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock (biasa) buah 1,635,743.00
2 dihit A.5.1.1 1.a Pemasangan 1 buah closet duduk/monoblock (setara INA) dengan jet washer buah 3,255,705.00
3 dihit A.5.1.1 1.b Pemasangan 1 buah closet duduk/monoblock (setara TOTO) dengan jet washer buah 1,937,125.00
4 A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen (biasa) buah 546,978.00
5 dihit A.5.1.1 2.a Pemasangan 1 buah closet jongkok porselen (Setara INA) buah 574,891.00
6 A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso buah 549,620.00
7 A.5.1.1 4. (K3) Pemasangan 1 buah urinoir buah 2,351,979.00
8 A.5.1.1 5. (K3) Pemasangan 1 buah wastafel buah 1,013,984.00
9 A.5.1.1 6. (K3) Pemasangan 1 buah bathcuip porselen buah 4,126,592.00
10 dihit A.5.1.1 7.a Pemasangan 1 buah Reservoir fibreglass vol 1 m3 (Roof tank) buah 3,631,181.00
11 A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 buah 1,778,265.00
12 dihit A.5.1.1 10.a Pemasangan 1 buah bak mandi fibreglass vol 120 liter (oval) buah 383,302.00
13 dihit A.5.1.1 10.b Pemasangan 1 buah bak mandi fibreglass vol 120 liter (kotak) buah 726,054.00
14 A.5.1.1 11. Pemasangan 1 buah bak beton volume 1 m3 buah 28,956,392.00
15 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainles steel (kecil) buah 303,999.00
16 A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso buah 1,105,761.00
17 A.5.1.1 14. Pemasangan 1 buah floor drain buah 118,604.00
18 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm buah 557,381.00
19 A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm buah 827,089.00
20 A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm buah 1,006,503.00
21 A.5.1.1 18. Pemasangan 1 m’ pipa galvanis medium A diameter ½” buah 526,051.00
22 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” (Stainles steel) buah 96,937.00
23 dihit A.5.1.1 19.a Pemasangan 1 buah kran diameter ½” atau 3/4” (Plastik) buah 96,746.00
24 dihit A.5.1.1 19.b Pemasangan 1 buah shower setara ONDA buah 106,070.00
24 A.5.1.1 20. Pemasangan 1 m’ pipa galvanis medium B diameter 3/4” m' 339,155.00
25 A.5.1.1 21. Pemasangan 1 m’ pipa galvanis medium B diameter 1” m' 447,358.00
26 A.5.1.1 22. Pemasangan 1 m’ pipa galvanis medium B diameter 1 ½” m' 689,544.00
27 dihit A.5.1.1 22.a Pemasangan 1 m’ pipa galvanis medium A diameter 1 ½” m' 1,515,822.00
28 A.5.1.1 23. Pemasangan 1 m’ pipa galvanis medium B diameter 3” m' 1,191,661.00
29 A.5.1.1 24. Pemasangan 1 m’ pipa galvanis medium B diameter 4” m' 1,506,433.00
30 dihit A.5.1.1 24.a Pemasangan 1 m’ pipa galvanis medium A diameter 4” m' 3,581,964.00
31 A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” m' 76,469.00
32 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m' 92,754.00
33 A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” m' 111,584.00
34 A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” m' 199,796.00
35 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m' 219,590.00
36 A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” m' 298,664.00
37 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” m' 399,162.00
38 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m' 645,078.00
39 A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 20 cm m' 771,189.00
40 A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm m' 458,616.00
41 A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 - 20 cm m' 195,916.00
42 A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 - 100 cm m' 782,686.00
43 dihit A.5.1.1.37. Pemasangan 1 m Talang Air Hujan PVC Persegi m' 296,794.00
44 dihit A.5.1.1.38. Pemasangan 1 m Talang Air Hujan PVC 1/2 Lingkaran 6" m¹ 190,559.00
45 dihit A.5.1.1.39. Pemasangan 1 m Talang Air Hujan Galvanis 1/2 Lingkaran 6" m¹ 259,415.00
46 dihit A.5.1.1.40. Pemasangan 1 Unit Septictank Dinding Bata Trassram 2x1,5x1,5 m unit 17,268,729.00
47 dihit A.5.1.1.41. Pemasangan 1 Unit Septictank Dinding Bata Trassram 1,5x1,2x1,7 m unit 12,135,592.00
48 dihit A.5.1.1.42. Pembuatan 1 Unit Septictank Bio Filter Kapasitas 6 orang unit 3,886,123.00
49 dihit A.5.1.1.43. Pembuatan 1 Unit Septictank Bio Filter Kapasitas 8 orang unit 4,814,890.00
50 dihit A.5.1.1.44. Pembuatan 1 Unit Septictank Bio Filter Kapasitas 12 orang unit 7,858,669.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DILUAR GEDUNG


1 A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC AW Ø 63 mm m' 142,546.00
2 dihit A.8.4.1.1.a Pemasangan 1 m Pipa PVC Ø 32 mm (SNI S-12,5 / 10 BAR) SCJ m' 73,130.00
3 dihit A.8.4.1.1.b Pemasangan 1 m Pipa PVC Ø 50 mm (SNI S-12,5 / 10 BAR) SCJ m' 76,956.00
4 dihit A.8.4.1.1.c Pemasangan 1 m pipa PVC Ø 63 mm (SNI.S-12,5 / 10 BAR) SCJ m' 81,449.00
5 dihit A.8.4.1.1.d Pemasangan 1 m pipa PVC Ø 63 mm (SNI.S-12,5 / 10 BAR) RRJ m' 81,560.00
6 dihit A.8.4.1.1.e Pemasangan 1 m pipa PVC AW Ø 75 mm m' 69,303.00
7 dihit A.8.4.1.1.f Pemasangan 1 m pipa PVC Ø 75 mm (SNI.S-12,5 / 10 BAR) SCJ m' 101,741.00
8 A.8.4.1.2 (K3) Pemasangan 1 m pipa PVC AW Ø 90 mm m' 253,292.00
9 dihit A.8.4.1.2.a Pemasangan 1 m pipa PVC Ø 90 mm (SNI.S-12,5 / 10 BAR) SCJ m' 141,270.00
10 dihit A.8.4.1.2.b Pemasangan 1 m pipa PVC Ø 90 mm (SNI.S-12,5 / 10 BAR) RRJ m' 141,604.00
11 A.8.4.1.3 (K3) Pemasangan 1 m pipa PVC AW Ø 110 mm m' 408,188.00
12 dihit A.8.4.1.3.a Pemasangan 1 m pipa PVC Ø 110 mm (SNI.S-12,5 / 10 BAR) SCJ m' 192,322.00
13 dihit A.8.4.1.3.b Pemasangan 1 m pipa PVC Ø 110 mm (SNI.S-12,5 / 10 BAR) RRJ m' 194,357.00
14 A.8.4.1.4 (K3) Pemasangan 1 m pipa PVC AW Ø 160 mm m' 248,180.00
15 dihit A.8.4.1.4.a Pemasangan 1 m pipa PVC Ø 160 mm (SNI.S-12,5 / 10 BAR) SCJ m' 362,063.00
16 dihit A.8.4.1.4.b Pemasangan 1 m pipa PVC Ø 160 mm (SNI.S-12,5 / 10 BAR) RRJ m' 364,198.00
17 A.8.4.1.5 (K3) Pemasangan 1 m pipa PVC AW Ø 200 mm m' 1,205,790.00
18 dihit A.8.4.1.5.a Pemasangan 1 m pipa PVC Ø 200 mm (SNI.S-12,5 / 10 BAR) SCJ m' 486,937.00
19 dihit A.8.4.1.5.b Pemasangan 1 m pipa PVC Ø 200 mm (SNI.S-12,5 / 10 BAR) RRJ m' 544,972.00
20 A.8.4.1.6 (K3) Pemasangan 1 m pipa PVC AW Ø 250 mm m' 1,866,913.00
21 dihit A.8.4.1.6.a Pemasangan 1 m pipa PVC Ø 250 mm (SNI.S-12,5 / 10 BAR) SCJ m' 743,548.00
22 dihit A.8.4.1.6.b Pemasangan 1 m pipa PVC Ø 250 mm (SNI.S-12,5 / 10 BAR) RRJ m' 825,003.00
23 A.8.4.1.7 (K3) Pemasangan 1 m pipa PVC AW Ø 315 mm m' 2,786,103.00
24 dihit A.8.4.1.7.a Pemasangan 1 m pipa PVC Ø 315 mm (SNI.S-12,5 / 10 BAR) SCJ m' 1,138,293.00
25 dihit A.8.4.1.7.b Pemasangan 1 m pipa PVC Ø 315 mm (SNI.S-12,5 / 10 BAR) RRJ m' 1,264,524.00
24 A.8.4.1.8 (K3) Pemasangan 1 m pipa PVC AW Ø 400 mm m' 4,545,438.00
26 dihit A.8.4.1.8.a Pemasangan 1 m pipa PVC Ø 400 mm (SNI.S-12,5 / 10 BAR) SCJ m' 1,692,189.00
27 dihit A.8.4.1.8.b Pemasangan 1 m pipa PVC Ø 400 mm (SNI.S-12,5 / 10 BAR) RRJ m' 2,058,962.00
28 A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm m' 103,687.00
29 A.8.4.1.18 (K3) Pemasangan 1 m pipa HDPE Ø 110 mm m' 273,101.00
30 A.8.4.1.19 (K3) Pemasangan 1 m pipa HDPE Ø 125 mm m' 333,253.00
31 A.8.4.1.20 (K3) Pemasangan 1 m pipa HDPE Ø 160 mm m' 509,129.00
32 A.8.4.1.21 (K3) Pemasangan 1 m pipa HDPE Ø 200 mm m' 863,164.00
33 A.8.4.1.22 (K3) Pemasangan 1 m pipa HDPE Ø 250 mm m' 1,286,064.00
34 A.8.4.1.23 (K3) Pemasangan 1 m pipa HDPE Ø 315 mm m' 2,146,000.00
35 A.8.4.1.24 (K3) Pemasangan 1 m pipa HDPE Ø 400 mm m' 3,534,015.00
36 A.8.4.1.25 (K3) Pemasangan 1 m pipa HDPE Ø 450 mm m' 4,802,332.00
37 A.8.4.1.26 (K3) Pemasangan 1 m pipa HDPE Ø 500 mm m' 6,484,011.00
38 A.8.4.1.27 (K3) Pemasangan 1 m pipa HDPE Ø 630 mm m' 9,937,720.00
39 A.8.4.1.28 (K3) Pemasangan 1 m pipa HDPE Ø 800 mm m' 21,922,537.00
40 A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP Ø 63 mm m' 1,312,667.00
41 A.8.4.1.34 (K3) Pemasangan 1 m pipa GIP Ø 90 mm m' 1,444,978.00
42 A.8.4.1.35 (K3) Pemasangan 1 m pipa GIP Ø 110 mm m' 2,274,084.00
43 A.8.4.1.36 (K3) Pemasangan 1 m pipa GIP Ø 160 mm m' 3,038,346.00
44 A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP Ø 200 mm m' 5,778,668.00
45 A.8.4.1.64 (K3) Pemasangan 1 m pipa baja Ø 63 mm m' 250,161.00
46 A.8.4.1.65 (K3) Pemasangan 1 m pipa baja Ø 100 mm m' 502,839.00
47 A.8.4.1.66 (K3) Pemasangan 1 m pipa baja Ø 125 mm m' 762,576.00
48 A.8.4.1.67 (K3) Pemasangan 1 m pipa baja Ø 150 mm m' 828,879.00
49 A.8.4.1.68 (K3) Pemasangan 1 m pipa baja Ø 200 mm m' 1,333,405.00
50 A.8.4.1.75 (K3) Pemasangan 1 m pipa baja Ø 800 mm m' 2,270,565.00
51 A.8.4.1.76 (K3) Pemasangan 1 m pipa baja Ø 900 mm m' 2,703,114.00
52 dihit A.8.4.1.77.a Pemasangan 1 m pipa baja Ø 1/2" , t = 1.5 mm (stainless steel) m' 56,451.00
53 dihit A.8.4.1.77.b Pemasangan 1 m pipa baja Ø 3/4" , t = 1.5 mm (stainless steel) m' 72,542.00
54 dihit A.8.4.1.77.c Pemasangan 1 m pipa baja Ø 1" , t = 1.5 mm (stainless steel) m' 87,418.00
55 dihit A.8.4.1.77.d Pemasangan 1 m pipa baja Ø 1.1/2" , t = 1.5 mm (stainless steel) m' 135,127.00
56 dihit A.8.4.1.77.e Pemasangan 1 m pipa baja Ø 2" , t = 1.5 mm (stainless steel) m' 169,434.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

57 dihit A.8.4.1.77.f Pemasangan 1 m pipa baja Ø 2.1/2" , t = 1.5 mm (stainless steel) m' 263,360.00
58 dihit A.8.4.1.77.g Pemasangan 1 m pipa baja Ø 3" , t = 1.5 mm (stainless steel) m' 312,808.00
59 dihit A.8.4.1.77.h Pemasangan 1 m pipa baja Ø 3.1/2" , t = 1.5 mm (stainless steel) m' 347,258.00
60 dihit A.8.4.1.77.i Pemasangan 1 m pipa baja Ø 4" , t = 1.5 mm (stainless steel) m' 399,699.00
61 dihit A.8.4.1.78.a Pekerjaan incian pipa GI Ø 0,5" panjang 0,5 m ( Las ) 0,5 m 34,240.00
62 dihit A.8.4.1.78.b Pekerjaan incian pipa GI Ø 1" panjang 0,5 m ( Las ) 0,5 m 77,970.00
63 dihit A.8.4.1.78.c Pekerjaan incian pipa GI Ø 2" panjang 0,5 m ( Las ) 0,5 m 157,734.00
64 dihit A.8.4.1.78.d Pekerjaan incian pipa GI Ø 3" panjang 0,5 m ( Las ) 0,5 m 194,994.00
65 dihit A.8.4.1.78.e Pekerjaan incian pipa GI Ø 4" panjang 0,5 m ( Las ) 0,5 m 290,444.00
66 dihit A.8.4.1.78.f Pekerjaan incian pipa GI Ø 0,5" panjang 0,5 m ( Drat ) 0,5 m 37,421.00
67 dihit A.8.4.1.78.g Pekerjaan incian pipa GI Ø 1" panjang 0,5 m ( Drat ) 0,5 m 62,215.00
68 dihit A.8.4.1.78.h Pekerjaan incian pipa GI Ø 2" panjang 0,5 m ( Drat ) 0,5 m 114,839.00
69 dihit A.8.4.1.78.i Pekerjaan incian pipa GI Ø 3" panjang 0,5 m ( Drat ) 0,5 m 130,709.00
70 dihit A.8.4.1.78.j Pekerjaan incian pipa GI Ø 4" panjang 0,5 m ( Drat ) 0,5 m 199,019.00
71 dihit A.8.4.1.78.k Pekerjaan incian pipa wall pipe GI Ø 2" panjang 0,5 m ( Las & Drat ) 0,5 m 475,594.00
72 dihit A.8.4.1.78.l Pekerjaan incian pipa wall pipe GI Ø 3" panjang 0,5 m ( Las & Drat ) 0,5 m 752,284.00
73 dihit A.8.4.1.78.m Pekerjaan incian pipa wall pipe GI Ø 4" panjang 0,5 m ( Las & Drat ) 0,5 m 1,016,209.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA


1 A.8.4.2.1 (K3) Pemotongan 1 buah pipa PVC Ø 63 mm buah 1,024.00
2 A.8.4.2.2 (K3) Pemotongan 1 buah pipa PVC Ø 90 mm buah 2,779.00
3 A.8.4.2.3 (K3) Pemotongan 1 buah pipa PVC Ø 110 mm buah 4,372.00
4 A.8.4.2.4 (K3) Pemotongan 1 buah pipa PVC Ø 160 mm buah 6,073.00
5 A.8.4.2.5 (K3) Pemotongan 1 buah pipa PVC Ø 200 mm buah 16,377.00
6 A.8.4.2.6 (K3) Pemotongan 1 buah pipa PVC Ø 250 mm buah 26,179.00
7 A.8.4.2.7 (K3) Pemotongan 1 buah pipa PVC Ø 315 mm buah 31,530.00
8 A.8.4.2.8 (K3) Pemotongan 1 buah pipa PVC Ø 400 mm buah 68,000.00
9 A.8.4.2.17 (K3) Pemotongan 1 buah pipa HDPE Ø 63 mm buah 5,857.00
10 A.8.4.2.18 (K3) Pemotongan 1 buah pipa HDPE Ø 100 mm buah 11,140.00
11 A.8.4.2.19 (K3) Pemotongan 1 buah pipa HDPE Ø 125 mm buah 14,886.00
12 A.8.4.2.20 (K3) Pemotongan 1 buah pipa HDPE Ø 150 mm buah 20,279.00
13 A.8.4.2.21 (K3) Pemotongan 1 buah pipa HDPE Ø 200 mm buah 34,595.00
14 A.8.4.2.22 (K3) Pemotongan 1 buah pipa HDPE Ø 250 mm buah 47,221.00
15 A.8.4.2.23 (K3) Pemotongan 1 buah pipa HDPE Ø 300 mm buah 60,267.00
16 A.8.4.2.24 (K3) Pemotongan 1 buah pipa HDPE Ø 400 mm buah 99,265.00
17 A.8.4.2.25 (K3) Pemotongan 1 buah pipa HDPE Ø 450 mm buah 120,954.00
18 A.8.4.2.26 (K3) Pemotongan 1 buah pipa HDPE Ø 500 mm buah 143,214.00
19 A.8.4.2.27 (K3) Pemotongan 1 buah pipa HDPE Ø 600 mm buah 172,018.00
20 A.8.4.2.28 (K3) Pemotongan 1 buah pipa HDPE Ø 800 mm buah 281,058.00
21 A.8.4.2.64 (K3) Pemotongan 1 buah pipa baja Ø 63 mm buah 21,098.00
22 A.8.4.2.65 (K3) Pemotongan 1 buah pipa baja Ø 100 mm buah 30,990.00
23 A.8.4.2.66 (K3) Pemotongan 1 buah pipa baja Ø 125 mm buah 39,321.00
24 A.8.4.2.67 (K3) Pemotongan 1 buah pipa baja Ø 150 mm buah 48,427.00
25 A.8.4.2.68 (K3) Pemotongan 1 buah pipa baja Ø 200 mm buah 99,921.00
26 A.8.4.2.75 (K3) Pemotongan 1 buah pipa baja Ø 800 mm buah 476,073.00
27 A.8.4.2.76 (K3) Pemotongan 1 buah pipa baja Ø 900 mm buah 536,792.00

A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA


1 dihit A.8.4.3.1.a Pemasangan 1 buah Valve HDPE Ø 63 mm buah 790,850.00
2 dihit A.8.4.3.1.b Pemasangan 1 buah Valve HDPE Ø 75 mm buah 1,386,878.00
3 dihit A.8.4.3.1.c Pemasangan 1 buah Valve HDPE Ø 90 mm buah 1,803,781.00
4 dihit A.8.4.3.1.d Pemasangan 1 buah Valve HDPE Ø 110 mm buah 1,716,466.00
5 dihit A.8.4.3.15.a Pemasangan 1 buah Tee HDPE Ø 63 mm buah 295,052.00
6 dihit A.8.4.3.15.b Pemasangan 1 buah Tee HDPE Ø 90 mm buah 496,485.00
7 dihit A.8.4.3.15.c Pemasangan 1 buah Tee HDPE Ø 110 mm buah 909,344.00

A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA


1 A.8.4.4.1 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm buah 1,387,968.00
2 A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm buah 1,561,228.00
3 A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm buah 1,994,379.00
4 A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm buah 2,427,530.00

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA


1 A.8.4.5.1 (K3) Pengetesan 1 m pipa Ø 50 mm m' 1,648.00
2 A.8.4.5.2 (K3) Pengetesan 1 m pipa Ø 75 mm m' 1,648.00
3 A.8.4.5.3 (K3) Pengetesan 1 m pipa Ø 100 mm m' 1,648.00
4 A.8.4.5.4 (K3) Pengetesan 1 m pipa Ø 150 mm m' 1,648.00
5 A.8.4.5.5 (K3) Pengetesan 1 m pipa Ø 200 mm m' 1,649.00
6 A.8.4.5.6 (K3) Pengetesan 1 m pipa Ø 250 mm m' 1,649.00
7 A.8.4.5.7 (K3) Pengetesan 1 m pipa Ø 300 mm m' 1,649.00
8 A.8.4.5.8 (K3) Pengetesan 1 m pipa Ø 400 mm m' 1,650.00
9 A.8.4.5.9 (K3) Pengetesan 1 m pipa Ø 500 mm m' 1,651.00
10 A.8.4.5.10 (K3) Pengetesan 1 m pipa Ø 600 mm m' 1,653.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL


1 A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (lengkap terpasang dengan fitting keramik) buah 714,310.00
2 dihit A.8.4.6.1.a Pemasangan 1 buah instalasi titik lampu (tanpa saklar & fitting) buah 314,567.00
3 dihit A.8.4.6.1.b Pemasangan 2 buah instalasi titik lampu ( dalam 1 saklar ) unit 488,574.00
4 dihit A.8.4.6.1.c Pemasangan 3 buah instalasi titik lampu ( dalam 1 saklar ) unit 587,237.00
5 dihit A.8.4.6.1.d Pemasangan 4 buah instalasi titik lampu ( dalam 1 saklar ) unit 688,329.00
6 A.8.4.6.2 (K3) Pemasangan 1 buah MCB (6 A) buah 597,187.00
7 dihit A.8.4.6.3 1 unit - pemasangan box panel unit 6,503,171.00

8 dihit A.8.4.6.3.a Pemasangan 1 Unit Panel MCB Ukuran Box 30x40x15 cm untuk 6 Grup MCB (1.Phasa) unit 846,110.00

Pemasangan 1 Unit Panel MCB Ukuran Box 40x50x20 cm untuk 12 Grup MCB
9 dihit A.8.4.6.3.b unit 1,652,021.00
(1.Phasa)

10 dihit A.8.4.6.3.c Pemasangan 1 Unit Panel MCB Ukuran Box 30x40x15 cm untuk 6 Grup MCB (3 Phasa) unit 1,329,072.00

Pemasangan 1 Unit Panel MCB Ukuran Box 40x50x20 cm untuk 12 Grup MCB (3
11 dihit A.8.4.6.3.d unit 2,531,004.00
Phasa)
12 dihit A.8.4.6.4 Pasang Saklar Tunggal sekualitas Broco, clipsal buah 35,867.00
13 dihit A.8.4.6.5 Pasang Saklar Ganda sekualitas Broco, clipsal buah 44,874.00
14 dihit A.8.4.6.6 Pasang Saklar Triple sekualitas Broco, clipsal buah 72,501.00
15 dihit A.8.4.6.7 Pasang Stop Kontak sekualitas Broco, clipsal buah 40,320.00
16 dihit A.8.4.6.7.a Pemasangan 1 buah instalasi stop kontak (tanpa stop kontak) buah 232,428.00
17 dihit A.8.4.6.8 Pasang Stop Kontak AC, Sekualtas Broco, clipsal buah 88,896.00
18 dihit A.8.4.6.9 1 m' memasang kabel NYM 3 x 1.5 mm m¹ 19,630.00
19 dihit A.8.4.6.10 1 m' memasang kabel NYM 2 x 2.5 mm m¹ 18,415.00
20 dihit A.8.4.6.11 1 m' memasang kabel NYY 3 x 2.5 mm m¹ 26,491.00
21 dihit A.8.4.6.12 1 m' memasang kabel NYY 3 x 4 mm m¹ 39,345.00
22 dihit A.8.4.6.13 1 m' memasang kabel NYY 3 x 6 mm m¹ 52,176.00
23 dihit A.8.4.6.14 1 m' memasang kabel NYA 1 x 1.5 mm m¹ 9,995.00
24 dihit A.8.4.6.15 1 m' memasang kabel NYA 1 x 2.5 mm m¹ 13,618.00
25 Ls Penangkal Petir Konvensional 2 AIP- BC 25 mm (termasuk biaya pemasangan) unit 2,500,000.00
26 Ls Penangkal Petir Konvensional 3 AIP- BC 25 mm (termasuk biaya pemasangan) unit 3,300,000.00
27 Ls Penangkal Petir Konvensional 4 AIP- BC 25 mm (termasuk biaya pemasangan) unit 3,900,000.00

28 Ls Penangkal Petir Elektrostatis Kurn R 35 M - BC 50 mm (termasuk biaya pemasangan) unit 6,700,000.00

29 Ls Penangkal Petir Elektrostatis Kurn R 85 M - BC 50 mm (termasuk biaya pemasangan) unit 8,300,000.00

30 Ls Penangkal Petir Elektrostatis Kurn R 150 M - BC 50 mm (termasuk biaya pemasangan) unit 8,900,000.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

AD.1 HARGA SATUAN PEKERJAAN SANITASI DILUAR GEDUNG


1 dihit AD.1.1 Got Normal U - Ø 15 cm ( lengkap terpasang ) m¹ 103,688.00
2 dihit AD.1.1.a Got Normal U - Ø 15 cm ( tanpa bata penjepit ) m¹ 66,657.00
3 dihit AD.1.2 Got Normal U - Ø 20 cm ( lengkap terpasang ) m¹ 135,089.00
4 dihit AD.1.2.a Got Normal U - Ø 20 cm ( tanpa bata penjepit ) m¹ 85,832.00
5 dihit AD.1.3 Got Normal U - Ø 30 cm ( lengkap terpasang ) m¹ 199,703.00
6 dihit AD.1.3.a Got Normal U - Ø 30 cm ( tanpa bata penjepit ) m¹ 115,870.00
7 dihit AD.1.4 Got Normal U - Ø 40 cm ( lengkap terpasang ) m¹ 269,540.00
8 dihit AD.1.4.a Got Normal U - Ø 40 cm ( tanpa bata penjepit ) m¹ 185,725.00
9 dihit AD.1.5 Got Normal U - Ø 60 cm ( lengkap terpasang ) m¹ 389,766.00
10 dihit AD.1.5.a Got Normal U - Ø 60 cm ( tanpa bata penjepit ) m¹ 299,309.00
11 dihit AD.1.6 Buis beton Ø 20 cm ( lengkap terpasang ) m¹ 195,576.00
12 dihit AD.1.7 Buis beton Ø 30 cm ( lengkap terpasang ) m¹ 275,049.00
13 dihit AD.1.8 Buis beton Ø 40 cm ( lengkap terpasang ) m¹ 361,584.00
14 dihit AD.1.9 Buis beton Ø 60 cm ( lengkap terpasang ) m¹ 394,980.00
15 dihit AD.1.10 Buis beton Ø 80 cm ( lengkap terpasang ) m¹ 755,656.00
16 dihit AD.1.11 Buis beton Ø 100 cm ( lengkap terpasang ) m¹ 869,203.00
17 dihit AD.1.12 U-Ditch 20 x 20 cm, K - 350, Fabrikasi ( terpasang ) m¹ 248,896.00
18 dihit AD.1.13 U-Ditch 30 x 30 cm, K - 350, Fabrikasi ( terpasang ) m¹ 313,574.00
19 dihit AD.1.14 U-Ditch 40 x 40 cm, K - 350, Fabrikasi ( terpasang ) m¹ 480,089.00
20 dihit AD.1.15 U-Ditch 50 x 50 cm, K - 350, Fabrikasi ( terpasang ) m¹ 624,608.00
21 dihit AD.1.16 U-Ditch 60 x 60 cm, K - 350, Fabrikasi ( terpasang ) m¹ 856,314.00
22 dihit AD.1.17 U-Ditch 60 x 80 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,122,792.00
23 dihit AD.1.18 U-Ditch 80 x 80 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,232,429.00
24 dihit AD.1.19 U-Ditch 80 x 100 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,536,029.00
25 dihit AD.1.20 U-Ditch 100 x 100 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,594,342.00
26 dihit AD.1.22 Tutup U-Ditch 20 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 183,619.00
27 dihit AD.1.23 Tutup U-Ditch 30 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 229,619.00
28 dihit AD.1.24 Tutup U-Ditch 40 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 233,299.00
29 dihit AD.1.24.a Tutup U-Ditch 40 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 297,791.00
30 dihit AD.1.25 Tutup U-Ditch 50 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 297,331.00
31 dihit AD.1.26 Tutup U-Ditch 60 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 354,739.00
32 dihit AD.1.27 Tutup U-Ditch 60 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 525,706.00
33 dihit AD.1.28 Tutup U-Ditch 80 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 476,271.00
34 dihit AD.1.29 Tutup U-Ditch 80 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 860,279.00
35 dihit AD.1.31 Tutup U-Ditch 100 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 821,639.00
36 dihit AD.1.36 Box Culvert 80 x 80 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 2,040,591.00
37 dihit AD.1.37 Box Culvert 80 x 80 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 3,008,554.00
38 dihit AD.1.38 Box Culvert 100 x 100 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 3,045,184.00
39 dihit AD.1.39 Box Culvert 100 x 100 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 3,722,795.00
40 dihit AD.1.40 Box Culvert 120 x 120 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 4,329,585.00
41 dihit AD.1.41 Box Culvert 120 x 120 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 5,295,585.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

AD.2 HARGA SATUAN PEKERJAAN LANGSIRAN

1 dihit AD.2.1 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 10m m¹ 33,246.00

2 dihit AD.2.2 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 30m m¹ 41,384.00

3 dihit AD.2.3 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 50m m¹ 49,056.00

4 dihit AD.2.4 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 100 m m¹ 69,748.00

5 dihit AD.2.5 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 200 m m¹ 110,435.00

6 dihit AD.2.6 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 300 m m¹ 151,121.00

AD.3 HARGA SATUAN PEKERJAAN PAGAR BETON DAN BESI

1 dihit AD.3.1 Pasang Pagar Panel Beton 240 x 40 x 5 cm & Kolom 225 x 18 x 17 cm, tinggi 160 cm m¹ 826,350.00

2 dihit AD.3.2 Pasang Pagar Panel Beton 240 x 40 x 5 cm & Kolom 280 x 18 x 17 cm, tinggi 200 cm m¹ 853,520.00

3 dihit AD.3.3 Pasang Pagar Panel Beton 240 x 40 x 5 cm & Kolom 320 x 18 x 17 cm, tinggi 240 cm m¹ 981,636.00

4 dihit AD.3.4 Pasang Pagar Panel Beton 240 x 40 x 5 cm & Kolom 370 x 18 x 17 cm, tinggi 280cm m¹ 947,917.00

5 dihit AD.3.5 Pasang Pagar Panel Beton 240 x 45 x 5 cm & Kolom 225 x 18 x 17 cm, tinggi 180 cm m¹ 826,399.00

6 dihit AD.3.6 Pasang Pagar Panel Beton 240 x 45 x 5 cm & Kolom 280 x 18 x 17 cm, tinggi 225 cm m¹ 895,950.00

7 dihit AD.3.7 Pasang Pagar Panel Beton 240 x 45 x 5 cm & Kolom 320 x 18 x 17 cm, tinggi 270 cm m¹ 1,032,552.00

8 dihit AD.3.8 Pasang Pagar Panel Beton 240 x 45 x 5 cm & Kolom 370 x 18 x 17 cm, tinggi 315 cm m¹ 1,016,375.00

9 dihit AD.3.9 Pasang Pagar Panel Beton 240 x 50 x 5 cm & Kolom 225 x 18 x 17 cm, tinggi 150 cm m¹ 791,816.00

10 dihit AD.3.10 Pasang Pagar Panel Beton 240 x 50 x 5 cm & Kolom 280 x 18 x 17 cm, tinggi 200 cm m¹ 830,592.00

11 dihit AD.3.11 Pasang Pagar Panel Beton 240 x 50 x 5 cm & Kolom 320 x 18 x 17 cm, tinggi 250 cm m¹ 970,314.00

12 dihit AD.3.12 Pasang Pagar Panel Beton 240 x 50 x 5 cm & Kolom 350 x 18 x 17 cm, tinggi 300 cm m¹ 979,597.00

13 dihit AD.3.13 Pasang Pagar BRC tinggi 90 cm + tiang Ø 2,0" m¹ 548,872.00


14 dihit AD.3.14 Pasang Pagar BRC tinggi 120 cm + tiang Ø 2,0" m¹ 597,853.00
15 dihit AD.3.15 Pasang Pagar BRC tinggi 175 cm + tiang Ø 2,0" m¹ 467,817.00
16 dihit AD.3.16 Pasang Pagar BRC tinggi 190 cm + tiang Ø 2,0" m¹ 496,153.00

17 dihit AD.3.17 Pemasangan 1 m2 Kawat Berduri diatas Pagar Panel Beton tinggi 50 cm - 4 lajur m¹ 207,465.00

18 dihit AD.3.18 Pemasangan 1 m2 Kawat Berduri diatas Pagar Panel Beton tinggi 60 cm - 5 lajur m¹ 249,129.00

19 dihit AD.3.19 Pemasangan 1 m2 Kawat Berduri diatas Pagar Panel Beton tinggi 60 cm - 7 lajur m¹ 324,826.00

20 LS Pekerjaan Pagar Railling Besi Hollow Meni tinggi s/d 120 cm m¹ 495,000.00
21 LS Pekerjaan Pintu Pagar Pipa Stainless tinggi s/d 200 cm m¹ 1,650,000.00
22 LS Pekerjaan Pintu Pagar Besi Hollow Meni tinggi s/d 200 cm m¹ 770,000.00
23 dihit AD.3.23 Pekerjaan railling tangga pipa stainless steel (SS.304) m¹ 836,689.00
24 dihit AD.3.24 Pekerjaan 1 m2 pipa besi hollow (untuk railling tangga, rangka atap, pagar) m2 354,249.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

AD.4 HARGA SATUAN PEKERJAAN SUMUR DALAM / AIR TANAH & AIR BERSIH
1 dihit A.T.01.1 Mobillisasi & demobilisasi drilling rig dan peralatan bor unit 2,699,963.00
2 dihit A.T.01.2 Pembuatan bak untuk sirkulasi air kerja unit 433,633.00
3 dihit A.T.02 Pengeboran dia. 8 3/4" m' 577,700.00
4 dihit A.T.02.1 Pengeboran dia. 6" m' 417,563.00
5 dihit A.T.02.2 Pengeboran Lubang Pandu 4" dari 0 m - 40 m m¹ 317,565.00
6 dihit A.T.02.3 Pengeboran Lubang Pandu 4" dari 40 m - 80 m m¹ 330,194.00
7 dihit A.T.02.4 Pengeboran Lubang Pandu 4" dari 80 m - 120 m m¹ 349,139.00
8 dihit A.T.03 1 m' Reaming Ø8 3/4" - Ø12" m' 534,179.00
9 dihit A.T.03.1 1 m' Reaming Ø6" - Ø8" m' 379,928.00
10 dihit A.T.03.2 Reaming dari 0 m - 40 m dari Ø4'' ke Ø8'' m¹ 274,089.00
11 dihit A.T.03.3 Reaming dari 40 m - 80 m dari Ø4'' ke Ø8'' m¹ 283,821.00
12 dihit A.T.03.4 Reaming dari 80 m - 120 m dari Ø4'' ke Ø8'' m¹ 299,349.00
13 dihit A.T.03.5 Reaming dari 0 m - 40 m dari Ø4'' ke Ø6'' m¹ 179,467.00
14 dihit A.T.03.6 Reaming dari 40 m - 80 m dari Ø4'' ke Ø6'' m¹ 212,918.00
15 dihit A.T.03.7 Reaming dari 80 m - 120 m dari Ø4'' ke Ø6'' m¹ 246,370.00
16 dihit A.T.05 Bongkar Pasang Temporary Cassing (ID) 12" m' 363,085.00
17 dihit A.T.07 Pengadaan dan Pemasangan Cassing Pipa Black Steel 6" m' 2,027,923.00
18 dihit A.T.07.1 Pengadaan dan Pemasangan Cassing Pipa Galvanis GI. SNI (Medium A) dia. 4" m' 2,444,437.00
19 dihit A.T.08 Pengadaan dan Pemasangan LC Screen 6" m' 1,629,551.00
20 dihit A.T.08.1 Pengadaan dan Pemasangan ST. Screen dia. 4" m' 1,653,541.00
21 dihit A.T.08.2 Pengadaan dan Pemasangan LC. Screen dia. 4" m' 1,272,847.00
22 dihit A.T.08.3 Pengadaan dan Pemasangan PVC. Screen dia. 4" m' 368,670.00
23 dihit A.T.12 Pengadaan dan Pemasangan Gravel Pack m3 508,541.00
24 dihit A.T.13 Pencucian Sumur (Well Development) jam 95,957.00
25 dihit A.T.14 Uji Pemompaan (Pumping Test) jam 37,920.00
26 dihit A.T.15 Pasang dan bongkar peralatan uji Unit 2,346,294.00
27 dihit A.T.16 Pemeriksaan Kualitas Air Spl 1,835,212.55
28 dihit A.T.18 Electric Logging ttk 1,403,686.00
29 dihit A.T.18.1 Bor Hole Logging m¹ 42,526.00
30 dihit A.T.18.2 Grouting 1 : 2 m3 1,278,288.00

AD.5 HARGA SATUAN PEKERJAAN PERTAMANAN


1 dihit AD.5.1 Penanaman 1 m2 rumput gajah mini m2 115,617.00
2 dihit AD.5.2 Penanaman 1 m2 rumput golf m2 195,767.00
3 dihit AD.5.3 Penanaman 1 m2 rumput jepang m2 118,956.00
4 dihit AD.5.4 Penyiapan media tanah dalam Polybag untuk tanaman Semak buah 64,798.00
5 dihit AD.5.5 Penanaman 1 Pohon Peneduh cemara kipas **) buah 202,557.00
6 dihit AD.5.6 Penanaman 1 Pohon Peneduh glodogan pecut **) Besar buah 900,612.00
7 dihit AD.5.7 Penanaman 1 Pohon Peneduh ketapang kencana **) buah 207,010.00
8 dihit AD.5.8 Penanaman 1 Pohon Peneduh palem botol **) buah 308,592.00
9 dihit AD.5.9 Penanaman 1 Pohon Peneduh palem ekor tupai ** Besar buah 497,836.00
10 dihit AD.5.10 Penanaman 1 Pohon Peneduh pucuk merah **) buah 119,978.00
11 dihit AD.5.11 Penanaman 1 Pohon Peneduh tabebuya kuning ** Besar buah 1,145,314.00
12 dihit AD.5.12 Penanaman 1 Pohon Peneduh trembesi **) buah 597,012.00
**) Besar / Kecilnya pohon peneduh disesuaikan ketersediaan barang
AD.6 HARGA SATUAN PEKERJAAN LAIN - LAIN
1 dihit AD.6.1 Sewa Scaffolding (m3 ruang) (m3 ruang) 17,681.00
2 dihit AD.6.2 Pemasangan platik cor m2 1,113.00
3 dihit AD.6.3 Pemasangan Letter / logo Pemerintah dari bahan Marmer uk. ( 40 x 50 ) cm2 buah 1,000,000.00
4 dihit AD.6.4 1 m3 bronjong penahan kawat Ø 3 mm m3 1,391,170.00
5 dihit AD.6.5 Penyediaan dan Pemasangan rangka panggung besi IWF Kg 81,589.00
6 dihit AD.6.6 Pasang penutup panggung multiplek 18 mm m2 233,682.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

AD.7 HARGA SATUAN PEKERJAAN LAIN - LAIN


1 dihit AD.7.1 Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm, kayu lama dipakai kembali m¹ 32,809.75
2 dihit AD.7.2 Pasang kusen pintu/ jendela/ boven lama buah 464,208.72
3 dihit AD.7.3 Pasang daun pintu lama buah 646,368.72
4 dihit AD.7.4 Pasang daun jendela / boven lama buah 485,258.32
5 dihit AD.7.5 Pemasangan 1 m’ pipa AC 1/2 x 1/4 m¹ 269,980.90
6 dihit AD.7.6 Pemasangan 1 m’ pipa AC 5/8 x 1/4 m¹ 309,327.46
7 dihit AD.7.7 Tabung FRP 1054 (10 inci) Kapasitas 700 lt / jam buah 5,283,883.17
8 dihit AD.7.8 Tabung FRP 1054 (10 inci) Kapasitas 700 lt / jam,softener buah 10,445,690.37
9 dihit AD.7.9 Pemasangan 1 buah floor drain stainles steel buah 118,604.58
10 dihit AD.7.10 (K3) Pemasangan 1 buah closet duduk (Merk TOTO COUPLED TOILET CW 631 J / SW buah 1,932,926.03
11 dihit AD.7.11 (K3) Pemasangan 1 buah wastafel (Merk KOHLER K-90012T-053010000) buah 4,171,208.56
12 dihit AD.7.12 (K3) Pemasangan 1 buah wastafel (MERK TOTO VESSEL CONTER LAVATORY LW 57 buah 4,171,208.56
13 dihit AD.7.13 Pemasangan 1 buah kran Merk TOTO 116 LEVAN buah 3,736,120.67
14 dihit AD.7.13.a Pemasangan 1 buah kran Merk KOHLER K-18872 K buah 5,339,128.67
15 dihit AD.7.13.b Pemasangan 1 buah kran Merk KOHLER 32640000 buah 7,216,105.31
16 dihit AD.7.13.c Pemasangan 1 buah kran Merk Toto tx 443 MMA buah 5,908,682.27
17 dihit AD.7.14 Pemasangan 1 buah Shower Merk TOTO SHOWER SPRAY TX 403 SMCRB buah 913,824.53
18 dihit AD.7.14.a Pemasangan 1 buah Shower Merk KOHLER 26238000 buah 10,900,807.25
19 dihit AD.7.14.b Pemasangan 1 buah Shower Merk Kohler 264254000 buah 1,993,183.25
20 dihit AD.7.15 (K3) Pemasangan 1 buah bathcuip porselen MERK TOP BATH TP-TC-S52-1 buah 51,991,519.57
21 dihit AD.7.16 Pemasangan 1 m’ pipa air panas diameter 1/2” m¹ 82,762.54
22 dihit AD.7.16.a Pemasangan 1 m’ pipa air panas diameter 3/4” m¹ 96,334.06
23 dihit AD.7.16.b Pemasangan 1 m’ pipa Alderon diameter 3/4” m¹ 66,355.72
24 dihit AD.7.17 (K3) Pemasangan 1 buah MCB (16 A) buah 690,969.22
25 dihit AD.7.18 Pemasangan Lampu Led strip buah 209,158.04
26 dihit AD.7.19 Pemasangan box panel 80 x 100cm 1 unit (Panel SDP 1 Gedung Utama) buah 15,321,655.62
27 dihit AD.7.19.a Pemasangan box panel 60 x 80cm 1 unit (Panel SDP 1 Gedung Utama) buah 9,795,771.30
28 dihit AD.7.19.b Pemasangan box panel 50 x 70cm 1 unit (Panel SDP 2 Gedung Utama) buah 12,791,331.78
29 dihit AD.7.20 Pasang Saklar Tunggal Panasonic buah 51,857.11
30 dihit AD.7.20.a Pasang Lampu Downlight Philips buah 124,915.42
31 dihit AD.7.20.b Pasang Saklar Ganda Panasonic buah 94,118.23
32 dihit AD.7.20.c Pasang Saklar Triple Panasonic buah 132,007.51
33 dihit AD.7.20.d Pasang Stop Kontak 2 gang Panasonic buah 192,727.51
34 dihit AD.7.20.e Pasang Stop Kontak lantai Panasonic buah 537,617.11
35 dihit AD.7.20.f 1 m' memasang kabel LVTC 3 x 70 m¹ 123,825.65
36 dihit AD.7.21 Penambahan daya dari 11 KVA ke 105 KVA buah 141,560,432.86
37 dihit AD.7.22 Pemasangan 1 buah Reservoir fibreglass vol 1.5 m3 (Roof tank) buah 4,809,959.53
38 dihit AD.7.22.a Pemasangan 1 buah Reservoir fibreglass vol 2m3 (Roof tank) buah 4,474,461.29
39 dihit AD.7.23 Pemasangan 1 buah Pompa Shimizu 130 PS buah 2,052,605.10
40 dihit AD.7.23.a Pemasangan 1 buah Pompa Shimizu 230 PS buah 2,528,649.90
41 dihit AD.7.23.b Pemasangan 1 buah Heater Ariston 30 ltr buah 5,669,185.45
42 dihit AD.7.23.c (K3) Pemasangan 1 buah Contactor Pump buah 854,292.53
43 dihit AD.7.24 Pemasangan 1 m' Rangka Drop Plafon m¹ 84,655.50
44 dihit AD.7.24.a Pemasangan 1 m' Rangka Cove Lamp m¹ 141,344.00
45 dihit AD.7.24.b Pemasangan Cove curtain plywood buah 251,517.04
46 dihit AD.7.24.c Pemasangan Cove lamp buah 234,416.78
47 dihit AD.7.24.d Pemasangan Shadowline buah 127,167.87
48 dihit AD.7.24.e Pemasangan Nat tali air buah 122,248.43
49 dihit AD.7.24.f Pemasangan 1 m' gypsum drop m¹ 32,580.65
50 dihit AD.7.25 Pemasangan 1 m2 Rockwool m2 146,028.89
51 dihit AD.7.26 Pekerjaan Compund Tembok Baru dan Lama buah 24,802.28
52 dihit AD.7.27 Pemasangan 1 m’ pipa Air, limbah jenis pipa tanah diameter 20 cm m¹ 771,189.97
53 dihit AD.7.27.a Pemasangan 1 m’ pipa Air, limbah jenis pipa tanah diameter 16 cm m¹ 517,671.83
54 dihit AD.7.28 Pembuatan 1 m’ nat ornamen garis 1SP : 3PP lebar 0.5 cm m¹ 105,193.87
55 dihit AD.7.29 Pemasangan 1 m2 Dinding Granit 30 x 60 cm m2 554,366.24
56 dihit AD.7.29.a Pemasangan 1m2 lantai Decking Kayu ukuran 15cm x 90cm m2 596,702.49
57 dihit AD.7.29.b Pemasangan 1m2 lantai Tako White ukuran 15cm x 7,5cm m2 679,664.60
58 dihit AD.7.30 Pemasangan 1m2 lantai rubber crumb cat warna standar m2 1,160,601.81
59 dihit AD.7.30.a Pemasangan 1m2 lantai rubber crumb cat warna spesial m2 1,160,601.81
60 dihit AD.7.31 Pemasangan 1m2 Tactile Stainless Steel m2 572,764.00
61 dihit AD.7.31.a Pemasangan 1m2 Tactile Alumunium m2 553,333.00
2
DAFTAR HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA 0
SESUAI PERMEN PUPR NOMOR 1 TAHUN 2022 1
(Sudah termasuk overhead dan profit, belum termasuk PPN) 9

HARGA SATUAN (
(Rp) 2
No KODE ANALISA URAIAN PEKERJAAN SATUAN
)
2021 (2) /
2
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
0
1 A.2.2.1.1. (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter m' 288,242.00 2
2 A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter m2 955,465.00 0
3 A.2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank m' 97,235.00
4 A.2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran m2 2,599,616.00 (
5 A.2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu ) m2 2,894,196.00 1
)
6 A.2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan m2 2,431,140.00
7 A.2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja m2 2,500,371.00
8 A.2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan m2 19,374.00
9 A.2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu m2 445,052.00
10 A.2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x 50cm x 25cm buah 147,348.00
11 A.2.2.1.12. Pembuatan 1 m2 jalan sementara m2 220,880.00
12 A.2.2.1.13. Pembongkaran 1 m3 beton bertulang m3 319,731.00
13 A.2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm m2 16,868.00

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1. Menggali 1 m3 tanah biasa sedalam 1 m m3 85,032.00
2 A.2.3.1.2. Menggali 1 m3 tanah biasa sedalam 2 m m3 104,622.00
3 A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m m3 124,557.00
4 A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m m3 113,147.00
5 A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m m3 171,788.00
6 A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m m3 136,913.00
7 A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter m2 6,242.00
8 A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter m3 37,242.00
9 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah (1/3 Galian; Tanah Biasa Sedalam 1 M) m3 28,344.00
10 A.2.3.1.10.a (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) manual m3 62,429.00
11 A.2.3.1.10.b Pemadatan tanah 1 m3 tanah ( per 20 cm) dengan stamper m3 67,127.00
12 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 382,463.00
13 A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL m3 487,558.00
14 A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan m2 58,804.00
15 A.2.3.1.14. Pengurugan 1 m3 sirtu padat (tanpa alat pemadat) m3 363,960.00

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP m3 1,377,049.00
2 A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP m3 1,329,035.00
3 A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP m3 1,295,704.00
4 A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP m3 1,272,292.00
5 A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP m3 1,240,152.00
6 A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP m3 1,055,634.00
7 A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP m3 1,203,774.00
8 A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP m3 1,179,132.00
9 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 861,516.00
(K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan
10 A.3.2.1.10. m3 3,126,673.00
40% batu belah
11 A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm m3 1,261,883.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


Membuat 1 m3 beton mutu fc' = 7,4 MPa (K 100) manual slump (12± 2) cm w/c =
1 A.4.1.1.1 m3 1,199,652.00
0,87
Membuat 1 m3 beton mutu fc’= 9,8 MPa (K 125) manual slump (12± 2) cm w/c =
2 A.4.1.1.2 m3 1,239,330.00
0,87
Membuat 1 m3 beton mutu fc’= 12,2 MPa (K 150) manual slump (12± 2) cm w/c =
3 A.4.1.1.3 m3 1,269,881.00
0,87
Membuat 1 m3 lantai kerja beton mutu fc' = 7,4 MPa (K 100), slump (3-6) cm, w/c =
4 A.4.1.1.4 m3 1,188,399.00
087 (manual)
Membuat 1 m3 beton mutu fc’ = 14.5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
5 A.4.1.1.5. m3 1,306,572.00
(manual)
Membuat 1 m3 beton mutu fc’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
6 A.4.1.1.6 m3 1,340,832.00
(manual)
Membuat 1 m3 beton mutu fc’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c =
7 A.4.1.1.7. m3 1,367,813.00
0,58 (manual)
Membuat 1 m3 beton mutu fc’= 21.7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
8 A.4.1.1.8. m3 1,384,049.00
(manual)
9 A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox - 100 m3 1,318,755.00
10 A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm m' 108,747.00
11 A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm m' 147,310.00
12 A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm - 320 mm m' 257,265.00
13 A.4.1.1.17.a Pembesian 1 kg dengan besi tulangan polos kg 17,181.00
14 A.4.1.1.17.b Pembesian 1 kg dengan besi tulangan ulir kg 16,289.00
15 A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) 10 kg 320,954.00
16 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi m2 212,752.00
17 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof m2 225,503.00
18 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom m2 457,809.00
19 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok m2 496,062.00
20 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai m2 541,273.00
21 A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding m2 566,781.00
22 A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga m2 444,025.00
23 A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton m2 117,750.00
24 A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm (termasuk bekisting) m' 173,125.00
25 A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm (termasuk bekisting) m' 147,819.00

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


(K3) Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump
1 A.4.1.2.1. m2 37,731,295.00
(120±20)mm
(K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump
2 A.4.1.2.2. m2 47,164,134.00
(120±20)mm
(K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump
3 A.4.1.2.3. m2 56,596,857.00
(120±20)mm
(K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump
4 A.4.1.2.4. m2 70,746,213.00
(120±20)mm
5 A.4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak m2 166,984.00
6 A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak m2 56,144.00
7 A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak m2 51,681.00
8 A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak buah 9,084.00
9 A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak buah 14,638.00
10 A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak buah 11,861.00
11 A.4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak buah 76,526.00
12 A.4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak buah 78,626.00
13 A.4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak buah 70,879.00
14 A.4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m) buah 94,625.00
15 A.4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak titik 68,636.00
16 A.4.1.2.23. Pemasangan 1 titik Bekisting join pracetak titik 159,033.00
17 A.4.1.2.24. Upah 1 titik Join dengan Sling titik 87,141.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


1 A.4.2.1.1. Pemasangan 1 kg besi profil kg 39,531.00
2 A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF kg 39,531.00
3 A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan 100 kg 46,637.00
4 A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku m2 4,470,198.00
5 A.4.2.1.5. Pengerjaan 1 cm pengelasan dengan las listrik Cm 1,168.40
6 A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube/Pipa kotak (25 x 5) cm m2 3,863,805.00
7 A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi m2 620,616.00
8 A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC m2 185,996.00
9 A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium m2 558,076.00
10 A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium m2 756,678.00
11 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium 3" warna Natural / Silver m' 163,424.00
12 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm m2 788,091.00
13 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium m2 287,174.00
14 A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan Vertical blinds (mewah) m2 253,994.00
15 A.4.2.1.15. Pemasangan 1 m2 teralis besi strip (2 x 3) mm m2 5,241,134.00
16 A.4.2.1.16. Pemasangan 1 m2 Kawat nyamuk plastik / PVC m2 2,003,704.00
17 A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis m2 521,382.00
18 A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm m' 291,989.00
19 A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm m' 127,435.00
20 A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.0,4 mm, modul 60 x 120 cm, dinding par m2 344,091.00
21 A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.0,4 mm, modul 60 x 60 cm, plafon m2 325,137.00
22 A.4.2.1.22 (K3) Pemasangan 1 m2 atap pelana rangka atap baja canal dingin profil C75 (tebal 1 m2 216,339.00
(K3) Pemasangan 1 m2 atap jurai rangka atap baja canal dingin profil C75 (tebal
23 A.4.2.1.23 m2 223,490.00
1mm)
Pemasangan 1 M2 pasang kuda-kuda baja ringan + reng untuk atap genteng
24 A.4.2.1.24 m2 408,011.00
biasa/metal
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2
1 A.4.4.1.1. m2 336,237.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3
2 A.4.4.1.2. m2 323,350.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4
3 A.4.4.1.3. m2 313,920.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5
4 A.4.4.1.4. m2 310,146.00
PP
Pemasangan 1 m2 dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6
5 A.4.4.1.5. m2 311,196.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP :
6 A.4.4.1.6 m2 296,487.00
3KP : 10PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :
7 A.4.4.1.7 m2 163,001.00
2PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :
8 A.4.4.1.8 m2 156,449.00
3PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran
9 A.4.4.1.9 m2 152,945.00
1SP :4PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5
10 A.4.4.1.10 m2 150,758.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6
11 A.4.4.1.11 m2 149,987.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8
12 A.4.4.1.12 m2 147,454.00
PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :
13 A.4.4.1.13 m2 149,082.00
3KP :10PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM :
14 A.4.4.1.14 m2 131,913.00
1KP :1PP
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM :


15 A.4.4.1.15 m2 134,080.00
1KP :2PP
16 A.4.4.1.16 Pemasangan 1 m2 dinding conblock HB20 campuran 1SP : 3PP m2 518,851.00
17 A.4.4.1.17 Pemasangan 1 m2 dinding conblock HB20 campuran 1SP:4PP m2 522,046.00
18 A.4.4.1.18 Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :3PP m2 390,184.00
19 A.4.4.1.19 Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP m2 394,045.00
20 A.4.4.1.20 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP m2 241,818.00
21 A.4.4.1.21 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :4PP m2 245,306.00
22 A.4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP : 3PP m2 425,914.00
23 A.4.4.1.23 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP : 4PP m2 425,914.00
24 A.4.4.1.24 Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1SP:3PP m2 611,926.00
25 A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai. m2 170,271.00
26 A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai m2 176,138.00

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm. m2 88,110.00
2 A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. m2 81,141.00
3 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. m2 78,305.00
4 A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm m2 76,221.00
5 A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm m2 46,364.00
6 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. m2 74,372.00
7 A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm m2 73,958.00
8 A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm m2 73,544.00
9 A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm m2 74,960.00
10 A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm m2 73,650.00
11 A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm m2 108,648.00
12 A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm m2 88,248.00
13 A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. m2 101,973.00
14 A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm m2 100,782.00
15 A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm m2 99,508.00
16 A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm m2 46,364.00
17 A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm m2 76,443.00
18 A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm m2 499,834.00
19 A.4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm m2 473,959.00
20 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP m2 59,242.00
21 A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah m2 34,111.00
22 A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose m2 16,240.00
23 A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. m2 72,240.00
24 A.4.4.2.27. Pemasangan 1 m2 acian. m2 43,855.00
25 A.4.4.2.28. Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP) m2 112,722.00
26 A.4.4.2.29. Pemasangan 1 m2 Acian dengan mortar siap pakai (MSP) m2 45,901.00

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40cm x 40cm m2 415,452.00
2 A.4.4.3.10. Pemasangan 1 m2 lantai ubin granit ukuran 30cm x 30cm m2 525,295.00
3 A.4.4.3.11. Pemasangan 1 m2 lantai ubin teralux ukuran 40cm x 40cm m2 575,072.00
4 A.4.4.3.12. Pemasangan 1 m2 lantai ubin teralux ukuran 30cm x 30cm m2 485,413.00
5 A.4.4.3.13. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 60cm x 60cm m2 448,182.00
6 A.4.4.3.14. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40cm x 40cm m2 508,044.00
7 A.4.4.3.15. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30cm x 30cm m2 670,285.00
8 A.4.4.3.17. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm m' 52,649.00
9 A.4.4.3.18. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm m' 46,773.00
10 A.4.4.3.24. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm m' 125,997.00
11 A.4.4.3.25. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm m' 41,456.00
12 A.4.4.3.26. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm m' 83,748.00
13 A.4.4.3.27. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm m' 98,042.00
14 A.4.4.3.28. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm m' 64,549.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

15 A.4.4.3.29. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm m' 80,943.00
16 A.4.4.3.30. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm m' 95,898.00
17 A.4.4.3.31. Pemasangan 1 m2 lantai teraso cor di tempat, tebal 3cm m2 87,154.00
18 A.4.4.3.32. Pemasangan 1 m2 lantai keramik artistik 10cm x 20cm (Setara Roman) m2 338,870.00
Pemasangan 1 m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm (Setara
19 A.4.4.3.33. m2 811,945.00
Roman)
Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm (putih) (Setara Mulia, Asia
20 A.4.4.3.35. m2 232,409.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm (putih) (Setara Mulia, Asia
21 A.4.4.3.36. m2 180,940.00
Tile, KIA)
22 A.4.4.3.37. Pemasangan 1 m2 Lantai keramik ukuran 10cm x 40 cm untuk variasi/border m2 1,029,568.00
23 A.4.4.3.38. Pemasangan 1 m2 lantai keramik mozaik ukuran 30cm x 30cm m2 361,303.00
24 A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm m' 86,385.00
25 A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm m' 112,667.00
26 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m' 52,527.00
27 A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm m' 283,349.00
28 A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm m2 1,454,124.00
29 A.4.4.3.44. Pemasangan 1 m2 lantai karpet m2 75,045.00
30 A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet) m2 109,776.00
31 A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu m2 449,369.00
32 A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor m2 542,492.00
33 A.4.4.3.48. Pemasangan 1 m2 dinding porslen 11cm x 11cm m2 300,782.00
34 A.4.4.3.49. Pemasangan 1 m2 dinding porslen 10cm x 20cm m2 337,845.00
35 A.4.4.3.50. Pemasangan 1 m2 dinding porslen 20cm x 20cm (putih) m2 304,355.00
36 A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm (Setara Roman) m2 367,841.00
37 A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm (Setara Roman) m2 825,733.00
38 A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10cm x 20cm (Setara Milan, Roman, KIA) m2 336,267.00
39 A.4.4.3.54. Pemasangan 1 m2 dinding keramik artistik 20cm x 20cm (Setara Roman) m2 352,558.00
40 A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100cm x 100cm m2 1,656,603.00
41 A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm m2 502,783.00
42 A.4.4.3.57. Pemasangan 1 m2 dinding batu paras m2 306,426.00
43 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam m2 339,154.00
44 A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm m2 2,034,783.00
45 A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm m2 195,483.00
46 A.4.4.3.61. Pemasangan 1 m2 floor harderner m2 53,762.00
47 A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm m' 589,114.00
48 A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm m' 78,453.00
Pemasangan 1 m2 paving block natural tebal 6 cm (K.250)(alas dengan pasir
49 A.4.4.3.64. m2 242,173.00
muntilan)
Pemasangan 1 m2 paving block berwarna tebal 6 cm (K.250)(alas dengan pasir
50 A.4.4.3.66. m2 289,394.00
muntilan)

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


1 A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm m2 165,692.00
2 A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm m2 339,641.00
3 A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm m2 248,439.00
4 A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm m2 128,381.00
Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm &
5 A.4.5.1.5. m2 54,619.00
6 mm
6 A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm m2 445,172.00
Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9
7 A.4.5.1.7. m2 45,802.00
mm
Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka
8 A.4.5.1.8. m2 4,772,150.00
alluminium
9 A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil m2 18,987.00
10 A.4.5.1.10. Pemasangan 1 m2 Plafond PVC m2 263,534.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil m2 74,663.00
2 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur m2 249,307.00
3 A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super m2 69,636.00
4 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong m2 157,225.00
5 A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur m2 169,369.00
6 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar m2 145,384.00
7 A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90x180 m2 73,800.00
8 A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm m2 114,877.00
9 A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm m2 102,733.00
10 A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm m2 96,613.00
11 A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm m2 85,319.00
12 A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm m2 68,409.00
13 A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm m2 74,550.00
14 A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm m2 67,551.00
15 A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm m2 66,072.00
16 A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm m2 70,139.00
17 A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm m2 86,813.00
18 A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm m2 81,919.00
19 A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm m2 100,074.00
20 A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm m2 79,430.00
21 A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm m2 84,227.00
22 A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92m m2 196,233.00
23 A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05m m' 179,839.00
24 A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08m m' 174,374.00
25 A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92m m' 138,549.00
26 A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05m m' 129,198.00
27 A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08m m' 129,198.00
28 A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92m m' 143,769.00
29 A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05m m' 123,855.00
30 A.4.5.2.30. Pemasangan 1 m2 genteng beton m2 149,299.00
31 A.4.5.2.31. Pemasangan 1 m2 genteng aspal (Onduvilla,106Cm x 40Cm x 3mm) m2 302,451.00
32 A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana m2 117,300.00
33 A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap Jurai m2 159,804.00
34 A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu m2 165,023.00
35 A.4.5.2.35. Pemasangan 1 m’ nok genteng beton m' 257,273.00
36 A.4.5.2.36. Pemasangan 1 m’ nok genteng aspal m' 255,956.00
37 A.4.5.2.37. Pemasangan 1 m’ nok genteng metal m' 94,059.00
38 A.4.5.2.38. Pemasangan 1 m’ nok sirap m' 75,945.00
39 A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang m2 65,406.00
40 A.4.5.2.40. Pemasangan 1 m’nok atap seng m' 53,823.00
41 A.4.5.2.41. Pemasangan 1 m2 atap alumunium m' 180,965.00
42 A.4.5.2.42. Pemasangan 1 m’ nok alumunium m' 181,623.00
43 A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation m2 55,859.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

1 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I (jati) m3 31,961,697.00

Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
2 A.4.6.1.2. m3 19,852,686.00
(Bengkirai)

3 A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II (Bengkirai) m2 813,093.00

4 A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III (kruing) m2 595,743.00

5 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II (Bengkirai) m2 1,205,994.00

6 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II (Bengkirai) m2 839,648.00

7 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas II (Bengkirai) m2 1,571,142.00

Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (Lebar
8 A.4.6.1.8. m2 885,846.00
s/d 90 cm)

9 A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas II (Bengkirai) m2 953,001.00

10 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas II (Bengkirai) m2 1,355,939.00


11 A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I (jati) m2 1,228,534.00
Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas III
12 A.4.6.1.12. m2 923,844.00
(kruing)

13 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter m3 17,706,869.00

14 A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I (jati) m3 34,690,761.00


15 A.4.6.1.15. Pemasangan 1 m3 konstruksi gording, kayu kelas II (Bengkirai) m3 16,713,724.00
16 A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II (Bengkirai) m2 2,279,275.00
17 A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas III (kruing) m2 214,074.00
18 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III (kruing) m2 217,386.00
19 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas II (Bengkirai) m' 209,547.00
20 A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas II (Bengkirai) m' 211,254.00

21 A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas III (kruing) m2 333,437.00

22 A.4.6.1.24. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas III (kruing) m2 463,417.00

23 A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas III (kruing) m2 451,550.00

24 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari Kayu Papan kayu kelas II (Bengkirai) m2 458,228.00

25 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm m2 48,388.00
26 A.4.6.1.28. Pemasangan 1 m2 dinding bilik bambu, rangka kayu kelas III (kruing) m2 149,946.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 A.4.6.2.1. Pemasangan 1 buah kunci tanam antik buah 205,430.00
2 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa buah 146,824.00
3 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi buah 126,966.00
4 A.4.6.2.4. Pemasangan 1 buah kunci silinder buah 134,252.00
5 A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 207,112.00
6 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu buah 20,879.00
7 A.4.6.2.7. Pemasangan 1 buah engsel angin buah 70,929.00
8 A.4.6.2.8. Pemasangan 1 buah spring knip buah 59,588.00
9 A.4.6.2.9. Pemasangan 1 buah kait angin buah 45,825.00
10 A.4.6.2.10. Pemasangan 1 buah door closer buah 186,458.00
11 A.4.6.2.11. Pemasangan 1 buah kunci slot buah 57,041.00
12 A.4.6.2.12. Pemasangan 1 buah Door holder buah 229,374.00
13 A.4.6.2.13. Pemasangan 1 buah door stop buah 56,872.00
14 A.4.6.2.14. Pemasangan 1 buah Rel pintu sorong buah 415,521.00
15 A.4.6.2.15. Pemasangan 1 buah kunci lemari buah 61,822.00
16 A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm m2 147,728.00
17 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm m2 201,162.00
18 A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm m2 365,809.00
19 A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm m2 508,244.00
20 A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm m2 159,776.00
21 A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm m2 373,430.00
22 A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm m2 329,307.00

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.1. Pengikisan/pengerokan 1 m2 permukaan cat lama m2 17,937.00
2 A.4.7.1.2. Pencucian 1 m2 bidang permukaan tembok yang pernah dicat m2 17,390.00
3 A.4.7.1.3. Pengerokan 1 m2 karat pada permukaan baja cara manual m2 18,213.00
Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
4 A.4.7.1.4. m2 50,685.00
penutup)
Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat
5 A.4.7.1.5. m2 69,451.00
Penutup)
6 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil m2 35,719.00
7 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 73,373.00
8 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter m2 15,821.00
9 A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis m2 55,457.00
Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
10 A.4.7.1.10. penutup) Interior setara Mowilex (Decorcryl, Dulux Pentalite, Vinilex) m2 68,822.00

Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Interior setara
11 A.4.7.1.11. m2 53,388.00
Mowilex (Decorcryl, Dulux Pentalite, Nippon / Vinilex)
12 A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium m2 10,816.00
13 A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih m2 21,945.00
14 A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) m2 13,064.00
15 A.4.7.1.15. Pemasangan 1 m2 wallpaper minimalis (motif sederhana) m2 103,320.00
16 A.4.7.1.16. Pengecatan 1 m2 permukaan besi / baja dengan menie besi m2 37,915.00
17 A.4.7.1.17. Pengecatan 1 m2 permukaan besi / baja dengan menie besi dengan perancah m2 68,654.00
18 A.4.7.1.18. Pengecatan 1 m2 permukaan besi / baja galvanis secara manual 4 lapis m2 86,072.00
Pengecatan 1 m2 permukaan besi / baja galvanis secara manual sistem 1 lapis cat
19 A.4.7.1.19. m2 34,297.00
mutakhir
20 A.4.7.1.20. Pengecatan 1 m2 permukaan besi / baja galvanis secara manual sistem 3 lapis m2 197,175.00
Pengecatan 1 m2 permukaan besi / baja galvanis secara semprot sistem 3 lapis cat
21 A.4.7.1.21. m2 171,865.00
mutakhir
22 A.4.7.1.22. Plituran 10 m2 dengan plitur melamic 10 m2 2,585,587.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock (biasa) buah 1,635,743.00
1 A.5.1.1.1.a (K3) Pemasangan 1 buah closet duduk/monoblock (merek toto) buah -
2 A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen (biasa) buah 546,978.00
3 A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso buah 549,620.00
4 A.5.1.1 4. (K3) Pemasangan 1 buah urinoir buah 2,351,979.00
5 A.5.1.1 5. (K3) Pemasangan 1 buah wastafel buah 1,013,984.00
6 A.5.1.1 6. (K3) Pemasangan 1 buah bathcuip porselen buah 4,126,592.00
7 A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 buah 1,778,265.00
8 A.5.1.1 11. Pemasangan 1 buah bak beton volume 1 m3 buah 28,956,392.00
9 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainles steel (kecil) buah 303,999.00
10 A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso buah 1,105,761.00
11 A.5.1.1 14. Pemasangan 1 buah floor drain buah 118,604.00
12 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm buah 557,381.00
13 A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm buah 827,089.00
14 A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm buah 1,006,503.00
15 A.5.1.1 18. Pemasangan 1 m’ pipa galvanis medium A diameter ½” buah 526,051.00
16 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” (Stainles steel) buah 96,937.00
17 A.5.1.1 20. Pemasangan 1 m’ pipa galvanis medium B diameter 3/4” m' 339,155.00
18 A.5.1.1 21. Pemasangan 1 m’ pipa galvanis medium B diameter 1” m' 447,358.00
19 A.5.1.1 22. Pemasangan 1 m’ pipa galvanis medium B diameter 1 ½” m' 689,544.00
20 A.5.1.1 23. Pemasangan 1 m’ pipa galvanis medium B diameter 3” m' 1,191,661.00
21 A.5.1.1 24. Pemasangan 1 m’ pipa galvanis medium B diameter 4” m' 1,506,433.00
22 A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” m' 76,469.00
23 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m' 92,754.00
24 A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” m' 111,584.00
25 A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” m' 199,796.00
26 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m' 219,590.00
27 A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” m' 298,664.00
28 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” m' 399,162.00
29 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m' 645,078.00
30 A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 20 cm m' 771,189.00
31 A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 16 cm m' 458,616.00
32 A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 - 20 cm m' 195,916.00
33 A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 - 100 cm m' 782,686.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DILUAR GEDUNG


1 A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC AW Ø 63 mm m' 142,546.00
2 A.8.4.1.2 (K3) Pemasangan 1 m pipa PVC AW Ø 90 mm m' 253,292.00
3 A.8.4.1.3 (K3) Pemasangan 1 m pipa PVC AW Ø 110 mm m' 408,188.00
4 A.8.4.1.4 (K3) Pemasangan 1 m pipa PVC AW Ø 160 mm m' 248,180.00
5 A.8.4.1.5 (K3) Pemasangan 1 m pipa PVC AW Ø 200 mm m' 1,205,790.00
6 A.8.4.1.6 (K3) Pemasangan 1 m pipa PVC AW Ø 250 mm m' 1,866,913.00
7 A.8.4.1.7 (K3) Pemasangan 1 m pipa PVC AW Ø 315 mm m' 2,786,103.00
8 A.8.4.1.8 (K3) Pemasangan 1 m pipa PVC AW Ø 400 mm m' 4,545,438.00
9 A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm m' 103,687.00
10 A.8.4.1.18 (K3) Pemasangan 1 m pipa HDPE Ø 110 mm m' 273,101.00
11 A.8.4.1.19 (K3) Pemasangan 1 m pipa HDPE Ø 125 mm m' 333,253.00
12 A.8.4.1.20 (K3) Pemasangan 1 m pipa HDPE Ø 160 mm m' 509,129.00
13 A.8.4.1.21 (K3) Pemasangan 1 m pipa HDPE Ø 200 mm m' 863,164.00
14 A.8.4.1.22 (K3) Pemasangan 1 m pipa HDPE Ø 250 mm m' 1,286,064.00
15 A.8.4.1.23 (K3) Pemasangan 1 m pipa HDPE Ø 315 mm m' 2,146,000.00
16 A.8.4.1.24 (K3) Pemasangan 1 m pipa HDPE Ø 400 mm m' 3,534,015.00
17 A.8.4.1.25 (K3) Pemasangan 1 m pipa HDPE Ø 450 mm m' 4,802,332.00
18 A.8.4.1.26 (K3) Pemasangan 1 m pipa HDPE Ø 500 mm m' 6,484,011.00
19 A.8.4.1.27 (K3) Pemasangan 1 m pipa HDPE Ø 630 mm m' 9,937,720.00
20 A.8.4.1.28 (K3) Pemasangan 1 m pipa HDPE Ø 800 mm m' 21,922,537.00
21 A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP Ø 63 mm m' 1,312,667.00
22 A.8.4.1.34 (K3) Pemasangan 1 m pipa GIP Ø 90 mm m' 1,444,978.00
23 A.8.4.1.35 (K3) Pemasangan 1 m pipa GIP Ø 110 mm m' 2,274,084.00
24 A.8.4.1.36 (K3) Pemasangan 1 m pipa GIP Ø 160 mm m' 3,038,346.00
25 A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP Ø 200 mm m' 5,778,668.00
26 A.8.4.1.64 (K3) Pemasangan 1 m pipa baja Ø 63 mm m' 250,161.00
27 A.8.4.1.65 (K3) Pemasangan 1 m pipa baja Ø 100 mm m' 502,839.00
28 A.8.4.1.66 (K3) Pemasangan 1 m pipa baja Ø 125 mm m' 762,576.00
29 A.8.4.1.67 (K3) Pemasangan 1 m pipa baja Ø 150 mm m' 828,879.00
30 A.8.4.1.68 (K3) Pemasangan 1 m pipa baja Ø 200 mm m' 1,333,405.00
31 A.8.4.1.75 (K3) Pemasangan 1 m pipa baja Ø 800 mm m' 2,270,565.00
32 A.8.4.1.76 (K3) Pemasangan 1 m pipa baja Ø 900 mm m' 2,703,114.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA


1 A.8.4.2.1 (K3) Pemotongan 1 buah pipa PVC Ø 63 mm buah 1,024.00
2 A.8.4.2.2 (K3) Pemotongan 1 buah pipa PVC Ø 90 mm buah 2,779.00
3 A.8.4.2.3 (K3) Pemotongan 1 buah pipa PVC Ø 110 mm buah 4,372.00
4 A.8.4.2.4 (K3) Pemotongan 1 buah pipa PVC Ø 160 mm buah 6,073.00
5 A.8.4.2.5 (K3) Pemotongan 1 buah pipa PVC Ø 200 mm buah 16,377.00
6 A.8.4.2.6 (K3) Pemotongan 1 buah pipa PVC Ø 250 mm buah 26,179.00
7 A.8.4.2.7 (K3) Pemotongan 1 buah pipa PVC Ø 315 mm buah 31,530.00
8 A.8.4.2.8 (K3) Pemotongan 1 buah pipa PVC Ø 400 mm buah 68,000.00
9 A.8.4.2.17 (K3) Pemotongan 1 buah pipa HDPE Ø 63 mm buah 5,857.00
10 A.8.4.2.18 (K3) Pemotongan 1 buah pipa HDPE Ø 100 mm buah 11,140.00
11 A.8.4.2.19 (K3) Pemotongan 1 buah pipa HDPE Ø 125 mm buah 14,886.00
12 A.8.4.2.20 (K3) Pemotongan 1 buah pipa HDPE Ø 150 mm buah 20,279.00
13 A.8.4.2.21 (K3) Pemotongan 1 buah pipa HDPE Ø 200 mm buah 34,595.00
14 A.8.4.2.22 (K3) Pemotongan 1 buah pipa HDPE Ø 250 mm buah 47,221.00
15 A.8.4.2.23 (K3) Pemotongan 1 buah pipa HDPE Ø 300 mm buah 60,267.00
16 A.8.4.2.24 (K3) Pemotongan 1 buah pipa HDPE Ø 400 mm buah 99,265.00
17 A.8.4.2.25 (K3) Pemotongan 1 buah pipa HDPE Ø 450 mm buah 120,954.00
18 A.8.4.2.26 (K3) Pemotongan 1 buah pipa HDPE Ø 500 mm buah 143,214.00
19 A.8.4.2.27 (K3) Pemotongan 1 buah pipa HDPE Ø 600 mm buah 172,018.00
20 A.8.4.2.28 (K3) Pemotongan 1 buah pipa HDPE Ø 800 mm buah 281,058.00
21 A.8.4.2.64 (K3) Pemotongan 1 buah pipa baja Ø 63 mm buah 21,098.00
22 A.8.4.2.65 (K3) Pemotongan 1 buah pipa baja Ø 100 mm buah 30,990.00
23 A.8.4.2.66 (K3) Pemotongan 1 buah pipa baja Ø 125 mm buah 39,321.00
24 A.8.4.2.67 (K3) Pemotongan 1 buah pipa baja Ø 150 mm buah 48,427.00
25 A.8.4.2.68 (K3) Pemotongan 1 buah pipa baja Ø 200 mm buah 99,921.00
26 A.8.4.2.75 (K3) Pemotongan 1 buah pipa baja Ø 800 mm buah 476,073.00
27 A.8.4.2.76 (K3) Pemotongan 1 buah pipa baja Ø 900 mm buah 536,792.00

A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA


1 A.8.4.4.1 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm buah 1,387,968.00
2 A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm buah 1,561,228.00
3 A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm buah 1,994,379.00
4 A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm buah 2,427,530.00

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA


1 A.8.4.5.1 (K3) Pengetesan 1 m pipa Ø 50 mm m' 1,648.00
2 A.8.4.5.2 (K3) Pengetesan 1 m pipa Ø 75 mm m' 1,648.00
3 A.8.4.5.3 (K3) Pengetesan 1 m pipa Ø 100 mm m' 1,648.00
4 A.8.4.5.4 (K3) Pengetesan 1 m pipa Ø 150 mm m' 1,648.00
5 A.8.4.5.5 (K3) Pengetesan 1 m pipa Ø 200 mm m' 1,649.00
6 A.8.4.5.6 (K3) Pengetesan 1 m pipa Ø 250 mm m' 1,649.00
7 A.8.4.5.7 (K3) Pengetesan 1 m pipa Ø 300 mm m' 1,649.00
8 A.8.4.5.8 (K3) Pengetesan 1 m pipa Ø 400 mm m' 1,650.00
9 A.8.4.5.9 (K3) Pengetesan 1 m pipa Ø 500 mm m' 1,651.00
10 A.8.4.5.10 (K3) Pengetesan 1 m pipa Ø 600 mm m' 1,653.00

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL


1 A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (lengkap terpasang dengan fitting keramik) buah 714,310.00
2 A.8.4.6.2 (K3) Pemasangan 1 buah MCB (6 A) buah 597,187.00
ANALISA HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA
SESUAI PERMEN PUPR NOMOR 1 TAHUN 2022

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A.2.2.1.1. (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.020 149,758.00 2,995.16
JUMLAH TENAGA KERJA 67,333.28
B BAHAN -
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.250 14,080.00 17,600.00
Portland cement M.245.a Kg 5.000 1,375.00 6,875.00
Pasir Beton (m3) M.9.c m3 0.005 339,234.40 1,696.17
Koral beton M.11.b m3 0.009 397,760.00 3,579.84
Kayu Sengon (balok) M.28.b m3 0.072 2,059,200.00 148,262.40
Paku 5 cm M.56.d Kg 0.060 21,648.00 1,298.88
Residu M.391 Liter 0.400 10,000.00 4,000.00
JUMLAH HARGA BAHAN 183,312.29
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 250,645.57
E Overhead & Profit 15 % 0.150 37,596.84
F Harga Satuan Pekerjaan (D+E) 288,242.00
-
A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Kayu L.02 OH 0.300 121,674.00 36,502.20
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.020 149,758.00 2,995.16
JUMLAH TENAGA KERJA 60,781.28
B BAHAN -
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.000 14,080.00 14,080.00
Portland cement M.245.a Kg 2.000 1,375.00 2,750.00
Kawat duri M.55.b M’ 25.000 29,920.00 748,000.00
Pasir Beton (m3) M.9.c m3 0.005 339,234.40 1,696.17
Koral bulat M.11.a m3 0.009 248,160.00 2,233.44
Paku 5 cm M.56.d Kg 0.060 21,648.00 1,298.88
JUMLAH HARGA BAHAN 770,058.49
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 830,839.77
E Overhead & Profit 15 % 0.150 124,625.97
F Harga Satuan Pekerjaan (D+E) 955,465.00
-
A.2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Kayu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 23,558.15
B BAHAN -
Kayu Sengon (balok) M.28.b m3 0.012 2,059,200.00 24,710.40
Paku 5 cm M.56.d Kg 0.020 21,648.00 432.96
Kayu Meranti (papan) M.29.b m3 0.007 5,121,600.00 35,851.20
JUMLAH HARGA BAHAN 60,994.56
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 84,552.71
E Overhead & Profit 15 % 0.150 12,682.91
F Harga Satuan Pekerjaan (D+E) 97,235.00
-
A.2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 2.000 93,597.00 187,194.00
Tukang Kayu L.02 OH 2.000 121,674.00 243,348.00
Tukang batu L.02 OH 1.000 121,674.00 121,674.00
Kepala Tukang L.03 OH 0.300 128,226.00 38,467.80
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 598,171.70
B BAHAN -
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.250 14,080.00 17,600.00
Kayu kruing (balok) M.18.a m3 0.180 7,525,000.00 1,354,500.00
Paku 3,5 cm M.56.c Kg 0.080 22,176.00 1,774.08
Besi strip M.46.g Kg 1.100 17,600.00 19,360.00
Portland cement M.245.a Kg 35.000 1,375.00 48,125.00
Pasir Pasang M.8.c m3 0.150 300,000.00 45,000.00
Pasir Beton (m3) M.9.c m3 0.100 339,234.40 33,923.44
Koral beton M.11.b m3 0.150 397,760.00 59,664.00
Bata merah 5 x 11 x 22 cm M.218.a buah 30.000 864.41 25,932.34
Seng plat bjls 30 M.137.g Lembar 0.250 52,800.00 13,200.00
Jendela nako M.351.a buah 0.200 20,697.60 4,139.52
Kaca polos 8 mm M.352.c m2 0.080 264,000.00 21,120.00
Kunci tanam antik M.312.a buah 0.150 91,872.00 13,780.80
Plywood 4 mm (120x240) M.32.a Lembar 0.060 70,752.00 4,245.12
JUMLAH HARGA BAHAN 1,662,364.30
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,260,536.00
E Overhead & Profit 15 % 0.150 339,080.40
F Harga Satuan Pekerjaan (D+E) 2,599,616.00
-
A.2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu ) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang Kayu L.02 OH 1.500 121,674.00 182,511.00
Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 302,829.80
B BAHAN -
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 3.000 14,080.00 42,240.00
Kayu kruing (balok) M.18.a m3 0.276 7,525,000.00 2,076,900.00
Paku 3,5 cm M.56.c Kg 0.700 22,176.00 15,523.20
Seng gelombang bjls 28 M.137.c Lembar 1.500 52,800.00 79,200.00
JUMLAH HARGA BAHAN 2,213,863.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,516,693.00
E Overhead & Profit 15 % 0.150 377,503.95
F Harga Satuan Pekerjaan (D+E) 2,894,196.00
-
A.2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang Kayu L.02 OH 2.000 121,674.00 243,348.00
Kepala Tukang L.03 OH 0.200 128,226.00 25,645.20
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 370,078.10
B BAHAN -
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.700 14,080.00 23,936.00
Kayu kruing (balok) M.18.a m3 0.210 7,525,000.00 1,580,250.00
Paku 3,5 cm M.56.c Kg 0.300 22,176.00 6,652.80
Portland cement M.245.a Kg 10.500 1,375.00 14,437.50
Pasir Beton (m3) M.9.c m3 0.030 339,234.40 10,177.03
Koral beton M.11.b m3 0.050 397,760.00 19,888.00
Seng gelombang bljs 30 M.137.b Lembar 1.500 51,744.00 77,616.00
Seng plat bjls 28 M.137.f Lembar 0.250 44,000.00 11,000.00
JUMLAH HARGA BAHAN 1,743,957.33
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,114,035.43
E Overhead & Profit 15 % 0.150 317,105.31
F Harga Satuan Pekerjaan (D+E) 2,431,140.00
-
A.2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang Kayu L.02 OH 2.000 121,674.00 243,348.00
Kepala Tukang L.03 OH 0.200 128,226.00 25,645.20
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 370,078.10
B BAHAN -
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.250 14,080.00 17,600.00
Kayu kruing (balok) M.18.a m3 0.186 7,525,000.00 1,399,650.00
Paku 3,5 cm M.56.c Kg 0.300 22,176.00 6,652.80
Portland cement M.245.a Kg 18.000 1,375.00 24,750.00
Pasir Beton (m3) M.9.c m3 0.030 339,234.40 10,177.03
Koral beton M.11.b m3 0.050 397,760.00 19,888.00
Seng gelombang 3"-5" M.137.a Lembar 1.500 116,160.00 174,240.00
Teakwood 4 mm (120x240) M.31.b Lembar 1.350 112,000.00 151,200.00
JUMLAH HARGA BAHAN 1,804,157.83
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,174,235.93
E Overhead & Profit 15 % 0.150 326,135.39
F Harga Satuan Pekerjaan (D+E) 2,500,371.00
-
A.2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 16,847.60
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,847.60
E Overhead & Profit 15 % 0.150 2,527.14
F Harga Satuan Pekerjaan (D+E) 19,374.00
-
A.2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang Kayu L.02 OH 2.000 121,674.00 243,348.00
Kepala Tukang L.03 OH 0.200 128,226.00 25,645.20
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 370,078.10
B BAHAN -
Bambu Ø 6 - 8 cm, panjang 400 cm M.23.a Batang 1.250 11,968.00 14,960.00
Tali ijuk M.556 kg 0.186 10,560.00 1,964.16
JUMLAH HARGA BAHAN 16,924.16
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 387,002.26
E Overhead & Profit 15 % 0.150 58,050.34
F Harga Satuan Pekerjaan (D+E) 445,052.00
-
A.2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang Kayu L.02 OH 0.300 121,674.00 36,502.20
Kepala Tukang L.03 OH 0.030 128,226.00 3,846.78
JUMLAH TENAGA KERJA 40,348.98
B BAHAN -
Kayu Sengon (papan) M.28.a m3 0.013 2,217,600.00 28,828.80
Kayu meranti (balok) M.29.a m3 0.013 4,488,000.00 57,177.12
Paku 3,5 cm M.56.c kg 0.080 22,176.00 1,774.08
JUMLAH HARGA BAHAN 87,780.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 128,128.98
E Overhead & Profit 15 % 0.150 19,219.35
F Harga Satuan Pekerjaan (D+E) 147,348.00
-
A.2.2.1.12. Pembuatan 1 m2 jalan sementara -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 94,345.79
B BAHAN -
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 0.150 418,880.00 62,832.00
Batu pecah 5-7 M.10.e m3 0.090 350,000.00 31,500.00
Pasir Beton (m3) M.9.c m3 0.010 339,234.40 3,392.34
JUMLAH HARGA BAHAN 97,724.34
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 192,070.13
E Overhead & Profit 15 % 0.150 28,810.52
F Harga Satuan Pekerjaan (D+E) 220,880.00
-
A.2.2.1.13. Pembongkaran 1 m3 beton bertulang -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.905 93,597.00 178,288.91
Mandor L.04 OH 0.666 149,758.00 99,738.83
JUMLAH TENAGA KERJA 278,027.74
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 278,027.74
E Overhead & Profit 15 % 0.150 41,704.16
F Harga Satuan Pekerjaan (D+E) 319,731.00
-
A.2.2.1.14. Pembongkaran 1 m3 dinding tembok bata -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 6.667 93,597.00 624,011.20
Mandor L.04 OH 0.333 149,758.00 49,869.41
JUMLAH TENAGA KERJA 673,880.61
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 673,880.61
E Overhead & Profit 15 % 0.150 101,082.09
F Harga Satuan Pekerjaan (D+E) 774,962.00
-
A.2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.042 93,597.00 3,931.07
Tukang Kayu L.02 OH 0.004 121,674.00 486.70
Kepala Tukang L.03 OH 0.002 128,226.00 256.45
Mandor L.04 OH 0.042 149,758.00 6,289.84
JUMLAH TENAGA KERJA 10,964.06
B BAHAN -
Jaring Kawat galvanis Ø 3mm, 1.2x2.4cm M.48.b Lembar 0.143 25,833.33 3,704.50
JUMLAH HARGA BAHAN 3,704.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 14,668.56
E Overhead & Profit 15 % 0.150 2,200.28
F Harga Satuan Pekerjaan (D+E) 16,868.00
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH -
A.2.3.1.1. Menggali 1 m3 tanah biasa sedalam 1 m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.750 93,597.00 70,197.75
Mandor L.04 OH 0.025 149,758.00 3,743.95
JUMLAH TENAGA KERJA 73,941.70
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 73,941.70
E Overhead & Profit 15 % 0.150 11,091.26
F Harga Satuan Pekerjaan (D+E) 85,032.00
-
A.2.3.1.2. Menggali 1 m3 tanah biasa sedalam 2 m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 90,976.41
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 90,976.41
E Overhead & Profit 15 % 0.150 13,646.46
F Harga Satuan Pekerjaan (D+E) 104,622.00
-
A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.050 93,597.00 98,276.85
Mandor L.04 OH 0.067 149,758.00 10,033.79
JUMLAH TENAGA KERJA 108,310.64
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 108,310.64
E Overhead & Profit 15 % 0.150 16,246.60
F Harga Satuan Pekerjaan (D+E) 124,557.00
-
A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Mandor L.04 OH 0.032 149,758.00 4,792.26
JUMLAH TENAGA KERJA 98,389.26
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 98,389.26
E Overhead & Profit 15 % 0.150 14,758.39
F Harga Satuan Pekerjaan (D+E) 113,147.00
-
A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.500 93,597.00 140,395.50
Mandor L.04 OH 0.060 149,758.00 8,985.48
JUMLAH TENAGA KERJA 149,380.98
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 149,380.98
E Overhead & Profit 15 % 0.150 22,407.15
F Harga Satuan Pekerjaan (D+E) 171,788.00
-
A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.200 93,597.00 112,316.40
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 119,055.51
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 119,055.51
E Overhead & Profit 15 % 0.150 17,858.33
F Harga Satuan Pekerjaan (D+E) 136,913.00
-
A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 5,428.64
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,428.64
E Overhead & Profit 15 % 0.150 814.30
F Harga Satuan Pekerjaan (D+E) 6,242.00
-
A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.330 93,597.00 30,887.01
Mandor L.04 OH 0.010 149,758.00 1,497.58
JUMLAH TENAGA KERJA 32,384.59
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 32,384.59
E Overhead & Profit 15 % 0.150 4,857.69
F Harga Satuan Pekerjaan (D+E) 37,242.00
-
A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah Tanah Biasa Sedalam 1 M -
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian -

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)

A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Mandor L.04 OH 0.008 149,758.00 1,247.98
JUMLAH TENAGA KERJA 24,647.23
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 24,647.23
E Overhead & Profit 15 % 0.150 3,697.09
F Harga Satuan Pekerjaan (D+E) 28,344.00
-
A.2.3.1.10.a (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) manual -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.500 93,597.00 46,798.50
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 54,286.40
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 54,286.40
E Overhead & Profit 15 % 0.150 8,142.96
F Harga Satuan Pekerjaan (D+E) 62,429.00
-
A.2.3.1.10.b Pemadatan tanah 1 m3 tanah ( per 20 cm) dengan stamper -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.500 93,597.00 46,798.50
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 54,286.40
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Stamper alat 45 hari 0.050 81,713.70 4,085.69
JUMLAH HARGA ALAT 4,085.69
D Jumlah (A+B+C) 58,372.09
E Overhead & Profit 15 % 0.150 8,755.81
F Harga Satuan Pekerjaan (D+E) 67,127.00
-
A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Mandor L.04 OH 0.010 149,758.00 1,497.58
JUMLAH TENAGA KERJA 29,576.68
B BAHAN -
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 1.200 252,500.00 303,000.00
JUMLAH HARGA BAHAN 303,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 332,576.68
E Overhead & Profit 15 % 0.150 49,886.50
F Harga Satuan Pekerjaan (D+E) 382,463.00
-
A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.800 93,597.00 74,877.60
Tukang Kayu L.02 OH 0.400 121,674.00 48,669.60
Kepala Tukang L.03 OH 0.040 128,226.00 5,129.04
Mandor L.04 OH 0.080 149,758.00 11,980.64
JUMLAH TENAGA KERJA 140,656.88
B BAHAN -
Kapur M.563 m3 0.135 277,728.00 37,493.28
Pasir Beton (m3) M.9.c m3 0.400 339,234.40 135,693.76
Tanah liat (quarry - lokasi pekerjaan) M.8.b m3 0.948 116,160.00 110,119.68
JUMLAH HARGA BAHAN 283,306.72
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 423,963.60
E Overhead & Profit 15 % 0.150 63,594.54
F Harga Satuan Pekerjaan (D+E) 487,558.00
-
A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 16,285.92
B BAHAN -
Ijuk M.552.a Kg 6.000 5,808.00 34,848.00
JUMLAH HARGA BAHAN 34,848.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 51,133.92
E Overhead & Profit 15 % 0.150 7,670.09
F Harga Satuan Pekerjaan (D+E) 58,804.00
-
A.2.3.1.14. Pengurugan 1 m3 sirtu padat -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Mandor L.04 OH 0.025 149,758.00 3,743.95
JUMLAH TENAGA KERJA 27,143.20
B BAHAN -
Sirtu (quarry - lokasi pekerjaan) M.5.b m3 1.200 241,120.00 289,344.00
JUMLAH HARGA BAHAN 289,344.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 316,487.20
E Overhead & Profit 15 % 0.150 47,473.08
F Harga Satuan Pekerjaan (D+E) 363,960.00
-
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI -
A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.500 93,597.00 140,395.50
Tukang Batu L.02 OH 0.750 121,674.00 91,255.50
Kepala Tukang L.03 OH 0.075 128,226.00 9,616.95
Mandor L.04 OH 0.075 149,758.00 11,231.85
JUMLAH TENAGA KERJA 252,499.80
B BAHAN -
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 418,880.00 502,656.00
Portland cement M.245.a Kg 202.000 1,375.00 277,750.00
Pasir Beton (m3) M.9.c m3 0.485 339,234.40 164,528.68
JUMLAH HARGA BAHAN 944,934.68
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,197,434.48
E Overhead & Profit 15 % 0.150 179,615.17
F Harga Satuan Pekerjaan (D+E) 1,377,049.00
-
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.500 93,597.00 140,395.50
Tukang Batu L.02 OH 0.750 121,674.00 91,255.50
Kepala Tukang L.03 OH 0.075 128,226.00 9,616.95
Mandor L.04 OH 0.075 149,758.00 11,231.85
JUMLAH TENAGA KERJA 252,499.80
B BAHAN -
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 418,880.00 502,656.00
Portland cement M.245.a Kg 163.000 1,375.00 224,125.00
Pasir Beton (m3) M.9.c m3 0.520 339,234.40 176,401.89
JUMLAH HARGA BAHAN 903,182.89
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,155,682.69
E Overhead & Profit 15 % 0.150 173,352.40
F Harga Satuan Pekerjaan (D+E) 1,329,035.00
-
A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.500 93,597.00 140,395.50
Tukang Batu L.02 OH 0.750 121,674.00 91,255.50
Kepala Tukang L.03 OH 0.075 128,226.00 9,616.95
Mandor L.04 OH 0.075 149,758.00 11,231.85
JUMLAH TENAGA KERJA 252,499.80
B BAHAN -
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 418,880.00 502,656.00
Portland cement M.245.a Kg 136.000 1,375.00 187,000.00
Pasir Beton (m3) M.9.c m3 0.544 339,234.40 184,543.51
JUMLAH HARGA BAHAN 874,199.51
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,126,699.31
E Overhead & Profit 15 % 0.150 169,004.90
F Harga Satuan Pekerjaan (D+E) 1,295,704.00
-
A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.500 93,597.00 140,395.50
Tukang Batu L.02 OH 0.750 121,674.00 91,255.50
Kepala Tukang L.03 OH 0.075 128,226.00 9,616.95
Mandor L.04 OH 0.075 149,758.00 11,231.85
JUMLAH TENAGA KERJA 252,499.80
B BAHAN -
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 418,880.00 502,656.00
Portland cement M.245.a Kg 117.000 1,375.00 160,875.00
Pasir Beton (m3) M.9.c m3 0.561 339,234.40 190,310.50
JUMLAH HARGA BAHAN 853,841.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,106,341.30
E Overhead & Profit 15 % 0.150 165,951.19
F Harga Satuan Pekerjaan (D+E) 1,272,292.00
-
A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.500 93,597.00 140,395.50
Tukang Batu L.02 OH 0.750 121,674.00 91,255.50
Kepala Tukang L.03 OH 0.075 128,226.00 9,616.95
Mandor L.04 OH 0.075 149,758.00 11,231.85
JUMLAH TENAGA KERJA 252,499.80
B BAHAN -
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 418,880.00 502,656.00
Portland cement M.245.a Kg 91.000 1,375.00 125,125.00
Pasir Beton (m3) M.9.c m3 0.584 339,234.40 198,112.89
JUMLAH HARGA BAHAN 825,893.89
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,078,393.69
E Overhead & Profit 15 % 0.150 161,759.05
F Harga Satuan Pekerjaan (D+E) 1,240,152.00
-
A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.500 93,597.00 140,395.50
Tukang Batu L.02 OH 0.750 121,674.00 91,255.50
Kepala Tukang L.03 OH 0.075 128,226.00 9,616.95
Mandor L.04 OH 0.075 149,758.00 11,231.85
JUMLAH TENAGA KERJA 252,499.80
B BAHAN -
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 418,880.00 502,656.00
Kapur M.563 m3 0.170 277,728.00 47,213.76
Portland cement M.245.a Kg 0.170 1,375.00 233.75
Pasir Beton (m3) M.9.c m3 0.340 339,234.40 115,339.70
JUMLAH HARGA BAHAN 665,443.21
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 917,943.01
E Overhead & Profit 15 % 0.150 137,691.45
F Harga Satuan Pekerjaan (D+E) 1,055,634.00
-
A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.500 93,597.00 140,395.50
Tukang Batu L.02 OH 0.750 121,674.00 91,255.50
Kepala Tukang L.03 OH 0.075 128,226.00 9,616.95
Mandor L.04 OH 0.075 149,758.00 11,231.85
JUMLAH TENAGA KERJA 252,499.80
B BAHAN -
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 418,880.00 502,656.00
Portland cement M.245.a Kg 61.000 1,375.00 83,875.00
Kapur M.563 m3 0.147 277,728.00 40,826.02
Pasir Beton (m3) M.9.c m3 0.492 339,234.40 166,903.32
JUMLAH HARGA BAHAN 794,260.34
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,046,760.14
E Overhead & Profit 15 % 0.150 157,014.02
F Harga Satuan Pekerjaan (D+E) 1,203,774.00
-
A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.500 93,597.00 140,395.50
Tukang Batu L.02 OH 0.750 121,674.00 91,255.50
Kepala Tukang L.03 OH 0.075 128,226.00 9,616.95
Mandor L.04 OH 0.075 149,758.00 11,231.85
JUMLAH TENAGA KERJA 252,499.80
B BAHAN -
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 418,880.00 502,656.00
Portland cement M.245.a Kg 41.000 1,375.00 56,375.00
Kapur M.563 m3 0.131 277,728.00 36,382.37
Pasir Beton (m3) M.9.c m3 0.523 339,234.40 177,419.59
JUMLAH HARGA BAHAN 772,832.96
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,025,332.76
E Overhead & Profit 15 % 0.150 153,799.91
F Harga Satuan Pekerjaan (D+E) 1,179,132.00
-
A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.780 93,597.00 73,005.66
Tukang Batu L.02 OH 0.390 121,674.00 47,452.86
Kepala Tukang L.03 OH 0.039 128,226.00 5,000.81
Mandor L.04 OH 0.039 149,758.00 5,840.56
JUMLAH TENAGA KERJA 131,299.90
B BAHAN -
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 418,880.00 502,656.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.432 266,640.00 115,188.48
JUMLAH HARGA BAHAN 617,844.48
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 749,144.38
E Overhead & Profit 15 % 0.150 112,371.66
F Harga Satuan Pekerjaan (D+E) 861,516.00
-
A.3.2.1.10. (K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 3.400 93,597.00 318,229.80
Tukang Batu L.02 OH 0.850 121,674.00 103,422.90
Kepala Tukang L.03 OH 0.085 128,226.00 10,899.21
Mandor L.04 OH 0.170 149,758.00 25,458.86
JUMLAH TENAGA KERJA 458,010.77
B BAHAN -
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 0.480 418,880.00 201,062.40
Portland cement M.245.a Kg 194.000 1,375.00 266,750.00
Pasir Beton (m3) M.9.c m3 0.312 339,234.40 105,841.13
Koral beton M.11.b m3 0.468 397,760.00 186,151.68
Baja tulangan ulir M.46.b Kg 126.000 11,606.20 1,462,380.88
Kawat beton M.54 Kg 1.800 21,472.00 38,649.60
JUMLAH HARGA BAHAN 2,260,835.69
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,718,846.46
E Overhead & Profit 15 % 0.150 407,826.97
F Harga Satuan Pekerjaan (D+E) 3,126,673.00
-
A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 2.400 93,597.00 224,632.80
Tukang Batu L.02 OH 0.800 121,674.00 97,339.20
Kepala Tukang L.03 OH 0.080 128,226.00 10,258.08
Mandor L.04 OH 0.119 149,758.00 17,821.20
JUMLAH TENAGA KERJA 350,051.28
B BAHAN -
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 0.450 418,880.00 188,496.00
Portland cement M.245.a Kg 194.000 1,375.00 266,750.00
Pasir Beton (m3) M.9.c m3 0.312 339,234.40 105,841.13
Koral beton M.11.b m3 0.468 397,760.00 186,151.68
JUMLAH HARGA BAHAN 747,238.81
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,097,290.09
E Overhead & Profit 15 % 0.150 164,593.51
F Harga Satuan Pekerjaan (D+E) 1,261,883.00
-
A.4.1.1 HARGA SATUAN PEKERJAAN BETON -
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) manual -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.650 93,597.00 154,435.05
Tukang Batu L.02 OH 0.275 121,674.00 33,460.35
Kepala Tukang L.03 OH 0.028 128,226.00 3,590.33
Mandor L.04 OH 0.083 149,758.00 12,429.91
JUMLAH TENAGA KERJA 203,915.64
B BAHAN -
Portland cement M.245.a kg 247.000 1,375.00 339,625.00
Pasir Beton M.9.b kg 869.000 226.16 196,529.80
Kerikil M.12 kg 999.000 300.00 299,700.00
Air, M.550.b Liter 215.000 15.84 3,405.60
JUMLAH HARGA BAHAN 839,260.40
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,043,176.04
E Overhead & Profit 15 % 0.150 156,476.41
F Harga Satuan Pekerjaan (D+E) 1,199,652.00
-
A.4.1.1.2 Membuat 1 m3 beton mutu f’= 9,8 MPa (K 125) manual -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.650 93,597.00 154,435.05
Tukang Batu L.02 OH 0.275 121,674.00 33,460.35
Kepala Tukang L.03 OH 0.028 128,226.00 3,590.33
Mandor L.04 OH 0.083 149,758.00 12,429.91
JUMLAH TENAGA KERJA 203,915.64
B BAHAN -
Portland cement M.245.a kg 276.000 1,375.00 379,500.00
Pasir Beton M.9.b kg 828.000 226.16 187,257.39
Kerikil M.12 kg 1,012.00 300.00 303,600.00
Air, M.550.b Liter 215.000 15.84 3,405.60
JUMLAH HARGA BAHAN 873,762.99
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,077,678.63
E Overhead & Profit 15 % 0.150 161,651.79
F Harga Satuan Pekerjaan (D+E) 1,239,330.00
-
A.4.1.1.3 Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150) manual -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.650 93,597.00 154,435.05
Tukang Batu L.02 OH 0.275 121,674.00 33,460.35
Kepala Tukang L.03 OH 0.028 128,226.00 3,590.33
Mandor L.04 OH 0.083 149,758.00 12,429.91
JUMLAH TENAGA KERJA 203,915.64
B BAHAN -
Portland cement M.245.a kg 299.000 1,375.00 411,125.00
Pasir Beton M.9.b kg 799.000 226.16 180,698.86
Kerikil M.12 kg 1,017.00 300.00 305,100.00
Air, M.550.b Liter 215.000 15.84 3,405.60
JUMLAH HARGA BAHAN 900,329.46
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,104,245.10
E Overhead & Profit 15 % 0.150 165,636.76
F Harga Satuan Pekerjaan (D+E) 1,269,881.00
CATATAN -
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 % -
-
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 (manual) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.650 93,597.00 154,435.05
Tukang Batu L.02 OH 0.275 121,674.00 33,460.35
Kepala Tukang L.03 OH 0.028 128,226.00 3,590.33
Mandor L.04 OH 0.083 149,758.00 12,429.91
JUMLAH TENAGA KERJA 203,915.64
B BAHAN -
Portland cement M.245.a kg 230.000 1,375.00 316,250.00
Pasir Beton M.9.b kg 893.000 226.16 201,957.55
Kerikil M.12 kg 1,027.00 300.00 308,100.00
Air, M.550.b Liter 200.000 15.84 3,168.00
JUMLAH HARGA BAHAN 829,475.55
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,033,391.19
E Overhead & Profit 15 % 0.150 155,008.68
F Harga Satuan Pekerjaan (D+E) 1,188,399.00
-
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66 (manual) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.650 93,597.00 154,435.05
Tukang Batu L.02 OH 0.275 121,674.00 33,460.35
Kepala Tukang L.03 OH 0.028 128,226.00 3,590.33
Mandor L.04 OH 0.083 149,758.00 12,429.91
JUMLAH TENAGA KERJA 203,915.64
B BAHAN -
Portland cement M.245.a kg 326.000 1,375.00 448,250.00
Pasir Beton M.9.b kg 760.000 226.16 171,878.76
Kerikil M.12 kg 1,029.00 300.00 308,700.00
Air, M.550.b Liter 215.000 15.84 3,405.60
JUMLAH HARGA BAHAN 932,234.36
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,136,150.00
E Overhead & Profit 15 % 0.150 170,422.50
F Harga Satuan Pekerjaan (D+E) 1,306,572.00
-
A.4.1.1.6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61 (manual) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.650 93,597.00 154,435.05
Tukang Batu L.02 OH 0.275 121,674.00 33,460.35
Kepala Tukang L.03 OH 0.028 128,226.00 3,590.33
Mandor L.04 OH 0.083 149,758.00 12,429.91
JUMLAH TENAGA KERJA 203,915.64
B BAHAN -
Portland cement M.245.a kg 352.000 1,375.00 484,000.00
Pasir Beton M.9.b kg 731.000 226.16 165,320.23
Kerikil M.12 kg 1,031.00 300.00 309,300.00
Air, M.550.b Liter 215.000 15.84 3,405.60
JUMLAH HARGA BAHAN 962,025.83
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,165,941.47
E Overhead & Profit 15 % 0.150 174,891.22
F Harga Satuan Pekerjaan (D+E) 1,340,832.00
-
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58 (manual) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.650 93,597.00 154,435.05
Tukang Batu L.02 OH 0.275 121,674.00 33,460.35
Kepala Tukang L.03 OH 0.028 128,226.00 3,590.33
Mandor L.04 OH 0.083 149,758.00 12,429.91
JUMLAH TENAGA KERJA 203,915.64
B BAHAN -
Portland cement M.245.a kg 371.000 1,375.00 510,125.00
Pasir Beton M.9.b kg 698.000 226.16 157,857.07
Kerikil M.12 kg 1,047.00 300.00 314,100.00
Air, M.550.b Liter 215.000 15.84 3,405.60
JUMLAH HARGA BAHAN 985,487.67
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,189,403.32
E Overhead & Profit 15 % 0.150 178,410.50
F Harga Satuan Pekerjaan (D+E) 1,367,813.00
-
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56 (manual) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.650 93,597.00 154,435.05
Tukang Batu L.02 OH 0.275 121,674.00 33,460.35
Kepala Tukang L.03 OH 0.028 128,226.00 3,590.33
Mandor L.04 OH 0.083 149,758.00 12,429.91
JUMLAH TENAGA KERJA 203,915.64
B BAHAN -
Portland cement M.245.a kg 384.000 1,375.00 528,000.00
Pasir Beton M.9.b kg 692.000 226.16 156,500.14
Kerikil M.12 kg 1,039.00 300.00 311,700.00
Air, M.550.b Liter 215.000 15.84 3,405.60
JUMLAH HARGA BAHAN 999,605.74
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,203,521.38
E Overhead & Profit 15 % 0.150 180,528.21
F Harga Satuan Pekerjaan (D+E) 1,384,049.00
-
A.4.1.1.13 Membuat 1 m3 beton kedap Air, dengan strorox - 100 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 2.100 93,597.00 196,553.70
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.105 149,758.00 15,724.59
JUMLAH TENAGA KERJA 259,352.10
B BAHAN -
Portland cement M.245.a kg 400.000 1,375.00 550,000.00
Pasir Beton (m3) M.9.c m3 0.480 339,234.40 162,832.51
Kerikil M.12 m3 0.800 300.00 240.00
Strorox - 100 M.401 kg 1.200 143,880.00 172,656.00
Air, M.550.b Liter 210.000 15.84 3,326.40
JUMLAH HARGA BAHAN 885,728.51
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,146,743.81
E Overhead & Profit 15 % 0.150 172,011.57
F Harga Satuan Pekerjaan (D+E) 1,318,755.00
-
A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.060 93,597.00 5,615.82
Tukang Pipa L.02 OH 0.030 121,674.00 3,650.22
Kepala Tukang L.03 OH 0.003 128,226.00 384.68
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,099.99
B BAHAN -
Waterstop lebar 150 mm M.381.a m 1.050 80,440.80 84,462.84
JUMLAH HARGA BAHAN 84,462.84
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 94,562.83
E Overhead & Profit 15 % 0.150 14,184.42
F Harga Satuan Pekerjaan (D+E) 108,747.00
-
A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.070 93,597.00 6,551.79
Tukang Pipa L.02 OH 0.035 121,674.00 4,258.59
Kepala Tukang L.03 OH 0.004 128,226.00 512.90
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 12,371.59
B BAHAN -
Waterstop lebar 200 mm M.381.b m 1.050 110,213.41 115,724.08
JUMLAH HARGA BAHAN 115,724.08
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 128,095.67
E Overhead & Profit 15 % 0.150 19,214.35
F Harga Satuan Pekerjaan (D+E) 147,310.00
-
A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm - 320 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.080 93,597.00 7,487.76
Tukang Pipa L.02 OH 0.040 121,674.00 4,866.96
Kepala Tukang L.03 OH 0.004 128,226.00 512.90
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 13,466.66
B BAHAN -
Waterstop lebar 230 mm - 320 mm M.381.c m 1.050 200,230.82 210,242.36
JUMLAH HARGA BAHAN 210,242.36
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 223,709.02
E Overhead & Profit 15 % 0.150 33,556.35
F Harga Satuan Pekerjaan (D+E) 257,265.00
-
A.4.1.1.17.a Pembesian dengan besi tulangan polos -
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA -
1 Pekerja L.01 OH 0.070 93,597.00 6,551.79
2 Tukang Besi L.02 OH 0.070 121,674.00 8,517.18
3 Kepala Tukang L.03 OH 0.007 128,226.00 897.58
4 Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH HARGA TENAGA KERJA 16,565.58
B BAHAN -
1 Baja tulangan polos M.46.a kg 10.500 12,344.68 129,619.17
2 Kawat beton M.54 kg 0.150 21,472.00 3,220.80
JUMLAH HARGA BAHAN 132,839.97
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) Harga per 10 kg 149,405.56
E Harga per 1 kg 14,940.56
F Overhead & Profit 15 % 0.150 2,241.08
G Harga Satuan Pekerjaan (E+F) 17,181.00
-
A.4.1.1.17.b Pembesian dengan besi tulangan ulir -
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA -
1 Pekerja L.01 OH 0.070 93,597.00 6,551.79
2 Tukang Besi L.02 OH 0.070 121,674.00 8,517.18
3 Kepala Tukang L.03 OH 0.007 128,226.00 897.58
4 Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH HARGA TENAGA KERJA 16,565.58
B BAHAN -
1 Baja tulangan ulir M.46.b kg 10.500 11,606.20 121,865.07
2 Kawat beton M.54 kg 0.150 21,472.00 3,220.80
JUMLAH HARGA BAHAN 125,085.87
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) Harga per 10 kg 141,651.46
E Harga per 1 kg 14,165.15
F Overhead & Profit 15 % 0.150 2,124.77
G Harga Satuan Pekerjaan (E+F) 16,289.00
-
A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.025 93,597.00 2,339.93
Tukang Besi L.02 OH 0.025 121,674.00 3,041.85
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 8,737.18
B BAHAN -
Jaring kawat baja dilas M.48.a kg 10.200 26,400.00 269,280.00
Kawat beton M.54 kg 0.050 21,472.00 1,073.60
JUMLAH HARGA BAHAN 270,353.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 279,090.78
E Overhead & Profit 15 % 0.150 41,863.62
F Harga Satuan Pekerjaan (D+E) 320,954.00
-
A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.520 93,597.00 48,670.44
Tukang Kayu L.02 OH 0.260 121,674.00 31,635.24
Kepala Tukang L.03 OH 0.026 128,226.00 3,333.88
Mandor L.04 OH 0.026 149,758.00 3,893.71
JUMLAH TENAGA KERJA 87,533.26
B BAHAN -
Kayu Sengon (papan) M.28.a m3 0.040 2,217,600.00 88,704.00
Paku 7 cm M.56.e kg 0.300 23,232.00 6,969.60
Minyak bekisting M.397 Liter 0.100 17,952.00 1,795.20
JUMLAH HARGA BAHAN 97,468.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 185,002.06
E Overhead & Profit 15 % 0.150 27,750.31
F Harga Satuan Pekerjaan (D+E) 212,752.00
-
A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.520 93,597.00 48,670.44
Tukang Kayu L.02 OH 0.260 121,674.00 31,635.24
Kepala Tukang L.03 OH 0.026 128,226.00 3,333.88
Mandor L.04 OH 0.026 149,758.00 3,893.71
JUMLAH TENAGA KERJA 87,533.26
B BAHAN -
Kayu Sengon (papan) M.28.a m3 0.045 2,217,600.00 99,792.00
Paku 7 cm M.56.e kg 0.300 23,232.00 6,969.60
Minyak bekisting M.397 Liter 0.100 17,952.00 1,795.20
JUMLAH HARGA BAHAN 108,556.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 196,090.06
E Overhead & Profit 15 % 0.150 29,413.51
F Harga Satuan Pekerjaan (D+E) 225,503.00
-
A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.660 93,597.00 61,774.02
Tukang Kayu L.02 OH 0.330 121,674.00 40,152.42
Kepala Tukang L.03 OH 0.033 128,226.00 4,231.46
Mandor L.04 OH 0.033 149,758.00 4,942.01
JUMLAH TENAGA KERJA 111,099.91
B BAHAN -
Kayu Sengon (papan) M.28.a m3 0.040 2,217,600.00 88,704.00
Paku 7 cm M.56.e kg 0.400 23,232.00 9,292.80
Minyak bekisting M.397 Liter 0.200 17,952.00 3,590.40
Balok kayu kelas II M.16.a m3 0.015 11,088,000.00 166,320.00
Plywood 9 mm (120x240) M.32.c Lembar 0.350 100,800.00 35,280.00
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 2.000 14,080.00 28,160.00
JUMLAH HARGA BAHAN 242,643.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 398,095.11
E Overhead & Profit 15 % 0.150 59,714.27
F Harga Satuan Pekerjaan (D+E) 457,809.00
-
A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.660 93,597.00 61,774.02
Tukang Kayu L.02 OH 0.330 121,674.00 40,152.42
Kepala Tukang L.03 OH 0.033 128,226.00 4,231.46
Mandor L.04 OH 0.033 149,758.00 4,942.01
JUMLAH TENAGA KERJA 111,099.91
B BAHAN -
Kayu Sengon (papan) M.28.a m3 0.040 2,217,600.00 88,704.00
Paku 7 cm M.56.e kg 0.400 23,232.00 9,292.80
Minyak bekisting M.397 Liter 0.200 17,952.00 3,590.40
Balok kayu kelas II M.16.a m3 0.018 11,088,000.00 199,584.00
Plywood 9 mm (120x240) M.32.c Lembar 0.350 100,800.00 35,280.00
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 2.000 14,080.00 28,160.00
JUMLAH HARGA BAHAN 275,907.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 431,359.11
E Overhead & Profit 15 % 0.150 64,703.87
F Harga Satuan Pekerjaan (D+E) 496,062.00
-
A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.660 93,597.00 61,774.02
Tukang Kayu L.02 OH 0.330 121,674.00 40,152.42
Kepala Tukang L.03 OH 0.033 128,226.00 4,231.46
Mandor L.04 OH 0.033 149,758.00 4,942.01
JUMLAH TENAGA KERJA 111,099.91
B BAHAN -
Kayu Sengon (papan) M.28.a m3 0.040 2,217,600.00 88,704.00
Paku 7 cm M.56.e kg 0.400 23,232.00 9,292.80
Minyak bekisting M.397 Liter 0.200 17,952.00 3,590.40
Balok kayu kelas II M.16.a m3 0.015 11,088,000.00 166,320.00
Plywood 12 mm (120x240) M.32.d Lembar 0.350 147,250.00 51,537.50
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 6.000 14,080.00 84,480.00
JUMLAH HARGA BAHAN 315,220.70
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 470,672.61
E Overhead & Profit 15 % 0.150 70,600.89
F Harga Satuan Pekerjaan (D+E) 541,273.00
-
A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.660 93,597.00 61,774.02
Tukang Kayu L.02 OH 0.330 121,674.00 40,152.42
Kepala Tukang L.03 OH 0.033 128,226.00 4,231.46
Mandor L.04 OH 0.033 149,758.00 4,942.01
JUMLAH TENAGA KERJA 111,099.91
B BAHAN -
Kayu Sengon (papan) M.28.a m3 0.030 2,217,600.00 66,528.00
Paku 7 cm M.56.e kg 0.400 23,232.00 9,292.80
Minyak bekisting M.397 Liter 0.200 17,952.00 3,590.40
Balok kayu kelas II M.16.a m3 0.020 11,088,000.00 221,760.00
Plywood 9 mm (120x240) M.32.c Lembar 0.350 100,800.00 35,280.00
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 3.000 14,080.00 42,240.00
Formtie/penjaga jarak bekesting/spacer M.253 Buah 4.000 9,081.60 36,326.40
JUMLAH HARGA BAHAN 348,489.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 492,853.51
E Overhead & Profit 15 % 0.150 73,928.03
F Harga Satuan Pekerjaan (D+E) 566,781.00
-
A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.660 93,597.00 61,774.02
Tukang Kayu L.02 OH 0.330 121,674.00 40,152.42
Kepala Tukang L.03 OH 0.033 128,226.00 4,231.46
Mandor L.04 OH 0.033 149,758.00 4,942.01
JUMLAH TENAGA KERJA 111,099.91
B BAHAN -
Kayu Sengon (papan) M.28.a m3 0.030 2,217,600.00 66,528.00
Paku 7 cm M.56.e kg 0.400 23,232.00 9,292.80
Minyak bekisting M.397 Liter 0.150 17,952.00 2,692.80
Balok kayu kelas II M.16.a m3 0.015 11,088,000.00 166,320.00
Plywood 9 mm (120x240) M.32.c Lembar 0.350 100,800.00 35,280.00
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 2.000 14,080.00 28,160.00
JUMLAH HARGA BAHAN 241,745.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 386,109.51
E Overhead & Profit 15 % 0.150 57,916.43
F Harga Satuan Pekerjaan (D+E) 444,025.00
-
A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.050 121,674.00 6,083.70
Kepala Tukang L.03 OH 0.005 128,226.00 641.13
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 21,962.44
B BAHAN -
Kayu Sengon (papan) M.28.a m3 0.026 2,217,600.00 58,544.64
Paku 10 cm M.56.f kg 0.600 24,740.57 14,844.34
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 0.500 14,080.00 7,040.00
JUMLAH HARGA BAHAN 80,428.98
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 102,391.43
E Overhead & Profit 15 % 0.150 15,358.71
F Harga Satuan Pekerjaan (D+E) 117,750.00
-
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm (tulangan pokok 4Ø10, begel Ø6-150 termasuk bekisting) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.180 93,597.00 16,847.46
Tukang batu L.02 OH 0.020 121,674.00 2,433.48
Tukang kayu L.02 OH 0.020 121,674.00 2,433.48
Tukang besi L.02 OH 0.020 121,674.00 2,433.48
Kepala Tukang L.03 OH 0.006 128,226.00 769.36
Mandor L.04 OH 0.009 149,758.00 1,347.82
JUMLAH TENAGA KERJA 26,265.08
B BAHAN -
Kayu kelas III M.18.a m3 0.009 7,525,000.00 66,220.00
Paku 10 Cm M.56.f kg 0.010 24,740.57 247.41
Besi beton polos M.46.a kg 3.000 12,344.68 37,034.05
Kawat beton M.54 kg 0.450 21,472.00 9,662.40
Portland cement M.245.a kg 4.000 1,375.00 5,500.00
Pasir Beton (m3) M.9.c m3 0.006 339,234.40 2,035.41
Koral beton M.11.b m3 0.009 397,760.00 3,579.84
JUMLAH HARGA BAHAN 124,279.10
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 150,544.18
E Overhead & Profit 15 % 0.150 22,581.63
F Harga Satuan Pekerjaan (D+E) 173,125.00
-
A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.297 93,597.00 27,798.31
Tukang batu L.02 OH 0.033 121,674.00 4,015.24
Tukang kayu L.02 OH 0.033 121,674.00 4,015.24
Tukang besi L.02 OH 0.033 121,674.00 4,015.24
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,372.67
B BAHAN -
Kayu kelas III M.18.a m3 0.003 7,525,000.00 22,575.00
Paku 10 Cm M.56.f kg 0.020 24,740.57 494.81
Besi beton polos M.46.a kg 3.600 12,344.68 44,440.86
Kawat beton M.54 kg 0.050 21,472.00 1,073.60
Portland cement M.245.a kg 5.500 1,375.00 7,562.50
Pasir Beton (m3) M.9.c m3 0.009 339,234.40 3,053.11
Koral beton M.11.b m3 0.015 397,760.00 5,966.40
JUMLAH HARGA BAHAN 85,166.28
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 128,538.95
E Overhead & Profit 15 % 0.150 19,280.84
F Harga Satuan Pekerjaan (D+E) 147,819.00
-
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK -
A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.132 93,597.00 12,354.80
Tukang batu L.02 OH 0.022 121,674.00 2,676.83
Kepala Tukang L.03 OH 0.002 128,226.00 256.45
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 16,336.39
B BAHAN -
Portland cement M.245.a Kg 26.080 1,375.00 35,860.00
Pasir beton M.9.b Kg 60.800 226.16 13,750.30
Koral beton (kg) M.11.b Kg 82.320 397,760.00 32,743,603.20
Air, M.550.b Liter 17.200 15.84 272.45
JUMLAH HARGA BAHAN 32,793,485.95
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 32,809,822.34
E Overhead & Profit 15 % 0.150 4,921,473.35
F Harga Satuan Pekerjaan (D+E) 37,731,295.00
-
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.165 93,597.00 15,443.51
Tukang batu L.02 OH 0.028 121,674.00 3,406.87
Kepala Tukang L.03 OH 0.003 128,226.00 384.68
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 20,433.12
B BAHAN -
Portland cement M.245.a Kg 32.600 1,375.00 44,825.00
Pasir beton M.9.b Kg 76.000 226.16 17,187.88
Koral beton (kg) M.11.b Kg 102.900 397,760.00 40,929,504.00
Air, M.550.b Liter 21.500 15.84 340.56
JUMLAH HARGA BAHAN 40,991,857.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,012,290.56
E Overhead & Profit 15 % 0.150 6,151,843.58
F Harga Satuan Pekerjaan (D+E) 47,164,134.00
-
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.198 93,597.00 18,532.21
Tukang batu L.02 OH 0.033 121,674.00 4,015.24
Kepala Tukang L.03 OH 0.003 128,226.00 384.68
Mandor L.04 OH 0.010 149,758.00 1,497.58
JUMLAH TENAGA KERJA 24,429.71
B BAHAN -
Portland cement M.245.a Kg 39.120 1,375.00 53,790.00
Pasir beton M.9.b Kg 91.200 226.16 20,625.45
Koral beton (kg) M.11.b Kg 123.480 397,760.00 49,115,404.80
Air, M.550.b Liter 25.800 15.84 408.67
JUMLAH HARGA BAHAN 49,190,228.92
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 49,214,658.63
E Overhead & Profit 15 % 0.150 7,382,198.79
F Harga Satuan Pekerjaan (D+E) 56,596,857.00
-
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.248 93,597.00 23,212.06
Tukang batu L.02 OH 0.041 121,674.00 4,988.63
Kepala Tukang L.03 OH 0.004 128,226.00 512.90
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 30,660.45
B BAHAN -
Portland cement M.245.a Kg 48.900 1,375.00 67,237.50
Pasir beton M.9.b Kg 114.000 226.16 25,781.81
Koral beton (kg) M.11.b Kg 154.350 397,760.00 61,394,256.00
Air, M.550.b Liter 32.250 15.84 510.84
JUMLAH HARGA BAHAN 61,487,786.15
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 61,518,446.60
E Overhead & Profit 15 % 0.150 9,227,766.99
F Harga Satuan Pekerjaan (D+E) 70,746,213.00
-
A.4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.007 93,597.00 655.18
Tukang batu L.02 OH 0.076 121,674.00 9,247.22
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 11,077.97
B BAHAN -
Lantai kerja tebal 10cm m3 0.008 1,033,391.19 8,267.13
Besi hollow 50.50.3 (Kg) M.47.b Kg 9.394 6,230.40 58,528.38
Kayu kruing (kaso 5x7) M.27.a m3 0.005 5,016,000.00 25,080.00
Phenol film 12mm (1 muka) M.33.a Lembar 0.080 227,040.00 18,163.20
Minyak bekisting M.397 Liter 0.200 17,952.00 3,590.40
Dynabolt dia 12mm (10-15cm) M.75.f buah 3.882 5,280.00 20,496.96
JUMLAH HARGA BAHAN 134,126.07
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 145,204.04
E Overhead & Profit 15 % 0.150 21,780.61
F Harga Satuan Pekerjaan (D+E) 166,984.00
-
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.004 93,597.00 374.39
Tukang batu L.02 OH 0.038 121,674.00 4,623.61
Kepala Tukang L.03 OH 0.004 128,226.00 512.90
Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 5,660.66
B BAHAN -
Kayu kruing (kaso 5x7) M.27.a m3 0.005 5,016,000.00 25,080.00
Phenol film 12mm (1 muka) M.33.a Lembar 0.043 227,040.00 9,762.72
Minyak bekisting M.397 Liter 0.200 17,952.00 3,590.40
Paku 7 cm M.56.e Kg 0.046 23,232.00 1,068.67
Dynabolt dia 12mm (10-15cm) M.75.f buah 0.693 5,280.00 3,659.04
JUMLAH HARGA BAHAN 43,160.83
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 48,821.49
E Overhead & Profit 15 % 0.150 7,323.22
F Harga Satuan Pekerjaan (D+E) 56,144.00
-
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.004 93,597.00 374.39
Tukang batu L.02 OH 0.038 121,674.00 4,623.61
Kepala Tukang L.03 OH 0.004 128,226.00 512.90
Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 5,660.66
B BAHAN -
Kayu kruing (balok) 5/7 M.27.a m3 0.004 5,016,000.00 20,064.00
Phenol film 12mm (1 muka) M.33.a Lembar 0.048 227,040.00 10,897.92
Minyak bekisting M.397 Liter 0.200 17,952.00 3,590.40
Paku 7 cm M.56.e Kg 0.046 23,232.00 1,068.67
Dynabolt dia 12mm (10-15cm) M.75.f buah 0.693 5,280.00 3,659.04
JUMLAH HARGA BAHAN 39,280.03
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 44,940.69
E Overhead & Profit 15 % 0.150 6,741.10
F Harga Satuan Pekerjaan (D+E) 51,681.00
-
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.053 93,597.00 4,960.64
Tukang kayu L.02 OH 0.018 121,674.00 2,190.13
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 7,899.56
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 7,899.56
E Overhead & Profit 15 % 0.150 1,184.93
F Harga Satuan Pekerjaan (D+E) 9,084.00
-
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.089 93,597.00 8,330.13
Tukang kayu L.02 OH 0.030 121,674.00 3,650.22
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 12,729.14
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 12,729.14
E Overhead & Profit 15 % 0.150 1,909.37
F Harga Satuan Pekerjaan (D+E) 14,638.00
-
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.071 93,597.00 6,645.39
Tukang kayu L.02 OH 0.024 121,674.00 2,920.18
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 10,314.35
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 10,314.35
E Overhead & Profit 15 % 0.150 1,547.15
F Harga Satuan Pekerjaan (D+E) 11,861.00
-
A.4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.064 93,597.00 5,990.21
Tukang batu L.02 OH 0.244 121,674.00 29,688.46
Tukang vibrator L.02 OH 0.128 121,674.00 15,574.27
Kepala Tukang L.03 OH 0.034 128,226.00 4,359.68
Mandor L.04 OH 0.073 149,758.00 10,932.33
JUMLAH TENAGA KERJA 66,544.95
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 66,544.95
E Overhead & Profit 15 % 0.150 9,981.74
F Harga Satuan Pekerjaan (D+E) 76,526.00
-
A.4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.069 93,597.00 6,458.19
Tukang batu L.02 OH 0.242 121,674.00 29,445.11
Tukang vibrator L.02 OH 0.138 121,674.00 16,791.01
Kepala Tukang L.03 OH 0.037 128,226.00 4,744.36
Mandor L.04 OH 0.073 149,758.00 10,932.33
JUMLAH TENAGA KERJA 68,371.01
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 68,371.01
E Overhead & Profit 15 % 0.150 10,255.65
F Harga Satuan Pekerjaan (D+E) 78,626.00
-
A.4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.061 93,597.00 5,709.42
Tukang batu L.02 OH 0.213 121,674.00 25,916.56
Tukang vibrator L.02 OH 0.122 121,674.00 14,844.23
Kepala Tukang L.03 OH 0.033 128,226.00 4,231.46
Mandor L.04 OH 0.073 149,758.00 10,932.33
JUMLAH TENAGA KERJA 61,634.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 61,634.00
E Overhead & Profit 15 % 0.150 9,245.10
F Harga Satuan Pekerjaan (D+E) 70,879.00
-
A.4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Operator crane L.06 OH 0.067 93,597.00 6,271.00
Pembantu operator crane L.08 OH 0.067 93,597.00 6,271.00
Pekerja L.01 OH 0.067 93,597.00 6,271.00
Tukang batu L.02 OH 0.067 121,674.00 8,152.16
Tukang ereksi L.02 OH 0.134 121,674.00 16,304.32
Kepala tukang L.03 OH 0.067 128,226.00 8,591.14
Mandor L.04 OH 0.067 149,758.00 10,033.79
JUMLAH TENAGA KERJA 61,894.40
B BAHAN -
###
JUMLAH HARGA BAHAN -
C PERALATAN -
Sewa Crane alat 61 unit hari 0.067 226,285.71 15,161.14
Sewa Pipe Support alat 74 Buah hari 1.100 9,504.00 10,454.40
JUMLAH HARGA ALAT 15,161.14
D Jumlah (A+B+C) 82,282.74
E Overhead & Profit 15 % 0.150 12,342.41
F Harga Satuan Pekerjaan (D+E) 94,625.00
-
A.4.1.2.22. Upah melakukan 1 titik pekerjaan grout pada join pracetak -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang batu L.02 OH 0.367 121,674.00 44,654.36
Kepala Tukang L.03 OH 0.074 128,226.00 9,488.72
Mandor L.04 OH 0.037 149,758.00 5,541.05
JUMLAH TENAGA KERJA 59,684.13
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 59,684.13
E Overhead & Profit 15 % 0.150 8,952.62
F Harga Satuan Pekerjaan (D+E) 68,636.00
-
A.4.1.2.23. Pemasangan 1 titik Bekisting join pracetak -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.147 93,597.00 13,758.76
Tukang kayu L.02 OH 0.147 121,674.00 17,886.08
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 34,317.02
B BAHAN -
Kayu kamper (kaso 5x7) M.26.a m3 0.012 7,200,000.00 86,400.00
Kayu bekisting M.20 m3 0.004 2,860,000.00 11,440.00
Paku 7 cm M.56.e Kg 0.264 23,232.00 6,133.25
JUMLAH HARGA BAHAN 103,973.25
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 138,290.26
E Overhead & Profit 15 % 0.150 20,743.54
F Harga Satuan Pekerjaan (D+E) 159,033.00
-
A.4.1.2.24. Upah 1 titik Join dengan Sling -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.220 93,597.00 20,591.34
Tukang kayu L.02 OH 0.220 121,674.00 26,768.28
Tukang besi L.02 OH 0.220 121,674.00 26,768.28
Mandor L.04 OH 0.011 149,758.00 1,647.34
JUMLAH TENAGA KERJA 75,775.24
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 75,775.24
E Overhead & Profit 15 % 0.150 11,366.29
F Harga Satuan Pekerjaan (D+E) 87,141.00
-
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM -
A.4.2.1.1. Pemasangan 1 kg besi profil -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.060 93,597.00 5,615.82
Tukang Las Konstruksi L.02 OH 0.060 121,674.00 7,300.44
Kepala Tukang L.03 OH 0.006 128,226.00 769.36
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 14,134.89
B BAHAN -
Besi Profil M.46.e Kg 1.150 17,600.00 20,240.00
JUMLAH HARGA BAHAN 20,240.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 34,374.89
E Overhead & Profit 15 % 0.150 5,156.23
F Harga Satuan Pekerjaan (D+E) 39,531.00
-
A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.060 93,597.00 5,615.82
Tukang Las Konstruksi L.02 OH 0.060 121,674.00 7,300.44
Kepala Tukang L.03 OH 0.006 128,226.00 769.36
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 14,134.89
B BAHAN -
Besi IWF M.46.i Kg 1.150 17,600.00 20,240.00
JUMLAH HARGA BAHAN 20,240.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 34,374.89
E Overhead & Profit 15 % 0.150 5,156.23
F Harga Satuan Pekerjaan (D+E) 39,531.00
-
A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Besi Konstruksi L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.001 128,226.00 128.23
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 22,404.12
B BAHAN -
Solar (industri) M.393.a Liter 1.000 11,193.60 11,193.60
Minyak pelumas M.398 Liter 0.100 29,568.00 2,956.80
JUMLAH HARGA BAHAN 14,150.40
C PERALATAN -
Sewa alat las (pek.ringan) alat 56 Jam 0.800 5,000.00 4,000.00
JUMLAH HARGA ALAT 4,000.00
D Jumlah (A+B+C) 40,554.52
E Overhead & Profit 15 % 0.150 6,083.18
F Harga Satuan Pekerjaan (D+E) 46,637.00
-
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.050 93,597.00 98,276.85
Tukang Las Konstruksi L.02 OH 1.050 121,674.00 127,757.70
Kepala Tukang L.03 OH 0.105 128,226.00 13,463.73
Mandor L.04 OH 0.052 149,758.00 7,787.42
JUMLAH TENAGA KERJA 247,285.70
B BAHAN -
Besi siku L 30.30.3 M.46.f Kg 15.000 17,600.00 264,000.00
Besi plat baja M.46.b Kg 32.800 11,606.20 380,683.28
Pengerjaan 1 cm pengelasan dengan las listrik L.04 cm 20.000 149,758.00 2,995,160.00
JUMLAH HARGA BAHAN 3,639,843.28
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,887,128.97
E Overhead & Profit 15 % 0.150 583,069.35
F Harga Satuan Pekerjaan (D+E) 4,470,198.00
-
A.4.2.1.5. Pengerjaan 1 cm pengelasan dengan las listrik -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.040 93,597.00 3,743.88
Tukang Las Konstruksi L.02 OH 0.020 121,674.00 2,433.48
Kepala Tukang L.03 OH 0.002 128,226.00 256.45
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 6,733.33
B BAHAN -
Kawat las listrik M.57 Kg 0.040 31,500.00 1,260.00
Solar (industri) M.393.a Liter 0.030 11,193.60 335.81
Minyak pelumas M.398 Liter - 29,568.00 -
JUMLAH HARGA BAHAN 1,595.81
C PERALATAN -
Sewa alat las alat 62 Jam 0.170 10,771.20 1,831.10
JUMLAH HARGA ALAT 1,831.10
D Jumlah (A+B+C) 10,160.24
E Overhead & Profit 15 % 0.150 1,524.04
F Harga Satuan Pekerjaan untuk 10 cm 11,684.28
G Harga Satuan Pekerjaan (F/10) 1,168.40
-
A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.650 93,597.00 60,838.05
Tukang Las Biasa L.02 OH 0.650 121,674.00 79,088.10
Kepala Tukang L.03 OH 0.065 128,226.00 8,334.69
Mandor L.04 OH 0.032 149,758.00 4,792.26
JUMLAH TENAGA KERJA 153,053.10
B BAHAN -
Besi square tube (Hollow) M.47.f m 4.760 16,368.00 77,911.68
Alumunium lis kaca (1 x 1) cm M.61 m 4.522 29,568.00 133,706.50
Pengerjaan 1 cm pengelasan dengan las listrik A.4.2.1.5. cm 20.000 149,758.00 2,995,160.00
JUMLAH HARGA BAHAN 3,206,778.18
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,359,831.27
E Overhead & Profit 15 % 0.150 503,974.69
F Harga Satuan Pekerjaan (D+E) 3,863,805.00
-
A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.200 93,597.00 112,316.40
Tukang Las Biasa L.02 OH 1.200 121,674.00 146,008.80
Kepala Tukang L.03 OH 0.120 128,226.00 15,387.12
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 274,610.87
B BAHAN -
Rolling door besi M.430 m2 1.000 265,056.00 265,056.00
JUMLAH HARGA BAHAN 265,056.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 539,666.87
E Overhead & Profit 15 % 0.150 80,950.03
F Harga Satuan Pekerjaan (D+E) 620,616.00
-
A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.440 93,597.00 41,182.68
Tukang Besi L.02 OH 0.440 121,674.00 53,536.56
Kepala Tukang L.03 OH 0.044 128,226.00 5,641.94
Mandor L.04 OH 0.022 149,758.00 3,294.68
JUMLAH TENAGA KERJA 103,655.86
B BAHAN -
Pintu lipat (folding door) bahan plastik/PVC M.585 m2 1.000 58,080.00 58,080.00
JUMLAH HARGA BAHAN 58,080.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 161,735.86
E Overhead & Profit 15 % 0.150 24,260.38
F Harga Satuan Pekerjaan (D+E) 185,996.00
-
A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.080 93,597.00 7,487.76
Tukang Khusus Alumunium L.02 OH 0.800 121,674.00 97,339.20
Kepala Tukang L.03 OH 0.080 128,226.00 10,258.08
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 115,684.07
B BAHAN -
Sunscreen aluminium M.434 m2 1.000 369,600.00 369,600.00
JUMLAH HARGA BAHAN 369,600.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 485,284.07
E Overhead & Profit 15 % 0.150 72,792.61
F Harga Satuan Pekerjaan (D+E) 558,076.00
-
A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang Khusus Alumunium L.02 OH 1.000 121,674.00 121,674.00
Kepala Tukang L.03 OH 0.100 128,226.00 12,822.60
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 235,581.50
B BAHAN -
Rolling door aluminium M.435 m2 1.000 422,400.00 422,400.00
JUMLAH HARGA BAHAN 422,400.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 657,981.50
E Overhead & Profit 15 % 0.150 98,697.22
F Harga Satuan Pekerjaan (D+E) 756,678.00
-
A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium 3" warna Natural / Silver -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.043 93,597.00 4,024.67
Tukang Khusus Alumunium L.02 OH 0.043 121,674.00 5,231.98
Kepala Tukang L.03 OH 0.004 128,226.00 551.37
Mandor L.04 OH 0.002 149,758.00 314.49
JUMLAH TENAGA KERJA 10,122.52
B BAHAN -
Kusen alumunium 3" putih M.433.a m 1.100 116,160.00 127,776.00
Skrup fixer M.56.o buah 2.000 774.40 1,548.80
Sealant kaca (besar) M.562.c Tube 0.060 44,352.00 2,661.12
JUMLAH HARGA BAHAN 131,985.92
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 142,108.44
E Overhead & Profit 15 % 0.150 21,316.27
F Harga Satuan Pekerjaan (D+E) 163,424.00
-
A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.085 93,597.00 7,955.75
Tukang Khusus Alumunium L.02 OH 0.085 121,674.00 10,342.29
Kepala Tukang L.03 OH 0.009 128,226.00 1,089.92
Mandor L.04 OH 0.004 149,758.00 628.98
JUMLAH TENAGA KERJA 20,016.94
B BAHAN -
Kusen alumunium 3" putih M.433.a m 4.400 116,160.00 511,104.00
Aluminium strip M.428 m 14.600 10,560.00 154,176.00
JUMLAH HARGA BAHAN 665,280.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 685,296.94
E Overhead & Profit 15 % 0.150 102,794.54
F Harga Satuan Pekerjaan (D+E) 788,091.00
-
A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.085 93,597.00 7,955.75
Tukang Khusus Alumunium L.02 OH 0.085 121,674.00 10,342.29
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 20,200.86
B BAHAN -
Rangka Pintu aluminium M.399.b m 4.400 31,891.20 140,321.28
Profil kaca M.350 m 4.500 17,160.00 77,220.00
Sealant kaca (besar) M.562.c Tube 0.270 44,352.00 11,975.04
JUMLAH HARGA BAHAN 229,516.32
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 249,717.18
E Overhead & Profit 15 % 0.150 37,457.58
F Harga Satuan Pekerjaan (D+E) 287,174.00
-
A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan Vertical blinds (Mewah) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.350 93,597.00 32,758.95
Tukang Khusus Alumunium L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 82,528.40
B BAHAN -
Venetions blinds dan vertical blinds (tirai) M.571 m2 1.000 138,336.00 138,336.00
JUMLAH HARGA BAHAN 138,336.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 220,864.40
E Overhead & Profit 15 % 0.150 33,129.66
F Harga Satuan Pekerjaan (D+E) 253,994.00
-
A.4.2.1.15. Pemasangan 1 m2 terali besi strip (20 x 3) mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.670 93,597.00 156,306.99
Tukang Las biasa L.02 OH 1.670 121,674.00 203,195.58
Kepala Tukang L.03 OH 0.167 128,226.00 21,413.74
Mandor L.04 OH 0.083 149,758.00 12,429.91
JUMLAH TENAGA KERJA 393,346.23
B BAHAN -
Besi strip M.46.g kg 6.177 17,600.00 108,715.20
Pengerjaan 1 cm pengelasan dengan las listrik A.4.2.1.5. cm 27.080 149,758.00 4,055,446.64
JUMLAH HARGA BAHAN 4,164,161.84
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,557,508.07
E Overhead & Profit 15 % 0.150 683,626.21
F Harga Satuan Pekerjaan (D+E) 5,241,134.00
-
A.4.2.1.16. Pemasangan 1 m2 Kawat nyamuk plastik / PVC -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 23,558.15
B BAHAN -
Kawat nyamuk plastik / PVC M.58 m2 1.100 22,528.00 24,780.80
Pengerjaan 1 cm pengelasan dengan las listrik A.4.2.1.5. cm 11.110 149,758.00 1,663,811.38
Besi strip M.46.g kg 1.716 17,600.00 30,201.60
JUMLAH HARGA BAHAN 1,718,793.78
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,742,351.93
E Overhead & Profit 15 % 0.150 261,352.79
F Harga Satuan Pekerjaan (D+E) 2,003,704.00
-
A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 45,768.48
B BAHAN -
Jendela nako (rangka + kaca 5 mm) M.351.b m2 1.100 211,200.00 232,320.00
Paku sekrup M.56.j buah 10.000 5,208.75 52,087.50
Besi strip M.46.g m 7.000 17,600.00 123,200.00
JUMLAH HARGA BAHAN 407,607.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 453,375.98
E Overhead & Profit 15 % 0.150 68,006.40
F Harga Satuan Pekerjaan (D+E) 521,382.00
-
A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 45,768.48
B BAHAN -
Seng plat, Lebar 90 cm M.137.f m 1.050 44,000.00 46,200.00
Paku 2,5 cm M.56.b kg 0.015 22,704.00 340.56
Kayu kruing (papan) M.18.b m3 0.019 8,505,000.00 161,595.00
JUMLAH HARGA BAHAN 208,135.56
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 253,904.04
E Overhead & Profit 15 % 0.150 38,085.61
F Harga Satuan Pekerjaan (D+E) 291,989.00
-
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang batu L.02 OH 0.300 121,674.00 36,502.20
Kepala Tukang L.03 OH 0.030 128,226.00 3,846.78
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 55,586.59
B BAHAN -
Seng plat, Lebar 45 cm M.137.f m 1.050 44,000.00 46,200.00
Paku 2,5 cm M.56.b kg 0.010 22,704.00 227.04
Besi strip M.46.g kg 0.500 17,600.00 8,800.00
JUMLAH HARGA BAHAN 55,227.04
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 110,813.63
E Overhead & Profit 15 % 0.150 16,622.05
F Harga Satuan Pekerjaan (D+E) 127,435.00
-
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1 x 40 x 40 x 0.4 mm, modul 60 x 120 cm, dinding partisi -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Besi L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 58,970.25
B BAHAN -
Besi hollow 40.40.4 M.47.c m' 5.000 40,040.00 200,200.00
Assesoris (perkuatan, las dll) 100% rangka 40,040.00 40,040.00
JUMLAH HARGA BAHAN 240,240.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 299,210.25
E Overhead & Profit 15 % 0.150 44,881.54
F Harga Satuan Pekerjaan (D+E) 344,091.00
-
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1 x 40 x 40 x 0,4 mm, modul 60 x 60 cm, plafon -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.350 93,597.00 32,758.95
Tukang Besi L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 82,528.40
B BAHAN -
Besi hollow 40.40.4 M.47.c m' 4.000 40,040.00 160,160.00
Assesoris (perkuatan, las dll) 100% rangka 40,040.00 40,040.00
JUMLAH HARGA BAHAN 200,200.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 282,728.40
E Overhead & Profit 15 % 0.150 42,409.26
F Harga Satuan Pekerjaan (D+E) 325,137.00
-
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.734 93,597.00 68,700.20
Tukang Besi L.02 OH 0.734 121,674.00 89,308.72
Kepala Tukang L.03 OH 0.073 128,226.00 9,360.50
Mandor L.04 OH 0.037 149,758.00 5,541.05
JUMLAH TENAGA KERJA 172,910.46
B BAHAN -
C channel galvanis lebar 75 mm, t= 1,0 mm (kg) M.436.e kg 0.873 15,840.00 13,828.32
JUMLAH HARGA BAHAN 13,828.32
C PERALATAN -
Alat Rangka Atap Baja Canal Dingin % 10.000 13,828.32 1,382.83
JUMLAH HARGA ALAT 1,382.83
D Jumlah (A+B+C) 188,121.61
E Overhead & Profit 15 % 0.150 28,218.24
F Harga Satuan Pekerjaan (D+E) 216,339.00
-
A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canal dingin profil C75 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.760 93,597.00 71,171.16
Tukang Besi L.02 OH 0.760 121,674.00 92,520.91
Kepala Tukang L.03 OH 0.076 128,226.00 9,745.18
Mandor L.04 OH 0.038 149,758.00 5,690.80
JUMLAH TENAGA KERJA 179,128.05
B BAHAN -
C channel galvanis lebar 75 mm, t= 1,0 mm (kg) M.436.e kg 0.873 15,840.00 13,828.32
JUMLAH HARGA BAHAN 13,828.32
C PERALATAN -
Alat Rangka Atap Baja Canal Dingin % 10.000 13,828.32 1,382.83
JUMLAH HARGA ALAT 1,382.83
D Jumlah (A+B+C) 194,339.20
E Overhead & Profit 15 % 0.150 29,150.88
F Harga Satuan Pekerjaan (D+E) 223,490.00
-
A.4.2.1.24. Pemasangan 1m2 pasang kuda-kuda baja ringan + reng untuk atap genteng biasa/metal -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Besi L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 82,242.86
B BAHAN -
C channel galvanis lebar 75 mm, t= 1,0 mm M.436.d m' 3.720 26,400.00 98,208.00
Sekrup kait / roofing M.56.p buah 28.000 721.60 20,204.80
Dynabolt dia 12mm (10-15cm) M.75.f buah 2.000 5,280.00 10,560.00
Reng Canal Dingin M.436.a m' 5.400 22,000.00 118,800.00
JUMLAH HARGA BAHAN 247,772.80
C PERALATAN -
Alat Rangka Atap Baja Canal Dingin % 10.000 247,772.80 24,777.28
JUMLAH HARGA ALAT 24,777.28
D Jumlah (A+B+C) 354,792.94
E Overhead & Profit 15 % 0.150 53,218.94
F Harga Satuan Pekerjaan (D+E) 408,011.00
-
-
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING -
A.4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.600 93,597.00 56,158.20
Tukang Batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.030 149,758.00 4,492.74
JUMLAH TENAGA KERJA 87,550.26
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 140.000 864.41 121,017.60
Portland cement M.245.a Kg 43.500 1,375.00 59,812.50
Pasir Pasang M.8.c m3 0.080 300,000.00 24,000.00
JUMLAH HARGA BAHAN 204,830.10
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 292,380.36
E Overhead & Profit 15 % 0.150 43,857.05
F Harga Satuan Pekerjaan (D+E) 336,237.00
-
A.4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.600 93,597.00 56,158.20
Tukang Batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.030 149,758.00 4,492.74
JUMLAH TENAGA KERJA 87,550.26
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 140.000 864.41 121,017.60
Portland cement M.245.a Kg 32.950 1,375.00 45,306.25
Pasir Pasang M.8.c m3 0.091 300,000.00 27,300.00
JUMLAH HARGA BAHAN 193,623.85
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 281,174.11
E Overhead & Profit 15 % 0.150 42,176.12
F Harga Satuan Pekerjaan (D+E) 323,350.00
-
A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.600 93,597.00 56,158.20
Tukang Batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.030 149,758.00 4,492.74
JUMLAH TENAGA KERJA 87,550.26
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 140.000 864.41 121,017.60
Portland cement M.245.a Kg 26.550 1,375.00 36,506.25
Pasir Pasang M.8.c m3 0.093 300,000.00 27,900.00
JUMLAH HARGA BAHAN 185,423.85
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 272,974.11
E Overhead & Profit 15 % 0.150 40,946.12
F Harga Satuan Pekerjaan (D+E) 313,920.00
-
A.4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.600 93,597.00 56,158.20
Tukang Batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.030 149,758.00 4,492.74
JUMLAH TENAGA KERJA 87,550.26
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 140.000 864.41 121,017.60
Portland cement M.245.a Kg 22.200 1,375.00 30,525.00
Pasir Pasang M.8.c m3 0.102 300,000.00 30,600.00
JUMLAH HARGA BAHAN 182,142.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 269,692.86
E Overhead & Profit 15 % 0.150 40,453.93
F Harga Satuan Pekerjaan (D+E) 310,146.00
-
A.4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.600 93,597.00 56,158.20
Tukang Batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.030 149,758.00 4,492.74
JUMLAH TENAGA KERJA 87,550.26
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 140.000 864.41 121,017.60
Portland cement M.245.a Kg 18.500 1,375.00 25,437.50
Pasir Pasang M.8.c m3 0.122 300,000.00 36,600.00
JUMLAH HARGA BAHAN 183,055.10
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 270,605.36
E Overhead & Profit 15 % 0.150 40,590.80
F Harga Satuan Pekerjaan (D+E) 311,196.00
-
A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.600 93,597.00 56,158.20
Tukang Batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.030 149,758.00 4,492.74
JUMLAH TENAGA KERJA 87,550.26
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 140.000 864.41 121,017.60
Portland cement M.245.a Kg 10.080 1,375.00 13,860.00
Kapur M.563 m3 0.028 277,728.00 7,637.52
Pasir Pasang M.8.c m3 0.093 300,000.00 27,750.00
JUMLAH HARGA BAHAN 170,265.12
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 257,815.38
E Overhead & Profit 15 % 0.150 38,672.31
F Harga Satuan Pekerjaan (D+E) 296,487.00
-
A.4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 864.41 60,508.80
Portland cement M.245.a Kg 18.950 1,375.00 26,056.25
Pasir Pasang M.8.c m3 0.038 300,000.00 11,400.00
JUMLAH HARGA BAHAN 97,965.05
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 141,740.18
E Overhead & Profit 15 % 0.150 21,261.03
F Harga Satuan Pekerjaan (D+E) 163,001.00
-
A.4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 864.41 60,508.80
Portland cement M.245.a Kg 14.370 1,375.00 19,758.75
Pasir Pasang M.8.c m3 0.040 300,000.00 12,000.00
JUMLAH HARGA BAHAN 92,267.55
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 136,042.68
E Overhead & Profit 15 % 0.150 20,406.40
F Harga Satuan Pekerjaan (D+E) 156,449.00
-
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 864.41 60,508.80
Portland cement M.245.a Kg 11.500 1,375.00 15,812.50
Pasir Pasang M.8.c m3 0.043 300,000.00 12,900.00
JUMLAH HARGA BAHAN 89,221.30
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 132,996.43
E Overhead & Profit 15 % 0.150 19,949.46
F Harga Satuan Pekerjaan (D+E) 152,945.00
-
A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 864.41 60,508.80
Portland cement M.245.a Kg 9.680 1,375.00 13,310.00
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
JUMLAH HARGA BAHAN 87,318.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 131,093.93
E Overhead & Profit 15 % 0.150 19,664.09
F Harga Satuan Pekerjaan (D+E) 150,758.00
-
A.4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 864.41 60,508.80
Portland cement M.245.a Kg 8.320 1,375.00 11,440.00
Pasir Pasang M.8.c m3 0.049 300,000.00 14,700.00
JUMLAH HARGA BAHAN 86,648.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 130,423.93
E Overhead & Profit 15 % 0.150 19,563.59
F Harga Satuan Pekerjaan (D+E) 149,987.00
-
A.4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 864.41 60,508.80
Portland cement M.245.a Kg 6.500 1,375.00 8,937.50
Pasir Pasang M.8.c m3 0.050 300,000.00 15,000.00
JUMLAH HARGA BAHAN 84,446.30
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 128,221.43
E Overhead & Profit 15 % 0.150 19,233.21
F Harga Satuan Pekerjaan (D+E) 147,454.00
-
A.4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 864.41 60,508.80
Portland cement M.245.a Kg 4.500 1,375.00 6,187.50
Kapur M.563 m3 0.015 277,728.00 4,165.92
Pasir Pasang M.8.c m3 0.050 300,000.00 15,000.00
JUMLAH HARGA BAHAN 85,862.22
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 129,637.35
E Overhead & Profit 15 % 0.150 19,445.60
F Harga Satuan Pekerjaan (D+E) 149,082.00
-
A.4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 864.41 60,508.80
Portland cement M.245.a Kg 0.018 1,375.00 24.75
Kapur M.563 m3 0.018 277,728.00 4,999.10
Pasir Pasang M.8.c m3 0.018 300,000.00 5,400.00
JUMLAH HARGA BAHAN 70,932.65
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 114,707.78
E Overhead & Profit 15 % 0.150 17,206.17
F Harga Satuan Pekerjaan (D+E) 131,913.00
-
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 864.41 60,508.80
Portland cement M.245.a Kg 0.014 1,375.00 19.25
Kapur M.563 m3 0.014 277,728.00 3,888.19
Pasir Pasang M.8.c m3 0.028 300,000.00 8,400.00
JUMLAH HARGA BAHAN 72,816.24
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 116,591.37
E Overhead & Profit 15 % 0.150 17,488.71
F Harga Satuan Pekerjaan (D+E) 134,080.00
-
A.4.4.1.16 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.350 93,597.00 32,758.95
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 55,629.08
B BAHAN -
HB.20 - Batako (ukuran 40x20x20) M.225.a buah 12.500 10,560.00 132,000.00
Portland cement M.245.a Kg 30.320 1,375.00 41,690.00
Pasir Pasang M.8.c m3 0.728 300,000.00 218,400.00
Besi angker dia 8 M.46.a Kg 0.280 12,344.68 3,456.51
JUMLAH HARGA BAHAN 395,546.51
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 451,175.60
E Overhead & Profit 15 % 0.150 67,676.34
F Harga Satuan Pekerjaan (D+E) 518,851.00
-
A.4.4.1.17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP:4PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.350 93,597.00 32,758.95
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 55,629.08
B BAHAN -
HB.20 - Batako (ukuran 40x20x20) M.225.a buah 12.500 10,560.00 132,000.00
Portland cement M.245.a Kg 22.740 1,375.00 31,267.50
Pasir Pasang M.8.c m3 0.772 300,000.00 231,600.00
Besi angker dia 8 M.46.a Kg 0.280 12,344.68 3,456.51
JUMLAH HARGA BAHAN 398,324.01
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 453,953.10
E Overhead & Profit 15 % 0.150 68,092.96
F Harga Satuan Pekerjaan (D+E) 522,046.00
-
A.4.4.1.8 Pemasangan 1m2 dinding conblock HB15 campuran 1SP :3PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.320 93,597.00 29,951.04
Tukang Batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.016 149,758.00 2,396.13
JUMLAH TENAGA KERJA 48,486.76
B BAHAN -
HB.15 - Batako (ukuran 40x20x15) M.224.a buah 12.500 7,286.40 91,080.00
Portland cement M.245.a Kg 22.740 1,375.00 31,267.50
Pasir Pasang M.8.c m3 0.550 300,000.00 165,000.00
Besi angker dia 8 M.46.a Kg 0.280 12,344.68 3,456.51
JUMLAH HARGA BAHAN 290,804.01
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 339,290.77
E Overhead & Profit 15 % 0.150 50,893.62
F Harga Satuan Pekerjaan (D+E) 390,184.00
-
A.4.4.1.19 Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.320 93,597.00 29,951.04
Tukang Batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.016 149,758.00 2,396.13
JUMLAH TENAGA KERJA 48,486.76
B BAHAN -
HB.15 - Batako (ukuran 40x20x15) M.224.a buah 12.500 7,286.40 91,080.00
Portland cement M.245.a Kg 18.200 1,375.00 25,025.00
Pasir Pasang M.8.c m3 0.582 300,000.00 174,600.00
Besi angker dia 8 M.46.a Kg 0.280 12,344.68 3,456.51
JUMLAH HARGA BAHAN 294,161.51
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 342,648.27
E Overhead & Profit 15 % 0.150 51,397.24
F Harga Satuan Pekerjaan (D+E) 394,045.00
-
A.4.4.1.20 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
HB.10 - Batako (ukuran 40x20x10) M.222.a buah 12.500 2,640.00 33,000.00
Portland cement M.245.a Kg 15.160 1,375.00 20,845.00
Pasir Pasang M.8.c m3 0.364 300,000.00 109,200.00
Besi angker dia 8 M.46.a Kg 0.280 12,344.68 3,456.51
JUMLAH HARGA BAHAN 166,501.51
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 210,276.64
E Overhead & Profit 15 % 0.150 31,541.50
F Harga Satuan Pekerjaan (D+E) 241,818.00
-
A.4.4.1.21 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :4PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
HB.10 - Batako (ukuran 40x20x10) M.222.a buah 12.500 2,640.00 33,000.00
Portland cement M.245.a Kg 12.130 1,375.00 16,678.75
Pasir Pasang M.8.c m3 0.388 300,000.00 116,400.00
Besi angker dia 8 M.46.a Kg 0.280 12,344.68 3,456.51
JUMLAH HARGA BAHAN 169,535.26
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 213,310.39
E Overhead & Profit 15 % 0.150 31,996.56
F Harga Satuan Pekerjaan (D+E) 245,306.00
-
A.4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Roster/terawang M.220 buah 30.000 10,032.00 300,960.00
Portland cement M.245.a Kg 11.000 1,375.00 15,125.00
Pasir Pasang M.8.c m3 0.035 300,000.00 10,500.00
JUMLAH HARGA BAHAN 326,585.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 370,360.13
E Overhead & Profit 15 % 0.150 55,554.02
F Harga Satuan Pekerjaan (D+E) 425,914.00
-
A.4.4.1.23 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Roster/terawang M.220 buah 30.000 10,032.00 300,960.00
Portland cement M.245.a Kg 11.000 1,375.00 15,125.00
Pasir Pasang M.8.c m3 0.035 300,000.00 10,500.00
JUMLAH HARGA BAHAN 326,585.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 370,360.13
E Overhead & Profit 15 % 0.150 55,554.02
F Harga Satuan Pekerjaan (D+E) 425,914.00
-
A.4.4.1.24 Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1 SP : 3 PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 50,499.96
B BAHAN -
Bata berongga / Roster 12x11 M.221.a buah 70.000 6,468.00 452,760.00
Portland cement M.245.a Kg 14.000 1,375.00 19,250.00
Pasir Pasang M.8.c m3 0.032 300,000.00 9,600.00
JUMLAH HARGA BAHAN 481,610.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 532,109.96
E Overhead & Profit 15 % 0.150 79,816.49
F Harga Satuan Pekerjaan (D+E) 611,926.00
-
A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai. -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.670 93,597.00 62,709.99
Tukang Batu L.02 OH 0.130 121,674.00 15,817.62
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 80,643.82
B BAHAN -
Hebel Block (ukuran 60x20x7,5 cm) M.235.a buah 8.400 7,142.78 59,999.39
Pengisi bata ringan (Semen MU 380) M.240.c Kg 0.473 2,728.00 1,290.34
JUMLAH HARGA BAHAN 61,289.73
C PERALATAN -
Peralatan Pasang Dinding Bata Ringan % 10.000 61,289.73 6,128.97
JUMLAH HARGA ALAT 6,128.97
D Jumlah (A+B+C) 148,062.52
E Overhead & Profit 15 % 0.150 22,209.38
F Harga Satuan Pekerjaan (D+E) 170,271.00
-
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.671 93,597.00 62,803.59
Tukang Batu L.02 OH 0.130 121,674.00 15,817.62
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 80,737.42
B BAHAN -
Hebel Block (ukuran 60x20x10 cm) M.235.b buah 8.400 7,817.92 65,670.53
Pengisi bata ringan (Semen MU 380) M.240.c Kg 0.063 2,728.00 171.86
JUMLAH HARGA BAHAN 65,842.39
C PERALATAN -
Peralatan Pasang Dinding Bata Ringan % 10.000 65,842.39 6,584.24
JUMLAH HARGA ALAT 6,584.24
D Jumlah (A+B+C) 153,164.05
E Overhead & Profit 15 % 0.150 22,974.61
F Harga Satuan Pekerjaan (D+E) 176,138.00
-
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN -
A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm. -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 50,499.96
B BAHAN -
Portland cement M.245.a Kg 15.504 1,375.00 21,318.00
Pasir Pasang M.8.c m3 0.016 300,000.00 4,800.00
JUMLAH HARGA BAHAN 26,118.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 76,617.96
E Overhead & Profit 15 % 0.150 11,492.69
F Harga Satuan Pekerjaan (D+E) 88,110.00
-
A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 50,499.96
B BAHAN -
Portland cement M.245.a Kg 10.224 1,375.00 14,058.00
Pasir Pasang M.8.c m3 0.020 300,000.00 6,000.00
JUMLAH HARGA BAHAN 20,058.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 70,557.96
E Overhead & Profit 15 % 0.150 10,583.69
F Harga Satuan Pekerjaan (D+E) 81,141.00
-
A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 50,499.96
B BAHAN -
Portland cement M.245.a Kg 7.776 1,375.00 10,692.00
Pasir Pasang M.8.c m3 0.023 300,000.00 6,900.00
JUMLAH HARGA BAHAN 17,592.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 68,091.96
E Overhead & Profit 15 % 0.150 10,213.79
F Harga Satuan Pekerjaan (D+E) 78,305.00
-
A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 50,499.96
B BAHAN -
Portland cement M.245.a Kg 6.240 1,375.00 8,580.00
Pasir Pasang M.8.c m3 0.024 300,000.00 7,200.00
JUMLAH HARGA BAHAN 15,780.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 66,279.96
E Overhead & Profit 15 % 0.150 9,941.99
F Harga Satuan Pekerjaan (D+E) 76,221.00
-
A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Batu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 25,388.97
B BAHAN -
Portland cement M.245.a Kg 5.184 1,375.00 7,128.00
Pasir Pasang M.8.c m3 0.026 300,000.00 7,800.00
JUMLAH HARGA BAHAN 14,928.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 40,316.97
E Overhead & Profit 15 % 0.150 6,047.55
F Harga Satuan Pekerjaan (D+E) 46,364.00
-
A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 50,499.96
B BAHAN -
Portland cement M.245.a Kg 4.416 1,375.00 6,072.00
Pasir Pasang M.8.c m3 0.027 300,000.00 8,100.00
JUMLAH HARGA BAHAN 14,172.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 64,671.96
E Overhead & Profit 15 % 0.150 9,700.79
F Harga Satuan Pekerjaan (D+E) 74,372.00
-
A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 50,499.96
B BAHAN -
Portland cement M.245.a Kg 3.936 1,375.00 5,412.00
Pasir Pasang M.8.c m3 0.028 300,000.00 8,400.00
JUMLAH HARGA BAHAN 13,812.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 64,311.96
E Overhead & Profit 15 % 0.150 9,646.79
F Harga Satuan Pekerjaan (D+E) 73,958.00
-
A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 50,499.96
B BAHAN -
Portland cement M.245.a Kg 3.456 1,375.00 4,752.00
Pasir Pasang M.8.c m3 0.029 300,000.00 8,700.00
JUMLAH HARGA BAHAN 13,452.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 63,951.96
E Overhead & Profit 15 % 0.150 9,592.79
F Harga Satuan Pekerjaan (D+E) 73,544.00
-
A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.360 93,597.00 33,694.92
Tukang Batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 52,530.16
B BAHAN -
Portland cement M.245.a Kg 5.760 1,375.00 7,920.00
Kapur M.563 m3 0.003 277,728.00 833.18
Pasir Pasang M.8.c m3 0.013 300,000.00 3,900.00
JUMLAH HARGA BAHAN 12,653.18
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 65,183.34
E Overhead & Profit 15 % 0.150 9,777.50
F Harga Satuan Pekerjaan (D+E) 74,960.00
-
A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.360 93,597.00 33,694.92
Tukang Batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 52,530.16
B BAHAN -
Portland cement M.245.a Kg 3.000 1,375.00 4,125.00
Kapur M.563 m3 0.005 277,728.00 1,388.64
Pasir Pasang M.8.c m3 0.020 300,000.00 6,000.00
JUMLAH HARGA BAHAN 11,513.64
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 64,043.80
E Overhead & Profit 15 % 0.150 9,606.57
F Harga Satuan Pekerjaan (D+E) 73,650.00
-
A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.022 149,758.00 3,294.68
JUMLAH TENAGA KERJA 67,632.80
B BAHAN -
Portland cement M.245.a Kg 13.632 1,375.00 18,744.00
Pasir Pasang M.8.c m3 0.027 300,000.00 8,100.00
JUMLAH HARGA BAHAN 26,844.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 94,476.80
E Overhead & Profit 15 % 0.150 14,171.52
F Harga Satuan Pekerjaan (D+E) 108,648.00
-
A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.260 93,597.00 24,335.22
Tukang Batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 53,181.39
B BAHAN -
Portland cement M.245.a Kg 10.368 1,375.00 14,256.00
Pasir Pasang M.8.c m3 0.031 300,000.00 9,300.00
JUMLAH HARGA BAHAN 23,556.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 76,737.39
E Overhead & Profit 15 % 0.150 11,510.61
F Harga Satuan Pekerjaan (D+E) 88,248.00
-
A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.022 149,758.00 3,294.68
JUMLAH TENAGA KERJA 67,632.80
B BAHAN -
Portland cement M.245.a Kg 8.320 1,375.00 11,440.00
Pasir Pasang M.8.c m3 0.032 300,000.00 9,600.00
JUMLAH HARGA BAHAN 21,040.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 88,672.80
E Overhead & Profit 15 % 0.150 13,300.92
F Harga Satuan Pekerjaan (D+E) 101,973.00
-
A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.022 149,758.00 3,294.68
JUMLAH TENAGA KERJA 67,632.80
B BAHAN -
Portland cement M.245.a Kg 6.912 1,375.00 9,504.00
Pasir Pasang M.8.c m3 0.035 300,000.00 10,500.00
JUMLAH HARGA BAHAN 20,004.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 87,636.80
E Overhead & Profit 15 % 0.150 13,145.52
F Harga Satuan Pekerjaan (D+E) 100,782.00
-
A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Batu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.022 149,758.00 3,294.68
JUMLAH TENAGA KERJA 67,632.80
B BAHAN -
Portland cement M.245.a Kg 5.888 1,375.00 8,096.00
Pasir Pasang M.8.c m3 0.036 300,000.00 10,800.00
JUMLAH HARGA BAHAN 18,896.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 86,528.80
E Overhead & Profit 15 % 0.150 12,979.32
F Harga Satuan Pekerjaan (D+E) 99,508.00
-
A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Batu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 25,388.97
B BAHAN -
Portland cement M.245.a Kg 5.184 1,375.00 7,128.00
Pasir Pasang M.8.c m3 0.026 300,000.00 7,800.00
JUMLAH HARGA BAHAN 14,928.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 40,316.97
E Overhead & Profit 15 % 0.150 6,047.55
F Harga Satuan Pekerjaan (D+E) 46,364.00
-
A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.080 93,597.00 7,487.76
Tukang Batu L.02 OH 0.400 121,674.00 48,669.60
Kepala Tukang L.03 OH 0.040 128,226.00 5,129.04
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 61,885.43
B BAHAN -
Portland cement M.245.a Kg 0.500 1,375.00 687.50
Pasir Pasang M.8.c m3 0.013 300,000.00 3,900.00
JUMLAH HARGA BAHAN 4,587.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 66,472.93
E Overhead & Profit 15 % 0.150 9,970.94
F Harga Satuan Pekerjaan (D+E) 76,443.00
-
A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.450 93,597.00 42,118.65
Tukang Batu L.02 OH 0.225 121,674.00 27,376.65
Kepala Tukang L.03 OH 0.023 128,226.00 2,949.20
Mandor L.04 OH 0.023 149,758.00 3,444.43
JUMLAH TENAGA KERJA 75,888.93
B BAHAN -
Portland cement M.245.a Kg 10.000 1,375.00 13,750.00
Batu granit kg 15.000 23,000.00 345,000.00
JUMLAH HARGA BAHAN 358,750.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 434,638.93
E Overhead & Profit 15 % 0.150 65,195.84
F Harga Satuan Pekerjaan (D+E) 499,834.00
-
A.4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.450 93,597.00 42,118.65
Tukang Batu L.02 OH 0.225 121,674.00 27,376.65
Kepala Tukang L.03 OH 0.023 128,226.00 2,949.20
Mandor L.04 OH 0.023 149,758.00 3,444.43
JUMLAH TENAGA KERJA 75,888.93
B BAHAN -
Portland cement M.245.a Kg 10.000 1,375.00 13,750.00
Batu traso Kg 15.000 21,500.00 322,500.00
JUMLAH HARGA BAHAN 336,250.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 412,138.93
E Overhead & Profit 15 % 0.150 61,820.84
F Harga Satuan Pekerjaan (D+E) 473,959.00
-
A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Portland cement M.245.a Kg 4.320 1,375.00 5,940.00
Pasir Pasang M.8.c m3 0.006 300,000.00 1,800.00
JUMLAH HARGA BAHAN 7,740.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 51,515.13
E Overhead & Profit 15 % 0.150 7,727.27
F Harga Satuan Pekerjaan (D+E) 59,242.00
-
A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Batu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 25,388.97
B BAHAN -
Portland cement M.245.a Kg 3.108 1,375.00 4,273.50
JUMLAH HARGA BAHAN 4,273.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 29,662.47
E Overhead & Profit 15 % 0.150 4,449.37
F Harga Satuan Pekerjaan (D+E) 34,111.00
-
A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.070 93,597.00 6,551.79
Tukang Batu L.02 OH 0.035 121,674.00 4,258.59
Kepala Tukang L.03 OH 0.004 128,226.00 512.90
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 11,922.32
B BAHAN -
Portland cement M.245.a Kg 1.600 1,375.00 2,200.00
JUMLAH HARGA BAHAN 2,200.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 14,122.32
E Overhead & Profit 15 % 0.150 2,118.35
F Harga Satuan Pekerjaan (D+E) 16,240.00
-
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 50,499.96
B BAHAN -
Portland cement M.245.a Kg 6.340 1,375.00 8,717.50
Pasir Pasang M.8.c m3 0.012 300,000.00 3,600.00
JUMLAH HARGA BAHAN 12,317.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 62,817.46
E Overhead & Profit 15 % 0.150 9,422.62
F Harga Satuan Pekerjaan (D+E) 72,240.00
-
A.4.4.2.27. Pemasangan 1 m2 acian. -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.010 149,758.00 1,497.58
JUMLAH TENAGA KERJA 33,666.64
B BAHAN -
Portland cement M.245.a Kg 3.250 1,375.00 4,468.75
JUMLAH HARGA BAHAN 4,468.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 38,135.39
E Overhead & Profit 15 % 0.150 5,720.31
F Harga Satuan Pekerjaan (D+E) 43,855.00
-
A.4.4.2.28. Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 50,499.96
B BAHAN -
Perekat plesteran (Semen MU 100) M.240.a Kg 20.000 2,376.00 47,520.00
JUMLAH HARGA BAHAN 47,520.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 98,019.96
E Overhead & Profit 15 % 0.150 14,702.99
F Harga Satuan Pekerjaan (D+E) 112,722.00
-
A.4.4.2.29. Pemasangan 1 m2 Acian dengan mortar siap pakai (MSP) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.010 149,758.00 1,497.58
JUMLAH TENAGA KERJA 33,666.64
B BAHAN -
Perekat acian (Semen MU 200) M.240.b Kg 2.000 3,124.00 6,248.00
JUMLAH HARGA BAHAN 6,248.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 39,914.64
E Overhead & Profit 15 % 0.150 5,987.20
F Harga Satuan Pekerjaan (D+E) 45,901.00
-
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING -
A.4.4.3.9. Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Batu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 42,222.29
B BAHAN -
Granit tile 40 x 40 cm ( double loading ) M.191.b buah 6.630 40,392.00 267,798.96
Portland cement M.245.a kg 9.800 1,375.00 13,475.00
Semen Warna M.244 Kg 1.300 18,666.67 24,266.67
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
JUMLAH HARGA BAHAN 319,040.63
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 361,262.92
E Overhead & Profit 15 % 0.150 54,189.44
F Harga Satuan Pekerjaan (D+E) 415,452.00
-
A.4.4.3.10. Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.260 93,597.00 24,335.22
Tukang Batu L.02 OH 0.130 121,674.00 15,817.62
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 43,766.63
B BAHAN -
Granit tile 30 x 30 cm ( double loading ) M.191.c buah 11.870 30,140.00 357,761.80
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 1.500 18,666.67 28,000.00
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
JUMLAH HARGA BAHAN 413,011.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 456,778.43
E Overhead & Profit 15 % 0.150 68,516.76
F Harga Satuan Pekerjaan (D+E) 525,295.00
-
A.4.4.3.11. Pemasangan 1m2 lantai ubin teralux ukuran 40cm x40cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Batu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 42,222.29
B BAHAN -
Ubin Teralux 40 cm x 40 cm M.195.b buah 6.630 61,327.20 406,599.34
Portland cement M.245.a kg 9.800 1,375.00 13,475.00
Semen Warna M.244 Kg 1.300 18,666.67 24,266.67
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
JUMLAH HARGA BAHAN 457,841.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 500,063.29
E Overhead & Profit 15 % 0.150 75,009.49
F Harga Satuan Pekerjaan (D+E) 575,072.00
-
A.4.4.3.12. Pemasangan 1m2 lantai ubin teralux ukuran 30cm x30cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.260 93,597.00 24,335.22
Tukang Batu L.02 OH 0.130 121,674.00 15,817.62
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 43,766.63
B BAHAN -
Ubin Teralux 30 cm x 30 cm M.195.a buah 11.870 27,218.40 323,082.41
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 1.500 18,666.67 28,000.00
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
JUMLAH HARGA BAHAN 378,332.41
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 422,099.04
E Overhead & Profit 15 % 0.150 63,314.86
F Harga Satuan Pekerjaan (D+E) 485,413.00
-
A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.240 93,597.00 22,463.28
Tukang Batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.012 149,758.00 1,797.10
JUMLAH TENAGA KERJA 40,399.97
B BAHAN -
Ubin Teralux Marmer 60 cm x 60 cm M.196.c buah 3.100 95,040.00 294,624.00
Portland cement M.245.a kg 9.600 1,375.00 13,200.00
Semen Warna M.244 Kg 1.500 18,666.67 28,000.00
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
JUMLAH HARGA BAHAN 349,324.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 389,723.97
E Overhead & Profit 15 % 0.150 58,458.60
F Harga Satuan Pekerjaan (D+E) 448,182.00
-
A.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Batu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 42,222.29
B BAHAN -
Ubin Teralux Marmer 40 cm x 40 cm M.196.b buah 6.630 52,536.00 348,313.68
Portland cement M.245.a kg 9.800 1,375.00 13,475.00
Semen Warna M.244 Kg 1.300 18,666.67 24,266.67
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
JUMLAH HARGA BAHAN 399,555.35
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 441,777.64
E Overhead & Profit 15 % 0.150 66,266.65
F Harga Satuan Pekerjaan (D+E) 508,044.00
-
A.4.4.3.15. Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.260 93,597.00 24,335.22
Tukang Batu L.02 OH 0.130 121,674.00 15,817.62
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 43,766.63
B BAHAN -
Ubin Teralux Marmer 30 cm x 30 cm M.196.a buah 11.870 40,761.60 483,840.19
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 1.500 18,666.67 28,000.00
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
JUMLAH HARGA BAHAN 539,090.19
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 582,856.82
E Overhead & Profit 15 % 0.150 87,428.52
F Harga Satuan Pekerjaan (D+E) 670,285.00
-
A.4.4.3.17. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Plint ubin PC abu - abu 10 cm x 30 cm M.198.a buah 3.530 6,204.00 21,900.12
Portland cement M.245.a kg 1.240 1,375.00 1,705.00
Pasir Pasang M.8.c m3 0.003 300,000.00 900.00
JUMLAH HARGA BAHAN 24,505.12
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 45,782.33
E Overhead & Profit 15 % 0.150 6,867.35
F Harga Satuan Pekerjaan (D+E) 52,649.00
-
A.4.4.3.18. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Plint ubin PC abu - abu 10 cm x 40 cm M.198.b buah 2.650 6,336.00 16,790.40
Portland cement M.245.a kg 1.240 1,375.00 1,705.00
Pasir Pasang M.8.c m3 0.003 300,000.00 900.00
JUMLAH HARGA BAHAN 19,395.40
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 40,672.61
E Overhead & Profit 15 % 0.150 6,100.89
F Harga Satuan Pekerjaan (D+E) 46,773.00
-
A.4.4.3.24. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Plint granit 10cm x 40cm M.201.a buah 2.650 31,680.00 83,952.00
Portland cement M.245.a kg 1.140 1,375.00 1,567.50
Semen Warna M.244 Kg 0.100 18,666.67 1,866.67
Pasir Pasang M.8.c m3 0.003 300,000.00 900.00
JUMLAH HARGA BAHAN 88,286.17
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 109,563.38
E Overhead & Profit 15 % 0.150 16,434.51
F Harga Satuan Pekerjaan (D+E) 125,997.00
-
A.4.4.3.25. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Plint granit 10cm x 30cm M.201.b buah 3.530 2,956.80 10,437.50
Portland cement M.245.a kg 1.140 1,375.00 1,567.50
Semen Warna M.244 Kg 0.100 18,666.67 1,866.67
Pasir Pasang M.8.c m3 0.003 300,000.00 900.00
JUMLAH HARGA BAHAN 14,771.67
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 36,048.88
E Overhead & Profit 15 % 0.150 5,407.33
F Harga Satuan Pekerjaan (D+E) 41,456.00
-
A.4.4.3.26. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Plint ubin Teralux Kerang 10 cm x 40 cm M.202.b buah 2.630 17,952.00 47,213.76
Portland cement M.245.a kg 1.140 1,375.00 1,567.50
Semen Warna M.244 Kg 0.100 18,666.67 1,866.67
Pasir Pasang M.8.c m3 0.003 300,000.00 900.00
JUMLAH HARGA BAHAN 51,547.93
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 72,825.14
E Overhead & Profit 15 % 0.150 10,923.77
F Harga Satuan Pekerjaan (D+E) 83,748.00
-
A.4.4.3.27. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Plint ubin Teralux Kerang 10 cm x 30 cm M.202.a buah 3.530 16,896.00 59,642.88
Portland cement M.245.a kg 1.140 1,375.00 1,567.50
Semen Warna M.244 Kg 0.100 18,666.67 1,866.67
Pasir Pasang M.8.c m3 0.003 300,000.00 900.00
JUMLAH HARGA BAHAN 63,977.05
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 85,254.26
E Overhead & Profit 15 % 0.150 12,788.14
F Harga Satuan Pekerjaan (D+E) 98,042.00
-
A.4.4.3.28. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Plint ubin Teralux Marmer 10 cm x 60 cm M.203.c buah 1.700 17,952.00 30,518.40
Portland cement M.245.a kg 1.140 1,375.00 1,567.50
Semen Warna M.244 Kg 0.100 18,666.67 1,866.67
Pasir Pasang M.8.c m3 0.003 300,000.00 900.00
JUMLAH HARGA BAHAN 34,852.57
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 56,129.78
E Overhead & Profit 15 % 0.150 8,419.47
F Harga Satuan Pekerjaan (D+E) 64,549.00
-
A.4.4.3.29. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Plint ubin Teralux Marmer 10 cm x 40 cm M.203.b buah 2.650 16,896.00 44,774.40
Portland cement M.245.a kg 1.140 1,375.00 1,567.50
Semen Warna M.244 Kg 0.100 18,666.67 1,866.67
Pasir Pasang M.8.c m3 0.003 300,000.00 900.00
JUMLAH HARGA BAHAN 49,108.57
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 70,385.78
E Overhead & Profit 15 % 0.150 10,557.87
F Harga Satuan Pekerjaan (D+E) 80,943.00
-
A.4.4.3.30. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Plint ubin Teralux marmer 10 cm x 30 cm M.203.a buah 3.530 16,368.00 57,779.04
Portland cement M.245.a kg 1.140 1,375.00 1,567.50
Semen Warna M.244 Kg 0.100 18,666.67 1,866.67
Pasir Pasang M.8.c m3 0.003 300,000.00 900.00
JUMLAH HARGA BAHAN 62,113.21
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 83,390.42
E Overhead & Profit 15 % 0.150 12,508.56
F Harga Satuan Pekerjaan (D+E) 95,898.00
-
A.4.4.3.31. Pemasangan 1m2 lantai teraso cor di tempat, tebal 3cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.360 93,597.00 33,694.92
Tukang Batu L.02 OH 0.180 121,674.00 21,901.32
Kepala Tukang L.03 OH 0.018 128,226.00 2,308.07
Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 60,599.95
B BAHAN -
Teraso cor di tempat, tebal 3cm m3 0.036 370,000.00 13,320.00
Semen warna M.244 Kg 0.100 18,666.67 1,866.67
JUMLAH HARGA BAHAN 15,186.67
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 75,786.62
E Overhead & Profit 15 % 0.150 11,367.99
F Harga Satuan Pekerjaan (D+E) 87,154.00
-
A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10cm x 20cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik Artistik 10 cm x 20 cm M.186.a buah 53.000 1,900.80 100,742.40
Portland cement M.245.a Kg 8.190 1,375.00 11,261.25
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
Semen warna M.244 Kg 2.750 18,666.67 51,333.33
JUMLAH HARGA BAHAN 176,836.98
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 294,670.22
E Overhead & Profit 15 % 0.150 44,200.53
F Harga Satuan Pekerjaan (D+E) 338,870.00
-
A.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
keramik artistik 10cm x 10cm atau 5cm x 20cm M.186.c buah 106.000 4,752.00 503,712.00
Portland cement M.245.a Kg 8.190 1,375.00 11,261.25
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
Semen Warna M.244 Kg 3.200 18,666.67 59,733.33
JUMLAH HARGA BAHAN 588,206.58
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 706,039.82
E Overhead & Profit 15 % 0.150 105,905.97
F Harga Satuan Pekerjaan (D+E) 811,945.00
-
A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm (putih) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 30 x 30 cm (putih) M.175.a doos 1.050 45,408.00 47,678.40
Portland cement M.245.a Kg 10.000 1,375.00 13,750.00
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
JUMLAH HARGA BAHAN 84,261.73
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 202,094.97
E Overhead & Profit 15 % 0.150 30,314.25
F Harga Satuan Pekerjaan (D+E) 232,409.00
-
A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm (putih) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 20 x 20 cm (putih) M.172.a doos 1.050 2,259.84 2,372.83
Portland cement M.245.a Kg 10.400 1,375.00 14,300.00
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
JUMLAH HARGA BAHAN 39,506.17
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 157,339.41
E Overhead & Profit 15 % 0.150 23,600.91
F Harga Satuan Pekerjaan (D+E) 180,940.00
-
A.4.4.3.37. Pemasangan 1 m2 Lantai keramik ukuran 10cm x 40 cm untuk variasi/border -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.050 93,597.00 98,276.85
Tukang Batu L.02 OH 0.525 121,674.00 63,878.85
Kepala Tukang L.03 OH 0.053 128,226.00 6,795.98
Mandor L.04 OH 0.053 149,758.00 7,937.17
JUMLAH TENAGA KERJA 176,888.85
B BAHAN -
Keramik Border 10 x 40 cm M.188.a buah 33.000 18,480.00 609,840.00
Portland cement M.245.a Kg 9.800 1,375.00 13,475.00
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
Semen Warna M.244 Kg 4.370 18,666.67 81,573.33
JUMLAH HARGA BAHAN 718,388.33
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 895,277.19
E Overhead & Profit 15 % 0.150 134,291.58
F Harga Satuan Pekerjaan (D+E) 1,029,568.00
-
A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Ubin keramik mozaik 30 cm x 30 cm M.190 buah 11.870 10,771.20 127,854.14
Portland cement M.245.a Kg 14.150 1,375.00 19,456.25
Pasir Pasang M.8.c m3 0.039 300,000.00 11,700.00
Semen Warna M.244 Kg 2.000 18,666.67 37,333.33
JUMLAH HARGA BAHAN 196,343.73
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 314,176.97
E Overhead & Profit 15 % 0.150 47,126.55
F Harga Satuan Pekerjaan (D+E) 361,303.00
-
A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 24,611.09
B BAHAN -
Plint keramik 10 x 20 cm M.204.a buah 5.300 8,976.00 47,572.80
Portland cement M.245.a Kg 1.140 1,375.00 1,567.50
Pasir Pasang M.8.c m3 0.003 300,000.00 900.00
Semen Warna M.244 Kg 0.025 18,666.67 466.67
JUMLAH HARGA BAHAN 50,506.97
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 75,118.06
E Overhead & Profit 15 % 0.150 11,267.71
F Harga Satuan Pekerjaan (D+E) 86,385.00
-
A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 24,611.09
B BAHAN -
Plint keramik 10 x 10 cm M.204.b buah 10.600 6,600.00 69,960.00
Portland cement M.245.a Kg 1.140 1,375.00 1,567.50
Pasir Pasang M.8.c m3 0.003 300,000.00 900.00
Semen Warna M.244 Kg 0.050 18,666.67 933.33
JUMLAH HARGA BAHAN 73,360.83
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 97,971.92
E Overhead & Profit 15 % 0.150 14,695.79
F Harga Satuan Pekerjaan (D+E) 112,667.00
-
A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 24,611.09
B BAHAN -
Plint keramik 5 x 20 cm M.204.c buah 5.300 3,696.00 19,588.80
Portland cement M.245.a Kg 0.570 1,375.00 783.75
Pasir Pasang M.8.c m3 0.002 300,000.00 450.00
Semen Warna M.244 Kg 0.013 18,666.67 242.67
JUMLAH HARGA BAHAN 21,065.22
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 45,676.31
E Overhead & Profit 15 % 0.150 6,851.45
F Harga Satuan Pekerjaan (D+E) 52,527.00
aaa -
A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.750 93,597.00 70,197.75
Tukang Batu L.02 OH 0.750 121,674.00 91,255.50
Kepala Tukang L.03 OH 0.075 128,226.00 9,616.95
Mandor L.04 OH 0.038 149,758.00 5,690.80
JUMLAH TENAGA KERJA 176,761.00
B BAHAN -
Internal Cove M.209 buah 5.300 12,320.00 65,296.00
Portland cement M.245.a Kg 1.140 1,375.00 1,567.50
Pasir Pasang M.8.c m3 0.003 300,000.00 900.00
Semen Warna M.244 Kg 0.100 18,666.67 1,866.67
JUMLAH HARGA BAHAN 69,630.17
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 246,391.17
E Overhead & Profit 15 % 0.150 36,958.68
F Harga Satuan Pekerjaan (D+E) 283,349.00
-
A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Marmer 100 x 100 cm M.211 buah 1.060 1,056,000.00 1,119,360.00
Portland cement M.245.a Kg 8.190 1,375.00 11,261.25
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
Semen Warna M.244 Kg 0.134 18,666.67 2,501.33
JUMLAH HARGA BAHAN 1,146,622.58
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,264,455.82
E Overhead & Profit 15 % 0.150 189,668.37
F Harga Satuan Pekerjaan (D+E) 1,454,124.00
-
A.4.4.3.44. Pemasangan 1 m2 lantai karpet -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.170 93,597.00 15,911.49
Tukang Kayu L.02 OH 0.170 121,674.00 20,684.58
Kepala Tukang L.03 OH 0.017 128,226.00 2,179.84
Mandor L.04 OH 0.009 149,758.00 1,347.82
JUMLAH TENAGA KERJA 40,123.73
B BAHAN -
Carpet M.215 m2 1.050 14,256.00 14,968.80
Lem aibon M.574 Kg 0.350 29,040.00 10,164.00
JUMLAH HARGA BAHAN 25,132.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 65,256.53
E Overhead & Profit 15 % 0.150 9,788.48
F Harga Satuan Pekerjaan (D+E) 75,045.00
-
A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang Kayu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN -
underlayer M.578 m2 1.050 54,308.57 57,024.00
Lem aibon M.574 Kg 0.350 29,040.00 10,164.00
JUMLAH HARGA BAHAN 67,188.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 95,457.78
E Overhead & Profit 15 % 0.150 14,318.67
F Harga Satuan Pekerjaan (D+E) 109,776.00
-
A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Kayu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Parquet jati M.214 m2 1.050 242,880.00 255,024.00
Lem kayu M.572 Kg 0.600 29,832.00 17,899.20
JUMLAH HARGA BAHAN 272,923.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 390,756.44
E Overhead & Profit 15 % 0.150 58,613.47
F Harga Satuan Pekerjaan (D+E) 449,369.00
-
A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Kayu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Parquet kayu gymfloor m2 1.050 320,000.00 336,000.00
Lem kayu M.572 Kg 0.600 29,832.00 17,899.20
JUMLAH HARGA BAHAN 353,899.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 471,732.44
E Overhead & Profit 15 % 0.150 70,759.87
F Harga Satuan Pekerjaan (D+E) 542,492.00
-
A.4.4.3.48. Pemasangan 1 m2 dinding porselen 11cm x 11cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang Batu L.02 OH 0.500 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 168,333.20
B BAHAN -
Porselin Dinding 11 x 11 cm M.170 doos 1.050 62,568.00 65,696.40
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Pasir Pasang M.8.c m3 0.018 300,000.00 5,400.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
JUMLAH HARGA BAHAN 93,217.23
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 261,550.43
E Overhead & Profit 15 % 0.150 39,232.56
F Harga Satuan Pekerjaan (D+E) 300,782.00
-
A.4.4.3.49. Pemasangan 1 m2 dinding porselen 10cm x 20cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang Batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 10 x 20 cm (putih) M.171 buah 53.000 1,372.80 72,758.40
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Pasir Pasang M.8.c m3 0.018 300,000.00 5,400.00
Semen Warna M.244 Kg 2.750 18,666.67 51,333.33
JUMLAH HARGA BAHAN 142,279.23
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 293,779.11
E Overhead & Profit 15 % 0.150 44,066.87
F Harga Satuan Pekerjaan (D+E) 337,845.00
-
A.4.4.3.50. Pemasangan 1 m2 dinding porselen 20cm x 20cm (putih) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang Batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 20 x 20 cm (putih) M.172.a buah 26.000 2,259.84 58,755.84
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Pasir Pasang M.8.c m3 0.018 300,000.00 5,400.00
Semen Warna M.244 Kg 1.940 18,666.67 36,213.33
JUMLAH HARGA BAHAN 113,156.67
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 264,656.55
E Overhead & Profit 15 % 0.150 39,698.48
F Harga Satuan Pekerjaan (D+E) 304,355.00
-
A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang Batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik Artistik 10 cm x 20 cm M.186.a buah 52.000 1,900.80 98,841.60
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Pasir Pasang M.8.c m3 0.018 300,000.00 5,400.00
Semen Warna M.244 Kg 2.750 18,666.67 51,333.33
JUMLAH HARGA BAHAN 168,362.43
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 319,862.31
E Overhead & Profit 15 % 0.150 47,979.35
F Harga Satuan Pekerjaan (D+E) 367,841.00
-
A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang Batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik Artistik 5 cm x 20 cm M.186.c buah 104.000 4,752.00 494,208.00
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Pasir Pasang M.8.c m3 0.018 300,000.00 5,400.00
Semen Warna M.244 Kg 2.900 18,666.67 54,133.33
JUMLAH HARGA BAHAN 566,528.83
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 718,028.71
E Overhead & Profit 15 % 0.150 107,704.31
F Harga Satuan Pekerjaan (D+E) 825,733.00
-
A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10cm x 20cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang Batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 10 x 20 cm (putih) M.171 buah 52.000 1,372.80 71,385.60
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Pasir Pasang M.8.c m3 0.018 300,000.00 5,400.00
Semen Warna M.244 Kg 2.750 18,666.67 51,333.33
JUMLAH HARGA BAHAN 140,906.43
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 292,406.31
E Overhead & Profit 15 % 0.150 43,860.95
F Harga Satuan Pekerjaan (D+E) 336,267.00
-
A.4.4.3.54. Pemasangan 1 m2 dinding keramik Artistik 20cm x 20cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang Batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik Artistik 20 cm x 20 cm M.186.b buah 26.000 3,872.00 100,672.00
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Pasir Pasang M.8.c m3 0.018 300,000.00 5,400.00
Semen Warna M.244 Kg 1.940 18,666.67 36,213.33
JUMLAH HARGA BAHAN 155,072.83
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 306,572.71
E Overhead & Profit 15 % 0.150 45,985.91
F Harga Satuan Pekerjaan (D+E) 352,558.00
-
A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100cm x 100cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.300 93,597.00 121,676.10
Tukang Batu L.02 OH 0.650 121,674.00 79,088.10
Kepala Tukang L.03 OH 0.065 128,226.00 8,334.69
Mandor L.04 OH 0.065 149,758.00 9,734.27
JUMLAH TENAGA KERJA 218,833.16
B BAHAN -
marmer M.211 buah 1.060 1,056,000.00 1,119,360.00
Portland cement M.245.a Kg 12.440 1,375.00 17,105.00
Pasir Pasang M.8.c m3 0.025 300,000.00 7,500.00
Semen Warna M.244 Kg 0.650 18,666.67 12,133.33
Paku 12 cm M.56.g buah 3.030 21,648.00 65,593.44
JUMLAH HARGA BAHAN 1,221,691.77
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,440,524.93
E Overhead & Profit 15 % 0.150 216,078.74
F Harga Satuan Pekerjaan (D+E) 1,656,603.00
-
A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang Batu L.02 OH 0.500 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 168,333.20
B BAHAN -
Bata tempel M.219 buah 63.000 3,062.40 192,931.20
Portland cement M.245.a Kg 12.440 1,375.00 17,105.00
Pasir Pasang M.8.c m3 0.025 300,000.00 7,500.00
Semen Warna M.244 Kg 2.750 18,666.67 51,333.33
JUMLAH HARGA BAHAN 268,869.53
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 437,202.73
E Overhead & Profit 15 % 0.150 65,580.41
F Harga Satuan Pekerjaan (D+E) 502,783.00
-
A.4.4.3.57. Pemasangan 1 m2 dinding batu paras -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Batu paras M.226 buah 1.100 110,880.00 121,968.00
Portland cement M.245.a Kg 11.750 1,375.00 16,156.25
Pasir Pasang M.8.c m3 0.035 300,000.00 10,500.00
JUMLAH HARGA BAHAN 148,624.25
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 266,457.49
E Overhead & Profit 15 % 0.150 39,968.62
F Harga Satuan Pekerjaan (D+E) 306,426.00
-
A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
batu tempel hitam M.227 buah 1.100 136,752.00 150,427.20
Portland cement M.245.a Kg 11.750 1,375.00 16,156.25
Pasir Pasang M.8.c m3 0.035 300,000.00 10,500.00
JUMLAH HARGA BAHAN 177,083.45
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 294,916.69
E Overhead & Profit 15 % 0.150 44,237.50
F Harga Satuan Pekerjaan (D+E) 339,154.00
-
A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Batu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 35,412.10
B BAHAN -
Lantai Vynil M.212 buah 11.870 145,200.00 1,723,524.00
Lem Kayu M.572 Kg 0.350 29,832.00 10,441.20
JUMLAH HARGA BAHAN 1,733,965.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,769,377.30
E Overhead & Profit 15 % 0.150 265,406.60
F Harga Satuan Pekerjaan (D+E) 2,034,783.00
-
A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.350 93,597.00 32,758.95
Tukang Batu L.02 OH 0.175 121,674.00 21,292.95
Kepala Tukang L.03 OH 0.017 128,226.00 2,179.84
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 56,531.26
B BAHAN -
Wallpaper M.581 m 2.200 47,520.00 104,544.00
Perekat untuk wallpaper M.576 Kg 0.250 35,640.00 8,910.00
JUMLAH HARGA BAHAN 113,454.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 169,985.26
E Overhead & Profit 15 % 0.150 25,497.79
F Harga Satuan Pekerjaan (D+E) 195,483.00
-
A.4.4.3.61. Pemasangan 1m2 floor harderner -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang Batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN -
floor harderner M.249 Kg 5.000 3,696.00 18,480.00
JUMLAH HARGA BAHAN 18,480.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 46,749.78
E Overhead & Profit 15 % 0.150 7,012.47
F Harga Satuan Pekerjaan (D+E) 53,762.00
-
A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.080 93,597.00 7,487.76
Tukang Batu L.02 OH 0.080 121,674.00 9,733.92
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 18,846.52
B BAHAN -
plint vynil M.213 buah 3.100 158,400.00 491,040.00
Lem Kayu M.572 Kg 0.080 29,832.00 2,386.56
JUMLAH HARGA BAHAN 493,426.56
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 512,273.08
E Overhead & Profit 15 % 0.150 76,840.96
F Harga Satuan Pekerjaan (D+E) 589,114.00
-
A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang Batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.003 13,230,000.00 39,690.00
Paku sekrup M.56.j Kg 0.050 5,208.75 260.44
JUMLAH HARGA BAHAN 39,950.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 68,220.22
E Overhead & Profit 15 % 0.150 10,233.03
F Harga Satuan Pekerjaan (D+E) 78,453.00
-
A.4.4.3.64. Pemasangan 1 m2 paving block natural tebal 6 cm (K.250) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Batu L.02 OH 0.500 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.001 149,758.00 194.69
JUMLAH TENAGA KERJA 90,842.24
B BAHAN -
Paving block 6 cm abu-abu K-250 M.90.a M2 1.010 92,928.00 93,857.28
Pasir Pasang M.8.c m3 0.050 300,000.00 15,000.00
JUMLAH HARGA BAHAN 108,857.28
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 108,857.28 10,885.73
JUMLAH HARGA ALAT 10,885.73
D Jumlah (A+B+C) 210,585.24
E Overhead & Profit 15 % 0.150 31,587.79
F Harga Satuan Pekerjaan (D+E) 242,173.00
-
A.4.4.3.66. Pemasangan 1 m2 paving block berwarna tebal 6 cm (K.250) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Batu L.02 OH 0.500 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.001 149,758.00 194.69
JUMLAH TENAGA KERJA 90,842.24
B BAHAN -
Paving block 6 cm warna K-250 M.90.b M2 1.010 129,888.00 131,186.88
Pasir Pasang M.8.c m3 0.050 300,000.00 15,000.00
JUMLAH HARGA BAHAN 146,186.88
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 146,186.88 14,618.69
JUMLAH HARGA ALAT 14,618.69
D Jumlah (A+B+C) 251,647.80
E Overhead & Profit 15 % 0.150 37,747.17
F Harga Satuan Pekerjaan (D+E) 289,394.00
-
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) -
A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.030 93,597.00 2,807.91
Tukang kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 12,821.70
B BAHAN -
Asbes 1,00 x 1,00 m M.138.a m2 1.100 119,152.00 131,067.20
Paku tripleks M.56.a kg 0.010 19,166.67 191.67
JUMLAH HARGA BAHAN 131,258.87
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 144,080.57
E Overhead & Profit 15 % 0.150 21,612.09
F Harga Satuan Pekerjaan (D+E) 165,692.00
-
A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang kayu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN -
Akustik ukuran 30 x 30 cm M.150.a Lembar 12.000 22,176.00 266,112.00
Paku tripleks M.56.a kg 0.050 19,166.67 958.33
JUMLAH HARGA BAHAN 267,070.33
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 295,340.11
E Overhead & Profit 15 % 0.150 44,301.02
F Harga Satuan Pekerjaan (D+E) 339,641.00
-
A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang kayu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN -
Akustik ukuran 30 x 60 cm M.150.b Lembar 5.800 32,208.00 186,806.40
Paku tripleks M.56.a kg 0.050 19,166.67 958.33
JUMLAH HARGA BAHAN 187,764.73
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 216,034.51
E Overhead & Profit 15 % 0.150 32,405.18
F Harga Satuan Pekerjaan (D+E) 248,439.00
-
A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang kayu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 23,558.15
B BAHAN -
Akustik 60 x 120 cm tebal 15 mm M.150.c Lembar 1.500 58,080.00 87,120.00
Paku tripleks M.56.a kg 0.050 19,166.67 958.33
JUMLAH HARGA BAHAN 88,078.33
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 111,636.48
E Overhead & Profit 15 % 0.150 16,745.47
F Harga Satuan Pekerjaan (D+E) 128,381.00
-
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang kayu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 23,558.15
B BAHAN -
Tripleks t= 4 mm, 120x240 cm M.34 Lembar 0.375 62,300.00 23,362.50
Paku tripleks M.56.a kg 0.030 19,166.67 575.00
JUMLAH HARGA BAHAN 23,937.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 47,495.65
E Overhead & Profit 15 % 0.150 7,124.35
F Harga Satuan Pekerjaan (D+E) 54,619.00
-
A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.800 93,597.00 74,877.60
Tukang kayu L.02 OH 0.800 121,674.00 97,339.20
Kepala Tukang L.03 OH 0.080 128,226.00 10,258.08
Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 188,465.20
B BAHAN -
Kayu lambrisering M.17.b m3 0.015 13,230,000.00 198,450.00
Paku tripleks M.56.a kg 0.010 19,166.67 191.67
JUMLAH HARGA BAHAN 198,641.67
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 387,106.87
E Overhead & Profit 15 % 0.150 58,066.03
F Harga Satuan Pekerjaan (D+E) 445,172.00
-
A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang kayu L.02 OH 0.050 121,674.00 6,083.70
Kepala Tukang L.03 OH 0.005 128,226.00 641.13
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 16,833.32
B BAHAN -
Gypsum Board (120 cm x 240 cm x 9 mm) M.151.a Lembar 0.364 61,600.00 22,422.40
Paku sekrup M.56.j kg 0.110 5,208.75 572.96
JUMLAH HARGA BAHAN 22,995.36
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 39,828.68
E Overhead & Profit 15 % 0.150 5,974.30
F Harga Satuan Pekerjaan (D+E) 45,802.00
-
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.500 93,597.00 46,798.50
Tukang kayu L.02 OH 0.500 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.025 149,758.00 3,743.95
JUMLAH TENAGA KERJA 117,790.75
B BAHAN -
Profil Alumunium "T" Natural / Silver M.162.d m 3.600 31,680.00 114,048.00
Kawat galvanis Ø 4 mm M.50.a kg 0.150 37,248.68 5,587.30
Ramset M.75.g Buah 1.050 3,643,000.00 3,825,150.00
Akustik 60 x 120 cm tebal 15 mm M.150.c Lembar 1.500 58,080.00 87,120.00
JUMLAH HARGA BAHAN 4,031,905.30
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,149,696.05
E Overhead & Profit 15 % 0.150 622,454.41
F Harga Satuan Pekerjaan (D+E) 4,772,150.00
-
A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Tukang Kayu L.02 OH 0.050 121,674.00 6,083.70
Kepala Tukang L.03 OH 0.005 128,226.00 641.13
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 11,853.95
B BAHAN -
List kayu profil 32 x 32 mm M.30.a m 1.050 4,224.00 4,435.20
Paku 3,5 cm M.56.c kg 0.010 22,176.00 221.76
JUMLAH HARGA BAHAN 4,656.96
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,510.91
E Overhead & Profit 15 % 0.150 2,476.64
F Harga Satuan Pekerjaan (D+E) 18,987.00
A.4.5.1.10 Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40 -
Lihat pada kelompok Pekerjaan Besi dan Alumunium ( A.9.21) -
-
A.4.5.1.10. Pemasangan 1 m2 Plafond PVC -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.075 149,758.00 11,231.85
JUMLAH TENAGA KERJA 58,895.55
B BAHAN -
Plafond PVC (setara Shunda Plafon, Flat Gloss Hal M.160.a m2 1.050 72,864.00 76,507.20
Paku sekrup M.56.j buah 18.000 5,208.75 93,757.50
JUMLAH HARGA BAHAN 170,264.70
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 229,160.25
E Overhead & Profit 15 % 0.150 34,374.04
F Harga Satuan Pekerjaan (D+E) 263,534.00
-
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP -
A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 961.69
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 25,324.86
B BAHAN -
Genteng palentong M.129.a buah 25.000 1,584.00 39,600.00
JUMLAH HARGA BAHAN 39,600.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 64,924.86
E Overhead & Profit 15 % 0.150 9,738.73
F Harga Satuan Pekerjaan (D+E) 74,663.00
-
A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 25,388.97
B BAHAN -
Genteng kodok glazuur M.127.b buah 25.000 7,656.00 191,400.00
JUMLAH HARGA BAHAN 191,400.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 216,788.97
E Overhead & Profit 15 % 0.150 32,518.35
F Harga Satuan Pekerjaan (D+E) 249,307.00
-
A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 25,388.97
B BAHAN -
Genteng palentong super M.129.b buah 12.000 2,930.40 35,164.80
JUMLAH HARGA BAHAN 35,164.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 60,553.77
E Overhead & Profit 15 % 0.150 9,083.07
F Harga Satuan Pekerjaan (D+E) 69,636.00
-
A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 64,637.64
B BAHAN -
Bubung genteng palentong M.134.e buah 5.000 10,296.00 51,480.00
Portland cement M.245.a Kg 8.000 1,375.00 11,000.00
Pasir Pasang M.8.c m3 0.032 300,000.00 9,600.00
JUMLAH HARGA BAHAN 72,080.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 136,717.64
E Overhead & Profit 15 % 0.150 20,507.65
F Harga Satuan Pekerjaan (D+E) 157,225.00
-
A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 64,637.64
B BAHAN -
Bubung genteng kodok glazuur M.134.d buah 5.000 12,408.00 62,040.00
Portland cement M.245.a Kg 8.000 1,375.00 11,000.00
Pasir Pasang M.8.c m3 0.032 300,000.00 9,600.00
JUMLAH HARGA BAHAN 82,640.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 147,277.64
E Overhead & Profit 15 % 0.150 22,091.65
F Harga Satuan Pekerjaan (D+E) 169,369.00
-
A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 64,637.64
B BAHAN -
Bubung genteng palentong M.134.e buah 4.000 10,296.00 41,184.00
Portland cement M.245.a Kg 8.000 1,375.00 11,000.00
Pasir Pasang M.8.c m3 0.032 300,000.00 9,600.00
JUMLAH HARGA BAHAN 61,784.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 126,421.64
E Overhead & Profit 15 % 0.150 18,963.25
F Harga Satuan Pekerjaan (D+E) 145,384.00
-
A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90x180 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.067 121,674.00 8,152.16
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,201.63
B BAHAN -
Atap Transparan Gelombang 180 x 80 cm M.142.a Lembar 0.600 64,944.00 38,966.40
Paku payung M.56.k Kg 0.050 40,130.00 2,006.50
JUMLAH HARGA BAHAN 40,972.90
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 64,174.53
E Overhead & Profit 15 % 0.150 9,626.18
F Harga Satuan Pekerjaan (D+E) 73,800.00
-
A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 24,453.00
B BAHAN -
Asbes gelombang besar 5mm (250x102cm) M.138.b Lembar 0.500 147,840.00 73,920.00
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 75,440.64
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 99,893.64
E Overhead & Profit 15 % 0.150 14,984.05
F Harga Satuan Pekerjaan (D+E) 114,877.00
-
A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 24,453.00
B BAHAN -
Asbes gelombang besar 5mm (225x102cm) M.138.c Lembar 0.600 105,600.00 63,360.00
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 64,880.64
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 89,333.64
E Overhead & Profit 15 % 0.150 13,400.05
F Harga Satuan Pekerjaan (D+E) 102,733.00
-
A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang besar 5mm (200x102cm) M.138.d Lembar 0.600 98,208.00 58,924.80
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 60,445.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 84,012.09
E Overhead & Profit 15 % 0.150 12,601.81
F Harga Satuan Pekerjaan (D+E) 96,613.00
-
A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang besar 5mm (180x102cm) M.138.e Lembar 0.750 65,472.00 49,104.00
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 50,624.64
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 74,191.29
E Overhead & Profit 15 % 0.150 11,128.69
F Harga Satuan Pekerjaan (D+E) 85,319.00
-
A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang kecil 4mm (300x105) M.138.f Lembar 0.350 98,283.43 34,399.20
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 35,919.84
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 59,486.49
E Overhead & Profit 15 % 0.150 8,922.97
F Harga Satuan Pekerjaan (D+E) 68,409.00
-
A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang kecil 4mm (270x105) M.138.g Lembar 0.420 94,617.60 39,739.39
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 41,260.03
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 64,826.68
E Overhead & Profit 15 % 0.150 9,724.00
F Harga Satuan Pekerjaan (D+E) 74,550.00
-
A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang kecil 4mm (240x105) M.138.h Lembar 0.440 76,484.57 33,653.21
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 35,173.85
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 58,740.50
E Overhead & Profit 15 % 0.150 8,811.07
F Harga Satuan Pekerjaan (D+E) 67,551.00
-
A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang kecil 4mm (210x105) M.138.i Lembar 0.510 63,465.60 32,367.46
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 33,888.10
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 57,454.74
E Overhead & Profit 15 % 0.150 8,618.21
F Harga Satuan Pekerjaan (D+E) 66,072.00
-
A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang kecil 4mm (150x105) M.138.k Lembar 0.800 44,880.00 35,904.00
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 37,424.64
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 60,991.29
E Overhead & Profit 15 % 0.150 9,148.69
F Harga Satuan Pekerjaan (D+E) 70,139.00
-
A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang besar 6mm (300x102) M.138.l Lembar 0.370 136,224.00 50,402.88
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 51,923.52
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 75,490.17
E Overhead & Profit 15 % 0.150 11,323.53
F Harga Satuan Pekerjaan (D+E) 86,813.00
-
A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang besar 6mm (270x102) M.138.m Lembar 0.380 121,440.00 46,147.20
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 47,667.84
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 71,234.49
E Overhead & Profit 15 % 0.150 10,685.17
F Harga Satuan Pekerjaan (D+E) 81,919.00
-
A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang besar 6mm (240x102) M.138.n Lembar 0.460 134,640.00 61,934.40
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 63,455.04
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 87,021.69
E Overhead & Profit 15 % 0.150 13,053.25
F Harga Satuan Pekerjaan (D+E) 100,074.00
-
A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang besar 6mm (210x102) M.138.o Lembar 0.490 89,760.00 43,982.40
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 45,503.04
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 69,069.69
E Overhead & Profit 15 % 0.150 10,360.45
F Harga Satuan Pekerjaan (D+E) 79,430.00
-
A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang besar 6mm (180x102) M.138.p Lembar 0.570 84,480.00 48,153.60
Paku pancing 6x23 M.56.m Kg 0.120 12,672.00 1,520.64
JUMLAH HARGA BAHAN 49,674.24
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 73,240.89
E Overhead & Profit 15 % 0.150 10,986.13
F Harga Satuan Pekerjaan (D+E) 84,227.00
-
A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.084 93,597.00 7,862.15
Tukang Kayu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 25,337.37
B BAHAN -
Nok stel gelombang M.135.b Lembar 2.400 47,520.00 114,048.00
Paku sekrup M.56.j buah 6.000 5,208.75 31,252.50
JUMLAH HARGA BAHAN 145,300.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 170,637.87
E Overhead & Profit 15 % 0.150 25,595.68
F Harga Satuan Pekerjaan (D+E) 196,233.00
-
A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.084 93,597.00 7,862.15
Tukang Kayu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 25,337.37
B BAHAN -
Nok stel gelombang M.135.b Lembar 2.100 47,520.00 99,792.00
Paku sekrup M.56.j buah 6.000 5,208.75 31,252.50
JUMLAH HARGA BAHAN 131,044.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 156,381.87
E Overhead & Profit 15 % 0.150 23,457.28
F Harga Satuan Pekerjaan (D+E) 179,839.00
-
A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.084 93,597.00 7,862.15
Tukang Kayu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 25,337.37
B BAHAN -
Nok stel gelombang M.135.b Lembar 2.000 47,520.00 95,040.00
Paku sekrup M.56.j buah 6.000 5,208.75 31,252.50
JUMLAH HARGA BAHAN 126,292.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 151,629.87
E Overhead & Profit 15 % 0.150 22,744.48
F Harga Satuan Pekerjaan (D+E) 174,374.00
-
A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.084 93,597.00 7,862.15
Tukang Kayu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 25,337.37
B BAHAN -
Nok paten 92 cm M.135.f Lembar 1.100 58,080.00 63,888.00
Paku sekrup M.56.j buah 6.000 5,208.75 31,252.50
JUMLAH HARGA BAHAN 95,140.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 120,477.87
E Overhead & Profit 15 % 0.150 18,071.68
F Harga Satuan Pekerjaan (D+E) 138,549.00
-
A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.084 93,597.00 7,862.15
Tukang Kayu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 25,337.37
B BAHAN -
Nok paten 105 cm M.135.g Lembar 1.200 46,464.00 55,756.80
Paku sekrup M.56.j buah 6.000 5,208.75 31,252.50
JUMLAH HARGA BAHAN 87,009.30
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 112,346.67
E Overhead & Profit 15 % 0.150 16,852.00
F Harga Satuan Pekerjaan (D+E) 129,198.00
-
A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.084 93,597.00 7,862.15
Tukang Kayu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 25,337.37
B BAHAN -
Nok paten 108 cm M.135.g Lembar 1.200 46,464.00 55,756.80
Paku sekrup M.56.j buah 6.000 5,208.75 31,252.50
JUMLAH HARGA BAHAN 87,009.30
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 112,346.67
E Overhead & Profit 15 % 0.150 16,852.00
F Harga Satuan Pekerjaan (D+E) 129,198.00
-
A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Kayu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 29,876.77
B BAHAN -
nok stel rata 92 cm M.135.f Lembar 1.100 58,080.00 63,888.00
Paku sekrup M.56.j buah 6.000 5,208.75 31,252.50
JUMLAH HARGA BAHAN 95,140.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 125,017.27
E Overhead & Profit 15 % 0.150 18,752.59
F Harga Satuan Pekerjaan (D+E) 143,769.00
-
A.4.5.2.29. Pemasangan 1 m’ nok steel rata 1,05m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.084 93,597.00 7,862.15
Tukang Kayu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 25,337.37
B BAHAN -
nok stel rata 105 cm M.135.g Lembar 1.100 46,464.00 51,110.40
Paku sekrup M.56.j buah 6.000 5,208.75 31,252.50
JUMLAH HARGA BAHAN 82,362.90
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 107,700.27
E Overhead & Profit 15 % 0.150 16,155.04
F Harga Satuan Pekerjaan (D+E) 123,855.00
-
A.4.5.2.30. Pemasangan 1 m2 genteng beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Kayu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.010 149,758.00 1,497.58
JUMLAH TENAGA KERJA 33,666.64
B BAHAN -
Genteng beton M.125 buah 11.000 8,674.29 95,417.14
Paku 10 cm M.56.f Kg 0.030 24,740.57 742.22
JUMLAH HARGA BAHAN 96,159.36
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 129,826.00
E Overhead & Profit 15 % 0.150 19,473.90
F Harga Satuan Pekerjaan (D+E) 149,299.00
-
A.4.5.2.31. Pemasangan 1 m2 genteng aspal (Onduvilla, 106Cm x 40Cm x 3mm) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Kayu L.02 OH 0.300 121,674.00 36,502.20
Kepala Tukang L.03 OH 0.003 128,226.00 384.68
Mandor L.04 OH 0.010 149,758.00 1,497.58
JUMLAH TENAGA KERJA 57,103.86
B BAHAN -
Genteng aspal (Onduvilla) M.132.a buah 3.667 55,968.00 205,216.00
Plywood 6 mm (120x240) M.32.b Lembar - 80,256.00 -
Paku 2,5 cm M.56.b Kg 0.030 22,704.00 681.12
Plastic aerator M.570 buah - 16,790.40 -
JUMLAH HARGA BAHAN 205,897.12
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 263,000.98
E Overhead & Profit 15 % 0.150 39,450.15
F Harga Satuan Pekerjaan (D+E) 302,451.00
-
A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Kayu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 32,318.82
B BAHAN -
Genteng metal M.128.a buah 1.300 52,800.00 68,640.00
Paku sekrup M.56.j Kg 0.200 5,208.75 1,041.75
JUMLAH HARGA BAHAN 69,681.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 102,000.57
E Overhead & Profit 15 % 0.150 15,300.09
F Harga Satuan Pekerjaan (D+E) 117,300.00
-
A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap Jurai -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Kayu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 32,318.82
B BAHAN -
Genteng metal M.128.a buah 2.000 52,800.00 105,600.00
Paku sekrup M.56.j Kg 0.200 5,208.75 1,041.75
JUMLAH HARGA BAHAN 106,641.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 138,960.57
E Overhead & Profit 15 % 0.150 20,844.09
F Harga Satuan Pekerjaan (D+E) 159,804.00
-
A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.166 93,597.00 15,537.10
Tukang Kayu L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 50,359.32
B BAHAN -
Sirap kayu M.141 buah 30.000 2,956.80 88,704.00
Paku 3,5 cm M.56.c Kg 0.200 22,176.00 4,435.20
JUMLAH HARGA BAHAN 93,139.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 143,498.52
E Overhead & Profit 15 % 0.150 21,524.78
F Harga Satuan Pekerjaan (D+E) 165,023.00
-
A.4.5.2.35. Pemasangan 1 m’ nok genteng beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.020 149,758.00 2,995.16
JUMLAH TENAGA KERJA 67,333.28
B BAHAN -
Nok genteng beton M.135.a buah 3.500 33,792.00 118,272.00
Paku sekrup M.56.j Kg 0.050 5,208.75 260.44
Portland cement M.245.a Kg 10.800 1,375.00 14,850.00
Pasir Pasang M.8.c m3 0.032 250,000.00 8,000.00
Semen warna M.244 Kg 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 156,382.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 223,715.72
E Overhead & Profit 15 % 0.150 33,557.36
F Harga Satuan Pekerjaan (D+E) 257,273.00
-
A.4.5.2.36. Pemasangan 1 m’ nok genteng aspal -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.125 93,597.00 11,699.63
Tukang Kayu L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 46,222.32
B BAHAN -
Nok genteng aspal M.135.d buah 2.000 68,640.00 137,280.00
Paku sekrup M.56.j Kg 0.050 5,208.75 260.44
Kayu kamper (balok) M.16.a m3 0.004 11,088,000.00 38,808.00
JUMLAH HARGA BAHAN 176,348.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 222,570.76
E Overhead & Profit 15 % 0.150 33,385.61
F Harga Satuan Pekerjaan (D+E) 255,956.00
-
A.4.5.2.37. Pemasangan 1 m’ nok genteng metal -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Kayu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 45,520.59
B BAHAN -
Nok genteng metal M.135.c buah 1.100 32,736.00 36,009.60
Paku sekrup M.56.j Kg 0.050 5,208.75 260.44
JUMLAH HARGA BAHAN 36,270.04
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 81,790.63
E Overhead & Profit 15 % 0.150 12,268.59
F Harga Satuan Pekerjaan (D+E) 94,059.00
-
A.4.5.2.38. Pemasangan 1 m’ nok sirap -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.125 93,597.00 11,699.63
Tukang Kayu L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 46,222.32
B BAHAN -
Seng plat bjls 28 M.137.f Lembar 0.400 44,000.00 17,600.00
Paku biasa ½" - 1" M.56.b Kg 0.050 22,704.00 1,135.20
Paku biasa 2"- 5" M.56.g Kg 0.050 21,648.00 1,082.40
JUMLAH HARGA BAHAN 19,817.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 66,039.92
E Overhead & Profit 15 % 0.150 9,905.99
F Harga Satuan Pekerjaan (D+E) 75,945.00
-
A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang Kayu L.02 OH 0.060 121,674.00 7,300.44
Kepala Tukang L.03 OH 0.006 128,226.00 769.36
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 20,199.98
B BAHAN -
Seng gelombang bljs 30 M.137.b Lembar 0.700 51,744.00 36,220.80
Paku biasa ½" - 1" M.56.b Kg 0.020 22,704.00 454.08
JUMLAH HARGA BAHAN 36,674.88
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 56,874.86
E Overhead & Profit 15 % 0.150 8,531.23
F Harga Satuan Pekerjaan (D+E) 65,406.00
-
A.4.5.2.40. Pemasangan 1 m’nok atap seng -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 24,352.86
B BAHAN -
Seng plat 3" x 6" bjls 28 M.137.e Lembar 0.300 71,808.00 21,542.40
Paku biasa ½" - 1" M.56.b Kg 0.040 22,704.00 908.16
JUMLAH HARGA BAHAN 22,450.56
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 46,803.42
E Overhead & Profit 15 % 0.150 7,020.51
F Harga Satuan Pekerjaan (D+E) 53,823.00
-
A.4.5.2.41. Pemasangan 1 m2 atap alumunium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.750 121,674.00 91,255.50
Kepala Tukang L.03 OH 0.080 128,226.00 10,258.08
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 116,451.68
B BAHAN -
Alumunium gelombang tebal 0,55 M.143 Lembar 0.350 116,160.00 40,656.00
Paku hak panj 15cm M.56.n Kg 0.020 12,672.00 253.44
JUMLAH HARGA BAHAN 40,909.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 157,361.12
E Overhead & Profit 15 % 0.150 23,604.17
F Harga Satuan Pekerjaan (D+E) 180,965.00
-
A.4.5.2.42. Pemasangan 1 m’ nok alumunium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Kayu L.02 OH 1.000 121,674.00 121,674.00
Kepala Tukang L.03 OH 0.100 128,226.00 12,822.60
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 151,344.20
B BAHAN -
Nok standar 40x18 M.135.e buah 1.200 5,280.00 6,336.00
Paku hak panj 15cm M.56.n Kg 0.020 12,672.00 253.44
JUMLAH HARGA BAHAN 6,589.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 157,933.64
E Overhead & Profit 15 % 0.150 23,690.05
F Harga Satuan Pekerjaan (D+E) 181,623.00
-
A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.050 121,674.00 6,083.70
Kepala Tukang L.03 OH 0.005 128,226.00 641.13
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 21,962.44
B BAHAN -
Aluminium foil M.560 M2 1.050 25,344.00 26,611.20
JUMLAH HARGA BAHAN 26,611.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 48,573.64
E Overhead & Profit 15 % 0.150 7,286.05
F Harga Satuan Pekerjaan (D+E) 55,859.00
-
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU -
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I (Jati) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 7.000 93,597.00 655,179.00
Tukang kayu L.02 OH 21.000 121,674.00 2,555,154.00
Kepala Tukang L.03 OH 2.100 128,226.00 269,274.60
Mandor L.04 OH 0.350 149,758.00 52,415.30
JUMLAH TENAGA KERJA 3,532,022.90
B BAHAN -
Kayu jati (balok) M.15.a m3 1.100 22,000,000.00 24,200,000.00
Paku 10 cm M.56.f Kg 1.250 24,740.57 30,925.71
Lem Kayu M.572 Kg 1.000 29,832.00 29,832.00
JUMLAH HARGA BAHAN 24,260,757.71
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 27,792,780.61
E Overhead & Profit 15 % 0.150 4,168,917.09
F Harga Satuan Pekerjaan (D+E) 31,961,697.00
-
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 6.000 93,597.00 561,582.00
Tukang kayu L.02 OH 18.000 121,674.00 2,190,132.00
Kepala Tukang L.03 OH 1.800 128,226.00 230,806.80
Mandor L.04 OH 0.300 149,758.00 44,927.40
JUMLAH TENAGA KERJA 3,027,448.20
B BAHAN -
Kayu bengkirai (balok) M.17.a m3 1.200 11,812,500.00 14,175,000.00
Paku 10 cm M.56.f Kg 1.250 24,740.57 30,925.71
Lem Kayu M.572 Kg 1.000 29,832.00 29,832.00
JUMLAH HARGA BAHAN 14,235,757.71
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 17,263,205.91
E Overhead & Profit 15 % 0.150 2,589,480.89
F Harga Satuan Pekerjaan (D+E) 19,852,686.00
-
A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.350 93,597.00 32,758.95
Tukang kayu L.02 OH 1.050 121,674.00 127,757.70
Kepala Tukang L.03 OH 0.105 128,226.00 13,463.73
Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 176,676.02
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.040 13,230,000.00 529,200.00
Paku 7 cm M.56.e Kg 0.050 23,232.00 1,161.60
JUMLAH HARGA BAHAN 530,361.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 707,037.62
E Overhead & Profit 15 % 0.150 106,055.64
F Harga Satuan Pekerjaan (D+E) 813,093.00
-
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III (Kruing) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.350 93,597.00 32,758.95
Tukang kayu L.02 OH 1.050 121,674.00 127,757.70
Kepala Tukang L.03 OH 0.105 128,226.00 13,463.73
Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 176,676.02
B BAHAN -
Kayu kruing (papan) M.18.b m3 0.040 8,505,000.00 340,200.00
Paku 7 cm M.56.e Kg 0.050 23,232.00 1,161.60
JUMLAH HARGA BAHAN 341,361.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 518,037.62
E Overhead & Profit 15 % 0.150 77,705.64
F Harga Satuan Pekerjaan (D+E) 595,743.00
-
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang kayu L.02 OH 3.000 121,674.00 365,022.00
Kepala Tukang L.03 OH 0.300 128,226.00 38,467.80
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 504,574.70
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.040 13,230,000.00 529,200.00
Lem Kayu M.572 Kg 0.500 29,832.00 14,916.00
JUMLAH HARGA BAHAN 544,116.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,048,690.70
E Overhead & Profit 15 % 0.150 157,303.60
F Harga Satuan Pekerjaan (D+E) 1,205,994.00
-
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.800 93,597.00 74,877.60
Tukang kayu L.02 OH 2.400 121,674.00 292,017.60
Kepala Tukang L.03 OH 0.240 128,226.00 30,774.24
Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 403,659.76
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.024 13,230,000.00 317,520.00
Lem Kayu M.572 Kg 0.300 29,832.00 8,949.60
JUMLAH HARGA BAHAN 326,469.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 730,129.36
E Overhead & Profit 15 % 0.150 109,519.40
F Harga Satuan Pekerjaan (D+E) 839,648.00
-
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang kayu L.02 OH 3.000 121,674.00 365,022.00
Kepala Tukang L.03 OH 0.300 128,226.00 38,467.80
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 504,574.70
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.064 13,230,000.00 846,720.00
Lem Kayu M.572 Kg 0.500 29,832.00 14,916.00
JUMLAH HARGA BAHAN 861,636.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,366,210.70
E Overhead & Profit 15 % 0.150 204,931.60
F Harga Satuan Pekerjaan (D+E) 1,571,142.00
-
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang kayu L.02 OH 2.100 121,674.00 255,515.40
Kepala Tukang L.03 OH 0.210 128,226.00 26,927.46
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 353,202.29
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.025 13,230,000.00 330,750.00
Paku 2,5 cm M.56.b kg 0.030 22,704.00 681.12
Lem Kayu M.572 kg 0.500 29,832.00 14,916.00
Plywood 4 mm (120x240) M.32.a Lembar 1.000 70,752.00 70,752.00
JUMLAH HARGA BAHAN 417,099.12
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 770,301.41
E Overhead & Profit 15 % 0.150 115,545.21
F Harga Satuan Pekerjaan (D+E) 885,846.00
-
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.800 93,597.00 74,877.60
Tukang kayu L.02 OH 2.400 121,674.00 292,017.60
Kepala Tukang L.03 OH 0.240 128,226.00 30,774.24
Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 403,659.76
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.026 13,230,000.00 338,688.00
Paku 2,5 cm M.56.b kg 0.030 22,704.00 681.12
Lem Kayu M.572 kg 0.500 29,832.00 14,916.00
Plywood 4 mm (120x240) M.32.a Lembar 1.000 70,752.00 70,752.00
JUMLAH HARGA BAHAN 425,037.12
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 828,696.88
E Overhead & Profit 15 % 0.150 124,304.53
F Harga Satuan Pekerjaan (D+E) 953,001.00
-
A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.670 93,597.00 62,709.99
Tukang kayu L.02 OH 2.000 121,674.00 243,348.00
Kepala Tukang L.03 OH 0.200 128,226.00 25,645.20
Mandor L.04 OH 0.335 149,758.00 50,168.93
JUMLAH TENAGA KERJA 381,872.12
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.060 13,230,000.00 793,800.00
Paku 2,5 cm M.56.b kg 0.150 22,704.00 3,405.60
JUMLAH HARGA BAHAN 797,205.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,179,077.72
E Overhead & Profit 15 % 0.150 176,861.66
F Harga Satuan Pekerjaan (D+E) 1,355,939.00
-
A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I (Jati) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.800 93,597.00 74,877.60
Tukang kayu L.02 OH 2.400 121,674.00 292,017.60
Kepala Tukang L.03 OH 0.240 128,226.00 30,774.24
Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 403,659.76
B BAHAN -
Kayu jati (papan) M.15.b m3 0.025 22,000,000.00 550,000.00
Paku 2,5 cm M.56.b kg 0.030 22,704.00 681.12
Lem Kayu M.572 kg 0.300 29,832.00 8,949.60
Teakwood 4 mm (90x220) M.31.a Lembar 1.000 105,000.00 105,000.00
JUMLAH HARGA BAHAN 664,630.72
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,068,290.48
E Overhead & Profit 15 % 0.150 160,243.57
F Harga Satuan Pekerjaan (D+E) 1,228,534.00
-
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas III (Kruing) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.850 93,597.00 79,557.45
Tukang kayu L.02 OH 2.550 121,674.00 310,268.70
Kepala Tukang L.03 OH 0.255 128,226.00 32,697.63
Mandor L.04 OH 0.043 149,758.00 6,439.59
JUMLAH TENAGA KERJA 428,963.37
B BAHAN -
Kayu kruing (papan) M.18.b m3 0.025 8,505,000.00 212,625.00
Paku 2,5 cm M.56.b kg 0.030 22,704.00 681.12
Lem Kayu M.572 kg 0.800 29,832.00 23,865.60
Teakwood 4 mm (90x220) M.31.a Lembar 1.000 105,000.00 105,000.00
Formika M.557 Lembar 0.500 64,416.00 32,208.00
JUMLAH HARGA BAHAN 374,379.72
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 803,343.09
E Overhead & Profit 15 % 0.150 120,501.46
F Harga Satuan Pekerjaan (D+E) 923,844.00
-
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 4.000 93,597.00 374,388.00
Tukang kayu L.02 OH 12.000 121,674.00 1,460,088.00
Kepala Tukang L.03 OH 1.200 128,226.00 153,871.20
Mandor L.04 OH 0.200 149,758.00 29,951.60
JUMLAH TENAGA KERJA 2,018,298.80
B BAHAN -
Kayu bengkirai (balok) M.17.a m3 1.100 11,812,500.00 12,993,750.00
Besi strip M.46.g kg 15.000 17,600.00 264,000.00
Paku 12 cm M.56.g kg 5.600 21,648.00 121,228.80
JUMLAH HARGA BAHAN 13,378,978.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 15,397,277.60
E Overhead & Profit 15 % 0.150 2,309,591.64
F Harga Satuan Pekerjaan (D+E) 17,706,869.00
-
A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I (Jati) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 6.700 93,597.00 627,099.90
Tukang kayu L.02 OH 20.100 121,674.00 2,445,647.40
Kepala Tukang L.03 OH 2.010 128,226.00 257,734.26
Mandor L.04 OH 0.335 149,758.00 50,168.93
JUMLAH TENAGA KERJA 3,380,650.49
B BAHAN -
Kayu jati (balok) M.15.a m3 1.200 22,000,000.00 26,400,000.00
Besi strip M.46.g kg 15.000 17,600.00 264,000.00
Paku 12 cm M.56.g kg 5.600 21,648.00 121,228.80
JUMLAH HARGA BAHAN 26,785,228.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 30,165,879.29
E Overhead & Profit 15 % 0.150 4,524,881.89
F Harga Satuan Pekerjaan (D+E) 34,690,761.00
-
A.4.6.1.15. Pemasangan 1 m3 konstruksi gording, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 2.400 93,597.00 224,632.80
Tukang kayu L.02 OH 7.200 121,674.00 876,052.80
Kepala Tukang L.03 OH 0.720 128,226.00 92,322.72
Mandor L.04 OH 0.120 149,758.00 17,970.96
JUMLAH TENAGA KERJA 1,210,979.28
B BAHAN -
Kayu bengkirai (balok) M.17.a m3 1.100 11,812,500.00 12,993,750.00
Besi strip M.46.g kg 15.000 17,600.00 264,000.00
Paku 12 cm M.56.g kg 3.000 21,648.00 64,944.00
JUMLAH HARGA BAHAN 13,322,694.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 14,533,673.28
E Overhead & Profit 15 % 0.150 2,180,050.99
F Harga Satuan Pekerjaan (D+E) 16,713,724.00
-
A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang kayu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN -
Kayu bengkirai (balok) M.17.a m3 0.165 11,812,500.00 1,949,062.50
Paku 7 cm M.56.e kg 0.200 23,232.00 4,646.40
JUMLAH HARGA BAHAN 1,953,708.90
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,981,978.68
E Overhead & Profit 15 % 0.150 297,296.80
F Harga Satuan Pekerjaan (D+E) 2,279,275.00
-
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas III (Kruing) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang kayu L.02 OH 0.300 121,674.00 36,502.20
Kepala Tukang L.03 OH 0.030 128,226.00 3,846.78
Mandor L.04 OH 0.075 149,758.00 11,231.85
JUMLAH TENAGA KERJA 65,620.38
B BAHAN -
Kayu kruing (balok) M.18.a m3 0.015 7,525,000.00 115,885.00
Paku 7 cm M.56.e kg 0.200 23,232.00 4,646.40
JUMLAH HARGA BAHAN 120,531.40
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 186,151.78
E Overhead & Profit 15 % 0.150 27,922.77
F Harga Satuan Pekerjaan (D+E) 214,074.00
-
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III (Kruing) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang kayu L.02 OH 0.300 121,674.00 36,502.20
Kepala Tukang L.03 OH 0.030 128,226.00 3,846.78
Mandor L.04 OH 0.010 149,758.00 1,497.58
JUMLAH TENAGA KERJA 60,565.96
B BAHAN -
Kayu kruing (balok) M.18.a m3 0.016 7,525,000.00 122,657.50
Paku 7 cm M.56.e kg 0.250 23,232.00 5,808.00
JUMLAH HARGA BAHAN 128,465.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 189,031.46
E Overhead & Profit 15 % 0.150 28,354.72
F Harga Satuan Pekerjaan (D+E) 217,386.00
-
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 37,007.81
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.011 13,230,000.00 142,884.00
Paku 7 cm M.56.e kg 0.100 23,232.00 2,323.20
JUMLAH HARGA BAHAN 145,207.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 182,215.01
E Overhead & Profit 15 % 0.150 27,332.25
F Harga Satuan Pekerjaan (D+E) 209,547.00
-
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 37,007.81
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.011 13,230,000.00 145,530.00
Paku 7 cm M.56.e kg 0.050 23,232.00 1,161.60
JUMLAH HARGA BAHAN 146,691.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 183,699.41
E Overhead & Profit 15 % 0.150 27,554.91
F Harga Satuan Pekerjaan (D+E) 211,254.00
-
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas III (Kruing) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang kayu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 75,761.08
B BAHAN -
Kayu kruing (balok) M.18.a m3 0.028 7,525,000.00 210,700.00
Paku 7 cm M.56.e kg 0.150 23,232.00 3,484.80
JUMLAH HARGA BAHAN 214,184.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 289,945.88
E Overhead & Profit 15 % 0.150 43,491.88
F Harga Satuan Pekerjaan (D+E) 333,437.00
-
A.4.6.1.24. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas III (Kruing) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang kayu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 75,761.08
B BAHAN -
Kayu kruing (balok) M.18.a m3 0.028 7,525,000.00 210,700.00
Paku 7 cm M.56.e kg 0.150 23,232.00 3,484.80
Teakwood 4 mm (120x240) M.31.b Lembar 0.860 112,000.00 96,320.00
Lem Kayu M.572 kg 0.560 29,832.00 16,705.92
JUMLAH HARGA BAHAN 327,210.72
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 402,971.80
E Overhead & Profit 15 % 0.150 60,445.77
F Harga Satuan Pekerjaan (D+E) 463,417.00
-
A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas III (kruing) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang kayu L.02 OH 0.600 121,674.00 73,004.40
Kepala Tukang L.03 OH 0.060 128,226.00 7,693.56
Mandor L.04 OH 0.010 149,758.00 1,497.58
JUMLAH TENAGA KERJA 100,914.94
B BAHAN -
Kayu kruing (balok) M.18.a m3 0.028 7,525,000.00 210,700.00
Paku 7 cm M.56.e kg 0.150 23,232.00 3,484.80
Plywood 4 mm (120x240) M.32.a Lembar 0.860 70,752.00 60,846.72
Lem Kayu M.572 kg 0.560 29,832.00 16,705.92
JUMLAH HARGA BAHAN 291,737.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 392,652.38
E Overhead & Profit 15 % 0.150 58,897.86
F Harga Satuan Pekerjaan (D+E) 451,550.00
-
A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari Kayu Papan kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.600 93,597.00 56,158.20
Tukang kayu L.02 OH 1.800 121,674.00 219,013.20
Kepala Tukang L.03 OH 0.180 128,226.00 23,080.68
Mandor L.04 OH 0.030 149,758.00 4,492.74
JUMLAH TENAGA KERJA 302,744.82
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.007 13,230,000.00 92,610.00
Paku 7 cm M.56.e kg 0.100 23,232.00 2,323.20
Paku sekrup M.56.j kg 0.150 5,208.75 781.31
JUMLAH HARGA BAHAN 95,714.51
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 398,459.33
E Overhead & Profit 15 % 0.150 59,768.90
F Harga Satuan Pekerjaan (D+E) 458,228.00
-
A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.025 93,597.00 2,339.93
Tukang kayu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 12,641.04
B BAHAN -
Plywood 4 mm (120x240) M.32.a Lembar 0.400 70,752.00 28,300.80
Paku 2,5 cm M.56.b kg 0.050 22,704.00 1,135.20
JUMLAH HARGA BAHAN 29,436.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 42,077.04
E Overhead & Profit 15 % 0.150 6,311.56
F Harga Satuan Pekerjaan (D+E) 48,388.00
-
A.4.6.1.28. Pemasangan 1 m2 dinding bilik bambu, rangka kayu kelas III (Kruing) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang kayu L.02 OH 0.050 121,674.00 6,083.70
Kepala Tukang L.03 OH 0.005 128,226.00 641.13
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 16,833.32
B BAHAN -
Sesek bambu (2x1,5m) M.555.a m2 1.500 5,280.00 7,920.00
Kayu kruing (balok) M.18.a m3 0.014 7,525,000.00 105,350.00
Paku 2,5 cm M.56.b kg 0.012 22,704.00 272.45
List kayu 2/4 M.30.a m' 0.003 4,224.00 12.67
JUMLAH HARGA BAHAN 113,555.12
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 130,388.44
E Overhead & Profit 15 % 0.150 19,558.27
F Harga Satuan Pekerjaan (D+E) 149,946.00
-
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA -
A.4.6.2.1. Pemasangan 1 buah kunci tanam antik -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.060 93,597.00 5,615.82
Tukang kayu L.02 OH 0.600 121,674.00 73,004.40
Kepala Tukang L.03 OH 0.060 128,226.00 7,693.56
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 86,763.05
B BAHAN -
Kunci tanam antik M.312.a buah 1.000 91,872.00 91,872.00
JUMLAH HARGA BAHAN 91,872.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 178,635.05
E Overhead & Profit 15 % 0.150 26,795.26
F Harga Satuan Pekerjaan (D+E) 205,430.00
-
A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.010 93,597.00 935.97
Tukang kayu L.02 OH 0.500 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 68,933.06
B BAHAN -
Kunci tanam biasa M.312.b buah 1.000 58,740.00 58,740.00
JUMLAH HARGA BAHAN 58,740.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 127,673.06
E Overhead & Profit 15 % 0.150 19,150.96
F Harga Satuan Pekerjaan (D+E) 146,824.00
-
A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.005 93,597.00 467.99
Tukang kayu L.02 OH 0.500 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 68,165.56
B BAHAN -
Kunci tanam kamar mandi M.312.c buah 1.000 42,240.00 42,240.00
JUMLAH HARGA BAHAN 42,240.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 110,405.56
E Overhead & Profit 15 % 0.150 16,560.83
F Harga Satuan Pekerjaan (D+E) 126,966.00
-
A.4.6.2.4. Pemasangan 1 buah kunci silinder -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.005 93,597.00 467.99
Tukang kayu L.02 OH 0.500 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 68,165.56
B BAHAN -
Kunci silinder M.311 buah 1.000 48,576.00 48,576.00
JUMLAH HARGA BAHAN 48,576.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 116,741.56
E Overhead & Profit 15 % 0.150 17,511.23
F Harga Satuan Pekerjaan (D+E) 134,252.00
-
A.4.6.2.5. Pemasangan 1 buah engsel pintu -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.015 93,597.00 1,403.96
Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 21,698.25
B BAHAN -
Engsel pintu (kw 1) M.305.b set 1.000 158,400.00 158,400.00
JUMLAH HARGA BAHAN 158,400.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 180,098.25
E Overhead & Profit 15 % 0.150 27,014.74
F Harga Satuan Pekerjaan (D+E) 207,112.00
-
A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.010 93,597.00 935.97
Tukang kayu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.001 149,758.00 74.88
JUMLAH TENAGA KERJA 14,460.51
B BAHAN -
Engsel kupu-kupu M.306 set 1.000 3,696.00 3,696.00
JUMLAH HARGA BAHAN 3,696.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 18,156.51
E Overhead & Profit 15 % 0.150 2,723.48
F Harga Satuan Pekerjaan (D+E) 20,879.00
-
A.4.6.2.7. Pemasangan 1 buah engsel angin -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.001 149,758.00 74.88
JUMLAH TENAGA KERJA 36,333.90
B BAHAN -
Engsel angin M.303 buah 1.000 25,344.00 25,344.00
JUMLAH HARGA BAHAN 25,344.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 61,677.90
E Overhead & Profit 15 % 0.150 9,251.68
F Harga Satuan Pekerjaan (D+E) 70,929.00
-
A.4.6.2.8. Pemasangan 1 buah spring knip -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.015 93,597.00 1,403.96
Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 22,776.51
B BAHAN -
Spring knip M.313 buah 1.000 29,040.00 29,040.00
JUMLAH HARGA BAHAN 29,040.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 51,816.51
E Overhead & Profit 15 % 0.150 7,772.48
F Harga Satuan Pekerjaan (D+E) 59,588.00
-
A.4.6.2.9. Pemasangan 1 buah kait angin -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.015 93,597.00 1,403.96
Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 22,776.51
B BAHAN -
Kait angin M.308 buah 1.000 17,072.00 17,072.00
JUMLAH HARGA BAHAN 17,072.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 39,848.51
E Overhead & Profit 15 % 0.150 5,977.28
F Harga Satuan Pekerjaan (D+E) 45,825.00
-
A.4.6.2.10. Pemasangan 1 buah door closer -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Tukang kayu L.02 OH 0.500 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 72,377.42
B BAHAN -
Door closer M.300 set 1.000 89,760.00 89,760.00
JUMLAH HARGA BAHAN 89,760.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 162,137.42
E Overhead & Profit 15 % 0.150 24,320.61
F Harga Satuan Pekerjaan (D+E) 186,458.00
-
A.4.6.2.11. Pemasangan 1 buah kunci slot -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.020 93,597.00 1,871.94
Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 28,921.02
B BAHAN -
Kunci selot M.310 buah 1.000 20,680.00 20,680.00
JUMLAH HARGA BAHAN 20,680.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 49,601.02
E Overhead & Profit 15 % 0.150 7,440.15
F Harga Satuan Pekerjaan (D+E) 57,041.00
-
A.4.6.2.12. Pemasangan 1 buah Door holder -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Tukang kayu L.02 OH 0.500 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 72,377.42
B BAHAN -
Door holder M.301 buah 1.000 127,079.04 127,079.04
JUMLAH HARGA BAHAN 127,079.04
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 199,456.46
E Overhead & Profit 15 % 0.150 29,918.47
F Harga Satuan Pekerjaan (D+E) 229,374.00
-
A.4.6.2.13. Pemasangan 1 buah door stop -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.010 93,597.00 935.97
Tukang kayu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 15,134.42
B BAHAN -
Door stop M.302 buah 1.000 34,320.00 34,320.00
JUMLAH HARGA BAHAN 34,320.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 49,454.42
E Overhead & Profit 15 % 0.150 7,418.16
F Harga Satuan Pekerjaan (D+E) 56,872.00
-
A.4.6.2.14. Pemasangan 1 buah Rel pintu sorong -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.060 93,597.00 5,615.82
Tukang kayu L.02 OH 0.600 121,674.00 73,004.40
Kepala Tukang L.03 OH 0.060 128,226.00 7,693.56
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 86,763.05
B BAHAN -
Rel pintu sorong M.316 Set 1.000 274,560.00 274,560.00
JUMLAH HARGA BAHAN 274,560.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 361,323.05
E Overhead & Profit 15 % 0.150 54,198.46
F Harga Satuan Pekerjaan (D+E) 415,521.00
-
A.4.6.2.15. Pemasangan 1 buah kunci lemari -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.025 93,597.00 2,339.93
Tukang kayu L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.001 149,758.00 194.69
JUMLAH TENAGA KERJA 36,158.76
B BAHAN -
Kunci lemari M.309 Set 1.000 17,600.00 17,600.00
JUMLAH HARGA BAHAN 17,600.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 53,758.76
E Overhead & Profit 15 % 0.150 8,063.81
F Harga Satuan Pekerjaan (D+E) 61,822.00
-
A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.015 93,597.00 1,403.96
Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 21,698.25
B BAHAN -
Kaca polos 3 mm M.352.a m2 1.100 95,040.00 104,544.00
Sealant kaca (besar) M.562.c Kg 0.050 44,352.00 2,217.60
JUMLAH HARGA BAHAN 106,761.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 128,459.85
E Overhead & Profit 15 % 0.150 19,268.98
F Harga Satuan Pekerjaan (D+E) 147,728.00
-
A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.015 93,597.00 1,403.96
Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 21,698.25
B BAHAN -
Kaca polos 5 mm M.352.b m2 1.100 137,280.00 151,008.00
Sealant kaca (besar) M.562.c Kg 0.050 44,352.00 2,217.60
JUMLAH HARGA BAHAN 153,225.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 174,923.85
E Overhead & Profit 15 % 0.150 26,238.58
F Harga Satuan Pekerjaan (D+E) 201,162.00
-
A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.017 93,597.00 1,591.15
Tukang kayu L.02 OH 0.170 121,674.00 20,684.58
Kepala Tukang L.03 OH 0.017 128,226.00 2,179.84
Mandor L.04 OH 0.001 149,758.00 134.78
JUMLAH TENAGA KERJA 24,590.35
B BAHAN -
Kaca polos 8 mm M.352.c m2 1.100 264,000.00 290,400.00
Sealant kaca (besar) M.562.c Kg 0.070 44,352.00 3,104.64
JUMLAH HARGA BAHAN 293,504.64
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 318,094.99
E Overhead & Profit 15 % 0.150 47,714.25
F Harga Satuan Pekerjaan (D+E) 365,809.00
-
A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.025 93,597.00 2,339.93
Tukang kayu L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.001 149,758.00 194.69
JUMLAH TENAGA KERJA 36,158.76
B BAHAN -
Kaca buram 12 mm M.354.b m2 1.100 366,080.00 402,688.00
Sealant kaca (besar) M.562.c Kg 0.070 44,352.00 3,104.64
JUMLAH HARGA BAHAN 405,792.64
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 441,951.40
E Overhead & Profit 15 % 0.150 66,292.71
F Harga Satuan Pekerjaan (D+E) 508,244.00
-
A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.015 93,597.00 1,403.96
Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 22,776.51
B BAHAN -
Kaca cermin 5 mm M.355.a m2 1.100 105,600.00 116,160.00
JUMLAH HARGA BAHAN 116,160.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 138,936.51
E Overhead & Profit 15 % 0.150 20,840.48
F Harga Satuan Pekerjaan (D+E) 159,776.00
-
A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.017 93,597.00 1,591.15
Tukang kayu L.02 OH 0.170 121,674.00 20,684.58
Kepala Tukang L.03 OH 0.017 128,226.00 2,179.84
Mandor L.04 OH 0.009 149,758.00 1,347.82
JUMLAH TENAGA KERJA 25,803.39
B BAHAN -
Kaca cermin 8 mm M.355.c m2 1.100 271,744.00 298,918.40
JUMLAH HARGA BAHAN 298,918.40
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 324,721.79
E Overhead & Profit 15 % 0.150 48,708.27
F Harga Satuan Pekerjaan (D+E) 373,430.00
-
A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.015 93,597.00 1,403.96
Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 22,776.51
B BAHAN -
Kaca patri 5 mm M.356 m2 1.100 237,600.00 261,360.00
Sealant kaca (besar) M.562.c Kg 0.050 44,352.00 2,217.60
JUMLAH HARGA BAHAN 263,577.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 286,354.11
E Overhead & Profit 15 % 0.150 42,953.12
F Harga Satuan Pekerjaan (D+E) 329,307.00
-
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN -
A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 14,488.82
B BAHAN -
Soda api M.561 Kg 0.050 22,176.00 1,108.80
JUMLAH HARGA BAHAN 1,108.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 15,597.62
E Overhead & Profit 15 % 0.150 2,339.64
F Harga Satuan Pekerjaan (D+E) 17,937.00
-
A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 14,488.82
B BAHAN -
Sabun M.558 Kg 0.050 12,672.00 633.60
JUMLAH HARGA BAHAN 633.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 15,122.42
E Overhead & Profit 15 % 0.150 2,268.36
F Harga Satuan Pekerjaan (D+E) 17,390.00
-
A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 15,237.61
B BAHAN -
Sabun M.558 Kg 0.050 12,000.00 600.00
JUMLAH HARGA BAHAN 600.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 15,837.61
E Overhead & Profit 15 % 0.150 2,375.64
F Harga Satuan Pekerjaan (D+E) 18,213.00
-
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.070 93,597.00 6,551.79
Tukang cat L.02 OH 0.009 121,674.00 1,095.07
Kepala Tukang L.03 OH 0.006 128,226.00 769.36
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 8,865.49
B BAHAN -
Meni kayu M.268.a Kg 0.200 36,000.00 7,200.00
Plamir kayu M.273.a Kg 0.150 23,232.00 3,484.80
Cat dasar (cat kayu) M.260.a Kg 0.170 50,388.89 8,566.11
Cat penutup (cat kayu) M.260.b Kg 0.260 54,000.00 14,040.00
Kuas 1" M.272.d buah 0.010 5,280.00 52.80
Pengencer cat kayu/besi M.276.a Kg 0.030 26,500.00 795.00
Ampelas M.271 Lembar 0.200 5,350.00 1,070.00
JUMLAH HARGA BAHAN 35,208.71
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 44,074.20
E Overhead & Profit 15 % 0.150 6,611.13
F Harga Satuan Pekerjaan (D+E) 50,685.00
-
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.070 93,597.00 6,551.79
Tukang cat L.02 OH 0.105 121,674.00 12,775.77
Kepala Tukang L.03 OH 0.004 128,226.00 512.90
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 20,289.74
B BAHAN -
Meni kayu M.268.a Kg 0.200 36,000.00 7,200.00
Plamir kayu M.273.a Kg 0.150 23,232.00 3,484.80
Cat dasar (cat kayu) M.260.a Kg 0.170 50,388.89 8,566.11
Cat penutup (cat kayu) M.260.b Kg 0.350 54,000.00 18,900.00
Kuas 2" M.272.c buah 0.010 8,712.00 87.12
Pengencer cat kayu/besi M.276.a Kg 0.030 26,500.00 795.00
Ampelas M.271 Lembar 0.200 5,350.00 1,070.00
JUMLAH HARGA BAHAN 40,103.03
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 60,392.77
E Overhead & Profit 15 % 0.150 9,058.92
F Harga Satuan Pekerjaan (D+E) 69,451.00
-
A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.040 93,597.00 3,743.88
Tukang cat L.02 OH 0.063 121,674.00 7,665.46
Kepala Tukang L.03 OH 0.063 128,226.00 8,078.24
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 19,936.85
B BAHAN -
Teak oil M.392 Liter 0.360 30,900.00 11,124.00
JUMLAH HARGA BAHAN 11,124.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,060.85
E Overhead & Profit 15 % 0.150 4,659.13
F Harga Satuan Pekerjaan (D+E) 35,719.00
-
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.040 93,597.00 3,743.88
Tukang cat L.02 OH 0.060 121,674.00 7,300.44
Kepala Tukang L.03 OH 0.016 128,226.00 2,051.62
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 13,545.21
B BAHAN -
Politur M.274.a Liter 0.150 65,120.00 9,768.00
Politur jadi M.274.b Liter 0.372 80,080.00 29,789.76
Ampelas M.271 Lembar 2.000 5,350.00 10,700.00
JUMLAH HARGA BAHAN 50,257.76
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 63,802.97
E Overhead & Profit 15 % 0.150 9,570.45
F Harga Satuan Pekerjaan (D+E) 73,373.00
-
A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 10,258.25
B BAHAN -
Residu M.391 Liter 0.350 10,000.00 3,500.00
JUMLAH HARGA BAHAN 3,500.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,758.25
E Overhead & Profit 15 % 0.150 2,063.74
F Harga Satuan Pekerjaan (D+E) 15,821.00
-
A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.160 93,597.00 14,975.52
Tukang cat L.02 OH 0.160 121,674.00 19,467.84
Kepala Tukang L.03 OH 0.016 128,226.00 2,051.62
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 36,944.25
B BAHAN -
Vernis M.275 Liter 0.150 60,720.00 9,108.00
Dempul M.269.a Kg 0.050 32,736.00 1,636.80
Ampelas M.271 Lembar 0.100 5,350.00 535.00
JUMLAH HARGA BAHAN 11,279.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 48,224.05
E Overhead & Profit 15 % 0.150 7,233.61
F Harga Satuan Pekerjaan (D+E) 55,457.00
-
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Interior setara mowilex -
(Decorcryl, Dulux Pentalite, Nippon)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.020 93,597.00 1,871.94
Tukang cat L.02 OH 0.063 121,674.00 7,665.46
Kepala Tukang L.03 OH 0.006 128,226.00 807.82
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,794.50
B BAHAN -
Plamir tembok M.273.b Kg 0.100 31,680.00 3,168.00
Cat dasar (cat tembok interior) setara mowilex M.263.a Kg 0.100 117,004.80 11,700.48
Cat penutup (cat tembok interior) setara mowilex M.263.b Kg 0.260 131,472.00 34,182.72
JUMLAH HARGA BAHAN 49,051.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 59,845.70
E Overhead & Profit 15 % 0.150 8,976.85
F Harga Satuan Pekerjaan (D+E) 68,822.00
-
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Interior setara mowilex -
(Decorcryl, Dulux Pentalite, Nippon)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.028 93,597.00 2,620.72
Tukang cat L.02 OH 0.042 121,674.00 5,110.31
Kepala Tukang L.03 OH 0.004 128,226.00 538.55
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 8,718.85
B BAHAN -
Cat dasar (cat tembok interior) setara mowilex M.263.a Kg 0.120 117,004.80 14,040.58
Cat penutup (cat tembok interior) setara mowilex M.263.b Kg 0.180 131,472.00 23,664.96
JUMLAH HARGA BAHAN 37,705.54
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 46,424.38
E Overhead & Profit 15 % 0.150 6,963.66
F Harga Satuan Pekerjaan (D+E) 53,388.00
-
A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.028 93,597.00 2,620.72
Tukang cat L.02 OH 0.042 121,674.00 5,110.31
Kepala Tukang L.03 OH 0.004 128,226.00 538.55
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 8,718.85
B BAHAN -
Kalkarium M.280 Kg 0.100 6,864.00 686.40
JUMLAH HARGA BAHAN 686.40
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 9,405.25
E Overhead & Profit 15 % 0.150 1,410.79
F Harga Satuan Pekerjaan (D+E) 10,816.00
-
A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang cat L.02 OH 0.001 121,674.00 121.67
Kepala Tukang L.03 OH 0.000 128,226.00 12.82
Mandor L.04 OH 0.003 149,758.00 374.40
JUMLAH TENAGA KERJA 14,548.44
B BAHAN -
Kapur sirih M.281 Kg 0.150 10,000.00 1,500.00
Ampelas M.271 Lembar 0.100 5,350.00 535.00
Alang-alang Ikat 0.250 10,000.00 2,500.00
JUMLAH HARGA BAHAN 4,535.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 19,083.44
E Overhead & Profit 15 % 0.150 2,862.52
F Harga Satuan Pekerjaan (D+E) 21,945.00
-
A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.040 93,597.00 3,743.88
Tukang cat L.02 OH 0.005 121,674.00 608.37
Kepala Tukang L.03 OH 0.001 128,226.00 64.11
Mandor L.04 OH 0.003 149,758.00 374.40
JUMLAH TENAGA KERJA 4,790.76
B BAHAN -
Kapur sirih M.281 Kg 0.300 10,000.00 3,000.00
Ampelas M.271 Lembar 0.200 5,350.00 1,070.00
Alang-alang Ikat 0.250 10,000.00 2,500.00
JUMLAH HARGA BAHAN 6,570.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 11,360.76
E Overhead & Profit 15 % 0.150 1,704.11
F Harga Satuan Pekerjaan (D+E) 13,064.00
-
-
A.4.7.1.16. Pengecatan 1 m2 permukaan besi / baja dengan menie besi -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.020 93,597.00 1,871.94
Tukang cat L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.003 149,758.00 374.40
JUMLAH TENAGA KERJA 29,145.66
B BAHAN -
Meni besi M.268.b Kg 0.100 37,714.29 3,771.43
Kuas 1" M.272.d buah 0.010 5,280.00 52.80
JUMLAH HARGA BAHAN 3,824.23
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 32,969.88
E Overhead & Profit 15 % 0.150 4,945.48
F Harga Satuan Pekerjaan (D+E) 37,915.00
-
A.4.7.1.17. Pengecatan 1 m2 permukaan besi / baja dengan menie besi dengan perancah -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang cat L.02 OH 0.225 121,674.00 27,376.65
Kepala Tukang L.03 OH 0.023 128,226.00 2,885.09
Mandor L.04 OH 0.008 149,758.00 1,123.19
JUMLAH TENAGA KERJA 54,784.17
B BAHAN -
Meni besi M.268.b Kg 0.100 37,714.29 3,771.43
Thinner M.273.b Liter 0.010 31,680.00 316.80
Kuas 1" M.272.d buah 0.010 5,280.00 52.80
Perancah kayu A.2.2.1.10. m3 0.002 387,002.00 774.00
JUMLAH HARGA BAHAN 4,915.03
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 59,699.20
E Overhead & Profit 15 % 0.150 8,954.88
F Harga Satuan Pekerjaan (D+E) 68,654.00
-
A.4.7.1.18. Pengecatan 1 m2 permukaan besi / baja galvanis secara manual 4 lapis -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang cat L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.001 149,758.00 194.69
JUMLAH TENAGA KERJA 57,218.09
B BAHAN -
Cat dasar (cat besi) M.261.a Kg 0.100 59,450.00 5,945.00
Cat antara (cat besi) M.261.b Kg 0.100 74,333.33 7,433.33
Cat penutup (Cat besi) M.261.c Kg 0.080 48,500.00 3,880.00
Kuas 1" M.272.d buah 0.010 5,280.00 52.80
Thinner M.273.b Liter 0.010 31,680.00 316.80
JUMLAH HARGA BAHAN 17,627.93
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 74,846.02
E Overhead & Profit 15 % 0.150 11,226.90
F Harga Satuan Pekerjaan (D+E) 86,072.00
-
A.4.7.1.19. Pengecatan 1 m2 permukaan besi / baja galvanis secara manual sistem 1 lapis cat mutakhir -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.060 93,597.00 5,615.82
Tukang cat L.02 OH 0.060 121,674.00 7,300.44
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 14,904.25
B BAHAN -
Cat penutup (Cat besi) M.261.c Kg 0.300 48,500.00 14,550.00
Kuas 1" M.272.d buah 0.010 5,280.00 52.80
Thinner M.273.b Liter 0.010 31,680.00 316.80
JUMLAH HARGA BAHAN 14,919.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 29,823.85
E Overhead & Profit 15 % 0.150 4,473.58
F Harga Satuan Pekerjaan (D+E) 34,297.00
-
A.4.7.1.20. Pengecatan 1 m2 permukaan besi / baja galvanis secara manual sistem 3 lapis -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang cat L.02 OH 0.800 121,674.00 97,339.20
Kepala Tukang L.03 OH 0.080 128,226.00 10,258.08
Mandor L.04 OH 0.020 149,758.00 2,995.16
JUMLAH TENAGA KERJA 148,031.24
B BAHAN -
Cat dasar (cat besi) M.261.a Kg 0.110 59,450.00 6,539.50
Cat antara (cat besi) M.261.b Kg 0.170 74,333.33 12,636.67
Cat penutup (Cat besi) M.261.c Kg 0.080 48,500.00 3,880.00
Kuas 1" M.272.d buah 0.010 5,280.00 52.80
Thinner M.273.b Liter 0.010 31,680.00 316.80
JUMLAH HARGA BAHAN 23,425.77
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 171,457.01
E Overhead & Profit 15 % 0.150 25,718.55
F Harga Satuan Pekerjaan (D+E) 197,175.00
-
A.4.7.1.21. Pengecatan 1 m2 permukaan besi / baja galvanis secara semprot sistem 3 lapis cat mutakhir -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang cat L.02 OH 0.700 121,674.00 85,171.80
Kepala Tukang L.03 OH 0.070 128,226.00 8,975.82
Mandor L.04 OH 0.020 149,758.00 2,995.16
JUMLAH TENAGA KERJA 134,581.58
B BAHAN -
Cat penutup (Cat besi) M.261.c Kg 0.300 48,500.00 14,550.00
Thinner M.273.b Liter 0.010 31,680.00 316.80
JUMLAH HARGA BAHAN 14,866.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 149,448.38
E Overhead & Profit 15 % 0.150 22,417.26
F Harga Satuan Pekerjaan (D+E) 171,865.00
-
A.4.7.1.22. Plituran 10 m2 dengan plitur melamic -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 2.000 93,597.00 187,194.00
Tukang cat L.02 OH 12.000 121,674.00 1,460,088.00
Kepala Tukang L.03 OH 1.200 128,226.00 153,871.20
Mandor L.04 OH 0.100 149,758.00 14,975.80
JUMLAH TENAGA KERJA 1,816,129.00
B BAHAN -
Wood filler M.278 kg 1.500 54,384.00 81,576.00
Woodstain 51,500 kg 1.500 56,700.00 85,050.00
Shanding M.277 kg 1.500 102,432.00 153,648.00
Melamic M.279 kg 2.400 6,864.00 16,473.60
Thinner M.273.b Liter 2.000 31,680.00 63,360.00
Ampelas M.271 Lembar 6.000 5,350.00 32,100.00
JUMLAH HARGA BAHAN 432,207.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,248,336.60
E Overhead & Profit 15 % 0.150 337,250.49
F Harga Satuan Pekerjaan (D+E) 2,585,587.00
-
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG -
A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock (Biasa) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.500 93,597.00 46,798.50
Tukang batu L.02 OH 1.100 121,674.00 133,841.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.160 149,758.00 23,961.28
JUMLAH TENAGA KERJA 205,883.44
B BAHAN -
Kloset duduk/monoblok (biasa / KW) M.376.a Unit 1.000 1,147,643.20 1,147,643.20
Perlengkapan % 6.000 1,147,643.20 68,858.59
JUMLAH HARGA BAHAN 1,216,501.79
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,422,385.23
E Overhead & Profit 15 % 0.150 213,357.78
F Harga Satuan Pekerjaan (D+E) 1,635,743.00
-
A.5.1.1 2.a Pemasangan 1 buah closet jongkok porselen (Biasa) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang batu L.02 OH 1.500 121,674.00 182,511.00
Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
Mandor L.04 OH 0.160 149,758.00 23,961.28
JUMLAH TENAGA KERJA 319,303.18
B BAHAN -
Kloset jongkok porselen (biasa) M.377.a Unit 1.000 137,280.00 137,280.00
Portland cement M.245.a Kg 6.000 1,375.00 8,250.00
Pasir Pasang M.8.c m3 0.036 300,000.00 10,800.00
JUMLAH HARGA BAHAN 156,330.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 475,633.18
E Overhead & Profit 15 % 0.150 71,344.98
F Harga Satuan Pekerjaan (D+E) 546,978.00
-
A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang batu L.02 OH 1.500 121,674.00 182,511.00
Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 302,829.80
B BAHAN -
Closet jongkok teraso Unit 1.000 150,000.00 150,000.00
Portland cement M.245.a Kg 6.000 1,375.00 8,250.00
Pasir Pasang M.8.c m3 0.036 300,000.00 10,800.00
Bata merah 5 x 11 x 22 cm M.218.a buah 7.000 864.41 6,050.88
JUMLAH HARGA BAHAN 175,100.88
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 477,930.68
E Overhead & Profit 15 % 0.150 71,689.60
F Harga Satuan Pekerjaan (D+E) 549,620.00
-
A.5.1.1 4. (K3) Pemasangan 1 buah urinoir -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang batu L.02 OH 1.000 121,674.00 121,674.00
Kepala Tukang L.03 OH 0.100 128,226.00 12,822.60
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 235,581.50
B BAHAN -
Urinoir (Besar) M.379.b Unit 1.000 1,383,360.00 1,383,360.00
Portland cement M.245.a Kg 6.000 1,375.00 8,250.00
Pasir Pasang M.8.c m3 0.010 300,000.00 3,000.00
Perlengkapan % 30.000 1,383,360.00 415,008.00
JUMLAH HARGA BAHAN 1,809,618.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,045,199.50
E Overhead & Profit 15 % 0.150 306,779.93
F Harga Satuan Pekerjaan (D+E) 2,351,979.00
-
A.5.1.1 5. (K3) Pemasangan 1 buah wastafel -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.200 93,597.00 112,316.40
Tukang batu L.02 OH 1.450 121,674.00 176,427.30
Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
Mandor L.04 OH 0.060 149,758.00 8,985.48
JUMLAH TENAGA KERJA 316,963.08
B BAHAN -
Wastafel (persegi) M.380.a Unit 1.200 411,840.00 494,208.00
Portland cement M.245.a Kg 6.000 1,375.00 8,250.00
Pasir Pasang M.8.c m3 0.010 300,000.00 3,000.00
Perlengkapan % 12.000 494,208.00 59,304.96
JUMLAH HARGA BAHAN 564,762.96
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 881,726.04
E Overhead & Profit 15 % 0.150 132,258.91
F Harga Satuan Pekerjaan (D+E) 1,013,984.00
-
A.5.1.1 6. (K3) Pemasangan 1 buah bathcuip porselen -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.075 93,597.00 7,019.78
Tukang batu L.02 OH 0.750 121,674.00 91,255.50
Kepala Tukang L.03 OH 0.075 128,226.00 9,616.95
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 108,341.50
B BAHAN -
bathcup Unit 1.000 2,900,000.00 2,900,000.00
Perlengkapan % 20.000 2,900,000.00 580,000.00
JUMLAH HARGA BAHAN 3,480,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,588,341.50
E Overhead & Profit 15 % 0.150 538,251.22
F Harga Satuan Pekerjaan (D+E) 4,126,592.00
-
A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 3.000 93,597.00 280,791.00
Tukang batu L.02 OH 4.500 121,674.00 547,533.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.900 149,758.00 134,782.20
JUMLAH TENAGA KERJA 969,517.50
B BAHAN -
bak mandi teraso vol 0,30 m3 Unit 1.000 515,000.00 515,000.00
Perlengkapan % 12.000 515,000.00 61,800.00
JUMLAH HARGA BAHAN 576,800.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,546,317.50
E Overhead & Profit 15 % 0.150 231,947.63
F Harga Satuan Pekerjaan (D+E) 1,778,265.00
-
A.5.1.1 11. Pemasangan 1 buah bak beton volume 1 m3 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 3.500 93,597.00 327,589.50
Tukang batu L.02 OH 4.500 121,674.00 547,533.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 884,229.44
B BAHAN -
Beton 1:2:3 m3 0.900 1,104,245.10 993,820.59
Baja tulangan polos U-24 M.46.a Kg 180.000 12,344.68 2,222,042.97
Kayu Sengon (papan) M.28.a M2 8.000 2,217,600.00 17,740,800.00
Keramik 20 x 20 cm (putih) M.172.a buah 500.000 2,259.84 1,129,920.00
Perlengkapan % 10.000 22,086,583.56 2,208,658.36
JUMLAH HARGA BAHAN 24,295,241.91
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 25,179,471.36
E Overhead & Profit 15 % 0.150 3,776,920.70
F Harga Satuan Pekerjaan (D+E) 28,956,392.00
-
A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.030 93,597.00 2,807.91
Tukang batu L.02 OH 0.300 121,674.00 36,502.20
Kepala Tukang L.03 OH 0.030 128,226.00 3,846.78
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 45,403.26
B BAHAN -
Bak cuci stainless steel (kecil) M.370.a Unit 1.000 155,584.00 155,584.00
Water drain + asesories M.382 buah 1.000 63,360.00 63,360.00
JUMLAH HARGA BAHAN 218,944.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 264,347.26
E Overhead & Profit 15 % 0.150 39,652.09
F Harga Satuan Pekerjaan (D+E) 303,999.00
-
A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Tukang batu L.02 OH 0.500 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.025 149,758.00 3,743.95
JUMLAH TENAGA KERJA 75,672.10
B BAHAN -
Bak cuci piring teraso Unit 1.000 780,000.00 780,000.00
Water drain + asesories M.382 buah 1.000 63,360.00 63,360.00
Portland cement M.245.a Kg 20.000 1,375.00 27,500.00
Pasir Pasang M.8.c m3 0.050 300,000.00 15,000.00
JUMLAH HARGA BAHAN 885,860.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 961,532.10
E Overhead & Profit 15 % 0.150 144,229.82
F Harga Satuan Pekerjaan (D+E) 1,105,761.00
-
A.5.1.1 14. Pemasangan 1 buah floor drain stainles steel -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.010 93,597.00 935.97
Tukang batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 15,134.42
B BAHAN -
Floor drain stainles steel M.375.a Unit 1.000 88,000.00 88,000.00
JUMLAH HARGA BAHAN 88,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 103,134.42
E Overhead & Profit 15 % 0.150 15,470.16
F Harga Satuan Pekerjaan (D+E) 118,604.00
-
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 2.160 93,597.00 202,169.52
Tukang batu L.02 OH 0.720 121,674.00 87,605.28
Kepala Tukang L.03 OH 0.072 128,226.00 9,232.27
Mandor L.04 OH 0.011 149,758.00 1,647.34
JUMLAH TENAGA KERJA 300,654.41
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 40.000 864.41 34,576.46
Portland cement M.245.a Kg 44.000 1,375.00 60,500.00
Pasir Pasang M.8.c m3 0.070 300,000.00 21,000.00
Pasir Beton (m3) M.9.c m3 0.060 339,234.40 20,354.06
Koral beton M.11.b m3 0.070 397,760.00 27,843.20
Baja tulangan polos U-24 M.46.a Kg 1.600 12,344.68 19,751.49
JUMLAH HARGA BAHAN 184,025.21
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 484,679.62
E Overhead & Profit 15 % 0.150 72,701.94
F Harga Satuan Pekerjaan (D+E) 557,381.00
-
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 3.200 93,597.00 299,510.40
Tukang batu L.02 OH 1.150 121,674.00 139,925.10
Kepala Tukang L.03 OH 0.011 128,226.00 1,410.49
Mandor L.04 OH 0.016 149,758.00 2,396.13
JUMLAH TENAGA KERJA 443,242.11
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 864.41 60,508.80
Portland cement M.245.a Kg 77.000 1,375.00 105,875.00
Pasir Pasang M.8.c m3 0.130 300,000.00 39,000.00
Pasir Beton (m3) M.9.c m3 0.090 339,234.40 30,531.10
Koral beton M.11.b m3 0.020 397,760.00 7,955.20
Baja tulangan polos U-24 M.46.a Kg 2.600 12,344.68 32,096.18
JUMLAH HARGA BAHAN 275,966.27
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 719,208.39
E Overhead & Profit 15 % 0.150 107,881.26
F Harga Satuan Pekerjaan (D+E) 827,089.00
-
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 3.200 93,597.00 299,510.40
Tukang batu L.02 OH 1.150 121,674.00 139,925.10
Kepala Tukang L.03 OH 0.011 128,226.00 1,410.49
Mandor L.04 OH 0.016 149,758.00 2,396.13
JUMLAH TENAGA KERJA 443,242.11
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 123.000 864.41 106,322.61
Portland cement M.245.a Kg 114.000 1,375.00 156,750.00
Pasir Pasang M.8.c m3 0.184 300,000.00 55,200.00
Pasir Beton (m3) M.9.c m3 0.120 339,234.40 40,708.13
Koral beton M.11.b m3 0.033 397,760.00 13,126.08
Baja tulangan polos U-24 M.46.a Kg 4.850 12,344.68 59,871.71
JUMLAH HARGA BAHAN 431,978.53
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 875,220.64
E Overhead & Profit 15 % 0.150 131,283.10
F Harga Satuan Pekerjaan (D+E) 1,006,503.00
-
A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.054 93,597.00 5,054.24
Tukang batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.027 149,758.00 4,043.47
JUMLAH TENAGA KERJA 21,202.40
B BAHAN -
Pipa galvanis medium A Ø 1/2" panjang 6 m M.44.a M 1.200 269,280.00 323,136.00
Perlengkapan % 35.000 323,136.00 113,097.60
JUMLAH HARGA BAHAN 436,233.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 457,436.00
E Overhead & Profit 15 % 0.150 68,615.40
F Harga Satuan Pekerjaan (D+E) 526,051.00
-
A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” (Stainles steel) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.010 93,597.00 935.97
Tukang batu L.02 OH 0.400 121,674.00 48,669.60
Kepala Tukang L.03 OH 0.040 128,226.00 5,129.04
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 55,483.40
B BAHAN -
Kran Air, (setara ONDA) M.378.b Buah 1.000 28,666.67 28,666.67
Seal tape M.559 Buah 0.025 5,750.00 143.75
JUMLAH HARGA BAHAN 28,810.42
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 84,293.82
E Overhead & Profit 15 % 0.150 12,644.07
F Harga Satuan Pekerjaan (D+E) 96,937.00
-
A.5.1.1 20. Pemasangan 1 m’ pipa galvanis medium B diameter 3/4” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.054 93,597.00 5,054.24
Tukang batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.027 149,758.00 4,043.47
JUMLAH TENAGA KERJA 21,202.40
B BAHAN -
Pipa galvanis medium B Ø 3/4" panjang 6 m M.43.b M 1.200 168,960.00 202,752.00
Perlengkapan % 35.000 202,752.00 70,963.20
JUMLAH HARGA BAHAN 273,715.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 294,917.60
E Overhead & Profit 15 % 0.150 44,237.64
F Harga Satuan Pekerjaan (D+E) 339,155.00
-
A.5.1.1 21. Pemasangan 1 m’ pipa galvanis medium B diameter 1” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.054 93,597.00 5,054.24
Tukang batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.027 149,758.00 4,043.47
JUMLAH TENAGA KERJA 21,202.40
B BAHAN -
Pipa galvanis medium B Ø 1" panjang 6 m M.43.c M 1.200 227,040.00 272,448.00
Perlengkapan % 35.000 272,448.00 95,356.80
JUMLAH HARGA BAHAN 367,804.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 389,007.20
E Overhead & Profit 15 % 0.150 58,351.08
F Harga Satuan Pekerjaan (D+E) 447,358.00
-
A.5.1.1 22. Pemasangan 1 m’ pipa galvanis medium B diameter 1 ½” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.108 93,597.00 10,108.48
Tukang batu L.02 OH 0.180 121,674.00 21,901.32
Kepala Tukang L.03 OH 0.018 128,226.00 2,308.07
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 35,066.65
B BAHAN -
Pipa galvanis medium B Ø 1 1/2" panjang 6 m M.43.d M 1.200 348,480.00 418,176.00
Perlengkapan % 35.000 418,176.00 146,361.60
JUMLAH HARGA BAHAN 564,537.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 599,604.25
E Overhead & Profit 15 % 0.150 89,940.64
F Harga Satuan Pekerjaan (D+E) 689,544.00
-
A.5.1.1 23. Pemasangan 1 m’ pipa galvanis medium B diameter 3” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.135 93,597.00 12,635.60
Tukang batu L.02 OH 0.225 121,674.00 27,376.65
Kepala Tukang L.03 OH 0.023 128,226.00 2,949.20
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 44,009.75
B BAHAN -
Pipa galvanis medium B Ø 3" panjang 6 m M.43.f M 1.200 612,480.00 734,976.00
Perlengkapan % 35.000 734,976.00 257,241.60
JUMLAH HARGA BAHAN 992,217.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,036,227.35
E Overhead & Profit 15 % 0.150 155,434.10
F Harga Satuan Pekerjaan (D+E) 1,191,661.00
-
A.5.1.1 24. Pemasangan 1 m’ pipa galvanis medium B diameter 4” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.135 93,597.00 12,635.60
Tukang batu L.02 OH 0.225 121,674.00 27,376.65
Kepala Tukang L.03 OH 0.023 128,226.00 2,949.20
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 44,009.75
B BAHAN -
Pipa galvanis medium B Ø 4" panjang 6 m M.43.g M 1.200 781,440.00 937,728.00
Perlengkapan % 35.000 937,728.00 328,204.80
JUMLAH HARGA BAHAN 1,265,932.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,309,942.55
E Overhead & Profit 15 % 0.150 196,491.38
F Harga Satuan Pekerjaan (D+E) 1,506,433.00
-
A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.036 93,597.00 3,369.49
Tukang batu L.02 OH 0.060 121,674.00 7,300.44
Kepala Tukang L.03 OH 0.006 128,226.00 769.36
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 11,738.80
B BAHAN -
Pipa PVC tipe AW Ø 1/2" panjang 4 m M.40.a M 1.200 33,800.00 40,560.00
Perlengkapan % 35.000 40,560.00 14,196.00
JUMLAH HARGA BAHAN 54,756.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 66,494.80
E Overhead & Profit 15 % 0.150 9,974.22
F Harga Satuan Pekerjaan (D+E) 76,469.00
-
A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.036 93,597.00 3,369.49
Tukang batu L.02 OH 0.060 121,674.00 7,300.44
Kepala Tukang L.03 OH 0.006 128,226.00 769.36
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 11,738.80
B BAHAN -
Pipa PVC tipe AW Ø 3/4" panjang 4 m M.40.b M 1.200 42,541.71 51,050.06
Perlengkapan % 35.000 51,050.06 17,867.52
JUMLAH HARGA BAHAN 68,917.58
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 80,656.38
E Overhead & Profit 15 % 0.150 12,098.46
F Harga Satuan Pekerjaan (D+E) 92,754.00
-
A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.036 93,597.00 3,369.49
Tukang batu L.02 OH 0.060 121,674.00 7,300.44
Kepala Tukang L.03 OH 0.006 128,226.00 769.36
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 11,738.80
B BAHAN -
Pipa PVC tipe AW Ø 1" panjang 4 m M.40.c M 1.200 52,649.14 63,178.97
Perlengkapan % 35.000 63,178.97 22,112.64
JUMLAH HARGA BAHAN 85,291.61
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 97,030.42
E Overhead & Profit 15 % 0.150 14,554.56
F Harga Satuan Pekerjaan (D+E) 111,584.00
-
A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.054 93,597.00 5,054.24
Tukang batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 17,608.21
B BAHAN -
Pipa PVC tipe AW Ø 1 1/2" panjang 4 m M.40.d M 1.200 96,375.00 115,650.00
Perlengkapan % 35.000 115,650.00 40,477.50
JUMLAH HARGA BAHAN 156,127.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 173,735.71
E Overhead & Profit 15 % 0.150 26,060.36
F Harga Satuan Pekerjaan (D+E) 199,796.00
-
A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.054 93,597.00 5,054.24
Tukang batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 17,608.21
B BAHAN -
Pipa PVC tipe AW Ø 2" panjang 4 m M.40.e M 1.200 107,000.00 128,400.00
Perlengkapan % 35.000 128,400.00 44,940.00
JUMLAH HARGA BAHAN 173,340.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 190,948.21
E Overhead & Profit 15 % 0.150 28,642.23
F Harga Satuan Pekerjaan (D+E) 219,590.00
-
A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.081 93,597.00 7,581.36
Tukang batu L.02 OH 0.135 121,674.00 16,425.99
Kepala Tukang L.03 OH 0.014 128,226.00 1,731.05
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 26,337.43
B BAHAN -
Pipa PVC tipe AW Ø 2 1/2" panjang 4 m M.40.f M 1.200 144,056.00 172,867.20
Perlengkapan % 35.000 172,867.20 60,503.52
JUMLAH HARGA BAHAN 233,370.72
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 259,708.15
E Overhead & Profit 15 % 0.150 38,956.22
F Harga Satuan Pekerjaan (D+E) 298,664.00
-
A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.081 93,597.00 7,581.36
Tukang batu L.02 OH 0.135 121,674.00 16,425.99
Kepala Tukang L.03 OH 0.014 128,226.00 1,731.05
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 26,337.43
B BAHAN -
Pipa PVC tipe AW Ø 3" panjang 4 m M.40.g M 1.200 198,000.00 237,600.00
Perlengkapan % 35.000 237,600.00 83,160.00
JUMLAH HARGA BAHAN 320,760.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 347,097.43
E Overhead & Profit 15 % 0.150 52,064.61
F Harga Satuan Pekerjaan (D+E) 399,162.00
-
A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.081 93,597.00 7,581.36
Tukang batu L.02 OH 0.135 121,674.00 16,425.99
Kepala Tukang L.03 OH 0.014 128,226.00 1,731.05
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 26,337.43
B BAHAN -
Pipa PVC tipe AW Ø 4" panjang 4 m M.40.h M 1.200 330,000.00 396,000.00
Perlengkapan % 35.000 396,000.00 138,600.00
JUMLAH HARGA BAHAN 534,600.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 560,937.43
E Overhead & Profit 15 % 0.150 84,140.61
F Harga Satuan Pekerjaan (D+E) 645,078.00
-
A.5.1.1 33. Pemasangan 1 m’ pipa Air, limbah jenis pipa tanah diameter 20 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.080 93,597.00 7,487.76
Tukang batu L.02 OH 0.040 121,674.00 4,866.96
Kepala Tukang L.03 OH 0.004 128,226.00 512.90
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 13,466.66
B BAHAN -
Pipa tanah Ø 200 mm SDR-41 (air limbah) M.608.b buah 1.600 375,328.80 600,526.08
Portland cement M.245.a Kg 35.000 1,375.00 48,125.00
Pasir Beton (m3) M.9.c m3 0.014 339,234.40 4,749.28
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.014 266,640.00 3,732.96
JUMLAH HARGA BAHAN 657,133.32
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 670,599.98
E Overhead & Profit 15 % 0.150 100,590.00
F Harga Satuan Pekerjaan (D+E) 771,189.00
-
A.5.1.1 34. Pemasangan 1 m’ pipa Air, limbah jenis pipa tanah diameter 15 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.060 93,597.00 5,615.82
Tukang batu L.02 OH 0.030 121,674.00 3,650.22
Kepala Tukang L.03 OH 0.003 128,226.00 384.68
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,099.99
B BAHAN -
Pipa tanah Ø 160 mm SDR-41 (air limbah) M.608.a m' 1.600 237,547.20 380,075.52
Portland cement M.245.a Kg 0.930 1,375.00 1,278.75
Pasir Beton (m3) M.9.c m3 0.013 339,234.40 4,410.05
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.011 266,640.00 2,933.04
JUMLAH HARGA BAHAN 388,697.36
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 398,797.35
E Overhead & Profit 15 % 0.150 59,819.60
F Harga Satuan Pekerjaan (D+E) 458,616.00
-
A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 - 20 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang batu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Buis beton Ø 20 cm M.95.a buah 1.100 89,760.00 98,736.00
Bata merah 5 x 11 x 22 cm (m3) M.218.b m3 0.027 792,000.00 21,384.00
Portland cement M.245.a Kg 0.930 1,375.00 1,278.75
Pasir Beton (m3) M.9.c m3 0.056 339,234.40 18,997.13
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.024 266,640.00 6,399.36
JUMLAH HARGA BAHAN 146,795.24
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 170,361.88
E Overhead & Profit 15 % 0.150 25,554.28
F Harga Satuan Pekerjaan (D+E) 195,916.00
-
A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 - 100 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.380 93,597.00 35,566.86
Tukang batu L.02 OH 0.190 121,674.00 23,118.06
Kepala Tukang L.03 OH 0.019 128,226.00 2,436.29
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 63,966.62
B BAHAN -
Buis beton Ø 30 cm M.95.b buah 1.100 116,160.00 127,776.00
Bata merah 5 x 11 x 22 cm (m3) M.218.b m3 0.550 792,000.00 435,600.00
Portland cement M.245.a Kg 10.300 1,375.00 14,162.50
Pasir Beton (m3) M.9.c m3 0.061 339,234.40 20,693.30
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.069 266,640.00 18,398.16
JUMLAH HARGA BAHAN 616,629.96
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 680,596.57
E Overhead & Profit 15 % 0.150 102,089.49
F Harga Satuan Pekerjaan (D+E) 782,686.00
-
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DILUAR GEDUNG -
A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC AW Ø 63 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.081 93,597.00 7,581.36
Tukang pipa L.02 OH 0.041 121,674.00 4,988.63
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 13,768.06
B BAHAN -
Pipa PVC tipe AW Ø 2" panjang 4 m M.40.e m 1.000 107,000.00 107,000.00
Lem Ls 0.100 12,850.00 1,285.00
JUMLAH HARGA BAHAN 108,285.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.006 316,800.00 1,900.80
JUMLAH HARGA ALAT 1,900.80
D Jumlah (A+B+C) 123,953.85
E Overhead & Profit 15 % 0.150 18,593.08
F Harga Satuan Pekerjaan (D+E) 142,546.00
Catatan: -
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel. -
Apabila ada tambahan peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan -
gambar kerja. -
-
A.8.4.1.2 (K3) Pemasangan 1 m pipa PVC AW Ø 90 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.094 93,597.00 8,798.12
Tukang pipa L.02 OH 0.047 121,674.00 5,718.68
Mandor L.04 OH 0.009 149,758.00 1,347.82
JUMLAH TENAGA KERJA 15,864.62
B BAHAN -
Pipa PVC tipe AW Ø 3" panjang 4 m M.40.g m 1.000 198,000.00 198,000.00
Lem Ls 0.300 12,850.00 3,855.00
JUMLAH HARGA BAHAN 201,855.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.008 316,800.00 2,534.40
JUMLAH HARGA ALAT 2,534.40
D Jumlah (A+B+C) 220,254.02
E Overhead & Profit 15 % 0.150 33,038.10
F Harga Satuan Pekerjaan (D+E) 253,292.00
-
A.8.4.1.3 (K3) Pemasangan 1 m pipa PVC AW Ø 110 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.105 93,597.00 9,827.69
Tukang pipa L.02 OH 0.053 121,674.00 6,448.72
Mandor L.04 OH 0.011 149,758.00 1,647.34
JUMLAH TENAGA KERJA 17,923.75
B BAHAN -
Pipa PVC tipe AW Ø 4" panjang 4 m M.40.h m 1.000 330,000.00 330,000.00
Lem Ls 0.300 12,850.00 3,855.00
JUMLAH HARGA BAHAN 333,855.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.010 316,800.00 3,168.00
JUMLAH HARGA ALAT 3,168.00
D Jumlah (A+B+C) 354,946.75
E Overhead & Profit 15 % 0.150 53,242.01
F Harga Satuan Pekerjaan (D+E) 408,188.00
-
A.8.4.1.4 (K3) Pemasangan 1 m pipa PVC AW Ø 160 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.118 93,597.00 11,044.45
Tukang pipa L.02 OH 0.059 121,674.00 7,178.77
Mandor L.04 OH 0.012 149,758.00 1,797.10
JUMLAH TENAGA KERJA 20,020.31
B BAHAN -
Pipa PVC tipe AW Ø 6" panjang 4 m M.40.j m 1.000 185,562.50 185,562.50
Lem Ls 0.500 12,850.00 6,425.00
JUMLAH HARGA BAHAN 191,987.50
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.012 316,800.00 3,801.60
JUMLAH HARGA ALAT 3,801.60
D Jumlah (A+B+C) 215,809.41
E Overhead & Profit 15 % 0.150 32,371.41
F Harga Satuan Pekerjaan (D+E) 248,180.00
-
A.8.4.1.5 (K3) Pemasngan 1 m pipa PVC AW Ø 200 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.189 93,597.00 17,689.83
Tukang pipa L.02 OH 0.095 121,674.00 11,559.03
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 32,094.27
B BAHAN -
Pipa PVC tipe AW Ø 8" panjang 4 m M.40.k m 1.000 1,002,391.41 1,002,391.41
Lem Ls 0.500 12,850.00 6,425.00
JUMLAH HARGA BAHAN 1,008,816.41
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.024 316,800.00 7,603.20
JUMLAH HARGA ALAT 7,603.20
D Jumlah (A+B+C) 1,048,513.87
E Overhead & Profit 15 % 0.150 157,277.08
F Harga Satuan Pekerjaan (D+E) 1,205,790.00
-
A.8.4.1.6 (K3) Pemasangan 1 m pipa PVC AW Ø 250 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.256 93,597.00 23,960.83
Tukang pipa L.02 OH 0.128 121,674.00 15,574.27
Mandor L.04 OH 0.026 149,758.00 3,893.71
JUMLAH TENAGA KERJA 43,428.81
B BAHAN -
Pipa PVC tipe AW Ø 10" panjang 4 m M.40.l m 1.000 1,560,208.32 1,560,208.32
Lem Ls 0.700 12,850.00 8,995.00
JUMLAH HARGA BAHAN 1,569,203.32
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.034 316,800.00 10,771.20
JUMLAH HARGA ALAT 10,771.20
D Jumlah (A+B+C) 1,623,403.33
E Overhead & Profit 15 % 0.150 243,510.50
F Harga Satuan Pekerjaan (D+E) 1,866,913.00
-
A.8.4.1.7 (K3) Pemasangan 1 m pipa PVC AW Ø 315 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.294 93,597.00 27,517.52
Tukang pipa L.02 OH 0.147 121,674.00 17,886.08
Mandor L.04 OH 0.029 149,758.00 4,342.98
JUMLAH TENAGA KERJA 49,746.58
B BAHAN -
Pipa PVC tipe AW Ø 12" panjang 4 m M.40.m m 1.000 2,350,000.00 2,350,000.00
Lem Ls 0.800 12,850.00 10,280.00
JUMLAH HARGA BAHAN 2,360,280.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.040 316,800.00 12,672.00
JUMLAH HARGA ALAT 12,672.00
D Jumlah (A+B+C) 2,422,698.58
E Overhead & Profit 15 % 0.150 363,404.79
F Harga Satuan Pekerjaan (D+E) 2,786,103.00
-
A.8.4.1.8 (K3) Pemasangan 1 m pipa PVC Ø 400 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.544 93,597.00 50,916.77
Tukang pipa L.02 OH 0.272 121,674.00 33,095.33
Mandor L.04 OH 0.054 149,758.00 8,086.93
JUMLAH TENAGA KERJA 92,099.03
B BAHAN -
Pipa PVC tipe AW Ø 16" panjang 4 m M.40.n m 1.000 3,824,832.00 3,824,832.00
Lem Ls 0.800 12,850.00 10,280.00
JUMLAH HARGA BAHAN 3,835,112.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.080 316,800.00 25,344.00
JUMLAH HARGA ALAT 25,344.00
D Jumlah (A+B+C) 3,952,555.03
E Overhead & Profit 15 % 0.150 592,883.25
F Harga Satuan Pekerjaan (D+E) 4,545,438.00
-
A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.035 93,597.00 3,275.90
Tukang pipa L.02 OH 0.017 121,674.00 2,068.46
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 5,793.63
B BAHAN -
Pipa HDPE Ø 63 mm (SDR 17) M.603.a m 1.000 58,037.50 58,037.50
Perlengkapan % 35.000 58,037.50 20,313.13
JUMLAH HARGA BAHAN 78,350.63
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 316,800.00 6,019.20
JUMLAH HARGA ALAT 6,019.20
D Jumlah (A+B+C) 90,163.45
E Overhead & Profit 15 % 0.150 13,524.52
F Harga Satuan Pekerjaan (D+E) 103,687.00
-
A.8.4.1.18 (K3) Pemasangan 1 m pipa HDPE Ø 110 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.040 93,597.00 3,743.88
Tukang pipa L.02 OH 0.020 121,674.00 2,433.48
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 6,776.39
B BAHAN -
Pipa HDPE Ø 110 mm (SDR 17) M.603.b m 1.000 166,432.50 166,432.50
Perlengkapan % 35.000 166,432.50 58,251.38
JUMLAH HARGA BAHAN 224,683.88
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 316,800.00 6,019.20
JUMLAH HARGA ALAT 6,019.20
D Jumlah (A+B+C) 237,479.47
E Overhead & Profit 15 % 0.150 35,621.92
F Harga Satuan Pekerjaan (D+E) 273,101.00
-
A.8.4.1.19 (K3) Pemasangan 1 m pipa HDPE Ø 125 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.045 93,597.00 4,211.87
Tukang pipa L.02 OH 0.023 121,674.00 2,798.50
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 7,759.16
B BAHAN -
Pipa HDPE Ø 125 mm (SDR 17) M.603.c m 1.000 204,450.00 204,450.00
Perlengkapan % 35.000 204,450.00 71,557.50
JUMLAH HARGA BAHAN 276,007.50
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 316,800.00 6,019.20
JUMLAH HARGA ALAT 6,019.20
D Jumlah (A+B+C) 289,785.86
E Overhead & Profit 15 % 0.150 43,467.88
F Harga Satuan Pekerjaan (D+E) 333,253.00
-
A.8.4.1.20 (K3) Pemasangan 1 m pipa HDPE Ø 160 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.062 93,597.00 5,803.01
Tukang pipa L.02 OH 0.031 121,674.00 3,771.89
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 10,473.46
B BAHAN -
Pipa HDPE Ø 160 mm (SDR 17) M.603.d m 1.000 315,725.00 315,725.00
Perlengkapan % 35.000 315,725.00 110,503.75
JUMLAH HARGA BAHAN 426,228.75
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 316,800.00 6,019.20
JUMLAH HARGA ALAT 6,019.20
D Jumlah (A+B+C) 442,721.41
E Overhead & Profit 15 % 0.150 66,408.21
F Harga Satuan Pekerjaan (D+E) 509,129.00
-
A.8.4.1.21 (K3) Pemasangan 1 m pipa HDPE Ø 200 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.102 93,597.00 9,546.89
Tukang pipa L.02 OH 0.051 121,674.00 6,205.37
Mandor L.04 OH 0.010 149,758.00 1,497.58
JUMLAH TENAGA KERJA 17,249.85
B BAHAN -
Pipa HDPE Ø 200 mm (SDR 17) M.603.e m 1.000 538,747.50 538,747.50
Perlengkapan % 35.000 538,747.50 188,561.63
JUMLAH HARGA BAHAN 727,309.13
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 316,800.00 6,019.20
JUMLAH HARGA ALAT 6,019.20
D Jumlah (A+B+C) 750,578.17
E Overhead & Profit 15 % 0.150 112,586.73
F Harga Satuan Pekerjaan (D+E) 863,164.00
-
A.8.4.1.22 (K3) Pemasangan 1 m pipa HDPE Ø 250 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.133 93,597.00 12,448.40
Tukang pipa L.02 OH 0.067 121,674.00 8,152.16
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 22,547.41
B BAHAN -
Pipa HDPE Ø 250 mm (SDR 17) M.603.f m 1.000 801,825.00 801,825.00
Perlengkapan % 35.000 801,825.00 280,638.75
JUMLAH HARGA BAHAN 1,082,463.75
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.042 316,800.00 13,305.60
JUMLAH HARGA ALAT 13,305.60
D Jumlah (A+B+C) 1,118,316.76
E Overhead & Profit 15 % 0.150 167,747.51
F Harga Satuan Pekerjaan (D+E) 1,286,064.00
-
A.8.4.1.23 (K3) Pemasangan 1 m pipa HDPE Ø 315 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.170 93,597.00 15,911.49
Tukang pipa L.02 OH 0.085 121,674.00 10,342.29
Mandor L.04 OH 0.017 149,758.00 2,545.89
JUMLAH TENAGA KERJA 28,799.67
B BAHAN -
Pipa HDPE Ø 315 mm (SDR 17) M.603.g m 1.000 1,345,700.50 1,345,700.50
Perlengkapan % 35.000 1,345,700.50 470,995.18
JUMLAH HARGA BAHAN 1,816,695.68
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.065 316,800.00 20,592.00
JUMLAH HARGA ALAT 20,592.00
D Jumlah (A+B+C) 1,866,087.34
E Overhead & Profit 15 % 0.150 279,913.10
F Harga Satuan Pekerjaan (D+E) 2,146,000.00
-
A.8.4.1.24 (K3) Pemasangan 1 m pipa HDPE Ø 400 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.290 93,597.00 27,143.13
Tukang pipa L.02 OH 0.145 121,674.00 17,642.73
Mandor L.04 OH 0.029 149,758.00 4,342.98
JUMLAH TENAGA KERJA 49,128.84
B BAHAN -
Pipa HDPE Ø 400 mm (SDR 17) M.603.h m 1.000 2,204,277.50 2,204,277.50
Perlengkapan % 35.000 2,204,277.50 771,497.13
JUMLAH HARGA BAHAN 2,975,774.63
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.152 316,800.00 48,153.60
JUMLAH HARGA ALAT 48,153.60
D Jumlah (A+B+C) 3,073,057.07
E Overhead & Profit 15 % 0.150 460,958.56
F Harga Satuan Pekerjaan (D+E) 3,534,015.00
-
A.8.4.1.25 (K3) Pemasangan 1 m pipa HDPE Ø 450 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.359 93,597.00 33,601.32
Tukang pipa L.02 OH 0.180 121,674.00 21,901.32
Mandor L.04 OH 0.036 149,758.00 5,391.29
JUMLAH TENAGA KERJA 60,893.93
B BAHAN -
Pipa HDPE Ø 450 mm (SDR 17) M.603.i m 1.000 3,001,250.00 3,001,250.00
Perlengkapan % 35.000 3,001,250.00 1,050,437.50
JUMLAH HARGA BAHAN 4,051,687.50
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.200 316,800.00 63,360.00
JUMLAH HARGA ALAT 63,360.00
D Jumlah (A+B+C) 4,175,941.43
E Overhead & Profit 15 % 0.150 626,391.21
F Harga Satuan Pekerjaan (D+E) 4,802,332.00
-
A.8.4.1.26 (K3) Pemasangan 1 m pipa HDPE Ø 500 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.433 93,597.00 40,527.50
Tukang pipa L.02 OH 0.216 121,674.00 26,281.58
Mandor L.04 OH 0.043 149,758.00 6,439.59
JUMLAH TENAGA KERJA 73,248.68
B BAHAN -
Pipa HDPE Ø 500 mm (SDR 17) M.603.j m 1.000 4,063,337.50 4,063,337.50
Perlengkapan % 35.000 4,063,337.50 1,422,168.13
JUMLAH HARGA BAHAN 5,485,505.63
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.251 316,800.00 79,516.80
JUMLAH HARGA ALAT 79,516.80
D Jumlah (A+B+C) 5,638,271.10
E Overhead & Profit 15 % 0.150 845,740.67
F Harga Satuan Pekerjaan (D+E) 6,484,011.00
-
A.8.4.1.27 (K3) Pemasangan 1 m pipa HDPE Ø 630 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.512 93,597.00 47,921.66
Tukang pipa L.02 OH 0.256 121,674.00 31,148.54
Mandor L.04 OH 0.051 149,758.00 7,637.66
JUMLAH TENAGA KERJA 86,707.87
B BAHAN -
Pipa HDPE Ø 630 mm (SDR 17) M.603.k m 1.000 6,264,837.50 6,264,837.50
Perlengkapan % 35.000 6,264,837.50 2,192,693.13
JUMLAH HARGA BAHAN 8,457,530.63
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.307 316,800.00 97,257.60
JUMLAH HARGA ALAT 97,257.60
D Jumlah (A+B+C) 8,641,496.09
E Overhead & Profit 15 % 0.150 1,296,224.41
F Harga Satuan Pekerjaan (D+E) 9,937,720.00
-
A.8.4.1.28 (K3) Pemasangan 1 m pipa HDPE Ø 800 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.893 93,597.00 83,582.12
Tukang pipa L.02 OH 0.446 121,674.00 54,266.60
Mandor L.04 OH 0.089 149,758.00 13,328.46
JUMLAH TENAGA KERJA 151,177.19
B BAHAN -
Pipa HDPE Ø 800 mm (SDR 17) M.603.m m 1.000 13,874,350.00 13,874,350.00
Perlengkapan % 35.000 13,874,350.00 4,856,022.50
JUMLAH HARGA BAHAN 18,730,372.50
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.573 316,800.00 181,526.40
JUMLAH HARGA ALAT 181,526.40
D Jumlah (A+B+C) 19,063,076.09
E Overhead & Profit 15 % 0.150 2,859,461.41
F Harga Satuan Pekerjaan (D+E) 21,922,537.00
-
A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP Ø 63 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.345 93,597.00 32,290.96
Tukang pipa L.02 OH 0.172 121,674.00 20,927.93
Mandor L.04 OH 0.034 149,758.00 5,091.77
JUMLAH TENAGA KERJA 58,310.66
B BAHAN -
Pipa galvanis medium A Ø 2" panjang 6 m M.44.e m 1.000 1,077,120.00 1,077,120.00
JUMLAH HARGA BAHAN 1,077,120.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 316,800.00 6,019.20
JUMLAH HARGA ALAT 6,019.20
D Jumlah (A+B+C) 1,141,449.87
E Overhead & Profit 15 % 0.150 171,217.48
F Harga Satuan Pekerjaan (D+E) 1,312,667.00
-
A.8.4.1.34 (K3) Pemasangan 1 m pipa GIP Ø 90 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang pipa L.02 OH 0.200 121,674.00 24,334.80
Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 67,763.92
B BAHAN -
Pipa galvanis medium A Ø 3" panjang 6 m M.44.f m 1.000 1,182,720.00 1,182,720.00
JUMLAH HARGA BAHAN 1,182,720.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 316,800.00 6,019.20
JUMLAH HARGA ALAT 6,019.20
D Jumlah (A+B+C) 1,256,503.12
E Overhead & Profit 15 % 0.150 188,475.47
F Harga Satuan Pekerjaan (D+E) 1,444,978.00
-
A.8.4.1.35 (K3) Pemasangan 1 m pipa GIP Ø 110 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.448 93,597.00 41,931.46
Tukang pipa L.02 OH 0.224 121,674.00 27,254.98
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 75,925.54
B BAHAN -
Pipa galvanis medium A Ø 4" panjang 6 m M.44.g m 1.000 1,895,520.00 1,895,520.00
JUMLAH HARGA BAHAN 1,895,520.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 316,800.00 6,019.20
JUMLAH HARGA ALAT 6,019.20
D Jumlah (A+B+C) 1,977,464.74
E Overhead & Profit 15 % 0.150 296,619.71
F Harga Satuan Pekerjaan (D+E) 2,274,084.00
-
A.8.4.1.36 (K3) Pemasangan 1 m pipa GIP Ø 160 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.506 93,597.00 47,360.08
Tukang pipa L.02 OH 0.253 121,674.00 30,783.52
Mandor L.04 OH 0.051 149,758.00 7,637.66
JUMLAH TENAGA KERJA 85,781.26
B BAHAN -
Pipa galvanis medium A Ø 6" panjang 6 m M.44.i m 1.000 2,550,240.00 2,550,240.00
JUMLAH HARGA BAHAN 2,550,240.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 316,800.00 6,019.20
JUMLAH HARGA ALAT 6,019.20
D Jumlah (A+B+C) 2,642,040.46
E Overhead & Profit 15 % 0.150 396,306.07
F Harga Satuan Pekerjaan (D+E) 3,038,346.00
-
A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP Ø 200 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.796 93,597.00 74,503.21
Tukang pipa L.02 OH 0.398 121,674.00 48,426.25
Mandor L.04 OH 0.080 149,758.00 11,980.64
JUMLAH TENAGA KERJA 134,910.10
B BAHAN -
Pipa galvanis medium A Ø 8" panjang 6 m M.44.j m 1.000 4,884,000.00 4,884,000.00
JUMLAH HARGA BAHAN 4,884,000.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 316,800.00 6,019.20
JUMLAH HARGA ALAT 6,019.20
D Jumlah (A+B+C) 5,024,929.30
E Overhead & Profit 15 % 0.150 753,739.40
F Harga Satuan Pekerjaan (D+E) 5,778,668.00
-
-
A.8.4.1.64 (K3) Pemasangan 1 m pipa baja Ø 63 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.499 93,597.00 46,704.90
Tukang pipa L.02 OH 0.100 121,674.00 12,167.40
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 66,360.20
B BAHAN -
Pipa Baja Ø 63 mm M.600.a m 1.000 111,040.00 111,040.00
Perlengkapan % 35.000 111,040.00 38,864.00
JUMLAH HARGA BAHAN 149,904.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.004 316,800.00 1,267.20
JUMLAH HARGA ALAT 1,267.20
D Jumlah (A+B+C) 217,531.40
E Overhead & Profit 15 % 0.150 32,629.71
F Harga Satuan Pekerjaan (D+E) 250,161.00
-
A.8.4.1.65 (K3) Pemasangan 1 m pipa baja Ø 100 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.579 93,597.00 54,192.66
Tukang pipa L.02 OH 0.116 121,674.00 14,114.18
Mandor L.04 OH 0.058 149,758.00 8,685.96
JUMLAH TENAGA KERJA 76,992.81
B BAHAN -
Pipa Baja Ø 100 mm M.600.b m 1.000 265,920.00 265,920.00
Perlengkapan % 35.000 265,920.00 93,072.00
JUMLAH HARGA BAHAN 358,992.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.004 316,800.00 1,267.20
JUMLAH HARGA ALAT 1,267.20
D Jumlah (A+B+C) 437,252.01
E Overhead & Profit 15 % 0.150 65,587.80
F Harga Satuan Pekerjaan (D+E) 502,839.00
-
A.8.4.1.66 (K3) Pemasangan 1 m pipa baja Ø 125 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.648 93,597.00 60,650.86
Tukang pipa L.02 OH 0.130 121,674.00 15,817.62
Mandor L.04 OH 0.065 149,758.00 9,734.27
JUMLAH TENAGA KERJA 86,202.75
B BAHAN -
Pipa Baja Ø 125 mm M.600.c m 1.000 426,400.00 426,400.00
Perlengkapan % 35.000 426,400.00 149,240.00
JUMLAH HARGA BAHAN 575,640.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.004 316,800.00 1,267.20
JUMLAH HARGA ALAT 1,267.20
D Jumlah (A+B+C) 663,109.95
E Overhead & Profit 15 % 0.150 99,466.49
F Harga Satuan Pekerjaan (D+E) 762,576.00
-
A.8.4.1.67 (K3) Pemasangan 1 m pipa baja Ø 150 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.708 93,597.00 66,266.68
Tukang pipa L.02 OH 0.142 121,674.00 17,277.71
Mandor L.04 OH 0.071 149,758.00 10,632.82
JUMLAH TENAGA KERJA 94,177.20
B BAHAN -
Pipa Baja Ø 150 mm M.600.d m 1.000 463,200.00 463,200.00
Perlengkapan % 35.000 463,200.00 162,120.00
JUMLAH HARGA BAHAN 625,320.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.004 316,800.00 1,267.20
JUMLAH HARGA ALAT 1,267.20
D Jumlah (A+B+C) 720,764.40
E Overhead & Profit 15 % 0.150 108,114.66
F Harga Satuan Pekerjaan (D+E) 828,879.00
-
A.8.4.1.68 (K3) Pemasangan 1 m pipa baja Ø 200 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.113 93,597.00 104,173.46
Tukang pipa L.02 OH 0.223 121,674.00 27,133.30
Mandor L.04 OH 0.111 149,758.00 16,623.14
JUMLAH TENAGA KERJA 147,929.90
B BAHAN -
Pipa Baja Ø 200 mm M.600.e m 1.000 748,359.74 748,359.74
Perlengkapan % 35.000 748,359.74 261,925.91
JUMLAH HARGA BAHAN 1,010,285.65
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.004 316,800.00 1,267.20
JUMLAH HARGA ALAT 1,267.20
D Jumlah (A+B+C) 1,159,482.76
E Overhead & Profit 15 % 0.150 173,922.41
F Harga Satuan Pekerjaan (D+E) 1,333,405.00
-
A.8.4.1.75 (K3) Pemasangan 1 m pipa baja Ø 800 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 3.897 93,597.00 364,747.51
Tukang pipa L.02 OH 0.779 121,674.00 94,784.05
Mandor L.04 OH 0.390 149,758.00 58,405.62
JUMLAH TENAGA KERJA 517,937.17
B BAHAN -
Pipa Baja Ø 800 mm M.600.f m 1.000 1,035,936.00 1,035,936.00
Perlengkapan % 35.000 1,035,936.00 362,577.60
JUMLAH HARGA BAHAN 1,398,513.60
C PERALATAN -
Excavator 80-140 HP alat 27 hari 0.046 584,943.63 26,907.41
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.098 316,800.00 31,046.40
JUMLAH HARGA ALAT 57,953.81
D Jumlah (A+B+C) 1,974,404.58
E Overhead & Profit 15 % 0.150 296,160.69
F Harga Satuan Pekerjaan (D+E) 2,270,565.00
-
A.8.4.1.76 (K3) Pemasangan 1 m pipa baja Ø 900 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 4.403 93,597.00 412,107.59
Tukang pipa L.02 OH 0.081 121,674.00 9,855.59
Mandor L.04 OH 0.440 149,758.00 65,893.52
JUMLAH TENAGA KERJA 487,856.70
B BAHAN -
Pipa Baja Ø 900 mm M.600.g m 1.000 1,330,243.20 1,330,243.20
Perlengkapan % 35.000 1,330,243.20 465,585.12
JUMLAH HARGA BAHAN 1,795,828.32
C PERALATAN -
Excavator 80-140 HP alat 27 hari 0.052 584,943.63 30,417.07
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.115 316,800.00 36,432.00
JUMLAH HARGA ALAT 66,849.07
D Jumlah (A+B+C) 2,350,534.09
E Overhead & Profit 15 % 0.150 352,580.11
F Harga Satuan Pekerjaan (D+E) 2,703,114.00
-
A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA -
A.8.4.2.1 (K3) Pemotongan 1 buah pipa PVC Ø 63 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.005 93,597.00 467.99
Tukang pipa L.02 OH 0.002 121,674.00 243.35
Mandor L.04 OH 0.001 149,758.00 74.88
JUMLAH TENAGA KERJA 786.21
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Gergaji Besi alat 91 hari 0.003 35,000.00 105.00
JUMLAH HARGA ALAT 105.00
D Jumlah (A+B+C) 891.21
E Overhead & Profit 15 % 0.150 133.68
F Harga Satuan Pekerjaan (D+E) 1,024.00
-
A.8.4.2.2 (K3) Pemotongan 1 buah pipa PVC Ø 90 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.014 93,597.00 1,310.36
Tukang pipa L.02 OH 0.007 121,674.00 851.72
Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 2,311.83
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Gergaji Besi alat 91 hari 0.003 35,000.00 105.00
JUMLAH HARGA ALAT 105.00
D Jumlah (A+B+C) 2,416.83
E Overhead & Profit 15 % 0.150 362.53
F Harga Satuan Pekerjaan (D+E) 2,779.00
-
A.8.4.2.3 (K3) Pemotongan 1 buah pipa PVC Ø 110 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.022 93,597.00 2,059.13
Tukang pipa L.02 OH 0.011 121,674.00 1,338.41
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 3,697.06
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Gergaji Besi alat 91 hari 0.003 35,000.00 105.00
JUMLAH HARGA ALAT 105.00
D Jumlah (A+B+C) 3,802.06
E Overhead & Profit 15 % 0.150 570.31
F Harga Satuan Pekerjaan (D+E) 4,372.00
-
A.8.4.2.4 (K3) Pemotongan 1 buah pipa PVC Ø 160 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.031 93,597.00 2,901.51
Tukang pipa L.02 OH 0.015 121,674.00 1,825.11
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 5,175.89
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Gergaji Besi alat 91 hari 0.003 35,000.00 105.00
JUMLAH HARGA ALAT 105.00
D Jumlah (A+B+C) 5,280.89
E Overhead & Profit 15 % 0.150 792.13
F Harga Satuan Pekerjaan (D+E) 6,073.00
-
A.8.4.2.5 (K3) Pemotongan 1 buah pipa PVC Ø 200 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.081 93,597.00 7,581.36
Tukang pipa L.02 OH 0.040 121,674.00 4,866.96
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 13,646.38
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Gergaji Besi alat 91 hari 0.017 35,000.00 595.00
JUMLAH HARGA ALAT 595.00
D Jumlah (A+B+C) 14,241.38
E Overhead & Profit 15 % 0.150 2,136.21
F Harga Satuan Pekerjaan (D+E) 16,377.00
-
A.8.4.2.6 (K3) Pemotongan 1 buah pipa PVC Ø 250 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.128 93,597.00 11,980.42
Tukang pipa L.02 OH 0.064 121,674.00 7,787.14
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 21,714.41
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Gergaji Besi alat 91 hari 0.030 35,000.00 1,050.00
JUMLAH HARGA ALAT 1,050.00
D Jumlah (A+B+C) 22,764.41
E Overhead & Profit 15 % 0.150 3,414.66
F Harga Satuan Pekerjaan (D+E) 26,179.00
-
A.8.4.2.7 (K3) Pemotongan 1 buah pipa PVC Ø 315 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.155 93,597.00 14,507.54
Tukang pipa L.02 OH 0.077 121,674.00 9,368.90
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 26,122.80
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Gergaji Besi alat 91 hari 0.037 35,000.00 1,295.00
JUMLAH HARGA ALAT 1,295.00
D Jumlah (A+B+C) 27,417.80
E Overhead & Profit 15 % 0.150 4,112.67
F Harga Satuan Pekerjaan (D+E) 31,530.00
-
A.8.4.2.8 (K3) Pemotongan 1 buah pipa PVC Ø 400 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.331 93,597.00 30,980.61
Tukang pipa L.02 OH 0.166 121,674.00 20,197.88
Mandor L.04 OH 0.033 149,758.00 4,942.01
JUMLAH TENAGA KERJA 56,120.51
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Gergaji Besi alat 91 hari 0.086 35,000.00 3,010.00
JUMLAH HARGA ALAT 3,010.00
D Jumlah (A+B+C) 59,130.51
E Overhead & Profit 15 % 0.150 8,869.58
F Harga Satuan Pekerjaan (D+E) 68,000.00
-
A.8.4.2.17 (K3) Pemotongan 1 buah pipa HDPE Ø 63 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.002 93,597.00 187.19
Tukang pipa L.02 OH 0.001 121,674.00 121.67
Mandor L.04 OH 0.000 149,758.00 29.95
Operator pompa L.06 OH 0.034 93,597.00 3,182.30
JUMLAH TENAGA KERJA 3,521.12
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.004 393,150.91 1,572.60
JUMLAH HARGA ALAT 1,572.60
D Jumlah (A+B+C) 5,093.72
E Overhead & Profit 15 % 0.150 764.06
F Harga Satuan Pekerjaan (D+E) 5,857.00
-
A.8.4.2.18 (K3) Pemotongan 1 buah pipa HDPE Ø 110 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.006 93,597.00 561.58
Tukang pipa L.02 OH 0.003 121,674.00 365.02
Mandor L.04 OH 0.001 149,758.00 149.76
Operator pompa L.06 OH 0.071 93,597.00 6,645.39
JUMLAH TENAGA KERJA 7,721.75
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.005 393,150.91 1,965.75
JUMLAH HARGA ALAT 1,965.75
D Jumlah (A+B+C) 9,687.50
E Overhead & Profit 15 % 0.150 1,453.13
F Harga Satuan Pekerjaan (D+E) 11,140.00
-
A.8.4.2.19 (K3) Pemotongan 1 buah pipa HDPE Ø 125 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.009 93,597.00 842.37
Tukang pipa L.02 OH 0.005 121,674.00 608.37
Mandor L.04 OH 0.001 149,758.00 149.76
Operator pompa L.06 OH 0.096 93,597.00 8,985.31
JUMLAH TENAGA KERJA 10,585.81
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.006 393,150.91 2,358.91
JUMLAH HARGA ALAT 2,358.91
D Jumlah (A+B+C) 12,944.72
E Overhead & Profit 15 % 0.150 1,941.71
F Harga Satuan Pekerjaan (D+E) 14,886.00
-
A.8.4.2.20 (K3) Pemotongan 1 buah pipa HDPE Ø 160 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.016 93,597.00 1,497.55
Tukang pipa L.02 OH 0.008 121,674.00 973.39
Mandor L.04 OH 0.002 149,758.00 299.52
Operator pompa L.06 OH 0.121 93,597.00 11,325.24
JUMLAH TENAGA KERJA 14,095.70
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.009 393,150.91 3,538.36
JUMLAH HARGA ALAT 3,538.36
D Jumlah (A+B+C) 17,634.06
E Overhead & Profit 15 % 0.150 2,645.11
F Harga Satuan Pekerjaan (D+E) 20,279.00
-
A.8.4.2.21 (K3) Pemotongan 1 buah pipa HDPE Ø 200 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.044 93,597.00 4,118.27
Tukang pipa L.02 OH 0.022 121,674.00 2,676.83
Mandor L.04 OH 0.004 149,758.00 599.03
Operator pompa L.06 OH 0.171 93,597.00 16,005.09
JUMLAH TENAGA KERJA 23,399.22
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.017 393,150.91 6,683.57
JUMLAH HARGA ALAT 6,683.57
D Jumlah (A+B+C) 30,082.78
E Overhead & Profit 15 % 0.150 4,512.42
F Harga Satuan Pekerjaan (D+E) 34,595.00
-
A.8.4.2.22 (K3) Pemotongan 1 buah pipaHDPE Ø 250 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.067 93,597.00 6,271.00
Tukang pipa L.02 OH 0.033 121,674.00 4,015.24
Mandor L.04 OH 0.007 149,758.00 1,048.31
Operator pompa L.06 OH 0.221 93,597.00 20,684.94
JUMLAH TENAGA KERJA 32,019.48
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.023 393,150.91 9,042.47
JUMLAH HARGA ALAT 9,042.47
D Jumlah (A+B+C) 41,061.95
E Overhead & Profit 15 % 0.150 6,159.29
F Harga Satuan Pekerjaan (D+E) 47,221.00
-
A.8.4.2.23 (K3) Pemotongan 1 buah pipa HDPE Ø 315 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang pipa L.02 OH 0.045 121,674.00 5,475.33
Mandor L.04 OH 0.009 149,758.00 1,347.82
Operator pompa L.06 OH 0.271 93,597.00 25,364.79
JUMLAH TENAGA KERJA 40,611.67
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.030 393,150.91 11,794.53
JUMLAH HARGA ALAT 11,794.53
D Jumlah (A+B+C) 52,406.20
E Overhead & Profit 15 % 0.150 7,860.93
F Harga Satuan Pekerjaan (D+E) 60,267.00
-
A.8.4.2.24 (K3) Pemotongan 1 buah pipa HDPE Ø 400 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.177 93,597.00 16,566.67
Tukang pipa L.02 OH 0.088 121,674.00 10,707.31
Mandor L.04 OH 0.018 149,758.00 2,695.64
Operator pompa L.06 OH 0.371 93,597.00 34,724.49
JUMLAH TENAGA KERJA 64,694.11
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.055 393,150.91 21,623.30
JUMLAH HARGA ALAT 21,623.30
D Jumlah (A+B+C) 86,317.41
E Overhead & Profit 15 % 0.150 12,947.61
F Harga Satuan Pekerjaan (D+E) 99,265.00
-
A.8.4.2.25 (K3) Pemotongan 1 buah pipa HDPE Ø 450 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.225 93,597.00 21,059.33
Tukang pipa L.02 OH 0.113 121,674.00 13,749.16
Mandor L.04 OH 0.023 149,758.00 3,444.43
Operator pompa L.06 OH 0.421 93,597.00 39,404.34
JUMLAH TENAGA KERJA 77,657.26
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.070 393,150.91 27,520.56
JUMLAH HARGA ALAT 27,520.56
D Jumlah (A+B+C) 105,177.82
E Overhead & Profit 15 % 0.150 15,776.67
F Harga Satuan Pekerjaan (D+E) 120,954.00
-
A.8.4.2.26 (K3) Pemotongan 1 buah pipa HDPE Ø 500 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.277 93,597.00 25,926.37
Tukang pipa L.02 OH 0.139 121,674.00 16,912.69
Mandor L.04 OH 0.028 149,758.00 4,193.22
Operator pompa L.06 OH 0.471 93,597.00 44,084.19
JUMLAH TENAGA KERJA 91,116.47
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.085 393,150.91 33,417.83
JUMLAH HARGA ALAT 33,417.83
D Jumlah (A+B+C) 124,534.29
E Overhead & Profit 15 % 0.150 18,680.14
F Harga Satuan Pekerjaan (D+E) 143,214.00
-
A.8.4.2.27 (K3) Pemotongan 1 buah pipa HDPE Ø 630 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.333 93,597.00 31,167.80
Tukang pipa L.02 OH 0.167 121,674.00 20,319.56
Mandor L.04 OH 0.033 149,758.00 4,942.01
Operator pompa L.06 OH 0.571 93,597.00 53,443.89
JUMLAH TENAGA KERJA 109,873.26
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.101 393,150.91 39,708.24
JUMLAH HARGA ALAT 39,708.24
D Jumlah (A+B+C) 149,581.50
E Overhead & Profit 15 % 0.150 22,437.23
F Harga Satuan Pekerjaan (D+E) 172,018.00
-
A.8.4.2.28 (K3) Pemotongan 1 buah pipa HDPE Ø 800 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.601 93,597.00 56,251.80
Tukang pipa L.02 OH 0.301 121,674.00 36,623.87
Mandor L.04 OH 0.060 149,758.00 8,985.48
Operator pompa L.06 OH 0.771 93,597.00 72,163.29
JUMLAH TENAGA KERJA 174,024.44
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.179 393,150.91 70,374.01
JUMLAH HARGA ALAT 70,374.01
D Jumlah (A+B+C) 244,398.45
E Overhead & Profit 15 % 0.150 36,659.77
F Harga Satuan Pekerjaan (D+E) 281,058.00
-
A.8.4.2.64 (K3) Pemotongan 1 buah pipa baja Ø 63 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.028 93,597.00 2,620.72
Tukang pipa L.02 OH 0.006 121,674.00 730.04
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 3,800.03
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.037 393,150.91 14,546.58
JUMLAH HARGA ALAT 14,546.58
D Jumlah (A+B+C) 18,346.62
E Overhead & Profit 15 % 0.150 2,751.99
F Harga Satuan Pekerjaan (D+E) 21,098.00
-
A.8.4.2.65 (K3) Pemotongan 1 buah pipa baja Ø 100 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.085 93,597.00 7,955.75
Tukang pipa L.02 OH 0.017 121,674.00 2,068.46
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 11,222.27
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.040 393,150.91 15,726.04
JUMLAH HARGA ALAT 15,726.04
D Jumlah (A+B+C) 26,948.30
E Overhead & Profit 15 % 0.150 4,042.25
F Harga Satuan Pekerjaan (D+E) 30,990.00
-
A.8.4.2.66 (K3) Pemotongan 1 buah pipa baja Ø 125 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.133 93,597.00 12,448.40
Tukang pipa L.02 OH 0.027 121,674.00 3,285.20
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 17,680.45
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.042 393,150.91 16,512.34
JUMLAH HARGA ALAT 16,512.34
D Jumlah (A+B+C) 34,192.79
E Overhead & Profit 15 % 0.150 5,128.92
F Harga Satuan Pekerjaan (D+E) 39,321.00
-
A.8.4.2.67 (K3) Pemotongan 1 buah pipa baja Ø 150 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.184 93,597.00 17,221.85
Tukang pipa L.02 OH 0.037 121,674.00 4,501.94
Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 24,419.43
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.045 393,150.91 17,691.79
JUMLAH HARGA ALAT 17,691.79
D Jumlah (A+B+C) 42,111.22
E Overhead & Profit 15 % 0.150 6,316.68
F Harga Satuan Pekerjaan (D+E) 48,427.00
-
A.8.4.2.68 (K3) Pemotongan 1 buah pipa baja Ø 200 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.476 93,597.00 44,552.17
Tukang pipa L.02 OH 0.095 121,674.00 11,559.03
Mandor L.04 OH 0.048 149,758.00 7,188.38
JUMLAH TENAGA KERJA 63,299.59
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.060 393,150.91 23,589.05
JUMLAH HARGA ALAT 23,589.05
D Jumlah (A+B+C) 86,888.64
E Overhead & Profit 15 % 0.150 13,033.30
F Harga Satuan Pekerjaan (D+E) 99,921.00
-
A.8.4.2.75 (K3) Pemotongan 1 buah pipa baja Ø 800 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 2.624 93,597.00 245,598.53
Tukang pipa L.02 OH 0.525 121,674.00 63,878.85
Mandor L.04 OH 0.262 149,758.00 39,236.60
JUMLAH TENAGA KERJA 348,713.97
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.166 393,150.91 65,263.05
JUMLAH HARGA ALAT 65,263.05
D Jumlah (A+B+C) 413,977.03
E Overhead & Profit 15 % 0.150 62,096.55
F Harga Satuan Pekerjaan (D+E) 476,073.00
-
A.8.4.2.76 (K3) Pemotongan 1 buah pipa baja Ø 900 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 2.971 93,597.00 278,076.69
Tukang pipa L.02 OH 0.594 121,674.00 72,274.36
Mandor L.04 OH 0.297 149,758.00 44,478.13
JUMLAH TENAGA KERJA 394,829.17
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.183 393,150.91 71,946.62
JUMLAH HARGA ALAT 71,946.62
D Jumlah (A+B+C) 466,775.79
E Overhead & Profit 15 % 0.150 70,016.37
F Harga Satuan Pekerjaan (D+E) 536,792.00
-
A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA -
A.8.4.4.1 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.466 93,597.00 137,213.20
Tukang pipa L.02 OH 0.733 121,674.00 89,187.04
Mandor L.04 OH 0.147 149,758.00 22,014.43
JUMLAH TENAGA KERJA 248,414.67
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.606 393,150.91 238,249.45
Generator set 135 KVA alat 29 hari 0.075 497,998.66 37,349.90
Pompa submersible alat 89 hari 0.968 422,400.00 408,883.20
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.865 316,800.00 274,032.00
JUMLAH HARGA ALAT 958,514.55
D Jumlah (A+B+C) 1,206,929.22
E Overhead & Profit 15 % 0.150 181,039.38
F Harga Satuan Pekerjaan (D+E) 1,387,968.00
-
A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.646 93,597.00 154,060.66
Tukang pipa L.02 OH 0.823 121,674.00 100,137.70
Mandor L.04 OH 0.165 149,758.00 24,710.07
JUMLAH TENAGA KERJA 278,908.43
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.650 393,150.91 255,548.09
Generator set 135 KVA alat 29 hari 0.159 497,998.66 79,181.79
Pompa submersible alat 89 hari 1.078 422,400.00 455,347.20
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.911 316,800.00 288,604.80
JUMLAH HARGA ALAT 1,078,681.88
D Jumlah (A+B+C) 1,357,590.31
E Overhead & Profit 15 % 0.150 203,638.55
F Harga Satuan Pekerjaan (D+E) 1,561,228.00
-
A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 2.096 93,597.00 196,179.31
Tukang pipa L.02 OH 1.048 121,674.00 127,514.35
Mandor L.04 OH 0.210 149,758.00 31,449.18
JUMLAH TENAGA KERJA 355,142.84
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.760 393,150.91 298,794.69
Generator set 135 KVA alat 29 hari 0.369 497,998.66 183,761.51
Pompa submersible alat 89 hari 1.353 422,400.00 571,507.20
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 1.026 316,800.00 325,036.80
JUMLAH HARGA ALAT 1,379,100.20
D Jumlah (A+B+C) 1,734,243.04
E Overhead & Profit 15 % 0.150 260,136.46
F Harga Satuan Pekerjaan (D+E) 1,994,379.00
-
A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 2.546 93,597.00 238,297.96
Tukang pipa L.02 OH 1.273 121,674.00 154,891.00
Mandor L.04 OH 0.255 149,758.00 38,188.29
JUMLAH TENAGA KERJA 431,377.25
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
Pipe Cutter alat 102 hari 0.870 393,150.91 342,041.29
Generator set 135 KVA alat 29 hari 0.579 497,998.66 288,341.23
Pompa submersible alat 89 hari 1.628 422,400.00 687,667.20
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 1.141 316,800.00 361,468.80
JUMLAH HARGA ALAT 1,679,518.52
D Jumlah (A+B+C) 2,110,895.77
E Overhead & Profit 15 % 0.150 316,634.37
F Harga Satuan Pekerjaan (D+E) 2,427,530.00
-
A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA -
A.8.4.5.1 (K3) Pengetesan 1 m pipa Ø 50 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.008 93,597.00 748.78
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 868.58
B BAHAN -
Air, M.550.b m3 0.002 15.84 0.03
Pertalite M.395.b liter 0.060 8,078.40 484.70
Oli mesin M.399.a liter 0.002 40,128.00 80.26
JUMLAH HARGA BAHAN 564.99
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,433.57
E Overhead & Profit 15 % 0.150 215.04
F Harga Satuan Pekerjaan (D+E) 1,648.00
-
A.8.4.5.2 (K3) Pengetesan 1 m pipa Ø 75 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.008 93,597.00 748.78
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 868.58
B BAHAN -
Air, M.550.b m3 0.004 15.84 0.06
Pertalite M.395.b liter 0.060 8,078.40 484.70
Oli mesin M.399.a liter 0.002 40,128.00 80.26
JUMLAH HARGA BAHAN 565.02
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,433.61
E Overhead & Profit 15 % 0.150 215.04
F Harga Satuan Pekerjaan (D+E) 1,648.00
-
A.8.4.5.3 (K3) Pengetesan 1 m pipa Ø 100 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.008 93,597.00 748.78
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 868.58
B BAHAN -
Air, M.550.b m3 0.008 15.84 0.13
Pertalite M.395.b liter 0.060 8,078.40 484.70
Oli mesin M.399.a liter 0.002 40,128.00 80.26
JUMLAH HARGA BAHAN 565.09
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,433.67
E Overhead & Profit 15 % 0.150 215.05
F Harga Satuan Pekerjaan (D+E) 1,648.00
-
A.8.4.5.4 (K3) Pengetesan 1 m pipa Ø 150 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.008 93,597.00 748.78
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 868.58
B BAHAN -
Air, M.550.b m3 0.018 15.84 0.29
Pertalite M.395.b liter 0.060 8,078.40 484.70
Oli mesin M.399.a liter 0.002 40,128.00 80.26
JUMLAH HARGA BAHAN 565.25
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,433.83
E Overhead & Profit 15 % 0.150 215.07
F Harga Satuan Pekerjaan (D+E) 1,648.00
-
A.8.4.5.5 (K3) Pengetesan 1 m pipa Ø 200 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.008 93,597.00 748.78
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 868.58
B BAHAN -
Air, M.550.b m3 0.031 15.84 0.49
Pertalite M.395.b liter 0.060 8,078.40 484.70
Oli mesin M.399.a liter 0.002 40,128.00 80.26
JUMLAH HARGA BAHAN 565.45
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,434.03
E Overhead & Profit 15 % 0.150 215.11
F Harga Satuan Pekerjaan (D+E) 1,649.00
-
A.8.4.5.6 (K3) Pengetesan 1 m pipa Ø 250 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.008 93,597.00 748.78
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 868.58
B BAHAN -
Air, M.550.b m3 0.049 15.84 0.78
Pertalite M.395.b liter 0.060 8,078.40 484.70
Oli mesin M.399.a liter 0.002 40,128.00 80.26
JUMLAH HARGA BAHAN 565.74
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,434.32
E Overhead & Profit 15 % 0.150 215.15
F Harga Satuan Pekerjaan (D+E) 1,649.00
-
A.8.4.5.7 (K3) Pengetesan 1 m pipa Ø 300 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.008 93,597.00 748.78
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 868.58
B BAHAN -
Air, M.550.b m3 0.071 15.84 1.12
Pertalite M.395.b liter 0.060 8,078.40 484.70
Oli mesin M.399.a liter 0.002 40,128.00 80.26
JUMLAH HARGA BAHAN 566.08
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,434.67
E Overhead & Profit 15 % 0.150 215.20
F Harga Satuan Pekerjaan (D+E) 1,649.00
-
A.8.4.5.8 (K3) Pengetesan 1 m pipa Ø 400 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.008 93,597.00 748.78
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 868.58
B BAHAN -
Air, M.550.b m3 0.126 15.84 2.00
Pertalite M.395.b liter 0.060 8,078.40 484.70
Oli mesin M.399.a liter 0.002 40,128.00 80.26
JUMLAH HARGA BAHAN 566.96
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,435.54
E Overhead & Profit 15 % 0.150 215.33
F Harga Satuan Pekerjaan (D+E) 1,650.00
-
A.8.4.5.9 (K3) Pengetesan 1 m pipa Ø 500 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.008 93,597.00 748.78
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 868.58
B BAHAN -
Air, M.550.b m3 0.158 15.84 2.50
Pertalite M.395.b liter 0.060 8,078.40 484.70
Oli mesin M.399.a liter 0.002 40,128.00 80.26
JUMLAH HARGA BAHAN 567.46
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,436.05
E Overhead & Profit 15 % 0.150 215.41
F Harga Satuan Pekerjaan (D+E) 1,651.00
-
A.8.4.5.10 (K3) Pengetesan 1 m pipa Ø 600 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.008 93,597.00 748.78
Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 868.58
B BAHAN -
Air, M.550.b m3 0.283 15.84 4.48
Pertalite M.395.b liter 0.060 8,078.40 484.70
Oli mesin M.399.a liter 0.002 40,128.00 80.26
JUMLAH HARGA BAHAN 569.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,438.03
E Overhead & Profit 15 % 0.150 215.70
F Harga Satuan Pekerjaan (D+E) 1,653.00
-
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL -
A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Fitting Keramik) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 % 100.000 121,674.00 121,674.00
JUMLAH TENAGA KERJA 121,674.00
B BAHAN -
Pipa listrik 5/8” M.475 btg 2.000 9,445.33 18,890.67
Kabel NYM 2 x 1.5 mm2 M.504.a m 24.000 11,019.36 264,464.64
T Dus (biasa) M.476.b buah 3.000 1,900.80 5,702.40
L Bow M.478 buah 4.000 1,254.00 5,016.00
Las Dop M.479 buah 3.000 1,056.00 3,168.00
Klem Pipa Listrik M.480 buah 24.000 7,216.00 173,184.00
Mongkok (Listrik) M.481 buah 1.000 1,936.00 1,936.00
Saklar Tunggal biasa M.482.a buah 1.000 14,432.00 14,432.00
Fitting DK E 27 / Keramik M.509.b buah 1.000 12,672.00 12,672.00
JUMLAH HARGA BAHAN 499,465.71
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 621,139.71
E Overhead & Profit 15 % 0.150 93,170.96
F Harga Satuan Pekerjaan (D+E) 714,310.00
-
A.8.4.6.2 (K3) Pemasangan 1 buah MCB (6 A) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 % 100.000 121,674.00 121,674.00
JUMLAH TENAGA KERJA 121,674.00
B BAHAN -
Pipa listrik 5/8” M.475 btg 3.000 9,445.33 28,336.00
Kabel NYM 2 x 1.5 mm2 M.504.a m 15.000 11,019.36 165,290.40
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
L Bow M.478 buah 2.000 1,254.00 2,508.00
Klem Pipa Listrik M.480 buah 24.000 7,216.00 173,184.00
MCB 6 A, 1 Phase M.500.a buah 1.000 26,400.00 26,400.00
JUMLAH HARGA BAHAN 397,619.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 519,293.20
E Overhead & Profit 15 % 0.150 77,893.98
F Harga Satuan Pekerjaan (D+E) 597,187.00
AD.4 PEKERJAAN AIR TANAH (SUMUR BOR DALAM)

A.T.02 1 m' Pengeboran dia. 8 3/4"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.3089 70,000.00 21,623.00
Tukang Bor L.02 OH 0.0772 90,000.00 6,948.00
Mandor L.04 OH 0.0309 85,000.00 2,626.50
JUMLAH TENAGA KERJA 31,197.50
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Borehole dia 8 3/4" m' 0.5405 835,958.70 451,835.68
JUMLAH HARGA ALAT 451,835.68
D Jumlah (A+B+C) 483,033.18
E Overhead & Profit 13.5% 0.135 65,209.48
F Harga Satuan Pekerjaan (D+E) 548,242.00

A.T.03 1 m' Reaming dia. 8 3/4" - 12"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.2857 70,000.00 19,999.00
Tukang Bor L.02 OH 0.0714 90,000.00 6,426.00
Mandor L.04 OH 0.0286 85,000.00 2,431.00
JUMLAH TENAGA KERJA 28,856.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Reaming dia. 8 3/4" - 12" m' 0.5000 835,958.70 417,979.35
JUMLAH HARGA ALAT 417,979.35
D Jumlah (A+B+C) 446,835.35
E Overhead & Profit 13.5% 0.135 60,322.77
F Harga Satuan Pekerjaan (D+E) 507,158.00

A.T.05 Bongkar Pasang Temporary Cassing (ID) 12" 344,616.93


A TENAGA KERJA 32,978.50
1 Pekerja L.01 OH 0.3265 70,000.00 22,855.00
2 Tukang Bor - OH 0.0816 90,000.00 7,344.00
3 Mandor L.04 OH 0.0327 85,000.00 2,779.50
B BAHAN -

C PERALATAN *) 270,648.75
1 Reaming dia. 6" - 8" m' 0.5714 473,659.00 270,648.75

D JUMLAH A + B + C 303,627.25
E OVERHEAD & PROFIT 0.135 40,989.68
F HARGA SATUAN PEKERJAAN (D+E) 344,616.93

Halaman 25
A.T.07 Pengadaan dan Pemasangan Cassing Pipa Black Steel 6" 540,712.58
A TENAGA KERJA 7,212.50
1 Pekerja L.01 OH 0.0714 70,000.00 4,998.00
2 Tukang Bor - OH 0.0179 90,000.00 1,611.00
3 Mandor L.04 OH 0.0071 85,000.00 603.50
B BAHAN 362,615.00
1 Pipa Black Steel 6" m 1.0500 326,300.00 342,615.00
2 Centralizer Ls 0.1000 200,000.00 20,000.00
C PERALATAN *) 106,571.25
1 Drilling Rig+Perlengkapan (Pemasangan Pipa) m' 0.1250 852,570.00 106,571.25

D JUMLAH A + B + C 476,398.75
E OVERHEAD & PROFIT 0.135 64,313.83
F HARGA SATUAN PEKERJAAN (D+E) 540,712.58

A.T.08 Pengadaan dan Pemasangan LC Screen 6" 1,533,145.23


A TENAGA KERJA 7,212.50
1 Pekerja L.01 OH 0.0714 70,000.00 4,998.00
2 Tukang Bor - OH 0.0179 90,000.00 1,611.00
3 Mandor L.04 OH 0.0071 85,000.00 603.50
B BAHAN 1,237,005.00
1 LC. Screen 6" m 1.0500 1,178,100.00 1,237,005.00

C PERALATAN *) 106,571.25
1 Drilling Rig+Perlengkapan (Pemasangan Pipa) E.09 m' 0.1250 852,570.00 106,571.25

D JUMLAH A + B + C 1,350,788.75
E OVERHEAD & PROFIT 0.135 182,356.48
F HARGA SATUAN PEKERJAAN (D+E) 1,533,145.23

Halaman 26
A.T.12 Pengadaan dan Pemasangan Gravel Pack 2,908,535.42
A TENAGA KERJA 104,943.50
1 Pekerja L.01 OH 1.0390 70,000.00 72,730.00
2 Tukang Bor - OH 0.2598 90,000.00 23,382.00
3 Mandor L.04 OH 0.1039 85,000.00 8,831.50
B BAHAN 907,500.00
1 Koral beton M.12 M3 1.2000 350,000.00 420,000.00
2 Portland cement M.15 Kg 325.0000 1,500.00 487,500.00
C PERALATAN *) 1,550,142.77
1 Drilling Rig+Perlengkapan (Pemasangan Pipa) E.09 m' 1.8182 852,570.00 1,550,142.77

D JUMLAH A + B + C 2,562,586.27
E OVERHEAD & PROFIT 0.135 345,949.15
F HARGA SATUAN PEKERJAAN (D+E) 2,908,535.42

A.T.13 Pencucian Sumur (Well Development) 922,416.20


A TENAGA KERJA 57,712.50
1 Pekerja L.01 OH 0.5714 70,000.00 39,998.00
2 Tukang Bor - OH 0.1429 90,000.00 12,861.00
3 Mandor L.04 OH 0.0571 85,000.00 4,853.50
B BAHAN -

C PERALATAN *) 754,989.00
1 Drilling Rig+Perlengkapan (Pemasangan Pipa) E.09 m' 1.0000 754,989.00 754,989.00

D JUMLAH A + B + C 812,701.50
E OVERHEAD & PROFIT 0.135 109,714.70
F HARGA SATUAN PEKERJAAN (D+E) 922,416.20

A.T.14 Uji Pemompaan (Pumping Test) 349,619.16


A TENAGA KERJA 57,712.50
1 Pekerja L.01 OH 0.5714 70,000.00 39,998.00
2 Tukang Bor - OH 0.1429 90,000.00 12,861.00
3 Mandor L.04 OH 0.0571 85,000.00 4,853.50
B BAHAN -

C PERALATAN *) 250,322.00
1 Drilling Rig+Perlengkapan (Pemasangan Pipa) E.09 m' 1.0000 250,322.00 250,322.00

D JUMLAH A + B + C 308,034.50
E OVERHEAD & PROFIT 0.135 41,584.66
F HARGA SATUAN PEKERJAAN (D+E) 349,619.16

A.T.15 Pasang dan bongkar peralatan uji 2,006,680.00


A TENAGA KERJA 718,000.00
1 Pekerja L.01 OH 8.0000 70,000.00 560,000.00
2 Tukang Bor - OH 1.0000 90,000.00 90,000.00
3 Mandor L.04 OH 0.8000 85,000.00 68,000.00
B BAHAN 1,050,000.00
1 Resin - tube 2.0000 250,000.00 500,000.00
2 Kabel isolator, Air accu, Besi strip - Ls 1.0000 550,000.00 550,000.00
C PERALATAN *)

D JUMLAH A + B + C 1,768,000.00
E OVERHEAD & PROFIT 0.135 238,680.00
F HARGA SATUAN PEKERJAAN (D+E) 2,006,680.00

A.T.16 Pemeriksaan Kualitas Air 1,742,225.00


A TENAGA KERJA -
1 Teknisi sampling kualitas air L.05 OH 0.5000 - -
B BAHAN 35,000.00
1 1 bh jerigen 1 L, 2bh botol 250 ml - tube 1.0000 35,000.00 35,000.00

C PERALATAN *) -

D JUMLAH A + B + C 35,000.00
E OVERHEAD & PROFIT 0.135 4,725.00
F HARGA SATUAN PEKERJAAN (D+E) 39,725.00
39,725.00
Biaya Analisa Sampling kualitas air (air minum) sampel 1.0000 1,500,000.00 1,500,000.00
G
13.5% X G 202,500.00
1,742,225.00

Halaman 27
A.T.18 Electric Logging 1,024,337.50
A TENAGA KERJA 70,000.00
1 Pekerja L.05 OH 1.0000 70,000.00 70,000.00
Engineer (Sipil/Geologi)/ Ahli Mdya L.05 OH 0.2500 - -
B BAHAN -
1 Patok kayu kaso 5/7 - 1m' Ls 6.0000 - -
2 Cat tembok kg 0.5000 - -
C PERALATAN *) 832,500.00
1 Geo Listrik Sewa/H 0.3330 2,500,000.00 832,500.00
D JUMLAH A + B + C 902,500.00
E OVERHEAD & PROFIT 0.135 121,837.50
F HARGA SATUAN PEKERJAAN (D+E) 1,024,337.50

Halaman 28
2
ANALISA DIHIT 0
DAFTAR HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA 1
9
(Sudah termasuk overhead dan profit, belum termasuk PPN)
HARGA SATUAN (
(Rp) 2
No KODE ANALISA URAIAN PEKERJAAN SATUAN
)
2021 (2) /
2
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
0
1 Dihit A.2.2.1.2.1 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter m2 213,071.00 2
2 Dihit A.2.2.1.2.2 Pembuatan 1 m2 pagar sementara dari sasak bambu, tinggi 2,00 meter m2 107,934.00 0
3 Dihit A.2.2.1.2.3 Pembuatan 1 m2 pagar sementara dari MMT, tinggi 2,00 meter m2 89,659.00
4 Dihit A.2.2.1.13.a Pembongkaran 1 m3 pasangan batu m3 189,065.00 (
5 Dihit A.2.2.1.14. Pembongkaran 1 m3 dinding tembok bata m3 129,143.00 1
)
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
1 Dihit A.2.3.1.6.a Menggali 1 m3 Tanah Berbatu Lunak (dengan excavator) m3 16,475.00
2 Dihit A.2.3.1.6.b Menggali 1 m3 Batu (dengan excavator ) m3 19,133.00
3 Dihit A.2.3.1.11.a Pengurugan 1 m3 dengan tanah merah untuk taman m3 165,159.00
4 Dihit A.2.3.1.15. 1 m3 urugan batu pecah 5/7 cm m3 487,859.00
5 Dihit A.2.3.1.16. 1 m3 urugan batu pecah 3/5 cm m3 401,609.00
Pengurugan 1 m3 dengan tanah padas setempat dengan pemadat stamper (per 20
6 Dihit A.2.3.1.17. m3 330,393.00
cm)
Pengurugan 1 m3 dengan tanah padas sepanjang jalan dengan pemadat alat berat &
7 Dihit A.2.3.1.18. m3 141,260.00
dump truck ( per 20 cm)
Pengurugan 1 m3 dengan tanah padas sepanjang jalan dengan pemadat alat berat
8 Dihit A.2.3.1.19. m3 327,652.00
( per 20cm)

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


1 Dihit A.3.3.1.12. Pengadaan & Pasang sheetpile type FPC.220.500 m' 859,922.00
2 Dihit A.3.3.1.12.1 Pengadaan & Pemancangan Cerucuk bambu apus Ø 10 cm, sedalam 2 meter titik 34,372.00

3 Dihit A.3.3.1.12.2 Pengadaan & Pemancangan Cerucuk bambu petung Ø 10 cm, sedalam 2 meter titik 34,372.00

4 Dihit A.3.3.1.13.1 Pengadaan & Pemancangan Minipile / Triangle Pile 200x200x200 mm (drop hammer) m' 291,388.00

5 Dihit A.3.3.1.13.2 Pengadaan & Pemancangan Minipile / Triangle Pile 200x200x200 mm (mekanis) m' 183,332.00

6 Dihit A.3.3.1.13.3 Pengadaan & Pemancangan Minipile / Triangle Pile 250x250x250 mm (drop hammer) m' 348,010.00

7 Dihit A.3.3.1.13.4 Pengadaan & Pemancangan Minipile / Triangle Pile 250x250x250 mm (mekanis) m' 254,149.00

8 Dihit A.3.3.1.13.5 Pengadaan & Pemancangan Minipile / Triangle Pile 280x280x280 mm (drop hammer) m' 389,739.00

9 Dihit A.3.3.1.13.6 Pengadaan & Pemancangan Minipile / Triangle Pile 280x280x280 mm (mekanis) m' 302,105.00

10 Dihit A.3.3.1.13.7 Pengadaan & Pemancangan Minipile / Triangle Pile 300x300x300 mm (drop hammer) m' 464,998.00

11 Dihit A.3.3.1.13.8 Pengadaan & Pemancangan Minipile / Triangle Pile 300x300x300 mm (mekanis) m' 354,625.00

12 Dihit A.3.3.1.13.9 Pengadaan & Pemancangan Minipile / Triangle Pile 320x320x320 mm (drop hammer) m' 447,180.00

13 Dihit A.3.3.1.13.10 Pengadaan & Pemancangan Minipile / Triangle Pile 320x320x320 mm (mekanis) m' 367,120.00

14 Dihit A.3.3.1.13.11 Pengadaan & Pemancangan Minipile / kotak 300x300 mm K.500 (drop hammer) m' 626,355.00

15 Dihit A.3.3.1.13.12 Pengadaan & Pemancangan Minipile / kotak 300x300 mm K.500 (mekanis) m' 515,983.00

16 Dihit A.3.3.1.13.13 Pengadaan & Pemancangan Minipile / kotak 400x400 mm K.500 (drop hammer) m' 662,699.00

17 Dihit A.3.3.1.13.14 Pengadaan & Pemancangan Minipile / kotak 400x400 mm K.500 (mekanis) m' 553,759.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


1 Dihit A.4.1.1.1.a Membuat 1 m3 Rabat Beton (manual) setara campuran 1 PC : 3 PS : 5 Kr m3 1,148,574.00
1 m3 lantai kerja beton mutu fc' = 7,4 MPa (K 100), slump (3-6) cm, w/c = 087
2 Dihit A.4.1.1.4.c m3 1,033,861.00
(Readymix) tanpa alat Pompa beton
3 Dihit A.4.1.1.5.c 1 m3 beton mutu fc’= 14.5 MPa (K 175) Readymix tanpa alat Pompa beton m3 1,074,301.00
4 Dihit A.4.1.1.5.d 1 m3 beton mutu fc’= 14.5 MPa (K 175) Readymix dengan alat Pompa beton m3 1,101,669.00
5 Dihit A.4.1.1.7.c 1 m3 beton mutu fc’= 19,3 MPa (K 225) Readymix tanpa alat Pompa beton m3 1,127,359.00
6 Dihit A.4.1.1.7.d 1 m3 beton mutu fc’= 19,3 MPa (K 225) Readymix dengan alat Pompa beton m3 1,154,727.00
7 Dihit A.4.1.1.8.c 1 m3 beton mutu fc’= 21.7 MPa (K 250) Readymix tanpa alat Pompa beton m3 1,152,285.00
8 Dihit A.4.1.1.8.d 1 m3 beton mutu fc’= 21.7 MPa (K 250) Readymix dengan alat Pompa beton m3 1,179,653.00
9 Dihit A.4.1.1.9.c 1 m3 beton mutu fc’= 24,0 MPa (K 275) Readymix tanpa alat Pompa beton m3 1,168,697.00
10 Dihit A.4.1.1.9.d 1 m3 beton mutu fc’= 24,0 MPa (K 275) Readymix dengan alat Pompa beton m3 1,206,737.00
11 Dihit A.4.1.1.10.c 1 m3 beton mutu fc’= 26.4 MPa (K 300) Readymix tanpa alat Pompa beton m3 1,200,818.00
12 Dihit A.4.1.1.10.c 1 m3 beton mutu fc’= 26.4 MPa (K 300) Readymix dengan alat Pompa beton m3 1,228,186.00
13 Dihit A.4.1.1.12.c 1 m3 beton mutu fc’= 31.2 MPa (K 350) Readymix tanpa alat Pompa beton m3 1,245,685.00
14 Dihit A.4.1.1.12.d 1 m3 beton mutu fc’= 31.2 MPa (K 350) Readymix dengan alat Pompa beton m3 1,273,053.00
15 Dihit A.4.1.1.21.b Pemasangan 1 m2 bekisting untuk sloof pasang kembali m2 261,387.00
16 Dihit A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom pasang kembali m2 193,583.00
17 Dihit A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok pasang kembali m2 312,388.00
18 Dihit A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai pasang kembali m2 186,830.00
19 Dihit A.4.1.1.24.b Pemasangan 1 m2 bekisting untuk lantai dengan floordeck (JAP ≤ 0,6 m) m2 279,826.00
20 Dihit A.4.1.1.24.c Pemasangan 1 m2 bekisting untuk lantai dengan floordeck (JAP ≤ 0,8 m) m2 279,041.00
21 Dihit A.4.1.1.24.d Pemasangan 1 m2 bekisting untuk lantai dengan floordeck (JAP ≤ 1,2 m) m2 263,730.00
22 Dihit A.4.1.1.24.e Pemasangan 1 m2 bekisting untuk lantai dengan Scaffolding T.3,8 m m2 487,758.00
23 Dihit A.4.1.1.24.f Pemasangan 1 m2 bekisting untuk lantai dengan Scaffolding T.3,4 m m2 469,358.00
24 Dihit A.4.1.1.25.a Pemasangan 1 m2 bekisting untuk dinding pasang kembali m2 196,291.00
25 Dihit A.4.1.1.35.a Membuat 1 m’ kolom praktis beton bertulang (12 x 12) cm (termasuk bekisting) m' 193,297.00
26 Dihit A.4.1.1.35.b Pemasangan 1 m' bekisting untuk kolom praktis m' 115,091.00
27 Dihit A.4.1.1.35.c Bongkar 1 m2 bekisting secara biasa m2 4,994.00
28 Dihit A.4.1.1.35.d Bongkar 1 m2 bekisting secara hati-hati (untuk dipakai kembali) m2 7,491.00
29 Dihit A.4.1.1.36.a Pemasangan 1 m' bekisting untuk ring balok pasang kembali m2 83,595.00
Membuat 1 m’ ring balok beton bertulang (15 x 20) cm (tulangan pokok 4Ø10, begel
30 Dihit A.4.1.1.36.b m' 249,169.00
Ø6-150 termasuk bekisting)
Membuat 1 m’ ring balok beton bertulang (15 x 20) cm (tulangan pokok 4Ø12, begel
31 Dihit A.4.1.1.36.c m' 266,080.00
Ø6-150 termasuk bekisting)
32 Dihit A.4.1.1.37 Pemasangan 1 m Papan Dilatasi Pada Cor Jalan Beton m' 36,774.00
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
33 Dihit A.4.1.1.38.1.1 m3 1,242,833.00
1x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
34 Dihit A.4.1.1.38.1.2 m3 1,205,374.00
2x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
35 Dihit A.4.1.1.38.1.3 m3 1,229,009.00
1x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
36 Dihit A.4.1.1.38.1.4 m3 1,190,451.00
2x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
37 Dihit A.4.1.1.38.2.1 m3 1,244,094.00
1x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
38 Dihit A.4.1.1.38.2.2 m3 1,205,126.00
2x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
39 Dihit A.4.1.1.38.2.3 m3 1,229,286.00
1x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
40 Dihit A.4.1.1.38.2.4 m3 1,190,088.00
2x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
41 Dihit A.4.1.1.38.3.1 m3 1,245,082.00
1x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
42 Dihit A.4.1.1.38.3.2 m3 1,205,292.00
2x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
43 Dihit A.4.1.1.38.3.3 m3 1,230,135.00
1x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
44 Dihit A.4.1.1.38.3.4 m3 1,190,114.00
2x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
45 Dihit A.4.1.1.38.4.1 m3 1,246,964.00
1x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
46 Dihit A.4.1.1.38.4.2 m3 1,206,077.00
2x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
47 Dihit A.4.1.1.38.4.3 m3 1,231,840.00
1x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
48 Dihit A.4.1.1.38.4.4 m3 1,190,724.00
2x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
49 Dihit A.4.1.1.38.5.1 m3 1,250,275.00
1x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
50 Dihit A.4.1.1.38.5.2 m3 1,207,854.00
2x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
51 Dihit A.4.1.1.38.5.3 m3 1,234,917.00
1x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
52 Dihit A.4.1.1.38.5.4 m3 1,192,265.00
2x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
53 Dihit A.4.1.1.38.6.1 m3 1,256,089.00
1x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
54 Dihit A.4.1.1.38.6.2 m3 1,211,365.00
2x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
55 Dihit A.4.1.1.38.6.3 m3 1,240,393.00
1x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
56 Dihit A.4.1.1.38.6.4 m3 1,195,439.00
2x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
57 Dihit A.4.1.1.38.7.1 m3 1,266,907.00
1x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan Bekisting
58 Dihit A.4.1.1.38.7.2 m3 1,218,346.00
2x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
59 Dihit A.4.1.1.38.7.3 m3 1,250,668.00
1x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Bekisting
60 Dihit A.4.1.1.38.7.4 m3 1,201,878.00
2x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
61 Dihit A.4.1.1.38.8.1 m3 1,207,823.00
1x pakai, tanpa tulangan dowel & tiebars, L = 3 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
62 Dihit A.4.1.1.38.8.2 m3 1,166,131.00
2x pakai, tanpa tulangan dowel & tiebars, L = 3 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
63 Dihit A.4.1.1.38.9.1 m3 1,206,430.00
1x pakai, tanpa tulangan dowel & tiebars, L = 3,5 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
64 Dihit A.4.1.1.38.9.2 m3 1,165,834.00
2x pakai, tanpa tulangan dowel & tiebars, L = 3,5 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
65 Dihit A.4.1.1.38.10.1 m3 1,205,835.00
1x pakai, tanpa tulangan dowel & tiebars, L = 4 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
66 Dihit A.4.1.1.38.10.2 m3 1,166,061.00
2x pakai, tanpa tulangan dowel & tiebars, L = 4 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
67 Dihit A.4.1.1.38.11.1 m3 1,205,771.00
1x pakai, tanpa tulangan dowel & tiebars, L = 4,5 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan Bekisting
68 Dihit A.4.1.1.38.11.2 m3 1,166,637.00
2x pakai, tanpa tulangan dowel & tiebars, L = 4,5 m
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


1 Dihit A.4.2.1.4.1 Pembuatan 1 m Rangka Pintu Alluminium Warna Natural/Silver m' 397,944.00
2 Dihit A.4.2.1.4.2 Pembuatan 1 m Rangka Pintu Alluminium Warna Powder coating m' 198,904.00
3 Dihit A.4.2.1.4.3 Pembuatan 1 m Rangka Pintu U PVC Warna Putih m¹ 270,816.00
4 Dihit A.4.2.1.4.4 Pemasangan 1 m Kusen Pintu U PVC Warna Putih m¹ 265,325.00
5 Dihit A.4.2.1.4.5 Pemasangan 1 Unit Pintu PVC + Sticker Kaca Oval Polos Untuk KM/WC unit 966,038.00
6 Dihit A.4.2.1.4.6 Pemasangan 1 Unit Pintu Alluminium Panil Kaca Hias Untuk KM/WC unit 1,426,038.00
7 Dihit A.4.2.1.5.1 Pengerjaan 1 cm pengelasan stainless steel Cm 2,012.00
8 Dihit A.4.2.1.6.1 Pembuatan 1 m Rangka Jendela Alluminium Warna Natural/Silver m2 397,944.00
9 Dihit A.4.2.1.6.2 Pembuatan 1 m Rangka Jendela Alluminium Warna Powder coating m2 198,904.00
10 Dihit A.4.2.1.6.3 Pembuatan 1 m Rangka Jendela U PVC Warna Putih m¹ 260,797.00
11 Dihit A.4.2.1.8.a Pemasangan 1 m2 pintu lipat (folding door) bahan alluminium m2 787,124.00
12 Dihit A.4.2.1.11.1 Pemasangan 1 m kusen pintu alluminium 3" warna Powder coating m' 142,093.00
13 Dihit A.4.2.1.11.2 Pemasangan 1 m kusen pintu alluminium 4" warna Powder coating m' 155,452.00
14 Dihit A.4.2.1.11.3 Pemasangan 1 m kusen pintu alluminium 4" warna Natural / Silver m' 182,168.00
15 Dihit A.4.2.1.11.4 Pemasangan 1 m Kusen Pintu Alluminium Urat Kayu 3" m' 198,644.00
16 Dihit A.4.2.1.11.5 Pemasangan 1 m Kusen Pintu Alluminium Urat Kayu 4" m' 260,983.00
17 Dihit A.4.2.1.14.a Pemasangan 1 m2 venetions blinds dan Vertical blinds (sedang) m2 253,994.00
18 Dihit A.4.2.1.14.b Pemasangan 1 m2 venetions blinds dan Vertical blinds (standar) m2 253,994.00
Pemasangan 1 m2 atap pelana rangka atap baja canal dingin profil C75 (tebal 0,75
19 Dihit A.4.2.1.22.a m2 297,793.00
mm)
Pemasangan 1 m2 atap jurai rangka atap baja canal dingin profil C75 (tebal 0,75
20 Dihit A.4.2.1.23.a m2 336,742.00
mm)

21 Dihit A.4.2.1.24.a Pemasangan 1 M2 pasang kuda-kuda baja ringan + reng untuk atap asbes / spandek m2 355,246.00

22 Ls Pemasangan 1 m2 Rangka atap baja ringan + reng (Bluescope lysaght) m2 225,000.00


- Truss C75.070 BMT ; Reng TS35.045 BMT (TS35.050 TCT) ; Jarak kuda-kuda 110
cm
23 Ls Pemasangan 1 m2 Rangka atap baja ringan + reng (Galvasteel)
- Profil Z95 (tebal 0.80), Z75 (tebal 0.80), W75 (tebal 0.80) DAN PROFIL C65 (tebal
0.80) ; Bentuk Atap = Pelana ; Jarak Kuda - kuda 120 cm
Bentang Jarak Reng
7 Meter 225 mm m2 170,000.00
8 Meter 225 mm m2 167,000.00
9 Meter 225 mm m2 164,000.00
10 Meter 225 mm m2 161,000.00
11 Meter 225 mm m2 158,000.00
12 Meter 225 mm m2 155,000.00
7 Meter 255 mm m2 167,000.00
8 Meter 255 mm m2 164,000.00
9 Meter 255 mm m2 161,000.00
10 Meter 255 mm m2 158,000.00
11 Meter 255 mm m2 155,000.00
12 Meter 255 mm m2 152,000.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

- Profil Z95 (tebal 0.80), Z75 (tebal 0.80), W75 (tebal 0.80) DAN PROFIL C65 (tebal
0.80) ; Bentuk Atap = Limas ; Jarak Kuda - kuda 120 cm
Bentang Jarak Reng
7 Meter 225 mm m2 175,000.00
8 Meter 225 mm m2 173,000.00
9 Meter 225 mm m2 171,000.00
10 Meter 225 mm m2 169,000.00
11 Meter 225 mm m2 167,000.00
12 Meter 225 mm m2 165,000.00
7 Meter 255 mm m2 172,000.00
8 Meter 255 mm m2 170,000.00
9 Meter 255 mm m2 168,000.00
10 Meter 255 mm m2 166,000.00
11 Meter 255 mm m2 164,000.00
12 Meter 255 mm m2 162,000.00
24 Ls Pemasangan 1 m2 Rangka atap baja ringan + reng (Gigasteel) m2
- Profil Z95 ( tebal 0.75 ), Z75 ( tebal 0.75 ), CN 75( tebal 0.75 ) DAN PROFIL CN 65 (
tebal 0.75 ) ; Bentuk Atap = Pelana ; Jarak Kuda - kuda 120 cm
Bentang Jarak Reng
7 Meter m2 190,000.00
8 Meter m2 200,000.00
9 Meter m2 200,000.00
225 mm
10 Meter m2 200,000.00
11 Meter m2 220,000.00
12 Meter m2 220,000.00
7 Meter m2 185,000.00
8 Meter m2 190,000.00
9 Meter m2 190,000.00
255 mm
10 Meter m2 190,000.00
11 Meter m2 215,000.00
12 Meter m2 215,000.00
7 Meter m2 175,000.00
8 Meter m2 188,000.00
9 Meter m2 188,000.00
360 mm
10 Meter m2 188,000.00
11 Meter m2 205,000.00
12 Meter m2 205,000.00
- Profil Z95 ( tebal 0.75 ), Z75 ( tebal 0.75 ), CN 75( tebal 0.75 ) DAN PROFIL CN 65 (
tebal 0.75 ) ; Bentuk Atap = Limas ; Jarak Kuda - kuda 120 cm
Bentang Jarak Reng
7 Meter m2 197,000.00
8 Meter m2 208,000.00
9 Meter m2 208,000.00
225 mm
10 Meter m2 208,000.00
11 Meter m2 225,000.00
12 Meter m2 225,000.00
7 Meter m2 190,000.00
8 Meter m2 198,000.00
9 Meter m2 198,000.00
255 mm
10 Meter m2 198,000.00
11 Meter m2 223,000.00
12 Meter m2 223,000.00
7 Meter m2 185,000.00
8 Meter m2 187,000.00
9 Meter m2 187,000.00
360 mm
10 Meter m2 187,000.00
11 Meter m2 215,000.00
12 Meter m2 215,000.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

Pemasangan Daun Pintu Rangka Alumunium warna natural / silver, Panil Kaca Rayban
25 Dihit A.4.2.1.25 buah 3,044,829.00
5 mm Ukuran 70/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna Powder Coating, Panil Kaca
26 Dihit A.4.2.1.26 buah 1,985,937.00
Rayban 5 mm Uk.70/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna natural / silver, Panil Kaca Rayban
27 Dihit A.4.2.1.27 buah 3,168,171.00
5 mm Ukuran 80/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna Powder Coating, Panil Kaca
28 Dihit A.4.2.1.28 buah 2,069,470.00
Rayban 5 mm Ukuran 80/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna natural / silver, Panil Kaca Rayban
29 Dihit A.4.2.1.29 buah 3,291,512.00
5 mm Ukuran 90/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna Powder Coating, Panil Kaca
30 Dihit A.4.2.1.30 buah 2,153,004.00
Rayban 5 mm Ukuran 90/210 cm
Pemasangan Daun Jendela Rangka Alumunium warna natural / silver, Panil Kaca
31 Dihit A.4.2.1.31 buah 1,416,904.00
Rayban 5 mm Ukuran 50/100 cm
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Kaca
32 Dihit A.4.2.1.32 buah 847,650.00
Rayban 5 mm Ukuran 50/100 cm
Pemasangan Daun Jendela Rangka Alumunium warna natural / silver, Panil Kaca
33 Dihit A.4.2.1.33 buah 1,701,702.00
Rayban 5 mm Ukuran 60/120 cm
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Kaca
34 Dihit A.4.2.1.34 buah 1,013,024.00
Rayban 5 mm Ukuran 60/120 cm
Pemasangan Daun Jendela Rangka Alumunium warna natural / silver, Panil Kaca
35 Dihit A.4.2.1.35 buah 2,005,330.00
Rayban 5 mm Ukuran 70/140 cm
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Kaca
36 Dihit A.4.2.1.36 buah 1,197,228.00
Rayban 5 mm Ukuran 70/140 cm
Pemasangan Daun Jendela Rangka Alumunium warna natural / silver, Panil Kaca
37 Dihit A.4.2.1.37 buah 1,334,125.00
Rayban 5 mm Ukuran 60/80 cm
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Kaca
38 Dihit A.4.2.1.38 buah 804,679.00
Rayban 5 mm Ukuran 60/80 cm
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
39 Dihit A.4.2.1.39 buah 879,211.00
50/40 cm
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
40 Dihit A.4.2.1.40 buah 966,548.00
60/40 cm
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
41 Dihit A.4.2.1.41 buah 1,053,885.00
70/40 cm
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
42 Dihit A.4.2.1.42 buah 1,141,221.00
80/40 cm
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
43 Dihit A.4.2.1.43 buah 1,228,558.00
90/40 cm
Pemasangan Daun Pintu Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 70/210
44 Dihit A.4.2.1.44 buah 2,738,572.00
cm
Pemasangan Daun Pintu Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 80/210
45 Dihit A.4.2.1.45 buah 3,038,831.00
cm
Pemasangan Daun Pintu Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 90/210
46 Dihit A.4.2.1.46 buah 3,339,090.00
cm
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 50/100
47 Dihit A.4.2.1.47 buah 1,405,581.00
cm
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 60/120
48 Dihit A.4.2.1.48 buah 1,723,632.00
cm
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
49 Dihit A.4.2.1.49 buah 2,094,065.00
70/140 cm
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 60/80
50 Dihit A.4.2.1.50 buah 1,405,410.00
cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
51 Dihit A.4.2.1.51 buah 979,822.00
50/40 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
52 Dihit A.4.2.1.52 buah 1,033,186.00
60/40 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
53 Dihit A.4.2.1.53 buah 1,086,550.00
70/40 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
54 Dihit A.4.2.1.54 buah 1,139,913.00
80/40 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
55 Dihit A.4.2.1.55 buah 1,193,277.00
90/40 cm
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu dengan semen
1 Dihit A.4.4.1.15.1 m2 220,316.00
instan
2 Dihit A.4.4.1.23.1 Pemasangan 1 m2 dinding terawang (rooster) 20 x 20 cm campuran 1SP : 4PP m2 303,104.00
3 Dihit A.4.4.1.23.2 Pemasangan 1 m2 dinding terawang (rooster) 40 x 20 cm campuran 1SP : 4PP m2 210,721.00
4 Dihit A.4.4.1.23.3 Pemasangan 1 m2 dinding terawang (rooster) genteng kecil m2 203,804.00
5 Dihit A.4.4.1.23.4 Pemasangan 1 m2 dinding terawang (rooster) genteng sedang m2 250,828.00
6 Dihit A.4.4.1.23.5 Pemasangan 1 m2 dinding terawang (rooster) genteng besar m2 369,345.00
7 Dihit A.4.4.1.23.6 Pemasangan 1 m2 dinding terawang (rooster) keramik 20 x 20 cm m2 1,552,924.00
8 Dihit A.4.4.1.23.7 Pemasangan 1 m2 dinding terawang (rooster) keramik 30 x 30 cm m2 1,058,179.00
9 Dihit A.4.4.1.23.8 Pemasangan 1 m2 dinding terawang (rooster) GRC m2 1,086,929.00
10 Dihit A.4.4.1.27 Pemasangan 1m2 Glass Block 20x20 cm m2 825,153.00
11 Dihit A.4.4.1.28 Pasang Partisi Dobel Gipsum Board 9 mm Rangka Hollow Meni 4 x 4 cm m2 398,864.00
12 Dihit A.4.4.1.29 Pasang Partisi Dobel Plywood 6 mm Rangka Hollow Meni 4 x 4 cm m2 415,253.00

13 Dihit A.4.4.1.30 Pemasangan 1 m2 Penutup Dinding / Pintu dg HPL Lapis Plywood 9 mm warna polos m2 416,907.00

Pemasangan 1 m2 Penutup Dinding / Pintu dg


14 Dihit A.4.4.1.31 m2 425,340.00
HPL Lapis Plywood 9 mm warna kayu
15 Dihit A.4.4.1.32 Pasang Partisi Dobel GRC Board 6 mm Rangka Hollow Meni 4 x 4 cm m2 437,517.00
16 Dihit A.4.4.1.33 Pasang Partisi Dobel Gipsum Board 9 mm Rangka Metal Stud / Alumunium m2 301,764.00
17 Dihit A.4.4.1.34 Pasang Partisi Dobel Plywood 6 mm Rangka Metal Stud / Alumunium m2 318,153.00
18 Dihit A.4.4.1.35 Pasang Partisi Dobel GRC Board 6 mm Rangka Metal Stud / Alumunium m2 340,417.00

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Dihit A.4.4.3.8.a Pemasangan 1 m2 lantai ubin granit ukuran 60cm x 60cm m2 323,684.00
2 Dihit A.4.4.3.10.a Pemasangan 1 m2 lantai ubin granit unpolish / anti skid m2 329,987.00
3 Dihit A.4.4.3.30.1 Pemasangan 1 m’ plint kaca rayben tinggi 10cm m' 47,479.00
4 Dihit A.4.4.3.30.2 Pemasangan 1 m Plint Hospital 8 x 30 cm m' 163,172.00
5 Dihit A.4.4.3.30.3 Pemasangan 1 m Plint Hospital 10 x 40 cm m' 179,870.00
Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm (putih) (Setara Milan, Roman,
6 Dihit A.4.4.3.34.1 m2 349,837.00
Platinum)
Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm (putih) (Setara Mulia, Asia
7 Dihit A.4.4.3.34.1a m2 282,246.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm (motif) (Setara Mulia, Asia
8 Dihit A.4.4.3.34.2 m2 339,955.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 50cm x 50cm (putih) (Setara Mulia, Asia
9 Dihit A.4.4.3.34.3 m2 264,723.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 50cm x 50cm (motif) (Setara Mulia, Asia
10 Dihit A.4.4.3.34.4 m2 271,418.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm (putih) (Setara Mulia, Asia
11 Dihit A.4.4.3.34.5 m2 239,540.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm (motif) (Setara Mulia, Asia
12 Dihit A.4.4.3.34.6 m2 245,596.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm (motif) (Setara Mulia, Asia
13 Dihit A.4.4.3.35.1 m2 239,327.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 25cm x 25cm (putih) (Setara Mulia, Asia
14 Dihit A.4.4.3.35.2 m2 242,090.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 25cm x 25cm (motif) (Setara Mulia, Asia
15 Dihit A.4.4.3.35.3 m2 230,614.00
Tile, KIA)
Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm (motif) (Setara Mulia, Asia
16 Dihit A.4.4.3.36.1 m2 251,648.00
Tile, KIA)
17 Dihit A.4.4.3.54.1a Pemasangan 1 m2 dinding keramik 20cm x 25cm (putih) (Setara Milan, Roman, KIA) m2 302,135.00

18 Dihit A.4.4.3.54.1b Pemasangan 1 m2 dinding keramik 20cm x 25cm (motif) (Setara Milan, Roman, KIA) m2 301,497.00

19 Dihit A.4.4.3.54.2.a Pemasangan 1 m2 Dinding Keramik 20 x 40 cm (Setara Milan, Roman, KIA) m2 317,745.00

20 Dihit A.4.4.3.54.2.b Pemasangan 1 m2 Dinding Keramik 25 x 40 cm (putih) (Setara Milan, Roman, KIA) m2 1,041,340.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

21 Dihit A.4.4.3.54.2.c Pemasangan 1 m2 Dinding Keramik 25 x 40 cm (motif) (Setara Milan, Roman, KIA) m2 752,920.00

22 Dihit A.4.4.3.54.3 Pemasangan 1 m2 Dinding Keramik 25 x 50 cm (Setara Milan, Roman, KIA) m2 340,024.00
23 Dihit A.4.4.3.54.4 Pemasangan 1 m2 Dinding Keramik 20 x 60 cm (Setara Milan, Roman, KIA) m2 311,024.00
24 Dihit A.4.4.3.54.5 Pemasangan 1 m2 Dinding Keramik 30 x 60 cm (Setara Milan, Roman, KIA) m2 365,577.00
25 Dihit A.4.4.3.54.6 Pemasangan 1 m2 Dinding Keramik 25 x 33 cm (Setara Milan, Roman, KIA) m2 362,794.00

26 Dihit A.4.4.3.54.7 Pemasangan 1 m2 Dinding Keramik 32,5 x 65,5 cm (Setara Milan, Roman, KIA) m2 397,708.00

27 Dihit A.4.4.3.54.8 Pemasangan 1 m Step Tile 30x30 cm m¹ 113,928.00


28 Dihit A.4.4.3.54.9 Pemasangan 1 m Step Tile 30x60 cm m¹ 88,898.00
29 Dihit A.4.4.3.54.10 Pemasangan 1 m Step Tile 30x120 cm m¹ 173,806.00
30 Dihit A.4.4.3.54.11 Pemasangan 1 m Step Nosing Keramik 10x40 cm m' 92,256.00
31 Dihit A.4.4.3.54.12 Pemasangan 1 m Step Nosing Granit 10x60 cm m' 83,300.00
32 Dihit A.4.4.3.54.13 Pemasangan 1 m Step Nosing Allumunium m' 342,726.00
33 Dihit A.4.4.3.54.14 Pemasangan 1 m Step Nosing Karet m' 124,883.00
34 Dihit A.4.4.3.54.15 Pemasangan 1 m Step Nosing Allumunium Karet m' 381,698.00
35 Dihit A.4.4.3.54.16 Pemasangan 1 m2 Kuku Macan 10 cm m2 81,294.00
36 Dihit A.4.4.3.54.17.a Pemasangan 1 m Keramik Border Dinding 5/25 cm m2 86,320.00
37 Dihit A.4.4.3.54.17.b Pemasangan 1 m Keramik Border Dinding 5-8/20 cm m2 69,956.00
38 Dihit A.4.4.3.54.18 Pemasangan 1 m Keramik Border Dinding 10/40 cm m2 85,895.00
39 Dihit A.4.4.3.54.19 Pemasangan 1 m Keramik Border Dinding 10/50 cm m2 74,419.00
40 Dihit A.4.4.3.54.20 Pemasangan 1 m Keramik Border Dinding 10/60 cm m¹ 67,725.00
41 Dihit A.4.4.3.54.21 Pemasangan 1 m Keramik Homogenous 40 x 40 cm (setara Granito) m¹ 472,632.00
42 Dihit A.4.4.3.54.22 Pemasangan 1 m2 Keramik Homogenous 60 x 30 cm (setara Granito) m2 376,377.00
43 Dihit A.4.4.3.54.23 Pemasangan 1 m2 Keramik Homogenous 60 x 60 cm (setara Granito) m2 391,310.00
44 Dihit A.4.4.3.54.24 Pemasangan 1 m2 Keramik Homogenous 80 x 80 cm (setara Granito) m2 624,093.00
45 Dihit A.4.4.3.58.1 Pemasangan 1 m2 Batu Alam Andesit Polos Bakar m2 331,382.00
46 Dihit A.4.4.3.58.2 Pemasangan 1 m2 Batu Alam Andesit Bintik Bakar m2 334,722.00
47 Dihit A.4.4.3.58.3 Pemasangan 1 m2 Batu Alam Andesit Alur Bakar m2 345,854.00
48 Dihit A.4.4.3.58.4 Pemasangan 1 m2 Batu Alam Andesit Motif m2 334,722.00
49 Dihit A.4.4.3.58.5 Pemasangan 1 m2 Batu Candi Hitam m2 340,733.00
50 Dihit A.4.4.3.58.6 Pemasangan 1 m2 Batu Candi Warna m2 297,986.00
51 Dihit A.4.4.3.58.7 Pemasangan 1 m2 Batu Wall Clading m2 401,514.00
52 Dihit A.4.4.3.58.8 Pemasangan 1 m2 Batu Sikat (batu mozaik) m2 295,609.00

53 Dihit A.4.4.3.64.a Pemasangan 1 m2 paving block natural tebal 6 cm (K.250)(alas dengan pasir urug) m2 240,522.00

Pemasangan 1 m2 paving block natural tebal 8 cm (K.300)(alas dengan pasir


54 Dihit A.4.4.3.65.a m2 319,026.00
muntilan)

55 Dihit A.4.4.3.65.b Pemasangan 1 m2 paving block natural tebal 8 cm (K.300)(alas dengan pasir urug) m2 313,825.00

56 Dihit A.4.4.3.66.a Pemasangan 1 m2 paving block berwarna tebal 6 cm (K.250)(alas dengan pasir urug) m2 289,430.00

Pemasangan 1 m2 paving block berwarna tebal 8 cm (K.300)(alas dengan pasir


57 Dihit A.4.4.3.67.a m2 338,190.00
muntilan)

58 Dihit A.4.4.3.67.b Pemasangan 1 m2 paving block berwarna tebal 8 cm (K.300)(alas dengan pasir urug) m2 332,990.00

59 Dihit A.4.4.3.68.a Pemasangan 1 m2 Penutup Dinding Dalam Ruangan dg ACP Rangka Allumunium m2 834,633.00
60 Dihit A.4.4.3.68.b Pemasangan 1 m2 Penutup Dinding Luar Ruangan dg ACP Rangka Allumunium m2 892,630.00
61 Dihit A.4.4.3.69.a Pemasangan 1m2 Ubin/Tegel Untuk Jalur Difabel 30 x 30 cm (Motif) m2 418,171.00
62 Dihit A.4.4.3.69.b Pemasangan 1m2 Ubin/Tegel Untuk Jalur Difabel 20 x 20 cm (Motif) m2 866,309.00
63 Dihit A.4.4.3.70. Perbaikan 1 m2 paving block (tanpa alat pemadat) m2 67,955.00
64 Dihit A.4.4.3.71. Pemasangan 1 m Kansteen Tipe S / tali air m¹ 164,079.00
65 Dihit A.4.4.3.72. Pemasangan 1 m Kansteen Taman m¹ 189,126.00
66 Dihit A.4.4.3.73. Pemasangan 1 m Kansteen Trotoar 1 m¹ 155,730.00
67 Dihit A.4.4.3.74. Pemasangan 1 m Kansteen Trotoar 2 m¹ 160,739.00
68 Dihit A.4.4.3.75. Pemasangan 1 m Kansteen 60x25x22x18 cm m¹ 183,560.00
69 Dihit A.4.4.3.76. Pemasangan 1 m Kansteen 60x15x22 cm m¹ 149,051.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


1 Dihit A.4.5.1.4.1 Pemasangan 1 m2 Langit-Langit Akustik Ukuran (60 x 60) cm m2 179,993.00
2 Dihit A.4.5.1.4.2 Pemasangan 1 m2 Langit - Langit Calsiboard, Uk. (120 x 240) cm Tebal 3,5 mm m2 35,956.00
3 Dihit A.4.5.1.4.3 Pemasangan 1 m2 Langit - Langit GRC board, Uk. (120 x 240) cm Tebal 4 mm m2 44,797.00
4 Dihit A.4.5.1.4.4 Pemasangan 1 m2 Langit - Langit Plat Lembaran Aluminium (spandril) m2 532,647.00
5 Dihit A.4.5.1.4.5 Pemasangan 1 m2 Langit - Langit PVC setara Shunda m2 359,089.00
6 Dihit A.4.5.1.4.6 Pemasangan 1 m2 Langit - Langit Plat Metal Berpori -Pori m2 271,773.00
Pemasangan 1 m2 Rangka Plafon Holo Galvanis Uk. 40 x 40 / 20 x 40 Tebal ± 0,4
7 Dihit A.4.5.1.10.2 m2 196,250.00
mm, modul 60 x 60 cm
8 Dihit A.4.5.1.10.4 Pemasangan 1 m2 Rangka Plafon Dengan Bahan Metal Furing m2 246,086.00
9 Dihit A.4.5.1.10.5 Pemasangan 1 m2 Rangka Plafon Dengan Bahan Metal Stud m2 204,214.00
10 Dihit A.4.5.1.10.6 Pemasangan 1 m2 Rangka Plafon Dengan Bahan profil " T " Alumunium m2 193,001.00
11 Dihit A.4.5.1.11. Pemasangan 1 m2 List PVC m2 73,411.00
12 Dihit A.4.5.1.11.1 Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar ± 8 cm m2 21,982.00
13 Dihit A.4.5.1.11.2 Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar ± 10 cm m2 23,257.00
14 Dihit A.4.5.1.11.3 Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar ± 15 cm m2 25,648.00
15 Dihit A.4.5.1.12. Pemasangan 1 m2 rangka langit-langit besi hollow 40.40.1,1 mm (A.4.2.1.21) m2 246,707.00

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 Dihit A.4.5.2.31.a Pemasangan 1 m2 genteng aspal (Onduline, 200Cm x 95Cm x 3mm) m2 245,520.00
2 Dihit A.4.5.2.41.a Pemasangan 1 m2 Atap Galvalum (tanpa rangka atap) m2 61,775.00
3 Dihit A.4.5.2.44. Pemasangan 1 m2 genteng Press Jatiwangi Kecil Natural m2 95,989.00
4 Dihit A.4.5.2.45. Pemasangan 1 m2 Atap Genteng Press Jatiwangi Besar Natural m2 95,711.00
5 Dihit A.4.5.2.46. Pemasangan 1 m2 Atap Genteng Press Jatiwangi Besar Glazur m2 120,186.00
6 Dihit A.4.5.2.47. Pemasangan 1 m’ Bubung Genteng Jatiwangi Kecil Natural m' 151,079.00
7 Dihit A.4.5.2.48. Pemasangan 1 m’ Bubung Genteng Jatiwangi Besar Natural m' 133,470.00
8 Dihit A.4.5.2.49. Pemasangan 1 m’ Bubung Genteng Jatiwangi Besar Glazur m' 154,115.00
9 Dihit A.4.5.2.50. Pemasangan 1 m2 Atap Fibre glass (jabes) m2 206,656.00
10 Dihit A.4.5.2.51. Pemasangan 1 m2 Atap Genteng Keramik M-Class m2 216,214.00
11 Dihit A.4.5.2.51.a Pemasangan 1 m2 Atap Genteng Keramik Glazur Morando m2 105,097.00
12 Dihit A.4.5.2.51.b Pemasangan 1 m2 Atap Genteng Keramik Glazur Kanmuri m2 233,216.00
13 Dihit A.4.5.2.52. Pemasangan 1 m’ Bubung Genteng Keramik m2 189,332.00
14 Dihit A.4.5.2.54. Pemasangan 1 m2 Atap U PVC Gelombang m2 190,134.00
15 Dihit A.4.5.2.55. Pemasangan 1 m2 Atap Transparan Gelombang m2 213,269.00

16 Dihit A.4.5.2.56.a Pemasangan 1 m2 rangka atap Carport & penutup atap Polycarbonate , t = 4 mm m2 517,733.00

17 Dihit A.4.5.2.56.b Pemasangan 1 m2 rangka atap Carport & penutup atap Polycarbonate , t = 5 mm m2 517,733.00

18 Dihit A.4.5.2.56.c Pemasangan 1 m2 rangka atap Carport & penutup atap Polycarbonate , t = 6 mm m2 528,025.00

19 Dihit A.4.5.2.56.d Pemasangan 1 m2 rangka atap Carport & penutup atap Polycarbonate , t = 10 mm m2 594,919.00

Pemasangan 1 m2 rangka atap Carport & penutup atap Galvalum gelombang, t= 0.3
20 Dihit A.4.5.2.56.e m2 459,618.00
mm, L= 80 cm
21 Dihit A.4.5.2.57 Pemasangan 1 m2 Atap Genteng Asbes ( Asbes Motif Genteng ) m2 234,733.00

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


1 Dihit A.4.6.1.5.a Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I (Jati) m2 1,609,414.00
2 Dihit A.4.6.1.16.a Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II (Bengkirai) m2 246,502.00
3 Dihit A.4.6.1.17.a Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II (Bengkirai) m2 269,051.00
4 Dihit A.4.6.1.21.a Pemasangan 1 m’ lisplank ukuran (2 x 20) cm, kayu kelas II (Bengkirai) m' 118,260.00
5 Dihit A.4.6.1.22.a Pemasangan 1 m’ lisplank ukuran (2 x 30) cm, kayu kelas II (Bengkirai) m' 153,439.00
6 Dihit A.4.6.1.22.b Pemasangan 1 m Lisplank Profil Beton Pracetak L 20 cm m¹ 86,247.00
7 Dihit A.4.6.1.22.c Pemasangan 1 m Lisplank Profil Beton Pracetak L 30 cm m¹ 150,669.00
8 Dihit A.4.6.1.22.d Pemasangan 1 m Lisplank Urat Kayu 20 cm m¹ 51,725.00
9 Dihit A.4.6.1.22.e Pemasangan 1 m Lisplank Urat Kayu 30 cm m¹ 72,220.00
10 Dihit A.4.6.1.29. Pembuatan dan pemasangan 1 m3 Kusen pintu dan jendela kayu Kruing m3 13,932,250.00
11 Dihit A.4.6.1.30. Pembuatan dan Pemasangan 1 m2 Daun Pintu Panel, Kayu Kruing m2 973,206.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

12 Dihit A.4.6.1.31. Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kaca Kayu Kruing m2 709,238.00
Pembuatan dan Pemasangan 1 m2 Pintu Plywood Rangkap Rangka Kayu Kruing (L
13 Dihit A.4.6.1.32. m2 784,558.00
s/d 90 cm)
Pembuatan dan Pemasangan 1 m2 Pintu Plywood Rangkap Rangka Expose Kayu
14 Dihit A.4.6.1.33. m2 848,452.00
Kruing
Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda-Kuda Konvensional Kayu Kruing
15 Dihit A.4.6.1.34. m3 12,283,181.00
Bentang 6 m
16 Dihit A.4.6.1.35. Pemasangan 1 m3 Konstruksi Gording, Kayu Kruing m3 13,785,158.00
17 Dihit A.4.6.1.36. Pemasangan 1 m2 Rangka Atap Genteng Keramik, Kayu Kruing m2 133,017.00
18 Dihit A.4.6.1.37. Pemasangan 1 m2 Rangka Atap Genteng Beton, Kayu Kruing m2 128,281.00
Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda - Kuda Konfensional Kayu Lokal
19 Dihit A.4.6.1.38. m3 5,368,944.00
6m
20 Dihit A.4.6.1.39. Pemasangan 1 m2 Rangka Atap Genteng Kecil, Kayu Lokal m2 63,863.00
21 Dihit A.4.6.1.40. Pemasangan 1 m3 Rangka Dinding Pemisah (60x120) cm Kayu Lokal m3 157,439.00
22 Dihit A.4.6.1.41.a Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kaca Kayu Lokal m2 535,706.00
23 Dihit A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati panel Kaca m2 1,081,700.00
24 Dihit A.4.6.1.42. Pembuatan dan Pemasangan 1 m2 Kusen Pintu dan Jendela Kayu Lokal m2 6,390,964.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 Dihit A.4.6.2.7.a Pemasangan 1 buah floor hinge set 1,017,724.00
2 Dihit A.4.6.2.7.b Pemasangan 1 buah Patch fitting set ( top , bottom, lock fitting & overpanel ) set 2,859,767.00
3 Dihit A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 227,879.00
4 Dihit A.4.6.2.24.b Pemasangan 1 m2 kaca ray band tebal 8 mm m2 252,369.00
5 Dihit A.4.6.2.25. Pemasangan 1 m2 Kaca Bening Warna tebal 5 mm m2 195,151.00
6 Dihit A.4.6.2.26. Pemasangan 1 m2 Kaca Buram/Es/Kabur tebal 5 mm m2 224,508.00
7 Dihit A.4.6.2.27. Pemasangan 1 m2 Kaca Hias Lukis tebal 5 mm m2 1,283,192.00
8 Dihit A.4.6.2.28. Pemasangan 1 m2 Kaca Bening Polos tebal 5 mm Lapis Sandblast m2 399,757.00
9 Dihit A.4.6.2.29. Pemasangan 1 m2 Kaca Oneway tebal 5 mm m2 428,255.00
10 Dihit A.4.6.2.30.a Pemasangan 1 m2 Kaca Tempered tebal 5 mm m2 338,086.00
11 Dihit A.4.6.2.30.b Pemasangan 1 m2 Kaca Tempered tebal 8 mm m2 576,204.00
12 Dihit A.4.6.2.30.c Pemasangan 1 m2 Kaca Tempered tebal 12 mm m2 878,049.00
13 Dihit A.4.6.2.31. Pemasangan 1 Buah Selot Tanam Pintu Tinggi 6" buah 181,011.00
14 Dihit A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" buah 141,340.00
15 Dihit A.4.6.2.33. Pemasangan 1 Buah Grendel Rantai (Door Guard) buah 59,166.00
16 Dihit A.4.6.2.34. Pemasangan 1 Pasang Tarikan Pintu Panjang ± 30 cm pasang 125,553.00
17 Dihit A.4.6.2.35. Pemasangan 1 Pasang Tarikan Pintu Panjang ± 40 cm pasang 178,032.00
18 Dihit A.4.6.2.36. Pemasangan 1 Pasang Tarikan Pintu Panjang ± 50 cm pasang 233,635.00
19 Dihit A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 149,841.00
20 Dihit A.4.6.2.38. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 12" pasang 159,556.00
21 Dihit A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 34,693.00
22 Dihit A.4.6.2.40. Pemasangan 1 m2 Sticker Kaca m2 195,407.00

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Interior
1 Dihit A.4.7.1.10.a setara Mowilex (Decorcryl, Dulux Pentalite) m2 65,279.00

Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
2 Dihit A.4.7.1.10.b penutup) Exterior setara Mowilex (Decorcryl, Dulux Pentalite) m2 79,679.00

Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior
3 Dihit A.4.7.1.10.c setara Mowilex (Decorcryl, Dulux Pentalite, Nippon) m2 76,035.00

Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
4 Dihit A.4.7.1.10.d penutup) Interior setara Catylac (Vinilex, Property, Danacryl, Avitex) m2 32,938.00

Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Interior
5 Dihit A.4.7.1.10.e setara Catylac (Vinilex, Property, Danacryl, Avitex) m2 29,295.00

Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
6 Dihit A.4.7.1.10.f penutup) Exterior setara Catylac (Vinilex, Property, Danacryl, Avitex) m2 37,229.00

Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior
7 Dihit A.4.7.1.10.g setara Catylac (Vinilex, Property, Danacryl, Avitex) m2 33,586.00

Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior setara
8 Dihit A.4.7.1.11.a m2 67,667.00
Mowilex (Decorcryl, Dulux Pentalite, Nippon)
Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Interior setara
9 Dihit A.4.7.1.11.b m2 24,493.00
Catylac (Vinilex, Property, Danacryl, Avitex)
Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior setara
10 Dihit A.4.7.1.11.c m2 29,002.00
Catylac (Vinilex, Property, Danacryl, Avitex)
11 Dihit A.4.7.1.15.a Pemasangan 1 m2 wallpaper Artistik ( motif warna warni ) m2 107,292.00
12 Dihit A.4.7.1.23. Pengecatan 1 m2 kerb dengan cat genteng m2 38,931.00
13 Dihit A.4.7.1.24. Pengecatan 1 m2 Kerb dengan cat besi m2 42,446.00
14 Dihit A.4.7.1.25. Pelapisan 1 m2 batu alam dengan cat coating (Natural / Hitam / Gloss) m2 47,813.00
15 Dihit A.4.7.1.26. Pengecatan 1 m2 Tembok Dengan Cat Waterproofing ( 3 Lapis ) m2 44,076.00
16 Dihit A.4.7.1.27.a Pengecatan 1 m2 Plat Atap/Talang Dengan Lapisan Membran Waterproofing m2 49,653.00
17 Dihit A.4.7.1.27.b Pengecatan 1 m2 Plat Atap/Talang Dengan Cat Waterproofing ( 3 lapis ) m2 43,975.00
18 Dihit A.4.7.1.28. 1 m2 pengecatan tembok dengan cat mengkilap m2 43,691.00

19 Dihit A.4.7.1.29. 1 m2 pengecatan permukaan besi dan baja dengan cat besi 3 lapis cat penutup m2 55,978.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 Dihit A.5.1.1 1.a Pemasangan 1 buah closet duduk/monoblock (setara INA) dengan jet washer buah 3,255,705.00
2 Dihit A.5.1.1 1.b Pemasangan 1 buah closet duduk/monoblock (setara TOTO) dengan jet washer buah 1,937,125.00
3 Dihit A.5.1.1 2.a Pemasangan 1 buah closet jongkok porselen (Setara INA) buah 574,891.00
4 Dihit A.5.1.1 7.a Pemasangan 1 buah Reservoir fibreglass vol 1 m3 (Roof tank) buah 3,631,181.00
5 Dihit A.5.1.1 10.a Pemasangan 1 buah bak mandi fibreglass vol 120 liter (oval) buah 383,302.00
6 Dihit A.5.1.1 10.b Pemasangan 1 buah bak mandi fibreglass vol 120 liter (kotak) buah 726,054.00
7 Dihit A.5.1.1 19.a Pemasangan 1 buah kran diameter ½” atau 3/4” (Plastik) buah 96,746.00
8 Dihit A.5.1.1 19.b Pemasangan 1 buah shower setara ONDA buah 106,070.00
9 Dihit A.5.1.1 22.a Pemasangan 1 m’ pipa galvanis medium A diameter 1 ½” m' 1,515,822.00
10 Dihit A.5.1.1 24.a Pemasangan 1 m’ pipa galvanis medium A diameter 4” m' 3,581,964.00
11 Dihit A.5.1.1.37. Pemasangan 1 m Talang Air Hujan PVC Persegi m' 296,794.00
12 Dihit A.5.1.1.38. Pemasangan 1 m Talang Air Hujan PVC 1/2 Lingkaran 6" m¹ 190,559.00
13 Dihit A.5.1.1.39. Pemasangan 1 m Talang Air Hujan Galvanis 1/2 Lingkaran 6" m¹ 259,415.00
14 Dihit A.5.1.1.40. Pemasangan 1 Unit Septictank Dinding Bata Trassram 2x1,5x1,5 m unit 17,268,729.00
15 Dihit A.5.1.1.41. Pemasangan 1 Unit Septictank Dinding Bata Trassram 1,5x1,2x1,7 m unit 12,135,592.00
16 Dihit A.5.1.1.42. Pembuatan 1 Unit Septictank Bio Filter Kapasitas 6 orang unit 3,886,123.00
17 Dihit A.5.1.1.43. Pembuatan 1 Unit Septictank Bio Filter Kapasitas 8 orang unit 4,814,890.00
18 Dihit A.5.1.1.44. Pembuatan 1 Unit Septictank Bio Filter Kapasitas 12 orang unit 7,858,669.00

A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DILUAR GEDUNG


1 Dihit A.8.4.1.1.a Pemasangan 1 m pipa PVC Ø 63 mm (SNI.S-12,5 / 10 BAR) SCJ m' 81,449.00
2 Dihit A.8.4.1.1.b Pemasangan 1 m pipa PVC Ø 63 mm (SNI.S-12,5 / 10 BAR) RRJ m' 81,560.00
3 Dihit A.8.4.1.1.c Pemasangan 1 m pipa PVC AW Ø 75 mm m' 69,303.00
4 Dihit A.8.4.1.1.d Pemasangan 1 m pipa PVC Ø 75 mm (SNI.S-12,5 / 10 BAR) SCJ m' 101,741.00
5 Dihit A.8.4.1.2.a Pemasangan 1 m pipa PVC Ø 90 mm (SNI.S-12,5 / 10 BAR) SCJ m' 141,270.00
6 Dihit A.8.4.1.2.b Pemasangan 1 m pipa PVC Ø 90 mm (SNI.S-12,5 / 10 BAR) RRJ m' 141,604.00
7 Dihit A.8.4.1.3.a Pemasangan 1 m pipa PVC Ø 110 mm (SNI.S-12,5 / 10 BAR) SCJ m' 192,322.00
8 Dihit A.8.4.1.3.b Pemasangan 1 m pipa PVC Ø 110 mm (SNI.S-12,5 / 10 BAR) RRJ m' 194,357.00
9 Dihit A.8.4.1.4.a Pemasangan 1 m pipa PVC Ø 160 mm (SNI.S-12,5 / 10 BAR) SCJ m' 362,063.00
10 Dihit A.8.4.1.4.b Pemasangan 1 m pipa PVC Ø 160 mm (SNI.S-12,5 / 10 BAR) RRJ m' 364,198.00
11 Dihit A.8.4.1.5.a Pemasangan 1 m pipa PVC Ø 200 mm (SNI.S-12,5 / 10 BAR) SCJ m' 486,937.00
12 Dihit A.8.4.1.5.b Pemasangan 1 m pipa PVC Ø 200 mm (SNI.S-12,5 / 10 BAR) RRJ m' 544,972.00
13 Dihit A.8.4.1.6.a Pemasangan 1 m pipa PVC Ø 250 mm (SNI.S-12,5 / 10 BAR) SCJ m' 743,548.00
14 Dihit A.8.4.1.6.b Pemasangan 1 m pipa PVC Ø 250 mm (SNI.S-12,5 / 10 BAR) RRJ m' 825,003.00
15 Dihit A.8.4.1.7.a Pemasangan 1 m pipa PVC Ø 315 mm (SNI.S-12,5 / 10 BAR) SCJ m' 1,138,293.00
16 Dihit A.8.4.1.7.b Pemasangan 1 m pipa PVC Ø 315 mm (SNI.S-12,5 / 10 BAR) RRJ m' 1,264,524.00
17 Dihit A.8.4.1.8.a Pemasangan 1 m pipa PVC Ø 400 mm (SNI.S-12,5 / 10 BAR) SCJ m' 1,692,189.00
18 Dihit A.8.4.1.8.b Pemasangan 1 m pipa PVC Ø 400 mm (SNI.S-12,5 / 10 BAR) RRJ m' 2,058,962.00
19 Dihit A.8.4.1.77.a Pemasangan 1 m pipa baja Ø 1/2" , t = 1.5 mm (stainless steel) m' 56,451.00
20 Dihit A.8.4.1.77.b Pemasangan 1 m pipa baja Ø 3/4" , t = 1.5 mm (stainless steel) m' 72,542.00
21 Dihit A.8.4.1.77.c Pemasangan 1 m pipa baja Ø 1" , t = 1.5 mm (stainless steel) m' 87,418.00
22 Dihit A.8.4.1.77.d Pemasangan 1 m pipa baja Ø 1.1/2" , t = 1.5 mm (stainless steel) m' 135,127.00
23 Dihit A.8.4.1.77.e Pemasangan 1 m pipa baja Ø 2" , t = 1.5 mm (stainless steel) m' 169,434.00
24 Dihit A.8.4.1.77.f Pemasangan 1 m pipa baja Ø 2.1/2" , t = 1.5 mm (stainless steel) m' 263,360.00
25 Dihit A.8.4.1.77.g Pemasangan 1 m pipa baja Ø 3" , t = 1.5 mm (stainless steel) m' 312,808.00
26 Dihit A.8.4.1.77.h Pemasangan 1 m pipa baja Ø 3.1/2" , t = 1.5 mm (stainless steel) m' 347,258.00
27 Dihit A.8.4.1.77.i Pemasangan 1 m pipa baja Ø 4" , t = 1.5 mm (stainless steel) m' 399,699.00
28 Dihit A.8.4.1.78.a Pekerjaan incian pipa GI Ø 0,5" panjang 0,5 m ( Las ) 0,5 m 34,240.00
29 Dihit A.8.4.1.78.b Pekerjaan incian pipa GI Ø 1" panjang 0,5 m ( Las ) 0,5 m 77,970.00
30 Dihit A.8.4.1.78.c Pekerjaan incian pipa GI Ø 2" panjang 0,5 m ( Las ) 0,5 m 157,734.00
31 Dihit A.8.4.1.78.d Pekerjaan incian pipa GI Ø 3" panjang 0,5 m ( Las ) 0,5 m 194,994.00
32 Dihit A.8.4.1.78.e Pekerjaan incian pipa GI Ø 4" panjang 0,5 m ( Las ) 0,5 m 290,444.00
33 Dihit A.8.4.1.78.f Pekerjaan incian pipa GI Ø 0,5" panjang 0,5 m ( Drat ) 0,5 m 37,421.00
34 Dihit A.8.4.1.78.g Pekerjaan incian pipa GI Ø 1" panjang 0,5 m ( Drat ) 0,5 m 62,215.00
35 Dihit A.8.4.1.78.h Pekerjaan incian pipa GI Ø 2" panjang 0,5 m ( Drat ) 0,5 m 114,839.00
36 Dihit A.8.4.1.78.i Pekerjaan incian pipa GI Ø 3" panjang 0,5 m ( Drat ) 0,5 m 130,709.00
37 Dihit A.8.4.1.78.j Pekerjaan incian pipa GI Ø 4" panjang 0,5 m ( Drat ) 0,5 m 199,019.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

38 Dihit A.8.4.1.78.k Pekerjaan incian pipa wall pipe GI Ø 2" panjang 0,5 m ( Las & Drat ) 0,5 m 475,594.00
39 Dihit A.8.4.1.78.l Pekerjaan incian pipa wall pipe GI Ø 3" panjang 0,5 m ( Las & Drat ) 0,5 m 752,284.00
40 Dihit A.8.4.1.78.m Pekerjaan incian pipa wall pipe GI Ø 4" panjang 0,5 m ( Las & Drat ) 0,5 m 1,016,209.00
41 Dihit A.8.4.1.79.a Pemasangan 1 m' Pipa HDPE Ø75 mm m' 229,255.01
42 Dihit A.8.4.1.79.b Pemasangan 1 m' Pipa HDPE Ø200 mm m' 884,166.08
43 Dihit A.8.4.1.79.c Pemasangan 1 m' Pipa HDPE Ø250 mm m' 1,144,799.09
44 Dihit A.8.4.1.80.a Pemasangan 1 m' Pipa PVC Tipe AW Ø 0,5 Inch m' 34,627.66
45 Dihit A.8.4.1.80.b Pemasangan 1 m' Pipa PVC Tipe AW Ø 1,5 Inch m' 76,864.14
A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA
1 Dihit A.8.4.3.1.a Pemasangan 1 buah Valve HDPE Ø 63 mm buah 790,850.00
2 Dihit A.8.4.3.1.b Pemasangan 1 buah Valve HDPE Ø 75 mm buah 1,386,878.00
3 Dihit A.8.4.3.1.c Pemasangan 1 buah Valve HDPE Ø 90 mm buah 1,803,781.00
4 Dihit A.8.4.3.1.d Pemasangan 1 buah Valve HDPE Ø 110 mm buah 1,716,466.00
5 Dihit A.8.4.3.15.a Pemasangan 1 buah Tee HDPE Ø 63 mm buah 295,052.00
6 Dihit A.8.4.3.15.b Pemasangan 1 buah Tee HDPE Ø 90 mm buah 496,485.00
7 Dihit A.8.4.3.15.c Pemasangan 1 buah Tee HDPE Ø 110 mm buah 909,344.00

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL


1 Dihit A.8.4.6.1.a Pemasangan 1 buah instalasi titik lampu (tanpa saklar & fitting) buah 314,567.00
2 Dihit A.8.4.6.1.b Pemasangan 2 buah instalasi titik lampu ( dalam 1 saklar ) unit 488,574.00
3 Dihit A.8.4.6.1.c Pemasangan 3 buah instalasi titik lampu ( dalam 1 saklar ) unit 587,237.00
4 Dihit A.8.4.6.1.d Pemasangan 4 buah instalasi titik lampu ( dalam 1 saklar ) unit 688,329.00
5 Dihit A.8.4.6.3 1 unit - pemasangan box panel unit 6,503,171.00

6 Dihit A.8.4.6.3.a Pemasangan 1 Unit Panel MCB Ukuran Box 30x40x15 cm untuk 6 Grup MCB (1.Phasa) unit 846,110.00

Pemasangan 1 Unit Panel MCB Ukuran Box 40x50x20 cm untuk 12 Grup MCB
7 Dihit A.8.4.6.3.b unit 1,652,021.00
(1.Phasa)

8 Dihit A.8.4.6.3.c Pemasangan 1 Unit Panel MCB Ukuran Box 30x40x15 cm untuk 6 Grup MCB (3 Phasa) unit 1,329,072.00

Pemasangan 1 Unit Panel MCB Ukuran Box 40x50x20 cm untuk 12 Grup MCB (3
9 Dihit A.8.4.6.3.d unit 2,531,004.00
Phasa)
10 Dihit A.8.4.6.4 Pasang Saklar Tunggal sekualitas Broco, clipsal buah 35,867.00
11 Dihit A.8.4.6.5 Pasang Saklar Ganda sekualitas Broco, clipsal buah 44,874.00
12 Dihit A.8.4.6.6 Pasang Saklar Triple sekualitas Broco, clipsal buah 72,501.00
13 Dihit A.8.4.6.7 Pasang Stop Kontak sekualitas Broco, clipsal buah 40,320.00
14 Dihit A.8.4.6.7.a Pemasangan 1 buah instalasi stop kontak (tanpa stop kontak) buah 232,428.00
15 Dihit A.8.4.6.8 Pasang Stop Kontak AC, Sekualtas Broco, clipsal buah 88,896.00
16 Dihit A.8.4.6.9 1 m' memasang kabel NYM 3 x 1.5 mm m¹ 19,630.00
17 Dihit A.8.4.6.10 1 m' memasang kabel NYM 2 x 2.5 mm m¹ 18,415.00
18 Dihit A.8.4.6.11 1 m' memasang kabel NYY 3 x 2.5 mm m¹ 26,491.00
19 Dihit A.8.4.6.12 1 m' memasang kabel NYY 3 x 4 mm m¹ 39,345.00
20 Dihit A.8.4.6.13 1 m' memasang kabel NYY 3 x 6 mm m¹ 52,176.00
21 Dihit A.8.4.6.14 1 m' memasang kabel NYA 1 x 1.5 mm m¹ 9,995.00
22 Dihit A.8.4.6.15 1 m' memasang kabel NYA 1 x 2.5 mm m¹ 13,618.00
23 Ls Penangkal Petir Konvensional 2 AIP- BC 25 mm (termasuk biaya pemasangan) unit 2,500,000.00
24 Ls Penangkal Petir Konvensional 3 AIP- BC 25 mm (termasuk biaya pemasangan) unit 3,300,000.00
25 Ls Penangkal Petir Konvensional 4 AIP- BC 25 mm (termasuk biaya pemasangan) unit 3,900,000.00

26 Ls Penangkal Petir Elektrostatis Kurn R 35 M - BC 50 mm (termasuk biaya pemasangan) unit 6,700,000.00

27 Ls Penangkal Petir Elektrostatis Kurn R 85 M - BC 50 mm (termasuk biaya pemasangan) unit 8,300,000.00

28 Ls Penangkal Petir Elektrostatis Kurn R 150 M - BC 50 mm (termasuk biaya pemasangan) unit 8,900,000.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

AD.1 HARGA SATUAN PEKERJAAN SANITASI DILUAR GEDUNG


1 Dihit AD.1.1 Got Normal U - Ø 15 cm ( lengkap terpasang ) m¹ 103,688.00
2 Dihit AD.1.1.a Got Normal U - Ø 15 cm ( tanpa bata penjepit ) m¹ 66,657.00
3 Dihit AD.1.2 Got Normal U - Ø 20 cm ( lengkap terpasang ) m¹ 135,089.00
4 Dihit AD.1.2.a Got Normal U - Ø 20 cm ( tanpa bata penjepit ) m¹ 85,832.00
5 Dihit AD.1.3 Got Normal U - Ø 30 cm ( lengkap terpasang ) m¹ 199,703.00
6 Dihit AD.1.3.a Got Normal U - Ø 30 cm ( tanpa bata penjepit ) m¹ 115,870.00
7 Dihit AD.1.4 Got Normal U - Ø 40 cm ( lengkap terpasang ) m¹ 269,540.00
8 Dihit AD.1.4.a Got Normal U - Ø 40 cm ( tanpa bata penjepit ) m¹ 185,725.00
9 Dihit AD.1.5 Got Normal U - Ø 60 cm ( lengkap terpasang ) m¹ 389,766.00
10 Dihit AD.1.5.a Got Normal U - Ø 60 cm ( tanpa bata penjepit ) m¹ 299,309.00
11 Dihit AD.1.6 Buis beton Ø 20 cm ( lengkap terpasang ) m¹ 195,576.00
12 Dihit AD.1.7 Buis beton Ø 30 cm ( lengkap terpasang ) m¹ 275,049.00
13 Dihit AD.1.8 Buis beton Ø 40 cm ( lengkap terpasang ) m¹ 361,584.00
14 Dihit AD.1.9 Buis beton Ø 60 cm ( lengkap terpasang ) m¹ 394,980.00
15 Dihit AD.1.10 Buis beton Ø 80 cm ( lengkap terpasang ) m¹ 755,656.00
16 Dihit AD.1.11 Buis beton Ø 100 cm ( lengkap terpasang ) m¹ 869,203.00
17 Dihit AD.1.12 U-Ditch 20 x 20 cm, K - 350, Fabrikasi ( terpasang ) m¹ 248,896.00
18 Dihit AD.1.13 U-Ditch 30 x 30 cm, K - 350, Fabrikasi ( terpasang ) m¹ 313,574.00
19 Dihit AD.1.14 U-Ditch 40 x 40 cm, K - 350, Fabrikasi ( terpasang ) m¹ 480,089.00
20 Dihit AD.1.15 U-Ditch 50 x 50 cm, K - 350, Fabrikasi ( terpasang ) m¹ 624,608.00
21 Dihit AD.1.16 U-Ditch 60 x 60 cm, K - 350, Fabrikasi ( terpasang ) m¹ 856,314.00
22 Dihit AD.1.17 U-Ditch 60 x 80 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,122,792.00
23 Dihit AD.1.18 U-Ditch 80 x 80 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,232,429.00
24 Dihit AD.1.19 U-Ditch 80 x 100 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,536,029.00
25 Dihit AD.1.20 U-Ditch 100 x 100 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,594,342.00
26 Dihit AD.1.22 Tutup U-Ditch 20 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 183,619.00
27 Dihit AD.1.23 Tutup U-Ditch 30 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 229,619.00
28 Dihit AD.1.24 Tutup U-Ditch 40 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 233,299.00
29 Dihit AD.1.24.a Tutup U-Ditch 40 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 297,791.00
30 Dihit AD.1.25 Tutup U-Ditch 50 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 297,331.00
31 Dihit AD.1.26 Tutup U-Ditch 60 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 354,739.00
32 Dihit AD.1.27 Tutup U-Ditch 60 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 525,706.00
33 Dihit AD.1.28 Tutup U-Ditch 80 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 476,271.00
34 Dihit AD.1.29 Tutup U-Ditch 80 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 860,279.00
35 Dihit AD.1.31 Tutup U-Ditch 100 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 821,639.00
36 Dihit AD.1.36 Box Culvert 80 x 80 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 2,040,591.00
37 Dihit AD.1.37 Box Culvert 80 x 80 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 3,008,554.00
38 Dihit AD.1.38 Box Culvert 100 x 100 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 3,045,184.00
39 Dihit AD.1.39 Box Culvert 100 x 100 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 3,722,795.00
40 Dihit AD.1.40 Box Culvert 120 x 120 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 4,329,585.00
41 Dihit AD.1.41 Box Culvert 120 x 120 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 5,295,585.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

AD.2 HARGA SATUAN PEKERJAAN LANGSIRAN

1 Dihit AD.2.1 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 10m m¹ 33,246.00

2 Dihit AD.2.2 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 30m m¹ 41,384.00

3 Dihit AD.2.3 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 50m m¹ 49,056.00

4 Dihit AD.2.4 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 100 m m¹ 69,748.00

5 Dihit AD.2.5 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 200 m m¹ 110,435.00

6 Dihit AD.2.6 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 300 m m¹ 151,121.00

AD.3 HARGA SATUAN PEKERJAAN PAGAR BETON DAN BESI

1 Dihit AD.3.1 Pasang Pagar Panel Beton 240 x 40 x 5 cm & Kolom 225 x 18 x 17 cm, tinggi 160 cm m¹ 826,350.00

2 Dihit AD.3.2 Pasang Pagar Panel Beton 240 x 40 x 5 cm & Kolom 280 x 18 x 17 cm, tinggi 200 cm m¹ 853,520.00

3 Dihit AD.3.3 Pasang Pagar Panel Beton 240 x 40 x 5 cm & Kolom 320 x 18 x 17 cm, tinggi 240 cm m¹ 981,636.00

4 Dihit AD.3.4 Pasang Pagar Panel Beton 240 x 40 x 5 cm & Kolom 370 x 18 x 17 cm, tinggi 280cm m¹ 947,917.00

5 Dihit AD.3.5 Pasang Pagar Panel Beton 240 x 45 x 5 cm & Kolom 225 x 18 x 17 cm, tinggi 180 cm m¹ 826,399.00

6 Dihit AD.3.6 Pasang Pagar Panel Beton 240 x 45 x 5 cm & Kolom 280 x 18 x 17 cm, tinggi 225 cm m¹ 895,950.00

7 Dihit AD.3.7 Pasang Pagar Panel Beton 240 x 45 x 5 cm & Kolom 320 x 18 x 17 cm, tinggi 270 cm m¹ 1,032,552.00

8 Dihit AD.3.8 Pasang Pagar Panel Beton 240 x 45 x 5 cm & Kolom 370 x 18 x 17 cm, tinggi 315 cm m¹ 1,016,375.00

9 Dihit AD.3.9 Pasang Pagar Panel Beton 240 x 50 x 5 cm & Kolom 225 x 18 x 17 cm, tinggi 150 cm m¹ 791,816.00

10 Dihit AD.3.10 Pasang Pagar Panel Beton 240 x 50 x 5 cm & Kolom 280 x 18 x 17 cm, tinggi 200 cm m¹ 830,592.00

11 Dihit AD.3.11 Pasang Pagar Panel Beton 240 x 50 x 5 cm & Kolom 320 x 18 x 17 cm, tinggi 250 cm m¹ 970,314.00

12 Dihit AD.3.12 Pasang Pagar Panel Beton 240 x 50 x 5 cm & Kolom 350 x 18 x 17 cm, tinggi 300 cm m¹ 979,597.00

13 Dihit AD.3.13 Pasang Pagar BRC tinggi 90 cm + tiang Ø 2,0" m¹ 548,872.00


14 Dihit AD.3.14 Pasang Pagar BRC tinggi 120 cm + tiang Ø 2,0" m¹ 597,853.00
15 Dihit AD.3.15 Pasang Pagar BRC tinggi 175 cm + tiang Ø 2,0" m¹ 467,817.00
16 Dihit AD.3.16 Pasang Pagar BRC tinggi 190 cm + tiang Ø 2,0" m¹ 496,153.00

17 Dihit AD.3.17 Pemasangan 1 m2 Kawat Berduri diatas Pagar Panel Beton tinggi 50 cm - 4 lajur m¹ 207,465.00

18 Dihit AD.3.18 Pemasangan 1 m2 Kawat Berduri diatas Pagar Panel Beton tinggi 60 cm - 5 lajur m¹ 249,129.00

19 Dihit AD.3.19 Pemasangan 1 m2 Kawat Berduri diatas Pagar Panel Beton tinggi 60 cm - 7 lajur m¹ 324,826.00

20 LS Pekerjaan Pagar Railling Besi Hollow Meni tinggi s/d 120 cm m¹ 495,000.00
21 LS Pekerjaan Pintu Pagar Pipa Stainless tinggi s/d 200 cm m¹ 1,650,000.00
22 LS Pekerjaan Pintu Pagar Besi Hollow Meni tinggi s/d 200 cm m¹ 770,000.00
23 Dihit AD.3.23 Pekerjaan railling tangga pipa stainless steel (SS.304) m¹ 836,689.00
24 Dihit AD.3.24 Pekerjaan 1 m2 pipa besi hollow (untuk railling tangga, rangka atap, pagar) m2 354,249.00
HARGA SATUAN
No KODE ANALISA URAIAN PEKERJAAN SATUAN (Rp)

AD.4 HARGA SATUAN PEKERJAAN SUMUR DALAM / AIR TANAH & AIR BERSIH
1 Dihit A.T.01.1 Mobillisasi & demobilisasi drilling rig dan peralatan bor unit 2,699,963.00
2 Dihit A.T.01.2 Pembuatan bak untuk sirkulasi air kerja unit 433,633.00
3 Dihit A.T.02 Pengeboran dia. 8 3/4" m' 577,700.00
4 Dihit A.T.02.1 Pengeboran dia. 6" m' 417,563.00
5 Dihit A.T.02.2 Pengeboran Lubang Pandu 4" dari 0 m - 40 m m¹ 317,565.00
6 Dihit A.T.02.3 Pengeboran Lubang Pandu 4" dari 40 m - 80 m m¹ 330,194.00
7 Dihit A.T.02.4 Pengeboran Lubang Pandu 4" dari 80 m - 120 m m¹ 349,139.00
8 Dihit A.T.03 1 m' Reaming Ø8 3/4" - Ø12" m' 534,179.00
9 Dihit A.T.03.1 1 m' Reaming Ø6" - Ø8" m' 379,928.00
10 Dihit A.T.03.2 Reaming dari 0 m - 40 m dari Ø4'' ke Ø8'' m¹ 274,089.00
11 Dihit A.T.03.3 Reaming dari 40 m - 80 m dari Ø4'' ke Ø8'' m¹ 283,821.00
12 Dihit A.T.03.4 Reaming dari 80 m - 120 m dari Ø4'' ke Ø8'' m¹ 299,349.00
13 Dihit A.T.03.5 Reaming dari 0 m - 40 m dari Ø4'' ke Ø6'' m¹ 179,467.00
14 Dihit A.T.03.6 Reaming dari 40 m - 80 m dari Ø4'' ke Ø6'' m¹ 212,918.00
15 Dihit A.T.03.7 Reaming dari 80 m - 120 m dari Ø4'' ke Ø6'' m¹ 246,370.00
16 Dihit A.T.05 Bongkar Pasang Temporary Cassing (ID) 12" m' 363,085.00
17 Dihit A.T.07 Pengadaan dan Pemasangan Cassing Pipa Black Steel 6" m' 2,027,923.00
18 Dihit A.T.07.1 Pengadaan dan Pemasangan Cassing Pipa Galvanis GI. SNI (Medium A) dia. 4" m' 2,444,437.00
19 Dihit A.T.08 Pengadaan dan Pemasangan LC Screen 6" m' 1,629,551.00
20 Dihit A.T.08.1 Pengadaan dan Pemasangan ST. Screen dia. 4" m' 1,653,541.00
21 Dihit A.T.08.2 Pengadaan dan Pemasangan LC. Screen dia. 4" m' 1,272,847.00
22 Dihit A.T.08.3 Pengadaan dan Pemasangan PVC. Screen dia. 4" m' 368,670.00
23 Dihit A.T.12 Pengadaan dan Pemasangan Gravel Pack m3 508,541.00
24 Dihit A.T.13 Pencucian Sumur (Well Development) jam 95,957.00
25 Dihit A.T.14 Uji Pemompaan (Pumping Test) jam 37,920.00
26 Dihit A.T.15 Pasang dan bongkar peralatan uji Unit 2,346,294.00
27 Dihit A.T.16 Pemeriksaan Kualitas Air Spl 1,835,212.55
28 Dihit A.T.18 Electric Logging ttk 1,403,686.00
29 Dihit A.T.18.1 Bor Hole Logging m¹ 42,526.00
30 Dihit A.T.18.2 Grouting 1 : 2 m3 1,278,288.00

AD.5 HARGA SATUAN PEKERJAAN PERTAMANAN


1 Dihit AD.5.1 Penanaman 1 m2 rumput gajah mini m2 115,617.00
2 Dihit AD.5.2 Penanaman 1 m2 rumput golf m2 195,767.00
3 Dihit AD.5.3 Penanaman 1 m2 rumput jepang m2 118,956.00
4 Dihit AD.5.4 Penyiapan media tanah dalam Polybag untuk tanaman Semak buah 64,798.00
5 Dihit AD.5.5 Penanaman 1 Pohon Peneduh cemara kipas **) buah 202,557.00
6 Dihit AD.5.6 Penanaman 1 Pohon Peneduh glodogan pecut **) Besar buah 900,612.00
7 Dihit AD.5.7 Penanaman 1 Pohon Peneduh ketapang kencana **) buah 207,010.00
8 Dihit AD.5.8 Penanaman 1 Pohon Peneduh palem botol **) buah 308,592.00
9 Dihit AD.5.9 Penanaman 1 Pohon Peneduh palem ekor tupai ** Besar buah 497,836.00
10 Dihit AD.5.10 Penanaman 1 Pohon Peneduh pucuk merah **) buah 119,978.00
11 Dihit AD.5.11 Penanaman 1 Pohon Peneduh tabebuya kuning ** Besar buah 1,145,314.00
12 Dihit AD.5.12 Penanaman 1 Pohon Peneduh trembesi **) buah 597,012.00
**) Besar / Kecilnya pohon peneduh disesuaikan ketersediaan barang
AD.6 HARGA SATUAN PEKERJAAN LAIN - LAIN
1 Dihit AD.6.1 Sewa Scaffolding (m3 ruang) (m3 ruang) 17,681.00
2 Dihit AD.6.2 Pemasangan plastik cor m2 1,113.00
3 Dihit AD.6.3 Pemasangan Letter / logo Pemerintah dari bahan Marmer uk. ( 40 x 50 ) cm2 buah 1,000,000.00
4 Dihit AD.6.4 1 m3 bronjong penahan kawat Ø 3 mm m3 1,391,170.00
5 Dihit AD.6.5 Penyediaan dan Pemasangan rangka panggung besi IWF Kg 81,589.00
6 Dihit AD.6.6 Pasang penutup panggung multiplek 18 mm m2 233,682.00
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
dihit A.2.2.1.2.1 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.020 149,758.00 2,995.16
JUMLAH TENAGA KERJA 67,333.28
B BAHAN -
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.250 14,080.00 17,600.00
Portland cement M.245.a Kg 5.000 1,375.00 6,875.00
Seng gelombang uk. 0.9 x 1.8 t=0.02 M.137.d lembar 0.741 54,912.00 40,675.56
Pasir Beton (m3) M.9.c m3 0.005 339,234.40 1,696.17
Koral bulat M.11.a m3 0.009 248,160.00 2,233.44
Kayu Sengon (balok) M.28.b m3 0.023 2,059,200.00 47,567.52
Paku 5 cm M.56.d kg 0.060 21,648.00 1,298.88
JUMLAH HARGA BAHAN 117,946.57
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 185,279.85
E Overhead & Profit 15% 0.150 27,791.98
F Harga Satuan Pekerjaan (D+E) 213,071.00
-
dihit A.2.2.1.2.2 Pembuatan 1 m2 pagar sementara dari sesek bambu, tinggi 2 meter -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.020 149,758.00 2,995.16
JUMLAH TENAGA KERJA 67,333.28
B BAHAN -
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.250 14,080.00 17,600.00
Sesek bambu ukuran (200 X 150) M.555.A m2 1.200 5,280.00 6,336.00
Paku 5 cm M.56.d kg 0.060 21,648.00 1,298.88
Kawat Beton M.54 kg 0.060 21,472.00 1,288.32
JUMLAH HARGA BAHAN 26,523.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 93,856.48
E Overhead & Profit 15% 0.150 14,078.47
F Harga Satuan Pekerjaan (D+E) 107,934.00
-
dihit A.2.2.1.2.3 Pembuatan 1 m2 pagar sementara dari MMT, tinggi 2 meter -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Mandor L.04 OH 0.020 149,758.00 2,995.16
JUMLAH TENAGA KERJA 21,714.56
B BAHAN -
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.250 14,080.00 17,600.00
MMT m2 1.200 30,000.00 36,000.00
Paku 2,5 cm M.56.b m3 0.060 22,704.00 1,362.24
Kawat Beton M.54 m3 0.060 21,472.00 1,288.32
JUMLAH HARGA BAHAN 56,250.56
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 77,965.12
E Overhead & Profit 15% 0.150 11,694.77
F Harga Satuan Pekerjaan (D+E) 89,659.00
dihit A.2.2.1.13.a Pembongkaran 1 m3 pasangan batu
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 jam 9.639 13,371.00 128,877.72
Mandor L.04 jam 1.205 21,394.00 25,775.49
JUMLAH TENAGA KERJA 154,653.21
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Jack hammer alat 30 jam 1.205 8,093.67 9,751.26
JUMLAH HARGA ALAT 9,751.26
D Jumlah (A+B+C) 164,404.47
E Overhead & Profit 15% 0.150 24,660.67
F Harga Satuan Pekerjaan (D+E) 189,065.00

dihit A.2.2.1.14 Pembongkaran 1 m3 dinding tembok bata


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.667 93,597.00 62,429.20
Mandor L.04 OH 0.333 149,758.00 49,869.41
JUMLAH TENAGA KERJA 112,298.61
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 112,298.61
E Overhead & Profit 15% 0.150 16,844.79
F Harga Satuan Pekerjaan (D+E) 129,143.00
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH -
dihit A.2.3.1.6.a Menggali 1 m3 Tanah Berbatu Lunak (dengan excavator)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 jam 0.446 13,371.00 5,966.14
2 Mandor L.04 jam 0.056 21,394.00 1,193.79
JUMLAH TENAGA KERJA 7,159.93
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
1 Excavator 80-140 HP alat 27 jam 0.074 83,563.38 6,166.98
2 Alat bantu set 0.020 50,000.00 1,000.00
JUMLAH HARGA ALAT 7,166.98
D Jumlah (A+B+C) 14,326.90
E Overhead & Profit 15% 0.150 2,149.04
F Harga Satuan Pekerjaan (D+E) 16,475.00

dihit A.2.3.1.6.b Menggali 1 m3 Batu (dengan excavator )


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 jam 0.590 13,371.00 7,891.56
2 Mandor L.04 jam 0.074 21,394.00 1,578.88
JUMLAH TENAGA KERJA 9,470.44
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
1 Excavator 80-140 HP alat 27 jam 0.074 83,563.38 6,166.98
2 Alat bantu set 0.020 50,000.00 1,000.00
JUMLAH HARGA ALAT 7,166.98
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 16,637.42
E Overhead & Profit 15% 0.150 x D 2,495.61
F Harga Satuan Pekerjaan per - m' (D+E) 19,133.00

dihit A.2.3.1.11.a Pengurugan 1 m3 dengan tanah merah untuk taman


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 13,371.00 4,011.30
Mandor L.04 OH 0.010 21,394.00 213.94
JUMLAH TENAGA KERJA 4,225.24
B BAHAN
Tanah liat (quarry - lokasi pekerjaan) M.8.b m3 1.200 116,160.00 139,392.00
JUMLAH HARGA BAHAN 139,392.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 143,617.24
E Overhead & Profit 15% 0.150 21,542.59
F Harga Satuan Pekerjaan (D+E) 165,159.00
dihit A.2.3.1.15. 1 m3 urugan batu pecah 5/7 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.300 13,371.00 4,011.30
2 Mandor L.04 OH 0.010 21,394.00 213.94
JUMLAH TENAGA KERJA 4,225.24
B BAHAN -
1 Batu pecah 5-7 M.10.e m3 1.200 350,000.00 420,000.00
JUMLAH HARGA BAHAN 420,000.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 424,225.24
E Overhead & Profit 15% 0.150 63,633.79
F Harga Satuan Pekerjaan (D+E) 487,859.00
-
dihit A.2.3.1.16. 1 m3 urugan batu pecah 3/5 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.300 13,371.00 4,011.30
2 Mandor L.04 OH 0.010 21,394.00 213.94
JUMLAH TENAGA KERJA 4,225.24
B BAHAN -
1 Batu pecah 3-5 M.10.d m3 1.200 287,500.00 345,000.00
JUMLAH HARGA BAHAN 345,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 349,225.24
E Overhead & Profit 15% 0.150 x D 52,383.79
F Harga Satuan Pekerjaan per - m' (D+E) 401,609.00
-
dihit A.2.3.1.17. Pengurugan 1 m3 dengan tanah padas setempat dengan pemadat stamper -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.5000 13,371.00 6,685.50
2 Mandor L.04 OH 0.0500 21,394.00 1,069.70
JUMLAH TENAGA KERJA 7,755.20
B BAHAN -
1 Tanah padas (quarry - lokasi pekerjaan) M.7.b m3 1.1100 248,160.00 275,457.60
JUMLAH HARGA BAHAN 275,457.60
C PERALATAN -
1 Stamper alat 45 hari 0.0500 81,713.70 4,085.69

JUMLAH HARGA ALAT 4,085.69


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 287,298.49
E Overhead & Profit 15% 0.150 x D 43,094.77
F Harga Satuan Pekerjaan per - m' (D+E) 330,393.00
-
dihit A.2.3.1.18. Pengurugan 1 m3 dengan tanah padas sepanjang jalan dengan pemadat alat berat & dump truck -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 jam 0.3136 13,371.00 4,193.15
2 Mandor L.04 jam 0.0784 21,394.00 1,677.29
JUMLAH TENAGA KERJA 5,870.44
B BAHAN -
1 Tanah padas (quarry) M.7.a m³ 1.110 75,000.00 83,250.00
JUMLAH HARGA BAHAN 83,250.00
C PERALATAN -
1 Dump truck 3,5 ton alat 23.c jam 0.6093 50,100.26 30,526.09
2 Motor grader >100 HP alat 31 jam 0.0037 708,493.63 2,621.43
3 Vibratory roller 5-8 ton alat 40 jam 0.0042 35,714.29 150.00
4 Water tanker truck 3000-4000 ℓ alat 43 jam 0.0070 45,115.08 317.07
5 Alat Bantu Ls 1.0000 100.00 100.00
JUMLAH HARGA ALAT 33,714.59
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 122,835.02
E Overhead & Profit 15% 0.150 x D 18,425.25
F Harga Satuan Pekerjaan per - m' (D+E) 141,260.00
-
dihit A.2.3.1.19. Pengurugan 1 m3 dengan tanah padas sepanjang jalan dengan pemadat alat berat -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 jam 0.3136 13,371.00 4,193.15
2 Mandor L.04 jam 0.0784 21,394.00 1,677.29
JUMLAH TENAGA KERJA 5,870.44
B BAHAN -
1 Tanah padas (quarry - lokasi pekerjaan) M.7.b m3 1.110 248,160.00 275,457.60
JUMLAH HARGA BAHAN 275,457.60
C PERALATAN -
1 Motor grader >100 HP alat 31 jam 0.0037 708,493.63 2,621.43
2 Vibratory roller 5-8 ton alat 40 jam 0.0042 35,714.29 150.00
3 Water tanker truck 3000-4000 ℓ alat 43 jam 0.0070 45,115.08 315.81
4 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH HARGA ALAT 3,587.23
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 284,915.27
E Overhead & Profit 15% 0.150 x D 42,737.29
F Harga Satuan Pekerjaan per - m' (D+E) 327,652.00
-
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI -
dihit A.3.3.1.12 Pengadaan & Pasang sheetpile type FPC.220.500 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.057 93,597.00 5,372.47
Tukang Batu L.02 OH 0.012 121,674.00 1,399.25
Mandor L.04 OH 0.006 149,758.00 853.62
JUMLAH TENAGA KERJA 7,625.34
B BAHAN -
Sheetpile type FPC.220.500 M.102.a m' 1.000 662,112.00 662,112.00
JUMLAH HARGA BAHAN 662,112.00
C PERALATAN -
Crane on track 35 ton alat 21 jam 0.292 86,472.26 25,221.08
Alat bantu alat 49 set 1.000 52,800.00 52,800.00
JUMLAH HARGA ALAT 78,021.08
D Jumlah (A+B+C) 747,758.41
E Overhead & Profit 15% 0.150 112,163.76
F Harga Satuan Pekerjaan (D+E) 859,922.00
-
dihit A.3.3.1.12.1 Pengadaan & Pemancangan cerucuk bambu apus Ø 10 cm, sedalam 2 meter -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.045 93,597.00 4,211.87
Tukang Batu L.02 OH 0.012 121,674.00 1,460.09
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 8,109.21
B BAHAN -
Bambu cerucuk Ø 10 cm panjang 400 cm M.24.a batang 0.500 33,000.00 16,500.00
JUMLAH HARGA BAHAN 16,500.00
C PERALATAN -
Alat bantu alat 49 set 0.100 52,800.00 5,280.00
JUMLAH HARGA ALAT 5,280.00
D Jumlah (A+B+C) 29,889.21
E Overhead & Profit 15% 0.150 4,483.38
F Harga Satuan Pekerjaan (D+E) 34,372.00
-
dihit A.3.3.1.12.2 Pengadaan & Pemancangan cerucuk bambu Petung Ø 10 cm, sedalam 2 meter -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.045 93,597.00 4,211.87
Tukang Batu L.02 OH 0.012 121,674.00 1,460.09
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 8,109.21
B BAHAN -
Cerucuk bambu Petung Ø 10 cm panjang 600 cm batang 0.500 33,000.00 16,500.00
JUMLAH HARGA BAHAN 16,500.00
C PERALATAN -
Alat bantu alat 49 set 0.100 52,800.00 5,280.00
JUMLAH HARGA ALAT 5,280.00
D Jumlah (A+B+C) 29,889.21
E Overhead & Profit 15% 0.150 4,483.38
F Harga Satuan Pekerjaan (D+E) 34,372.00
-
dihit A.3.3.1.13.1 Pengadaan & Pemancangan Minipile / Triangle Pile 200x200x200 mm (drop hammer) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.4200 93,597.00 39,310.74
2 Tukang Batu L.02 OH 0.0700 121,674.00 8,517.18
3 Mandor L.04 OH 0.0420 149,758.00 6,289.84
JUMLAH TENAGA KERJA 54,117.76
B BAHAN -
1 Triangle Pile 200 mm M.103.a m' 1.0300 115,104.00 118,557.12
JUMLAH HARGA BAHAN 118,557.12
C PERALATAN -
1 Tripod tinggi 5 m alat 82 hari 0.1000 264,000.00 26,400.00
2 Hammer 1 - 2 ton (manual) alat 103 hari 0.1000 467,662.27 46,766.23
3 Las listrik diesel (termasuk Solar (industri)) alat 62 hari 0.1000 75,398.40 7,539.84
JUMLAH HARGA ALAT 80,706.07
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 253,380.94
E Overhead & Profit 15% 0.150 x D 38,007.14
F Harga Satuan Pekerjaan per - m' (D+E) 291,388.00
-
dihit A.3.3.1.13.3 Pengadaan & Pemancangan Minipile / Triangle Pile 250x250x250 mm (drop hammer) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.4800 93,597.00 44,926.56
2 Tukang Batu L.02 OH 0.0800 121,674.00 9,733.92
3 Mandor L.04 OH 0.0480 149,758.00 7,188.38
JUMLAH TENAGA KERJA 61,848.86
B BAHAN -
1 Triangle Pile 250 mm M.103.b m' 1.0300 171,072.00 176,204.16
JUMLAH HARGA BAHAN 176,204.16
C PERALATAN -
1 Tripod tinggi 5 m alat 82 hari 0.0800 264,000.00 21,120.00
2 Hammer 1 - 2 ton (manual) alat 103 hari 0.0800 467,662.27 37,412.98
3 Las listrik diesel (termasuk Solar (industri)) alat 62 hari 0.0800 75,398.40 6,031.87
JUMLAH HARGA ALAT 64,564.85
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 302,617.88
E Overhead & Profit 15% 0.150 x D 45,392.68
F Harga Satuan Pekerjaan per - m' (D+E) 348,010.00
-
dihit A.3.3.1.13.5 Pengadaan & Pemancangan Minipile / Triangle Pile 280x280x280 mm (drop hammer) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.5160 93,597.00 48,296.05
2 Tukang Batu L.02 OH 0.0860 121,674.00 10,463.96
3 Mandor L.04 OH 0.0516 149,758.00 7,727.51
JUMLAH TENAGA KERJA 66,487.53
B BAHAN -
1 Triangle Pile 280 mm M.103.c m' 1.0300 211,200.00 217,536.00
JUMLAH HARGA BAHAN 217,536.00
C PERALATAN -
1 Tripod tinggi 5 m alat 82 hari 0.0680 264,000.00 17,952.00
2 Hammer 1 - 2 ton (manual) alat 103 hari 0.0680 467,662.27 31,801.03
3 Las listrik diesel (termasuk Solar (industri)) alat 62 hari 0.0680 75,398.40 5,127.09
JUMLAH HARGA ALAT 54,880.13
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 338,903.65
E Overhead & Profit 15% 0.150 x D 50,835.55
F Harga Satuan Pekerjaan per - m' (D+E) 389,739.00
-
dihit A.3.3.1.13.7 Pengadaan & Pemancangan Minipile / Triangle Pile 300x300x300 mm (drop hammer) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.5400 93,597.00 50,542.38
2 Tukang Las Konstruksi L.02 OH 0.0900 121,674.00 10,950.66
3 Mandor L.04 OH 0.0540 149,758.00 8,086.93
JUMLAH TENAGA KERJA 69,579.97
B BAHAN -
1 Triangle Pile 300 mm M.103.d m' 1.0300 254,496.00 262,130.88
JUMLAH HARGA BAHAN 262,130.88
C PERALATAN -
1 Tripod tinggi 5 m alat 82 hari 0.0900 264,000.00 23,760.00
2 Hammer 1 - 2 ton (manual) alat 103 hari 0.0900 467,662.27 42,089.60
3 Las listrik diesel (termasuk Solar (industri)) alat 62 hari 0.0900 75,398.40 6,785.86
JUMLAH HARGA ALAT 72,635.46
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 404,346.31
E Overhead & Profit 15% 0.150 x D 60,651.95
F Harga Satuan Pekerjaan per - m' (D+E) 464,998.00
-
dihit A.3.3.1.13.9 Pengadaan & Pemancangan Minipile / Triangle Pile 320x320x320 mm (drop hammer) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.4440 93,597.00 41,557.07
2 Tukang Batu L.02 OH 0.0740 121,674.00 9,003.88
3 Mandor L.04 OH 0.0444 149,758.00 6,649.26
JUMLAH TENAGA KERJA 57,210.20
B BAHAN -
1 Triangle Pile 320 mm M.103.e m' 1.0300 264,000.00 271,920.00
JUMLAH HARGA BAHAN 271,920.00
C PERALATAN -
1 Tripod tinggi 5 m alat 82 hari 0.0740 264,000.00 19,536.00
2 Hammer 1 - 2 ton (manual) alat 103 hari 0.0740 467,662.27 34,607.01
3 Las listrik diesel (termasuk Solar (industri)) alat 62 hari 0.0740 75,398.40 5,579.48
JUMLAH HARGA ALAT 59,722.49
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 388,852.69
E Overhead & Profit 15% 0.150 x D 58,327.90
F Harga Satuan Pekerjaan per - m' (D+E) 447,180.00
-
dihit A.3.3.1.13.2 Pengadaan & Pemancangan Minipile / Triangle Pile 200x200x200 mm (mekanis) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.2252 93,597.00 21,078.04
2 Tukang Batu L.02 OH 0.0563 121,674.00 6,850.25
3 Mandor L.04 OH 0.0225 149,758.00 3,369.56
JUMLAH TENAGA KERJA 31,297.85
B BAHAN -
1 Triangle Pile 200 mm M.103.a m' 1.0300 115,104.00 118,557.12
JUMLAH HARGA BAHAN 118,557.12
C PERALATAN -
1 Crane on wheel 10-15 ton alat 22 jam 0.0563 125,615.68 7,072.16
2 Pile driver + hammer 2,5 ton alat 33 jam 0.0563 33,495.27 1,885.78
3 Sewa alat las alat 62 jam 0.0563 10,771.20 606.42
JUMLAH HARGA ALAT 9,564.37
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 159,419.33
E Overhead & Profit 15% 0.150 x D 23,912.90
F Harga Satuan Pekerjaan per - m' (D+E) 183,332.00
-
dihit A.3.3.1.13.4 Pengadaan & Pemancangan Minipile / Triangle Pile 250x250x250 mm (mekanis) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.2469 93,597.00 23,109.10
2 Tukang Batu L.02 OH 0.0617 121,674.00 7,507.29
3 Mandor L.04 OH 0.0247 149,758.00 3,697.53
JUMLAH TENAGA KERJA 34,313.91
B BAHAN -
1 Triangle Pile 250 mm M.103.b m' 1.0300 171,072.00 176,204.16
JUMLAH HARGA BAHAN 176,204.16
C PERALATAN -
1 Crane on wheel 10-15 ton alat 22 jam 0.0617 125,615.68 7,750.49
2 Pile driver + hammer 2,5 ton alat 33 jam 0.0617 33,495.27 2,066.66
3 Sewa alat las alat 62 jam 0.0617 10,771.20 664.58
JUMLAH HARGA ALAT 10,481.73
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 220,999.80
E Overhead & Profit 15% 0.150 x D 33,149.97
F Harga Satuan Pekerjaan per - m' (D+E) 254,149.00
-
dihit A.3.3.1.13.6 Pengadaan & Pemancangan Minipile / Triangle Pile 280x280x280 mm (mekanis) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.249 93,597.00 23,294.42
2 Tukang Batu L.02 OH 0.062 121,674.00 7,570.56
3 Mandor L.04 OH 0.025 149,758.00 3,728.97
JUMLAH TENAGA KERJA 34,593.95
B BAHAN -
1 Triangle Pile 280 mm M.103.c m' 1.0300 211,200.00 217,536.00
JUMLAH HARGA BAHAN 217,536.00
C PERALATAN -
1 Crane on wheel 10-15 ton alat 22 jam 0.0622 125,615.68 7,815.81
2 Pile driver + hammer 2,5 ton alat 33 jam 0.0622 33,495.27 2,084.08
3 Sewa alat las alat 62 jam 0.0622 10,771.20 670.18
JUMLAH HARGA ALAT 10,570.07
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 262,700.02
E Overhead & Profit 15% 0.150 x D 39,405.00
F Harga Satuan Pekerjaan per - m' (D+E) 302,105.00
-
dihit A.3.3.1.13.8 Pengadaan & Pemancangan Minipile / Triangle Pile 300x300x300 mm (mekanis) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.2548 93,597.00 23,848.52
2 Tukang Batu L.02 OH 0.0637 121,674.00 7,750.63
3 Mandor L.04 OH 0.0255 149,758.00 3,818.83
JUMLAH TENAGA KERJA 35,417.98
B BAHAN -
1 Triangle Pile 300 mm M.103.d m' 1.0300 254,496.00 262,130.88
JUMLAH HARGA BAHAN 262,130.88
C PERALATAN -
1 Crane on wheel 10-15 ton alat 22 jam 0.0637 125,615.68 8,001.72
2 Pile driver + hammer 2,5 ton alat 33 jam 0.0637 33,495.27 2,133.65
3 Sewa alat las alat 62 jam 0.0637 10,771.20 686.13
JUMLAH HARGA ALAT 10,821.49
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 308,370.35
E Overhead & Profit 15% 0.150 x D 46,255.55
F Harga Satuan Pekerjaan per - m' (D+E) 354,625.00
-
dihit A.3.3.1.13.10 Pengadaan & Pemancangan Minipile / Triangle Pile 320x320x320 mm (mekanis) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.261 93,597.00 24,402.61
2 Tukang Batu L.02 OH 0.065 121,674.00 7,930.71
3 Mandor L.04 OH 0.026 149,758.00 3,908.68
JUMLAH TENAGA KERJA 36,242.00
B BAHAN -
1 Triangle Pile 320 mm M.103.e m' 1.0300 264,000.00 271,920.00
JUMLAH HARGA BAHAN 271,920.00
C PERALATAN -
1 Crane on wheel 10-15 ton alat 22 jam 0.0652 125,615.68 8,187.63
2 Pile driver + hammer 2,5 ton alat 33 jam 0.0652 33,495.27 2,183.22
3 Sewa alat las alat 62 jam 0.0652 10,771.20 702.07
JUMLAH HARGA ALAT 11,072.92
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 319,234.92
E Overhead & Profit 15% 0.150 x D 47,885.24
F Harga Satuan Pekerjaan per - m' (D+E) 367,120.00
-
dihit A.3.3.1.13.11 Pengadaan & Pemancangan Minipile / kotak 300x300 mm K.500 (drop hammer) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.5400 93,597.00 50,542.38
2 Tukang Las Konstruksi L.02 OH 0.0900 121,674.00 10,950.66
3 Mandor L.04 OH 0.0540 149,758.00 8,086.93
JUMLAH TENAGA KERJA 69,579.97
B BAHAN -
1 Minipile kotak 30x30 cm, K.500 M.104.c m' 1.0300 390,720.00 402,441.60
JUMLAH HARGA BAHAN 402,441.60
C PERALATAN -
1 Tripod tinggi 5 m alat 82 hari 0.0900 264,000.00 23,760.00
2 Hammer 1 - 2 ton (manual) alat 103 hari 0.0900 467,662.27 42,089.60
3 Las listrik diesel (termasuk Solar (industri)) alat 62 hari 0.0900 75,398.40 6,785.86
JUMLAH HARGA ALAT 72,635.46
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 544,657.03
E Overhead & Profit 15% 0.150 x D 81,698.55
F Harga Satuan Pekerjaan per - m' (D+E) 626,355.00
-
dihit A.3.3.1.13.12 Pengadaan & Pemancangan Minipile / kotak 300x300 mm K.500 (mekanis) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.255 93,597.00 23,848.52
2 Tukang Batu L.02 OH 0.064 121,674.00 7,750.63
3 Mandor L.04 OH 0.026 149,758.00 3,818.83
JUMLAH TENAGA KERJA 35,417.98
B BAHAN -
1 Minipile kotak 30x30 cm, K.500 M.104.c m' 1.030 390,720.00 402,441.60
JUMLAH HARGA BAHAN 402,441.60
C PERALATAN -
1 Crane on wheel 10-15 ton alat 22 jam 0.064 125,615.68 8,001.72
2 Pile driver + hammer 2,5 ton alat 33 jam 0.064 33,495.27 2,133.65
3 Sewa alat las alat 62 jam 0.064 10,771.20 686.13
JUMLAH HARGA ALAT 10,821.49
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 448,681.07
E Overhead & Profit 15% 0.150 x D 67,302.16
F Harga Satuan Pekerjaan per - m' (D+E) 515,983.00
-
dihit A.3.3.1.13.13 Pengadaan & Pemancangan Minipile / kotak 400x400 mm K.500 (drop hammer) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.6600 93,597.00 61,774.02
2 Tukang Las Konstruksi L.02 OH 0.1100 121,674.00 13,384.14
3 Mandor L.04 OH 0.0660 149,758.00 9,884.03
JUMLAH TENAGA KERJA 85,042.19
B BAHAN -
1 Minipile kotak 30x30 cm, K.500 M.104.c m' 1.030 390,720.00 402,441.60
JUMLAH HARGA BAHAN 402,441.60
C PERALATAN -
1 Tripod tinggi 5 m alat 82 hari 0.1100 264,000.00 29,040.00
2 Hammer 1 - 2 ton (manual) alat 103 hari 0.1100 467,662.27 51,442.85
3 Las listrik diesel (termasuk Solar (industri)) alat 62 hari 0.1100 75,398.40 8,293.82
JUMLAH HARGA ALAT 88,776.67
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 576,260.46
E Overhead & Profit 15% 0.150 x D 86,439.07
F Harga Satuan Pekerjaan per - m' (D+E) 662,699.00
-
dihit A.3.3.1.13.14 Pengadaan & Pemancangan Minipile / kotak 400x400 mm K.500 (mekanis) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.472 93,597.00 44,168.42
2 Tukang Batu L.02 OH 0.135 121,674.00 16,401.66
3 Mandor L.04 OH 0.047 149,758.00 7,068.58
JUMLAH TENAGA KERJA 67,638.66
B BAHAN -
1 Minipile kotak 30x30 cm, K.500 M.104.c m' 1.030 390,720.00 402,441.60
JUMLAH HARGA BAHAN 402,441.60
C PERALATAN -
1 Crane on wheel 10-15 ton alat 22 jam 0.067 125,615.68 8,466.50
2 Pile driver + hammer 2,5 ton alat 33 jam 0.067 33,495.27 2,257.58
3 Sewa alat las alat 62 jam 0.067 10,771.20 725.98
JUMLAH HARGA ALAT 11,450.06
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 481,530.31
E Overhead & Profit 15% 0.150 x D 72,229.55
F Harga Satuan Pekerjaan per - m' (D+E) 553,759.00
-
A.4.1.1 HARGA SATUAN PEKERJAAN BETON -
dihit A.4.1.1.1.a Membuat 1 m3 Rabat Beton (manual) setara campuran 1 PC : 3 PS : 5 Kr -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 1.320 93,597.00 123,548.04
2 Tukang Batu L.02 OH 0.220 121,674.00 26,768.28
3 Kepala tukang L.03 OH 0.022 128,226.00 2,820.97
4 Mandor L.04 OH 0.132 149,758.00 19,768.06
JUMLAH TENAGA KERJA 172,905.35
B BAHAN -
1 Portland cement M.245.a kg 220.000 1,375.00 302,500.00
2 Pasir Beton (m3) M.9.c m3 0.522 339,234.40 177,080.36
3 Koral beton M.11.b m3 0.862 397,760.00 342,869.12
4 Air, M.550.b liter 215.000 15.84 3,405.60
JUMLAH HARGA BAHAN 825,855.08
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 998,760.42
E Overhead & Profit 15% 0.150 149,814.06
F Harga Satuan Pekerjaan (D+E) 1,148,574.00

dihit A.4.1.1.4.c 1 m3 lantai kerja beton mutu fc' = 7,4 MPa (K 100), slump (3-6) cm, w/c = 087, (Readymix) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 1.050 93,597.00 98,276.85
2 Tukang Batu L.02 OH 0.250 121,674.00 30,418.50
3 Kepala tukang L.03 OH 0.005 128,226.00 641.13
4 Mandor L.04 OH 0.100 149,758.00 14,975.80
JUMLAH TENAGA KERJA 144,312.28
B BAHAN -
1 Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 1.020 733,666.67 748,340.00
JUMLAH HARGA BAHAN 748,340.00
C PERALATAN -
1 Concrete vibrator alat 20 jam 0.100 10,775.51 1,077.55
2 Alat bantu alat 49 set 0.100 52,800.00 5,280.00
JUMLAH HARGA ALAT 6,357.55
D Jumlah (A+B+C) 899,009.83
E Overhead & Profit 15% 0.150 134,851.47
F Harga Satuan Pekerjaan (D+E) 1,033,861.00
-
dihit A.4.1.1.5.c 1 m3 beton mutu fc’= 14.5 MPa (K 175) Readymix tanpa alat pompa beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 1.050 93,597.00 98,276.85
2 Tukang Batu L.02 OH 0.250 121,674.00 30,418.50
3 Kepala tukang L.03 OH 0.005 128,226.00 641.13
4 Mandor L.04 OH 0.100 149,758.00 14,975.80
JUMLAH TENAGA KERJA 144,312.28
B BAHAN -
1 Mutu beton fc' 14.5 Mpa (K 175) Ready mix M.250.c m3 1.0200 768,142.86 783,505.71
JUMLAH HARGA BAHAN 783,505.71
C PERALATAN -
1 Concrete vibrator alat 20 jam 0.1000 10,775.51 1,077.55
2 Alat bantu alat 49 set 0.1000 52,800.00 5,280.00
JUMLAH HARGA ALAT 6,357.55
D Jumlah (A+B+C) 934,175.55
E Overhead & Profit 15% 0.150 140,126.33
F Harga Satuan Pekerjaan (D+E) 1,074,301.00
-
dihit A.4.1.1.5.d 1 m3 beton mutu fc’= 14.5 MPa (K 175) Readymix dengan alat pompa beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 1.2500 93,597.00 116,996.25
2 Tukang Batu L.02 OH 0.2500 121,674.00 30,418.50
3 Kepala tukang L.03 OH 0.0250 128,226.00 3,205.65
4 Mandor L.04 OH 0.1000 149,758.00 14,975.80
JUMLAH TENAGA KERJA 165,596.20
B BAHAN -
1 Mutu beton fc' 14.5 Mpa (K 175) Ready mix M.250.c m3 1.0200 768,142.86 783,505.71
JUMLAH HARGA BAHAN 783,505.71
C PERALATAN -
1 Concrete vibrator alat 20 jam 0.1000 10,775.51 1,077.55
2 Concrete pump alat 18 jam 0.1200 20,952.38 2,514.29
Alat bantu alat 49 set 0.1000 52,800.00 5,280.00
JUMLAH HARGA ALAT 8,871.84
D Jumlah (A+B+C) 957,973.75
E Overhead & Profit 15% 0.150 143,696.06
F Harga Satuan Pekerjaan (D+E) 1,101,669.00
-
dihit A.4.1.1.7.c 1 m3 beton mutu fc’= 19,3 MPa (K 225) Readymix tanpa alat pompa beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 1.050 93,597.00 98,276.85
2 Tukang Batu L.02 OH 0.250 121,674.00 30,418.50
3 Kepala tukang L.03 OH 0.005 128,226.00 641.13
4 Mandor L.04 OH 0.100 149,758.00 14,975.80
JUMLAH TENAGA KERJA 144,312.28
B BAHAN -
1 Mutu beton fc' 19,3 Mpa (K 225) Ready mix M.250.e m3 1.020 813,375.00 829,642.50
JUMLAH HARGA BAHAN 829,642.50
C PERALATAN -
1 Concrete vibrator alat 20 jam 0.100 10,775.51 1,077.55
2 Alat bantu alat 49 set 0.100 52,800.00 5,280.00
JUMLAH HARGA ALAT 6,357.55
D Jumlah (A+B+C) 980,312.33
E Overhead & Profit 15% 0.150 147,046.85
F Harga Satuan Pekerjaan (D+E) 1,127,359.00
-
dihit A.4.1.1.7.d 1 m3 beton mutu fc’= 19,3 MPa (K 225) Readymix dengan alat pompa beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 1.2500 93,597.00 116,996.25
2 Tukang Batu L.02 OH 0.2500 121,674.00 30,418.50
3 Kepala tukang L.03 OH 0.0250 128,226.00 3,205.65
4 Mandor L.04 OH 0.1000 149,758.00 14,975.80
JUMLAH TENAGA KERJA 165,596.20
B BAHAN -
1 Mutu beton fc' 19,3 Mpa (K 225) Ready mix M.250.e m3 1.020 813,375.00 829,642.50
JUMLAH HARGA BAHAN 829,642.50
C PERALATAN -
1 Concrete vibrator alat 20 jam 0.1000 10,775.51 1,077.55
2 Concrete pump alat 18 jam 0.1200 20,952.38 2,514.29
3 Alat bantu alat 49 set 0.1000 52,800.00 5,280.00
JUMLAH HARGA ALAT 8,871.84
D Jumlah (A+B+C) 1,004,110.54
E Overhead & Profit 15% 0.150 150,616.58
F Harga Satuan Pekerjaan (D+E) 1,154,727.00
-
dihit A.4.1.1.8.c 1 m3 beton mutu fc’= 21.7 MPa (K 250) Readymix tanpa alat pompa beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 1.050 93,597.00 98,276.85
2 Tukang Batu L.02 OH 0.250 121,674.00 30,418.50
3 Kepala tukang L.03 OH 0.005 128,226.00 641.13
4 Mandor L.04 OH 0.100 149,758.00 14,975.80
JUMLAH TENAGA KERJA 144,312.28
B BAHAN -
1 Mutu beton fc' 21.7 Mpa (K 250) Ready mix M.250.f m3 1.0200 834,625.00 851,317.50
JUMLAH HARGA BAHAN 851,317.50
C PERALATAN -
1 Concrete vibrator alat 20 jam 0.100 10,775.51 1,077.55
2 Alat bantu alat 49 set 0.100 52,800.00 5,280.00
JUMLAH HARGA ALAT 6,357.55
D Jumlah (A+B+C) 1,001,987.33
E Overhead & Profit 15% 0.150 150,298.10
F Harga Satuan Pekerjaan (D+E) 1,152,285.00
-
dihit A.4.1.1.8.d 1 m3 beton mutu fc’= 21.7 MPa (K 250) Readymix dengan alat pompa beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 1.2500 93,597.00 116,996.25
2 Tukang Batu L.02 OH 0.2500 121,674.00 30,418.50
3 Kepala tukang L.03 OH 0.0250 128,226.00 3,205.65
4 Mandor L.04 OH 0.1000 149,758.00 14,975.80
JUMLAH TENAGA KERJA 165,596.20
B BAHAN -
1 Mutu beton fc' 21.7 Mpa (K 250) Ready mix M.250.f m3 1.0200 834,625.00 851,317.50
JUMLAH HARGA BAHAN 851,317.50
C PERALATAN -
1 Concrete vibrator alat 20 jam 0.100 10,775.51 1,077.55
2 Concrete pump alat 18 jam 0.1200 20,952.38 2,514.29
3 Alat bantu alat 49 set 0.100 52,800.00 5,280.00
JUMLAH HARGA ALAT 8,871.84
D Jumlah (A+B+C) 1,025,785.54
E Overhead & Profit 15% 0.150 153,867.83
F Harga Satuan Pekerjaan (D+E) 1,179,653.00
-
dihit A.4.1.1.9.c 1 m3 beton mutu fc’= 24,0 MPa (K 275) Readymix tanpa alat pompa beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.057 93,597.00 5,325.67
2 Tukang Batu L.02 OH 0.228 121,674.00 27,693.00
3 Mandor L.04 OH 0.455 149,758.00 68,169.84
JUMLAH TENAGA KERJA 101,188.51
B BAHAN -
1 Mutu beton fc' 24 Mpa (K 275) Ready mix M.250.g m3 1.060 857,714.29 909,177.14
JUMLAH HARGA BAHAN 909,177.14
C PERALATAN -
1 Concrete vibrator alat 20 jam 0.057 10,775.51 613.13
2 Alat bantu alat 49 set 0.100 52,800.00 5,280.00
JUMLAH HARGA ALAT 5,893.13
D Jumlah (A+B+C) 1,016,258.78
E Overhead & Profit 15% 0.150 152,438.82
F Harga Satuan Pekerjaan (D+E) 1,168,697.00
-
dihit A.4.1.1.9.d 1 m3 beton mutu fc’= 24,0 MPa (K 275) Readymix dengan alat pompa beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 1.2500 93,597.00 116,996.25
2 Tukang Batu L.02 OH 0.2500 121,674.00 30,418.50
3 Kepala tukang L.03 OH 0.0250 128,226.00 3,205.65
4 Mandor L.04 OH 0.1000 149,758.00 14,975.80
JUMLAH TENAGA KERJA 165,596.20
B BAHAN -
1 Mutu beton fc' 24 Mpa (K 275) Ready mix M.250.g m3 1.0200 857,714.29 874,868.57
JUMLAH HARGA BAHAN 874,868.57
C PERALATAN -
1 Concrete vibrator alat 20 jam 0.100 10,775.51 1,077.55
2 Concrete pump alat 18 jam 0.1200 20,952.38 2,514.29
3 Alat bantu alat 49 set 0.100 52,800.00 5,280.00
JUMLAH HARGA ALAT 8,871.84
D Jumlah (A+B+C) 1,049,336.61
E Overhead & Profit 15% 0.150 157,400.49
F Harga Satuan Pekerjaan (D+E) 1,206,737.00
-
dihit A.4.1.1.10.c 1 m3 beton mutu fc’= 26.4 MPa (K 300) Readymix tanpa alat pompa beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.050 93,597.00 98,276.85
Tukang Batu L.02 OH 0.250 121,674.00 30,418.50
Kepala tukang L.03 OH 0.005 128,226.00 641.13
Mandor L.04 OH 0.100 149,758.00 14,975.80
JUMLAH TENAGA KERJA 144,312.28
B BAHAN -
Mutu beton fc' 26.4 Mpa (K 300) Ready mix M.250.h m3 1.020 876,000.00 893,520.00
JUMLAH HARGA BAHAN 893,520.00
C PERALATAN -
Concrete vibrator alat 20 jam 0.100 10,775.51 1,077.55
Alat bantu alat 49 set 0.100 52,800.00 5,280.00
JUMLAH HARGA ALAT 6,357.55
D Jumlah (A+B+C) 1,044,189.83
E Overhead & Profit 15% 0.150 156,628.47
F Harga Satuan Pekerjaan (D+E) 1,200,818.00
-
dihit A.4.1.1.10.d 1 m3 beton mutu fc’= 26.4 MPa (K 300) Readymix dengan alat pompa beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.2500 93,597.00 116,996.25
Tukang Batu L.02 OH 0.2500 121,674.00 30,418.50
Kepala tukang L.03 OH 0.0250 128,226.00 3,205.65
Mandor L.04 OH 0.1000 149,758.00 14,975.80
JUMLAH TENAGA KERJA 165,596.20
B BAHAN -
Mutu beton fc' 26.4 Mpa (K 300) Ready mix M.250.h m3 1.0200 876,000.00 893,520.00
JUMLAH HARGA BAHAN 893,520.00
C PERALATAN -
Concrete vibrator alat 20 jam 0.1000 10,775.51 1,077.55
Concrete pump alat 18 jam 0.1200 20,952.38 2,514.29
Alat bantu alat 49 set 0.1000 52,800.00 5,280.00
JUMLAH HARGA ALAT 8,871.84
D Jumlah (A+B+C) 1,067,988.04
E Overhead & Profit 15% 0.150 160,198.21
F Harga Satuan Pekerjaan (D+E) 1,228,186.00
-
dihit A.4.1.1.12.c 1 m3 beton mutu fc’= 31.2 MPa (K 350) Readymix tanpa alat pompa beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.0500 93,597.00 98,276.85
Tukang Batu L.02 OH 0.2500 121,674.00 30,418.50
Kepala tukang L.03 OH 0.0050 128,226.00 641.13
Mandor L.04 OH 0.1000 149,758.00 14,975.80
JUMLAH TENAGA KERJA 144,312.28
B BAHAN -
Mutu beton fc' 31.2 Mpa (K 350) Ready mix M.250.j m3 1.020 914,250.00 932,535.00
JUMLAH HARGA BAHAN 932,535.00
C PERALATAN -
Concrete vibrator alat 20 jam 0.100 10,775.51 1,077.55
Alat bantu alat 49 set 0.100 52,800.00 5,280.00
JUMLAH HARGA ALAT 6,357.55
D Jumlah (A+B+C) 1,083,204.83
E Overhead & Profit 15% 0.150 162,480.72
F Harga Satuan Pekerjaan (D+E) 1,245,685.00
-
dihit A.4.1.1.12.d 1 m3 beton mutu fc’= 31.2 MPa (K 350) Readymix dengan alat pompa beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.2500 93,597.00 116,996.25
Tukang Batu L.02 OH 0.2500 121,674.00 30,418.50
Kepala tukang L.03 OH 0.0250 128,226.00 3,205.65
Mandor L.04 OH 0.1000 149,758.00 14,975.80
JUMLAH TENAGA KERJA 165,596.20
B BAHAN -
Mutu beton fc' 31.2 Mpa (K 350) Ready mix M.250.j m3 1.0200 914,250.00 932,535.00
JUMLAH HARGA BAHAN 932,535.00
C PERALATAN -
Concrete vibrator alat 20 jam 0.1000 10,775.51 1,077.55
Concrete pump alat 18 jam 0.1200 20,952.38 2,514.29
Alat bantu alat 49 set 0.1000 52,800.00 5,280.00
JUMLAH HARGA ALAT 8,871.84
D Jumlah (A+B+C) 1,107,003.04
E Overhead & Profit 15% 0.150 166,050.46
F Harga Satuan Pekerjaan (D+E) 1,273,053.00
-
dihit A.4.1.1.21.b Pemasangan 1 m2 bekisting untuk sloof pasang kembali -
Jumlah
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan
(Rp.)
(Rp) (Rp)
A TENAGA KERJA -
1 Pekerja L.01 OH 0.300 93,597.00 28,079.10
2 Tukang Kayu L.02 OH 0.150 121,674.00 18,251.10
3 Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
4 Mandor L.04 OH 0.030 149,758.00 4,492.74
JUMLAH TENAGA KERJA 52,746.33
B BAHAN -
1 Kayu Sengon (papan) M.28.a m3 0.022 2,217,600.00 48,787.20
2 Kayu kamper (kaso 5x7) M.26.a m3 0.016 7,200,000.00 115,200.00
3 Paku 7 cm M.56.e kg 0.300 23,232.00 6,969.60
4 Minyak bekisting M.397 liter 0.200 17,952.00 3,590.40
JUMLAH HARGA BAHAN 174,547.20
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 227,293.53
E Overhead & Profit 15% 0.150 34,094.03
F Harga Satuan Pekerjaan (D+E) 261,387.00
-
dihit A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom pasang kembali -
Jumlah
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan
(Rp.)
(Rp) (Rp)
A TENAGA KERJA -
1 Pekerja L.01 OH 0.220 93,597.00 20,591.34
2 Tukang Kayu L.02 OH 0.110 121,674.00 13,384.14
3 Kepala Tukang L.03 OH 0.011 128,226.00 1,410.49
4 Mandor L.04 OH 0.022 149,758.00 3,294.68
JUMLAH TENAGA KERJA 38,680.64
B BAHAN -
1 Plywood 9 mm (120x240) M.32.c lembar 0.203 100,800.00 20,462.40
2 Balok kayu kelas II M.16.a m3 0.009 11,088,000.00 99,792.00
3 Paku 7 cm M.56.e kg 0.250 23,232.00 5,808.00
4 Minyak bekisting M.397 liter 0.200 17,952.00 3,590.40
JUMLAH HARGA BAHAN 129,652.80
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 168,333.44
E Overhead & Profit 15% 0.150 25,250.02
F Harga Satuan Pekerjaan (D+E) 193,583.00

dihit A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok pasang kembali -


Jumlah
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan
(Rp.)
(Rp) (Rp)
A TENAGA KERJA -
1 Pekerja L.01 OH 0.240 93,597.00 22,463.28
2 Tukang Kayu L.02 OH 0.120 121,674.00 14,600.88
3 Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
4 Mandor L.04 OH 0.024 149,758.00 3,594.19
JUMLAH TENAGA KERJA 42,197.06
B BAHAN -
1 Balok kayu kelas II M.16.a m3 0.018 11,088,000.00 199,584.00
2 Plywood 9 mm (120x240) M.32.c lembar 0.203 100,800.00 20,462.40
3 Paku 7 cm M.56.e kg 0.250 23,232.00 5,808.00
4 Minyak bekisting M.397 liter 0.200 17,952.00 3,590.40
JUMLAH HARGA BAHAN 229,444.80
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 271,641.86
E Overhead & Profit 15% 0.150 40,746.28
F Harga Satuan Pekerjaan (D+E) 312,388.00
-
dihit A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai pasang kembali -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA KERJA -
1 Pekerja L.01 OH 0.200 93,597.00 18,719.40
2 Tukang Kayu L.02 OH 0.100 121,674.00 12,167.40
3 Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
4 Mandor L.04 OH 0.020 149,758.00 2,995.16
JUMLAH TENAGA KERJA 35,164.22
B BAHAN -
1 Balok kayu kelas II M.16.a m3 0.008 11,088,000.00 88,704.00
2 Plywood 12 mm (120x240) M.32.d lembar 0.203 147,250.00 29,891.75
3 Paku 7 cm M.56.e kg 0.220 23,232.00 5,111.04
4 Minyak bekisting M.397 liter 0.200 17,952.00 3,590.40
JUMLAH HARGA BAHAN 127,297.19
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 162,461.41
E Overhead & Profit 15% 0.150 24,369.21
F Harga Satuan Pekerjaan (D+E) 186,830.00
-
dihit A.4.1.1.24.b Pemasangan 1 m2 bekisting untuk lantai dengan floordeck (Jarak Antar Pengaku ≤ 0,6 m) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA KERJA -
1 Pekerja L.01 OH 0.1000 93,597.00 9,359.70
2 Tukang Kayu L.02 OH 0.0500 121,674.00 6,083.70
3 Kepala Tukang L.03 OH 0.0050 128,226.00 641.13
4 Mandor L.04 OH 0.0100 149,758.00 1,497.58
JUMLAH TENAGA KERJA 17,582.11
B BAHAN -
1 paku 7 cm M.56.e Kg 0.2700 23,232.00 6,272.64
2 Kayu kruing (balok) M.18.a m3 0.0098 7,525,000.00 73,745.00
3 Floordeck; t = 1,0 mm; L = 1,0 m M.210 m' 1.0800 134,933.33 145,728.00
JUMLAH HARGA BAHAN 225,745.64
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 243,327.75
E Overhead & Profit 15% 0.150 36,499.16
F Harga Satuan Pekerjaan (D+E) 279,826.00
-
dihit A.4.1.1.24.c Pemasangan 1 m2 bekisting untuk lantai dengan floordeck (Jarak Antar Pengaku ≤ 0,8 m) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA KERJA -
1 Pekerja L.01 OH 0.0800 93,597.00 7,487.76
2 Tukang Kayu L.02 OH 0.0400 121,674.00 4,866.96
3 Kepala Tukang L.03 OH 0.0040 128,226.00 512.90
4 Mandor L.04 OH 0.0080 149,758.00 1,198.06
JUMLAH TENAGA KERJA 14,065.69
B BAHAN -
1 paku 7 cm M.56.e Kg 0.2300 23,232.00 5,343.36
2 Kayu kruing (balok) M.18.a m3 0.0103 7,525,000.00 77,507.50
3 Floordeck; t = 1,0 mm; L = 1,0 m M.210 m' 1.0800 134,933.33 145,728.00
JUMLAH HARGA BAHAN 228,578.86
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 242,644.55
E Overhead & Profit 15% 0.150 36,396.68
F Harga Satuan Pekerjaan (D+E) 279,041.00
-
dihit A.4.1.1.24.d Pemasangan 1 m2 bekisting untuk lantai dengan floordeck (Jarak Antar Pengaku ≤ 1,2 m) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA KERJA -
1 Pekerja L.01 OH 0.0540 93,597.00 5,054.24
2 Tukang Kayu L.02 OH 0.0270 121,674.00 3,285.20
3 Kepala Tukang L.03 OH 0.0027 128,226.00 346.21
4 Mandor L.04 OH 0.0054 149,758.00 808.69
JUMLAH TENAGA KERJA 9,494.34
B BAHAN -
1 paku 7 cm M.56.e Kg 0.2100 23,232.00 4,878.72
2 Kayu kruing (balok) M.18.a m3 0.0092 7,525,000.00 69,230.00
3 Floordeck; t = 1,0 mm; L = 1,0 m M.210 m' 1.0800 134,933.33 145,728.00
JUMLAH HARGA BAHAN 219,836.72
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 229,331.06
E Overhead & Profit 15% 0.150 34,399.66
F Harga Satuan Pekerjaan (D+E) 263,730.00
-
dihit A.4.1.1.24.e Pemasangan 1 m2 bekisting untuk lantai dengan scaffolding, T = 3,8 m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA KERJA -
1 Pekerja L.01 OH 0.6600 93,597.00 61,774.02
2 Tukang Kayu L.02 OH 0.3300 121,674.00 40,152.42
3 Kepala Tukang L.03 OH 0.0330 128,226.00 4,231.46
4 Mandor L.04 OH 0.0330 149,758.00 4,942.01
JUMLAH TENAGA KERJA 111,099.91
B BAHAN -
1 Minyak Bekisting M.397 Ltr 0.2000 17,952.00 3,590.40
2 paku 7 cm M.56.e Kg 0.4000 23,232.00 9,292.80
3 Kayu kruing (balok) M.18.a m3 0.0150 7,525,000.00 112,875.00
4 Plywood 9 mm (120x240) M.32.c Lbr 0.3500 100,800.00 35,280.00
JUMLAH HARGA BAHAN 161,038.20
C PERALATAN -
1 Sewa scaffolding (Lengkap unit) m3 ruang 3.800 40,000.00 152,000.00
JUMLAH HARGA ALAT 152,000.00
D Jumlah (A+B+C) 424,138.11
E Overhead & Profit 15% 0.150 63,620.72
F Harga Satuan Pekerjaan (D+E) 487,758.00
-
dihit A.4.1.1.24.f Pemasangan 1 m2 bekisting untuk lantai dengan scaffolding, T = 3,4 m -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA KERJA -
1 Pekerja L.01 OH 0.660 93,597.00 61,774.02
2 Tukang Kayu L.02 OH 0.330 121,674.00 40,152.42
3 Kepala Tukang L.03 OH 0.033 128,226.00 4,231.46
4 Mandor L.04 OH 0.033 149,758.00 4,942.01
JUMLAH TENAGA KERJA 111,099.91
B BAHAN -
1 Minyak Bekisting M.397 Ltr 0.200 17,952.00 3,590.40
2 paku 7 cm M.56.e Kg 0.400 23,232.00 9,292.80
3 Kayu kruing (balok) M.18.a m3 0.015 7,525,000.00 112,875.00
4 Plywood 9 mm (120x240) M.32.c Lbr 0.350 100,800.00 35,280.00
JUMLAH HARGA BAHAN 161,038.20
C PERALATAN -
1 Sewa scaffolding (Lengkap unit) m3 ruang 3.400 40,000.00 136,000.00
JUMLAH HARGA ALAT 136,000.00
D Jumlah (A+B+C) 408,138.11
E Overhead & Profit 15% 0.150 61,220.72
F Harga Satuan Pekerjaan (D+E) 469,358.00
-
dihit A.4.1.1.25.a Pemasangan 1 m2 bekisting untuk dinding pasang kembali -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp.)
A TENAGA KERJA -
1 Pekerja L.01 OH 0.240 93,597.00 22,463.28
2 Tukang Kayu L.02 OH 0.120 121,674.00 14,600.88
3 Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
4 Mandor L.04 OH 0.024 149,758.00 3,594.19
JUMLAH TENAGA KERJA 42,197.06
B BAHAN -
1 paku 7 cm M.56.e kg 0.200 23,232.00 4,646.40
2 Minyak bekisting M.397 liter 0.200 17,952.00 3,590.40
3 Balok kayu kelas II M.16.a m3 0.009 11,088,000.00 99,792.00
4 Plywood 9 mm (120x240) M.32.c Lbr 0.203 100,800.00 20,462.40
-
JUMLAH HARGA BAHAN 128,491.20
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 170,688.26
E Overhead & Profit 15% 0.150 25,603.24
F Harga Satuan Pekerjaan (D+E) 196,291.00
-
dihit A.4.1.1.35.a Membuat 1 m’ kolom praktis beton bertulang (12 x 12) cm (tulangan pokok 4Ø10, begel Ø6-150 termasuk bekisting) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.180 93,597.00 16,847.46
2 Tukang batu L.02 OH 0.020 121,674.00 2,433.48
3 Tukang kayu L.02 OH 0.020 121,674.00 2,433.48
4 Tukang besi L.02 OH 0.020 121,674.00 2,433.48
5 Kepala Tukang L.03 OH 0.006 128,226.00 769.36
6 Mandor L.04 OH 0.009 149,758.00 1,347.82
JUMLAH TENAGA KERJA 26,265.08
B BAHAN -
1 Kayu kelas III M.18.b m3 0.010 8,505,000.00 81,648.00
2 Paku 10 Cm M.56.f kg 0.010 24,740.57 247.41
3 Besi beton polos M.46.a kg 3.000 12,344.68 37,034.05
4 Kawat beton M.54 kg 0.450 21,472.00 9,662.40
5 Portland cement M.245.a kg 4.760 1,375.00 6,545.45
6 Pasir Beton (m3) M.9.c m3 0.007 339,234.40 2,422.30
7 Koral beton M.11.b m3 0.011 397,760.00 4,260.31
JUMLAH HARGA BAHAN 141,819.92
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 168,085.00
E Overhead & Profit 15% 0.150 25,212.75
F Harga Satuan Pekerjaan (D+E) 193,297.00
-
dihit A.4.1.1.35.b Pemasangan 1 m2 bekisting untuk kolom praktis -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.180 93,597.00 16,847.46
2 Tukang kayu L.02 OH 0.020 121,674.00 2,433.48
3 Kepala Tukang L.03 OH 0.006 128,226.00 769.36
4 Mandor L.04 OH 0.009 149,758.00 1,347.82
JUMLAH TENAGA KERJA 21,398.12
B BAHAN -
1 Paku 10 Cm M.56.f kg 0.010 24,740.57 247.41
2 Kayu kelas III M.18.b m3 0.009 8,505,000.00 74,844.00
3 Minyak bekisting M.397 Liter 0.200 17,952.00 3,590.40
JUMLAH HARGA BAHAN 78,681.81
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 100,079.92
E Overhead & Profit 15% 0.150 15,011.99
F Harga Satuan Pekerjaan (D+E) 115,091.00
-
dihit A.4.1.1.29.a Pemasangan 1 m2 bekisting untuk ring balok pasang kembali -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.297 93,597.00 27,798.31
2 Tukang kayu L.02 OH 0.033 121,674.00 4,015.24
3 Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
4 Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 35,342.18
B BAHAN -
1 Paku 10 Cm M.56.f kg 0.020 24,740.57 494.81
2 Minyak bekisting M.397 Liter 0.200 17,952.00 3,590.40
3 Kayu kelas III M.16.a m3 0.003 11,088,000.00 33,264.00
JUMLAH HARGA BAHAN 37,349.21
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 72,691.39
E Overhead & Profit 15% 0.150 10,903.71
F Harga Satuan Pekerjaan (D+E) 83,595.00
-
dihit A.4.1.1.36.b Membuat 1 m’ ring balok beton bertulang (15 x 20) cm (tulangan pokok 4Ø10, begel Ø6-150 termasuk bekisting) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.297 93,597.00 27,798.31
2 Tukang batu L.02 OH 0.033 121,674.00 4,015.24
3 Tukang kayu L.02 OH 0.033 121,674.00 4,015.24
4 Tukang besi L.02 OH 0.033 121,674.00 4,015.24
5 Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
6 Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,372.67
B BAHAN -
1 Kayu kelas III M.18.b m3 0.011 8,505,000.00 93,555.00
2 Paku 10 Cm M.56.f kg 0.020 24,740.57 494.81
3 Besi beton polos M.46.a kg 4.075 12,344.68 50,308.29
4 Kawat beton M.54 kg 0.050 21,472.00 1,073.60
5 Portland cement M.245.a kg 9.780 1,375.00 13,447.50
6 Pasir Beton M.9.b kg 22.800 226.16 5,156.36
7 kerikil M.12 kg 30.870 300.00 9,261.00
JUMLAH HARGA BAHAN 173,296.56
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 216,669.23
E Overhead & Profit 15% 0.150 32,500.38
F Harga Satuan Pekerjaan (D+E) 249,169.00
-
dihit A.4.1.1.36.c Membuat 1 m’ ring balok beton bertulang (15 x 20) cm (tulangan pokok 4Ø12, begel Ø6-150 termasuk bekisting) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.297 93,597.00 27,798.31
2 Tukang batu L.02 OH 0.033 121,674.00 4,015.24
3 Tukang kayu L.02 OH 0.033 121,674.00 4,015.24
4 Tukang besi L.02 OH 0.033 121,674.00 4,015.24
5 Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
6 Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,372.67
B BAHAN -
1 Kayu kelas III M.18.b m3 0.011 8,505,000.00 93,555.00
2 Paku 10 Cm M.56.f kg 0.020 24,740.57 494.81
3 Besi beton polos M.46.a kg 5.267 12,344.68 65,013.27
4 Kawat beton M.54 kg 0.050 21,472.00 1,073.60
5 Portland cement M.245.a kg 9.780 1,375.00 13,447.50
6 Pasir Beton M.9.b kg 22.800 226.16 5,156.36
7 kerikil M.12 kg 30.870 300.00 9,261.00
JUMLAH HARGA BAHAN 188,001.55
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 231,374.21
E Overhead & Profit 15% 0.150 34,706.13
F Harga Satuan Pekerjaan (D+E) 266,080.00
-
dihit A.4.1.1.37 Pemasangan 1 m Papan Dilatasi Pada Cor Jalan Beton -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.132 93,597.00 12,354.80
2 Tukang kayu L.02 OH 0.066 121,674.00 8,030.48
3 Kepala Tukang L.03 OH 0.007 128,226.00 846.29
4 Mandor L.04 OH 0.007 149,758.00 988.40
JUMLAH TENAGA KERJA 22,219.98
B BAHAN -
1 Kayu Sengon (papan) M.28.a m3 0.0044 2,217,600.00 9,757.44
JUMLAH HARGA BAHAN 9,757.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,977.42
E Overhead & Profit 15% 0.150 4,796.61
F Harga Satuan Pekerjaan (D+E) 36,774.00
-
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM -
dihit A.4.2.1.4.1 Pembuatan 1 m Rangka Pintu Alluminium Warna Natural/Silver -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.085 93,597.00 7,955.75
2 Tukang Khusus Alumunium L.02 OH 0.085 121,674.00 10,342.29
3 Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
4 Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 20,200.86
B BAHAN -
1 Profil aluminium natural M.426.a m¹ 1.100 285,120.00 313,632.00
2 Siku aluminium natural M.426.c m¹ 1.100 8,096.00 8,905.60
3 Karet penjepit Kaca Hitam m¹ 1.100 3,000.00 3,300.00
JUMLAH HARGA BAHAN 325,837.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 346,038.46
E Overhead & Profit 15% 0.150 51,905.77
F Harga Satuan Pekerjaan (D+E) 397,944.00
-
dihit A.4.2.1.4.2 Pembuatan 1 m Rangka Pintu Alluminium Warna Powder Coating -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.085 93,597.00 7,955.75
2 Tukang Khusus Alumunium L.02 OH 0.085 121,674.00 10,342.29
3 Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
4 Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 20,200.86
B BAHAN -
1 Profil aluminium warna M.426.b m¹ 1.100 123,552.00 135,907.20
2 Siku aluminium warna M.426.d m¹ 1.100 12,320.00 13,552.00
3 Karet penjepit Kaca Hitam 078b m¹ 1.100 3,000.00 3,300.00
JUMLAH HARGA BAHAN 152,759.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 172,960.06
E Overhead & Profit 15% 0.150 25,944.01
F Harga Satuan Pekerjaan (D+E) 198,904.00
-
dihit A.4.2.1.4.3 Pembuatan 1 m Rangka Pintu U PVC Warna Putih -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.085 93,597.00 7,955.75
2 Tukang Khusus Alumunium L.02 OH 0.085 121,674.00 10,342.29
3 Kepala tukang L.03 OH 0.009 128,226.00 1,154.03
4 Mandor L.04 OH 0.005 149,758.00 748.79
-
JUMLAH TENAGA KERJA 20,200.86
B BAHAN -
1 Profil Rangka Pintu U PVC Putih setara Bosca M.427.a m' 1.100 192,720.00 211,992.00
2 Karet perapat m' 1.100 3,000.00 3,300.00
JUMLAH HARGA BAHAN 215,292.00
C ALAT -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 235,492.86
E Overhead & Profit 15% 0.150 35,323.93
F Harga Satuan Pekerjaan (D+E) 270,816.00
-
dihit A.4.2.1.4.4 Pemasangan 1 m Kusen Pintu U PVC Warna Putih -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.043 93,597.00 4,024.67
2 Tukang Khusus Alumunium L.02 OH 0.043 121,674.00 5,231.98
3 Kepala tukang L.03 OH 0.004 128,226.00 551.37
4 Mandor L.04 OH 0.002 149,758.00 314.49
-
JUMLAH TENAGA KERJA 10,122.52
B BAHAN -
1 Profil kusen pintu U PVC putih setara Bosca M.427 m' 1.100 197,736.00 217,509.60
2 Skrup fixer M.56.o buah 2.000 774.40 1,548.80
3 Sealant kaca (tanggung) M.562.b tube 0.060 25,608.00 1,536.48
JUMLAH HARGA BAHAN 220,594.88
C ALAT -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 230,717.40
E Overhead & Profit 15% 0.150 34,607.61
F Harga Satuan Pekerjaan (D+E) 265,325.00
-
dihit A.4.2.1.4.5 Pemasangan 1 Unit Pintu PVC + Sticker Kaca Oval Polos Untuk KM/WC -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.170 93,597.00 15,911.49
2 Tukang Khusus Alumunium L.02 OH 0.170 121,674.00 20,684.58
3 Kepala tukang L.03 OH 0.017 128,226.00 2,179.84
4 Mandor L.04 OH 0.008 149,758.00 1,257.97
-
JUMLAH TENAGA KERJA 40,033.88
B BAHAN -
1 Pintu PVC + Stiker Kaca Oval Polos set 1.000 800,000.00 800,000.00
-
JUMLAH HARGA BAHAN 800,000.00
C ALAT -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 840,033.88
E Overhead & Profit 15% 0.150 126,005.08
F Harga Satuan Pekerjaan (D+E) 966,038.00
-
dihit A.4.2.1.4.6 Pemasangan 1 Unit Pintu Alluminium Panil Kaca Hias Untuk KM/WC -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.170 93,597.00 15,911.49
2 Tukang Khusus Alumunium L.02 OH 0.170 121,674.00 20,684.58
3 Kepala tukang L.03 OH 0.017 128,226.00 2,179.84
4 Mandor L.04 OH 0.008 149,758.00 1,257.97
-
JUMLAH TENAGA KERJA 40,033.88
B BAHAN -
1 Pintu Alluminium Panil Kaca Hias set 1.000 1,200,000.00 1,200,000.00
-
JUMLAH HARGA BAHAN 1,200,000.00
C ALAT -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,240,033.88
E Overhead & Profit 15% 0.150 186,005.08
F Harga Satuan Pekerjaan (D+E) 1,426,038.00
-
dihit A.4.2.1.5.1 Pengerjaan 1 cm pengelasan stainless steel
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.040 93,597.00 3,743.88
Tukang Las Konstruksi L.02 OH 0.020 121,674.00 2,433.48
Kepala Tukang L.03 OH 0.002 128,226.00 256.45
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 6,733.33
B BAHAN
Kawat las stainless steel (NC.36 / NC.39) M.57.a Kg 0.040 214,896.00 8,595.84
Solar (industri) M.393.a Liter 0.030 11,193.60 335.81
Minyak pelumas M.398 Liter - 29,568.00 -
JUMLAH HARGA BAHAN 8,931.65
C PERALATAN
Sewa alat las alat 62 Jam 0.170 10,771.20 1,831.10
JUMLAH HARGA ALAT 1,831.10
D Jumlah (A+B+C) 17,496.08
E Overhead & Profit 15% 0.150 2,624.41
F Harga Satuan Pekerjaan untuk 10 cm 20,120.49
G Harga Satuan Pekerjaan (F/10) 2,012.00

dihit A.4.2.1.6.1 Pembuatan 1 m Rangka Jendela Alluminium Warna Natural/Silver -


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.085 93,597.00 7,955.75
2 Tukang Khusus Alumunium L.02 OH 0.085 121,674.00 10,342.29
3 Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
4 Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 20,200.86
B BAHAN -
1 Profil aluminium natural M.426.a m¹ 1.100 285,120.00 313,632.00
2 Siku aluminium natural M.426.c m¹ 1.100 8,096.00 8,905.60
3 Karet penjepit Kaca Hitam m¹ 1.100 3,000.00 3,300.00
JUMLAH HARGA BAHAN 325,837.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 346,038.46
E Overhead & Profit 15% 0.150 51,905.77
F Harga Satuan Pekerjaan (D+E) 397,944.00
-
dihit A.4.2.1.6.2 Pembuatan 1 m Rangka Jendela Alluminium Warna Powder Coating -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.085 93,597.00 7,955.75
2 Tukang Khusus Alumunium L.02 OH 0.085 121,674.00 10,342.29
3 Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
4 Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 20,200.86
B BAHAN -
1 Profil aluminium warna M.426.b m¹ 1.100 123,552.00 135,907.20
2 Siku aluminium warna M.426.d m¹ 1.100 12,320.00 13,552.00
3 Karet penjepit Kaca Hitam 078b m¹ 1.100 3,000.00 3,300.00
JUMLAH HARGA BAHAN 152,759.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 172,960.06
E Overhead & Profit 15% 0.150 25,944.01
F Harga Satuan Pekerjaan (D+E) 198,904.00
-
dihit A.4.2.1.6.3 Pembuatan 1 m Rangka Jendela U PVC Warna Putih -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.085 93,597.00 7,955.75
2 Tukang Khusus Alumunium L.02 OH 0.085 121,674.00 10,342.29
3 Kepala tukang L.03 OH 0.009 128,226.00 1,154.03
4 Mandor L.04 OH 0.005 149,758.00 748.79
-
JUMLAH TENAGA KERJA 20,200.86
B BAHAN -
1 Profil Rangka Jendela U PVC Putih setara Bosca M.427.b m' 1.100 184,800.00 203,280.00
2 Karet perapat m' 1.100 3,000.00 3,300.00
JUMLAH HARGA BAHAN 206,580.00
C ALAT -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 226,780.86
E Overhead & Profit 15% 0.150 34,017.13
F Harga Satuan Pekerjaan (D+E) 260,797.00
-
dihit A.4.2.1.8.a Pemasangan 1 m2 pintu lipat (folding door) bahan alumunium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.440 93,597.00 41,182.68
2 Tukang Besi L.02 OH 0.440 121,674.00 53,536.56
3 Kepala Tukang L.03 OH 0.044 128,226.00 5,641.94
4 Mandor L.04 OH 0.022 149,758.00 3,294.68
JUMLAH TENAGA KERJA 103,655.86
B BAHAN -
1 Pintu lipat (folding door) alumunium M.429 m2 1.000 580,800.00 580,800.00
JUMLAH HARGA BAHAN 580,800.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 684,455.86
E Overhead & Profit 15% 0.150 102,668.38
F Harga Satuan Pekerjaan (D+E) 787,124.00
-
dihit A.4.2.1.11.1 Pemasangan 1 m kusen pintu alluminium 3" warna Powder Coating -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.043 93,597.00 4,024.67
2 Tukang Khusus Alumunium L.02 OH 0.043 121,674.00 5,231.98
3 Kepala Tukang L.03 OH 0.004 128,226.00 551.37
4 Mandor L.04 OH 0.002 149,758.00 314.49
JUMLAH TENAGA KERJA 10,122.52
B BAHAN -
1 Kusen alumunium 3" warna gelap M.433.c m 1.100 100,320.00 110,352.00
2 Skrup fixer M.56.o buah 2.000 774.40 1,548.80
3 Sealant kaca (tanggung) M.562.b Tube 0.060 25,608.00 1,536.48
JUMLAH HARGA BAHAN 113,437.28
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 123,559.80
E Overhead & Profit 15% 0.150 18,533.97
F Harga Satuan Pekerjaan (D+E) 142,093.00
-
dihit A.4.2.1.11.2 Pemasangan 1 m kusen pintu alluminium 4" warna Powder Coating -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.043 93,597.00 4,024.67
2 Tukang Khusus Alumunium L.02 OH 0.043 121,674.00 5,231.98
3 Kepala Tukang L.03 OH 0.004 128,226.00 551.37
4 Mandor L.04 OH 0.002 149,758.00 314.49
JUMLAH TENAGA KERJA 10,122.52
B BAHAN -
1 Kusen alumunium 4" warna gelap M.433.d m 1.100 110,880.00 121,968.00
2 Skrup fixer M.56.o buah 2.000 774.40 1,548.80
3 Sealant kaca (tanggung) M.562.b Tube 0.060 25,608.00 1,536.48
JUMLAH HARGA BAHAN 125,053.28
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 135,175.80
E Overhead & Profit 15% 0.150 20,276.37
F Harga Satuan Pekerjaan (D+E) 155,452.00
-
dihit A.4.2.1.11.3 Pemasangan 1 m kusen pintu alluminium 4" warna Natural / Silver -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.043 93,597.00 4,024.67
2 Tukang Khusus Alumunium L.02 OH 0.043 121,674.00 5,231.98
3 Kepala Tukang L.03 OH 0.004 128,226.00 551.37
4 Mandor L.04 OH 0.002 149,758.00 314.49
JUMLAH TENAGA KERJA 10,122.52
B BAHAN -
1 Kusen alumunium 4" putih M.433.b m 1.100 132,000.00 145,200.00
2 Skrup fixer M.56.o buah 2.000 774.40 1,548.80
3 Sealant kaca (tanggung) M.562.b Tube 0.060 25,608.00 1,536.48
JUMLAH HARGA BAHAN 148,285.28
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 158,407.80
E Overhead & Profit 15% 0.150 23,761.17
F Harga Satuan Pekerjaan (D+E) 182,168.00
-
dihit A.4.2.1.11.4 Pemasangan 1 m Kusen Pintu Alluminium Urat Kayu 3" -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.043 93,597.00 4,024.67
2 Tukang Khusus Alumunium L.02 OH 0.043 121,674.00 5,231.98
3 Kepala Tukang L.03 OH 0.004 128,226.00 551.37
4 Mandor L.04 OH 0.002 149,758.00 314.49
JUMLAH TENAGA KERJA 10,122.52
B BAHAN -
1 Kusen alumunium 3" warna urat kayu M.433.e m 1.100 145,024.00 159,526.40
2 Skrup fixer M.56.o buah 2.000 774.40 1,548.80
3 Sealant kaca (tanggung) M.562.b Tube 0.060 25,608.00 1,536.48
JUMLAH HARGA BAHAN 162,611.68
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 172,734.20
E Overhead & Profit 15% 0.150 25,910.13
F Harga Satuan Pekerjaan (D+E) 198,644.00
-
dihit A.4.2.1.11.5 Pemasangan 1 m Kusen Pintu Alluminium Urat Kayu 4" -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.043 93,597.00 4,024.67
2 Tukang Khusus Alumunium L.02 OH 0.043 121,674.00 5,231.98
3 Kepala Tukang L.03 OH 0.004 128,226.00 551.37
4 Mandor L.04 OH 0.002 149,758.00 314.49
JUMLAH TENAGA KERJA 10,122.52
B BAHAN -
1 Kusen alumunium 4" warna urat kayu M.433.f m 1.100 194,304.00 213,734.40
2 Skrup fixer M.56.o buah 2.000 774.40 1,548.80
3 Sealant kaca (tanggung) M.562.b Tube 0.060 25,608.00 1,536.48
JUMLAH HARGA BAHAN 216,819.68
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 226,942.20
E Overhead & Profit 15% 0.150 34,041.33
F Harga Satuan Pekerjaan (D+E) 260,983.00
-
dihit A.4.2.1.14.a Pemasangan 1 m2 venetions blinds dan Vertical blinds (sedang) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.350 93,597.00 32,758.95
2 Tukang Khusus Alumunium L.02 OH 0.350 121,674.00 42,585.90
3 Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
4 Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 82,528.40
B BAHAN -
1 Venetions blinds dan vertical blinds (tirai) M.571 m2 1.000 138,336.00 138,336.00
JUMLAH HARGA BAHAN 138,336.00
PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 220,864.40
E Overhead & Profit 15% 0.150 33,129.66
F Harga Satuan Pekerjaan (D+E) 253,994.00
-
dihit A.4.2.1.14.b Pemasangan 1 m2 venetions blinds dan Vertical blinds (standar) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.350 93,597.00 32,758.95
2 Tukang Khusus Alumunium L.02 OH 0.350 121,674.00 42,585.90
3 Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
4 Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 82,528.40
B BAHAN -
1 Venetions blinds dan vertical blinds (tirai) M.571 m2 1.000 138,336.00 138,336.00
JUMLAH HARGA BAHAN 138,336.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 220,864.40
E Overhead & Profit 15% 0.150 33,129.66
F Harga Satuan Pekerjaan (D+E) 253,994.00
-
dihit A.4.2.1.22.a Pemasangan 1 m2 atap pelana rangka atap baja canal dingin profil C75 (tebal 0,75 mm) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.734 93,597.00 68,700.20
2 Tukang Besi L.02 OH 0.734 121,674.00 89,308.72
3 Kepala Tukang L.03 OH 0.073 128,226.00 9,360.50
4 Mandor L.04 OH 0.037 149,758.00 5,541.05
JUMLAH TENAGA KERJA 172,910.46
B BAHAN -
1 C channel galvanis lebar 75 mm, t= 0,75 mm (kg) M.436.c kg 3.065 25,520.00 78,218.80
JUMLAH HARGA BAHAN 78,218.80
C PERALATAN -
Alat Rangka Atap Baja Canal Dingin % 10.000 78,218.80 7,821.88
JUMLAH HARGA ALAT 7,821.88
D Jumlah (A+B+C) 258,951.14
E Overhead & Profit 15% 0.150 38,842.67
F Harga Satuan Pekerjaan (D+E) 297,793.00
-
dihit A.4.2.1.23.a Pemasangan 1 m2 atap jurai rangka atap baja canal dingin profil C75 (tebal 0,75 mm) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.760 93,597.00 71,171.16
2 Tukang Besi L.02 OH 0.760 121,674.00 92,520.91
3 Kepala Tukang L.03 OH 0.076 128,226.00 9,745.18
4 Mandor L.04 OH 0.038 149,758.00 5,690.80
JUMLAH TENAGA KERJA 179,128.05
B BAHAN -
1 C channel galvanis lebar 75 mm, t= 0,75 mm (kg) M.436.c kg 4.050 25,520.00 103,356.00
JUMLAH HARGA BAHAN 103,356.00
C PERALATAN -
1 Alat Rangka Atap Baja Canal Dingin % 10.000 103,356.00 10,335.60
JUMLAH HARGA ALAT 10,335.60
D Jumlah (A+B+C) 292,819.65
E Overhead & Profit 15% 0.150 43,922.95
F Harga Satuan Pekerjaan (D+E) 336,742.00
-
dihit A.4.2.1.24.a Pemasangan 1 M2 pasang kuda-kuda baja ringan + reng untuk atap asbes / spandek -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Besi L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 82,242.86
B BAHAN -
C channel galvanis lebar 75 mm, t= 1,0 mm M.436.d m' 3.720 26,400.00 98,208.00
Sekrup kait / roofing M.56.p buah 28.000 721.60 20,204.80
Dynabolt dia 12mm (10-15cm) M.75.f buah 1.600 5,280.00 8,448.00
Reng Canal Dingin M.436.a m' 3.600 22,000.00 79,200.00
JUMLAH HARGA BAHAN 206,060.80
C PERALATAN -
Alat Rangka Atap Baja Canal Dingin % 10.000 206,060.80 20,606.08
JUMLAH HARGA ALAT 20,606.08
D Jumlah (A+B+C) 308,909.74
E Overhead & Profit 15% 0.150 46,336.46
F Harga Satuan Pekerjaan (D+E) 355,246.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Satuan Koefisien
(Rp.) (Rp.)
Pemasangan Daun Pintu Rangka Alumunium warna natural / silver, Panil Kaca
A.4.2.1.25
Rayban 5 mm Uk.70/210 cm
Buah cek

A.4.2.1.4.1 Pembuatan 1 m Rangka Pintu Alluminium Warna Natural/Silver m' 5.320 397,944.00 2,117,062.08
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 1.094 227,879.00 249,390.78
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 3.000 207,112.00 621,336.00
A.4.6.2.11. Pemasangan 1 buah kunci slot buah 1.000 57,041.00 57,041.00
Jumlah 3,044,829.00
Pemasangan Daun Pintu Rangka Alumunium warna Powder Coating, Panil
A.4.2.1.26
Kaca Rayban 5 mm Uk.70/210 cm
Buah cek

A.4.2.1.4.2 Pembuatan 1 m Rangka Pintu Alluminium Warna Powder Coating m' 5.320 198,904.00 1,058,169.28
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 1.094 227,879.00 249,390.78
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 3.000 207,112.00 621,336.00
A.4.6.2.11. Pemasangan 1 buah kunci slot buah 1.000 57,041.00 57,041.00
Jumlah 1,985,937.00
Pemasangan Daun Pintu Rangka Alumunium warna natural / silver, Panil Kaca Harga Satuan Jumlah Harga
A.4.2.1.27 Satuan Koefisien
Rayban 5 mm Uk.80/210 cm (Rp.) (Rp.)
A.4.2.1.4.1 Pembuatan 1 m Rangka Pintu Alluminium Warna Natural/Silver m' 5.520 397,944.00 2,196,650.88
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 1.286 227,879.00 293,143.55
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 3.000 207,112.00 621,336.00
A.4.6.2.11. Pemasangan 1 buah kunci slot buah 1.000 57,041.00 57,041.00
Jumlah 3,168,171.00
Pemasangan Daun Pintu Rangka Alumunium warna Powder Coating, Panil Harga Satuan Jumlah Harga
A.4.2.1.28 Satuan Koefisien
Kaca Rayban 5 mm Uk.80/210 cm (Rp.) (Rp.)
A.4.2.1.4.2 Pembuatan 1 m Rangka Pintu Alluminium Warna Powder Coating m' 5.520 198,904.00 1,097,950.08
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 1.286 227,879.00 293,143.55
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 3.000 207,112.00 621,336.00
A.4.6.2.11. Pemasangan 1 buah kunci slot buah 1.000 57,041.00 57,041.00
Jumlah 2,069,470.00
Pemasangan Daun Pintu Rangka Alumunium warna natural / silver, Panil Kaca Harga Satuan Jumlah Harga
A.4.2.1.29 Satuan Koefisien
Rayban 5 mm Uk.90/210 cm (Rp.) (Rp.)
A.4.2.1.4.1 Pembuatan 1 m Rangka Pintu Alluminium Warna Natural/Silver m' 5.720 397,944.00 2,276,239.68
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 1.478 227,879.00 336,896.31
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 3.000 207,112.00 621,336.00
A.4.6.2.11. Pemasangan 1 buah kunci slot buah 1.000 57,041.00 57,041.00
Jumlah 3,291,512.00
Pemasangan Daun Pintu Rangka Alumunium warna Powder Coating, Panil Harga Satuan Jumlah Harga
A.4.2.1.30 Satuan Koefisien
Kaca Rayban 5 mm Uk.90/210 cm (Rp.) (Rp.)
A.4.2.1.4.2 Pembuatan 1 m Rangka Pintu Alluminium Warna Powder Coating m' 5.720 198,904.00 1,137,730.88
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 1.478 227,879.00 336,896.31
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 3.000 207,112.00 621,336.00
A.4.6.2.11. Pemasangan 1 buah kunci slot buah 1.000 57,041.00 57,041.00
Jumlah 2,153,004.00

Pemasangan Daun Jendela Rangka Alumunium Warna Natural/Silver, Panil Harga Satuan Jumlah Harga
A.4.2.1.31 Satuan Koefisien
Kaca Rayban 5 mm Uk.50/100 cm (Rp.) (Rp.)
A.4.2.1.6.1 Pembuatan 1 m Rangka Jendela Alluminium Warna Natural/Silver m' 2.860 397,944.00 1,138,119.84
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.414 227,879.00 94,250.75
A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 1.000 149,841.00 149,841.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 1,416,904.00
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Harga Satuan Jumlah Harga
A.4.2.1.32 Satuan Koefisien
Kaca Rayban 5 mm Uk.50/100 cm (Rp.) (Rp.)
A.4.2.1.6.2 Pembuatan 1 m Rangka Jendela Alluminium warna Powder Coating m' 2.860 198,904.00 568,865.44
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.414 227,879.00 94,250.75
A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 1.000 149,841.00 149,841.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 847,650.00
Pemasangan Daun Jendela Rangka Alumunium Warna Natural/Silver, Panil Harga Satuan Jumlah Harga
A.4.2.1.33 Satuan Koefisien
Kaca Rayban 5 mm Uk.60/120 cm (Rp.) (Rp.)
A.4.2.1.6.1 Pembuatan 1 m Rangka Jendela Alluminium Warna Natural/Silver m' 3.460 397,944.00 1,376,886.24
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.616 227,879.00 140,282.31
A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 1.000 149,841.00 149,841.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 1,701,702.00
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Harga Satuan Jumlah Harga
A.4.2.1.34 Satuan Koefisien
Kaca Rayban 5 mm Uk.60/120 cm (Rp.) (Rp.)
A.4.2.1.6.2 Pembuatan 1 m Rangka Jendela Alluminium warna Powder Coating m' 3.460 198,904.00 688,207.84
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.616 227,879.00 140,282.31
A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 1.000 149,841.00 149,841.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 1,013,024.00
Pemasangan Daun Jendela Rangka Alumunium Warna Natural/Silver, Panil Harga Satuan Jumlah Harga
A.4.2.1.35 Satuan Koefisien
Kaca Rayban 5 mm Uk. 70/140 cm (Rp.) (Rp.)
A.4.2.1.6.1 Pembuatan 1 m Rangka Jendela Alluminium Warna Natural/Silver m' 4.060 397,944.00 1,615,652.64
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.858 227,879.00 195,429.03
A.4.6.2.38. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 12" pasang 1.000 159,556.00 159,556.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 2,005,330.00
Pemasangan Daun Jendela Rangka Alumunium Warna Powder Coating, Panil Harga Satuan Jumlah Harga
A.4.2.1.36 Satuan Koefisien
Kaca Rayban 5 mm Uk. 70/140 cm (Rp.) (Rp.)
A.4.2.1.6.2 Pembuatan 1 m Rangka Jendela Alluminium warna Powder Coating m' 4.060 198,904.00 807,550.24
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.858 227,879.00 195,429.03
A.4.6.2.38. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 12" pasang 1.000 159,556.00 159,556.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 1,197,228.00
Pemasangan Daun Jendela Rangka Alumunium Warna Natural/Silver, Panil Harga Satuan Jumlah Harga
A.4.2.1.37 Satuan Koefisien
Kaca Rayban 5 mm Uk. 60/80 cm (Rp.) (Rp.)
A.4.2.1.6.1 Pembuatan 1 m Rangka Jendela Alluminium Warna Natural/Silver m' 2.660 397,944.00 1,058,531.04
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.400 227,879.00 91,060.45
A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 1.000 149,841.00 149,841.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 1,334,125.00
Pemasangan Daun Jendela Rangka Alumunium Warna Powder Coating, Panil Harga Satuan Jumlah Harga
A.4.2.1.38 Satuan Koefisien
Kaca Rayban 5 mm Uk. 60/80 cm (Rp.) (Rp.)
A.4.2.1.6.2 Pembuatan 1 m Rangka Jendela Alluminium warna Powder Coating m' 2.660 198,904.00 529,084.64
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.400 227,879.00 91,060.45
A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 1.000 149,841.00 149,841.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 804,679.00
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Uk. Harga Satuan Jumlah Harga
A.4.2.1.39 Satuan Koefisien
50/40 cm (Rp.) (Rp.)
A.4.2.1.4.1 Pembuatan 1 m Rangka Pintu Alluminium Warna Natural/Silver m' 1.660 397,944.00 660,587.04
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.150 227,879.00 34,090.70
A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 1.000 149,841.00 149,841.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 879,211.00
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Uk. Harga Satuan Jumlah Harga
A.4.2.1.40 Satuan Koefisien
60/40 cm (Rp.) (Rp.)
A.4.2.1.4.1 Pembuatan 1 m Rangka Pintu Alluminium Warna Natural/Silver m' 1.860 397,944.00 740,175.84
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.184 227,879.00 41,838.58
A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 1.000 149,841.00 149,841.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 966,548.00
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Uk. Harga Satuan Jumlah Harga
A.4.2.1.41 Satuan Koefisien
70/40 cm (Rp.) (Rp.)
A.4.2.1.4.1 Pembuatan 1 m Rangka Pintu Alluminium Warna Natural/Silver m' 2.060 397,944.00 819,764.64
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.218 227,879.00 49,586.47
A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 1.000 149,841.00 149,841.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 1,053,885.00
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Uk. Harga Satuan Jumlah Harga
A.4.2.1.42 Satuan Koefisien
80/40 cm (Rp.) (Rp.)
A.4.2.1.4.1 Pembuatan 1 m Rangka Pintu Alluminium Warna Natural/Silver m' 2.260 397,944.00 899,353.44
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.252 227,879.00 57,334.36
A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 1.000 149,841.00 149,841.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 1,141,221.00
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Uk. Harga Satuan Jumlah Harga
A.4.2.1.43 Satuan Koefisien
90/40 cm (Rp.) (Rp.)
A.4.2.1.4.1 Pembuatan 1 m Rangka Pintu Alluminium Warna Natural/Silver m' 2.460 397,944.00 978,942.24
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.286 227,879.00 65,082.24
A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 1.000 149,841.00 149,841.00
A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 1.000 34,693.00 34,693.00
Jumlah 1,228,558.00
Pemasangan Daun Pintu Rangka Kayu Jati Panil Kaca Rayban 5 mm Uk.70/210 Harga Satuan Jumlah Harga
A.4.2.1.44 Satuan Koefisien
cm (Rp.) (Rp.)
A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati pan m2 1.470 1,081,700.00 1,590,099.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 3.008 73,373.00 220,705.98
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 1.094 227,879.00 249,390.78
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 3.000 207,112.00 621,336.00
A.4.6.2.11. Pemasangan 1 buah kunci slot buah 1.000 57,041.00 57,041.00
Jumlah 2,738,572.00
Pemasangan Daun Pintu Rangka Kayu Jati Panil Kaca Rayban 5 mm Uk.80/210 Harga Satuan Jumlah Harga
A.4.2.1.45 Satuan Koefisien
cm (Rp.) (Rp.)
A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati pan m2 1.680 1,081,700.00 1,817,256.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 3.408 73,373.00 250,055.18
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 1.286 227,879.00 293,143.55
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 3.000 207,112.00 621,336.00
A.4.6.2.11. Pemasangan 1 buah kunci slot buah 1.000 57,041.00 57,041.00
Jumlah 3,038,831.00
Pemasangan Daun Pintu Rangka Kayu Jati Panil Kaca Rayban 5 mm Uk.90/210 Harga Satuan Jumlah Harga
A.4.2.1.46 Satuan Koefisien
cm (Rp.) (Rp.)
A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati pan m2 1.890 1,081,700.00 2,044,413.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 3.808 73,373.00 279,404.38
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 1.478 227,879.00 336,896.31
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 3.000 207,112.00 621,336.00
A.4.6.2.11. Pemasangan 1 buah kunci slot buah 1.000 57,041.00 57,041.00
Jumlah 3,339,090.00
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Harga Satuan Jumlah Harga
A.4.2.1.47 Satuan Koefisien
Uk.50/100 cm (Rp.) (Rp.)
A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati pan m2 0.500 1,081,700.00 540,850.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 1.680 73,373.00 123,266.64
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.414 227,879.00 94,250.75
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 2.000 207,112.00 414,224.00
A.4.6.2.9. Pemasangan 1 buah kait angin buah 2.000 45,825.00 91,650.00
A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" buah 1.000 141,340.00 141,340.00
Jumlah 1,405,581.00
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Harga Satuan Jumlah Harga
A.4.2.1.48 Satuan Koefisien
Uk.60/120 cm (Rp.) (Rp.)
A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati pan m2 0.720 1,081,700.00 778,824.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 2.144 73,373.00 157,311.71
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.616 227,879.00 140,282.31
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 2.000 207,112.00 414,224.00
A.4.6.2.9. Pemasangan 1 buah kait angin buah 2.000 45,825.00 91,650.00
A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" buah 1.000 141,340.00 141,340.00
Jumlah 1,723,632.00
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Uk. Harga Satuan Jumlah Harga
A.4.2.1.49 Satuan Koefisien
70/140 cm (Rp.) (Rp.)
A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati pan m2 0.980 1,081,700.00 1,060,066.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 2.608 73,373.00 191,356.78
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.858 227,879.00 195,429.03
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 2.000 207,112.00 414,224.00
A.4.6.2.9. Pemasangan 1 buah kait angin buah 2.000 45,825.00 91,650.00
A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" buah 1.000 141,340.00 141,340.00
Jumlah 2,094,065.00
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Uk. Harga Satuan Jumlah Harga
A.4.2.1.50 Satuan Koefisien
60/80 cm (Rp.) (Rp.)
A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati pan m2 0.480 1,081,700.00 519,216.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 2.016 73,373.00 147,919.97
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.400 227,879.00 91,060.45
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 2.000 207,112.00 414,224.00
A.4.6.2.9. Pemasangan 1 buah kait angin buah 2.000 45,825.00 91,650.00
A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" buah 1.000 141,340.00 141,340.00
Jumlah 1,405,410.00
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Uk. Harga Satuan Jumlah Harga
A.4.2.1.51 Satuan Koefisien
50/40 cm (Rp.) (Rp.)
A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati pan m2 0.200 1,081,700.00 216,340.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 1.120 73,373.00 82,177.76
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.150 227,879.00 34,090.70
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 2.000 207,112.00 414,224.00
A.4.6.2.9. Pemasangan 1 buah kait angin buah 2.000 45,825.00 91,650.00
A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" buah 1.000 141,340.00 141,340.00
Jumlah 979,822.00
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Uk. Harga Satuan Jumlah Harga
A.4.2.1.52 Satuan Koefisien
60/40 cm (Rp.) (Rp.)
A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati pan m2 0.240 1,081,700.00 259,608.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 1.152 73,373.00 84,525.70
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.184 227,879.00 41,838.58
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 2.000 207,112.00 414,224.00
A.4.6.2.9. Pemasangan 1 buah kait angin buah 2.000 45,825.00 91,650.00
A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" buah 1.000 141,340.00 141,340.00
Jumlah 1,033,186.00
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Uk. Harga Satuan Jumlah Harga
A.4.2.1.53 Satuan Koefisien
70/40 cm (Rp.) (Rp.)
A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati pan m2 0.280 1,081,700.00 302,876.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 1.184 73,373.00 86,873.63
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.218 227,879.00 49,586.47
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 2.000 207,112.00 414,224.00
A.4.6.2.9. Pemasangan 1 buah kait angin buah 2.000 45,825.00 91,650.00
A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" buah 1.000 141,340.00 141,340.00
Jumlah 1,086,550.00
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Uk. Harga Satuan Jumlah Harga
A.4.2.1.54 Satuan Koefisien
80/40 cm (Rp.) (Rp.)
A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati pan m2 0.320 1,081,700.00 346,144.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 1.216 73,373.00 89,221.57
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.252 227,879.00 57,334.36
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 2.000 207,112.00 414,224.00
A.4.6.2.9. Pemasangan 1 buah kait angin buah 2.000 45,825.00 91,650.00
A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" buah 1.000 141,340.00 141,340.00
Jumlah 1,139,913.00
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Uk. Harga Satuan Jumlah Harga
A.4.2.1.55 Satuan Koefisien
90/40 cm (Rp.) (Rp.)
A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati pan m2 0.360 1,081,700.00 389,412.00
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 1.248 73,373.00 91,569.50
A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 0.286 227,879.00 65,082.24
A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 2.000 207,112.00 414,224.00
A.4.6.2.9. Pemasangan 1 buah kait angin buah 2.000 45,825.00 91,650.00
A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" buah 1.000 141,340.00 141,340.00
Jumlah 1,193,277.00
-
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING -
-
dihit A.4.4.1.15.1 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu dengan semen instan -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 864.41 60,508.80
Pengisi bata ringan (Semen MU 380) M.240.c Kg 32.000 2,728.00 87,296.00
JUMLAH HARGA BAHAN 147,804.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 191,579.93
E Overhead & Profit 15% 0.150 28,736.99
F Harga Satuan Pekerjaan (D+E) 220,316.00
-
dihit A.4.4.1.23.1 Pemasangan 1 m2 dinding terawang (rooster) 20x20 cm campuran 1SP : 4PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata berongga / Roster 20x20 M.221.b buah 25.000 8,448.00 211,200.00
Portland cement M.245.a Kg 6.250 1,375.00 8,593.75
JUMLAH HARGA BAHAN 219,793.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 263,568.88
E Overhead & Profit 15% 0.150 39,535.33
F Harga Satuan Pekerjaan (D+E) 303,104.00
-
dihit A.4.4.1.23.2 Pemasangan 1 m2 dinding terawang (rooster) 40x20 cm campuran 1SP : 4PP -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata berongga / Roster 40x20 M.221.c buah 13.000 10,384.00 134,992.00
Portland cement M.245.a Kg 3.250 1,375.00 4,468.75
JUMLAH HARGA BAHAN 139,460.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 183,235.88
E Overhead & Profit 15% 0.150 27,485.38
F Harga Satuan Pekerjaan (D+E) 210,721.00
-
dihit A.4.4.1.23.3 Pemasangan 1 m2 dinding terawang (rooster) genteng kecil -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata berongga / Roster genteng kecil M.221.e buah 38.000 3,168.00 120,384.00
Portland cement M.245.a Kg 9.500 1,375.00 13,062.50
JUMLAH HARGA BAHAN 133,446.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 177,221.63
E Overhead & Profit 15% 0.150 26,583.24
F Harga Satuan Pekerjaan (D+E) 203,804.00
-
dihit A.4.4.1.23.4 Pemasangan 1 m2 dinding terawang (rooster) genteng sedang -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata berongga / Roster genteng sedang M.221.f buah 31.000 5,280.00 163,680.00
Portland cement M.245.a Kg 7.750 1,375.00 10,656.25
JUMLAH HARGA BAHAN 174,336.25
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 218,111.38
E Overhead & Profit 15% 0.150 32,716.71
F Harga Satuan Pekerjaan (D+E) 250,828.00
-
dihit A.4.4.1.23.5 Pemasangan 1 m2 dinding terawang (rooster) genteng besar -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata berongga / Roster genteng besar M.221.g buah 19.000 14,256.00 270,864.00
Portland cement M.245.a Kg 4.750 1,375.00 6,531.25
JUMLAH HARGA BAHAN 277,395.25
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 321,170.38
E Overhead & Profit 15% 0.150 48,175.56
F Harga Satuan Pekerjaan (D+E) 369,345.00
-
dihit A.4.4.1.23.6 Pemasangan 1 m2 dinding terawang (rooster) keramik 20 x 20 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata berongga / Roster keramik 20 x 20 cm M.221.h buah 25.000 51,920.00 1,298,000.00
Portland cement M.245.a Kg 6.250 1,375.00 8,593.75
JUMLAH HARGA BAHAN 1,306,593.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,350,368.88
E Overhead & Profit 15% 0.150 202,555.33
F Harga Satuan Pekerjaan (D+E) 1,552,924.00
-
dihit A.4.4.1.23.7 Pemasangan 1 m2 dinding terawang (rooster) keramik 30 x 30 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata berongga / Roster keramik 30 x 30 cm M.221.i buah 12.000 72,688.00 872,256.00
Portland cement M.245.a Kg 3.000 1,375.00 4,125.00
JUMLAH HARGA BAHAN 876,381.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 920,156.13
E Overhead & Profit 15% 0.150 138,023.42
F Harga Satuan Pekerjaan (D+E) 1,058,179.00
-
dihit A.4.4.1.23.8 Pemasangan 1 m2 dinding terawang (rooster) GRC -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Bata berongga / Roster GRC M.221.j m2 1.000 897,600.00 897,600.00
Portland cement M.245.a Kg 2.750 1,375.00 3,781.25
JUMLAH HARGA BAHAN 901,381.25
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 945,156.38
E Overhead & Profit 15% 0.150 141,773.46
F Harga Satuan Pekerjaan (D+E) 1,086,929.00
-
dihit A.4.4.1.27 Pemasangan 1m2 Glass Block 20x20 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
Glass Block M.236 buah 25.000 26,400.00 660,000.00
Portland cement M.245.a Kg 10.000 1,375.00 13,750.00
JUMLAH HARGA BAHAN 673,750.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 717,525.13
E Overhead & Profit 15% 0.150 107,628.77
F Harga Satuan Pekerjaan (D+E) 825,153.00
-
dihit. A.4.4.1.28 Pasang Partisi Dobel Gipsum Board 9 mm Rangka Hollow Meni 4x4 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Besi L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 58,970.25
B BAHAN -
Gypsum Board (120 cm x 240 cm x 9 mm) M.151.a Lembar 0.764 61,600.00 47,055.56
Paku sekrup M.56.j kg 0.110 5,208.75 572.96
Besi hollow 40.40.4 M.47.c m' 5.000 40,040.00 200,200.00
Assesoris (perkuatan, dll) 100% rangka 40,040.00 40,040.00
JUMLAH HARGA BAHAN 287,868.52
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 346,838.77
E Overhead & Profit 15% 0.150 52,025.82
F Harga Satuan Pekerjaan (D+E) 398,864.00
-
dihit. A.4.4.1.29 Pasang Partisi Dobel Plywood 6 mm Rangka Hollow Meni 4x4 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Besi L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 58,970.25
B BAHAN -
Plywood 6 mm (120x240) M.32.b Lembar 0.764 80,256.00 61,306.67
Paku sekrup M.56.j kg 0.110 5,208.75 572.96
Rangka metal hollow 40.40.0,4 mm M.47.c m' 5.000 40,040.00 200,200.00
Assesoris (perkuatan, dll) 100% rangka 40,040.00 40,040.00
JUMLAH HARGA BAHAN 302,119.63
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 361,089.88
E Overhead & Profit 15% 0.150 54,163.48
F Harga Satuan Pekerjaan (D+E) 415,253.00
-
dihit. A.4.4.1.32 Pasang Partisi Dobel GRC Board 6 mm Rangka Hollow Meni 4x4 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Besi L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 58,970.25
B BAHAN -
GRC board (120 cm x 240 cm x 6 mm) M.153.a Lembar 0.764 105,600.00 80,666.67
Paku sekrup M.56.j kg 0.110 5,208.75 572.96
Rangka metal hollow 40.40.0,4 mm M.47.c m' 5.000 40,040.00 200,200.00
Assesoris (perkuatan, dll) 100% rangka 40,040.00 40,040.00
JUMLAH HARGA BAHAN 321,479.63
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 380,449.88
E Overhead & Profit 15% 0.150 57,067.48
F Harga Satuan Pekerjaan (D+E) 437,517.00
-
dihit. A.4.4.1.33 Pasang Partisi Dobel Gipsum Board 9 mm Rangka Metal Stud / Alumunium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Besi L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 58,970.25
B BAHAN #N/A -
Gypsum Board (120 cm x 240 cm x 9 mm) M.151.a Lembar 0.764 61,600.00 47,055.56
Paku sekrup M.56.j kg 0.220 5,208.75 1,145.93
Metal Stud 34x50x0,4 mm M.165.d m' 5.000 25,872.00 129,360.00
Assesoris (perkuatan, las dll) 100% rangka 25,872.00 25,872.00
JUMLAH HARGA BAHAN 203,433.48
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 262,403.73
E Overhead & Profit 15% 0.150 39,360.56
F Harga Satuan Pekerjaan (D+E) 301,764.00
-
dihit. A.4.4.1.34 Pasang Partisi Dobel Plywood 6 mm Rangka Metal Stud / Alumunium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Besi L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 58,970.25
B BAHAN -
Plywood 6 mm (120x240) M.32.b Lembar 0.764 80,256.00 61,306.67
Paku sekrup M.56.j kg 0.220 5,208.75 1,145.93
Metal Stud 34x50x0,4 mm M.165.d m' 5.000 25,872.00 129,360.00
Assesoris (perkuatan, las dll) 100% rangka 25,872.00 25,872.00
JUMLAH HARGA BAHAN 217,684.59
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 276,654.85
E Overhead & Profit 15% 0.150 41,498.23
F Harga Satuan Pekerjaan (D+E) 318,153.00
-
dihit. A.4.4.1.35 Pasang Partisi Dobel GRC Board 6 mm Rangka Metal Stud / Alumunium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Besi L.02 OH 0.250 121,674.00 30,418.50
Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 58,970.25
B BAHAN -
GRC board (120 cm x 240 cm x 6 mm) M.153.a Lembar 0.764 105,600.00 80,666.67
Paku sekrup M.56.j kg 0.220 5,208.75 1,145.93
Metal Stud 34x50x0,4 mm M.165.d m' 5.000 25,872.00 129,360.00
Assesoris (perkuatan, las dll) 100% rangka 25,872.00 25,872.00
JUMLAH HARGA BAHAN 237,044.59
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 296,014.85
E Overhead & Profit 15% 0.150 44,402.23
F Harga Satuan Pekerjaan (D+E) 340,417.00
-
dihit A.4.4.1.30 Pemasangan 1 m2 Penutup Dinding dg HPL Lapis Plywood 9 mm warna polos -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.800 93,597.00 74,877.60
Tukang Batu L.02 OH 0.800 121,674.00 97,339.20
Kepala Tukang L.03 OH 0.160 128,226.00 20,516.16
Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 198,723.28
B BAHAN -
High Pressure Laminated (HPL) Uk. 244 x 122 cm w M.216.a Lbr 0.347 126,720.00 43,997.18
Plywood 9 mm (120x240) M.32.c Lbr 0.347 100,800.00 34,997.76
Paku 2,5 cm M.56.b Kg 0.250 22,704.00 5,676.00
Kayu kruing (kaso 4x6) M.27.b m3 0.010 5,940,000.00 59,400.00
Perekat untuk HPL M.577 Kg 0.500 39,468.00 19,734.00
JUMLAH HARGA BAHAN 163,804.94
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 362,528.22
E Overhead & Profit 15% 0.150 54,379.23
F Harga Satuan Pekerjaan (D+E) 416,907.00
-
dihit A.4.4.1.31 Pemasangan 1 m2 Penutup Dinding dg HPL Lapis Plywood 9 mm warna kayu -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.800 93,597.00 74,877.60
Tukang Batu L.02 OH 0.800 121,674.00 97,339.20
Kepala Tukang L.03 OH 0.160 128,226.00 20,516.16
Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 198,723.28
B BAHAN -
High Pressure Laminated (HPL) Uk. 244 x 122 cm w M.216.b Lbr 0.347 147,840.00 51,330.05
Plywood 9 mm (120x240) M.32.c Lbr 0.347 100,800.00 34,997.76
Paku 2,5 cm M.56.b Kg 0.250 22,704.00 5,676.00
Kayu kruing (kaso 4x6) M.27.b m3 0.010 5,940,000.00 59,400.00
Perekat untuk HPL M.577 Kg 0.500 39,468.00 19,734.00
JUMLAH HARGA BAHAN 171,137.81
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 369,861.09
E Overhead & Profit 15% 0.150 55,479.16
F Harga Satuan Pekerjaan (D+E) 425,340.00
-
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING -
dihit A.4.4.3.8.a Pemasangan 1m2 lantai ubin granit ukuran 60cm x 60cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.240 93,597.00 22,463.28
Tukang Batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.012 149,758.00 1,797.10
JUMLAH TENAGA KERJA 40,399.97
B BAHAN -
Granit tile 60 x 60 cm( double loading ) M.191.a buah 3.100 59,370.67 184,049.07
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 1.500 18,666.67 28,000.00
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 241,064.61
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 281,464.58
E Overhead & Profit 15% 0.150 42,219.69
F Harga Satuan Pekerjaan (D+E) 323,684.00
-
dihit A.4.4.3.10.a Pemasangan 1 m2 lantai ubin granit unpolish / anti skid -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.240 93,597.00 22,463.28
Tukang Batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.012 149,758.00 1,797.10
JUMLAH TENAGA KERJA 40,399.97
B BAHAN -
Granit tile unpolish / anti skid M.191.d m2 1.000 190,080.00 190,080.00
Portland cement M.245.a kg 9.600 1,375.00 13,200.00
Semen Warna M.244 kg 1.500 18,666.67 28,000.00
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 246,545.55
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 286,945.52
E Overhead & Profit 15% 0.150 43,041.83
F Harga Satuan Pekerjaan (D+E) 329,987.00
-
dihit A.4.4.3.30.1 Pemasangan 1 m’ plint kaca rayben tinggi 10cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Kaca Ray Band 5 mm M.358.b m2 0.110 158,400.00 17,424.00
Portland cement M.245.a kg 1.140 1,375.00 1,567.50
Pasir Beton (m3) M.9.c m3 0.003 339,234.40 1,017.70
JUMLAH HARGA BAHAN 20,009.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,286.42
E Overhead & Profit 15% 0.150 6,192.96
F Harga Satuan Pekerjaan (D+E) 47,479.00
-
dihit A.4.4.3.30.2 Pemasangan 1 m’ plint hospital 8 x 30 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Plint hospital 30 cm M.205.a buah 3.667 31,680.00 116,160.00
Portland cement M.245.a kg 1.140 1,375.00 1,567.50
Semen Warna M.244 Kg 0.100 18,666.67 1,866.67
Pasir Beton (m3) M.9.c m3 0.003 339,234.40 1,017.70
JUMLAH HARGA BAHAN 120,611.87
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 141,889.08
E Overhead & Profit 15% 0.150 21,283.36
F Harga Satuan Pekerjaan (D+E) 163,172.00
-
dihit A.4.4.3.30.3 Pemasangan 1 m’ plint hospital 10 x 40 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang Batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Plint hospital 40 cm M.205.b buah 2.750 47,520.00 130,680.00
Portland cement M.245.a kg 1.140 1,375.00 1,567.50
Semen Warna M.244 Kg 0.100 18,666.67 1,866.67
Pasir Beton (m3) M.9.c m3 0.003 339,234.40 1,017.70
JUMLAH HARGA BAHAN 135,131.87
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 156,409.08
E Overhead & Profit 15% 0.150 23,461.36
F Harga Satuan Pekerjaan (D+E) 179,870.00
-
dihit A.4.4.3.34.1 Pemasangan 1m2 lantai keramik ukuran 60cm x 60cm (putih) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 60 x 60 cm (putih) M.178.b dos 1.050 140,976.00 148,024.80
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 186,373.68
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 304,206.92
E Overhead & Profit 15% 0.150 45,631.04
F Harga Satuan Pekerjaan (D+E) 349,837.00
-
dihit A.4.4.3.34.1.a Pemasangan 1m2 lantai keramik ukuran 60cm x 60cm (putih) Platinum -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 60 x 60 cm (putih) Platinum dos 1.050 85,000.00 89,250.00
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 127,598.88
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 245,432.12
E Overhead & Profit 15% 0.150 36,814.82
F Harga Satuan Pekerjaan (D+E) 282,246.00
-
dihit A.4.4.3.34.2 Pemasangan 1m2 lantai keramik ukuran 60cm x 60cm (motif) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 60 x 60 cm motif M.178.a dos 1.050 132,792.00 139,431.60
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 177,780.48
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 295,613.72
E Overhead & Profit 15% 0.150 44,342.06
F Harga Satuan Pekerjaan (D+E) 339,955.00
-
dihit A.4.4.3.34.3 Pemasangan 1m2 lantai keramik ukuran 50cm x 50cm (putih) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 50 x 50 cm (putih) M.177.b dos 1.050 70,488.00 74,012.40
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 112,361.28
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 230,194.52
E Overhead & Profit 15% 0.150 34,529.18
F Harga Satuan Pekerjaan (D+E) 264,723.00
-
dihit A.4.4.3.34.4 Pemasangan 1m2 lantai keramik ukuran 50cm x 50cm (motif) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 50 x 50 cm motif M.177.a dos 1.050 76,032.00 79,833.60
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 118,182.48
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 236,015.72
E Overhead & Profit 15% 0.150 35,402.36
F Harga Satuan Pekerjaan (D+E) 271,418.00
-
dihit A.4.4.3.34.5 Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm (putih) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 40 x 40 cm (putih) M.176.a dos 1.050 49,632.00 52,113.60
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 90,462.48
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 208,295.72
E Overhead & Profit 15% 0.150 31,244.36
F Harga Satuan Pekerjaan (D+E) 239,540.00
-
dihit A.4.4.3.34.6 Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm (motif) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 40 x 40 cm motif M.176.b dos 1.050 54,648.00 57,380.40
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 95,729.28
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 213,562.52
E Overhead & Profit 15% 0.150 32,034.38
F Harga Satuan Pekerjaan (D+E) 245,596.00
-
dihit A.4.4.3.35.1 Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm (motif) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 30 x 30 cm motif M.175.b doos 1.050 49,456.00 51,928.80
Portland cement M.245.a Kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 90,277.68
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 208,110.92
E Overhead & Profit 15% 0.150 31,216.64
F Harga Satuan Pekerjaan (D+E) 239,327.00
-
dihit A.4.4.3.35.2 Pemasangan 1m2 lantai keramik ukuran 25cm x 25cm (putih) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 25 x 25 cm (putih) M.174.a dos 1.050 51,744.00 54,331.20
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 92,680.08
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 210,513.32
E Overhead & Profit 15% 0.150 31,577.00
F Harga Satuan Pekerjaan (D+E) 242,090.00
-
dihit A.4.4.3.35.3 Pemasangan 1m2 lantai keramik ukuran 25cm x 25cm (motif) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 25 x 25 cm motif M.174.b dos 1.050 42,240.00 44,352.00
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 82,700.88
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 200,534.12
E Overhead & Profit 15% 0.150 30,080.12
F Harga Satuan Pekerjaan (D+E) 230,614.00
-
dihit A.4.4.3.36.1 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm (motif) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik 20 x 20 cm motif M.172.b dos 1.050 59,136.00 62,092.80
Portland cement M.245.a Kg 10.400 1,375.00 14,300.00
Semen Warna M.244 Kg 0.500 18,666.67 9,333.33
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 100,991.68
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 218,824.92
E Overhead & Profit 15% 0.150 32,823.74
F Harga Satuan Pekerjaan (D+E) 251,648.00
-
dihit A.4.4.3.54.1a Pemasangan 1 m2 dinding keramik 20cm x 25cm (putih) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang Batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 20 x 25 cm (putih) M.173.a dos 1.050 59,136.00 62,092.80
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Semen Warna M.244 Kg 1.620 18,666.67 30,240.00
Pasir Beton (m3) M.9.c m3 0.018 339,234.40 6,106.22
JUMLAH HARGA BAHAN 111,226.52
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 262,726.40
E Overhead & Profit 15% 0.150 39,408.96
F Harga Satuan Pekerjaan (D+E) 302,135.00
-
dihit A.4.4.3.54.1b Pemasangan 1 m2 dinding keramik 20cm x 25cm (motif) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang Batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 20 x 25 cm motif M.173.b dos 1.050 58,608.00 61,538.40
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Semen Warna M.244 Kg 1.620 18,666.67 30,240.00
Pasir Beton (m3) M.9.c m3 0.018 339,234.40 6,106.22
JUMLAH HARGA BAHAN 110,672.12
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 262,172.00
E Overhead & Profit 15% 0.150 39,325.80
F Harga Satuan Pekerjaan (D+E) 301,497.00
-
dihit A.4.4.3.54.2.a Pemasangan 1 m2 Dinding Keramik 20 x 40 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 20 x 40 cm M.182 Buah 13.500 5,604.92 75,666.46
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Semen warna M.244 Kg 1.620 18,666.67 30,240.00
Pasir Beton (m3) M.9.c m3 0.018 339,234.40 6,106.22
JUMLAH HARGA BAHAN 124,800.18
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 276,300.06
E Overhead & Profit 15% 0.150 41,445.01
F Harga Satuan Pekerjaan (D+E) 317,745.00
-
dihit A.4.4.3.54.2.b Pemasangan 1 m2 Dinding Keramik 25 x 40 cm (putih) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 25 x 40 cm (putih) M.174.d Buah 10.000 70,488.00 704,880.00
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Semen warna M.244 Kg 1.620 18,666.67 30,240.00
Pasir Beton (m3) M.9.c m3 0.018 339,234.40 6,106.22
JUMLAH HARGA BAHAN 754,013.72
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 905,513.60
E Overhead & Profit 15% 0.150 135,827.04
F Harga Satuan Pekerjaan (D+E) 1,041,340.00
-
dihit A.4.4.3.54.2.c Pemasangan 1 m2 Dinding Keramik 25 x 40 cm (motif) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 25 x 40 cm motif M.174.c Buah 10.000 45,408.00 454,080.00
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Semen warna M.244 Kg 1.620 18,666.67 30,240.00
Pasir Beton (m3) M.9.c m3 0.018 339,234.40 6,106.22
JUMLAH HARGA BAHAN 503,213.72
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 654,713.60
E Overhead & Profit 15% 0.150 98,207.04
F Harga Satuan Pekerjaan (D+E) 752,920.00
-
dihit A.4.4.3.54.3 Pemasangan 1 m2 Dinding Keramik 25 x 50 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 25 x 50 cm M.181 Buah 9.000 10,560.00 95,040.00
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Semen warna M.244 Kg 1.620 18,666.67 30,240.00
Pasir Beton (m3) M.9.c m3 0.018 339,234.40 6,106.22
JUMLAH HARGA BAHAN 144,173.72
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 295,673.60
E Overhead & Profit 15% 0.150 44,351.04
F Harga Satuan Pekerjaan (D+E) 340,024.00
-
dihit A.4.4.3.54.4 Pemasangan 1 m2 Dinding Keramik 20 x 60 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 20 x 60 cm M.183 Buah 9.500 7,349.76 69,822.72
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Semen warna M.244 Kg 1.620 18,666.67 30,240.00
Pasir Beton (m3) M.9.c m3 0.018 339,234.40 6,106.22
JUMLAH HARGA BAHAN 118,956.44
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 270,456.32
E Overhead & Profit 15% 0.150 40,568.45
F Harga Satuan Pekerjaan (D+E) 311,024.00
-
dihit A.4.4.3.54.5 Pemasangan 1 m2 Dinding Keramik 30 x 60 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 30 x 60 cm M.180 Buah 6.500 18,040.00 117,260.00
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Semen warna M.244 Kg 1.620 18,666.67 30,240.00
Pasir Beton (m3) M.9.c m3 0.018 339,234.40 6,106.22
JUMLAH HARGA BAHAN 166,393.72
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 317,893.60
E Overhead & Profit 15% 0.150 47,684.04
F Harga Satuan Pekerjaan (D+E) 365,577.00
-
dihit A.4.4.3.54.6 Pemasangan 1 m2 Dinding Keramik 25 x 33 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 25 x 33 cm M.179 Buah 13.500 8,506.67 114,840.00
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Semen warna M.244 Kg 1.620 18,666.67 30,240.00
Pasir Beton (m3) M.9.c m3 0.018 339,234.40 6,106.22
JUMLAH HARGA BAHAN 163,973.72
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 315,473.60
E Overhead & Profit 15% 0.150 47,321.04
F Harga Satuan Pekerjaan (D+E) 362,794.00
-
dihit A.4.4.3.54.7 Pemasangan 1 m2 Dinding Keramik 32,5 x 65,5 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN -
Keramik 32.5 x 65.5 cm M.184 Buah 5.000 29,040.00 145,200.00
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Semen warna M.244 Kg 1.620 18,666.67 30,240.00
Pasir Beton (m3) M.9.c m3 0.018 339,234.40 6,106.22
JUMLAH HARGA BAHAN 194,333.72
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 345,833.60
E Overhead & Profit 15% 0.150 51,875.04
F Harga Satuan Pekerjaan (D+E) 397,708.00
-
dihit A.4.4.3.54.8 Pemasangan 1 m Step Tile 30x30 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.210 93,597.00 19,674.09
Tukang batu L.02 OH 0.105 121,674.00 12,787.94
Kepala Tukang L.03 OH 0.011 128,226.00 1,346.37
Mandor L.04 OH 0.011 149,758.00 1,572.46
JUMLAH TENAGA KERJA 35,380.86
B BAHAN -
Keramik Step Tile 30 x 30 cm M.187.b buah 3.500 13,305.60 46,569.60
Portland cement M.245.a kg 3.003 1,375.00 4,129.13
Semen warna M.244 Kg 0.451 18,666.67 8,409.33
Pasir Beton (m3) M.9.c m3 0.014 339,234.40 4,579.66
JUMLAH HARGA BAHAN 63,687.72
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 99,068.58
E Overhead & Profit 15% 0.150 14,860.29
F Harga Satuan Pekerjaan (D+E) 113,928.00
-
dihit A.4.4.3.54.9 Pemasangan 1 m Step Tile 30x60 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.210 93,597.00 19,674.09
Tukang batu L.02 OH 0.105 121,674.00 12,787.94
Kepala Tukang L.03 OH 0.011 128,226.00 1,346.37
Mandor L.04 OH 0.011 149,758.00 1,572.46
JUMLAH TENAGA KERJA 35,380.86
B BAHAN -
Keramik Step Tile 30 x 60 cm M.187.c buah 1.750 14,173.63 24,803.86
Portland cement M.245.a kg 3.003 1,375.00 4,129.13
Semen warna M.244 Kg 0.451 18,666.67 8,409.33
Pasir Beton (m3) M.9.c m3 0.014 339,234.40 4,579.66
JUMLAH HARGA BAHAN 41,921.98
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 77,302.84
E Overhead & Profit 15% 0.150 11,595.43
F Harga Satuan Pekerjaan (D+E) 88,898.00
-
dihit A.4.4.3.54.10 Pemasangan 1 m Step Tile 30x120 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.210 93,597.00 19,674.09
Tukang batu L.02 OH 0.105 121,674.00 12,787.94
Kepala Tukang L.03 OH 0.011 128,226.00 1,346.37
Mandor L.04 OH 0.011 149,758.00 1,572.46
JUMLAH TENAGA KERJA 35,380.86
B BAHAN -
Keramik Step Tile 30 x 120 cm M.187.a buah 0.875 112,728.00 98,637.00
Portland cement M.245.a kg 3.003 1,375.00 4,129.13
Semen warna M.244 Kg 0.451 18,666.67 8,409.33
Pasir Beton (m3) M.9.c m3 0.014 339,234.40 4,579.66
JUMLAH HARGA BAHAN 115,755.12
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 151,135.98
E Overhead & Profit 15% 0.150 22,670.40
F Harga Satuan Pekerjaan (D+E) 173,806.00
-
dihit A.4.4.3.54.11 Pemasangan 1 m Step Nosing Keramik 10x40 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN -
Step Nosing Keramik 10x40 cm M.206.e buah 2.750 17,952.00 49,368.00
Portland cement M.245.a Kg 1.140 1,375.00 1,567.50
Pasir Beton (m3) M.9.c m3 0.003 339,234.40 1,017.70
JUMLAH HARGA BAHAN 51,953.20
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 80,222.98
E Overhead & Profit 15% 0.150 12,033.45
F Harga Satuan Pekerjaan (D+E) 92,256.00
-
dihit A.4.4.3.54.12 Pemasangan 1 m Step Nosing Granit 10x60 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN -
Step Nosing Granit 10x60 cm M.206.c buah 1.750 23,760.00 41,580.00
Portland cement M.245.a Kg 1.140 1,375.00 1,567.50
Pasir Beton (m3) M.9.c m3 0.003 339,234.40 1,017.70
JUMLAH HARGA BAHAN 44,165.20
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 72,434.98
E Overhead & Profit 15% 0.150 10,865.25
F Harga Satuan Pekerjaan (D+E) 83,300.00
-
dihit A.4.4.3.54.13 Pemasangan 1 m Step Nosing Allumunium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN -
Step Nosing Alumunium SWP M.206.b buah 1.100 242,880.00 267,168.00
Portland cement M.245.a Kg 1.140 1,375.00 1,567.50
Pasir Beton (m3) M.9.c m3 0.003 339,234.40 1,017.70
JUMLAH HARGA BAHAN 269,753.20
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 298,022.98
E Overhead & Profit 15% 0.150 44,703.45
F Harga Satuan Pekerjaan (D+E) 342,726.00
-
dihit A.4.4.3.54.14 Pemasangan 1 m Step Nosing Karet -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN -
Step Nosing Karet M.206.d m' 1.100 60,984.00 67,082.40
Lem Aibon M.574 Kg 0.456 29,040.00 13,242.24
JUMLAH HARGA BAHAN 80,324.64
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 108,594.42
E Overhead & Profit 15% 0.150 16,289.16
F Harga Satuan Pekerjaan (D+E) 124,883.00
-
dihit A.4.4.3.54.15 Pemasangan 1 m Step Nosing Allumunium Karet -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN -
Step Nosing Allumunium Karet M.206.a m' 1.100 264,000.00 290,400.00
Lem Aibon M.574 Kg 0.456 29,040.00 13,242.24
JUMLAH HARGA BAHAN 303,642.24
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 331,912.02
E Overhead & Profit 15% 0.150 49,786.80
F Harga Satuan Pekerjaan (D+E) 381,698.00
-
dihit A.4.4.3.54.16 Pemasangan 1 m2 Kuku Macan 10 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN -
Kuku macan 10 cm M.207 Buah 11.000 3,828.00 42,108.00
Portland cement M.245.a Kg 0.228 1,375.00 313.50
JUMLAH HARGA BAHAN 42,421.50
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 70,691.28
E Overhead & Profit 15% 0.150 10,603.69
F Harga Satuan Pekerjaan (D+E) 81,294.00
-
dihit A.4.4.3.54.17.a Pemasangan 1 m Keramik Border Dinding 5/25 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Keramik Border 5-8 x 25 cm M.188.e Buah 4.250 11,827.20 50,265.60
Portland cement M.245.a Kg 1.140 1,375.00 1,567.50
Semen warna M.244 Kg 0.050 18,666.67 933.33
Pasir Beton (m3) M.9.c m3 0.003 339,234.40 1,017.70
JUMLAH HARGA BAHAN 53,784.14
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 75,061.35
E Overhead & Profit 15% 0.150 11,259.20
F Harga Satuan Pekerjaan (D+E) 86,320.00
-
dihit A.4.4.3.54.17.b Pemasangan 1 m Keramik Border Dinding 5-8/20 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Keramik Border 5-8 x 20 cm M.188.d Buah 5.250 6,864.00 36,036.00
Portland cement M.245.a Kg 1.140 1,375.00 1,567.50
Semen warna M.244 Kg 0.050 18,666.67 933.33
Pasir Beton (m3) M.9.c m3 0.003 339,234.40 1,017.70
JUMLAH HARGA BAHAN 39,554.54
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 60,831.75
E Overhead & Profit 15% 0.150 9,124.76
F Harga Satuan Pekerjaan (D+E) 69,956.00
-
dihit A.4.4.3.54.18 Pemasangan 1 m Keramik Border Dinding 10/40 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Keramik Border 10 x 40 cm M.188.a Buah 2.700 18,480.00 49,896.00
Portland cement M.245.a Kg 1.140 1,375.00 1,567.50
Semen warna M.244 Kg 0.050 18,666.67 933.33
Pasir Beton (m3) M.9.c m3 0.003 339,234.40 1,017.70
JUMLAH HARGA BAHAN 53,414.54
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 74,691.75
E Overhead & Profit 15% 0.150 11,203.76
F Harga Satuan Pekerjaan (D+E) 85,895.00
-
dihit A.4.4.3.54.19 Pemasangan 1 m Keramik Border Dinding 10/50 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Keramik Border 10 x 50 cm M.188.b Buah 2.100 19,008.00 39,916.80
Portland cement M.245.a Kg 1.140 1,375.00 1,567.50
Semen warna M.244 Kg 0.050 18,666.67 933.33
Pasir Beton (m3) M.9.c m3 0.003 339,234.40 1,017.70
JUMLAH HARGA BAHAN 43,435.34
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 64,712.55
E Overhead & Profit 15% 0.150 9,706.88
F Harga Satuan Pekerjaan (D+E) 74,419.00
-
dihit A.4.4.3.54.20 Pemasangan 1 m Keramik Border Dinding 10/60 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.090 93,597.00 8,423.73
Tukang batu L.02 OH 0.090 121,674.00 10,950.66
Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 21,277.21
B BAHAN -
Keramik Border 10 x 60 cm M.188.c Buah 1.750 19,483.20 34,095.60
Portland cement M.245.a Kg 1.140 1,375.00 1,567.50
Semen warna M.244 Kg 0.050 18,666.67 933.33
Pasir Beton (m3) M.9.c m3 0.003 339,234.40 1,017.70
JUMLAH HARGA BAHAN 37,614.14
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 58,891.35
E Overhead & Profit 15% 0.150 8,833.70
F Harga Satuan Pekerjaan (D+E) 67,725.00
-
dihit A.4.4.3.54.21 Pemasangan 1 m Keramik Homogenous 40 x 40 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik Homogenous 40 x 40 cm M.189.a Buah 6.630 36,220.80 240,143.90
Portland cement M.245.a Kg 9.800 1,375.00 13,475.00
Semen warna M.244 Kg 1.300 18,666.67 24,266.67
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 293,151.12
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 410,984.36
E Overhead & Profit 15% 0.150 61,647.65
F Harga Satuan Pekerjaan (D+E) 472,632.00
-
dihit A.4.4.3.54.22 Pemasangan 1 m2 Keramik Homogenous 60 x 30 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik Homogenous 60 x 30 cm M.189.b Buah 5.556 28,160.00 156,444.44
Portland cement M.245.a Kg 9.800 1,375.00 13,475.00
Semen warna M.244 Kg 1.300 18,666.67 24,266.67
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 209,451.66
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 327,284.90
E Overhead & Profit 15% 0.150 49,092.73
F Harga Satuan Pekerjaan (D+E) 376,377.00
-
dihit A.4.4.3.54.23 Pemasangan 1 m2 Keramik Homogenous 60 x 60 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik Homogenous 60 x 60 cm M.189.c Buah 3.10 53,539.20 165,971.52
Portland cement M.245.a Kg 9.60 1,375.00 13,200.00
Semen warna M.244 Kg 1.50 18,666.67 28,000.00
Pasir Beton (m3) M.9.c m3 0.05 339,234.40 15,265.55
JUMLAH HARGA BAHAN 222,437.07
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 340,270.31
E Overhead & Profit 15% 0.150 51,040.55
F Harga Satuan Pekerjaan (D+E) 391,310.00
-
dihit A.4.4.3.54.24 Pemasangan 1 m2 Keramik Homogenous 80 x 80 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Keramik Homogenous 80 x 80 cm M.189.d Buah 1.562 250,060.80 390,720.00
Portland cement M.245.a Kg 4.900 1,375.00 6,737.50
Semen warna M.244 Kg 0.650 18,666.67 12,133.33
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 424,856.38
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 542,689.62
E Overhead & Profit 15% 0.150 81,403.44
F Harga Satuan Pekerjaan (D+E) 624,093.00
-
dihit A.4.4.3.58.1 Pemasangan 1 m2 Batu Alam Andesit Polos Bakar -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Batu Alam Andesit polos Bakar M.228.b m2 1.100 129,360.00 142,296.00
Portland cement M.245.a Kg 11.750 1,375.00 16,156.25
Pasir Beton (m3) M.9.c m3 0.035 339,234.40 11,873.20
JUMLAH HARGA BAHAN 170,325.45
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 288,158.69
E Overhead & Profit 15% 0.150 43,223.80
F Harga Satuan Pekerjaan (D+E) 331,382.00
-
dihit A.4.4.3.58.2 Pemasangan 1 m2 Batu Alam Andesit Bintik Bakar -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Batu Alam Andesit Bintik Bakar M.228.d m2 1.100 132,000.00 145,200.00
Portland cement M.245.a Kg 11.750 1,375.00 16,156.25
Pasir Beton (m3) M.9.c m3 0.035 339,234.40 11,873.20
JUMLAH HARGA BAHAN 173,229.45
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 291,062.69
E Overhead & Profit 15% 0.150 43,659.40
F Harga Satuan Pekerjaan (D+E) 334,722.00
-
dihit A.4.4.3.58.3 Pemasangan 1 m2 Batu Alam Andesit Alur Bakar -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Batu Alam Andesit Alur Bakar M.228.c m2 1.100 140,800.00 154,880.00
Portland cement M.245.a Kg 11.750 1,375.00 16,156.25
Pasir Beton (m3) M.9.c m3 0.035 339,234.40 11,873.20
JUMLAH HARGA BAHAN 182,909.45
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 300,742.69
E Overhead & Profit 15% 0.150 45,111.40
F Harga Satuan Pekerjaan (D+E) 345,854.00
-
dihit A.4.4.3.58.4 Pemasangan 1 m2 Batu Alam Andesit Motif -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Batu Alam Andesit Motif M.228.e m2 1.100 132,000.00 145,200.00
Portland cement M.245.a Kg 11.750 1,375.00 16,156.25
Pasir Beton (m3) M.9.c m3 0.035 339,234.40 11,873.20
JUMLAH HARGA BAHAN 173,229.45
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 291,062.69
E Overhead & Profit 15% 0.150 43,659.40
F Harga Satuan Pekerjaan (D+E) 334,722.00
-
dihit A.4.4.3.58.5 Pemasangan 1 m2 Batu Candi Hitam -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Batu tempel Hitam M.227 m2 1.100 136,752.00 150,427.20
Portland cement M.245.a Kg 11.750 1,375.00 16,156.25
Pasir Beton (m3) M.9.c m3 0.035 339,234.40 11,873.20
JUMLAH HARGA BAHAN 178,456.65
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 296,289.89
E Overhead & Profit 15% 0.150 44,443.48
F Harga Satuan Pekerjaan (D+E) 340,733.00
-
dihit A.4.4.3.58.6 Pemasangan 1 m2 Batu Candi Warna -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Batu Candi Warna M.229 m2 1.100 102,960.00 113,256.00
Portland cement M.245.a Kg 11.750 1,375.00 16,156.25
Pasir Beton (m3) M.9.c m3 0.035 339,234.40 11,873.20
JUMLAH HARGA BAHAN 141,285.45
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 259,118.69
E Overhead & Profit 15% 0.150 38,867.80
F Harga Satuan Pekerjaan (D+E) 297,986.00
-
dihit A.4.4.3.58.7 Pemasangan 1 m2 Batu Wall Clading -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Batu Wall Cladding M.234 m2 1.100 184,800.00 203,280.00
Portland cement M.245.a Kg 11.750 1,375.00 16,156.25
Pasir Beton (m3) M.9.c m3 0.035 339,234.40 11,873.20
JUMLAH HARGA BAHAN 231,309.45
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 349,142.69
E Overhead & Profit 15% 0.150 52,371.40
F Harga Satuan Pekerjaan (D+E) 401,514.00
-
dihit A.4.4.3.58.8 Pemasangan 1 m2 Batu Sikat (batu mozaik) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN -
Batu Sikat M.231 Kg 25.000 3,326.40 83,160.00
Portland cement M.245.a Kg 23.500 1,375.00 32,312.50
Pasir Beton (m3) M.9.c m3 0.070 339,234.40 23,746.41
JUMLAH HARGA BAHAN 139,218.91
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 257,052.15
E Overhead & Profit 15% 0.150 38,557.82
F Harga Satuan Pekerjaan (D+E) 295,609.00
-
dihit A.4.4.3.64.a Pemasangan 1 m2 paving block natural tebal 6 cm (K.250) alas dengan pasir urug -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.2500 93,597.00 23,399.25
Tukang Batu L.02 OH 0.5000 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.0500 128,226.00 6,411.30
Mandor L.04 OH 0.0013 149,758.00 194.69
JUMLAH TENAGA KERJA 90,842.24
B BAHAN -
Paving block 6 cm abu-abu K-250 M.90.a M2 1.0100 92,928.00 93,857.28
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.0450 266,640.00 11,998.80
Pasir Beton (m3) M.9.c m3 0.0050 339,234.40 1,696.17
JUMLAH HARGA BAHAN 107,552.25
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 107,552.25 10,755.23
JUMLAH HARGA ALAT 10,755.23
D Jumlah (A+B+C) 209,149.71
E Overhead & Profit 15% 0.150 31,372.46
F Harga Satuan Pekerjaan (D+E) 240,522.00
-
dihit A.4.4.3.65.a Pemasangan 1 m2 paving block natural tebal 8 cm (K.300) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.5000 93,597.00 46,798.50
Tukang Batu L.02 OH 0.5000 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.0500 128,226.00 6,411.30
Mandor L.04 OH 0.0013 149,758.00 194.69
JUMLAH TENAGA KERJA 114,241.49
B BAHAN -
Paving block 8 cm abu-abu K-300 M.90.e M2 1.010 120,000.00 121,200.00
Pasir Beton (m3) M.9.c m3 0.080 339,234.40 27,138.75
JUMLAH HARGA BAHAN 148,338.75
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 148,338.75 14,833.88
JUMLAH HARGA ALAT 14,833.88
D Jumlah (A+B+C) 277,414.11
E Overhead & Profit 15% 0.150 41,612.12
F Harga Satuan Pekerjaan (D+E) 319,026.00
-
dihit A.4.4.3.65.b Pemasangan 1 m2 paving block natural tebal 8 cm (K.300) alas dengan pasir urug -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.5000 93,597.00 46,798.50
Tukang Batu L.02 OH 0.5000 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.0500 128,226.00 6,411.30
Mandor L.04 OH 0.0013 149,758.00 194.69
JUMLAH TENAGA KERJA 114,241.49
B BAHAN -
Paving block 8 cm abu-abu K-300 M.90.e M2 1.010 120,000.00 121,200.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.080 266,640.00 21,331.20
Pasir Beton (m3) M.9.c m3 0.005 339,234.40 1,696.17
JUMLAH HARGA BAHAN 144,227.37
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 144,227.37 14,422.74
JUMLAH HARGA ALAT 14,422.74
D Jumlah (A+B+C) 272,891.59
E Overhead & Profit 15% 0.150 40,933.74
F Harga Satuan Pekerjaan (D+E) 313,825.00
-
dihit A.4.4.3.66.a Pemasangan 1 m2 paving block berwarna tebal 6 cm (K.250) alas dengan pasir urug -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.2500 93,597.00 23,399.25
Tukang Batu L.02 OH 0.5000 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.0500 128,226.00 6,411.30
Mandor L.04 OH 0.0013 149,758.00 194.69
JUMLAH TENAGA KERJA 90,842.24
B BAHAN -
Paving block 6 cm warna K-250 M.90.b M2 1.010 129,888.00 131,186.88
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.050 266,640.00 13,332.00
Pasir Beton (m3) M.9.c m3 0.005 339,234.40 1,696.17
JUMLAH HARGA BAHAN 146,215.05
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 146,215.05 14,621.51
JUMLAH HARGA ALAT 14,621.51
D Jumlah (A+B+C) 251,678.79
E Overhead & Profit 15% 0.150 37,751.82
F Harga Satuan Pekerjaan (D+E) 289,430.00
-
dihit A.4.4.3.67.a Pemasangan 1 m2 paving block berwarna tebal 8 cm (K.300) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.5000 93,597.00 46,798.50
Tukang Batu L.02 OH 0.5000 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.0500 128,226.00 6,411.30
Mandor L.04 OH 0.0013 149,758.00 194.69
JUMLAH TENAGA KERJA 114,241.49
B BAHAN -
Paving block 8 cm warna K-300 M.90.f M2 1.010 135,000.00 136,350.00
Pasir Beton (m3) M.9.c m3 0.080 339,234.40 27,138.75
JUMLAH HARGA BAHAN 163,488.75
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 163,488.75 16,348.88
JUMLAH HARGA ALAT 16,348.88
D Jumlah (A+B+C) 294,079.11
E Overhead & Profit 15% 0.150 44,111.87
F Harga Satuan Pekerjaan (D+E) 338,190.00
-
dihit A.4.4.3.67.b Pemasangan 1 m2 paving block berwarna tebal 8 cm (K.300) alas dengan pasir urug -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.5000 93,597.00 46,798.50
Tukang Batu L.02 OH 0.5000 121,674.00 60,837.00
Kepala Tukang L.03 OH 0.0500 128,226.00 6,411.30
Mandor L.04 OH 0.0013 149,758.00 194.69
JUMLAH TENAGA KERJA 114,241.49
B BAHAN -
Paving block 8 cm warna K-300 M.90.f M2 1.010 135,000.00 136,350.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.080 266,640.00 21,331.20
Pasir Beton (m3) M.9.c m3 0.005 339,234.40 1,696.17
JUMLAH HARGA BAHAN 159,377.37
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 159,377.37 15,937.74
JUMLAH HARGA ALAT 15,937.74
D Jumlah (A+B+C) 289,556.59
E Overhead & Profit 15% 0.150 43,433.49
F Harga Satuan Pekerjaan (D+E) 332,990.00
-
dihit A.4.4.3.68.a Pemasangan 1 m2 Penutup Dinding Dalam Ruangan dg ACP Rangka Allumunium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.800 93,597.00 74,877.60
Tukang Besi L.02 OH 0.800 121,674.00 97,339.20
Kepala Tukang L.03 OH 0.160 128,226.00 20,516.16
Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 198,723.28
B BAHAN -
ACP Coating PE (Indoor) M.217.a Lbr 0.1680 712,800.00 119,725.88
Hollow galvanis 20x40x0,4 mm M.437.a m' 2.0000 19,008.00 38,016.00
Hollow galvanis 40x40x0,4 mm M.437.b m' 2.0000 29,304.00 58,608.00
ACP Bracing Buah 1.0000 45,000.00 45,000.00
Sealant kaca (tanggung) M.562.b tube 1.0000 25,608.00 25,608.00
Paku Sekrup M.56.j Buah 10.0000 5,208.75 52,087.50
ACP Bracket Buah 8.0000 23,500.00 188,000.00
JUMLAH HARGA BAHAN 527,045.38
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 725,768.66
E Overhead & Profit 15% 0.150 108,865.30
F Harga Satuan Pekerjaan (D+E) 834,633.00
-
dihit A.4.4.3.68.b Pemasangan 1 m2 Penutup Dinding Luar Ruangan dg ACP Rangka Allumunium -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.800 93,597.00 74,877.60
Tukang Besi L.02 OH 0.800 121,674.00 97,339.20
Kepala Tukang L.03 OH 0.160 128,226.00 20,516.16
Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 198,723.28
B BAHAN -
ACP Coating PVDF (Outdoor) M.217.b Lbr 0.1680 897,600.00 150,765.92
Hollow galvanis 20x40x0,4 mm M.437.a m' 2.0000 19,008.00 38,016.00
Hollow galvanis 40x40x0,4 mm M.437.b m' 2.0000 29,304.00 58,608.00
ACP Bracing Buah 1.0000 45,000.00 45,000.00
Sealant kaca (tanggung) M.562.b tube 1.0000 45,000.00 45,000.00
Paku Sekrup M.56.j Buah 10.0000 5,208.75 52,087.50
ACP Bracket Buah 8.0000 23,500.00 188,000.00
JUMLAH HARGA BAHAN 577,477.42
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 776,200.70
E Overhead & Profit 15% 0.150 116,430.11
F Harga Satuan Pekerjaan (D+E) 892,630.00
-
dihit A.4.4.3.69.a Pemasangan 1m2 Ubin/Tegel Untuk Jalur Difabel 30 x 30 cm (Motif) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang Batu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 42,222.29
B BAHAN -
Ubin alur 30x30 cm difabel (tuna netra) M.197.b buah 11.870 22,273.75 264,389.44
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
Semen warna M.244 kg 1.500 18,666.67 28,000.00
JUMLAH HARGA BAHAN 321,404.98
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 363,627.28
E Overhead & Profit 15% 0.150 54,544.09
F Harga Satuan Pekerjaan (D+E) 418,171.00
-
dihit A.4.4.3.69.b Pemasangan 1m2 Ubin/Tegel Untuk Jalur Difabel 20 x 20 cm (Motif) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.2700 93,597.00 25,271.19
Tukang Batu L.02 OH 0.1350 121,674.00 16,425.99
Kepala Tukang L.03 OH 0.0140 128,226.00 1,795.16
Mandor L.04 OH 0.0140 149,758.00 2,096.61
JUMLAH TENAGA KERJA 45,588.96
B BAHAN -
Ubin alur 20x20 cm difabel (tuna netra) M.197.a buah 26.5000 23,232.00 615,648.00
Portland cement M.245.a kg 10.4000 1,375.00 14,300.00
Pasir Beton (m3) M.9.c m3 0.0450 339,234.40 15,265.55
Semen warna M.244 kg 3.349 18,666.67 62,510.53
JUMLAH HARGA BAHAN 707,724.08
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 753,313.03
E Overhead & Profit 15% 0.150 112,996.96
F Harga Satuan Pekerjaan (D+E) 866,309.00
-
dihit A.4.4.3.70. Perbaikan 1 m2 paving block -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Mandor L.04 OH 0.020 149,758.00 2,995.16
JUMLAH TENAGA KERJA 40,433.96
B BAHAN -
Pasir Beton (m3) M.9.c m3 0.050 339,234.40 16,961.72
JUMLAH HARGA BAHAN 16,961.72
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 16,961.72 1,696.17
JUMLAH HARGA ALAT 1,696.17
D Jumlah (A+B+C) 59,091.85
E Overhead & Profit 15% 0.150 8,863.78
F Harga Satuan Pekerjaan (D+E) 67,955.00
-
dihit A.4.4.3.71. Pemasangan 1 m Kansteen Tipe S / tali Air, -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 42,222.29
B BAHAN -
Kanstin tali Air Tipe S-40x30x15x8 M.91.e buah 2.500 32,208.00 80,520.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.040 266,640.00 10,665.60
Portland cement M.245.a kg 0.100 1,375.00 137.50
JUMLAH HARGA BAHAN 91,323.10
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 91,323.10 9,132.31
JUMLAH HARGA ALAT 9,132.31
D Jumlah (A+B+C) 142,677.70
E Overhead & Profit 15% 0.150 21,401.66
F Harga Satuan Pekerjaan (D+E) 164,079.00
-
dihit A.4.4.3.72. Pemasangan 1 m Kansteen Taman -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 42,222.29
B BAHAN -
Kanstin Taman 40x20x10 M.91.b buah 2.500 40,128.00 100,320.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.040 266,640.00 10,665.60
Portland cement M.245.a kg 0.100 1,375.00 137.50
JUMLAH HARGA BAHAN 111,123.10
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 111,123.10 11,112.31
JUMLAH HARGA ALAT 11,112.31
D Jumlah (A+B+C) 164,457.70
E Overhead & Profit 15% 0.150 24,668.66
F Harga Satuan Pekerjaan (D+E) 189,126.00
-
dihit A.4.4.3.73. Pemasangan 1 m Kansteen Trotoar 1 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 42,222.29
B BAHAN -
Kanstin Trotoar 40x25x15x13 M.91.c buah 2.500 29,568.00 73,920.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.040 266,640.00 10,665.60
Portland cement M.245.a kg 0.100 1,375.00 137.50
JUMLAH HARGA BAHAN 84,723.10
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 84,723.10 8,472.31
JUMLAH HARGA ALAT 8,472.31
D Jumlah (A+B+C) 135,417.70
E Overhead & Profit 15% 0.150 20,312.66
F Harga Satuan Pekerjaan (D+E) 155,730.00
-
dihit A.4.4.3.74. Pemasangan 1 m Kansteen Trotoar 2 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 42,222.29
B BAHAN -
Kanstin Trotoar 40x28x15x13 M.91.d buah 2.500 31,152.00 77,880.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.040 266,640.00 10,665.60
Portland cement M.245.a kg 0.100 1,375.00 137.50
JUMLAH HARGA BAHAN 88,683.10
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 88,683.10 8,868.31
JUMLAH HARGA ALAT 8,868.31
D Jumlah (A+B+C) 139,773.70
E Overhead & Profit 15% 0.150 20,966.06
F Harga Satuan Pekerjaan (D+E) 160,739.00
-
dihit A.4.4.3.75. Pemasangan 1 m Kansteen 60x25x22x18 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 42,222.29
B BAHAN -
Kanstin 60x25x22x18 M.91.f buah 1.667 57,552.00 95,920.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.040 266,640.00 10,665.60
Portland cement M.245.a kg 0.100 1,375.00 137.50
JUMLAH HARGA BAHAN 106,723.10
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 106,723.10 10,672.31
JUMLAH HARGA ALAT 10,672.31
D Jumlah (A+B+C) 159,617.70
E Overhead & Profit 15% 0.150 23,942.66
F Harga Satuan Pekerjaan (D+E) 183,560.00
-
dihit A.4.4.3.76. Pemasangan 1 m Kansteen 60x15x22 -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.250 93,597.00 23,399.25
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala Tukang L.03 OH 0.013 128,226.00 1,666.94
Mandor L.04 OH 0.013 149,758.00 1,946.85
JUMLAH TENAGA KERJA 42,222.29
B BAHAN -
Kanstin 60x15x22 M.91.g buah 1.667 41,184.00 68,640.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.040 266,640.00 10,665.60
Portland cement M.245.a kg 0.100 1,375.00 137.50
JUMLAH HARGA BAHAN 79,443.10
C PERALATAN -
Peralatan Kerja Paving Blok % 10.000 79,443.10 7,944.31
JUMLAH HARGA ALAT 7,944.31
D Jumlah (A+B+C) 129,609.70
E Overhead & Profit 15% 0.150 19,441.46
F Harga Satuan Pekerjaan (D+E) 149,051.00
-
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) -
-
dihit A.4.5.1.4.1 Pemasangan 1 m2 Langit-Langit Akustik Uk. (60 x 60) cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang kayu L.02 OH 0.100 121,674.00 12,167.40
Kepala tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 23,558.15
B BAHAN -
Akustik 60 x 60 cm tebal 15 mm M.150.d Lembar 2.778 47,520.00 132,000.00
Paku tripleks M.56.a kg 0.050 19,166.67 958.33
JUMLAH HARGA BAHAN 132,958.33
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 156,516.48
E Overhead & Profit 15% 0.150 23,477.47
F Harga Satuan Pekerjaan (D+E) 179,993.00
-
dihit A.4.5.1.4.2 Pemasangan 1 m2 Langit - Langit Calsiboard, Uk. (120 x 240) cm Tebal 3,5 mm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.030 93,597.00 2,807.91
Tukang kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 12,821.70
B BAHAN -
Calsiboard 122 x 244 cm tebal 3,5 mm M.163 Lembar 0.364 44,880.00 16,336.32
Paku tripleks M.56.a kg 0.110 19,166.67 2,108.33
JUMLAH HARGA BAHAN 18,444.65
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 31,266.36
E Overhead & Profit 15% 0.150 4,689.95
F Harga Satuan Pekerjaan (D+E) 35,956.00
-
dihit A.4.5.1.4.3 Pemasangan 1 m2 Langit - Langit GRC board, Uk. (120 x 240) cm Tebal 4 mm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.030 93,597.00 2,807.91
Tukang kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 12,821.70
B BAHAN -
Papan Semen 122 x 244 cm tebal 4 mm M.158 Lembar 0.364 66,000.00 24,024.00
Paku tripleks M.56.a kg 0.110 19,166.67 2,108.33
JUMLAH HARGA BAHAN 26,132.33
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 38,954.04
E Overhead & Profit 15% 0.150 5,843.11
F Harga Satuan Pekerjaan (D+E) 44,797.00
-
dihit A.4.5.1.4.4 Pemasangan 1 m2 Langit - Langit Plat Lembaran Aluminium (spandril) -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.030 93,597.00 2,807.91
Tukang Khusus Alumunium L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 12,821.70
B BAHAN -
Plat Alumunium Spandrill lebar 12 cm M.159.c m2 8.333 29,040.00 242,000.00
Paku sekrup M.56.j Buah 40.000 5,208.75 208,350.00
JUMLAH HARGA BAHAN 450,350.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 463,171.70
E Overhead & Profit 15% 0.150 69,475.76
F Harga Satuan Pekerjaan (D+E) 532,647.00
-
dihit A.4.5.1.4.5 Pemasangan 1 m2 Langit - Langit PVC setara Shunda -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.030 93,597.00 2,807.91
Tukang kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 12,821.70
B BAHAN -
Plat PVC 400 x 20 cm tebal 6 mm M.160.a Lbr 1.250 72,864.00 91,080.00
Paku sekrup M.56.j Buah 40.000 5,208.75 208,350.00
JUMLAH HARGA BAHAN 299,430.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 312,251.70
E Overhead & Profit 15% 0.150 46,837.76
F Harga Satuan Pekerjaan (D+E) 359,089.00
-
dihit A.4.5.1.4.6 Pemasangan 1 m2 Langit - Langit Plat Metal Berpori -Pori -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.030 93,597.00 2,807.91
Tukang Khusus Alumunium L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 12,821.70
B BAHAN -
Plat Alumunium Berlubang 60 x 60 cm M.159.a m2 1.000 119,328.00 119,328.00
Paku sekrup M.56.j Buah 20.000 5,208.75 104,175.00
JUMLAH HARGA BAHAN 223,503.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 236,324.70
E Overhead & Profit 15% 0.150 35,448.71
F Harga Satuan Pekerjaan (D+E) 271,773.00
-
dihit A.4.5.1.10.2 Pemasangan 1 m2 Rangka Plafon Holo Galvanis Uk. 40 x 40 / 20 x 40 Tebal ± 0,4 mm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Khusus Alumunium L.02 OH 0.150 121,674.00 18,251.10
Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 30,282.98
B BAHAN -
Hollow galvanis 40x40x0,4 mm M.437.b Btg 0.625 29,304.00 18,315.00
Hollow galvanis 20x40x0,4 mm M.437.a Btg 0.625 19,008.00 11,880.00
Kawat penggantung kg 0.300 20,000.00 6,000.00
Paku sekrup M.56.j Buah 20.000 5,208.75 104,175.00
JUMLAH HARGA BAHAN 140,370.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 170,652.98
E Overhead & Profit 15% 0.150 25,597.95
F Harga Satuan Pekerjaan (D+E) 196,250.00
-
dihit A.4.5.1.10.4 Pemasangan 1 m2 Rangka Plafon Dengan Bahan Metal Furing -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Khusus Alumunium L.02 OH 0.150 121,674.00 18,251.10
Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 30,282.98
B BAHAN -
Metal Furing 20 x 20 x 0,40 mm M.165.a Btg 0.625 86,592.00 54,120.00
Metal Furing 40 x 40 x 0,40 mm M.165.b Btg 0.625 40,656.00 25,410.00
Paku sekrup M.56.j Buah 20.000 5,208.75 104,175.00
JUMLAH HARGA BAHAN 183,705.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 213,987.98
E Overhead & Profit 15% 0.150 32,098.20
F Harga Satuan Pekerjaan (D+E) 246,086.00
-
dihit A.4.5.1.10.5 Pemasangan 1 m2 Rangka Plafon Dengan Bahan Metal Stud -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Khusus Alumunium L.02 OH 0.150 121,674.00 18,251.10
Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 30,282.98
B BAHAN -
Metal Stud 34x50x0,4 mm M.165.d Btg 1.667 25,872.00 43,120.00
Paku sekrup M.56.j Buah 20.000 5,208.75 104,175.00
JUMLAH HARGA BAHAN 147,295.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 177,577.98
E Overhead & Profit 15% 0.150 26,636.70
F Harga Satuan Pekerjaan (D+E) 204,214.00
-
dihit A.4.5.1.10.6 Pemasangan 1 m2 Rangka Plafon Dengan Bahan profil " T " Alumunium -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Khusus Alumunium L.02 OH 0.150 121,674.00 18,251.10
Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 30,282.98
B BAHAN -
Profil Alumunium "T" natural / Silver M.162.d Btg 4.000 31,680.00 126,720.00
Paku Ramset M.56.l Buah 20.000 264.00 5,280.00
Kawat Galvanis Ø 4 mm M.52.b Kg 0.150 36,960.00 5,544.00
JUMLAH HARGA BAHAN 137,544.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 167,826.98
E Overhead & Profit 15% 0.150 25,174.05
F Harga Satuan Pekerjaan (D+E) 193,001.00
-
dihit A.4.5.1.11. Pemasangan 1 m2 List PVC -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Kayu L.02 OH 0.050 121,674.00 6,083.70
Kepala Tukang L.03 OH 0.005 128,226.00 641.13
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 16,833.32
B BAHAN -
List PVC (setara Shunda Plafon,LS 301-1 Min.Silver Metalic) M' 1.050 15,000.00 15,750.00
Paku sekrup M.56.j buah 6.000 5,208.75 31,252.50
JUMLAH HARGA BAHAN 47,002.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 63,835.82
E Overhead & Profit 15% 0.150 9,575.37
F Harga Satuan Pekerjaan (D+E) 73,411.00
-
dihit A.4.5.1.11.1 Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar ± 8 cm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Tukang kayu L.02 OH 0.050 121,674.00 6,083.70
Kepala tukang L.03 OH 0.005 128,226.00 641.13
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 11,853.95
B BAHAN -
List Profil Gipsum lebar 8 cm M.157.a m 1.050 6,864.00 7,207.20
Lem Gipsum M.575 Kg 0.010 5,438.40 54.38
JUMLAH HARGA BAHAN 7,261.58
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 19,115.54
E Overhead & Profit 15% 0.150 2,867.33
F Harga Satuan Pekerjaan (D+E) 21,982.00
-
dihit A.4.5.1.11.2 Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar ± 10 cm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Tukang kayu L.02 OH 0.050 121,674.00 6,083.70
Kepala tukang L.03 OH 0.005 128,226.00 641.13
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 11,853.95
B BAHAN -
List Profil Gipsum lebar 10 cm M.157.b m 1.050 7,920.00 8,316.00
Lem Gipsum M.575 Kg 0.010 5,438.40 54.38
JUMLAH HARGA BAHAN 8,370.38
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 20,224.34
E Overhead & Profit 15% 0.150 3,033.65
F Harga Satuan Pekerjaan (D+E) 23,257.00
-
dihit A.4.5.1.11.3 Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar ± 15 cm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Tukang kayu L.02 OH 0.050 121,674.00 6,083.70
Kepala tukang L.03 OH 0.005 128,226.00 641.13
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 11,853.95
B BAHAN -
List Profil Gipsum lebar 15 cm M.157.d m 1.050 9,900.00 10,395.00
Lem Gipsum M.575 Kg 0.010 5,438.40 54.38
JUMLAH HARGA BAHAN 10,449.38
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 22,303.34
E Overhead & Profit 15% 0.150 3,345.50
F Harga Satuan Pekerjaan (D+E) 25,648.00
-
dihit A.4.5.1.12. Pemasangan 1 m2 rangka langit-langit besi hollow 40.40.1,1 mm (A.4.2.1.21) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.350 93,597.00 32,758.95
Tukang Besi L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.018 149,758.00 2,695.64
JUMLAH TENAGA KERJA 82,528.40
B BAHAN -
Rangka metal hollow 40.40.1,2 mm M.440 m' 4.000 26,400.00 105,600.00
Assesoris (perkuatan, las dll) % 100.000 26,400.00 26,400.00
JUMLAH HARGA BAHAN 132,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 214,528.40
E Overhead & Profit 15% 0.150 32,179.26
F Harga Satuan Pekerjaan (D+E) 246,707.00
-
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP -
dihit A.4.5.2.41.a Pemasangan 1 m2 Atap Galvalum -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.120 93,597.00 11,231.64
Tukang Kayu L.02 OH 0.060 121,674.00 7,300.44
Kepala Tukang L.03 OH 0.006 128,226.00 769.36
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 20,199.98
B BAHAN -
Galvalum gelombang, t= 0.3 mm, L= 80 cm M.144.b Lembar 0.700 47,520.00 33,264.00
Paku hak panj 15cm M.56.n Kg 0.020 12,672.00 253.44
JUMLAH HARGA BAHAN 33,517.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 53,717.42
E Overhead & Profit 15% 0.150 8,057.61
F Harga Satuan Pekerjaan (D+E) 61,775.00
-
dihit A.4.5.2.44. Pemasangan 1 m2 genteng Press Jatiwangi Kecil Natural -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 25,388.97
B BAHAN -
Genteng Press Jatiwangi Kecil Natural M.130.a buah 25.000 2,323.20 58,080.00
JUMLAH HARGA BAHAN 58,080.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 83,468.97
E Overhead & Profit 15% 0.150 12,520.35
F Harga Satuan Pekerjaan (D+E) 95,989.00
-
dihit A.4.5.2.45. Pemasangan 1 m2 genteng Press Jatiwangi Besar Natural -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 25,388.97
B BAHAN -
Genteng pres jatiwangi besar natural M.130.b buah 18.000 3,213.26 57,838.63
JUMLAH HARGA BAHAN 57,838.63
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 83,227.60
E Overhead & Profit 15% 0.150 12,484.14
F Harga Satuan Pekerjaan (D+E) 95,711.00
-
dihit A.4.5.2.46. Pemasangan 1 m2 genteng Press Jatiwangi Besar Glazuur -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 25,388.97
B BAHAN -
Genteng pres jatiwangi besar Glazuur M.130.c buah 18.000 4,395.60 79,120.80
JUMLAH HARGA BAHAN 79,120.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 104,509.77
E Overhead & Profit 15% 0.150 15,676.47
F Harga Satuan Pekerjaan (D+E) 120,186.00
-
dihit A.4.5.2.47. Pemasangan 1 m2 Bubung genteng Press Jatiwangi Kecil Natural -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 64,637.64
B BAHAN -
Bubung Genteng press jatiwangi kecil natural M.134.a buah 5.000 8,976.00 44,880.00
Portland cement M.245.a kg 8.000 1,375.00 11,000.00
Pasir Beton (m3) M.9.c m3 0.032 339,234.40 10,855.50
JUMLAH HARGA BAHAN 66,735.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 131,373.14
E Overhead & Profit 15% 0.150 19,705.97
F Harga Satuan Pekerjaan (D+E) 151,079.00
-
dihit A.4.5.2.48. Pemasangan 1 m2 Bubung genteng Press Jatiwangi Besar Natural -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 64,637.64
B BAHAN -
Bubung Genteng press jatiwangi besar natural M.134.b buah 4.000 7,392.00 29,568.00
Portland cement M.245.a kg 8.000 1,375.00 11,000.00
Pasir Beton (m3) M.9.c m3 0.032 339,234.40 10,855.50
JUMLAH HARGA BAHAN 51,423.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 116,061.14
E Overhead & Profit 15% 0.150 17,409.17
F Harga Satuan Pekerjaan (D+E) 133,470.00
-
dihit A.4.5.2.49. Pemasangan 1 m2 Bubung genteng Press Jatiwangi Besar Glazuur -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang Kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 64,637.64
B BAHAN -
Bubung Genteng press jatiwangi besar Glazuur M.134.c buah 4.000 11,880.00 47,520.00
Portland cement M.245.a kg 8.000 1,375.00 11,000.00
Pasir Beton (m3) M.9.c m3 0.032 339,234.40 10,855.50
JUMLAH HARGA BAHAN 69,375.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 134,013.14
E Overhead & Profit 15% 0.150 20,101.97
F Harga Satuan Pekerjaan (D+E) 154,115.00
-
dihit A.4.5.2.50. Pemasangan 1 m2 Atap Fibre glass (jabes) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala Tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Fibre glass (jabes) 180x105 cm M.139.a buah 0.664 63,360.00 42,086.96
Paku pancing 6x23 M.56.m buah 9.000 12,672.00 114,048.00
-
JUMLAH HARGA BAHAN 156,134.96
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 179,701.60
E Overhead & Profit 15% 0.150 26,955.24
F Harga Satuan Pekerjaan (D+E) 206,656.00
-
dihit A.4.5.2.51. Pemasangan 1 m2 Atap Genteng Keramik -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang kayu L.02 OH 0.075 121,674.00 9,125.55
Kepala tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 25,388.97
B BAHAN -
Genteng Keramik M-Class M.131 Buah 14.000 11,616.00 162,624.00
JUMLAH HARGA BAHAN 162,624.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 188,012.97
E Overhead & Profit 15% 0.150 28,201.95
F Harga Satuan Pekerjaan (D+E) 216,214.00
-
dihit A.4.5.2.51.a Pemasangan 1 m2 Atap Genteng Keramik Glazur Morando -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 25,388.97
B BAHAN -
Genteng Keramik Glazur Morando M.129.c buah 20.000 3,300.00 66,000.00
JUMLAH HARGA BAHAN 66,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 91,388.97
E Overhead & Profit 15% 0.150 13,708.35
F Harga Satuan Pekerjaan (D+E) 105,097.00
-
dihit A.4.5.2.51.b Pemasangan 1 m2 Atap Genteng Keramik Glazur Kanmuri -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.075 121,674.00 9,125.55
Kepala Tukang L.03 OH 0.008 128,226.00 1,025.81
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 25,388.97
B BAHAN -
Genteng Keramik Glazur Kanmuri M.129.d buah 14.000 12,672.00 177,408.00
JUMLAH HARGA BAHAN 177,408.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 202,796.97
E Overhead & Profit 15% 0.150 30,419.55
F Harga Satuan Pekerjaan (D+E) 233,216.00
-
dihit A.4.5.2.52. Pemasangan 1 m’ Bubung Genteng Keramik -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.400 93,597.00 37,438.80
Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 64,637.64
B BAHAN -
Genteng Bubungan Keramik Warna Standar M.133 Buah 4.000 19,536.00 78,144.00
Portland cement M.245.a Kg 8.000 1,375.00 11,000.00
Pasir Beton (m3) M.9.c m3 0.032 339,234.40 10,855.50
JUMLAH HARGA BAHAN 99,999.50
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 164,637.14
E Overhead & Profit 15% 0.150 24,695.57
F Harga Satuan Pekerjaan (D+E) 189,332.00
-
dihit A.4.5.2.31.a Pemasangan 1 m2 genteng aspal (onduline, 200Cm x 95Cm x 3mm) -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang kayu L.02 OH 0.300 121,674.00 36,502.20
Kepala tukang L.03 OH 0.003 128,226.00 384.68
Mandor L.04 OH 0.010 149,758.00 1,497.58
JUMLAH TENAGA KERJA 57,103.86
B BAHAN -
Genteng aspal (Onduline) M.132.b Buah 0.611 179,520.00 109,706.67
Plywood 6 mm (120x240) M.32.b Lbr 0.500 80,256.00 40,128.00
Paku 2,5 cm M.56.b Kg 0.030 22,704.00 681.12
Plastic aerator M.570 Buah 0.350 16,790.40 5,876.64
JUMLAH HARGA BAHAN 156,392.43
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 213,496.28
E Overhead & Profit 15% 0.150 32,024.44
F Harga Satuan Pekerjaan (D+E) 245,520.00
-
dihit A.4.5.2.54. Pemasangan 1 m2 Atap U PVC Gelombang -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -

U PVC Gelombang 300 x 80 cm tebal 1,4 mm M.583 Lembar 0.437 63,360.00 27,720.00

Paku pancing 6x23 M.56.m Buah 9.000 12,672.00 114,048.00


JUMLAH HARGA BAHAN 141,768.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 165,334.65
E Overhead & Profit 15% 0.150 24,800.20
F Harga Satuan Pekerjaan (D+E) 190,134.00
-
dihit A.4.5.2.55. Pemasangan 1 m2 Atap Transparan Gelombang -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Atap transparan gelombang 240 x 86 cm M.142.b lembar 0.533 89,760.00 47,837.21
Paku pancing 6x23 M.56.m Buah 9.000 12,672.00 114,048.00
JUMLAH HARGA BAHAN 161,885.21
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 185,451.86
E Overhead & Profit 15% 0.150 27,817.78
F Harga Satuan Pekerjaan (D+E) 213,269.00
-
dihit A.4.5.2.55.a Pemasangan 1 m2 atap Carport / penutup atap polycarbonate , t = 4 mm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Pekerjaan pipa besi hollow (untuk railling tangga,
AD.1.15 m¹ 1.000 308,042.80 308,042.80
rangka atap, pagar)
Polycarbonate , 2,1 m x 11,8 m x 4 mm M.145.a Lembar 0.042 1,900,800.00 80,542.37
Profil “H” warna putih untuk sambungan, P= 6m M.146.b buah 0.167 68,640.00 11,440.00
Profil “U” warna hitam untuk sisi terluar, P= 6m M.147.a buah 0.500 35,904.00 17,952.00
Sekrup kait / roofing M.56.p buah 12.000 721.60 8,659.20
JUMLAH HARGA BAHAN 426,636.38
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 450,203.03
E Overhead & Profit 15% 0.150 67,530.45
F Harga Satuan Pekerjaan (D+E) 517,733.00
-
dihit A.4.5.2.55.b Pemasangan 1 m2 atap Carport / penutup atap polycarbonate , t = 5 mm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Pekerjaan pipa besi hollow (untuk railling tangga,
Ls 1.000 308,042.80 308,042.80
rangka atap, pagar)
Polycarbonate , 2,1 m x 11,8 m x 5 mm M.145.a Lembar 0.042 1,900,800.00 80,542.37
Profil “H” warna putih untuk sambungan, P= 6m M.146.b buah 0.167 68,640.00 11,440.00
Profil “U” warna hitam untuk sisi terluar, P= 6m M.147.a buah 0.500 35,904.00 17,952.00
Sekrup kait / roofing M.56.p buah 12.000 721.60 8,659.20
JUMLAH HARGA BAHAN 426,636.38
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 450,203.03
E Overhead & Profit 15% 0.150 67,530.45
F Harga Satuan Pekerjaan (D+E) 517,733.00
-
dihit A.4.5.2.55.c Pemasangan 1 m2 atap Carport / penutup atap polycarbonate , t = 6 mm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Pekerjaan pipa besi hollow (untuk railling tangga,
AD.3.3 m¹ 1.000 308,042.80 308,042.80
rangka atap, pagar)
Polycarbonate , 2,1 m x 11,8 m x 6 mm M.145.b Lembar 0.042 2,112,000.00 89,491.53
Profil “H” warna putih untuk sambungan, P= 6m M.146.b buah 0.167 68,640.00 11,440.00
Profil “U” warna hitam untuk sisi terluar, P= 6m M.147.a buah 0.500 35,904.00 17,952.00
Sekrup kait / roofing M.56.p buah 12.000 721.60 8,659.20
JUMLAH HARGA BAHAN 435,585.53
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 459,152.18
E Overhead & Profit 15% 0.150 68,872.83
F Harga Satuan Pekerjaan (D+E) 528,025.00
-
dihit A.4.5.2.55.d Pemasangan 1 m2 atap Carport / penutup atap polycarbonate , t = 10 mm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Pekerjaan pipa besi hollow (untuk railling tangga,
AD.3.24 m2 1.000 308,042.80 308,042.80
rangka atap, pagar)
Polycarbonate , 2,1 m x 11,8 m x 10 mm M.145.c Lembar 0.042 3,484,800.00 147,661.02
Profil “H” warna putih untuk sambungan, P= 6m M.146.b buah 0.167 68,640.00 11,440.00
Profil “U” warna hitam untuk sisi terluar, P= 6m M.147.a buah 0.500 35,904.00 17,952.00
Sekrup kait / roofing M.56.p buah 12.000 721.60 8,659.20
JUMLAH HARGA BAHAN 493,755.02
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 517,321.67
E Overhead & Profit 15% 0.150 77,598.25
F Harga Satuan Pekerjaan (D+E) 594,919.00
-
dihit A.4.5.2.55.b Pemasangan 1 m2 atap Carport / penutup atap Galvalum gelombang, t= 0.3 mm, L= 80 cm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Pekerjaan 1 m2 pipa besi hollow (untuk railling dihit.AD.3 m2 1.000 308,042.80 308,042.80
tangga, rangka atap, pagar) .24
Galvalum gelombang, t= 0.3 mm, L= 80 cm M.144.b m' 1.250 47,520.00 59,400.00
Sekrup kait / roofing M.56.p buah 12.000 721.60 8,659.20
JUMLAH HARGA BAHAN 376,102.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 399,668.65
E Overhead & Profit 15% 0.150 59,950.30
F Harga Satuan Pekerjaan (D+E) 459,618.00
-
dihit A.4.5.2.57 Pemasangan 1 m2 Atap Genteng Asbes ( Asbesd Motif Genteng ) -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.140 93,597.00 13,103.58
Tukang kayu L.02 OH 0.070 121,674.00 8,517.18
Kepala tukang L.03 OH 0.007 128,226.00 897.58
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
Asbes gelombang kecil 4mm (180x105) M.138.j m2 1.100 60,456.00 66,501.60
Paku pancing 6x23 M.56.m Buah 9.000 12,672.00 114,048.00
Buah JUMLAH HARGA BAHAN 180,549.60
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 204,116.25
E Overhead & Profit 15% 0.150 30,617.44
F Harga Satuan Pekerjaan (D+E) 234,733.00
-
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU -

dihit A.4.6.1.5.a Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I (Jati)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang kayu L.02 OH 3.000 121,674.00 365,022.00
Kepala Tukang L.03 OH 0.300 128,226.00 38,467.80
Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 504,574.70
B BAHAN
Kayu jati (papan) M.15.b m3 0.040 22,000,000.00 880,000.00
Lem Kayu M.572 Kg 0.500 29,832.00 14,916.00
JUMLAH HARGA BAHAN 894,916.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,399,490.70
E Overhead & Profit 15% 0.150 209,923.60
F Harga Satuan Pekerjaan (D+E) 1,609,414.00

dihit A.4.6.1.16.a Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang kayu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 23,558.15
B BAHAN -
Kayu bengkirai (kaso 5x7) M.25.a m3 0.0140 10,840,408.14 151,765.71
Kayu bengkirai (reng 3x4) M.25.d m3 0.0036 9,337,261.86 33,614.14
Paku 5 cm M.56.d kg 0.2500 21,648.00 5,412.00
JUMLAH HARGA BAHAN 190,791.86
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 214,350.01
E Overhead & Profit 15% 0.150 32,152.50
F Harga Satuan Pekerjaan (D+E) 246,502.00
-
dihit A.4.6.1.17.a Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang kayu L.02 OH 0.100 121,674.00 12,167.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 23,558.15
B BAHAN -
Kayu bengkirai (kaso 5x7) M.25.a m3 0.0140 10,840,408.14 151,765.71
Kayu bengkirai (reng 3x4) M.25.d m3 0.0057 9,337,261.86 53,222.39
Paku 5 cm M.56.d kg 0.2500 21,648.00 5,412.00
JUMLAH HARGA BAHAN 210,400.11
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 233,958.26
E Overhead & Profit 15% 0.150 35,093.74
F Harga Satuan Pekerjaan (D+E) 269,051.00
-
dihit. A.4.6.1.21.a Pemasangan 1 m’ lisplank ukuran (2 x 20) cm, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 37,007.81
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.0048 13,230,000.00 63,504.00
Paku 7 cm M.56.e kg 0.100 23,232.00 2,323.20
JUMLAH HARGA BAHAN 65,827.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 102,835.01
E Overhead & Profit 15% 0.150 15,425.25
F Harga Satuan Pekerjaan (D+E) 118,260.00
-
dihit. A.4.6.1.22.a Pemasangan 1 m’ lisplank ukuran (2 x 30) cm, kayu kelas II (Bengkirai) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 37,007.81
B BAHAN -
Kayu bengkirai (papan) M.17.b m3 0.0072 13,230,000.00 95,256.00
Paku 7 cm M.56.e kg 0.050 23,232.00 1,161.60
JUMLAH HARGA BAHAN 96,417.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 133,425.41
E Overhead & Profit 15% 0.150 20,013.81
F Harga Satuan Pekerjaan (D+E) 153,439.00
-
dihit A.4.6.1.22.b Pemasangan 1 m Lisplank Profil Beton Pracetak L 20 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.300 93,597.00 28,079.10
2 Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
3 Kepala tukang L.03 OH 0.010 128,226.00 1,282.26
4 Mandor L.04 OH 0.015 149,758.00 2,246.37
-
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
1 Papan Semen 8 mm x 20 cm x 405 cm M.158.c cm 20.000 1,368.89 27,377.78
2 Portland cement M.245.a kg 0.652 1,375.00 896.30
3 Pasir Beton (m3) M.9.c m3 0.002 339,234.40 678.47
4 Paku 2,5 cm M.56.b kg 0.100 22,704.00 2,270.40
JUMLAH HARGA BAHAN 31,222.94
C ALAT ###
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 74,998.07
E Overhead & Profit 15% 0.150 11,249.71
F Harga Satuan Pekerjaan (D+E) 86,247.00
-
dihit A.4.6.1.22.c Pemasangan 1 m Lisplank Profil Beton Pracetak L 30 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.300 93,597.00 28,079.10
2 Tukang Batu L.02 OH 0.100 121,674.00 12,167.40
3 Kepala tukang L.03 OH 0.010 128,226.00 1,282.26
4 Mandor L.04 OH 0.015 149,758.00 2,246.37
-
JUMLAH TENAGA KERJA 43,775.13
B BAHAN -
1 Papan Semen 9 mm x 30 cm x 244 cm M.158.b cm 30.000 2,791.48 83,744.26
2 Portland cement M.245.a kg 0.978 1,375.00 1,344.44
3 Pasir Beton (m3) M.9.c m3 0.003 339,234.40 1,017.70
4 Paku 2,5 cm M.56.b kg 0.050 22,704.00 1,135.20
JUMLAH HARGA BAHAN 87,241.61
C ALAT ###
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 131,016.74
E Overhead & Profit 15% 0.150 19,652.51
F Harga Satuan Pekerjaan (D+E) 150,669.00
-
dihit A.4.6.1.22.d Pemasangan 1 m Lisplank Urat Kayu 20 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.1400 93,597.00 13,103.58
2 Tukang Kayu L.02 OH 0.0700 121,674.00 8,517.18
3 Kepala tukang L.03 OH 0.0070 128,226.00 897.58
4 Mandor L.04 OH 0.0070 149,758.00 1,048.31
-
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
1 Listplang GRC (20 cm x 244 cm x 9 mm ) M.154 buah 0.4167 45,936.00 19,141.53
2 Paku 2,5 cm M.56.b kg 0.1000 22,704.00 2,270.40
JUMLAH HARGA BAHAN 21,411.93
C ALAT ###
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 44,978.58
E Overhead & Profit 15% 0.150 6,746.79
F Harga Satuan Pekerjaan (D+E) 51,725.00
-
dihit A.4.6.1.22.e Pemasangan 1 m Lisplank Urat Kayu 30 cm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.140 93,597.00 13,103.58
2 Tukang Kayu L.02 OH 0.070 121,674.00 8,517.18
3 Kepala tukang L.03 OH 0.007 128,226.00 897.58
4 Mandor L.04 OH 0.007 149,758.00 1,048.31
-
JUMLAH TENAGA KERJA 23,566.65
B BAHAN -
1 Listplang tekstur kayu M.155 buah 0.417 88,704.00 36,962.96
2 Paku 2,5 cm M.56.b kg 0.100 22,704.00 2,270.40
JUMLAH HARGA BAHAN 39,233.36
C ALAT ###
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 62,800.00
E Overhead & Profit 15% 0.150 9,420.00
F Harga Satuan Pekerjaan (D+E) 72,220.00
-
dihit A.4.6.1.29. Pembuatan dan pemasangan 1 m3 Kusen pintu dan jendela kayu Kruing -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 6.000 93,597.00 561,582.00
2 Tukang kayu L.02 OH 18.000 121,674.00 2,190,132.00
3 Kepala tukang L.03 OH 1.800 128,226.00 230,806.80
4 Mandor L.04 OH 0.300 149,758.00 44,927.40
JUMLAH TENAGA KERJA 3,027,448.20
B BAHAN -
1 Kayu kruing (balok) M.18.a m3 1.200 7,525,000.00 9,030,000.00
2 paku 3,5 cm M.56.c Kg 1.250 22,176.00 27,720.00
3 Lem kayu M.572 Kg 1.000 29,832.00 29,832.00
JUMLAH HARGA BAHAN 9,087,552.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 12,115,000.20
E Overhead & Profit 15% 0.150 1,817,250.03
F Harga Satuan Pekerjaan (D+E) 13,932,250.00
-
dihit A.4.6.1.30. Pembuatan dan Pemasangan 1 m2 Daun Pintu Panel, Kayu Kruing -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 1.000 93,597.00 93,597.00
2 Tukang kayu L.02 OH 3.000 121,674.00 365,022.00
3 Kepala tukang L.03 OH 0.300 128,226.00 38,467.80
4 Mandor L.04 OH 0.050 149,758.00 7,487.90
JUMLAH TENAGA KERJA 504,574.70
B BAHAN -
1 Kayu Kruing (Papan) M.18.b m3 0.040 8,505,000.00 340,200.00
2 Lem Kayu M.572 Kg 0.050 29,832.00 1,491.60
JUMLAH HARGA BAHAN 341,691.60
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 846,266.30
E Overhead & Profit 15% 0.150 126,939.95
F Harga Satuan Pekerjaan (D+E) 973,206.00
-
dihit A.4.6.1.31. Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kaca Kayu Kruing -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.800 93,597.00 74,877.60
2 Tukang kayu L.02 OH 2.400 121,674.00 292,017.60
3 Kepala tukang L.03 OH 0.240 128,226.00 30,774.24
4 Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 403,659.76
B BAHAN -
1 Kayu Kruing (Papan) M.18.b m3 0.024 8,505,000.00 204,120.00
2 Lem Kayu M.572 kg 0.300 29,832.00 8,949.60
JUMLAH HARGA BAHAN 213,069.60
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 616,729.36
E Overhead & Profit 15% 0.150 92,509.40
F Harga Satuan Pekerjaan (D+E) 709,238.00
-
dihit A.4.6.1.32. Pembuatan dan Pemasangan 1 m2 Pintu Plywood Rangkap Rangka Kayu Kruing (L s/d 90 cm) -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.700 93,597.00 65,517.90
2 Tukang kayu L.02 OH 2.100 121,674.00 255,515.40
3 Kepala tukang L.03 OH 0.210 128,226.00 26,927.46
4 Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 353,202.29
B BAHAN -
1 Kayu Kruing (Papan) M.18.b m3 0.025 8,505,000.00 212,625.00
2 paku 2,5 cm M.56.b Kg 0.030 22,704.00 681.12
3 Plywood 9 mm (120x240) M.32.c Lbr 1.000 100,800.00 100,800.00
4 Lem Kayu M.572 Ltr 0.500 29,832.00 14,916.00
JUMLAH HARGA BAHAN 329,022.12
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 682,224.41
E Overhead & Profit 15% 0.150 102,333.66
F Harga Satuan Pekerjaan (D+E) 784,558.00
-
dihit A.4.6.1.33. Pembuatan dan Pemasangan 1 m2 Pintu Plywood Rangkap Rangka Expose Kayu Kruing -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.800 93,597.00 74,877.60
2 Tukang kayu L.02 OH 2.400 121,674.00 292,017.60
3 Kepala tukang L.03 OH 0.240 128,226.00 30,774.24
4 Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 403,659.76
B BAHAN -
1 Kayu Kruing (Papan) M.18.b m3 0.026 8,505,000.00 217,728.00
2 paku 2,5 cm M.56.b Kg 0.030 22,704.00 681.12
3 Plywood 9 mm (120x240) M.32.c Lbr 1.000 100,800.00 100,800.00
4 Lem Kayu M.572 Ltr 0.500 29,832.00 14,916.00
JUMLAH HARGA BAHAN 334,125.12
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 737,784.88
E Overhead & Profit 15% 0.150 110,667.73
F Harga Satuan Pekerjaan (D+E) 848,452.00
-
dihit A.4.6.1.34. Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda-Kuda Konvensional Kayu Kruing Bentang 6 m -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 4.000 93,597.00 374,388.00
2 Tukang kayu L.02 OH 12.000 121,674.00 1,460,088.00
3 Kepala tukang L.03 OH 1.200 128,226.00 153,871.20
4 Mandor L.04 OH 0.200 149,758.00 29,951.60
JUMLAH TENAGA KERJA 2,018,298.80
B BAHAN -
1 Kayu kruing (balok) M.18.a m3 1.100 7,525,000.00 8,277,500.00
2 Besi Strip M.46.g Kg 15.000 17,600.00 264,000.00
3 paku 12 cm M.56.g Kg 5.600 21,648.00 121,228.80
JUMLAH HARGA BAHAN 8,662,728.80
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 10,681,027.60
E Overhead & Profit 15% 0.150 1,602,154.14
F Harga Satuan Pekerjaan (D+E) 12,283,181.00
-
dihit A.4.6.1.35. Pemasangan 1 m3 Konstruksi Gording, Kayu Kruing -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 6.700 93,597.00 627,099.90
2 Tukang kayu L.02 OH 20.100 121,674.00 2,445,647.40
3 Kepala tukang L.03 OH 2.010 128,226.00 257,734.26
4 Mandor L.04 OH 0.335 149,758.00 50,168.93
JUMLAH TENAGA KERJA 3,380,650.49
B BAHAN -
1 Kayu kruing (balok) M.18.a m3 1.100 7,525,000.00 8,277,500.00
2 Besi Strip M.46.g kg 15.000 17,600.00 264,000.00
3 paku 12 cm M.56.g Kg 3.000 21,648.00 64,944.00
JUMLAH HARGA BAHAN 8,606,444.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 11,987,094.49
E Overhead & Profit 15% 0.150 1,798,064.17
F Harga Satuan Pekerjaan (D+E) 13,785,158.00
-
dihit A.4.6.1.36. Pemasangan 1 m2 Rangka Atap Genteng Keramik, Kayu Kruing -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.100 93,597.00 9,359.70
2 Tukang kayu L.02 OH 0.100 121,674.00 12,167.40
3 Kepala tukang L.03 OH 0.010 128,226.00 1,282.26
4 Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 23,558.15
B BAHAN -
1 Kayu kruing (kaso 5x7) M.27.a m3 0.0140 5,016,000.00 70,224.00
2 Kayu kruing (reng 3x4) M.27.d m3 0.0048 3,432,000.00 16,473.60
3 paku 5 cm M.56.d Kg 0.2500 21,648.00 5,412.00
JUMLAH HARGA BAHAN 92,109.60
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 115,667.75
E Overhead & Profit 15% 0.150 17,350.16
F Harga Satuan Pekerjaan (D+E) 133,017.00
-
dihit A.4.6.1.37. Pemasangan 1 m2 Rangka Atap Genteng Beton, Kayu Kruing -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.100 93,597.00 9,359.70
2 Tukang kayu L.02 OH 0.100 121,674.00 12,167.40
3 Kepala tukang L.03 OH 0.010 128,226.00 1,282.26
4 Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 23,558.15
B BAHAN -
1 Kayu kruing (kaso 5x7) M.27.a m3 0.0140 5,016,000.00 70,224.00
2 Kayu kruing (reng 3x4) M.27.d m3 0.0036 3,432,000.00 12,355.20
3 paku 5 cm M.56.d Kg 0.2500 21,648.00 5,412.00
JUMLAH HARGA BAHAN 87,991.20
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 111,549.35
E Overhead & Profit 15% 0.150 16,732.40
F Harga Satuan Pekerjaan (D+E) 128,281.00
-
dihit A.4.6.1.38. Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda - Kuda Konfensional Kayu Lokal 6 m -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 4.000 93,597.00 374,388.00
2 Tukang kayu L.02 OH 12.000 121,674.00 1,460,088.00
3 Kepala tukang L.03 OH 1.200 128,226.00 153,871.20
4 Mandor L.04 OH 0.200 149,758.00 29,951.60
JUMLAH TENAGA KERJA 2,018,298.80
B BAHAN -
1 Kayu Sengon (balok) M.28.b m3 1.100 2,059,200.00 2,265,120.00
2 Besi strip M.46.g Kg 15.000 17,600.00 264,000.00
3 paku 12 cm M.56.g Kg 5.600 21,648.00 121,228.80
JUMLAH HARGA BAHAN 2,650,348.80
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,668,647.60
E Overhead & Profit 15% 0.150 700,297.14
F Harga Satuan Pekerjaan (D+E) 5,368,944.00
-
dihit A.4.6.1.39. Pemasangan 1 m2 Rangka Atap Genteng Kecil, Kayu Lokal -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.1000 93,597.00 9,359.70
2 Tukang kayu L.02 OH 0.1000 121,674.00 12,167.40
3 Kepala tukang L.03 OH 0.0100 128,226.00 1,282.26
4 Mandor L.04 OH 0.0050 149,758.00 748.79
JUMLAH TENAGA KERJA 23,558.15
B BAHAN -
1 Kaso - kaso 5 x 7 cm ( sengon ) M.28.b m3 0.0105 2,059,200.00 21,621.60
2 Reng 2 x 3 cm (sengon) M.28.b m3 0.0024 2,059,200.00 4,942.08
3 paku 5 cm M.56.d Kg 0.2500 21,648.00 5,412.00
JUMLAH HARGA BAHAN 31,975.68
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 55,533.83
E Overhead & Profit 15% 0.150 8,330.07
F Harga Satuan Pekerjaan (D+E) 63,863.00
-
dihit A.4.6.1.40. Pemasangan 1 m3 Rangka Dinding Pemisah (60x120) cm Kayu Lokal -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.150 93,597.00 14,039.55
2 Tukang kayu L.02 OH 0.450 121,674.00 54,753.30
3 Kepala tukang L.03 OH 0.045 128,226.00 5,770.17
4 Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 75,761.08
B BAHAN -
1 Kayu Sengon Balok/pesagen M.28.b m3 0.028 2,059,200.00 57,657.60
2 paku 7 cm M.56.e Kg 0.150 23,232.00 3,484.80
JUMLAH HARGA BAHAN 61,142.40
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 136,903.48
E Overhead & Profit 15% 0.150 20,535.52
F Harga Satuan Pekerjaan (D+E) 157,439.00
-
dihit A.4.6.1.41.a Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kaca Kayu Lokal -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.800 93,597.00 74,877.60
2 Tukang kayu L.02 OH 2.400 121,674.00 292,017.60
3 Kepala tukang L.03 OH 0.240 128,226.00 30,774.24
4 Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 403,659.76
B BAHAN -
1 Kayu Sengon (papan) M.28.a m3 0.024 2,217,600.00 53,222.40
2 Lem Kayu M.572 kg 0.300 29,832.00 8,949.60
JUMLAH HARGA BAHAN 62,172.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 465,831.76
E Overhead & Profit 15% 0.150 69,874.76
F Harga Satuan Pekerjaan (D+E) 535,706.00
-
dihit A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati panil Kaca -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.800 93,597.00 74,877.60
2 Tukang kayu L.02 OH 2.400 121,674.00 292,017.60
3 Kepala tukang L.03 OH 0.240 128,226.00 30,774.24
4 Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 403,659.76
B BAHAN -
1 Kayu jati (papan) M.15.b m3 0.024 22,000,000.00 528,000.00
2 Lem Kayu M.572 kg 0.300 29,832.00 8,949.60
JUMLAH HARGA BAHAN 536,949.60
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 940,609.36
E Overhead & Profit 15% 0.150 141,091.40
F Harga Satuan Pekerjaan (D+E) 1,081,700.00
-
dihit A.4.6.1.42. Pembuatan dan Pemasangan 1 m2 Kusen Pintu dan Jendela Kayu Lokal -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 6.000 93,597.00 561,582.00
2 Tukang kayu L.02 OH 18.000 121,674.00 2,190,132.00
3 Kepala tukang L.03 OH 1.800 128,226.00 230,806.80
4 Mandor L.04 OH 0.300 149,758.00 44,927.40
JUMLAH TENAGA KERJA 3,027,448.20
B BAHAN -
1 Kayu Sengon Balok/Pesagen M.28.b m3 1.200 2,059,200.00 2,471,040.00
2 paku 7 cm M.56.e Kg 1.250 23,232.00 29,040.00
3 Lem kayu M.572 Kg 1.000 29,832.00 29,832.00
JUMLAH HARGA BAHAN 2,529,912.00
C PERALATAN -
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,557,360.20
E Overhead & Profit 15% 0.150 833,604.03
F Harga Satuan Pekerjaan (D+E) 6,390,964.00
-
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA -
dihit A.4.6.2.7.a Pemasangan 1 buah floor hinge
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.015 93,597.00 1,403.96
2 Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
3 Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
4 Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 21,698.25
B BAHAN
1 Floor Hinges (Engsel Lantai) M.318 set 1.000 863,280.00 863,280.00

JUMLAH HARGA BAHAN 863,280.00


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 884,978.25


E Overhead & Profit 15% 0.150 132,746.74
F Harga Satuan Pekerjaan (D+E) 1,017,724.00

dihit A.4.6.2.7.b Pemasangan 1 buah Patch fitting set ( top , bottom, lock fitting & overpanel )
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.015 93,597.00 1,403.96
2 Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
3 Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
4 Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 21,698.25
B BAHAN
1 Top Patch Fitting M.317.a set 1.000 570,240.00 570,240.00
2 Bottom Patch Fitting M.317.b set 1.000 566,016.00 566,016.00
3 Over panel M.321 set 1.000 189,376.00 189,376.00
4 Bottom Lock Fitting M.322 set 1.000 720,984.00 720,984.00
5 Pull Handle (untuk pintu kaca) M.362.b set 1.000 418,440.00 418,440.00
JUMLAH HARGA BAHAN 2,465,056.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,486,754.25


E Overhead & Profit 15% 0.150 373,013.14
F Harga Satuan Pekerjaan (D+E) 2,859,767.00

dihit A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm -


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.015 93,597.00 1,403.96
2 Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
3 Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
4 Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 21,698.25
B BAHAN -
1 Kaca Ray band 5 mm M.358.b m2 1.100 158,400.00 174,240.00
2 Sealant kaca (besar) M.562.c Kg 0.050 44,352.00 2,217.60
JUMLAH HARGA BAHAN 176,457.60
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 198,155.85
E Overhead & Profit 15% 0.150 29,723.38
F Harga Satuan Pekerjaan (D+E) 227,879.00
-
dihit A.4.6.2.24.b Pemasangan 1 m2 kaca ray band tebal 8 mm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.015 93,597.00 1,403.96
2 Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
3 Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
4 Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 21,698.25
B BAHAN -
1 Kaca ray band 8 mm M.358.c m2 1.100 177,760.00 195,536.00
2 Sealant kaca (besar) M.562.c Kg 0.050 44,352.00 2,217.60
JUMLAH HARGA BAHAN 197,753.60
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 219,451.85
E Overhead & Profit 15% 0.150 32,917.78
F Harga Satuan Pekerjaan (D+E) 252,369.00
-
dihit A.4.6.2.25. Pemasangan 1 m2 Kaca Bening Warna tebal 5 mm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.015 93,597.00 1,403.96
2 Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
3 Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
4 Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 21,698.25
B BAHAN -
1 Kaca Bening/Polos 5 mm (warna) M.353 m2 1.100 132,528.00 145,780.80
2 Sealant kaca (besar) M.562.c Kg 0.050 44,352.00 2,217.60
JUMLAH HARGA BAHAN 147,998.40
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 169,696.65
E Overhead & Profit 15% 0.150 25,454.50
F Harga Satuan Pekerjaan (D+E) 195,151.00
-
dihit A.4.6.2.26. Pemasangan 1 m2 Kaca Buram/Es/Kabur tebal 5 mm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.017 93,597.00 1,591.15
2 Tukang kayu L.02 OH 0.170 121,674.00 20,684.58
3 Kepala tukang L.03 OH 0.017 128,226.00 2,179.84
4 Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 24,575.38
B BAHAN -
1 Kaca Es ( Buram ) 5 mm M.354.a m2 1.100 153,120.00 168,432.00
2 Sealant kaca (besar) M.562.c Kg 0.050 44,352.00 2,217.60
JUMLAH HARGA BAHAN 170,649.60
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 195,224.98
E Overhead & Profit 15% 0.150 29,283.75
F Harga Satuan Pekerjaan (D+E) 224,508.00
-
dihit A.4.6.2.27. Pemasangan 1 m2 Kaca Hias Lukis tebal 5 mm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.015 93,597.00 1,403.96
2 Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
3 Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
4 Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 21,698.25
B BAHAN -
1 Kaca lukis alur 5 mm M.360 m2 1.100 992,640.00 1,091,904.00
2 Sealant kaca (besar) M.562.c Kg 0.050 44,352.00 2,217.60
JUMLAH HARGA BAHAN 1,094,121.60
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 1,115,819.85
E Overhead & Profit 15% 0.150 167,372.98
F Harga Satuan Pekerjaan (D+E) 1,283,192.00
-
dihit A.4.6.2.28. Pemasangan 1 m2 Kaca Bening Polos tebal 5 mm Lapis Sandblast -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.030 93,597.00 2,807.91
2 Tukang kayu L.02 OH 0.300 121,674.00 36,502.20
3 Kepala tukang L.03 OH 0.030 128,226.00 3,846.78
4 Mandor L.04 OH 0.002 149,758.00 224.64
JUMLAH TENAGA KERJA 43,381.53
B BAHAN -
1 Kaca Polos 5 mm M.352.b m2 1.100 137,280.00 151,008.00
2 Sticker Sandblast M.363 m2 1.100 137,280.00 151,008.00
3 Sealant kaca (besar) M.562.c Kg 0.050 44,352.00 2,217.60
JUMLAH HARGA BAHAN 304,233.60
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 347,615.13
E Overhead & Profit 15% 0.150 52,142.27
F Harga Satuan Pekerjaan (D+E) 399,757.00
-
dihit A.4.6.2.29. Pemasangan 1 m2 Kaca Oneway tebal 5 mm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.015 93,597.00 1,403.96
2 Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
3 Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
4 Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 21,698.25
B BAHAN -
1 Kaca OneWay 5 mm M.362.a m2 1.100 316,800.00 348,480.00
2 Sealant kaca (besar) M.562.c Kg 0.050 44,352.00 2,217.60
JUMLAH HARGA BAHAN 350,697.60
-
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 372,395.85
E Overhead & Profit 15% 0.150 55,859.38
F Harga Satuan Pekerjaan (D+E) 428,255.00
-
dihit A.4.6.2.30.a Pemasangan 1 m2 kaca Tempered, tebal 5 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.015 93,597.00 1,403.96
2 Tukang kayu L.02 OH 0.150 121,674.00 18,251.10
3 Kepala Tukang L.03 OH 0.015 128,226.00 1,923.39
4 Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 21,698.25
B BAHAN -
1 Kaca Flat Tempered 5 mm M.361.a m2 1.100 245,520.00 270,072.00
2 Sealant kaca (besar) M.562.c Kg 0.050 44,352.00 2,217.60
JUMLAH HARGA BAHAN 272,289.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 293,987.85
E Overhead & Profit 15% 0.150 44,098.18
F Harga Satuan Pekerjaan (D+E) 338,086.00
-
dihit A.4.6.2.30.b Pemasangan 1 m2 kaca Tempered, tebal 8 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.017 93,597.00 1,591.15
2 Tukang kayu L.02 OH 0.170 121,674.00 20,684.58
3 Kepala Tukang L.03 OH 0.017 128,226.00 2,179.84
4 Mandor L.04 OH 0.001 149,758.00 134.78
JUMLAH TENAGA KERJA 24,590.35
B BAHAN -
1 Kaca Flat Tempered 8 mm M.361.b m2 1.100 430,320.00 473,352.00
2 Sealant kaca (besar) M.562.c Kg 0.070 44,352.00 3,104.64
JUMLAH HARGA BAHAN 476,456.64
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 501,046.99
E Overhead & Profit 15% 0.150 75,157.05
F Harga Satuan Pekerjaan (D+E) 576,204.00

dihit A.4.6.2.30.c Pemasangan 1 m2 kaca Tempered, tebal 8 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.017 93,597.00 1,591.15
2 Tukang kayu L.02 OH 0.170 121,674.00 20,684.58
3 Kepala Tukang L.03 OH 0.017 128,226.00 2,179.84
4 Mandor L.04 OH 0.001 149,758.00 134.78
JUMLAH TENAGA KERJA 24,590.35
B BAHAN
1 Kaca Flat Tempered 10 mm M.361.c m2 1.100 575,520.00 633,072.00
2 Sealant kaca (besar) M.562.c Kg 0.070 44,352.00 3,104.64
JUMLAH HARGA BAHAN 636,176.64
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 660,766.99
E Overhead & Profit 15% 0.150 99,115.05
F Harga Satuan Pekerjaan (D+E) 759,882.00
-
dihit A.4.6.2.30.d Pemasangan 1 m2 kaca Tempered, tebal 12 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.025 93,597.00 2,339.93
2 Tukang kayu L.02 OH 0.250 121,674.00 30,418.50
3 Kepala Tukang L.03 OH 0.025 128,226.00 3,205.65
4 Mandor L.04 OH 0.001 149,758.00 194.69
JUMLAH TENAGA KERJA 36,158.76
B BAHAN -
1 Kaca Flat Tempered 12 mm M.361.d m2 1.100 658,416.00 724,257.60
2 Sealant kaca (besar) M.562.c Kg 0.070 44,352.00 3,104.64
JUMLAH HARGA BAHAN 727,362.24
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 763,521.00
E Overhead & Profit 15% 0.150 114,528.15
F Harga Satuan Pekerjaan (D+E) 878,049.00
-
dihit A.4.6.2.31. Pemasangan 1 Buah Selot Tanam Pintu Tinggi 6" -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
3 Kepala tukang L.03 OH 0.020 128,226.00 2,564.52
4 Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 28,921.02
B BAHAN -
1 selot Tanam 6" kuning/silver M.314.d Buah 1.000 128,480.00 128,480.00
JUMLAH HARGA BAHAN 128,480.00
-
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 157,401.02
E Overhead & Profit 15% 0.150 23,610.15
F Harga Satuan Pekerjaan (D+E) 181,011.00
-
dihit A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
3 Kepala tukang L.03 OH 0.020 128,226.00 2,564.52
4 Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 28,921.02
B BAHAN -
1 Grendel 4" kuning/silver M.314.c Buah 1.000 93,984.00 93,984.00
JUMLAH HARGA BAHAN 93,984.00
-
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 122,905.02
E Overhead & Profit 15% 0.150 18,435.75
F Harga Satuan Pekerjaan (D+E) 141,340.00
-
dihit A.4.6.2.33. Pemasangan 1 Buah Grendel Rantai (Door Guard) -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
3 Kepala tukang L.03 OH 0.020 128,226.00 2,564.52
4 Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 28,921.02
B BAHAN -
1 Grendel Rantai M.314.b Buah 1.000 22,528.00 22,528.00
JUMLAH HARGA BAHAN 22,528.00
-
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 51,449.02
E Overhead & Profit 15% 0.150 7,717.35
F Harga Satuan Pekerjaan (D+E) 59,166.00
-
dihit A.4.6.2.34. Pemasangan 1 Pasang Tarikan Pintu Panjang ± 30 cm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
3 Kepala tukang L.03 OH 0.020 128,226.00 2,564.52
4 Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 28,921.02
B BAHAN -
1 Handle pintu (kecil) M.315.c Pasang 1.000 80,256.00 80,256.00
JUMLAH HARGA BAHAN 80,256.00
-
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 109,177.02
E Overhead & Profit 15% 0.150 16,376.55
F Harga Satuan Pekerjaan (D+E) 125,553.00
-
dihit A.4.6.2.35. Pemasangan 1 Pasang Tarikan Pintu Panjang ± 40 cm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
3 Kepala tukang L.03 OH 0.020 128,226.00 2,564.52
4 Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 28,921.02
B BAHAN -
1 Handle pintu (medium) M.315.b Pasang 1.000 125,890.29 125,890.29
JUMLAH HARGA BAHAN 125,890.29
-
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 154,811.30
E Overhead & Profit 15% 0.150 23,221.70
F Harga Satuan Pekerjaan (D+E) 178,032.00
-
dihit A.4.6.2.36. Pemasangan 1 Pasang Tarikan Pintu Panjang ± 50 cm -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
3 Kepala tukang L.03 OH 0.020 128,226.00 2,564.52
4 Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 28,921.02
B BAHAN -
1 Handle pintu stainless jumbo (besar) M.315.a Pasang 1.000 174,240.00 174,240.00
JUMLAH HARGA BAHAN 174,240.00
-
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 203,161.02
E Overhead & Profit 15% 0.150 30,474.15
F Harga Satuan Pekerjaan (D+E) 233,635.00
-
dihit A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
3 Kepala tukang L.03 OH 0.020 128,226.00 2,564.52
4 Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 28,921.02
B BAHAN -
1 Casement 8" M.320 Buah 2.000 50,688.00 101,376.00
JUMLAH HARGA BAHAN 101,376.00
-
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 130,297.02
E Overhead & Profit 15% 0.150 19,544.55
F Harga Satuan Pekerjaan (D+E) 149,841.00
-
dihit A.4.6.2.38. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 12" -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang kayu L.02 OH 0.200 121,674.00 24,334.80
3 Kepala tukang L.03 OH 0.020 128,226.00 2,564.52
4 Mandor L.04 OH 0.001 149,758.00 149.76
JUMLAH TENAGA KERJA 28,921.02
B BAHAN -
1 Casement 12" M.319 Buah 2.000 54,912.00 109,824.00
JUMLAH HARGA BAHAN 109,824.00
-
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 138,745.02
E Overhead & Profit 15% 0.150 20,811.75
F Harga Satuan Pekerjaan (D+E) 159,556.00
-
dihit A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium 12" -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.010 93,597.00 935.97
2 Tukang kayu L.02 OH 0.100 121,674.00 12,167.40
3 Kepala tukang L.03 OH 0.010 128,226.00 1,282.26
4 Mandor L.04 OH 0.001 149,758.00 74.88
JUMLAH TENAGA KERJA 14,460.51
B BAHAN -
1 Handle jendela alumunium M.315.d Buah 1.000 15,708.00 15,708.00
JUMLAH HARGA BAHAN 15,708.00
-
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 30,168.51
E Overhead & Profit 15% 0.150 4,525.28
F Harga Satuan Pekerjaan (D+E) 34,693.00
-
dihit A.4.6.2.40. Pemasangan 1 m2 Sticker Kaca -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.150 93,597.00 14,039.55
2 Tukang kayu L.02 OH 0.015 121,674.00 1,825.11
3 Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
4 Mandor L.04 OH 0.008 149,758.00 1,123.19
JUMLAH TENAGA KERJA 18,911.24
B BAHAN -
1 Sticker Sandblast M.363 m2 1.100 137,280.00 151,008.00
JUMLAH HARGA BAHAN 151,008.00
-
C PERALATAN -
-
JUMLAH HARGA ALAT -
-
D Jumlah (A+B+C) 169,919.24
E Overhead & Profit 15% 0.150 25,487.89
F Harga Satuan Pekerjaan (D+E) 195,407.00
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN -
dihit A.4.7.1.10.a Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Interior setara mowilex
(Decorcryl, Dulux Pentalite)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang cat L.02 OH 0.063 121,674.00 7,665.46
3 Kepala Tukang L.03 OH 0.006 128,226.00 807.82
4 Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,794.50
B BAHAN
1 Cat dasar (cat tembok interior) setara mowilex M.263.a Kg 0.100 117,004.80 11,700.48
2 Cat penutup (cat tembok interior) setara mowilex M.263.b Kg 0.260 131,472.00 34,182.72
JUMLAH HARGA BAHAN 45,883.20
C PERALATAN
Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 56,764.82
E Overhead & Profit 15% 0.150 8,514.72
F Harga Satuan Pekerjaan (D+E) 65,279.00

dihit A.4.7.1.10.b Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Exterior setara mowilex -
(Decorcryl, Dulux Pentalite)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang cat L.02 OH 0.063 121,674.00 7,665.46
3 Kepala Tukang L.03 OH 0.006 128,226.00 807.82
4 Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,794.50
B BAHAN -
1 Plamir tembok M.273.b Kg 0.100 31,680.00 3,168.00
2 Cat dasar (cat tembok exterior) setara mowilex M.263.c Kg 0.100 232,320.00 23,232.00
3 Cat penutup (cat tembok exterior) setara mowilex M.263.d Kg 0.260 123,094.40 32,004.54
JUMLAH HARGA BAHAN 58,404.54
C PERALATAN -
Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 69,286.16
E Overhead & Profit 15% 0.150 10,392.92
F Harga Satuan Pekerjaan (D+E) 79,679.00
-
dihit A.4.7.1.10.c Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior setara mowilex -
(Decorcryl, Dulux Pentalite)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang cat L.02 OH 0.063 121,674.00 7,665.46
3 Kepala Tukang L.03 OH 0.006 128,226.00 807.82
4 Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,794.50
B BAHAN -
1 Cat dasar (cat tembok exterior) setara mowilex M.263.c Kg 0.100 232,320.00 23,232.00
2 Cat penutup (cat tembok exterior) setara mowilex M.263.d Kg 0.260 123,094.40 32,004.54
JUMLAH HARGA BAHAN 55,236.54
C PERALATAN -
Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 66,118.16
E Overhead & Profit 15% 0.150 9,917.72
F Harga Satuan Pekerjaan (D+E) 76,035.00
-
dihit A.4.7.1.10.d Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Interior setara Catylac -
(Vinilex, Property, Danacryl, Avitex)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang cat L.02 OH 0.063 121,674.00 7,665.46
3 Kepala Tukang L.03 OH 0.006 128,226.00 807.82
4 Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,794.50
B BAHAN -
1 Plamir tembok M.273.b Kg 0.100 31,680.00 3,168.00
2 Cat dasar (cat tembok interior) setara Catylac M.263.e Kg 0.100 47,085.60 4,708.56
3 Cat penutup (cat tembok interior) setara Catylac M.263.f Kg 0.260 38,016.00 9,884.16
JUMLAH HARGA BAHAN 17,760.72
C PERALATAN -
Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 28,642.34
E Overhead & Profit 15% 0.150 4,296.35
F Harga Satuan Pekerjaan (D+E) 32,938.00
-
dihit A.4.7.1.10.e Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Interior setara Catylac -
(Vinilex, Property, Danacryl, Avitex)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang cat L.02 OH 0.063 121,674.00 7,665.46
3 Kepala Tukang L.03 OH 0.006 128,226.00 807.82
4 Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,794.50
B BAHAN -
1 Cat dasar (cat tembok interior) setara Catylac M.263.e Kg 0.100 47,085.60 4,708.56
2 Cat penutup (cat tembok interior) setara Catylac M.263.f Kg 0.260 38,016.00 9,884.16
JUMLAH HARGA BAHAN 14,592.72
C PERALATAN -
Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 25,474.34
E Overhead & Profit 15% 0.150 3,821.15
F Harga Satuan Pekerjaan (D+E) 29,295.00
-
dihit A.4.7.1.10.f Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Exterior setara Catylac -
(Vinilex, Property, Danacryl, Avitex)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang cat L.02 OH 0.063 121,674.00 7,665.46
3 Kepala Tukang L.03 OH 0.006 128,226.00 807.82
4 Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,794.50
B BAHAN -
1 Plamir tembok M.273.b Kg 0.100 31,680.00 3,168.00
2 Cat dasar (cat tembok exterior) setara Catylac M.263.g Kg 0.100 73,418.40 7,341.84
3 Cat penutup (cat tembok exterior) setara Catylac M.263.h Kg 0.260 42,240.00 10,982.40
JUMLAH HARGA BAHAN 21,492.24
C PERALATAN -
Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 32,373.86
E Overhead & Profit 15% 0.150 4,856.08
F Harga Satuan Pekerjaan (D+E) 37,229.00
-
dihit A.4.7.1.10.g Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior setara Catylac -
(Vinilex, Property, Danacryl, Avitex)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang cat L.02 OH 0.063 121,674.00 7,665.46
3 Kepala Tukang L.03 OH 0.006 128,226.00 807.82
4 Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,794.50
B BAHAN -
1 Cat dasar (cat tembok exterior) setara Catylac M.263.g Kg 0.100 73,418.40 7,341.84
2 Cat penutup (cat tembok exterior) setara Catylac M.263.h Kg 0.260 42,240.00 10,982.40
JUMLAH HARGA BAHAN 18,324.24
C PERALATAN -
Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 29,205.86
E Overhead & Profit 15% 0.150 4,380.88
F Harga Satuan Pekerjaan (D+E) 33,586.00
-
dihit A.4.7.1.11.a Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior setara mowilex -
(Decorcryl, Dulux Pentalite, Vinilex)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.028 93,597.00 2,620.72
2 Tukang cat L.02 OH 0.042 121,674.00 5,110.31
3 Kepala Tukang L.03 OH 0.004 128,226.00 538.55
4 Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 8,718.85
B BAHAN -
1 Cat dasar (cat tembok exterior) setara mowilex M.263.c Kg 0.120 232,320.00 27,878.40
2 Cat penutup (cat tembok exterior) setara mowilex M.263.d Kg 0.180 123,094.40 22,156.99
JUMLAH HARGA BAHAN 50,035.39
C PERALATAN -
Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 58,841.36
E Overhead & Profit 15% 0.150 8,826.20
F Harga Satuan Pekerjaan (D+E) 67,667.00
-
dihit A.4.7.1.11.b Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Interior setara Catylac -
(Vinilex, Property, Danacryl, Avitex)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.028 93,597.00 2,620.72
2 Tukang cat L.02 OH 0.042 121,674.00 5,110.31
3 Kepala Tukang L.03 OH 0.004 128,226.00 538.55
4 Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 8,718.85
B BAHAN -
1 Cat dasar (cat tembok interior) setara Catylac M.263.e Kg 0.120 47,085.60 5,650.27
2 Cat penutup (cat tembok interior) setara Catylac M.263.f Kg 0.180 38,016.00 6,842.88
JUMLAH HARGA BAHAN 12,493.15
C PERALATAN -
1 Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 21,299.12
E Overhead & Profit 15% 0.150 3,194.87
F Harga Satuan Pekerjaan (D+E) 24,493.00
-
dihit A.4.7.1.11.c Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior setara Catylac -
(Vinilex, Property, Danacryl, Avitex)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.028 93,597.00 2,620.72
2 Tukang cat L.02 OH 0.042 121,674.00 5,110.31
3 Kepala Tukang L.03 OH 0.004 128,226.00 538.55
4 Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 8,718.85
B BAHAN -
1 Cat dasar (cat tembok exterior) setara Catylac M.263.g Kg 0.120 73,418.40 8,810.21
2 Cat penutup (cat tembok exterior) setara Catylac M.263.h Kg 0.180 42,240.00 7,603.20
JUMLAH HARGA BAHAN 16,413.41
C PERALATAN -
1 Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 25,219.38
E Overhead & Profit 15% 0.150 3,782.91
F Harga Satuan Pekerjaan (D+E) 29,002.00
-
dihit A.4.7.1.15. Pemasangan 1 m2 wallpaper minimalis (motif sederhana) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang cat L.02 OH 0.200 121,674.00 24,334.80
3 Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
4 Mandor L.04 OH 0.003 149,758.00 374.40
JUMLAH TENAGA KERJA 29,145.66
B BAHAN -
1 Wallpaper M.581 m2 1.200 47,520.00 57,024.00
2 Perekat untuk wallpaper M.576 Kg 0.200 35,640.00 7,128.00
JUMLAH HARGA BAHAN 64,152.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 93,297.66
E Overhead & Profit 15% 0.150 13,994.65
F Harga Satuan Pekerjaan (D+E) 107,292.00
-
dihit A.4.7.1.23. Pengecatan kerb dengan cat genteng -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.080 93,597.00 7,487.76
2 Tukang cat L.02 OH 0.120 121,674.00 14,600.88
3 Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
4 Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 23,747.16
B BAHAN -
1 Cat genteng M.265 kg 0.300 33,396.00 10,018.80
JUMLAH HARGA BAHAN 10,018.80
C PERALATAN -
1 Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 33,853.08
E Overhead & Profit 15% 0.150 5,077.96
F Harga Satuan Pekerjaan (D+E) 38,931.00
-
dihit A.4.7.1.24. Pengecatan Kerb dengan cat besi -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.080 93,597.00 7,487.76
2 Tukang cat L.02 OH 0.120 121,674.00 14,600.88
3 Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
4 Mandor L.04 OH 0.001 149,758.00 119.81
JUMLAH TENAGA KERJA 23,747.16
B BAHAN -
1 Cat penutup (cat besi) M.261.c kg 0.250 48,500.00 12,125.00
2 Thinner M.276.c liter 0.050 19,008.00 950.40
JUMLAH HARGA BAHAN 13,075.40
C PERALATAN -
1 Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 36,909.68
E Overhead & Profit 15% 0.150 5,536.45
F Harga Satuan Pekerjaan (D+E) 42,446.00
-
dihit A.4.7.1.25. Pelapisan batu alam dengan cat coating (Natural / Hitam / Gloss) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.0200 93,597.00 1,871.94
2 Tukang Cat L.02 OH 0.0630 121,674.00 7,665.46
3 Kepala Tukang L.03 OH 0.0063 128,226.00 807.82
4 Mandor L.04 OH 0.0025 149,758.00 374.40
JUMLAH TENAGA KERJA 10,719.62
B BAHAN -
1 cat coating M.264 liter 0.360 85,714.29 30,857.14
JUMLAH HARGA BAHAN 30,857.14
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,576.76
E Overhead & Profit 15% 0.150 6,236.51
F Harga Satuan Pekerjaan (D+E) 47,813.00
-
dihit A.4.7.1.26. Pengecatan 1 m2 Tembok Dengan Cat Waterproofing ( 3 Lapis ) -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.020 93,597.00 1,871.94
2 Tukang Cat L.02 OH 0.063 121,674.00 7,665.46
3 Kepala Tukang L.03 OH 0.006 128,226.00 807.82
4 Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,794.50
B BAHAN -
1 Cat Waterproofing M.270 Kg 0.460 59,664.00 27,445.44
JUMLAH HARGA BAHAN 27,445.44
C PERALATAN -
1 Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 38,327.06
E Overhead & Profit 15% 0.150 5,749.06
F Harga Satuan Pekerjaan (D+E) 44,076.00
-
dihit A.4.7.1.27. Pengecatan 1 m2 Plat Atap/Talang Dengan Lapisan Membran Waterproofing -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
1 Pekerja L.01 OH 0.0200 93,597.00 1,871.94
2 Tukang Cat L.02 OH 0.0630 121,674.00 7,665.46
3 Kepala Tukang L.03 OH 0.0063 128,226.00 807.82
4 Mandor L.04 OH 0.0030 149,758.00 449.27
JUMLAH TENAGA KERJA 10,794.50
B BAHAN -
1 Cat Waterproofing M.270 Kg 0.460 59,664.00 27,445.44
2 Serat Fiberglass M.140 m2 1.100 4,488.00 4,936.80
-
JUMLAH HARGA BAHAN 32,382.24
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 43,176.74
E Overhead & Profit 15% 0.150 6,476.51
F Harga Satuan Pekerjaan (D+E) 49,653.00
-
dihit A.4.7.1.27. Pengecatan 1 m2 Plat Atap/Talang Dengan Cat Waterproofing ( 3 lapis ) -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.020 93,597.00 1,871.94
Tukang Cat L.02 OH 0.063 121,674.00 7,665.46
Kepala Tukang L.03 OH 0.006 128,226.00 807.82
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,794.50
B BAHAN -
Cat Waterproofing M.270 Kg 0.460 59,664.00 27,445.44
JUMLAH HARGA BAHAN 27,445.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 38,239.94
E Overhead & Profit 15% 0.150 5,735.99
F Harga Satuan Pekerjaan (D+E) 43,975.00
-
dihit A.4.7.1.28. Pengecatan 1 m2 Tembok Dengan Cat mengkilap -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.020 93,597.00 1,871.94
Tukang Cat L.02 OH 0.063 121,674.00 7,665.46
Kepala Tukang L.03 OH 0.006 128,226.00 807.82
Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 10,794.50
B BAHAN -
Plamir tembok M.273.b Kg 0.100 31,680.00 3,168.00
Cat dasar (cat tembok interior) setara mowilex M.263.a Kg 0.100 117,004.80 11,700.48
Cat tembok kedap air ( water base) M.263.e Kg 0.260 47,085.60 12,242.26
JUMLAH HARGA BAHAN 27,110.74
C PERALATAN -
Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 37,992.36
E Overhead & Profit 15% 0.150 5,698.85
F Harga Satuan Pekerjaan (D+E) 43,691.00
-
dihit A.4.7.1.29. Pengecatan 1 m2 permukaan besi dan baja dengan cat besi 3 lapis cat penutup -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.020 93,597.00 1,871.94
Tukang Cat L.02 OH 0.200 121,674.00 24,334.80
Kepala Tukang L.03 OH 0.020 128,226.00 2,564.52
Mandor L.04 OH 0.010 149,758.00 1,497.58
JUMLAH TENAGA KERJA 30,268.84
B BAHAN -
Meni besi M.268.b Kg 0.100 37,714.29 3,771.43
cat penutup (Cat besi) M.261.c Kg 0.300 48,500.00 14,550.00
JUMLAH HARGA BAHAN 18,321.43
C PERALATAN -
Kuas 2" M.272.c buah 0.010 8,712.00 87.12
JUMLAH HARGA ALAT 87.12
D Jumlah (A+B+C) 48,677.39
E Overhead & Profit 15% 0.150 7,301.61
F Harga Satuan Pekerjaan (D+E) 55,978.00
-
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG -
dihit A.5.1.1.1.a Pemasangan 1 buah closet duduk/monoblock (setara INA) dengan jet washer -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 3.300 93,597.00 308,870.10
Tukang batu L.02 OH 1.100 121,674.00 133,841.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.160 149,758.00 23,961.28
JUMLAH TENAGA KERJA 467,955.04
B BAHAN -
Kloset duduk/monoblok (Ina) dengan jet washer M.376.c Unit 1.000 2,229,333.33 2,229,333.33
Perlengkapan % 0.060 2,229,333.33 133,760.00
JUMLAH HARGA BAHAN 2,363,093.33
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,831,048.37
E Overhead & Profit 15% 0.150 424,657.26
F Harga Satuan Pekerjaan (D+E) 3,255,705.00
-
dihit A.5.1.1.1.b Pemasangan 1 buah closet duduk/monoblock (setara TOTO) dengan jet washer -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 3.300 93,597.00 308,870.10
Tukang batu L.02 OH 1.100 121,674.00 133,841.40
Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
Mandor L.04 OH 0.160 149,758.00 23,961.28
JUMLAH TENAGA KERJA 467,955.04
B BAHAN -
Kloset duduk/monoblok (TOTO) dengan jet washer M.376.d Unit 1.000 1,147,643.20 1,147,643.20
Perlengkapan % 0.060 1,147,643.20 68,858.59
JUMLAH HARGA BAHAN 1,216,501.79
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,684,456.83
E Overhead & Profit 15% 0.150 252,668.52
F Harga Satuan Pekerjaan (D+E) 1,937,125.00
-
dihit A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen (Setara INA) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.000 93,597.00 93,597.00
Tukang batu L.02 OH 1.500 121,674.00 182,511.00
Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
Mandor L.04 OH 0.160 149,758.00 23,961.28
JUMLAH TENAGA KERJA 319,303.18
B BAHAN -
Kloset jongkok porselen (Ina) M.377.b Unit 1.000 168,960.00 168,960.00
Portland cement M.245.a Kg 6.000 1,375.00 8,250.00
Pasir Beton (m3) M.9.c m3 0.010 339,234.40 3,392.34
JUMLAH HARGA BAHAN 180,602.34
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 499,905.52
E Overhead & Profit 15% 0.150 74,985.83
F Harga Satuan Pekerjaan (D+E) 574,891.00
-
dihit A.5.1.1 7.a Pemasangan 1 buah Reservoir fibreglass vol 1 m3 (Roof tank) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 3.000 93,597.00 280,791.00
Tukang batu L.02 OH 4.500 121,674.00 547,533.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.900 149,758.00 134,782.20
JUMLAH TENAGA KERJA 969,517.50
B BAHAN -
Tandon Reservoir fibreglass (kapasitas 1050 liter) M.373.b Unit 1.000 1,953,600.00 1,953,600.00
Perlengkapan % 12.000 1,953,600.00 234,432.00
JUMLAH HARGA BAHAN 2,188,032.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,157,549.50
E Overhead & Profit 15% 0.150 473,632.43
F Harga Satuan Pekerjaan (D+E) 3,631,181.00
-
dihit A.5.1.1 10.a Pemasangan 1 buah bak Air, fibreglass vol 120 liter (Oval) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 90,848.94
B BAHAN -
Bak mandi fiberglass 55x55x66 cm (oval) M.371.a Unit 1.000 216,480.00 216,480.00
Perlengkapan % 12.000 216,480.00 25,977.60
JUMLAH HARGA BAHAN 242,457.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 333,306.54
E Overhead & Profit 15% 0.150 49,995.98
F Harga Satuan Pekerjaan (D+E) 383,302.00
-
dihit A.5.1.1 10.b Pemasangan 1 buah bak Air, fibreglass vol 120 liter (Kotak) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.300 93,597.00 28,079.10
Tukang batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.015 149,758.00 2,246.37
JUMLAH TENAGA KERJA 90,848.94
B BAHAN -
Bak mandi fiberglass 55x55x66 cm (Kotak) M.371.b Unit 1.000 482,592.00 482,592.00
Perlengkapan % 12.000 482,592.00 57,911.04
JUMLAH HARGA BAHAN 540,503.04
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 631,351.98
E Overhead & Profit 15% 0.150 94,702.80
F Harga Satuan Pekerjaan (D+E) 726,054.00
-
dihit A.5.1.1 19.a Pemasangan 1 buah kran diameter 1/2” atau 3/4” (Plastik) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.010 93,597.00 935.97
Tukang batu L.02 OH 0.400 121,674.00 48,669.60
Kepala Tukang L.03 OH 0.040 128,226.00 5,129.04
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 55,483.40
B BAHAN -
Kran air (Plastik) M.378.a Buah 1.000 28,500.00 28,500.00
Seal tape M.559 Buah 0.025 5,750.00 143.75
JUMLAH HARGA BAHAN 28,643.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 84,127.15
E Overhead & Profit 15% 0.150 12,619.07
F Harga Satuan Pekerjaan (D+E) 96,746.00
-
dihit A.5.1.1 19.b Pemasangan 1 buah Shower setara ONDA
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.010 93,597.00 935.97
Tukang batu L.02 OH 0.400 121,674.00 48,669.60
Kepala Tukang L.03 OH 0.040 128,226.00 5,129.04
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 55,483.40
B BAHAN
Shower kamar mandi M.378.c Buah 1.000 36,608.00 36,608.00
Seal tape M.559 Buah 0.025 5,750.00 143.75
JUMLAH HARGA BAHAN 36,751.75
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 92,235.15
E Overhead & Profit 15% 0.150 13,835.27
F Harga Satuan Pekerjaan (D+E) 106,070.00

dihit A.5.1.1 22.a Pemasangan 1 m’ pipa galvanis medium A diameter 1 ½” -


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.108 93,597.00 10,108.48
Tukang batu L.02 OH 0.180 121,674.00 21,901.32
Kepala Tukang L.03 OH 0.018 128,226.00 2,308.07
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 35,066.65
B BAHAN -
Pipa galvanis medium A Ø 1 1/2" panjang 6 m M.44.d M 1.200 792,000.00 950,400.00
Perlengkapan % 35.000 950,400.00 332,640.00
JUMLAH HARGA BAHAN 1,283,040.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,318,106.65
E Overhead & Profit 15% 0.150 197,716.00
F Harga Satuan Pekerjaan (D+E) 1,515,822.00
-
dihit A.5.1.1 24.a Pemasangan 1 m’ pipa galvanis medium A diameter 4” -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.135 93,597.00 12,635.60
Tukang batu L.02 OH 0.225 121,674.00 27,376.65
Kepala Tukang L.03 OH 0.023 128,226.00 2,949.20
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 44,009.75
B BAHAN -
Pipa galvanis medium A Ø 4" panjang 6 m M.44.g M 1.200 1,895,520.00 2,274,624.00
Perlengkapan % 35.000 2,274,624.00 796,118.40
JUMLAH HARGA BAHAN 3,070,742.40
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,114,752.15
E Overhead & Profit 15% 0.150 467,212.82
F Harga Satuan Pekerjaan (D+E) 3,581,964.00
-
dihit A.5.1.1.37. Pemasangan 1 m Talang Air, Hujan PVC Persegi -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.036 93,597.00 3,369.49
Tukang batu L.02 OH 0.060 121,674.00 7,300.44
Kepala Tukang L.03 OH 0.006 128,226.00 769.36
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 11,738.80
B BAHAN -
Talang PVC Persegi Abu-abu 4" M.586 m 1.200 152,064.00 182,476.80
Perlengkapan 35% x talang PVC % 35.000 182,476.80 63,866.88
JUMLAH HARGA BAHAN 246,343.68
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 258,082.48
E Overhead & Profit 15% 0.150 38,712.37
F Harga Satuan Pekerjaan (D+E) 296,794.00
-
dihit A.5.1.1.38. Pemasangan 1 m Talang Air, Hujan PVC 1/2 Lingkaran 6" -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.036 93,597.00 3,369.49
Tukang batu L.02 OH 0.060 121,674.00 7,300.44
Kepala Tukang L.03 OH 0.006 128,226.00 769.36
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 11,738.80
B BAHAN -
Talang PVC 1/2 Lingkaran 6" M.584 m 1.200 95,040.00 114,048.00
Perlengkapan 35% x talang PVC % 35.000 114,048.00 39,916.80
JUMLAH HARGA BAHAN 153,964.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 165,703.60
E Overhead & Profit 15% 0.150 24,855.54
F Harga Satuan Pekerjaan (D+E) 190,559.00
-
dihit A.5.1.1.39. Pemasangan 1 m Talang Air, Hujan 1/2 Lingkaran 6" -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA -
Pekerja L.01 OH 0.036 93,597.00 3,369.49
Tukang batu L.02 OH 0.060 121,674.00 7,300.44
Kepala Tukang L.03 OH 0.006 128,226.00 769.36
Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 11,738.80
B BAHAN -
Talang Galvanis Setengah Lingkaran 6" M.439 m 1.200 132,000.00 158,400.00
Perlengkapan 35% x talang PVC % 35.000 158,400.00 55,440.00
JUMLAH HARGA BAHAN 213,840.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 225,578.80
E Overhead & Profit 15% 0.150 33,836.82
F Harga Satuan Pekerjaan (D+E) 259,415.00
-
dihit A.5.1.1.40. Pemasangan 1 Unit Septictank Dinding Bata Trassram 2x1,5x1,5 m -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA & BAHAN -
Galian Tanah A.2.3.1.1. m3 14.118 73,941.70 1,043,891.17
Urugan Kembali A.2.3.1.9. m3 0.331 24,647.23 8,155.40
Urugan Pasir A.2.3.1.11. m3 0.594 332,576.68 197,591.26
Pondasi Batu Kosong ( anstamping) A.3.2.1.9. m3 1.218 749,144.38 912,200.74
Pas. Bata Tebal 1 Batu 1Pc : 3PP A.4.4.1.2. m2 16.687 281,174.11 4,691,923.75
Pas. Bata Tebal 1/2 Batu 1Pc : 3PP A.4.4.1.8. m2 8.687 136,042.68 1,181,780.21
Plesteran 1PC : 3PP, tebal 15mm A.4.4.2.3. m2 21.624 68,091.96 1,472,430.32
Beton Mutu f' c=14,5 Mpa (K200) A.4.1.1.6. m3 0.692 1,165,941.47 806,834.80
Pembesian A.4.1.1.17.a. Kg 161.105 14,940.56 2,406,999.91
Bekisting untuk sloof A.4.1.1.21. m2 6.197 196,090.06 1,215,191.38
Pasang Pipa Galvanis Ø 1 1/2" A.5.1.1 22. m 1.800 599,604.25 1,079,287.66
B Jumlah (A) 15,016,286.59
C Overhead & Profit 15% 0.150 2,252,442.99
D Harga Satuan Pekerjaan (C+D) 17,268,729.00
-
dihit A.5.1.1.41. Pemasangan 1 Unit Septictank Dinding Bata Trassram 1,5x1,2x1,7 m -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA & BAHAN -
Galian Tanah A.2.3.1.1. m3 9.600 73,941.70 709,840.32
Urugan Kembali A.2.3.1.9. m3 0.225 24,647.23 5,545.63
Urugan Pasir A.2.3.1.11. m3 0.404 332,576.68 134,360.98
Pondasi Batu Kosong ( anstamping) A.3.2.1.9. m3 0.828 749,144.38 620,291.54
Pas. Bata Tebal 1 Batu 1Pc : 3PP A.4.4.1.2. m2 11.347 281,174.11 3,190,482.63
Pas. Bata Tebal 1/2 Batu 1Pc : 3PP A.4.4.1.8. m2 5.907 136,042.68 803,604.11
Plesteran 1PC : 3PP, tebal 15mm A.4.4.2.3. m2 14.704 68,091.96 1,001,244.61
Beton Mutu f' c=14,5 Mpa (K200) A.4.1.1.6. m3 0.467 1,165,941.47 544,961.04
Pembesian A.4.1.1.17.a. Kg 109.551 14,940.56 1,636,746.84
Bekisting untuk sloof A.4.1.1.21. m2 4.214 196,090.06 826,323.53
Pasang Pipa Galvanis Ø 1 1/2" A.5.1.1 22. m 1.800 599,604.25 1,079,287.66
B Jumlah (A) 10,552,688.89
C Overhead & Profit 15% 0.150 1,582,903.33
D Harga Satuan Pekerjaan (C+D) 12,135,592.00
-
dihit A.5.1.1.42. Pembuatan 1 Unit Septictank Bio Filter Kapasitas 6 orang -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA & BAHAN -
Galian Tanah A.2.3.1.1. m3 2.000 73,941.70 147,883.40
Urugan Kembali A.2.3.1.9. m3 0.150 24,647.23 3,697.08
Urugan Pasir A.2.3.1.11. m3 0.100 332,576.68 33,257.67
Septic Tank Bio Filter Volume 1850 Liter Kapastas M.374.b unit 1.000 3,194,400.00 3,194,400.00
4-6 Orang -
-
B Jumlah (A) 3,379,238.15
C Overhead & Profit 15% 0.150 506,885.72
D Harga Satuan Pekerjaan (C+D) 3,886,123.00
-
dihit A.5.1.1.43. Pembuatan 1 Unit Septictank Bio Filter Kapasitas 8 orang -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA & BAHAN -
Galian Tanah A.2.3.1.1. m3 2.500 73,941.70 184,854.25
Urugan Kembali A.2.3.1.9. m3 0.355 24,647.23 8,749.77
Urugan Pasir A.2.3.1.11. m3 0.100 332,576.68 33,257.67
Septic Tank Bio Filter Volume 2145 Liter Kapastas M.374.c unit 1.000 3,960,000.00 3,960,000.00
6-8 Orang -
-
B Jumlah (A) 4,186,861.69
C Overhead & Profit 15% 0.150 628,029.25
D Harga Satuan Pekerjaan (C+D) 4,814,890.00
-
dihit A.5.1.1.44. Pembuatan 1 Unit Septictank Bio Filter Kapasitas 12 orang -
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA & BAHAN -
Galian Tanah A.2.3.1.1. m3 3.500 73,941.70 258,795.95
Urugan Kembali A.2.3.1.9. m3 0.500 24,647.23 12,323.62
Urugan Pasir A.2.3.1.11. m3 0.100 332,576.68 33,257.67
Septic Tank Bio Filter Volume 3000 Liter Kapastas M.374.h unit 1.000 6,529,248.00 6,529,248.00
8-12 Orang -
-
B Jumlah (A) 6,833,625.23
C Overhead & Profit 15% 0.150 1,025,043.79
D Harga Satuan Pekerjaan (C+D) 7,858,669.00
-
A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA -
dihit A.8.4.3.1.a Pemasangan 1 buah Valve HDPE Ø 63 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.144 93,597.00 107,074.97
Tukang pipa L.02 OH 0.573 121,674.00 69,719.20
Mandor L.04 OH 0.115 149,758.00 17,222.17
JUMLAH TENAGA KERJA 194,016.34
B BAHAN -
Valve HDPE Ø 63 mm M.611.e buah 1.000 462,000.00 462,000.00
JUMLAH HARGA BAHAN 462,000.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.100 316,800.00 31,680.00
JUMLAH HARGA ALAT 31,680.00
D Jumlah (A+B+C) 687,696.34
E Overhead & Profit 15% 0.150 103,154.45
F Harga Satuan Pekerjaan (D+E) 790,850.00
-
dihit A.8.4.3.1.b Pemasangan 1 buah Valve HDPE Ø 75 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.144 93,597.00 107,074.97
Tukang pipa L.02 OH 0.573 121,674.00 69,719.20
Mandor L.04 OH 0.115 149,758.00 17,222.17
JUMLAH TENAGA KERJA 194,016.34
B BAHAN -
Valve HDPE Ø 75 mm M.611.f buah 1.000 980,284.80 980,284.80
JUMLAH HARGA BAHAN 980,284.80
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.100 316,800.00 31,680.00
JUMLAH HARGA ALAT 31,680.00
D Jumlah (A+B+C) 1,205,981.14
E Overhead & Profit 15% 0.150 180,897.17
F Harga Satuan Pekerjaan (D+E) 1,386,878.00
-
dihit A.8.4.3.1.c Pemasangan 1 buah Valve HDPE Ø 90 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.144 93,597.00 107,074.97
Tukang pipa L.02 OH 0.573 121,674.00 69,719.20
Mandor L.04 OH 0.115 149,758.00 17,222.17
JUMLAH TENAGA KERJA 194,016.34
B BAHAN -
Valve HDPE Ø 90 mm M.611.g buah 1.000 1,342,809.60 1,342,809.60
JUMLAH HARGA BAHAN 1,342,809.60
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.100 316,800.00 31,680.00
JUMLAH HARGA ALAT 31,680.00
D Jumlah (A+B+C) 1,568,505.94
E Overhead & Profit 15% 0.150 235,275.89
F Harga Satuan Pekerjaan (D+E) 1,803,781.00
-
dihit A.8.4.3.1.d Pemasangan 1 buah Valve HDPE Ø 110 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 1.144 93,597.00 107,074.97
Tukang pipa L.02 OH 0.573 121,674.00 69,719.20
Mandor L.04 OH 0.115 149,758.00 17,222.17
JUMLAH TENAGA KERJA 194,016.34
B BAHAN -
Valve HDPE Ø 110 mm M.611.h buah 1.000 1,266,883.20 1,266,883.20
JUMLAH HARGA BAHAN 1,266,883.20
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.100 316,800.00 31,680.00
JUMLAH HARGA ALAT 31,680.00
D Jumlah (A+B+C) 1,492,579.54
E Overhead & Profit 15% 0.150 223,886.93
F Harga Satuan Pekerjaan (D+E) 1,716,466.00
-
dihit A.8.4.3.15.a Pemasangan 1 buah Tee HDPE Ø 63 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.106 93,597.00 9,921.28
Tukang pipa L.02 OH 0.053 121,674.00 6,448.72
Mandor L.04 OH 0.011 149,758.00 1,647.34
JUMLAH TENAGA KERJA 18,017.34
B BAHAN -
Tee HDPE Ø 63 mm M.611.v buah 1.000 229,680.00 229,680.00
JUMLAH HARGA BAHAN 229,680.00
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.028 316,800.00 8,870.40
JUMLAH HARGA ALAT 8,870.40
D Jumlah (A+B+C) 256,567.74
E Overhead & Profit 15% 0.150 38,485.16
F Harga Satuan Pekerjaan (D+E) 295,052.00
-
dihit A.8.4.3.15.b Pemasangan 1 buah Tee HDPE Ø 90 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.106 93,597.00 9,921.28
Tukang pipa L.02 OH 0.053 121,674.00 6,448.72
Mandor L.04 OH 0.011 149,758.00 1,647.34
JUMLAH TENAGA KERJA 18,017.34
B BAHAN -
Tee HDPE Ø 90 mm M.611.w buah 1.000 404,838.72 404,838.72
JUMLAH HARGA BAHAN 404,838.72
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.028 316,800.00 8,870.40
JUMLAH HARGA ALAT 8,870.40
D Jumlah (A+B+C) 431,726.46
E Overhead & Profit 15% 0.150 64,758.97
F Harga Satuan Pekerjaan (D+E) 496,485.00
-
dihit A.8.4.3.15.c Pemasangan 1 buah Tee HDPE Ø 110 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Pekerja L.01 OH 0.106 93,597.00 9,921.28
Tukang pipa L.02 OH 0.053 121,674.00 6,448.72
Mandor L.04 OH 0.011 149,758.00 1,647.34
JUMLAH TENAGA KERJA 18,017.34
B BAHAN -
Tee HDPE Ø 110 mm M.611.x buah 1.000 763,847.04 763,847.04
JUMLAH HARGA BAHAN 763,847.04
C PERALATAN -
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.028 316,800.00 8,870.40
JUMLAH HARGA ALAT 8,870.40
D Jumlah (A+B+C) 790,734.78
E Overhead & Profit 15% 0.150 118,610.22
F Harga Satuan Pekerjaan (D+E) 909,344.00
-
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL -
dihit A.8.4.6.1.a Pemasangan 1 buah instalasi titik lampu (tanpa saklar & fitting) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 % 100 121,674.00 121,674.00
JUMLAH TENAGA KERJA 121,674.00
B BAHAN -
Pipa listrik 5/8” M.475 btg 2.0000 9,445.33 18,890.67
Kabel NYM 3 x 1.5 mm2 M.504.d m 8.0000 12,883.20 103,065.60
T Dus (biasa) M.476.b buah 1.0000 1,900.80 1,900.80
L Bow M.478 buah 1.0000 1,254.00 1,254.00
Las Dop M.479 buah 3.0000 1,056.00 3,168.00
Klem Pipa Listrik M.480 buah 3.0000 7,216.00 21,648.00
Mongkok (Listrik) M.481 buah 1.0000 1,936.00 1,936.00
JUMLAH HARGA BAHAN 151,863.07
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 273,537.07
E Overhead & Profit 15% 0.150 41,030.56
F Harga Satuan Pekerjaan (D+E) 314,567.00
-
dihit A.8.4.6.1.b Pemasangan 2 buah instalasi titik lampu ( dalam 1 saklar )
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 % 100 121,674.00 121,674.00
JUMLAH TENAGA KERJA 121,674.00
B BAHAN
Pipa listrik 5/8” M.475 btg 3.0000 9,445.33 28,336.00
Kabel NYM 3 x 1.5 mm2 M.504.d m 12.0000 12,883.20 154,598.40
T Dus (biasa) M.476.b buah 1.0000 1,900.80 1,900.80
L Bow M.478 buah 3.0000 1,254.00 3,762.00
Las Dop M.479 buah 5.0000 1,056.00 5,280.00
Klem Pipa Listrik M.480 buah 6.0000 7,216.00 43,296.00
Mongkok (Listrik) M.481 buah 1.0000 1,936.00 1,936.00
Saklar Tunggal biasa M.482.a buah 1.0000 14,432.00 14,432.00
Fitting DK E 40 M.509.c buah 2.0000 24,816.00 49,632.00
JUMLAH HARGA BAHAN 303,173.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 424,847.20
E Overhead & Profit 15% 0.150 63,727.08
F Harga Satuan Pekerjaan (D+E) 488,574.00

dihit A.8.4.6.1.c Pemasangan 3 buah instalasi titik lampu ( dalam 1 saklar )


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 % 100 121,674.00 121,674.00
JUMLAH TENAGA KERJA 121,674.00
B BAHAN
Pipa listrik 5/8” M.475 btg 4.0000 9,445.33 37,781.33
Kabel NYM 3 x 1.5 mm2 M.504.d m 16.0000 12,883.20 206,131.20
T Dus (biasa) M.476.b buah 1.0000 1,900.80 1,900.80
L Bow M.478 buah 3.0000 1,254.00 3,762.00
Las Dop M.479 buah 5.0000 1,056.00 5,280.00
Klem Pipa Listrik M.480 buah 6.0000 7,216.00 43,296.00
Mongkok (Listrik) M.481 buah 1.0000 1,936.00 1,936.00
Saklar Tunggal biasa M.482.a buah 1.0000 14,432.00 14,432.00
Fitting DK E 40 M.509.c buah 3.0000 24,816.00 74,448.00
JUMLAH HARGA BAHAN 388,967.33
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 510,641.33
E Overhead & Profit 15% 0.150 76,596.20
F Harga Satuan Pekerjaan (D+E) 587,237.00
dihit A.8.4.6.1.d Pemasangan 4 buah instalasi titik lampu ( dalam 1 saklar )
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 % 100 121,674.00 121,674.00
JUMLAH TENAGA KERJA 121,674.00
B BAHAN
Pipa listrik 5/8” M.475 btg 5.0000 9,445.33 47,226.67
Kabel NYM 3 x 1.5 mm2 M.504.d m 20.0000 12,883.20 257,664.00
T Dus (biasa) M.476.b buah 1.0000 1,900.80 1,900.80
L Bow M.478 buah 3.0000 1,254.00 3,762.00
Las Dop M.479 buah 7.0000 1,056.00 7,392.00
Klem Pipa Listrik M.480 buah 6.0000 7,216.00 43,296.00
Mongkok (Listrik) M.481 buah 1.0000 1,936.00 1,936.00
Saklar Tunggal biasa M.482.a buah 1.0000 14,432.00 14,432.00
Fitting DK E 40 M.509.c buah 4.0000 24,816.00 99,264.00
JUMLAH HARGA BAHAN 476,873.47
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 598,547.47
E Overhead & Profit 15% 0.150 89,782.12
F Harga Satuan Pekerjaan (D+E) 688,329.00

dihit A.8.4.6.3 1 unit - pemasangan box panel -


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
1 Pekerja L.01 OH 0.500 93,597.00 46,798.50
2 Tukang listrik L.02 OH 0.500 121,674.00 60,837.00
3 Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
JUMLAH TENAGA KERJA 114,046.80
B BAHAN -
1 Box panel 80x60x30 cm M.510.g unit 1.000 1,003,200.00 1,003,200.00
2 Begel steel box panel M.511.a buah 2.000 61,881.60 123,763.20
3 Begel steel infoor M.511.b buah 2.000 61,564.80 123,129.60
4 Magnetic Contactor SN.65 M.512 buah 2.000 818,400.00 1,636,800.00
5 Timer Theben (b) M.528.b buah 2.000 195,360.00 390,720.00
6 Pipa infoor galvanis Ø 2" M.513 batang 1.000 272,448.00 272,448.00
7 Pipa flexibel M.514 m 1.000 4,224.00 4,224.00
8 Kawat BC - 6 mm M.515 m 2.500 11,616.00 29,040.00
9 Besi Canal (untuk Box Panel) M.531 m 1.000 31,416.00 31,416.00
10 Kabel NYY 2 x 16 mm2 M.505.a m 10.000 12,460.80 124,608.00
11 Kabel LVTC 3 x 16 mm2 M.506 m¹ 10.000 16,156.80 161,568.00
12 Mur baut M.75.e buah 4.000 13,728.00 54,912.00
13 MCB 25 A, 3 Phase M.500.d buah 4.000 138,336.00 553,344.00
14 Ground rood 5/8" M.516 unit 1.000 929,280.00 929,280.00
15 T. infooring M.517 buah 1.000 35,904.00 35,904.00
17 Assesoris panel M.530 buah 1.000 66,528.00 66,528.00
JUMLAH HARGA BAHAN 5,540,884.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,654,931.60
E Overhead & Profit 15% 0.150 848,239.74
F Harga Satuan Pekerjaan (D+E) 6,503,171.00
-
dihit. A.8.4.6.3.a Pemasangan 1 Unit Panel MCB Ukuran Box 30x40x15 cm untuk 6 Grup MCB (1 Phasa) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 1.250 121,674.00 152,092.50
JUMLAH TENAGA KERJA 152,092.50
B BAHAN -
Box Panel 30 x 40 x 15 cm (standar) M.510.a buah 1.000 168,960.00 168,960.00
MCB 10 A, 1 Phase M.500.b buah 6.000 66,616.00 399,696.00
JUMLAH HARGA BAHAN 568,656.00
C PERALATAN -
Alat bantu set 1.000 15,000.00 15,000.00
JUMLAH HARGA ALAT 15,000.00
D Jumlah (A+B+C) 735,748.50
E Overhead & Profit 15% 0.150 110,362.28
F Harga Satuan Pekerjaan (D+E) 846,110.00
-
dihit. A.8.4.6.3.b Pemasangan 1 Unit Panel MCB Ukuran Box 40x50x20 cm untuk 12 Grup MCB (1 Phasa) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 1.250 121,674.00 152,092.50
-
JUMLAH TENAGA KERJA 152,092.50
B BAHAN -
Box Panel 40 x 50 x 20 cm (standar) M.510.c buah 1.000 432,256.00 432,256.00
MCB 10 A, 1 Phase M.500.b buah 12.000 66,616.00 799,392.00
JUMLAH HARGA BAHAN 1,231,648.00
C PERALATAN -
Alat bantu alat 49 set 1.000 52,800.00 52,800.00
JUMLAH HARGA ALAT 52,800.00
D Jumlah (A+B+C) 1,436,540.50
E Overhead & Profit 15% 0.150 215,481.07
F Harga Satuan Pekerjaan (D+E) 1,652,021.00
-
dihit. A.8.4.6.3.c Pemasangan 1 Unit Panel MCB Ukuran Box 30x40x15 cm untuk 6 Grup MCB (3 Phasa) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 1.250 121,674.00 152,092.50
-
JUMLAH TENAGA KERJA 152,092.50
B BAHAN -
Box Panel 30 x 40 x 15 cm (standar) M.510.a buah 1.000 168,960.00 168,960.00
MCB 10 A, 3 Phase M.500.c buah 6.000 130,310.40 781,862.40
JUMLAH HARGA BAHAN 950,822.40
C PERALATAN -
Alat bantu alat 49 set 1.000 52,800.00 52,800.00
JUMLAH HARGA ALAT 52,800.00
D Jumlah (A+B+C) 1,155,714.90
E Overhead & Profit 15% 0.150 173,357.24
F Harga Satuan Pekerjaan (D+E) 1,329,072.00
-
dihit. A.8.4.6.3.d Pemasangan 1 Unit Panel MCB Ukuran Box 40x50x20 cm untuk 12 Grup MCB (3 Phasa) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 1.250 121,674.00 152,092.50
-
JUMLAH TENAGA KERJA 152,092.50
B BAHAN -
Box Panel 40 x 50 x 20 cm (standar) M.510.c buah 1.000 432,256.00 432,256.00
MCB (3 Phasa) 10 A M.500.c buah 12.000 130,310.40 1,563,724.80
JUMLAH HARGA BAHAN 1,995,980.80
C PERALATAN -
Alat bantu alat 49 set 1.000 52,800.00 52,800.00
JUMLAH HARGA ALAT 52,800.00
D Jumlah (A+B+C) 2,200,873.30
E Overhead & Profit 15% 0.150 330,130.99
F Harga Satuan Pekerjaan (D+E) 2,531,004.00
-
dihit. A.8.4.6.4 Pasang Saklar Tunggal sekualitas Broco, clipsal -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 0.050 121,674.00 6,083.70
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 11,512.34
B BAHAN -
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
Saklar Tunggal sekualitas Broco, clipsal M.482.c buah 1.000 17,776.00 17,776.00
JUMLAH HARGA BAHAN 19,676.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,189.14
E Overhead & Profit 15% 0.150 4,678.37
F Harga Satuan Pekerjaan (D+E) 35,867.00
-
dihit. A.8.4.6.5 Pasang Saklar Ganda sekualitas Broco, clipsal -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 0.050 121,674.00 6,083.70
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 11,512.34
B BAHAN -
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
Saklar Ganda sekualitas Broco, clipsal M.483.c buah 1.000 25,608.00 25,608.00
JUMLAH HARGA BAHAN 27,508.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 39,021.14
E Overhead & Profit 15% 0.150 5,853.17
F Harga Satuan Pekerjaan (D+E) 44,874.00
-
dihit. A.8.4.6.6 Pasang Saklar Triple sekualitas Broco, clipsal -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 0.050 121,674.00 6,083.70
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 11,512.34
B BAHAN -
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
Saklar Triple sekualitas Broco, clipsal M.484.b buah 1.000 49,632.00 49,632.00
JUMLAH HARGA BAHAN 51,532.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 63,045.14
E Overhead & Profit 15% 0.150 9,456.77
F Harga Satuan Pekerjaan (D+E) 72,501.00
-
dihit. A.8.4.6.7 Pasang Stop Kontak sekualitas Broco, clipsal -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 0.050 121,674.00 6,083.70
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 11,512.34
B BAHAN -
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
Stop Kontak sekualitas Broco, clipsal M.485.c buah 1.000 21,648.00 21,648.00
JUMLAH HARGA BAHAN 23,548.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 35,061.14
E Overhead & Profit 15% 0.150 5,259.17
F Harga Satuan Pekerjaan (D+E) 40,320.00
-
dihit A.8.4.6.7.a Pemasangan 1 buah instalasi stop kontak (tanpa stop kontak) -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 % 100.0000 121,674.00 121,674.00
JUMLAH TENAGA KERJA 121,674.00
B BAHAN -
Pipa listrik 5/8” M.475 btg 1.0000 9,445.33 9,445.33
Kabel NYM 2 x 1.5 mm2 M.504.a m 4.0000 11,019.36 44,077.44
T Dus (biasa) M.476.b buah 1.0000 1,900.80 1,900.80
L Bow M.478 buah 1.0000 1,254.00 1,254.00
Las Dop M.479 buah 2.0000 1,056.00 2,112.00
Klem Pipa Listrik M.480 buah 3.0000 7,216.00 21,648.00
JUMLAH HARGA BAHAN 80,437.57
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 202,111.57
E Overhead & Profit 15% 0.150 30,316.74
F Harga Satuan Pekerjaan (D+E) 232,428.00
-
dihit. A.8.4.6.8 Pasang Stop Kontak AC, Sekualtas Broco, clipsal -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 0.050 121,674.00 6,083.70
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 11,512.34
B BAHAN -
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
Stop Kontak AC, Sekualtas Broco, clipsal M.486.b buah 1.000 63,888.00 63,888.00
JUMLAH HARGA BAHAN 65,788.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 77,301.14
E Overhead & Profit 15% 0.150 11,595.17
F Harga Satuan Pekerjaan (D+E) 88,896.00
-
dihit. A.8.4.6.9 1 m' memasang kabel NYM 3 x 1.5 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 0.005 121,674.00 608.37
Pekerja L.01 OH 0.005 93,597.00 467.99
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 1,825.15
B BAHAN -
Pipa listrik 5/8” M.475 buah 0.250 9,445.33 2,361.33
Kabel NYM 3 x 1.5 mm2 M.504.d m¹ 1.000 12,883.20 12,883.20
JUMLAH HARGA BAHAN 15,244.53
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 17,069.68
E Overhead & Profit 15% 0.150 2,560.45
F Harga Satuan Pekerjaan (D+E) 19,630.00
-
dihit. A.8.4.6.10 1 m' memasang kabel NYM 2 x 2.5 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 0.005 121,674.00 608.37
Pekerja L.01 OH 0.005 93,597.00 467.99
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 1,825.15
B BAHAN -
Pipa listrik 5/8” M.475 buah 0.250 9,445.33 2,361.33
Kabel NYM 2 x 2.5 mm2 M.504.b m¹ 1.000 11,827.20 11,827.20
JUMLAH HARGA BAHAN 14,188.53
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,013.68
E Overhead & Profit 15% 0.150 2,402.05
F Harga Satuan Pekerjaan (D+E) 18,415.00
-
dihit. A.8.4.6.11 1 m' memasang kabel NYY 3 x 2.5 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 0.005 121,674.00 608.37
Pekerja L.01 OH 0.005 93,597.00 467.99
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 1,825.15
B BAHAN -
Pipa listrik 5/8” M.475 buah 0.250 9,445.33 2,361.33
Kabel NYY 3 x 2.5 mm2 M.505.c m¹ 1.000 18,849.60 18,849.60
JUMLAH HARGA BAHAN 21,210.93
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 23,036.08
E Overhead & Profit 15% 0.150 3,455.41
F Harga Satuan Pekerjaan (D+E) 26,491.00
-
dihit. A.8.4.6.12 1 m' memasang kabel NYY 3 x 4 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 0.005 121,674.00 608.37
Pekerja L.01 OH 0.005 93,597.00 467.99
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 1,825.15
B BAHAN -
Pipa listrik 5/8” M.475 buah 0.250 9,445.33 2,361.33
Kabel NYY 3 x 4 mm2 M.505.d m¹ 1.000 30,027.36 30,027.36
JUMLAH HARGA BAHAN 32,388.69
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 34,213.84
E Overhead & Profit 15% 0.150 5,132.08
F Harga Satuan Pekerjaan (D+E) 39,345.00
-
dihit. A.8.4.6.13 1 m' memasang kabel NYY 3 x 6 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 0.005 121,674.00 608.37
Pekerja L.01 OH 0.005 93,597.00 467.99
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 1,825.15
B BAHAN -
Pipa listrik 5/8” M.475 buah 0.250 9,445.33 2,361.33
Kabel NYY 3 x 6 mm2 M.505.e m¹ 1.000 41,184.00 41,184.00
JUMLAH HARGA BAHAN 43,545.33
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 45,370.48
E Overhead & Profit 15% 0.150 6,805.57
F Harga Satuan Pekerjaan (D+E) 52,176.00
-
dihit. A.8.4.6.14 1 m' memasang kabel NYA 1 x 1.5 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 0.005 121,674.00 608.37
Pekerja L.01 OH 0.005 93,597.00 467.99
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 1,825.15
B BAHAN -
Pipa listrik 5/8” M.475 buah 0.250 9,445.33 2,361.33
Kabel NYA 1.5 mm M.507.a m¹ 1.000 4,505.60 4,505.60
JUMLAH HARGA BAHAN 6,866.93
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 8,692.08
E Overhead & Profit 15% 0.150 1,303.81
F Harga Satuan Pekerjaan (D+E) 9,995.00
-
dihit. A.8.4.6.15 1 m' memasang kabel NYA 1 x 2.5 mm -
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA -
Tukang listrik L.02 OH 0.005 121,674.00 608.37
Pekerja L.01 OH 0.005 93,597.00 467.99
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 1,825.15
B BAHAN -
Pipa listrik 5/8” M.475 buah 0.250 9,445.33 2,361.33
Kabel NYA 2.5 mm M.507.b m¹ 1.000 7,656.00 7,656.00
JUMLAH HARGA BAHAN 10,017.33
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 11,842.48
E Overhead & Profit 15% 0.150 1,776.37
F Harga Satuan Pekerjaan (D+E) 13,618.00

dihit. A.4.1.1.35.c Bongkar 1 m2 bekisting secara biasa


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.040 93,597.00 3,743.88
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 4,342.91
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,342.91
E Overhead & Profit 15% 0.150 651.44
F Harga Satuan Pekerjaan (D+E) 4,994.00

dihit. A.4.1.1.35.d Bongkar 1 m2 bekisting secara hati-hati (untuk dipakai kembali)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.060 93,597.00 5,615.82
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 6,514.37
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,514.37
E Overhead & Profit 15% 0.150 977.16
F Harga Satuan Pekerjaan (D+E) 7,491.00
dihit.A.4.1.1.38.1.1
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.1.1 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.485 46,560.00 22,560
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.004 2,860,000.00 11,500
7. Paku M.56.d Kg 0.748 21,648.00 16,194

JUMLAH HARGA BAHAN 1,043,803.97

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 244.34 244.34

JUMLAH HARGA PERALATAN 2,687.72


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,080,724.52
E. OVERHEAD & PROFIT 15.0 % x D 162,108.68
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,242,833.20
G. HARGA SATUAN PEKERJAAN / M3 1,242,833.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.2.2
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.2.2
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.485 46,560.00 22,560
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.002 2,860,000.00 5,750
7. Paku M.56.d Kg 0.748 21,648.00 16,194

JUMLAH HARGA BAHAN 1,010,475.21

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,048,151.42
E. OVERHEAD & PROFIT 15.0 % x D 157,222.71
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,205,374.13
G. HARGA SATUAN PEKERJAAN / M3 1,205,374.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.1.3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.1.3 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.433 46,560.00 20,140
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.004 2,860,000.00 11,901
7. Paku M.56.d Kg 0.721 21,648.00 15,599

JUMLAH HARGA BAHAN 1,031,027.79

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,068,704.00
E. OVERHEAD & PROFIT 15.0 % x D 160,305.60
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,229,009.60
G. HARGA SATUAN PEKERJAAN / M3 1,229,009.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.2.4
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.2.4
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.433 46,560.00 20,140
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.002 2,860,000.00 5,950
7. Paku M.56.d Kg 0.721 21,648.00 15,599

JUMLAH HARGA BAHAN 997,498.83

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,035,175.04
E. OVERHEAD & PROFIT 15.0 % x D 155,276.26
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,190,451.30
G. HARGA SATUAN PEKERJAAN / M3 1,190,451.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.2.1
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.2.1 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.484 46,560.00 22,536
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.004 2,860,000.00 12,613
7. Paku M.56.d Kg 0.714 21,648.00 15,447

JUMLAH HARGA BAHAN 1,044,145.04

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,081,821.25
E. OVERHEAD & PROFIT 15.0 % x D 162,273.19
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,244,094.44
G. HARGA SATUAN PEKERJAAN / M3 1,244,094.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.2.2
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.2.2
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.484 46,560.00 22,536
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.002 2,860,000.00 6,306
7. Paku M.56.d Kg 0.714 21,648.00 15,447

JUMLAH HARGA BAHAN 1,010,260.17

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,047,936.38
E. OVERHEAD & PROFIT 15.0 % x D 157,190.46
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,205,126.84
G. HARGA SATUAN PEKERJAAN / M3 1,205,126.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.2.3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.2.3 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.431 46,560.00 20,090
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.005 2,860,000.00 13,013
7. Paku M.56.d Kg 0.683 21,648.00 14,778

JUMLAH HARGA BAHAN 1,031,268.69

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,068,944.91
E. OVERHEAD & PROFIT 15.0 % x D 160,341.74
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,229,286.64
G. HARGA SATUAN PEKERJAAN / M3 1,229,286.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.2.4
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.2.4
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.431 46,560.00 20,090
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.002 2,860,000.00 6,507
7. Paku M.56.d Kg 0.683 21,648.00 14,778

JUMLAH HARGA BAHAN 997,183.62

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,034,859.83
E. OVERHEAD & PROFIT 15.0 % x D 155,228.98
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,190,088.81
G. HARGA SATUAN PEKERJAAN / M3 1,190,088.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.3.1
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.3.1 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.484 46,560.00 22,552
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.005 2,860,000.00 14,043
7. Paku M.56.d Kg 0.686 21,648.00 14,860

JUMLAH HARGA BAHAN 1,045,004.16

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,082,680.38
E. OVERHEAD & PROFIT 15.0 % x D 162,402.06
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,245,082.43
G. HARGA SATUAN PEKERJAAN / M3 1,245,082.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.3.2
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.3.2
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.484 46,560.00 22,552
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.002 2,860,000.00 7,021
7. Paku M.56.d Kg 0.686 21,648.00 14,860

JUMLAH HARGA BAHAN 1,010,404.29

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,048,080.51
E. OVERHEAD & PROFIT 15.0 % x D 157,212.08
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,205,292.58
G. HARGA SATUAN PEKERJAAN / M3 1,205,292.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.3.3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.3.3 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.431 46,560.00 20,081
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.005 2,860,000.00 14,443
7. Paku M.56.d Kg 0.651 21,648.00 14,095

JUMLAH HARGA BAHAN 1,032,006.42

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,069,682.63
E. OVERHEAD & PROFIT 15.0 % x D 160,452.40
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,230,135.03
G. HARGA SATUAN PEKERJAAN / M3 1,230,135.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.3.4
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.3.4
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.431 46,560.00 20,081
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.003 2,860,000.00 7,222
7. Paku M.56.d Kg 0.651 21,648.00 14,095

JUMLAH HARGA BAHAN 997,206.35

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,034,882.56
E. OVERHEAD & PROFIT 15.0 % x D 155,232.38
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,190,114.95
G. HARGA SATUAN PEKERJAAN / M3 1,190,114.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.4.1
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.4.1 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.486 46,560.00 22,631
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.006 2,860,000.00 15,949
7. Paku M.56.d Kg 0.670 21,648.00 14,511

JUMLAH HARGA BAHAN 1,046,640.36

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,084,316.58
E. OVERHEAD & PROFIT 15.0 % x D 162,647.49
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,246,964.07
G. HARGA SATUAN PEKERJAAN / M3 1,246,964.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.4.2
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.4.2
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 3 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.486 46,560.00 22,631
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.003 2,860,000.00 7,975
7. Paku M.56.d Kg 0.670 21,648.00 14,511

JUMLAH HARGA BAHAN 1,011,087.16

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,048,763.37
E. OVERHEAD & PROFIT 15.0 % x D 157,314.51
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,206,077.88
G. HARGA SATUAN PEKERJAAN / M3 1,206,077.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.4.3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.4.3 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.432 46,560.00 20,133
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.006 2,860,000.00 16,350
7. Paku M.56.d Kg 0.629 21,648.00 13,619

JUMLAH HARGA BAHAN 1,033,489.38

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,071,165.60
E. OVERHEAD & PROFIT 15.0 % x D 160,674.84
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,231,840.44
G. HARGA SATUAN PEKERJAAN / M3 1,231,840.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.4.4
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.4.4
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 3 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.432 46,560.00 20,133
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.003 2,860,000.00 8,175
7. Paku M.56.d Kg 0.629 21,648.00 13,619

JUMLAH HARGA BAHAN 997,735.98

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,035,412.19
E. OVERHEAD & PROFIT 15.0 % x D 155,311.83
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,190,724.02
G. HARGA SATUAN PEKERJAAN / M3 1,190,724.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.5.1
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.5.1 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.490 46,560.00 22,807
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.007 2,860,000.00 18,619
7. Paku M.56.d Kg 0.672 21,648.00 14,544

JUMLAH HARGA BAHAN 1,049,519.89

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,087,196.10
E. OVERHEAD & PROFIT 15.0 % x D 163,079.42
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,250,275.52
G. HARGA SATUAN PEKERJAAN / M3 1,250,275.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.5.2
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.5.2
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.490 46,560.00 22,807
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.003 2,860,000.00 9,309
7. Paku M.56.d Kg 0.672 21,648.00 14,544

JUMLAH HARGA BAHAN 1,012,632.02

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,050,308.23
E. OVERHEAD & PROFIT 15.0 % x D 157,546.23
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,207,854.47
G. HARGA SATUAN PEKERJAAN / M3 1,207,854.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.5.3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.5.3 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.436 46,560.00 20,284
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.007 2,860,000.00 19,019
7. Paku M.56.d Kg 0.622 21,648.00 13,474

JUMLAH HARGA BAHAN 1,036,164.72

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,073,840.93
E. OVERHEAD & PROFIT 15.0 % x D 161,076.14
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,234,917.07
G. HARGA SATUAN PEKERJAAN / M3 1,234,917.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.5.4
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.5.4
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.436 46,560.00 20,284
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.003 2,860,000.00 9,510
7. Paku M.56.d Kg 0.622 21,648.00 13,474

JUMLAH HARGA BAHAN 999,076.65

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,036,752.86
E. OVERHEAD & PROFIT 15.0 % x D 155,512.93
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,192,265.79
G. HARGA SATUAN PEKERJAAN / M3 1,192,265.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.6.1
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.6.1 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.497 46,560.00 23,157
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.008 2,860,000.00 22,623
7. Paku M.56.d Kg 0.704 21,648.00 15,246

JUMLAH HARGA BAHAN 1,054,575.23

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,092,251.44
E. OVERHEAD & PROFIT 15.0 % x D 163,837.72
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,256,089.16
G. HARGA SATUAN PEKERJAAN / M3 1,256,089.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.6.2
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.6.2
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.497 46,560.00 23,157
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.004 2,860,000.00 11,311
7. Paku M.56.d Kg 0.704 21,648.00 15,246

JUMLAH HARGA BAHAN 1,015,685.36

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,053,361.57
E. OVERHEAD & PROFIT 15.0 % x D 158,004.24
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,211,365.81
G. HARGA SATUAN PEKERJAAN / M3 1,211,365.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.6.3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.6.3 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.443 46,560.00 20,607
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.008 2,860,000.00 23,023
7. Paku M.56.d Kg 0.643 21,648.00 13,909

JUMLAH HARGA BAHAN 1,040,926.71

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,078,602.92
E. OVERHEAD & PROFIT 15.0 % x D 161,790.44
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,240,393.36
G. HARGA SATUAN PEKERJAAN / M3 1,240,393.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.6.4
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.6.4
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.443 46,560.00 20,607
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.004 2,860,000.00 11,512
7. Paku M.56.d Kg 0.643 21,648.00 13,909

JUMLAH HARGA BAHAN 1,001,836.64

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,039,512.85
E. OVERHEAD & PROFIT 15.0 % x D 155,926.93
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,195,439.78
G. HARGA SATUAN PEKERJAAN / M3 1,195,439.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.7.1
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.7.1 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.512 46,560.00 23,851
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.010 2,860,000.00 29,296
7. Paku M.56.d Kg 0.799 21,648.00 17,286

JUMLAH HARGA BAHAN 1,063,982.20

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,101,658.41
E. OVERHEAD & PROFIT 15.0 % x D 165,248.76
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,266,907.18
G. HARGA SATUAN PEKERJAAN / M3 1,266,907.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.7.2
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.7.2
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.299 47,520.00 61,747
3. Polytene 125 mikron M.112 Kg 0.512 46,560.00 23,851
4. Curing Compound M.252 Ltr 0.382 37,833.33 14,468
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.005 2,860,000.00 14,648
7. Paku M.56.d Kg 0.799 21,648.00 17,286

JUMLAH HARGA BAHAN 1,021,755.66

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,059,431.87
E. OVERHEAD & PROFIT 15.0 % x D 158,914.78
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,218,346.66
G. HARGA SATUAN PEKERJAAN / M3 1,218,346.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.7.3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.7.3 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.457 46,560.00 21,275
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.010 2,860,000.00 29,696
7. Paku M.56.d Kg 0.716 21,648.00 15,503

JUMLAH HARGA BAHAN 1,049,862.01

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,087,538.22
E. OVERHEAD & PROFIT 15.0 % x D 163,130.73
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,250,668.96
G. HARGA SATUAN PEKERJAAN / M3 1,250,668.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.7.4
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.7.4
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 1.126 47,520.00 53,514
3. Polytene 125 mikron M.112 Kg 0.457 46,560.00 21,275
4. Curing Compound M.252 Ltr 0.331 37,833.33 12,539
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.005 2,860,000.00 14,848
7. Paku M.56.d Kg 0.716 21,648.00 15,503

JUMLAH HARGA BAHAN 1,007,435.27

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,045,111.49
E. OVERHEAD & PROFIT 15.0 % x D 156,766.72
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,201,878.21
G. HARGA SATUAN PEKERJAAN / M3 1,201,878.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.8.1
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.8.1 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars, L = 3 m
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 0.845 47,520.00 40,135
3. Polytene 125 mikron M.112 Kg 0.348 46,560.00 16,210
4. Curing Compound M.252 Ltr 0.249 37,833.33 9,404
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.006 2,860,000.00 17,351
7. Paku M.56.d Kg 0.562 21,648.00 12,170

JUMLAH HARGA BAHAN 1,012,605.19

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,050,281.40
E. OVERHEAD & PROFIT 15.0 % x D 157,542.21
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,207,823.61
G. HARGA SATUAN PEKERJAAN / M3 1,207,823.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.8.2
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.8.2
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars, L = 3 m
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 0.845 47,520.00 40,135
3. Polytene 125 mikron M.112 Kg 0.348 46,560.00 16,210
4. Curing Compound M.252 Ltr 0.249 37,833.33 9,404
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.003 2,860,000.00 8,675
7. Paku M.56.d Kg 0.562 21,648.00 12,170

JUMLAH HARGA BAHAN 976,351.28

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,014,027.49
E. OVERHEAD & PROFIT 15.0 % x D 152,104.12
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,166,131.62
G. HARGA SATUAN PEKERJAAN / M3 1,166,131.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.9.1
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.9.1 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars, L = 3,5 m
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 0.845 47,520.00 40,135
3. Polytene 125 mikron M.112 Kg 0.348 46,560.00 16,222
4. Curing Compound M.252 Ltr 0.249 37,833.33 9,404
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.005 2,860,000.00 15,444
7. Paku M.56.d Kg 0.594 21,648.00 12,853

JUMLAH HARGA BAHAN 1,011,393.87

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,049,070.08
E. OVERHEAD & PROFIT 15.0 % x D 157,360.51
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,206,430.60
G. HARGA SATUAN PEKERJAAN / M3 1,206,430.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.9.2
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.9.2
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars, L = 3,5 m
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 0.845 47,520.00 40,135
3. Polytene 125 mikron M.112 Kg 0.348 46,560.00 16,222
4. Curing Compound M.252 Ltr 0.249 37,833.33 9,404
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.003 2,860,000.00 7,722
7. Paku M.56.d Kg 0.594 21,648.00 12,853

JUMLAH HARGA BAHAN 976,093.30

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,013,769.51
E. OVERHEAD & PROFIT 15.0 % x D 152,065.43
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,165,834.94
G. HARGA SATUAN PEKERJAAN / M3 1,165,834.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.10.1
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.10.1 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars, L = 4 m
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 0.845 47,520.00 40,135
3. Polytene 125 mikron M.112 Kg 0.350 46,560.00 16,296
4. Curing Compound M.252 Ltr 0.249 37,833.33 9,404
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.005 2,860,000.00 14,014
7. Paku M.56.d Kg 0.632 21,648.00 13,692

JUMLAH HARGA BAHAN 1,010,876.04

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,048,552.26
E. OVERHEAD & PROFIT 15.0 % x D 157,282.84
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,205,835.10
G. HARGA SATUAN PEKERJAAN / M3 1,205,835.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.10.2
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.10.2
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars, L = 4 m
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 0.845 47,520.00 40,135
3. Polytene 125 mikron M.112 Kg 0.350 46,560.00 16,296
4. Curing Compound M.252 Ltr 0.249 37,833.33 9,404
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.002 2,860,000.00 7,007
7. Paku M.56.d Kg 0.632 21,648.00 13,692

JUMLAH HARGA BAHAN 976,290.47

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,013,966.69
E. OVERHEAD & PROFIT 15.0 % x D 152,095.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,166,061.69
G. HARGA SATUAN PEKERJAAN / M3 1,166,061.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.11.1
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ddk dwl
PROYEK : ……………………………………………… ddk tb
NAMA PAKET : ……………………………………………… ###
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.11.1 ###
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) dengan Papan
Bekisting 1x pakai, tanpa tulangan dowel & tiebars, L = 4,5 m
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 0.845 47,520.00 40,135
3. Polytene 125 mikron M.112 Kg 0.352 46,560.00 16,411
4. Curing Compound M.252 Ltr 0.249 37,833.33 9,404
5. Kayu Bekisting M.20 m3 0.019 2,860,000.00 55,157
6. Kayu Acuan M.20 m3 0.005 2,860,000.00 12,902
7. Paku M.56.d Kg 0.676 21,648.00 14,633

JUMLAH HARGA BAHAN 1,010,820.54

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,048,496.76
E. OVERHEAD & PROFIT 15.0 % x D 157,274.51
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,205,771.27
G. HARGA SATUAN PEKERJAAN / M3 1,205,771.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.11.2
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.11.2
JENIS PEKERJAAN : Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) dengan Papan
Bekisting 2x pakai, tanpa tulangan dowel & tiebars, L = 4,5 m
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 jam 1.4056 13,371.00 18,794.58
2. Tukang Batu L.02 jam 0.7028 17,382.00 12,216.27
3. Mandor L.04 jam 0.1506 21,394.00 3,221.99

JUMLAH HARGA TENAGA 34,232.83

B. BAHAN
1. Mutu beton fc' 19,3 Mpa (K 225) Ready M.250.e m3 1.060 813,375.00 862,178
2. Joint Sealent & cutting M.569 Kg 0.845 47,520.00 40,135
3. Polytene 125 mikron M.112 Kg 0.352 46,560.00 16,411
4. Curing Compound M.252 Ltr 0.249 37,833.33 9,404
5. Kayu Bekisting M.20 m3 0.010 2,860,000.00 27,579
6. Kayu Acuan M.20 m3 0.002 2,860,000.00 6,451
7. Paku M.56.d Kg 0.676 21,648.00 14,633

JUMLAH HARGA BAHAN 976,791.08

C. PERALATAN
1. Concrete vibrator alat 20 jam 0.05 10,775.51 540.94
2. Water tanker truck 3000-4000 ℓ alat 43 jam 0.04 45,115.08 1,902.44
3. Alat Bantu Ls 1.00 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 3,443.38


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,014,467.30
E. OVERHEAD & PROFIT 15.0 % x D 152,170.09
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,166,637.39
G. HARGA SATUAN PEKERJAAN / M3 1,166,637.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
dihit.A.4.1.1.38.11.3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.11.3
JENIS PEKERJAAN : Pekerjaan Supercrete Premium Full Agregate
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 OH 0.1000 13,371.00 1,337.10
2. Tukang Batu L.02 OH 0.1000 17,382.00 1,738.20
3. Kepala Tukang L.03 OH 0.0200 18,318.00 366.36
4 Mandor L.04 OH 0.0100 21,394.00 213.94
JUMLAH HARGA TENAGA 3,655.60

B. BAHAN
1. Densifier A-01 M.256 pail 0.0070 1,550,000.00 10,850.00
2. Densifier B-01 M.256.a pail 0.0070 1,700,000.00 11,900.00
3. Densifier L-01 M.256.b pail 0.0070 2,100,000.00 14,700.00
4. Densifier EC - 1008 M.256.c pail 0.0050 1,800,000.00 9,000.00
5. Sealer (EC-S02) M.257 kg 0.0050 2,700,000.00 13,500.00
6. Metal Bond #30 M.588 set 0.0020 945,000.00 1,890.00
7. Metal Bond #60 M.588.a set 0.0020 945,000.00 1,890.00
8 Metal Bond #120 M.588.b set 0.0020 945,000.00 1,890.00
9 Resin Pad #50 M.589 set 0.0050 1,350,000.00 6,750.00
10 Resin Pad #100 M.589.a set 0.0050 1,350,000.00 6,750.00
11 Resin Pad #200 M.589.b set 0.0050 1,350,000.00 6,750.00
12 Resin Pad #400 M.589.c set 0.0050 1,350,000.00 6,750.00
13 Resin Pad #800 M.589.d set 0.0050 1,575,000.00 7,875.00
14 Burnish #1500 M.590 pcs 0.0040 470,000.00 1,880.00
15 Buffing M.591 pcs 0.0500 150,000.00 7,500.00
JUMLAH HARGA BAHAN 109,875.00

C. PERALATAN
1. Mesin grinding & polishing HTG series jam
alat 104 0.0570 225,000.00 12,825.00
2. Mesin Industrial Vacum Cleaner jam
alat 105 0.0730 187,500.00 13,687.50
3. Mesin Burnisher 17" jam
alat 106 0.1000 87,500.00 8,750.00
4 Gerinda 7" jam
alat 107 0.1000 1,875.00 187.50
JUMLAH HARGA PERALATAN 35,450.00
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 148,980.60
E. OVERHEAD & PROFIT 15.0 % x D 22,347.09
F. HARGA SATUAN PEKERJAAN ( D + E ) 171,327.69
G. HARGA SATUAN PEKERJAAN / M2 171,327.00
dihit.A.4.1.1.38.11.4
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.11.4
JENIS PEKERJAAN : Pekerjaan Supercrete Cream Finish
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 OH 0.1000 13,371.00 1,337.10
2. Tukang Batu L.02 OH 0.1000 17,382.00 1,738.20
3. Kepala Tukang L.03 OH 0.0200 18,318.00 366.36
4 Mandor L.04 OH 0.0100 21,394.00 213.94
JUMLAH HARGA TENAGA 3,655.60

B. BAHAN
1. Densifier A-01 M.256 pail 0.0070 1,550,000.00 10,850.00
2. Densifier B-01 M.256.a pail 0.0070 1,700,000.00 11,900.00
3. Densifier L-01 M.256.b pail 0.0070 2,100,000.00 14,700.00
4. Densifier EC - 1008 M.256.c pail 0.0050 1,800,000.00 9,000.00
5. Sealer (EC-S02) M.257 kg 0.0050 2,700,000.00 13,500.00
6. Metal Bond #30 M.588 set 0.0014 945,000.00 1,323.00
7. Metal Bond #60 M.588.a set 0.0014 945,000.00 1,323.00
8 Metal Bond #120 M.588.b set 0.0014 945,000.00 1,323.00
9 Resin Pad #50 M.589 set 0.0050 1,350,000.00 6,750.00
10 Resin Pad #100 M.589.a set 0.0050 1,350,000.00 6,750.00
11 Resin Pad #200 M.589.b set 0.0050 1,350,000.00 6,750.00
12 Resin Pad #400 M.589.c set 0.0050 1,350,000.00 6,750.00
13 Resin Pad #800 M.589.d set 0.0050 1,575,000.00 7,875.00
14 Burnish #1500 M.590 pcs 0.0040 470,000.00 1,880.00
15 Buffing M.591 pcs 0.0500 150,000.00 7,500.00
JUMLAH HARGA BAHAN 108,174.00

C. PERALATAN
1. Mesin grinding & polishing HTG series jam
alat 104 0.040 225,000.00 9,000.00
2. Mesin Industrial Vacum Cleaner jam
alat 105 0.050 187,500.00 9,375.00
3. Mesin Burnisher 17" jam
alat 106 0.100 87,500.00 8,750.00
4 Gerinda 7" jam
alat 107 0.100 1,875.00 187.50
JUMLAH HARGA PERALATAN 27,312.50
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 139,142.10
E. OVERHEAD & PROFIT 15.0 % x D 20,871.32
F. HARGA SATUAN PEKERJAAN ( D + E ) 160,013.42
G. HARGA SATUAN PEKERJAAN / M2 160,013.00
dihit.A.4.1.1.38.11.5
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : ………………………………………………
PROP / KAB / KODYA : KENDAL
ITEM PEMBAYARAN NO. : dihit.A.4.1.1.38.11.5
JENIS PEKERJAAN : Pekerjaan Stamping System (SYS)
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja L.01 OH 0.0714 13,371.00 954.69
2. Tukang Batu L.02 OH 0.0476 17,382.00 827.38
3. Kepala Tukang L.03 OH 0.0238 18,318.00 435.97
4 Mandor L.04 OH 0.0238 21,394.00 509.18
JUMLAH HARGA TENAGA 2,727.22

B. BAHAN
1. Colour Hardener M.258 kg 8.0000 9,300.00 74,400.00
2. Release Agent M.258.a kg 0.7000 80,000.00 56,000.00
3. Coating Primer M.258.b kg 0.4348 83,400.00 36,262.32
4. Coating Fiinishing M.258.c kg 0.3125 66,700.00 20,843.75
5. Bonding Agent M.258.d kg 0.1000 48,000.00 4,800.00
liter JUMLAH HARGA BAHAN 192,306.07

C. PERALATAN
1 Bullfloat alat 108 jam 0.130 1,125.00 146.25
2 Bullnose alat 109 jam 0.130 625.00 81.25
3 Gerinda 7" alat 107 jam 0.130 1,875.00 243.75
4 High Pressure alat 110 jam 0.130 4,166.67 541.67
5 Raskam alat 111 jam 0.130 208.00 27.04
6 Molding Stamp alat 112 jam 0.130 1,000.00 130.00
7 Safety alat 113 jam 0.130 800.00 104.00
JUMLAH HARGA PERALATAN 1,273.96
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 196,307.25
E. OVERHEAD & PROFIT 15.0 % x D 29,446.09
F. HARGA SATUAN PEKERJAAN ( D + E ) 225,753.33
G. HARGA SATUAN PEKERJAAN / M2 225,753.00
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DILUAR GEDUNG
dihit A.8.4.1.1.a Pemasangan 1 m Pipa PVC Ø 32 mm (SNI S-12,5 / 10 BAR) SCJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.081 93,597.00 7,581.36
Tukang pipa L.02 OH 0.041 121,674.00 4,988.63
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 13,768.06
B BAHAN
Pipa PVC Ø 32 mm (SNI S-12,5 / 10 BAR) SCJ M.606.a m 1.000 44,315.20 44,315.20
Lem M.611.ax Ls 0.100 36,080.00 3,608.00
JUMLAH HARGA BAHAN 47,923.20
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.006 316,800.00 1,900.80
JUMLAH HARGA ALAT 1,900.80
D Jumlah (A+B+C) 63,592.06
E Overhead & Profit 15% 0.150 9,538.81
F Harga Satuan Pekerjaan (D+E) 73,130.00
Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel.
Apabila ada tambahan peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan
gambar kerja.

dihit A.8.4.1.1.b Pemasangan 1 m Pipa PVC Ø 50 mm (SNI S-12,5 / 10 BAR) SCJ


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.081 93,597.00 7,581.36
Tukang pipa L.02 OH 0.041 121,674.00 4,988.63
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 13,768.06
B BAHAN
Pipa PVC Ø 50 mm (SNI S-12,5 / 10 BAR) SCJ M.606.b m 1.000 47,641.60 47,641.60
Lem M.611.ax Ls 0.100 36,080.00 3,608.00
JUMLAH HARGA BAHAN 51,249.60
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.006 316,800.00 1,900.80
JUMLAH HARGA ALAT 1,900.80
D Jumlah (A+B+C) 66,918.45
E Overhead & Profit 15% 0.150 10,037.77
F Harga Satuan Pekerjaan (D+E) 76,956.00
Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel.
Apabila ada tambahan peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan
gambar kerja.
dihit A.8.4.1.1.c Pemasangan 1 m pipa PVC Ø 63 mm (SNI S-12,5 / 10 BAR) SCJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.081 93,597.00 7,581.36
Tukang pipa L.02 OH 0.041 121,674.00 4,988.63
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 13,768.06
B BAHAN
Pipa PVC Ø 63 mm (SNI S-12,5 / 10 BAR) SCJ M.606.c m 1.000 51,548.80 51,548.80
Lem M.611.ax Ls 0.100 36,080.00 3,608.00
JUMLAH HARGA BAHAN 55,156.80
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.006 316,800.00 1,900.80
JUMLAH HARGA ALAT 1,900.80
D Jumlah (A+B+C) 70,825.66
E Overhead & Profit 15% 0.150 10,623.85
F Harga Satuan Pekerjaan (D+E) 81,449.00
Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel.
Apabila ada tambahan peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan
gambar kerja.

dihit A.8.4.1.1.d Pemasangan 1 m pipa PVC Ø 63 mm (SNI S-12,5 / 10 BAR) RRJ


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.081 93,597.00 7,581.36
Tukang pipa L.02 OH 0.041 121,674.00 4,988.63
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 13,768.06
B BAHAN
Pipa PVC Ø 63 mm (SNI S-12,5 / 10 BAR) RRJ M.607.a m 1.000 53,449.60 53,449.60
Lem M.611.ax Ls 0.100 36,080.00 3,608.00
JUMLAH HARGA BAHAN 53,449.60
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.006 316,800.00 1,900.80
JUMLAH HARGA ALAT 1,900.80
D Jumlah (A+B+C) 70,922.45
E Overhead & Profit 15% 0.150 10,638.37
F Harga Satuan Pekerjaan (D+E) 81,560.00

dihit A.8.4.1.1.e Pemasangan 1 m pipa PVC AW Ø 75 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.088 93,597.00 8,189.74
Tukang pipa L.02 OH 0.044 121,674.00 5,353.66
Mandor L.04 OH 0.009 149,758.00 1,272.94
JUMLAH TENAGA KERJA 14,816.34
B BAHAN
Pipa PVC tipe AW Ø 2 1/2" panjang 4 m M.40.f m 0.250 144,056.00 36,014.00
Lem M.611.ax Ls 0.200 36,080.00 7,216.00
JUMLAH HARGA BAHAN 43,230.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.007 316,800.00 2,217.60
JUMLAH HARGA ALAT 2,217.60
D Jumlah (A+B+C) 60,263.94
E Overhead & Profit 15% 0.150 9,039.59
F Harga Satuan Pekerjaan (D+E) 69,303.00
dihit A.8.4.1.1.f Pemasangan 1 m pipa PVC Ø 75 mm (SNI S-12,5 / 10 BAR) SCJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.088 93,597.00 8,189.74
Tukang pipa L.02 OH 0.044 121,674.00 5,353.66
Mandor L.04 OH 0.009 149,758.00 1,272.94
JUMLAH TENAGA KERJA 14,816.34
B BAHAN
Pipa PVC Ø 75 mm (SNI S-12,5 / 10 BAR) SCJ M.606.d m 1.000 64,220.80 64,220.80
Lem M.611.ax Ls 0.200 36,080.00 7,216.00
JUMLAH HARGA BAHAN 71,436.80
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.007 316,800.00 2,217.60
JUMLAH HARGA ALAT 2,217.60
D Jumlah (A+B+C) 88,470.74
E Overhead & Profit 15% 0.150 13,270.61
F Harga Satuan Pekerjaan (D+E) 101,741.00

dihit A.8.4.1.2.a Pemasangan 1 m pipa PVC Ø 90 mm (SNI S-12,5 / 10 BAR) SCJ


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.094 93,597.00 8,798.12
Tukang pipa L.02 OH 0.047 121,674.00 5,718.68
Mandor L.04 OH 0.009 149,758.00 1,347.82
JUMLAH TENAGA KERJA 15,864.62
B BAHAN
Pipa PVC Ø 90 mm (SNI S-12,5 / 10 BAR) SCJ M.606.e m 1.000 93,621.00 93,621.00
Lem M.611.ax Ls 0.300 36,080.00 10,824.00
JUMLAH HARGA BAHAN 104,445.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.008 316,800.00 2,534.40
JUMLAH HARGA ALAT 2,534.40
D Jumlah (A+B+C) 122,844.02
E Overhead & Profit 15% 0.150 18,426.60
F Harga Satuan Pekerjaan (D+E) 141,270.00

dihit A.8.4.1.2.b Pemasangan 1 m pipa PVC Ø 90 mm (SNI S-12,5 / 10 BAR) RRJ


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.094 93,597.00 8,798.12
Tukang pipa L.02 OH 0.047 121,674.00 5,718.68
Mandor L.04 OH 0.009 149,758.00 1,347.82
JUMLAH TENAGA KERJA 15,864.62
B BAHAN
Pipa PVC Ø 90 mm (SNI S-12,5 / 10 BAR) RRJ M.607.c m 1.000 99,323.40 99,323.40
Lem M.611.ax Ls 0.300 36,080.00 10,824.00
JUMLAH HARGA BAHAN 99,323.40
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.008 316,800.00 2,534.40
JUMLAH HARGA ALAT 2,534.40
D Jumlah (A+B+C) 123,134.42
E Overhead & Profit 15% 0.150 18,470.16
F Harga Satuan Pekerjaan (D+E) 141,604.00
dihit A.8.4.1.3.a Pemasangan 1 m pipa PVC Ø 110 mm (SNI S-12,5 / 10 BAR) SCJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.105 93,597.00 9,827.69
Tukang pipa L.02 OH 0.053 121,674.00 6,448.72
Mandor L.04 OH 0.011 149,758.00 1,647.34
JUMLAH TENAGA KERJA 17,923.75
B BAHAN
Pipa PVC Ø 110 mm (SNI S-12,5 / 10 BAR) SCJ M.606.f m 1.000 135,321.60 135,321.60
Lem M.611.ax Ls 0.300 36,080.00 10,824.00
JUMLAH HARGA BAHAN 146,145.60
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.010 316,800.00 3,168.00
JUMLAH HARGA ALAT 3,168.00
D Jumlah (A+B+C) 167,237.35
E Overhead & Profit 15% 0.150 25,085.60
F Harga Satuan Pekerjaan (D+E) 192,322.00

dihit A.8.4.1.3.b Pemasangan 1 m pipa PVC Ø 110 mm (SNI S-12,5 / 10 BAR) RRJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.105 93,597.00 9,827.69
Tukang pipa L.02 OH 0.053 121,674.00 6,448.72
Mandor L.04 OH 0.011 149,758.00 1,647.34
JUMLAH TENAGA KERJA 17,923.75
B BAHAN
Pipa PVC Ø 110 mm (SNI S-12,5 / 10 BAR) RRJ M.607.d m 1.000 142,502.40 142,502.40
Lem M.611.ax Ls 0.300 36,080.00 10,824.00
JUMLAH HARGA BAHAN 142,502.40
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.010 316,800.00 3,168.00
JUMLAH HARGA ALAT 3,168.00
D Jumlah (A+B+C) 169,006.15
E Overhead & Profit 15% 0.150 25,350.92
F Harga Satuan Pekerjaan (D+E) 194,357.00

dihit. A.8.4.1.4.a Pemasangan 1 m pipa PVC Ø 160 mm (SNI S-12,5 / 10 BAR) SCJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.118 93,597.00 11,044.45
Tukang pipa L.02 OH 0.059 121,674.00 7,178.77
Mandor L.04 OH 0.012 149,758.00 1,797.10
JUMLAH TENAGA KERJA 20,020.31
B BAHAN
Pipa PVC Ø 160 mm (SNI S-12,5 / 10 BAR) SCJ M.606.g m 1.000 272,976.00 272,976.00
Lem M.611.ax Ls 0.500 36,080.00 18,040.00
JUMLAH HARGA BAHAN 291,016.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.012 316,800.00 3,801.60
JUMLAH HARGA ALAT 3,801.60
D Jumlah (A+B+C) 314,837.91
E Overhead & Profit 15% 0.150 47,225.69
F Harga Satuan Pekerjaan (D+E) 362,063.00
dihit. A.8.4.1.4.b Pemasangan 1 m pipa PVC Ø 160 mm (SNI S-12,5 / 10 BAR) RRJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.118 93,597.00 11,044.45
Tukang pipa L.02 OH 0.059 121,674.00 7,178.77
Mandor L.04 OH 0.012 149,758.00 1,797.10
JUMLAH TENAGA KERJA 20,020.31
B BAHAN
Pipa PVC Ø 160 mm (SNI S-12,5 / 10 BAR) RRJ M.607.e m 1.000 283,852.80 283,852.80
Lem M.611.ax Ls 0.500 36,080.00 18,040.00
JUMLAH HARGA BAHAN 283,852.80
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.012 316,800.00 3,801.60
JUMLAH HARGA ALAT 3,801.60
D Jumlah (A+B+C) 316,694.71
E Overhead & Profit 15% 0.150 47,504.21
F Harga Satuan Pekerjaan (D+E) 364,198.00

dihit. A.8.4.1.5.a Pemasngan 1 m pipa PVC Ø 200 mm (SNI S-12,5 / 10 BAR) SCJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.189 93,597.00 17,689.83
Tukang pipa L.02 OH 0.095 121,674.00 11,559.03
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 32,094.27
B BAHAN
Pipa PVC Ø 200 mm (SNI S-12,5 / 10 BAR) SCJ M.606.h m 1.000 365,686.46 365,686.46
Lem M.611.ax Ls 0.500 36,080.00 18,040.00
JUMLAH HARGA BAHAN 383,726.46
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.024 316,800.00 7,603.20
JUMLAH HARGA ALAT 7,603.20
D Jumlah (A+B+C) 423,423.93
E Overhead & Profit 15% 0.150 63,513.59
F Harga Satuan Pekerjaan (D+E) 486,937.00

dihit. A.8.4.1.5.b Pemasngan 1 m pipa PVC Ø 200 mm (SNI S-12,5 / 10 BAR) RRJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.189 93,597.00 17,689.83
Tukang pipa L.02 OH 0.095 121,674.00 11,559.03
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 32,094.27
B BAHAN
Pipa PVC Ø 200 mm (SNI S-12,5 / 10 BAR) RRJ M.607.f m 1.000 425,172.00 425,172.00
Lem M.611.ax Ls 0.500 36,080.00 18,040.00
JUMLAH HARGA BAHAN 425,172.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.024 316,800.00 7,603.20
JUMLAH HARGA ALAT 7,603.20
D Jumlah (A+B+C) 473,889.46
E Overhead & Profit 15% 0.150 71,083.42
F Harga Satuan Pekerjaan (D+E) 544,972.00
dihit. A.8.4.1.6.a Pemasangan 1 m pipa PVC Ø 250 mm (SNI S-12,5 / 10 BAR) SCJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.256 93,597.00 23,960.83
Tukang pipa L.02 OH 0.128 121,674.00 15,574.27
Mandor L.04 OH 0.026 149,758.00 3,893.71
JUMLAH TENAGA KERJA 43,428.81
B BAHAN
Pipa PVC Ø 250 mm (SNI S-12,5 / 10 BAR) SCJ M.606.i m 1.000 567,107.90 567,107.90
Lem M.611.ax Ls 0.700 36,080.00 25,256.00
JUMLAH HARGA BAHAN 592,363.90
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.034 316,800.00 10,771.20
JUMLAH HARGA ALAT 10,771.20
D Jumlah (A+B+C) 646,563.92
E Overhead & Profit 15% 0.150 96,984.59
F Harga Satuan Pekerjaan (D+E) 743,548.00

dihit. A.8.4.1.6.b Pemasangan 1 m pipa PVC Ø 250 mm (SNI S-12,5 / 10 BAR) RRJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.256 93,597.00 23,960.83
Tukang pipa L.02 OH 0.128 121,674.00 15,574.27
Mandor L.04 OH 0.026 149,758.00 3,893.71
JUMLAH TENAGA KERJA 43,428.81
B BAHAN
Pipa PVC Ø 250 mm (SNI S-12,5 / 10 BAR) RRJ M.607.g m 1.000 650,566.40 650,566.40
Lem M.611.ax Ls 0.700 36,080.00 25,256.00
JUMLAH HARGA BAHAN 650,566.40
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.034 316,800.00 10,771.20
JUMLAH HARGA ALAT 10,771.20
D Jumlah (A+B+C) 717,394.41
E Overhead & Profit 15% 0.150 107,609.16
F Harga Satuan Pekerjaan (D+E) 825,003.00

dihit. A.8.4.1.7.a Pemasangan 1 m pipa PVC Ø 315 mm (SNI S-12,5 / 10 BAR) SCJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.294 93,597.00 27,517.52
Tukang pipa L.02 OH 0.147 121,674.00 17,886.08
Mandor L.04 OH 0.029 149,758.00 4,342.98
JUMLAH TENAGA KERJA 49,746.58
B BAHAN
Pipa PVC Ø 315 mm (SNI S-12,5 / 10 BAR) SCJ M.606.j m 1.000 898,537.73 898,537.73
Lem M.611.ax Ls 0.800 36,080.00 28,864.00
JUMLAH HARGA BAHAN 927,401.73
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.040 316,800.00 12,672.00
JUMLAH HARGA ALAT 12,672.00
D Jumlah (A+B+C) 989,820.31
E Overhead & Profit 15% 0.150 148,473.05
F Harga Satuan Pekerjaan (D+E) 1,138,293.00
dihit. A.8.4.1.7.b Pemasangan 1 m pipa PVC Ø 315 mm (SNI S-12,5 / 10 BAR) RRJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.294 93,597.00 27,517.52
Tukang pipa L.02 OH 0.147 121,674.00 17,886.08
Mandor L.04 OH 0.029 149,758.00 4,342.98
JUMLAH TENAGA KERJA 49,746.58
B BAHAN
Pipa PVC Ø 315 mm (SNI S-12,5 / 10 BAR) RRJ M.607.h m 1.000 1,022,736.00 1,022,736.00
Lem M.611.ax Ls 0.800 36,080.00 28,864.00
JUMLAH HARGA BAHAN 1,022,736.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.040 316,800.00 12,672.00
JUMLAH HARGA ALAT 12,672.00
D Jumlah (A+B+C) 1,099,586.58
E Overhead & Profit 15% 0.150 164,937.99
F Harga Satuan Pekerjaan (D+E) 1,264,524.00

dihit. A.8.4.1.8.a Pemasangan 1 m pipa PVC Ø 400 mm (SNI S-12,5 / 10 BAR) SCJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.544 93,597.00 50,916.77
Tukang pipa L.02 OH 0.272 121,674.00 33,095.33
Mandor L.04 OH 0.054 149,758.00 8,086.93
JUMLAH TENAGA KERJA 92,099.03
B BAHAN
Pipa PVC Ø 400 mm (SNI S-12,5 / 10 BAR) SCJ M.606.k m 1.000 1,325,161.73 1,325,161.73
Lem M.611.ax Ls 0.800 36,080.00 28,864.00
JUMLAH HARGA BAHAN 1,354,025.73
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.080 316,800.00 25,344.00
JUMLAH HARGA ALAT 25,344.00
D Jumlah (A+B+C) 1,471,468.76
E Overhead & Profit 15% 0.150 220,720.31
F Harga Satuan Pekerjaan (D+E) 1,692,189.00

dihit. A.8.4.1.8.b Pemasangan 1 m pipa PVC Ø 400 mm (SNI S-12,5 / 10 BAR) RRJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.544 93,597.00 50,916.77
Tukang pipa L.02 OH 0.272 121,674.00 33,095.33
Mandor L.04 OH 0.054 149,758.00 8,086.93
JUMLAH TENAGA KERJA 92,099.03
B BAHAN
Pipa PVC Ø 400 mm (SNI S-12,5 / 10 BAR) RRJ M.607.i m 1.000 1,658,527.20 1,658,527.20
Lem M.611.ax Ls 0.800 36,080.00 28,864.00
JUMLAH HARGA BAHAN 1,658,527.20
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.080 316,800.00 25,344.00
JUMLAH HARGA ALAT 25,344.00
D Jumlah (A+B+C) 1,790,402.23
E Overhead & Profit 15% 0.150 268,560.33
F Harga Satuan Pekerjaan (D+E) 2,058,962.00
dihit. A.8.4.1.77.a Pemasangan 1 m pipa baja Ø 1/2" (stainless steel)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 93,597.00 5,054.24
Tukang pipa L.02 OH 0.090 121,674.00 10,950.66
Mandor L.04 OH 0.027 149,758.00 4,043.47
JUMLAH TENAGA KERJA 20,048.36
B BAHAN
Pipa SS304 Ø 1/2" M.601.a m 1.000 29,040.00 29,040.00

JUMLAH HARGA BAHAN 29,040.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 49,088.36
E Overhead & Profit 15% 0.150 7,363.25
F Harga Satuan Pekerjaan (D+E) 56,451.00

dihit. A.8.4.1.77.b Pemasangan 1 m pipa baja Ø 3/4" (stainless steel)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 93,597.00 5,054.24
Tukang pipa L.02 OH 0.090 121,674.00 10,950.66
Mandor L.04 OH 0.027 149,758.00 4,043.47
JUMLAH TENAGA KERJA 20,048.36
B BAHAN
Pipa SS304 Ø 3/4" M.601.b m 1.000 43,032.00 43,032.00

JUMLAH HARGA BAHAN 43,032.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 63,080.36
E Overhead & Profit 15% 0.150 9,462.05
F Harga Satuan Pekerjaan (D+E) 72,542.00

dihit. A.8.4.1.77.c Pemasangan 1 m pipa baja Ø 1" (stainless steel)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 93,597.00 5,054.24
Tukang pipa L.02 OH 0.090 121,674.00 10,950.66
Mandor L.04 OH 0.027 149,758.00 4,043.47
JUMLAH TENAGA KERJA 20,048.36
B BAHAN
Pipa SS304 Ø 1" M.601.c m 1.000 55,968.00 55,968.00

JUMLAH HARGA BAHAN 55,968.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 76,016.36
E Overhead & Profit 15% 0.150 11,402.45
F Harga Satuan Pekerjaan (D+E) 87,418.00
dihit. A.8.4.1.77.d Pemasangan 1 m pipa baja Ø 1.1/2" (stainless steel)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.108 93,597.00 10,108.48
Tukang pipa L.02 OH 0.180 121,674.00 21,901.32
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 32,758.59
B BAHAN
Pipa SS304 Ø 1.1/2" M.601.d m 1.000 84,744.00 84,744.00

JUMLAH HARGA BAHAN 84,744.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 117,502.59
E Overhead & Profit 15% 0.150 17,625.39
F Harga Satuan Pekerjaan (D+E) 135,127.00

dihit. A.8.4.1.77.e Pemasangan 1 m pipa baja Ø 2" (stainless steel)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.108 93,597.00 10,108.48
Tukang pipa L.02 OH 0.180 121,674.00 21,901.32
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 32,758.59
B BAHAN
Pipa SS304 Ø 2" M.601.e m 1.000 114,576.00 114,576.00

JUMLAH HARGA BAHAN 114,576.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 147,334.59
E Overhead & Profit 15% 0.150 22,100.19
F Harga Satuan Pekerjaan (D+E) 169,434.00

dihit. A.8.4.1.77.f Pemasangan 1 m pipa baja Ø 2.1/2" (stainless steel)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.122 93,597.00 11,372.04
Tukang pipa L.02 OH 0.202 121,674.00 24,638.98
Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 36,909.57
B BAHAN
Pipa SS304 Ø 2.1/2" M.601.f m 1.000 142,296.00 142,296.00
Perlengkapan % 35.000 142,296.00 49,803.60
JUMLAH HARGA BAHAN 192,099.60
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 229,009.17
E Overhead & Profit 15% 0.150 34,351.38
F Harga Satuan Pekerjaan (D+E) 263,360.00
dihit. A.8.4.1.77.g Pemasangan 1 m pipa baja Ø 3" (stainless steel)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.135 93,597.00 12,635.60
Tukang pipa L.02 OH 0.225 121,674.00 27,376.65
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 41,060.55
B BAHAN
Pipa SS304 Ø 3" M.601.g m 1.000 171,072.00 171,072.00
Perlengkapan % 35.000 171,072.00 59,875.20
JUMLAH HARGA BAHAN 230,947.20
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 272,007.75
E Overhead & Profit 15% 0.150 40,801.16
F Harga Satuan Pekerjaan (D+E) 312,808.00

dihit. A.8.4.1.77.h Pemasangan 1 m pipa baja Ø 3.1/2" (stainless steel)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.135 93,597.00 12,635.60
Tukang pipa L.02 OH 0.225 121,674.00 27,376.65
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 41,060.55
B BAHAN
Pipa SS304 Ø 3.1/2" M.601.h m 1.000 193,261.73 193,261.73
Perlengkapan % 35.000 193,261.73 67,641.60
JUMLAH HARGA BAHAN 260,903.33
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 301,963.88
E Overhead & Profit 15% 0.150 45,294.58
F Harga Satuan Pekerjaan (D+E) 347,258.00

dihit. A.8.4.1.77.i Pemasangan 1 m pipa baja Ø 4" (stainless steel)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.135 93,597.00 12,635.60
Tukang pipa L.02 OH 0.225 121,674.00 27,376.65
Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA KERJA 41,060.55
B BAHAN
Pipa SS304 Ø 4" M.601.i m 1.000 227,040.00 227,040.00
Perlengkapan % 35.000 227,040.00 79,464.00
JUMLAH HARGA BAHAN 306,504.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 347,564.55
E Overhead & Profit 15% 0.150 52,134.68
F Harga Satuan Pekerjaan (D+E) 399,699.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.a Pekerjaan incian pipa GI Ø 0,5" panjang 0,5 m
Pipa galvanis medium A Ø 1/2" panjang 6 m M.44.a 0,5 m 0.083 269,280.00 22,440.00
Ongkos las pipa GI Ø 0.5" Ls unit 2.000 5,900.00 11,800.00

Jumlah (A+B+C) 34,240.00


Overhead & Profit 15% 0.150 5,136.00
Harga Satuan Pekerjaan (D+E) 39,376.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.b Pekerjaan incian pipa GI Ø 1" panjang 0,5 m
Pipa galvanis medium A Ø 1" panjang 6 m M.44.c 0,5 m 0.083 528,000.00 44,000.00
Ongkos las pipa GI Ø 1" Ls unit 2.000 11,900.00 23,800.00

Jumlah (A+B+C) 67,800.00


Overhead & Profit 15% 0.150 10,170.00
Harga Satuan Pekerjaan (D+E) 77,970.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.c Pekerjaan incian pipa GI Ø 2" panjang 0,5 m
Pipa galvanis medium A Ø 2" panjang 6 m M.44.e 0,5 m 0.083 1,077,120.00 89,760.00
Ongkos las pipa GI Ø 2" Ls unit 2.000 23,700.00 47,400.00

Jumlah (A+B+C) 137,160.00


Overhead & Profit 15% 0.150 20,574.00
Harga Satuan Pekerjaan (D+E) 157,734.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.d Pekerjaan incian pipa GI Ø 3" panjang 0,5 m
Pipa galvanis medium A Ø 3" panjang 6 m M.44.f 0,5 m 0.083 1,182,720.00 98,560.00
Ongkos las pipa GI Ø 3" Ls unit 2.000 35,500.00 71,000.00

Jumlah (A+B+C) 169,560.00


Overhead & Profit 15% 0.150 25,434.00
Harga Satuan Pekerjaan (D+E) 194,994.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.e Pekerjaan incian pipa GI Ø 4" panjang 0,5 m
Pipa galvanis medium A Ø 4" panjang 6 m M.44.g 0,5 m 0.083 1,895,520.00 157,960.00
Ongkos las pipa GI Ø 4" Ls unit 2.000 47,300.00 94,600.00

Jumlah (A+B+C) 252,560.00


Overhead & Profit 15% 0.150 37,884.00
Harga Satuan Pekerjaan (D+E) 290,444.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.f Pekerjaan incian pipa GI Ø 0,5" panjang 0,5 m
Pipa galvanis medium A Ø 1/2" panjang 6 m M.44.a 0,5 m 0.083 269,280.00 22,440.00
Ongkos drat pipa Ø 1/2" s/d Ø 2" Ls unit 1.000 10,100.00 10,100.00

Jumlah (A+B+C) 32,540.00


Overhead & Profit 15% 0.150 4,881.00
Harga Satuan Pekerjaan (D+E) 37,421.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.g Pekerjaan incian pipa GI Ø 1" panjang 0,5 m
Pipa galvanis medium A Ø 1" panjang 6 m M.44.c 0,5 m 0.083 528,000.00 44,000.00
Ongkos drat pipa Ø 1/2" s/d Ø 2" Ls unit 1.000 10,100.00 10,100.00

Jumlah (A+B+C) 54,100.00


Overhead & Profit 15% 0.150 8,115.00
Harga Satuan Pekerjaan (D+E) 62,215.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.h Pekerjaan incian pipa GI Ø 2" panjang 0,5 m
Pipa galvanis medium A Ø 2" panjang 6 m M.44.e 0,5 m 0.083 1,077,120.00 89,760.00
Ongkos drat pipa Ø 1/2" s/d Ø 2" Ls unit 1.000 10,100.00 10,100.00

Jumlah (A+B+C) 99,860.00


Overhead & Profit 15% 0.150 14,979.00
Harga Satuan Pekerjaan (D+E) 114,839.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.i Pekerjaan incian pipa GI Ø 3" panjang 0,5 m
Pipa galvanis medium A Ø 3" panjang 6 m M.44.f 0,5 m 0.083 1,182,720.00 98,560.00
Ongkos drat pipa Ø 3" s/d Ø 4" Ls unit 1.000 15,100.00 15,100.00

Jumlah (A+B+C) 113,660.00


Overhead & Profit 15% 0.150 17,049.00
Harga Satuan Pekerjaan (D+E) 130,709.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.j Pekerjaan incian pipa GI Ø 4" panjang 0,5 m
Pipa galvanis medium A Ø 4" panjang 6 m M.44.g 0,5 m 0.083 1,895,520.00 157,960.00
Ongkos drat pipa Ø 3" s/d Ø 4" Ls unit 1.000 15,100.00 15,100.00

Jumlah (A+B+C) 173,060.00


Overhead & Profit 15% 0.150 25,959.00
Harga Satuan Pekerjaan (D+E) 199,019.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.k Pekerjaan incian pipa wall pipe GI Ø 2" panjang 0,5 m
Pipa galvanis medium A Ø 2" panjang 6 m M.44.e 0,5 m 0.083 1,077,120.00 89,760.00
Wall pipe all flange pipa GI Ø 2" - 50 cm buah 1.000 290,000.00 290,000.00
Ongkos las pipa GI Ø 2" Ls unit 1.000 23,700.00 23,700.00
Ongkos drat pipa Ø 1/2" s/d Ø 2" Ls unit 1.000 10,100.00 10,100.00

Jumlah (A+B+C) 413,560.00


Overhead & Profit 15% 0.150 62,034.00
Harga Satuan Pekerjaan (D+E) 475,594.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.l Pekerjaan incian pipa wall pipe GI Ø 3" panjang 0,5 m
Pipa galvanis medium A Ø 3" panjang 6 m M.44.f 0,5 m 0.083 1,182,720.00 98,560.00
Wall pipe all flange pipa GI Ø 3" - 50 cm buah 1.000 505,000.00 505,000.00
Ongkos las pipa GI Ø 3" Ls unit 1.000 35,500.00 35,500.00
Ongkos drat pipa Ø 3" s/d Ø 4" Ls unit 1.000 15,100.00 15,100.00

Jumlah (A+B+C) 654,160.00


Overhead & Profit 15% 0.150 98,124.00
Harga Satuan Pekerjaan (D+E) 752,284.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.78.m Pekerjaan incian pipa wall pipe GI Ø 4" panjang 0,5 m
Pipa galvanis medium A Ø 4" panjang 6 m M.44.g 0,5 m 0.083 1,895,520.00 157,960.00
Wall pipe all flange pipa GI Ø 4" - 50 cm buah 1.000 663,300.00 663,300.00
Ongkos las pipa GI Ø 4" Ls unit 1.000 47,300.00 47,300.00
Ongkos drat pipa Ø 3" s/d Ø 4" Ls unit 1.000 15,100.00 15,100.00

Jumlah (A+B+C) 883,660.00


Overhead & Profit 15% 0.150 132,549.00
Harga Satuan Pekerjaan (D+E) 1,016,209.00
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.79.a Pemasangan 1 m' Pipa HDPE Ø75 mm
A TENAGA
1 Pekerja L.01 OH 0.100 93,429.00 9,342.90
2 Tukang Pipa L.02 OH 0.410 121,457.00 49,797.37
3 Mandor L.04 OH 0.005 149,485.00 747.43
Sub Total A 59,887.70
B BAHAN
1 Pipa HDPE Ø75 mm M.603.n OH 1.200 91,575.00 109,890.00
2 Air M.550.a OH 2.355 4,065.60 9,574.49
3 Disinfeksi - Ls 1.000 5,000.00 5,000.00
Sub Total B 124,464.49
C ALAT
1 Alat Bantu, Dll - Ls 0.600 25,000.00 15,000.00
Sub Total C 15,000.00
D JUMLAH (A+B+C) 199,352.18
E Overhead & Profit 15% 0.150 29,902.83
F Harga Satuan Pekerjaan (D+E) 229,255.01
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.79.b Pemasangan 1 m' Pipa HDPE Ø200 mm
A TENAGA
1 Pekerja L.01 OH 1.110 93,597.00 103,892.67
2 Tukang Pipa L.02 OH 0.060 121,674.00 7,300.44
3 Mandor L.04 OH 0.030 149,758.00 4,492.74
Sub Total A 115,685.85
B BAHAN
1 Pipa HDPE Ø200 mm M.603.e OH 1.100 538,747.50 592,622.25
2 Air M.550.a OH 6.280 4,065.60 25,531.97
3 Disinfeksi - Ls 1.000 5,000.00 5,000.00
Sub Total B 623,154.22
C ALAT
1 Alat Bantu, Dll - Ls 0.600 50,000.00 30,000.00
Sub Total C 30,000.00
D JUMLAH (A+B+C) 768,840.07
E Overhead & Profit 15% 0.150 115,326.01
F Harga Satuan Pekerjaan (D+E) 884,166.08
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.79.c Pemasangan 1 m' Pipa HDPE Ø250 mm
A TENAGA
1 Pekerja L.01 OH 0.250 93,597.00 23,399.25
2 Tukang Pipa L.02 OH 0.130 121,674.00 15,817.62
3 Mandor L.04 OH 0.049 149,758.00 7,338.14
Sub Total A 46,555.01
B BAHAN
1 Pipa HDPE Ø250 mm M.603.f OH 1.100 801,825.00 882,007.50
2 Air M.550.a OH 7.850 4,065.60 31,914.96
3 Disinfeksi - Ls 1.000 5,000.00 5,000.00
Sub Total B 918,922.46
C ALAT
1 Alat Bantu, Dll - Ls 0.600 50,000.00 30,000.00
Sub Total C 30,000.00
D JUMLAH (A+B+C) 995,477.47
E Overhead & Profit 15% 0.150 149,321.62
F Harga Satuan Pekerjaan (D+E) 1,144,799.09
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.80.a Pemasangan 1 m' Pipa PVC Ø250 mm
A TENAGA
1 Pekerja L.01 OH 0.250 93,597.00 23,399.25
2 Tukang Pipa L.02 OH 0.130 121,674.00 15,817.62
3 Mandor L.04 OH 0.049 149,758.00 7,338.14
Sub Total A 46,555.01
B BAHAN
1 Pipa HDPE Ø250 mm M.603.f OH 1.100 801,825.00 882,007.50
2 Air M.550.a OH 7.850 4,065.60 31,914.96
3 Disinfeksi - Ls 1.000 5,000.00 5,000.00
Sub Total B 918,922.46
C ALAT
1 Alat Bantu, Dll - Ls 0.600 50,000.00 30,000.00
Sub Total C 30,000.00
D JUMLAH (A+B+C) 995,477.47
E Overhead & Profit 15% 0.150 149,321.62
F Harga Satuan Pekerjaan (D+E) 1,144,799.09
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.80.a Pemasangan 1 m' Pipa PVC Tipe AW Ø 0,5 Inch
A TENAGA
1 Pekerja L.01 OH 0.036 93,597.00 3,369.49
2 Tukang Pipa L.02 OH 0.060 121,674.00 7,300.44
3 Kepala Tukang L.03 OH 0.006 128,226.00 769.36
4 Mandor L.04 OH 0.002 149,758.00 299.52
Sub Total A 11,738.80
B BAHAN
1 Pipa PVC tipe AW Ø 1/2" panjang 4 m M.40.a btg 0.300 33,800.00 10,140.00
2 Lem M.611.ax Kaleng 0.061 36,080.00 2,210.00
Sub Total B 12,350.00
C ALAT
1 Alat Bantu, Dll - Ls 1.000 6,022.20 6,022.20
Sub Total C 6,022.20
D JUMLAH (A+B+C) 30,111.00
E Overhead & Profit 15% 0.150 4,516.65
F Harga Satuan Pekerjaan (D+E) 34,627.66
Harga Satuan Jumlah Harga
NO DIHIT Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A.8.4.1.80.b Pemasangan 1 m' Pipa PVC Tipe AW Ø 1,5 Inch
A TENAGA
1 Pekerja L.01 OH 0.054 93,597.00 5,054.24
2 Tukang Pipa L.02 OH 0.090 121,674.00 10,950.66
3 Kepala Tukang L.03 OH 0.009 128,226.00 1,154.03
4 Mandor L.04 OH 0.003 149,758.00 449.27
Sub Total A 17,608.21
B BAHAN
1 Pipa PVC tipe AW Ø 1 1/2" panjang 4 m M.40.d btg 0.300 96,375.00 28,912.50
2 Lem M.611.ax Kaleng 0.193 36,080.00 6,950.00
Sub Total B 35,862.50
C ALAT
1 Alat Bantu, Dll - Ls 1.000 13,367.68 13,367.68
Sub Total C 13,367.68
D JUMLAH (A+B+C) 66,838.38
E Overhead & Profit 15% 0.150 10,025.76
F Harga Satuan Pekerjaan (D+E) 76,864.14
PEKERJAAN SANITASI DILUAR GEDUNG

dihit. AD.1.1 Jenis Pekerjaan : Got Normal U - Ø 15 cm ( lengkap terpasang )


Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA A
1. Pekerja L.01 OH 0.100 93,597.00 9,359.70
2. Tukang Batu L.02 OH 0.050 121,674.00 6,083.70
3. Kepala Tukang L.03 OH 0.005 128,226.00 641.13
4. Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA 16,833.32
B. BAHAN B
1. Got Normal U-15 M.96.a buah 1.100 42,240.00 46,464.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m³ 0.014 266,640.00 3,599.64
3. Bata merah 5 x 11 x 22 cm M.218.a buah 11.048 864.41 9,549.59
4. Portland cement M.245.a kg 2.205 1,375.00 3,031.88
5. Pasir Beton (m3) M.9.c m³ 0.032 339,234.40 10,685.88
JUMLAH HARGA BAHAN 73,330.98
C. PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 90,164.30
E Overhead & Profit 0.150 13,524.65
F Harga Satuan Pekerjaan (D+E) 103,688.00

dihit. AD.1.2 Jenis Pekerjaan : Got Normal U - Ø 20 cm ( lengkap terpasang ) Jenis Pekerjaa
Satuan Pekerjaan : m¹ Satuan Pekerja
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA A.
1. Pekerja L.01 OH 0.1400 93,597.00 13,103.58
2. Tukang Batu L.02 OH 0.0700 121,674.00 8,517.18
3. Kepala Tukang L.03 OH 0.0070 128,226.00 897.58
4. Mandor L.04 OH 0.0070 149,758.00 1,048.31
JUMLAH TENAGA 23,566.65
B. BAHAN B.
1. Got Normal U-20 M.96.b buah 1.1000 52,800.00 58,080.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m³ 0.0180 266,640.00 4,799.52
3. Bata merah 5 x 11 x 22 cm M.218.a buah 14.7300 864.41 12,732.78
4. Portland cement M.245.a kg 2.9400 1,375.00 4,042.50
5. Pasir Beton (m3) M.9.c m³ 0.0420 339,234.40 14,247.84
JUMLAH HARGA BAHAN 93,902.65
C. PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 117,469.29
E Overhead & Profit 0.150 17,620.39
F Harga Satuan Pekerjaan (D+E) 135,089.00
dihit. AD.1.3 Jenis Pekerjaan : Got Normal U - Ø 30 cm ( lengkap terpasang ) Jenis Pekerjaa
Satuan Pekerjaan : m¹ Satuan Pekerja
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.140 93,597.00 13,103.58
2. Tukang Batu L.02 OH 0.070 121,674.00 8,517.18
3. Kepala Tukang L.03 OH 0.007 128,226.00 897.58
4. Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA 23,566.65
B. BAHAN
1. Got Normal U-30 M.96.c m 1.100 76,560.00 84,216.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.052 266,640.00 13,798.62
3. Bata merah 5 x 11 x 22 cm M.218.a buah 30.000 864.41 25,932.34
4. Portland cement M.245.a kg 7.725 1,375.00 10,621.88
5. Pasir Beton (m3) M.9.c m3 0.046 339,234.40 15,519.97
JUMLAH HARGA BAHAN 150,088.81
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 173,655.46
E Overhead & Profit 0.150 26,048.32
F Harga Satuan Pekerjaan (D+E) 199,703.00
dihit. AD.1.4 Jenis Pekerjaan : Got Normal U - Ø 40 cm ( lengkap terpasang ) Jenis Pekerjaa
Satuan Pekerjaan : m¹ Satuan Pekerja
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.380 93,597.00 35,566.86
2. Tukang Batu L.02 OH 0.190 121,674.00 23,118.06
3. Kepala Tukang L.03 OH 0.019 128,226.00 2,436.29
4. Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA 63,966.62
B. BAHAN
1. Got Normal U-40 M.96.d m 1.100 95,040.00 104,544.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.052 266,640.00 13,798.62
3. Bata merah 5 x 11 x 22 cm M.218.a buah 30.000 864.41 25,932.34
4. Portland cement M.245.a kg 7.725 1,375.00 10,621.88
5. Pasir Beton (m3) M.9.c m3 0.046 339,234.40 15,519.97
JUMLAH HARGA BAHAN 170,416.81
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 234,383.43
E Overhead & Profit 0.150 35,157.51
F Harga Satuan Pekerjaan (D+E) 269,540.00
dihit. AD.1.5.a Jenis Pekerjaan : Got Normal U - Ø 60 cm ( lengkap terpasang ) Jenis Pekerjaa
Satuan Pekerjaan : m¹ Satuan Pekerja
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.380 93,597.00 35,566.86
2. Tukang Batu L.02 OH 0.190 121,674.00 23,118.06
3. Kepala Tukang L.03 OH 0.019 128,226.00 2,436.29
4. Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA 63,966.62
B. BAHAN
1. Got Normal U-60 M.96.e m 1.100 190,080.00 209,088.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.052 266,640.00 13,798.62
3. Bata merah 5 x 11 x 22 cm M.218.a buah 30.000 864.41 25,932.34
4. Portland cement M.245.a kg 7.725 1,375.00 10,621.88
5. Pasir Beton (m3) M.9.c m3 0.046 339,234.40 15,519.97
JUMLAH HARGA BAHAN 274,960.81
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 338,927.43
E Overhead & Profit 0.150 50,839.11
F Harga Satuan Pekerjaan (D+E) 389,766.00

dihit. AD.1.6 Jenis Pekerjaan : Buis beton Ø 20 cm ( lengkap terpasang )


Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.140 93,597.00 13,103.58
2. Tukang Batu L.02 OH 0.070 121,674.00 8,517.18
3. Kepala Tukang L.03 OH 0.007 128,226.00 897.58
4. Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA 23,566.65
B. BAHAN
1. Buis beton Ø 20 cm M.95.a buah 1.100 89,760.00 98,736.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m³ 0.024 266,640.00 6,399.36
3. Bata merah 5 x 11 x 22 cm M.218.a buah 19.640 864.41 16,977.04
4. Portland cement M.245.a kg 3.920 1,375.00 5,390.00
5. Pasir Beton (m3) M.9.c m³ 0.056 339,234.40 18,997.13
JUMLAH HARGA BAHAN 146,499.53
C. PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 170,066.17
E Overhead & Profit 0.150 25,509.93
F Harga Satuan Pekerjaan (D+E) 195,576.00
dihit. AD.1.7 Jenis Pekerjaan : Buis beton Ø 30 cm ( lengkap terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.140 93,597.00 13,103.58
2. Tukang Batu L.02 OH 0.070 121,674.00 8,517.18
3. Kepala Tukang L.03 OH 0.007 128,226.00 897.58
4. Mandor L.04 OH 0.007 149,758.00 1,048.31
JUMLAH TENAGA 23,566.65
B. BAHAN
1. Buis beton Ø 30 cm M.95.b m 1.100 116,160.00 127,776.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.069 266,640.00 18,398.16
3. Bata merah 5 x 11 x 22 cm M.218.a buah 40.000 864.41 34,576.46
4. Portland cement M.245.a kg 10.300 1,375.00 14,162.50
5. Pasir Beton (m3) M.9.c m3 0.061 339,234.40 20,693.30
JUMLAH HARGA BAHAN 215,606.42
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 239,173.06
E Overhead & Profit 0.150 35,875.96
F Harga Satuan Pekerjaan (D+E) 275,049.00

dihit. AD.1.8 Jenis Pekerjaan : Buis beton Ø 40 cm ( lengkap terpasang )


Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.380 93,597.00 35,566.86
2. Tukang Batu L.02 OH 0.190 121,674.00 23,118.06
3. Kepala Tukang L.03 OH 0.019 128,226.00 2,436.29
4. Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA 63,966.62
B. BAHAN
1. Buis beton Ø 40 cm M.95.c m 1.100 147,840.00 162,624.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.069 266,640.00 18,398.16
3. Bata merah 5 x 11 x 22 cm M.218.a buah 40.000 864.41 34,576.46
4. Portland cement M.245.a kg 10.300 1,375.00 14,162.50
5. Pasir Beton (m3) M.9.c m3 0.061 339,234.40 20,693.30
JUMLAH HARGA BAHAN 250,454.42
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 314,421.03
E Overhead & Profit 0.150 47,163.15
F Harga Satuan Pekerjaan (D+E) 361,584.00
dihit. AD.1.9 Jenis Pekerjaan : Buis beton Ø 60 cm ( lengkap terpasang )
Satuan Pekerjaan : m¹
Koefisien Harga Satuan Jumlah Harga
No Uraian Kode Satuan
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.380 93,597.00 35,566.86
2. Tukang Batu L.02 OH 0.190 121,674.00 23,118.06
3. Kepala Tukang L.03 OH 0.019 128,226.00 2,436.29
4. Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA 63,966.62
B. BAHAN
1. Buis beton Ø 60 cm M.95.e m 1.100 174,240.00 191,664.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.069 266,640.00 18,398.16
3. Bata merah 5 x 11 x 22 cm M.218.a buah 40.000 864.41 34,576.46
4. Portland cement M.245.a kg 10.300 1,375.00 14,162.50
5. Pasir Beton (m3) M.9.c m3 0.061 339,234.40 20,693.30
JUMLAH HARGA BAHAN 279,494.42
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 343,461.03
E Overhead & Profit 0.150 51,519.15
F Harga Satuan Pekerjaan (D+E) 394,980.00

dihit. AD.1.10 Jenis Pekerjaan : Buis beton Ø 80 cm ( lengkap terpasang )


Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.380 93,597.00 35,566.86
2. Tukang Batu L.02 OH 0.190 121,674.00 23,118.06
3. Kepala Tukang L.03 OH 0.019 128,226.00 2,436.29
4. Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA 63,966.62
B. BAHAN
1. Buis beton Ø 80 cm @50 cm M.95.f buah 2.200 229,680.00 505,296.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.069 266,640.00 18,398.16
3. Bata merah 5 x 11 x 22 cm M.218.a buah 40.000 864.41 34,576.46
4. Portland cement M.245.a kg 10.300 1,375.00 14,162.50
5. Pasir Beton (m3) M.9.c m3 0.061 339,234.40 20,693.30
JUMLAH HARGA BAHAN 593,126.42
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 657,093.03
E Overhead & Profit 0.150 98,563.95
F Harga Satuan Pekerjaan (D+E) 755,656.00
dihit. AD.1.11 Jenis Pekerjaan : Buis beton Ø 100 cm ( lengkap terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.380 93,597.00 35,566.86
2. Tukang Batu L.02 OH 0.190 121,674.00 23,118.06
3. Kepala Tukang L.03 OH 0.019 128,226.00 2,436.29
4. Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA 63,966.62
B. BAHAN
1. Buis beton Ø 100 cm @50 cm M.95.g buah 2.200 274,560.00 604,032.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.069 266,640.00 18,398.16
3. Bata merah 5 x 11 x 22 cm M.218.a buah 40.000 864.41 34,576.46
4. Portland cement M.245.a kg 10.300 1,375.00 14,162.50
5. Pasir Beton (m3) M.9.c m3 0.061 339,234.40 20,693.30
JUMLAH HARGA BAHAN 691,862.42
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 755,829.03
E Overhead & Profit 0.150 113,374.35
F Harga Satuan Pekerjaan (D+E) 869,203.00

dihit. AD.1.12 Jenis Pekerjaan : U-Ditch 20 x 20 cm, K - 350, Fabrikasi ( terpasang )


Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.093 93,597.00 8,704.52
2. Mandor L.04 OH 0.023 149,758.00 3,489.36
JUMLAH TENAGA 12,193.88
B. BAHAN
1. U - Ditch 20 x 20, panjang 120 cm, K-350, fabrikasi. M.97.a unit 0.833 232,320.00 193,600.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.015 733,666.67 10,638.17
JUMLAH HARGA BAHAN 204,238.17
C. PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 216,432.05
E Overhead & Profit 0.150 32,464.81
F Harga Satuan Pekerjaan (D+E) 248,896.00

dihit. AD.1.13 Jenis Pekerjaan : U-Ditch 30 x 30 cm, K - 350, Fabrikasi ( terpasang )


Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.093 93,597.00 8,704.52
2. Mandor L.04 OH 0.023 149,758.00 3,489.36
JUMLAH TENAGA 12,193.88
B. BAHAN
1. U - Ditch 30 x 30, panjang 120 cm, K-350, fabrikasi. M.97.b unit 0.833 295,408.00 246,173.33
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.020 733,666.67 14,306.50
JUMLAH HARGA BAHAN 260,479.83
C. PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 272,673.72
E Overhead & Profit 0.150 40,901.06
F Harga Satuan Pekerjaan (D+E) 313,574.00
dihit. AD.1.14 Jenis Pekerjaan : U-Ditch 40 x 40 cm, K - 350, Fabrikasi ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.093 93,597.00 8,704.52
2. Operator alat berat L.06 OH 0.023 93,597.00 2,180.81
3. Mandor L.04 OH 0.023 149,758.00 3,489.36
JUMLAH TENAGA 14,374.69
B. BAHAN
1. U - Ditch 40 x 40, panjang 120 cm, K-350, fabrikasi. M.97.c unit 0.833 359,920.00 299,933.33
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.025 733,666.67 18,341.67
JUMLAH HARGA BAHAN 318,275.00
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.161 528,000.00 84,819.28
JUMLAH HARGA ALAT 84,819.28
D Jumlah (A+B+C) 417,468.97
E Overhead & Profit 0.150 62,620.35
F Harga Satuan Pekerjaan (D+E) 480,089.00

dihit. AD.1.15 Jenis Pekerjaan : U-Ditch 50 x 50 cm, K - 350, Fabrikasi ( terpasang )


Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.093 93,597.00 8,704.52
2. Operator alat berat L.06 OH 0.023 93,597.00 2,180.81
3. Mandor L.04 OH 0.023 149,758.00 3,489.36
JUMLAH TENAGA 14,374.69
B. BAHAN
1. U - Ditch 50 x 50, panjang 120 cm, K-350, fabrikasi. M.97.d unit 0.833 504,560.00 420,466.67
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.032 733,666.67 23,477.33
JUMLAH HARGA BAHAN 443,944.00
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.161 528,000.00 84,819.28
JUMLAH HARGA ALAT 84,819.28
D Jumlah (A+B+C) 543,137.97
E Overhead & Profit 0.150 81,470.70
F Harga Satuan Pekerjaan (D+E) 624,608.00

dihit. AD.1.16 Jenis Pekerjaan : U-Ditch 60 x 60 cm, K - 350, Fabrikasi ( terpasang )


Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.154 93,597.00 14,395.22
2. Operator alat berat L.06 OH 0.039 93,597.00 3,603.48
3. Mandor L.04 OH 0.039 149,758.00 5,765.68
JUMLAH TENAGA 23,764.39
B. BAHAN
1. U - Ditch 60 x 60, panjang 120 cm, K-350, fabrikasi. M.97.e unit 0.833 667,056.00 555,880.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.037 733,666.67 27,145.67
JUMLAH HARGA BAHAN 583,025.67
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.261 528,000.00 137,831.33
JUMLAH HARGA ALAT 137,831.33
D Jumlah (A+B+C) 744,621.38
E Overhead & Profit 0.150 111,693.21
F Harga Satuan Pekerjaan (D+E) 856,314.00
dihit. AD.1.17 Jenis Pekerjaan : U-Ditch 60 x 80 cm, K - 350, Fabrikasi ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.154 93,597.00 14,395.22
2. Operator alat berat L.06 OH 0.039 93,597.00 3,603.48
3. Mandor L.04 OH 0.039 149,758.00 5,765.68
JUMLAH TENAGA 23,764.39
B. BAHAN
1. U - Ditch 60 x 80, panjang 120 cm, K-350, fabrikasi. M.97.f unit 0.833 945,120.00 787,600.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.037 733,666.67 27,145.67
JUMLAH HARGA BAHAN 814,745.67
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.261 528,000.00 137,831.33
JUMLAH HARGA ALAT 137,831.33
D Jumlah (A+B+C) 976,341.38
E Overhead & Profit 0.150 146,451.21
F Harga Satuan Pekerjaan (D+E) 1,122,792.00

dihit. AD.1.18 Jenis Pekerjaan : U-Ditch 80 x 80 cm, K - 350, Fabrikasi ( terpasang )


Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.154 93,597.00 14,395.22
2. Operator alat berat L.06 OH 0.039 93,597.00 3,603.48
3. Mandor L.04 OH 0.039 149,758.00 5,765.68
JUMLAH TENAGA 23,764.39
B. BAHAN
1. U - Ditch 80 x 80, panjang 120 cm, K-350, fabrikasi. M.97.g unit 0.833 1,050,720.00 875,600.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.047 733,666.67 34,482.33
JUMLAH HARGA BAHAN 910,082.33
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.261 528,000.00 137,831.33
JUMLAH HARGA ALAT 137,831.33
D Jumlah (A+B+C) 1,071,678.04
E Overhead & Profit 0.150 160,751.71
F Harga Satuan Pekerjaan (D+E) 1,232,429.00

dihit. AD.1.19 Jenis Pekerjaan : U-Ditch 80 x 100 cm, K - 350, Fabrikasi ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.154 93,597.00 14,395.22
2. Operator alat berat L.06 OH 0.039 93,597.00 3,603.48
3. Mandor L.04 OH 0.039 149,758.00 5,765.68
JUMLAH TENAGA 23,764.39
B. BAHAN
1. U - Ditch 80 x 100, panjang 120 cm, K-350, fabrikasi. M.97.h unit 0.833 1,367,520.00 1,139,600.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.047 733,666.67 34,482.33
JUMLAH HARGA BAHAN 1,174,082.33
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.261 528,000.00 137,831.33
JUMLAH HARGA ALAT 137,831.33
D Jumlah (A+B+C) 1,335,678.04
E Overhead & Profit 0.150 200,351.71
F Harga Satuan Pekerjaan (D+E) 1,536,029.00
dihit. AD.1.20 Jenis Pekerjaan : U-Ditch 100 x 100 cm, K - 350, Fabrikasi ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.174 93,597.00 16,276.52
2. Operator alat berat L.06 OH 0.044 93,597.00 4,071.47
3. Mandor L.04 OH 0.044 149,758.00 6,514.47
JUMLAH TENAGA 26,862.46
B. BAHAN
1. U - Ditch 100 x 100, panjang 120 cm, K-350, fabrikasi. M.97.i unit 0.833 1,388,640.00 1,157,200.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.059 733,666.67 43,286.33
JUMLAH HARGA BAHAN 1,200,486.33
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.301 528,000.00 159,036.14
JUMLAH HARGA ALAT 159,036.14
D Jumlah (A+B+C) 1,386,384.94
E Overhead & Profit 0.150 207,957.74
F Harga Satuan Pekerjaan (D+E) 1,594,342.00

dihit. AD.1.20a Jenis Pekerjaan : U-Ditch 100 x 120 cm, K - 350, Fabrikasi ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.174 93,597.00 16,276.52
2. Operator alat berat L.06 OH 0.044 93,597.00 4,071.47
3. Mandor L.04 OH 0.044 149,758.00 6,514.47
JUMLAH TENAGA 26,862.46
B. BAHAN
1. U - Ditch 100 x 120, panjang 120 cm, K-350, fabrikasi. M.97.j unit 0.833 1,673,760.00 1,394,800.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.059 733,666.67 43,286.33
JUMLAH HARGA BAHAN 1,438,086.33
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.301 528,000.00 159,036.14
JUMLAH HARGA ALAT 159,036.14
D Jumlah (A+B+C) 1,623,984.94
E Overhead & Profit 0.150 243,597.74
F Harga Satuan Pekerjaan (D+E) 1,867,582.00

dihit. AD.1.21 Jenis Pekerjaan : U-Ditch 120 x 120 cm, K - 350, Fabrikasi ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.174 93,597.00 16,276.52
2. Operator alat berat L.06 OH 0.044 93,597.00 4,071.47
3. Mandor L.04 OH 0.044 149,758.00 6,514.47
JUMLAH TENAGA 26,862.46
B. BAHAN
1. U - Ditch 120 x 120, panjang 120 cm, K-350, fabrikasi. M.97.k unit 0.833 1,832,160.00 1,526,800.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.069 733,666.67 50,989.83
JUMLAH HARGA BAHAN 1,577,789.83
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.301 528,000.00 159,036.14
JUMLAH HARGA ALAT 159,036.14
D Jumlah (A+B+C) 1,763,688.44
E Overhead & Profit 0.150 264,553.27
F Harga Satuan Pekerjaan (D+E) 2,028,241.00
dihit. AD.1.21a Jenis Pekerjaan : U-Ditch 140 x 140 cm, K - 350, Fabrikasi ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.174 93,597.00 16,276.52
2. Operator alat berat L.06 OH 0.044 93,597.00 4,071.47
3. Mandor L.04 OH 0.044 149,758.00 6,514.47
JUMLAH TENAGA 26,862.46
B. BAHAN
1. U - Ditch 140 x 140, panjang 120 cm, K-350, fabrikasi. M.97.l unit 0.833 3,895,584.00 3,246,320.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.081 733,666.67 59,427.00
JUMLAH HARGA BAHAN 3,305,747.00
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.301 528,000.00 159,036.14
JUMLAH HARGA ALAT 159,036.14
D Jumlah (A+B+C) 3,491,645.61
E Overhead & Profit 0.150 523,746.84
F Harga Satuan Pekerjaan (D+E) 4,015,392.00

dihit. AD.1.22 Jenis Pekerjaan : Tutup U-Ditch 20 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.109 93,597.00 10,220.79
2. Mandor L.04 OH 0.009 149,758.00 1,362.80
JUMLAH TENAGA 11,583.59
B. BAHAN
Penutup U - Ditch 20, P= 60 cm, K-350, beban ringan
1. (fabrikasi) M.98.b unit 1.667 78,960.00 131,600.00

JUMLAH HARGA BAHAN 131,600.00


C. PERALATAN
1. Flat bed truck 3-4 m³ alat 28 jam 0.032 517,597.29 16,485.47
JUMLAH HARGA ALAT 16,485.47
D Jumlah (A+B+C) 159,669.06
E Overhead & Profit 0.150 23,950.36
F Harga Satuan Pekerjaan (D+E) 183,619.00

dihit. AD.1.23 Jenis Pekerjaan : Tutup U-Ditch 30 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.109 93,597.00 10,220.79
2. Mandor L.04 OH 0.009 149,758.00 1,362.80
JUMLAH TENAGA 11,583.59
B. BAHAN
Penutup U - Ditch 30, P= 60 cm, K-350, beban berat
1. (fabrikasi) M.98.c unit 1.667 102,960.00 171,600.00

JUMLAH HARGA BAHAN 171,600.00


C. PERALATAN
1. Flat bed truck 3-4 m³ alat 28 jam 0.032 517,597.29 16,485.47
JUMLAH HARGA ALAT 16,485.47
D Jumlah (A+B+C) 199,669.06
E Overhead & Profit 0.150 29,950.36
F Harga Satuan Pekerjaan (D+E) 229,619.00
dihit. AD.1.24 Jenis Pekerjaan : Tutup U-Ditch 40 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.109 93,597.00 10,220.79
2. Mandor L.04 OH 0.009 149,758.00 1,362.80
JUMLAH TENAGA 11,583.59
B. BAHAN
Penutup U - Ditch 40, P= 60 cm, K-350, beban ringan
1. (fabrikasi) M.98.d Unit 1.667 104,880.00 174,800.00

JUMLAH HARGA BAHAN 174,800.00


C. PERALATAN
1. Flat bed truck 3-4 m³ alat 28 jam 0.032 517,597.29 16,485.47
JUMLAH HARGA ALAT 16,485.47
D Jumlah (A+B+C) 202,869.06
E Overhead & Profit 0.150 30,430.36
F Harga Satuan Pekerjaan (D+E) 233,299.00

dihit. AD.1.24.a Jenis Pekerjaan : Tutup U-Ditch 40 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.109 93,597.00 10,220.79
2. Mandor L.04 OH 0.009 149,758.00 1,362.80
JUMLAH TENAGA 11,583.59
B. BAHAN
Penutup U - Ditch 40, P= 60 cm, K-350, beban berat
1. M.98.e unit 1.667 138,528.00 230,880.00
(fabrikasi)
JUMLAH HARGA BAHAN 230,880.00
C. PERALATAN
1. Flat bed truck 3-4 m³ alat 28 jam 0.032 517,597.29 16,485.47
JUMLAH HARGA ALAT 16,485.47
D Jumlah (A+B+C) 258,949.06
E Overhead & Profit 0.150 38,842.36
F Harga Satuan Pekerjaan (D+E) 297,791.00

dihit. AD.1.25 Jenis Pekerjaan : Tutup U-Ditch 50 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.109 93,597.00 10,220.79
2. Mandor L.04 OH 0.009 149,758.00 1,362.80
JUMLAH TENAGA 11,583.59
B. BAHAN
Penutup U - Ditch 50, P= 60 cm, K-350, beban ringan
1. (fabrikasi) M.98.f unit 1.667 138,288.00 230,480.00

JUMLAH HARGA BAHAN 230,480.00


C. PERALATAN
1. Flat bed truck 3-4 m³ alat 28 jam 0.032 517,597.29 16,485.47
JUMLAH HARGA ALAT 16,485.47
D Jumlah (A+B+C) 258,549.06
E Overhead & Profit 0.150 38,782.36
F Harga Satuan Pekerjaan (D+E) 297,331.00
dihit. AD.1.26 Jenis Pekerjaan : Tutup U-Ditch 60 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.109 93,597.00 10,220.79
2. Mandor L.04 OH 0.009 149,758.00 1,362.80
JUMLAH TENAGA 11,583.59
B. BAHAN
1. Penutup U-Ditch 60, P= 60 cm, beban ringan M.98.h unit 1.667 168,240.00 280,400.00
JUMLAH HARGA BAHAN 280,400.00
C. PERALATAN
1. Flat bed truck 3-4 m³ alat 28 jam 0.032 517,597.29 16,485.47
JUMLAH HARGA ALAT 16,485.47
D Jumlah (A+B+C) 308,469.06
E Overhead & Profit 0.150 46,270.36
F Harga Satuan Pekerjaan (D+E) 354,739.00

dihit. AD.1.27 Jenis Pekerjaan : Tutup U-Ditch 60 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.109 93,597.00 10,220.79
2. Mandor L.04 OH 0.009 149,758.00 1,362.80
JUMLAH TENAGA 11,583.59
B. BAHAN
1. Penutup U-Ditch 60, P= 60 cm, beban berat M.98.i unit 1.667 257,440.00 429,066.67
JUMLAH HARGA BAHAN 429,066.67
C. PERALATAN
1. Flat bed truck 3-4 m³ alat 28 jam 0.032 517,597.29 16,485.47
JUMLAH HARGA ALAT 16,485.47
D Jumlah (A+B+C) 457,135.73
E Overhead & Profit 0.150 68,570.36
F Harga Satuan Pekerjaan (D+E) 525,706.00

dihit. AD.1.28 Jenis Pekerjaan : Tutup U-Ditch 80 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.109 93,597.00 10,220.79
2. Mandor L.04 OH 0.009 149,758.00 1,362.80
JUMLAH TENAGA 11,583.59
B. BAHAN
1. Penutup U-Ditch 80, P= 60 cm, beban ringan M.98.j unit 1.667 231,648.00 386,080.00
JUMLAH HARGA BAHAN 386,080.00
C. PERALATAN
1. Flat bed truck 3-4 m³ alat 28 jam 0.032 517,597.29 16,485.47
JUMLAH HARGA ALAT 16,485.47
D Jumlah (A+B+C) 414,149.06
E Overhead & Profit 0.150 62,122.36
F Harga Satuan Pekerjaan (D+E) 476,271.00
dihit. AD.1.29 Jenis Pekerjaan : Tutup U-Ditch 80 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.109 93,597.00 10,220.79
2. Mandor L.04 OH 0.009 149,758.00 1,362.80
JUMLAH TENAGA 11,583.59
B. BAHAN
1. Penutup U-Ditch 80, P= 60 cm, beban berat M.98.k unit 1.667 432,000.00 720,000.00
JUMLAH HARGA BAHAN 720,000.00
C. PERALATAN
1. Flat bed truck 3-4 m³ alat 28 jam 0.032 517,597.29 16,485.47
JUMLAH HARGA ALAT 16,485.47
D Jumlah (A+B+C) 748,069.06
E Overhead & Profit 0.150 112,210.36
F Harga Satuan Pekerjaan (D+E) 860,279.00

dihit. AD.1.31 Jenis Pekerjaan : Tutup U-Ditch 100 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.109 93,597.00 10,220.79
2. Mandor L.04 OH 0.009 149,758.00 1,362.80
JUMLAH TENAGA 11,583.59
B. BAHAN
1. Penutup U-Ditch 100, P= 60 cm, beban berat M.98.m unit 1.667 411,840.00 686,400.00
JUMLAH HARGA BAHAN 686,400.00
C. PERALATAN
1. Flat bed truck 3-4 m³ alat 28 jam 0.032 517,597.29 16,485.47
JUMLAH HARGA ALAT 16,485.47
D Jumlah (A+B+C) 714,469.06
E Overhead & Profit 0.150 107,170.36
F Harga Satuan Pekerjaan (D+E) 821,639.00

dihit. AD.1.36 Jenis Pekerjaan : Box Culvert 80 x 80 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.154 93,597.00 14,395.22
2. Operator alat berat L.06 OH 0.039 93,597.00 3,603.48
3. Mandor L.04 OH 0.039 149,758.00 5,765.68
JUMLAH TENAGA 23,764.39
B. BAHAN
1. Box Culvert 80 x 80, P= 100 cm, K-350, beban ringan M.99.a unit / m 1.000 1,572,480.00 1,572,480.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.055 733,666.67 40,351.67
JUMLAH HARGA BAHAN 1,612,831.67
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.261 528,000.00 137,831.33
JUMLAH HARGA ALAT 137,831.33
D Jumlah (A+B+C) 1,774,427.38
E Overhead & Profit 0.150 266,164.11
F Harga Satuan Pekerjaan (D+E) 2,040,591.00
dihit. AD.1.37 Jenis Pekerjaan : Box Culvert 80 x 80 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.154 93,597.00 14,395.22
2. Operator alat berat L.06 OH 0.039 93,597.00 3,603.48
3. Mandor L.04 OH 0.039 149,758.00 5,765.68
JUMLAH TENAGA 23,764.39
B. BAHAN
1. Box Culvert 80 x 80, P= 100 cm, K-350, beban berat M.99.b unit / m 1.000 2,414,186.67 2,414,186.67
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.055 733,666.67 40,351.67
JUMLAH HARGA BAHAN 2,454,538.33
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.261 528,000.00 137,831.33
JUMLAH HARGA ALAT 137,831.33
D Jumlah (A+B+C) 2,616,134.04
E Overhead & Profit 0.150 392,420.11
F Harga Satuan Pekerjaan (D+E) 3,008,554.00

dihit. AD.1.38 Jenis Pekerjaan : Box Culvert 100 x 100 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.174 93,597.00 16,276.52
2. Operator alat berat L.06 OH 0.044 93,597.00 4,071.47
3. Mandor L.04 OH 0.044 149,758.00 6,514.47
JUMLAH TENAGA 26,862.46
B. BAHAN
1. Box Culvert 100 x 100, P= 100 cm, K-350, beban ringan M.99.d unit / m 1.000 2,414,400.00 2,414,400.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.065 733,666.67 47,688.33
JUMLAH HARGA BAHAN 2,462,088.33
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.301 528,000.00 159,036.14
JUMLAH HARGA ALAT 159,036.14
D Jumlah (A+B+C) 2,647,986.94
E Overhead & Profit 0.150 397,198.04
F Harga Satuan Pekerjaan (D+E) 3,045,184.00

dihit. AD.1.39 Jenis Pekerjaan : Box Culvert 100 x 100 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.174 93,597.00 16,276.52
2. Operator alat berat L.06 OH 0.044 93,597.00 4,071.47
3. Mandor L.04 OH 0.044 149,758.00 6,514.47
JUMLAH TENAGA 26,862.46
B. BAHAN
1. Box Culvert 100 x 100, P= 100 cm, K-350, beban berat M.99.e unit / m 1.000 3,003,626.67 3,003,626.67
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.065 733,666.67 47,688.33
JUMLAH HARGA BAHAN 3,051,315.00
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.301 528,000.00 159,036.14
JUMLAH HARGA ALAT 159,036.14
D Jumlah (A+B+C) 3,237,213.61
E Overhead & Profit 0.150 485,582.04
F Harga Satuan Pekerjaan (D+E) 3,722,795.00
dihit. AD.1.40 Jenis Pekerjaan : Box Culvert 120 x 120 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.174 93,597.00 16,276.52
2. Operator alat berat L.06 OH 0.044 93,597.00 4,071.47
3. Mandor L.04 OH 0.044 149,758.00 6,514.47
JUMLAH TENAGA 26,862.46
B. BAHAN
1. Box Culvert 120 x 120, P= 100 cm, K-350, beban ringan M.99.g unit / m 1.000 3,523,200.00 3,523,200.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.076 733,666.67 55,758.67
JUMLAH HARGA BAHAN 3,578,958.67
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.301 528,000.00 159,036.14
JUMLAH HARGA ALAT 159,036.14
D Jumlah (A+B+C) 3,764,857.27
E Overhead & Profit 0.150 564,728.59
F Harga Satuan Pekerjaan (D+E) 4,329,585.00

dihit. AD.1.41 Jenis Pekerjaan : Box Culvert 120 x 120 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L.01 OH 0.174 93,597.00 16,276.52
2. Operator alat berat L.06 OH 0.044 93,597.00 4,071.47
3. Mandor L.04 OH 0.044 149,758.00 6,514.47
JUMLAH TENAGA 26,862.46
B. BAHAN
1. Box Culvert 120 x 120, P= 100 cm, K-350, beban berat M.99.h unit / m 1.000 4,363,200.00 4,363,200.00
2. Mutu beton fc' 7,4 Mpa (K 100) Ready mix M.250.a m3 0.076 733,666.67 55,758.67
JUMLAH HARGA BAHAN 4,418,958.67
C. PERALATAN
1. Truck Crane 5 ton alat 95 jam 0.301 528,000.00 159,036.14
JUMLAH HARGA ALAT 159,036.14
D Jumlah (A+B+C) 4,604,857.27
E Overhead & Profit 0.150 690,728.59
F Harga Satuan Pekerjaan (D+E) 5,295,585.00
DAFTAR SEWA PERALATAN

HARGA SATUAN
NO JENIS BAHAN SATUAN
BAHAN

1 2 3 4
III SEWA ALAT Kapasitas
1 Geo Listrik Hari Rp 2,500,000.00
2 Borehole meter Rp 829,102.00
3 Temporary Cassing (ID) meter Rp 473,659.00
4 Drilling Rig+Perlengkapan (Pemasangan Pipa) meter Rp 852,570.00
5 Drilling Rig+Perlengkapan (Pencucian Sumur) m3 Rp 754,989.00
6 Drilling Rig+Perlengkapan (Uji Pemompaan) m3 Rp 250,322.00
ANALISIS BIAYA ALAT BERAT PEMBUATAN SUMUR BOR AIR TANAH DALAM

No. Uraian Kode Satuan Perhitungan, Biaya Operasional Peralatan Keterangan


Mesin Bor Pumping Test
A. Uraian Peralatan - Mud Pump Air Kompresor Truk cargo Pick up Welding Set Water Jetting
Drilling Rig) Unit
1 Jenis Alat
2 Merk / Type -
3 Tenaga Pw Hp 130 120 300 110 100 24 42 120
4 Kapasitas 0.002 x B Cp -
5 Umur Ekonomis W A Tahun 6 6 6 5 5 5 10 10
6 Jam Operaional Dalam 1 Tahun W Jam 1500 1500 1500 2000 2000 1500 1500 1500
7 Harga Alat B Rp. 645,750,000 150,000,000 105,600,000 175,000,000 125,000,000 140,000,000 150,000,000 220,000,000

B. Biaya Pasti Per jam Kerja


1 Nilai Sisa Alat C Rp 64,575,000 15,000,000 10,560,000 17,500,000 12,500,000 14,000,000 15,000,000 22,000,000
2 Faktor Angsuran Modal i x (1 + i)^A D - 0.16725 0.16725 0.16725 0.20060 0.20060 0.20060 0.10055 0.10055 I= 10%
(1 + i)^A - 1
3 Biaya Pasti Perjam
a. Biaya Pengembalian Modal (B-C)xD E Rp./Jam 64,801.20 15,052.54 10,596.99 15,797.28 11,283.77 16,850.43 9,049.57 13,272.71
W
b. Asuransi. Dll =px F Rp./Jam 861.000 200.000 140.800 175.000 125.000 186.667 200.000 293.333 p= 0.20%
Biaya Pasti Perjam G = (E+F) G Rp./Jam 65,662 15,253 10,738 15,972 11,409 17,037 9,250 13,566

C Biaya Operasional Per Jam Kerja


1 Bahan Bakar = (12% - 15%) x Pw x Ms H Rp./Jam - - - - - - - - 12.00%
2 Pelumas = (2,5% - 3%) x Pw x Ms I Rp./Jam #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 2.50%
Biaya Bengkel = (6,25% - 8,75%) x B J Rp./Jam 26,906 6,250 4,400 1,093.75 781.25 5,833 6,250 9,167 6.25%
W
3 Perawatan dan = (12,5% - 17,5%) x B K Rp./Jam 53,813 12,500 8,800 2,187.50 1,562.50 11,667 12,500 18,333 12.50%
Perbaikan W
4 Operator = (m orang/jam) x U1 M Rp./Jam 17,228.57 17,228.57 17,228.57 17,228.57 17,228.57 17,228.57 17,228.57 17,228.57
Pembantu Operator = (m orang/jam) x U2 L Rp./Jam - - - - - - - -
Biaya Operasional ( Per Jam ) P Rp./Jam #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

D Biaya Operasional Alat / Jam = (G + P) S Rp./Jam #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

E Lain-Lain
1 Bahan Bakar Premium (Non Subsidi) Mb Liter 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000
2 Bahan Bakar Solar (Non Subsidi) Ms Liter - - - - - - - -
3 Minyak Pelumas Mp Liter xD xD xD xD xD xD xD xD

F Lain-Lain
1 Operator U1 Or/jam 17,229 17,229 17,229 17,229 17,229 17,229 17,229 17,229
2 Pembantu Operator U2 Or/jam - - - - - - - -
1 Pengeboran (Pilot Hole dan Reaming)

A. Uraian Peralatan Kode Satuan Mesin Bor Mud Pump Air Kompresor Truk cargo Pick up Welding Set Pumping Test Water Jetting
1 Prosentase M % 100% 100% 0% 15% 20% 5% 0% 0%
2 Biaya Operasional Alat / Jam = (G + P) S Rp./Jam #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3 Bahan Pakai habis K Rp./Jam 91,390 - - - - - - -
- Drilling Fluid/mud - Rp./Jam 68,890 - - - - - - -
- Bit - Rp./Jam 22,500.0 - - - - - - -
4 Biaya Operaional Alat dan Material S+K Rp./Jam #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 Baiya Operasional Total M x (S x K) Rp./Jam #VALUE!

Koefisien Alat
6 Pengeboran Piot Hole dan Reaming) Produksi *) (Q) Satuan Koefisien Tenaga Kerja (OH) *) Produktifitas alat tergantung ukuran pipa dan konsistensi tanah
(1/Q)
Qt Tenaga Tukang Bor Mandor Kapasitas ini untuk konsistensi stiff (sedang), sedangkan untuk
a Borehole Dia 8 3/4" 1.85 m/Jam 0.5405 12.9500 0.3089 0.0772 0.0309 tanah lembek dikali 2-3
b Reaming Dia 8 3/4" - 12" 2.00 m/Jam 0.5000 14.0000 0.2857 0.0714 0.0286 dan untuk tanah keras kapasitas di kali 30-50%
c Reaming Dia 8 3/4" - 14 3/4" 1.95 m/Jam 0.5128 13.6500 0.2930 0.0733 0.0293 K.A Borhole Interpolasi Reaming
d Reaming Dia 8 3/4" - 17" 1.85 m/Jam 0.5405 12.9500 0.3089 0.0772 0.0309 Pipa 8 3/4" 1.85 m' 2.00 m'
0.21875 m 0.21875 m
1 Borehole Dia 6" 2.50 m/Jam 0.4000 17.5000 0.2286 0.0571 0.0229 0.32 m3 0.34 m3
2 Reaming Dia 6" - 8" 2.75 m/Jam 0.3636 19.2500 0.2078 0.0519 0.0208 Pipa 6" 0.15 m 0.15 m
0.12 m3 0.12 m3
2.54 m' 2.69 m'
2 Bongkar Pasang Temporari Cassing

A. Uraian Peralatan Kode Satuan Mesin Bor Mud Pump Air Kompresor Truk cargo Pick up Welding Set Pumping Test Water Jetting
1 Prosentase M % 75% 30% 0% 10% 0% 50% 0% 0%
2 Biaya Operasional Alat / Jam = (G + P) S Rp./Jam #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3 Bahan Pakai habis K Rp./Jam 91,390 - - - - - - -
- Drilling Fluid/mud - Rp./Jam 68,890 - - - - - - -
- Bit - Rp./Jam 22,500 - - - - - - -
4 Biaya Operaional Alat dan Material S+K Rp./Jam #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 Baiya Operasional Total M x (S x K) Rp./Jam #VALUE!

Koefisien Alat
6 Pengeboran Piot Hole dan Reaming) Produksi *) (Q) Satuan Mud Pump Welding Set Pumping Test Water Jetting
(1/Q)
Qt Tenaga Tukang Bor Mandor
a (ID) 17" 1.75 m/Jam 0.5714 12.2500 0.3265 0.0816 0.0327
b (ID) 12" 1.75 m/Jam 0.5714 12.2500 0.3265 0.0816 0.0327
3 Pemasangan Konstruksi Sumur (Pipa Black Steel dan Screen Low Carbon)

A. Uraian Peralatan Kode Satuan Mesin Bor Mud Pump Air Kompresor Truk cargo Pick up Welding Set Pumping Test Water Jetting
1 Prosentase Pemanfaatan M % 100% 0% 0% 10% 10% 100% 0% 100%
2 Biaya Operasional Alat / Jam = (G + P) S Rp./Jam #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3 Bahan Pakai habis K Rp./Jam - - - - - - - -
- Wire RB & Ciron - Rp./Jam - - - - - - - -
- Acetelyn & CO2 - Rp./Jam - - - - - - - -
4 Biaya Operaional Alat + Material S+K Rp./Jam #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 Baiya Operasional Total M x (S x K) Rp./Jam #VALUE!

Koefisien Alat
6 Pemasangan Casing dan Screen Low Carbon Produksi *) (Q) Satuan Koefisien Tenaga Kerja
(1/Q)
Qt Tenaga Tukang Bor Mandor
a BS Casing or LC Screen 6" 8.00 m/Jam 0.1250 56.0000 0.0714 0.0179 0.0071
b BS Casing or LC Screen 8" 7.00 m/Jam 0.1429 49.0000 0.0816 0.0204 0.0082
c Pipa Sounding PVC 1" 25.00 m/Jam 0.0400 175.0000 0.0229 0.0057 0.0023 K.A BS. ST Interpolasi
d Gravel Pack 0.55 m/Jam 1.8182 3.8500 1.0390 0.0260 0.1039 Pipa 8 3/4" 8.00 m'
0.21875 m
1 BS Casing or ST Screen 4" 8.69 m/Jam 0.1151 60.8000 0.0658 0.0164 0.0066 1.37 m3
Pipa 6" 0.15 m
0.12 m3
8.69 m'

4 Pencucian Sumur (Well Development)

A. Uraian Peralatan Kode Satuan Mesin Bor Mud Pump Air Kompresor Truk cargo Pick up Welding Set Pumping Test Water Jetting
1 Prosentase M % 20% 0% 0% 15% 20% 5% 0% 0%
2 Biaya Operasional Alat / Jam = (G + P) S Rp./Jam #VALUE! #VALUE! - #VALUE! - - - -
3 Bahan Pakai habis K Rp./Jam - - - - - - - -
- Foam/Detergen - Rp./Jam - - - - - - - -
4 Biaya Operaional Alat dan Material S+K Rp./Jam #VALUE! #VALUE! - #VALUE! - - - -

5 Baiya Operasional Total M x (S x K) Rp./Jam #VALUE!

Koefisien Alat
6 Development Methods Produksi *) (Q) Satuan Koefisien Tenaga Kerja (OH) *) Produktifitas alat tergantung ukuran pipa dan konsistensi tanah
(1/Q)
Dia 8 3/4" - 12" Qt Tenaga Tukang Bor Mandor Kapasitas ini untuk konsistensi stiff (sedang), sedangkan untuk
a Air Liffting 1.00 Jam 1.0000 7.0000 0.5714 0.1429 0.0571 tanah lembek dikali 2-3
b Air Jeting 1.00 Jam 1.0000 7.0000 0.5714 0.1429 0.0571 dan untuk tanah keras kapasitas di kali 30-50%
c Blow Up 1.00 Jam 1.0000 7.0000 0.5714 0.1429 0.0571 K.A Borhole Interpolasi Reaming
Pipa 8 3/4" 1.00 m' 1.00 m'
Dia 6" - 8" 0.21875 m 0.21875 m
1 Air Liffting 2.00 Jam 0.5000 14.0000 0.2857 0.0714 0.0286 0.17 m3 0.17 m3
2 Air Jeting 2.00 Jam 0.5000 14.0000 0.2857 0.0714 0.0286 Pipa 6" 0.15 m 0.15 m
3 Blow Up 2.00 Jam 0.5000 14.0000 0.2857 0.0714 0.0286 0.12 m3 0.12 m3
1.69 m' 1.69 m'
5 Uji Pemompaan ( Pumping Test )

A. Uraian Peralatan Kode Satuan Mesin Bor Mud Pump Air Kompresor Truk cargo Pick up Welding Set Pumping Test Water Jetting
1 Prosentase M % 20% 0% 0% 15% 20% 5% 0% 0%
2 Biaya Operasional Alat / Jam = (G + P) S Rp./Jam #VALUE! #VALUE! - #VALUE! - - - -
3 Bahan Pakai habis K Rp./Jam - - - - - - - -
- Foam/Detergen - Rp./Jam - - - - - - - -
4 Biaya Operaional Alat dan Material S+K Rp./Jam #VALUE! #VALUE! - #VALUE! - - - -

5 Baiya Operasional Total M x (S x K) Rp./Jam #VALUE!

Koefisien Alat
6 Development Methods Produksi *) (Q) Satuan Koefisien Tenaga Kerja (OH) *) Produktifitas alat tergantung ukuran pipa dan konsistensi tanah
(1/Q)
Dia 8 3/4" - 12" Qt Tenaga Tukang Bor Mandor Kapasitas ini untuk konsistensi stiff (sedang), sedangkan untuk
a Air Liffting 1.00 Jam 1.0000 7.0000 0.5714 0.1429 0.0571 tanah lembek dikali 2-3
b Air Jeting 1.00 Jam 1.0000 7.0000 0.5714 0.1429 0.0571 dan untuk tanah keras kapasitas di kali 30-50%
c Blow Up 1.00 Jam 1.0000 7.0000 0.5714 0.1429 0.0571 K.A Borhole Interpolasi Reaming
Pipa 8 3/4" 1.00 m' 1.00 m'
Dia 6" - 8" 0.21875 m 0.21875 m
1 Air Liffting 2.00 Jam 0.5000 14.0000 0.2857 0.0714 0.0286 0.17 m3 0.17 m3
2 Air Jeting 2.00 Jam 0.5000 14.0000 0.2857 0.0714 0.0286 Pipa 6" 0.15 m 0.15 m
3 Blow Up 2.00 Jam 0.5000 14.0000 0.2857 0.0714 0.0286 0.12 m3 0.12 m3
1.69 m' 1.69 m'
PEKERJAAN SANITASI DILUAR GEDUNG

1 Jenis Pekerjaan : Got Normal U - Ø 15 cm ( tanpa bata penjepit )


Satuan Pekerjaan : m¹ pas bata 1 batu
Harga Satuan Jumlah
Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. Upah Tenaga Pasir pasang m
1. Pekerja L.01 OH 0.0614 93,597.00 5,749.53
2. Tukang Batu L.02 OH 0.0371 121,674.00 4,519.32
3. Kepala Tukang L.03 OH 0.0037 128,226.00 476.27
4. Mandor L.04 OH 0.0031 149,758.00 459.97
JUMLAH TENAGA 11,205.09
B. B a h a n luas U.30=
1. Got Normal U-15 M.96.a buah 1.0000 42,240.00 42,240.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m³ 0.0075 266,640.00 1,999.80
3. Bata merah 5 x 11 x 22 cm M.218.a buah 2.0475 864.41 1,769.88
4. Portland cement M.245.a kg 0.2921 1,375.00 401.57
5. Pasir Beton (m3) M.9.c m³ 0.0010 339,234.40 347.04
JUMLAH HARGA BAHAN 46,758.29
C. Peralatan
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 57,963.38
E Overhead & Profit 15.0% 8,694.51
F Harga Satuan Pekerjaan (D+E) 66,657.00

2 Jenis Pekerjaan : Got Normal U - Ø 20 cm (tanpa bata penjepit )


Satuan Pekerjaan : m¹
Harga Satuan Jumlah
Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. Upah Tenaga
1. Pekerja L.01 OH 0.0886 93,597.00 8,290.02
2. Tukang Batu L.02 OH 0.0529 121,674.00 6,431.34
3. Kepala Tukang L.03 OH 0.0053 128,226.00 677.77
4. Mandor L.04 OH 0.0044 149,758.00 663.21
JUMLAH TENAGA 16,062.34
B. B a h a n
1. Got Normal U-20 M.96.b buah 1.0000 52,800.00 52,800.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m³ 0.0100 266,640.00 2,666.40
3. Bata merah 5 x 11 x 22 cm M.218.a buah 2.7300 864.41 2,359.84
4. Portland cement M.245.a kg 0.2921 1,375.00 401.57
5. Pasir Beton (m3) M.9.c m³ 0.0010 339,234.40 347.04
JUMLAH HARGA BAHAN 58,574.85
C. Peralatan
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 74,637.19
E Overhead & Profit 15.0% 11,195.58
F Harga Satuan Pekerjaan (D+E) 85,832.00
3 Jenis Pekerjaan : Got Normal U - Ø 30 cm (tanpa bata penjepit )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah
Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. Upah Tenaga 1.
1. Pekerja L.01 OH 0.0243 93,597.00 2,273.07
2. Tukang Batu L.02 OH 0.0314 121,674.00 3,824.04
3. Kepala Tukang L.03 OH 0.0031 128,226.00 403.00
4. Mandor L.04 OH 0.0012 149,758.00 181.85
JUMLAH TENAGA 6,681.96
B. B a h a n 1.
1. Got Normal U-30 M.96.c m 1.0000 76,560.00 76,560.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.0518 266,640.00 13,798.62
3. Bata merah 5 x 11 x 22 cm M.218.a buah 3.0000 864.41 2,593.23
4. Portland cement M.245.a kg 0.4381 1,375.00 602.35
5. Pasir Beton (m3) M.9.c m3 0.0015 339,234.40 520.56
JUMLAH HARGA BAHAN 94,074.76
C. Peralatan

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 100,756.72
E Overhead & Profit 15.0% 15,113.51
F Harga Satuan Pekerjaan (D+E) 115,870.00

4 Jenis Pekerjaan : Got Normal U - Ø 40 cm (tanpa bata penjepit )


Satuan Pekerjaan : m¹
Harga Satuan Jumlah
Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. Upah Tenaga
1. Pekerja L.01 OH 0.2686 93,597.00 25,137.48
2. Tukang Batu L.02 OH 0.1529 121,674.00 18,598.74
3. Kepala Tukang L.03 OH 0.0153 128,226.00 1,960.03
4. Mandor L.04 OH 0.0134 149,758.00 2,011.04
JUMLAH TENAGA 47,707.28
B. B a h a n
1. Got Normal U-40 M.96.d m 1.0000 95,040.00 95,040.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.0518 266,640.00 13,798.62
3. Bata merah 5 x 11 x 22 cm M.218.a buah 4.0000 864.41 3,457.65
4. Portland cement M.245.a kg 0.5841 1,375.00 803.14
5. Pasir Beton (m3) M.9.c m3 0.0020 339,234.40 694.07
JUMLAH HARGA BAHAN 113,793.48
C. Peralatan

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 161,500.76
E Overhead & Profit 15.0% 24,225.11
F Harga Satuan Pekerjaan (D+E) 185,725.00
5 Jenis Pekerjaan : Got Normal U - Ø 60 cm (tanpa bata penjepit )
Satuan Pekerjaan : m¹
Harga Satuan Jumlah
Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. Upah Tenaga
1. Pekerja L.01 OH 0.2771 93,597.00 25,939.74
2. Tukang Batu L.02 OH 0.1557 121,674.00 18,946.38
3. Kepala Tukang L.03 OH 0.0156 128,226.00 1,996.66
4. Mandor L.04 OH 0.0139 149,758.00 2,075.22
JUMLAH TENAGA 48,958.00
B. B a h a n
1. Got Normal U-60 M.96.e m 1.0000 190,080.00 190,080.00
2. Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.0518 266,640.00 13,798.62
3. Bata merah 5 x 11 x 22 cm M.218.a buah 6.0000 864.41 5,186.47
4. Portland cement M.245.a kg 0.8762 1,375.00 1,204.71
5. Pasir Beton (m3) M.9.c m3 0.0031 339,234.40 1,041.11
JUMLAH HARGA BAHAN 211,310.91
C. Peralatan

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 260,268.91
E Overhead & Profit 15.0% 39,040.34
F Harga Satuan Pekerjaan (D+E) 299,309.00
PEKERJAAN LANGSIRAN
dihit AD.2.1 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 10 m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA KERJA
1 Pekerja L.01 OH 0.286 93,597.00 26,768.74
2 Mandor L.04 OH 0.014 149,758.00 2,141.54
JUMLAH HARGA TENAGA KERJA 28,910.28
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 28,910.28


E Overhead & Profit 15% 0.150 4,336.54
F Harga Satuan Pekerjaan (D+E) 33,246.00

dihit AD.2.2 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 30 m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA KERJA
1 Pekerja L.01 OH 0.356 93,597.00 33,320.53
2 Mandor L.04 OH 0.018 149,758.00 2,665.69
JUMLAH HARGA TENAGA KERJA 35,986.22
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 35,986.22


E Overhead & Profit 15% 0.150 5,397.93
F Harga Satuan Pekerjaan (D+E) 41,384.00

dihit AD.2.3 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 50 m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA KERJA
1 Pekerja L.01 OH 0.422 93,597.00 39,497.93
2 Mandor L.04 OH 0.021 149,758.00 3,159.89
JUMLAH HARGA TENAGA KERJA 42,657.83
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,657.83


E Overhead & Profit 15% 0.150 6,398.67
F Harga Satuan Pekerjaan (D+E) 49,056.00
dihit AD.2.4 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 100 m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA KERJA
1 Pekerja L.01 OH 0.600 93,597.00 56,158.20
2 Mandor L.04 OH 0.030 149,758.00 4,492.74
JUMLAH HARGA TENAGA KERJA 60,650.94
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 60,650.94


E Overhead & Profit 15% 0.150 9,097.64
F Harga Satuan Pekerjaan (D+E) 69,748.00

dihit AD.2.5 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 200 m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA KERJA
1 Pekerja L.01 OH 0.950 93,597.00 88,917.15
2 Mandor L.04 OH 0.048 149,758.00 7,113.51
JUMLAH HARGA TENAGA KERJA 96,030.66
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 96,030.66


E Overhead & Profit 15% 0.150 14,404.60
F Harga Satuan Pekerjaan (D+E) 110,435.00

dihit AD.2.6 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 300 m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA KERJA
1 Pekerja L.01 OH 1.300 93,597.00 121,676.10
2 Mandor L.04 OH 0.065 149,758.00 9,734.27
JUMLAH HARGA TENAGA KERJA 131,410.37
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 131,410.37


E Overhead & Profit 15% 0.150 19,711.56
F Harga Satuan Pekerjaan (D+E) 151,121.00
HARGA SATUAN PEKERJAAN PAGAR BETON DAN BESI
dihit AD.3.1 Pasang Pagar Panel Beton 240 x 40 x 5 & Kolom 225 x 18 x 17 cm, tinggi 160 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.500 93,597.00 46,798.50
Tukang batu L.02 OH 0.250 121,674.00 30,418.50
Kepala tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.025 149,758.00 3,743.95
JUMLAH TENAGA KERJA 84,166.60
B BAHAN
Panel beton pracetak 240 x 40 x 5 cm M.456.a Lbr 1.667 144,738.00 241,230.00
Kolom beton pracetak 225 x 18 x 17 cm M.455.c Btg 0.525 417,120.00 218,988.00
Portland cement M.245.a Kg 45.000 1,375.00 61,875.00
Pasir Beton (muntilan) M.9.c m3 0.074 339,234.40 25,103.35
Koral Beton M.11.b m3 0.146 397,760.00 58,072.96
JUMLAH HARGA BAHAN 605,269.31
C PERALATAN
Alat Bantu Set 0.583 50,000.00 29,130.00
JUMLAH HARGA ALAT 29,130.00
D Jumlah (A+B+C) 718,565.91
E Overhead & Profit 15% 0.150 107,784.89
F Harga Satuan Pekerjaan (D+E) 826,350.00

dihit AD.3.2 Pasang Pagar Panel Beton 240 x 40 x 5 & Kolom 280 x 18 x 17 cm, tinggi 200 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.375 93,597.00 35,098.88
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 54,692.24
B BAHAN
Panel beton pracetak 240 x 40 x 5 cm M.456.a Lbr 2.083 144,738.00 301,537.50
Kolom beton pracetak 280 x 18 x 17 cm M.455.d Btg 0.525 403,392.00 211,780.80
Portland cement M.245.a Kg 45.000 1,375.00 61,875.00
Pasir Beton (muntilan) M.9.c m3 0.074 339,234.40 25,103.35
Koral Beton M.11.b m3 0.146 397,760.00 58,072.96
JUMLAH HARGA BAHAN 658,369.61
C PERALATAN
Alat Bantu Set 0.583 50,000.00 29,130.00
JUMLAH HARGA ALAT 29,130.00
D Jumlah (A+B+C) 742,191.84
E Overhead & Profit 15% 0.150 111,328.78
F Harga Satuan Pekerjaan (D+E) 853,520.00
dihit AD.3.3 Pasang Pagar Panel Beton 240 x 40 x 5 & Kolom 320 x 18 x 17 cm, tinggi 240 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.375 93,597.00 35,098.88
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 54,692.24
B BAHAN
Panel beton pracetak 240 x 40 x 5 cm M.456.a Lbr 2.500 144,738.00 361,845.00
Kolom beton pracetak 320 x 18 x 17 cm M.455.e Btg 0.525 500,720.00 262,878.00
Portland cement M.245.a Kg 45.000 1,375.00 61,875.00
Pasir Beton (muntilan) M.9.c m3 0.074 339,234.40 25,103.35
Koral Beton M.11.b m3 0.146 397,760.00 58,072.96
JUMLAH HARGA BAHAN 769,774.31
C PERALATAN
Alat Bantu Set 0.583 50,000.00 29,130.00
JUMLAH HARGA ALAT 29,130.00
D Jumlah (A+B+C) 853,596.54
E Overhead & Profit 15% 0.150 128,039.48
F Harga Satuan Pekerjaan (D+E) 981,636.00

dihit AD.3.4 Pasang Pagar Panel Beton 240 x 40 x 5 & Kolom 370 x 18 x 17 cm, tinggi 280 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.375 93,597.00 35,098.88
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 54,692.24
B BAHAN
Panel beton pracetak 240 x 40 x 5 cm M.456.a Lbr 2.917 144,738.00 422,152.50
Kolom beton pracetak 370 x 18 x 17 cm M.455.f Btg 0.525 330,000.00 173,250.00
Portland cement M.245.a Kg 45.000 1,375.00 61,875.00
Pasir Beton (muntilan) M.9.c m3 0.074 339,234.40 25,103.35
Koral Beton M.11.b m3 0.146 397,760.00 58,072.96
JUMLAH HARGA BAHAN 740,453.81
C PERALATAN
Alat Bantu Set 0.583 50,000.00 29,130.00
JUMLAH HARGA ALAT 29,130.00
D Jumlah (A+B+C) 824,276.04
E Overhead & Profit 15% 0.150 123,641.41
F Harga Satuan Pekerjaan (D+E) 947,917.00
dihit AD.3.5 Pasang Pagar Panel Beton 240 x 45 x 5 & Kolom 225 x 18 x 17 cm, tinggi 180 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.375 93,597.00 35,098.88
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 54,692.24
B BAHAN
Panel beton pracetak 240 x 45 x 5 cm M.456.b Lbr 1.667 162,448.00 270,746.67
Kolom beton pracetak 225 x 18 x 17 cm M.455.c Btg 0.525 417,120.00 218,988.00
Portland cement M.245.a Kg 45.000 1,375.00 61,875.00
Pasir Beton (muntilan) M.9.c m3 0.074 339,234.40 25,103.35
Koral Beton M.11.b m3 0.146 397,760.00 58,072.96
JUMLAH HARGA BAHAN 634,785.97
C PERALATAN
Alat Bantu Set 0.583 50,000.00 29,130.00
JUMLAH HARGA ALAT 29,130.00
D Jumlah (A+B+C) 718,608.21
E Overhead & Profit 15% 0.150 107,791.23
F Harga Satuan Pekerjaan (D+E) 826,399.00

dihit AD.3.6 Pasang Pagar Panel Beton 240 x 45 x 5 & Kolom 280 x 18 x 17 cm, tinggi 225 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.375 93,597.00 35,098.88
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 54,692.24
B BAHAN
Panel beton pracetak 240 x 45 x 5 cm M.456.b Lbr 2.083 162,448.00 338,433.33
Kolom beton pracetak 280 x 18 x 17 cm M.455.d Btg 0.525 403,392.00 211,780.80
Portland cement M.245.a Kg 45.000 1,375.00 61,875.00
Pasir Beton (muntilan) M.9.c m3 0.074 339,234.40 25,103.35
Koral Beton M.11.b m3 0.146 397,760.00 58,072.96
JUMLAH HARGA BAHAN 695,265.44
C PERALATAN
Alat Bantu Set 0.583 50,000.00 29,130.00
JUMLAH HARGA ALAT 29,130.00
D Jumlah (A+B+C) 779,087.68
E Overhead & Profit 15% 0.150 116,863.15
F Harga Satuan Pekerjaan (D+E) 895,950.00
dihit AD.3.7 Pasang Pagar Panel Beton 240 x 45 x 5 & Kolom 320 x 18 x 17 cm, tinggi 270 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.375 93,597.00 35,098.88
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 54,692.24
B BAHAN
Panel beton pracetak 240 x 45 x 5 cm M.456.b Lbr 2.500 162,448.00 406,120.00
Kolom beton pracetak 320 x 18 x 17 cm M.455.e Btg 0.525 500,720.00 262,878.00
Portland cement M.245.a Kg 45.000 1,375.00 61,875.00
Pasir Beton (muntilan) M.9.c m3 0.074 339,234.40 25,103.35
Koral Beton M.11.b m3 0.146 397,760.00 58,072.96
JUMLAH HARGA BAHAN 814,049.31
C PERALATAN
Alat Bantu Set 0.583 50,000.00 29,130.00
JUMLAH HARGA ALAT 29,130.00
D Jumlah (A+B+C) 897,871.54
E Overhead & Profit 15% 0.150 134,680.73
F Harga Satuan Pekerjaan (D+E) 1,032,552.00

dihit AD.3.8 Pasang Pagar Panel Beton 240 x 45 x 5 & Kolom 370 x 18 x 17 cm, tinggi 315 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.375 93,597.00 35,098.88
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 54,692.24
B BAHAN
Panel beton pracetak 240 x 45 x 5 cm M.456.b Lbr 2.917 162,448.00 473,806.67
Kolom beton pracetak 370 x 18 x 17 cm M.455.f Btg 0.525 345,000.00 181,125.00
Portland cement M.245.a Kg 45.000 1,375.00 61,875.00
Pasir Beton (muntilan) M.9.c m3 0.074 339,234.40 25,103.35
Koral Beton M.11.b m3 0.146 397,760.00 58,072.96
JUMLAH HARGA BAHAN 799,982.97
C PERALATAN
Alat Bantu Set 0.583 50,000.00 29,130.00
JUMLAH HARGA ALAT 29,130.00
D Jumlah (A+B+C) 883,805.21
E Overhead & Profit 15% 0.150 132,570.78
F Harga Satuan Pekerjaan (D+E) 1,016,375.00
dihit AD.3.9 Pasang Pagar Panel Beton 240 x 50 x 5 & Kolom 225 x 18 x 17 cm, tinggi 150 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.500 93,597.00 46,798.50
Tukang batu L.02 OH 0.250 121,674.00 30,418.50
Kepala tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.025 149,758.00 3,743.95
JUMLAH TENAGA KERJA 84,166.60
B BAHAN
Panel beton pracetak 240 x 50 x 5 cm M.456.c Lbr 1.250 168,960.00 211,200.00
Kolom beton pracetak 225 x 18 x 17 cm M.455.c Btg 0.525 417,120.00 218,988.00
Portland cement M.245.a Kg 45.000 1,375.00 61,875.00
Pasir Beton (muntilan) M.9.c m3 0.074 339,234.40 25,103.35
Koral Beton M.11.b m3 0.146 397,760.00 58,072.96
JUMLAH HARGA BAHAN 575,239.31
C PERALATAN
Alat Bantu Set 0.583 50,000.00 29,130.00
JUMLAH HARGA ALAT 29,130.00
D Jumlah (A+B+C) 688,535.91
E Overhead & Profit 15% 0.150 103,280.39
F Harga Satuan Pekerjaan (D+E) 791,816.00

dihit AD.3.10 Pasang Pagar Panel Beton 240 x 50 x 5 & Kolom 280 x 18 x 17 cm, tinggi 200 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.375 93,597.00 35,098.88
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 54,692.24
B BAHAN
Panel beton pracetak 240 x 50 x 5 cm M.456.c Lbr 1.667 168,960.00 281,600.00
Kolom beton pracetak 280 x 18 x 17 cm M.455.d Btg 0.525 403,392.00 211,780.80
Portland cement M.245.a Kg 45.000 1,375.00 61,875.00
Pasir Beton (muntilan) M.9.c m3 0.074 339,234.40 25,103.35
Koral Beton M.11.b m3 0.146 397,760.00 58,072.96
JUMLAH HARGA BAHAN 638,432.11
C PERALATAN
Alat Bantu Set 0.583 50,000.00 29,130.00
JUMLAH HARGA ALAT 29,130.00
D Jumlah (A+B+C) 722,254.34
E Overhead & Profit 15% 0.150 108,338.15
F Harga Satuan Pekerjaan (D+E) 830,592.00
dihit AD.3.11 Pasang Pagar Panel Beton 240 x 50 x 5 & Kolom 320 x 18 x 17 cm, tinggi 250 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.375 93,597.00 35,098.88
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 54,692.24
B BAHAN
Panel beton pracetak 240 x 50 x 5 cm M.456.c Lbr 2.083 168,960.00 352,000.00
Kolom beton pracetak 320 x 18 x 17 cm M.455.e Btg 0.525 500,720.00 262,878.00
Portland cement M.245.a Kg 45.000 1,375.00 61,875.00
Pasir Beton (muntilan) M.9.c m3 0.074 339,234.40 25,103.35
Koral Beton M.11.b m3 0.146 397,760.00 58,072.96
JUMLAH HARGA BAHAN 759,929.31
C PERALATAN
Alat Bantu Set 0.583 50,000.00 29,130.00
JUMLAH HARGA ALAT 29,130.00
D Jumlah (A+B+C) 843,751.54
E Overhead & Profit 15% 0.150 126,562.73
F Harga Satuan Pekerjaan (D+E) 970,314.00

dihit AD.3.12 Pasang Pagar Panel Beton 240 x 50 x 5 & Kolom 350 x 18 x 17 cm, tinggi 300 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.375 93,597.00 35,098.88
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 54,692.24
B BAHAN
Panel beton pracetak 240 x 50 x 5 cm M.456.c Lbr 2.500 168,960.00 422,400.00
Kolom beton pracetak 350 x 18 x 17 cm M.455.g Btg 0.525 382,000.00 200,550.00
Portland cement M.245.a Kg 45.000 1,375.00 61,875.00
Pasir Beton (muntilan) M.9.c m3 0.074 339,234.40 25,103.35
Koral Beton M.11.b m3 0.146 397,760.00 58,072.96
JUMLAH HARGA BAHAN 768,001.31
C PERALATAN
Alat Bantu Set 0.583 50,000.00 29,130.00
JUMLAH HARGA ALAT 29,130.00
D Jumlah (A+B+C) 851,823.54
E Overhead & Profit 15% 0.150 127,773.53
F Harga Satuan Pekerjaan (D+E) 979,597.00
dihit AD.3.13 Pasang 1 m' Pagar BRC tinggi 90 cm + tiang Ø 2,0"
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.500 93,597.00 46,798.50
Tukang batu L.02 OH 0.250 121,674.00 30,418.50
Kepala tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.025 149,758.00 3,743.95
JUMLAH TENAGA KERJA 84,166.60
B BAHAN
Pagar BRC 90 K2, Tebal 6 mm M.450.e Lbr 0.417 686,400.00 286,000.00
Tiang BRC lengkap P 120 Ø 2,0" M.451.i Btg 0.500 198,176.00 99,088.00
Portland cement M.245.a Kg 2.000 1,375.00 2,750.00
Pasir Beton (muntilan) M.9.c m3 0.005 339,234.40 1,696.17
Koral Beton M.11.b m3 0.009 397,760.00 3,579.84
JUMLAH HARGA BAHAN 393,114.01
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 477,280.61
E Overhead & Profit 15% 0.150 71,592.09
F Harga Satuan Pekerjaan (D+E) 548,872.00

dihit AD.3.14 Pasang 1 m' Pagar BRC tinggi 120 cm + tiang Ø 2,0"
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.500 93,597.00 46,798.50
Tukang batu L.02 OH 0.250 121,674.00 30,418.50
Kepala tukang L.03 OH 0.025 128,226.00 3,205.65
Mandor L.04 OH 0.025 149,758.00 3,743.95
JUMLAH TENAGA KERJA 84,166.60
B BAHAN
Pagar BRC 120 K2, Tebal 6 mm M.450.h Lbr 0.417 792,000.00 330,000.00
Tiang BRC lengkap P 150 Ø 2,0" M.451.j Btg 0.500 195,360.00 97,680.00
Portland cement M.245.a Kg 2.000 1,375.00 2,750.00
Pasir Beton (muntilan) M.9.c m3 0.005 339,234.40 1,696.17
Koral Beton M.11.b m3 0.009 397,760.00 3,579.84
JUMLAH HARGA BAHAN 435,706.01
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 519,872.61
E Overhead & Profit 15% 0.150 77,980.89
F Harga Satuan Pekerjaan (D+E) 597,853.00
dihit AD.3.15 Pasang 1 m' Pagar BRC tinggi 175 cm + tiang Ø 2,0"
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.375 93,597.00 35,098.88
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 54,692.24
B BAHAN
Pagar BRC 175 K3, Tebal 7 mm M.450.o Lbr 0.417 644,160.00 268,400.00
Tiang BRC lengkap P 225 Ø 2,0" M.451.c Btg 0.500 151,360.00 75,680.00
Portland cement M.245.a Kg 2.000 1,375.00 2,750.00
Pasir Beton (muntilan) M.9.c m3 0.005 339,234.40 1,696.17
Koral Beton M.11.b m3 0.009 397,760.00 3,579.84
JUMLAH HARGA BAHAN 352,106.01
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 406,798.25
E Overhead & Profit 15% 0.150 61,019.74
F Harga Satuan Pekerjaan (D+E) 467,817.00

dihit AD.3.16 Pasang 1 m' Pagar BRC tinggi 190 cm + tiang Ø 2,0"
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.375 93,597.00 35,098.88
Tukang batu L.02 OH 0.125 121,674.00 15,209.25
Kepala tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.019 149,758.00 2,845.40
JUMLAH TENAGA KERJA 54,692.24
B BAHAN
Pagar BRC 190 K3, Tebal 7 mm M.450.r Lbr 0.417 686,400.00 286,000.00
Tiang BRC lengkap P 240 Ø 2,0" M.451.d Btg 0.500 165,440.00 82,720.00
Portland cement M.245.a Kg 2.000 1,375.00 2,750.00
Pasir Beton (muntilan) M.9.c m3 0.005 339,234.40 1,696.17
Koral Beton M.11.b m3 0.009 397,760.00 3,579.84
JUMLAH HARGA BAHAN 376,746.01
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 431,438.25
E Overhead & Profit 15% 0.150 64,715.74
F Harga Satuan Pekerjaan (D+E) 496,153.00

dihit AD.3.17 Pemasangan 1 m2 Kawat Berduri diatas Pagar Panel Beton tinggi 50 cm - 4 lajur
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.042 93,597.00 3,931.07
Tukang Kayu L.02 OH 0.004 121,674.00 486.70
Kepala Tukang L.03 OH 0.002 128,226.00 256.45
Mandor L.04 OH 0.042 149,758.00 6,289.84
JUMLAH TENAGA KERJA 10,964.06
B BAHAN
Besi Siku 50.50.5 M.46.f kg 2.074 17,600.00 36,493.60
Paku 12 cm M.56.g kg 0.060 21,648.00 1,298.88
Kawat duri M.55.b M’ 4.400 29,920.00 131,648.00
JUMLAH HARGA BAHAN 169,440.48
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 180,404.54
E Overhead & Profit 15% 0.150 27,060.68
F Harga Satuan Pekerjaan (D+E) 207,465.00
dihit AD.3.18 Pemasangan 1 m2 Kawat Berduri diatas Pagar Panel Beton tinggi 60 cm - 5 lajur
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.042 93,597.00 3,931.07
Tukang Kayu L.02 OH 0.004 121,674.00 486.70
Kepala Tukang L.03 OH 0.002 128,226.00 256.45
Mandor L.04 OH 0.042 149,758.00 6,289.84
JUMLAH TENAGA KERJA 10,964.06
B BAHAN
Besi Siku 50.50.5 M.46.f kg 2.262 17,600.00 39,811.20
Paku 12 cm M.56.g kg 0.060 21,648.00 1,298.88
Kawat duri M.55.b M’ 5.500 29,920.00 164,560.00
JUMLAH HARGA BAHAN 205,670.08
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 216,634.14
E Overhead & Profit 15% 0.150 32,495.12
F Harga Satuan Pekerjaan (D+E) 249,129.00

dihit AD.3.19 Pemasangan 1 m2 Kawat Berduri diatas Pagar Panel Beton tinggi 60 cm - 7 lajur
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.042 93,597.00 3,931.07
Tukang Kayu L.02 OH 0.004 121,674.00 486.70
Kepala Tukang L.03 OH 0.002 128,226.00 256.45
Mandor L.04 OH 0.042 149,758.00 6,289.84
JUMLAH TENAGA KERJA 10,964.06
B BAHAN
Besi Siku 50.50.5 M.46.f kg 2.262 17,600.00 39,811.20
Paku 12 cm M.56.g kg 0.060 21,648.00 1,298.88
Kawat duri M.55.b M’ 7.700 29,920.00 230,384.00
JUMLAH HARGA BAHAN 271,494.08
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 282,458.14
E Overhead & Profit 15% 0.150 42,368.72
F Harga Satuan Pekerjaan (D+E) 324,826.00

dihit AD.3.23 Pekerjaan railling tangga pipa stainless steel (SS.304)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tenaga Pengukuran, Pemotongan dan
- % 40.000 519,683.22 207,873.29
Pemasangan
JUMLAH TENAGA KERJA 207,873.29
B BAHAN
Pipa SS304 Ø 2" M.601.e m¹ 1.000 114,576.00 114,576.00
Pipa SS304 Ø 1.1/2" M.601.d m¹ 2.000 84,744.00 169,488.00
Tutup Pipa SS304 Ø 2" M.601.j buah 1.000 18,480.00 18,480.00
Pengerjaan 1 cm pengelasan stainless steel A.4.2.1.5.1 cm¹ 47.100 1,749.61 82,406.54
JUMLAH HARGA BAHAN 384,950.54
C PERALATAN
Perlengkapan % 35.000 384,950.54 134,732.69
JUMLAH HARGA ALAT 134,732.69
D Jumlah (A+B+C) 727,556.51
E Overhead & Profit 15% 0.150 109,133.48
F Harga Satuan Pekerjaan (D+E) 836,689.00
dihit AD.3.24 Pekerjaan 1 m2 pipa besi hollow (untuk railling tangga, rangka atap, pagar)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tenaga Pengukuran, Pemotongan dan
- % 40.000 660,091.72 264,036.69
Pemasangan
JUMLAH TENAGA KERJA 264,036.69
B BAHAN
Besi hollow 40.40.2 M.47.h m 3.167 27,280.00 86,386.67
Besi hollow 20.40.2 M.47.g m 1.417 20,240.00 28,673.33
Pengerjaan 1 cm pengelasan dengan las listrik A.4.2.1.5. cm¹ 368.000 1,016.02 373,896.83
JUMLAH HARGA BAHAN 488,956.83
C PERALATAN
Perlengkapan % 35.000 488,956.83 171,134.89
JUMLAH HARGA ALAT 171,134.89
D Jumlah (A+B+C) Untuk Pekerjaan 3 m2 924,128.41
E Untuk Pekerjaan 1 m2 308,042.80
F Overhead & Profit 15% 0.150 46,206.42
G Harga Satuan Pekerjaan (E+F) 354,249.00
AD.4 PEKERJAAN AIR TANAH (SUMUR BOR DALAM)

A.T.01.1 1 Unit Mobillisasi & demobilisasi drilling rig dan peralatan bor
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Koordinator bor L.04 OH 2.0000 149,758.00 299,516.00
Driller L.10 OH 2.0000 93,597.00 187,194.00
Pembantu L.09 OH 2.0000 121,674.00 243,348.00
Crew driller L.10 OH 2.0000 93,597.00 187,194.00
Pekerja L.01 OH 2.0000 93,597.00 187,194.00
Sopir / Driver L.07 OH 2.0000 121,674.00 243,348.00
JUMLAH TENAGA KERJA 1,347,794.00
B BAHAN
Alat bantu set 20.000 50,000.000 1,000,000.00
JUMLAH HARGA BAHAN 1,000,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 2,347,794.00
E Overhead & Profit 15% 0.150 352,169.10
F Harga Satuan Pekerjaan (D+E) 2,699,963.00

A.T.01.2 1 Unit Pembuatan bak untuk air kerja


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Mandor L.04 OH 0.0500 149,758.00 7,487.90
Kepala Tukang L.03 OH 0.2000 128,226.00 25,645.20
Tukang Batu L.02 OH 0.5000 121,674.00 60,837.00
Pekerja L.01 OH 0.5000 93,597.00 46,798.50
JUMLAH TENAGA KERJA 140,768.60
B BAHAN
Portland cement M.245.a kg 93.3120 1,375.00 128,304.00
Pasir Pasang M.8.c m³ 0.3600 300,000.00 108,000.00
JUMLAH HARGA BAHAN 236,304.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 377,072.60
E Overhead & Profit 15% 0.150 56,560.89
F Harga Satuan Pekerjaan (D+E) 433,633.00

A.T.02.2 1 m' Pengeboran Lubang Pandu 4" dari 0 m - 40 m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Ahli geologist L.11 OH 0.1000 350,000.00 35,000.00
Administrasi bor L.02 OH 0.1000 121,674.00 12,167.40
Crew driller L.10 OH 0.2000 93,597.00 18,719.40
Pekerja L.01 OH 0.2000 93,597.00 18,719.40
JUMLAH TENAGA KERJA 84,606.20
B BAHAN
Solar M.394.b liter 7.0000 9,926.40 69,484.80
Oli mesin M.399.a liter 0.5000 40,128.00 20,064.00
Steamvet M.400 liter 0.2000 52,694.40 10,538.88
Bentonit M.402 liter 4.0000 10,982.40 43,929.60
JUMLAH HARGA BAHAN 144,017.28
C PERALATAN
Mesin bor alat 55 unit 0.1000 475,200.00 47,520.00
JUMLAH HARGA ALAT 47,520.00
D Jumlah (A+B+C) 276,143.48
E Overhead & Profit 15% 0.150 41,421.52
F Harga Satuan Pekerjaan (D+E) 317,565.00
A.T.02.3 1 m' Pengeboran Lubang Pandu 4" dari 40 m - 80 m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Ahli geologist L.11 OH 0.1000 350,000.00 35,000.00
Administrasi bor L.02 OH 0.1000 121,674.00 12,167.40
Crew driller L.10 OH 0.2000 93,597.00 18,719.40
Pekerja L.01 OH 0.2000 93,597.00 18,719.40
JUMLAH TENAGA KERJA 84,606.20
B BAHAN
Solar M.394.b liter 7.0000 9,926.40 69,484.80
Oli mesin M.399.a liter 0.5000 40,128.00 20,064.00
Steamvet M.400 liter 0.2000 52,694.40 10,538.88
Bentonit M.402 liter 5.0000 10,982.40 54,912.00
JUMLAH HARGA BAHAN 154,999.68
C PERALATAN
Mesin bor alat 55 unit 0.1000 475,200.00 47,520.00
JUMLAH HARGA ALAT 47,520.00
D Jumlah (A+B+C) 287,125.88
E Overhead & Profit 15% 0.150 43,068.88
F Harga Satuan Pekerjaan (D+E) 330,194.00

A.T.02.4 1 m' Pengeboran Lubang Pandu 4" dari 80 m - 120 m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Ahli geologist L.11 OH 0.1000 350,000.00 35,000.00
Administrasi bor L.02 OH 0.1000 121,674.00 12,167.40
Crew driller L.10 OH 0.2000 93,597.00 18,719.40
Pekerja L.01 OH 0.2000 93,597.00 18,719.40
JUMLAH TENAGA KERJA 84,606.20
B BAHAN
Solar M.394.b liter 7.0000 9,926.40 69,484.80
Oli mesin M.399.a liter 0.5000 40,128.00 20,064.00
Steamvet M.400 liter 0.2000 52,694.40 10,538.88
Bentonit M.402 liter 6.5000 10,982.40 71,385.60
JUMLAH HARGA BAHAN 171,473.28
C PERALATAN
Mesin bor alat 55 unit 0.1000 475,200.00 47,520.00
JUMLAH HARGA ALAT 47,520.00
D Jumlah (A+B+C) 303,599.48
E Overhead & Profit 15% 0.150 45,539.92
F Harga Satuan Pekerjaan (D+E) 349,139.00

A.T.03.2 Reaming dari 0 m - 40 m dari 4'' ke 8''


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Ahli geologist L.11 OH 0.1000 350,000.00 35,000.00
Administrasi bor L.02 OH 0.1000 121,674.00 12,167.40
Crew driller L.10 OH 0.2000 93,597.00 18,719.40
Pekerja L.01 OH 0.2000 93,597.00 18,719.40
JUMLAH TENAGA KERJA 84,606.20
B BAHAN
Solar M.394.b liter 4.0000 9,926.40 39,705.60
Oli mesin M.399.a liter 0.3000 40,128.00 12,038.40
Steamvet M.400 liter 0.2000 52,694.40 10,538.88
Bentonit M.402 liter 4.0000 10,982.40 43,929.60
JUMLAH HARGA BAHAN 106,212.48
C PERALATAN
Mesin bor alat 55 unit 0.1000 475,200.00 47,520.00
JUMLAH HARGA ALAT 47,520.00
D Jumlah (A+B+C) 238,338.68
E Overhead & Profit 15% 0.150 35,750.80
F Harga Satuan Pekerjaan (D+E) 274,089.00
A.T.03.3 Reaming dari 40 m - 80 m dari 4'' ke 8''
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Ahli geologist L.11 OH 0.1000 350,000.00 35,000.00
Administrasi bor L.02 OH 0.1000 121,674.00 12,167.40
Crew driller L.10 OH 0.2000 93,597.00 18,719.40
Pekerja L.01 OH 0.2000 93,597.00 18,719.40
JUMLAH TENAGA KERJA 84,606.20
B BAHAN
Solar M.394.b liter 4.0000 9,926.40 39,705.60
Oli mesin M.399.a liter 0.3000 40,128.00 12,038.40
Steamvet M.400 liter 0.2000 52,694.40 10,538.88
Bentonit M.402 liter 5.0000 10,982.40 54,912.00
JUMLAH HARGA BAHAN 117,194.88
C PERALATAN
Mesin bor alat 55 unit 0.1000 450,000.00 45,000.00
JUMLAH HARGA ALAT 45,000.00
D Jumlah (A+B+C) 246,801.08
E Overhead & Profit 15% 0.150 37,020.16
F Harga Satuan Pekerjaan (D+E) 283,821.00

A.T.03.4 Reaming dari 80 m - 120 m dari 4'' ke 8''


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Ahli geologist L.11 OH 0.1000 350,000.00 35,000.00
Administrasi bor L.02 OH 0.1000 121,674.00 12,167.40
Crew driller L.10 OH 0.2000 93,597.00 18,719.40
Pekerja L.01 OH 0.2000 93,597.00 18,719.40
JUMLAH TENAGA KERJA 84,606.20
B BAHAN
Solar M.394.b liter 4.0000 9,926.40 39,705.60
Oli mesin M.399.a liter 0.3000 40,128.00 12,038.40
Steamvet M.400 liter 0.2000 52,694.40 10,538.88
Bentonit M.402 liter 6.0000 10,982.40 65,894.40
JUMLAH HARGA BAHAN 128,177.28
C PERALATAN
Mesin bor alat 55 unit 0.1000 475,200.00 47,520.00
JUMLAH HARGA ALAT 47,520.00
D Jumlah (A+B+C) 260,303.48
E Overhead & Profit 15% 0.150 39,045.52
F Harga Satuan Pekerjaan (D+E) 299,349.00

A.T.03.5 Reaming dari 0 m - 40 m dari Ø4'' ke Ø6''


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Ahli geologist L.11 OH 0.0333 350,000.00 11,666.67
Administrasi bor L.02 OH 0.0667 121,674.00 8,111.60
Crew driller L.10 OH 0.1333 93,597.00 12,479.60
Pekerja L.01 OH 0.0667 93,597.00 6,239.80
JUMLAH TENAGA KERJA 38,497.67
B BAHAN
Solar M.394.b liter 4.0000 9,926.40 39,705.60
Oli mesin M.399.a liter 0.3333 40,128.00 13,376.00
Steamvet M.400 liter 0.0667 52,694.40 3,512.96
Bentonit M.402 liter 2.6667 10,982.40 29,286.40
JUMLAH HARGA BAHAN 85,880.96
C PERALATAN
Mesin bor alat 55 unit 0.0667 475,200.00 31,680.00
JUMLAH HARGA ALAT 31,680.00
D Jumlah (A+B+C) 156,058.63
E Overhead & Profit 15% 0.150 23,408.79
F Harga Satuan Pekerjaan (D+E) 179,467.00
A.T.03.6 Reaming dari 40 m - 80 m dari Ø4'' ke Ø6''
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Ahli geologist L.11 OH 0.0417 350,000.00 14,583.33
Administrasi bor L.02 OH 0.0833 121,674.00 10,139.50
Crew driller L.10 OH 0.1667 93,597.00 15,599.50
Pekerja L.01 OH 0.0833 93,597.00 7,799.75
JUMLAH TENAGA KERJA 48,122.08
B BAHAN
Solar M.394.b liter 4.0000 9,926.40 39,705.60
Oli mesin M.399.a liter 0.4167 40,128.00 16,720.00
Steamvet M.400 liter 0.0833 52,694.40 4,391.20
Bentonit M.402 liter 3.3333 10,982.40 36,608.00
JUMLAH HARGA BAHAN 97,424.80
C PERALATAN
Mesin bor alat 55 unit 0.0833 475,200.00 39,600.00
JUMLAH HARGA ALAT 39,600.00
D Jumlah (A+B+C) 185,146.88
E Overhead & Profit 15% 0.150 27,772.03
F Harga Satuan Pekerjaan (D+E) 212,918.00

A.T.03.7 Reaming dari 80 m - 120 m dari Ø4'' ke Ø6''


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Ahli geologist L.11 OH 0.0500 350,000.00 17,500.00
Administrasi bor L.02 OH 0.1000 121,674.00 12,167.40
Crew driller L.10 OH 0.2000 93,597.00 18,719.40
Pekerja L.01 OH 0.1000 93,597.00 9,359.70
JUMLAH TENAGA KERJA 57,746.50
B BAHAN
Solar M.394.b liter 4.0000 9,926.40 39,705.60
Oli mesin M.399.a liter 0.5000 40,128.00 20,064.00
Steamvet M.400 liter 0.1000 52,694.40 5,269.44
Bentonit M.402 liter 4.0000 10,982.40 43,929.60
JUMLAH HARGA BAHAN 108,968.64
C PERALATAN
Mesin bor alat 55 unit 0.1000 475,200.00 47,520.00
JUMLAH HARGA ALAT 47,520.00
D Jumlah (A+B+C) 214,235.14
E Overhead & Profit 15% 0.150 32,135.27
F Harga Satuan Pekerjaan (D+E) 246,370.00

A.T.02 1 m' Pengeboran dia. 8 3/4"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.3088 93,597.00 28,902.75
Tukang Bor L.02 OH 0.0772 121,674.00 9,393.23
Mandor L.04 OH 0.0309 149,758.00 4,627.52
JUMLAH TENAGA KERJA 42,923.51
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Borehole dia 8 3/4" m' 0.5405 850,000.000 459,425.00
JUMLAH HARGA ALAT 459,425.00
D Jumlah (A+B+C) 502,348.51
E Overhead & Profit 15% 0.150 75,352.28
F Harga Satuan Pekerjaan (D+E) 577,700.00
A.T.02.1 1 m' Pengeboran dia. 6"
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.2286 93,597.00 21,393.60
Tukang Bor L.02 OH 0.0571 121,674.00 6,952.80
Mandor L.04 OH 0.0208 149,758.00 3,111.85
JUMLAH TENAGA KERJA 31,458.25
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Borehole dia 6" m' 0.4000 829,102.000 331,640.80
JUMLAH HARGA ALAT 331,640.80
D Jumlah (A+B+C) 363,099.05
E Overhead & Profit 15% 0.150 54,464.86
F Harga Satuan Pekerjaan (D+E) 417,563.00

A.T.03 1 m' Reaming dia. 8 3/4" - 12"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.2840 93,597.00 26,581.55
Tukang Bor L.02 OH 0.0710 121,674.00 8,638.85
Mandor L.04 OH 0.0286 149,758.00 4,283.08
JUMLAH TENAGA KERJA 39,503.48
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Reaming dia. 8 3/4" - 12" m' 0.5000 850,000.000 425,000.00
JUMLAH HARGA ALAT 425,000.00
D Jumlah (A+B+C) 464,503.48
E Overhead & Profit 15% 0.150 69,675.52
F Harga Satuan Pekerjaan (D+E) 534,179.00

A.T.03.1 1 m' Reaming dia. 6" - 8"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.2078 93,597.00 19,448.73
Tukang Bor L.02 OH 0.0519 121,674.00 6,320.73
Mandor L.04 OH 0.0208 149,758.00 3,111.85
JUMLAH TENAGA KERJA 28,881.31
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Reaming dia. 6" - 8" m' 0.3636 829,102.000 301,491.64
JUMLAH HARGA ALAT 301,491.64
D Jumlah (A+B+C) 330,372.95
E Overhead & Profit 15% 0.150 49,555.94
F Harga Satuan Pekerjaan (D+E) 379,928.00
A.T.05 Bongkar Pasang Temporary Cassing (ID) 12" 363,085.00
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 45,078.11
Pekerja L.01 OH 0.3240 93,597.00 30,325.43
Tukang Bor L.02 OH 0.0810 121,674.00 9,855.59
Mandor L.04 OH 0.0327 149,758.00 4,897.09
B BAHAN -

C PERALATAN 270,648.75
Reaming dia. 6" - 8" m' 0.5714 473,659.000 270,648.75
D JUMLAH A + B + C 315,726.86
E Overhead & Profit 15% 0.150 47,359.03
F HARGA SATUAN PEKERJAAN (D+E) 363,085.00

A.T.07 Pengadaan dan Pemasangan Cassing Pipa Black Steel 6" 2,027,923.00
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 9,992.40
Pekerja L.01 OH 0.0720 93,597.00 6,738.98
Tukang Bor L.02 OH 0.0180 121,674.00 2,190.13
Mandor L.04 OH 0.0071 149,758.00 1,063.28
B BAHAN 1,646,848.00
Pipa Carbon Steel / Hitam Ø 6 " (4,6 mm) M.609.d 1.0500 1,541,760.00 1,618,848.00
Centralizer Ls 0.1000 280,000.000 28,000.00
C PERALATAN 106,571.25
Drilling Rig+Perlengkapan (Pemasangan Pipa) m' 0.1250 852,570.000 106,571.25
D JUMLAH A + B + C 1,763,411.65
E Overhead & Profit 15% 0.150 264,511.75
F HARGA SATUAN PEKERJAAN (D+E) 2,027,923.00

A.T.07.1 Pengadaan dan Pemasangan Cassing Pipa Galvanis GI. SNI (Medium A) dia. 4" 2,444,437.00
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 9,144.16
Pekerja L.01 OH 0.0658 93,597.00 6,157.70
Tukang Bor L.02 OH 0.0164 121,674.00 2,001.22
Mandor L.04 OH 0.0066 149,758.00 985.25
B BAHAN 2,018,296.00
Pipa galvanis medium A Ø 4" panjang 6 m M.44.g m 1.0500 1,895,520.00 1,990,296.00
Centralizer - Ls 0.1000 280,000.000 28,000.00
C PERALATAN 98,157.73
Drilling Rig+Perlengkapan (Pemasangan Pipa) m' 0.1151 852,570.000 98,157.73
D JUMLAH A + B + C 2,125,597.89
E Overhead & Profit 15% 0.150 318,839.68
F HARGA SATUAN PEKERJAAN (D+E) 2,444,437.00

A.T.08 Pengadaan dan Pemasangan LC Screen 6" 1,629,551.00


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 9,992.40
Pekerja L.01 OH 0.0720 93,597.00 6,738.98
Tukang Bor L.02 OH 0.0180 121,674.00 2,190.13
Mandor L.04 OH 0.0071 149,758.00 1,063.28
B BAHAN 1,300,437.60
Screen low carbon ø 6" M.564.b m 1.0500 1,238,512.00 1,300,437.60
C PERALATAN 106,571.25
Drilling Rig+Perlengkapan (Pemasangan Pipa) E.09 m' 0.1250 852,570.000 106,571.25
D JUMLAH A + B + C 1,417,001.25
E Overhead & Profit 15% 0.150 212,550.19
F HARGA SATUAN PEKERJAAN (D+E) 1,629,551.00
A.T.08.1 Pengadaan dan Pemasangan ST. Screen dia. 4" 1,653,541.00
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 9,144.16
Pekerja L.01 OH 0.0658 93,597.00 6,157.70
Tukang Bor L.02 OH 0.0164 121,674.00 2,001.22
Mandor L.04 OH 0.0066 149,758.00 985.25
B BAHAN 1,330,560.00
Screen stainless steel ø 4" M.565 m 1.0500 1,267,200.00 1,330,560.00

C PERALATAN 98,157.73
Drilling Rig+Perlengkapan (Pemasangan Pipa) m' 0.1151 852,570.000 98,157.73

D JUMLAH A + B + C 1,437,861.89
E Overhead & Profit 15% 0.150 215,679.28
F HARGA SATUAN PEKERJAAN (D+E) 1,653,541.00

A.T.08.2 Pengadaan dan Pemasangan LC. Screen dia. 4" 1,272,847.00


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 9,144.16
Pekerja L.01 OH 0.0658 93,597.00 6,157.70
Tukang Bor L.02 OH 0.0164 121,674.00 2,001.22
Mandor L.04 OH 0.0066 149,758.00 985.25
B BAHAN 999,521.60
Screen low carbon ø 4" M.564.a m 1.0500 951,925.33 999,521.60

C PERALATAN 98,157.73
Drilling Rig+Perlengkapan (Pemasangan Pipa) E.09 m' 0.1151 852,570.000 98,157.73

D JUMLAH A + B + C 1,106,823.49
E Overhead & Profit 15% 0.150 166,023.52
F HARGA SATUAN PEKERJAAN (D+E) 1,272,847.00

A.T.08.3 Pengadaan dan Pemasangan PVC. Screen dia. 4" 368,670.00


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 117,089.49
Driller L.10 OH 0.0300 93,597.00 2,807.91
Pembantu driller L.07 OH 0.2500 121,674.00 30,418.50
Crew driller L.10 OH 0.8000 93,597.00 74,877.60
Koordinator bor L.04 OH 0.0600 149,758.00 8,985.48
B BAHAN 105,336.00
Pipa screen pvc Ø 4" M.566 m 1.0500 100,320.00 105,336.00

C PERALATAN 98,157.73
Drilling Rig+Perlengkapan (Pemasangan Pipa) E.09 m' 0.1151 852,570.000 98,157.73

D JUMLAH A + B + C 320,583.22
E Overhead & Profit 15% 0.150 48,087.48
F HARGA SATUAN PEKERJAAN (D+E) 368,670.00

A.T.12 Pengadaan dan Pemasangan Gravel Pack 508,541.00


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 144,418.04
Pekerja L.01 OH 1.0390 93,597.00 97,247.28
Tukang Bor L.02 OH 0.2598 121,674.00 31,610.91
Mandor L.04 OH 0.1039 149,758.00 15,559.86
B BAHAN 297,792.00
Koral bulat M.11.a M3 1.2000 248,160.00 297,792.00
C PERALATAN -

D JUMLAH A + B + C 442,210.04
E Overhead & Profit 15% 0.150 66,331.51
F HARGA SATUAN PEKERJAAN (D+E) 508,541.00
A.T.13 Pencucian Sumur (Well Development) 95,957.00
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 7,941.97
Pekerja L.01 OH 0.0571 93,597.00 5,348.13
Tukang Bor L.02 OH 0.0143 121,674.00 1,738.72
Mandor L.04 OH 0.0057 149,758.00 855.12
B BAHAN -

C PERALATAN 75,498.90
Drilling Rig+Perlengkapan (Pemasangan Pipa) m' 0.1000 754,989.000 75,498.90

D JUMLAH A + B + C 83,440.87
E Overhead & Profit 15% 0.150 12,516.13
F HARGA SATUAN PEKERJAAN (D+E) 95,957.00

A.T.14 Uji Pemompaan (Pumping Test) 37,920.00


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 7,941.97
Pekerja L.01 OH 0.0571 93,597.00 5,348.13
Tukang Bor L.02 OH 0.0143 121,674.00 1,738.72
Mandor L.04 OH 0.0057 149,758.00 855.12
B BAHAN -

C PERALATAN 25,032.20
Drilling Rig+Perlengkapan (Pemasangan Pipa) m' 0.1000 250,322.000 25,032.20

D JUMLAH A + B + C 32,974.17
E Overhead & Profit 15% 0.150 4,946.13
F HARGA SATUAN PEKERJAAN (D+E) 37,920.00

A.T.15 Pasang dan bongkar peralatan uji 2,346,294.00


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 990,256.40
Pekerja L.01 OH 8.0000 93,597.00 748,776.00
Tukang Bor L.02 OH 1.0000 121,674.00 121,674.00
Mandor L.04 OH 0.8000 149,758.00 119,806.40
B BAHAN 1,050,000.00
Resin - tube 2.0000 250,000.000 500,000.00
Kabel isolator, Air accu, Besi strip - Ls 1.0000 550,000.000 550,000.00
C PERALATAN

D JUMLAH A + B + C 2,040,256.40
E Overhead & Profit 15% 0.150 306,038.46
F HARGA SATUAN PEKERJAAN (D+E) 2,346,294.00

A.T.16 Pemeriksaan Kualitas Air 1,835,212.55


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 60,837.00
Teknisi sampling kualitas air L.05 OH 0.5000 121,674.00 60,837.00
B BAHAN 35,000.00
1 bh jerigen 1 L, 2bh botol 250 ml - tube 1.0000 35,000.000 35,000.00

C PERALATAN -

D JUMLAH A + B + C 95,837.00
E Overhead & Profit 15% 0.150 14,375.55
F HARGA SATUAN PEKERJAAN (D+E) 110,212.55
49,375.00
Biaya Analisa Sampling kualitas air (air minum) sampel 1.0000 1,500,000.000 1,500,000.00
G
15.0% X G 225,000.00
1,835,212.55
A.T.18 Electric Logging 1,403,686.00
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA 181,097.00
Pekerja L.01 OH 1.0000 93,597.00 93,597.00
Engineer (Sipil/Geologi)/ Ahli Madya OH 0.2500 350,000.000 87,500.00
B BAHAN 207,000.00
Patok kayu kaso 5/7 - 1m' Ls 6.0000 30,000.000 180,000.00
Cat penutup (cat kayu) M.260.b kg 0.5000 54,000.00 27,000.00
C PERALATAN 832,500.00
Geo Listrik Sewa/H 0.3330 2,500,000.000 832,500.00
D JUMLAH A + B + C 1,220,597.00
E Overhead & Profit 15% 0.150 183,089.55
F HARGA SATUAN PEKERJAAN (D+E) 1,403,686.00

A.T.18.1 1 m' Bor Hole Logging


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Ahli geologist L.11 OH 0.0200 350,000.00 7,000.00
Administrasi bor L.02 OH 0.0200 121,674.00 2,433.48
Crew driller L.10 OH 0.0400 93,597.00 3,743.88
Pekerja L.01 OH 0.0400 93,597.00 3,743.88
JUMLAH TENAGA KERJA 16,921.24
B BAHAN
Recorder paper M.567 set 0.0200 174,240.00 3,484.80
Alat tulis buah 0.0200 5,000.000 100.00
JUMLAH HARGA BAHAN 3,584.80
C PERALATAN
Logging alat 53 unit 0.0200 295,680.00 5,913.60
Alat bantu alat 49 set 0.2000 52,800.00 10,560.00
JUMLAH HARGA ALAT 16,473.60
D Jumlah (A+B+C) 36,979.64
E Overhead & Profit 15% 0.150 5,546.95
F Harga Satuan Pekerjaan (D+E) 42,526.00

A.T.18.2 Grouting 1 : 2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Koordinator bor L.04 OH 0.1000 149,758.00 14,975.80
Crew driller L.10 OH 0.3000 93,597.00 28,079.10
Pekerja L.01 OH 0.2000 93,597.00 18,719.40
JUMLAH HARGA TENAGA KERJA 61,774.30
B BAHAN
Portland cement M.245.a kg 240.00 1,375.00 330,000.00
Pasir Pasang M.8.c m³ 2.0000 300,000.00 600,000.00
Bentonit M.402 liter 5.0000 10,982.40 54,912.00
JUMLAH HARGA BAHAN 984,912.00
C PERALATAN
Pompa injeksi alat 58 unit 0.1000 316,800.00 31,680.00
Concrete mixer 350 ℓ alat 13 jam 1.1000 30,171.43 33,188.57
JUMLAH HARGA ALAT 64,868.57
D Jumlah (A+B+C) 1,111,554.87
E Overhead & Profit 15% 0.150 166,733.23
F Harga Satuan Pekerjaan (D+E) 1,278,288.00
PEKERJAAN PERPIPAAN

1 Jenis Pekerjaan : Pemasangan pipa


Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Pekerja Err:504 Err:504 0.0900 Err:504 Err:504
2. Tukang Pipa Err:504 Err:504 0.1500 Err:504 Err:504
3. Kepala Tukang Err:504 Err:504 0.0150 Err:504 Err:504
4. Mandor Err:504 Err:504 0.0090 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

2 Jenis Pekerjaan : Pengetesan pipa


Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Pekerja Err:504 Err:504 0.0160 Err:504 Err:504
2. Tukang Pipa Err:504 Err:504 0.0320 Err:504 Err:504
3. Mandor Err:504 Err:504 0.0080 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Air Err:504 Err:504 0.0200 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

3 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 0,5 "pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1 Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m³ 0.0600 73,941.70 4,436.50
2 Urugan bekas tanah galian (manual) m³ 0.0599 24,647.23 1,475.81
3 Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4 Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1 Pipa PVC tipe AW Ø 1/2" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2 Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 138


4 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 0,5 " pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0599 24,647.23 1,475.81
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 1/2" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

5 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 3/4 "pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1 Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m³ 0.0600 73,941.70 4,436.50
2 Urugan bekas tanah galian (manual) m³ 0.0597 24,647.23 1,472.03
3 Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4 Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1 Pipa PVC tipe AW Ø 3/4" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2 Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

6 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 3/4 " pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0597 24,647.23 1,472.03
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 3/4" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 139


7 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 1 "pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m3 0.0600 73,941.70 4,436.50
2. Urugan bekas tanah galian (manual) m3 0.0595 24,647.23 1,466.74
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 1" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

8 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 1" pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0595 24,647.23 1,466.74
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 1" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

9 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 1,5" pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m3 0.0600 73,941.70 4,436.50
2. Urugan bekas tanah galian (manual) m3 0.0589 24,647.23 1,451.61
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 1 1/2" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 140


10 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 1.5" pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0589 24,647.23 1,451.61
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 1 1/2" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

11 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 2" pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m3 0.0600 73,941.70 4,436.50
2. Urugan bekas tanah galian (manual) m3 0.0580 24,647.23 1,430.44
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 2" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

12 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 2" pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0580 24,647.23 1,430.44
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 2" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 141


13 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 2,5 "pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1 Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m³ 0.0600 73,941.70 4,436.50
2 Urugan bekas tanah galian (manual) m³ 0.0569 24,647.23 1,403.22
3 Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4 Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1 Pipa PVC tipe AW Ø 2 1/2" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2 Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

14 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 2,5 " pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0569 24,647.23 1,403.22
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 2 1/2" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

15 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 3" pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m3 0.0600 73,941.70 4,436.50
2. Urugan bekas tanah galian (manual) m3 0.0556 24,647.23 1,369.95
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 3" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 142


16 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 3" pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0556 24,647.23 1,369.95
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 3" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

17 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 4" pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m3 0.0600 73,941.70 4,436.50
2. Urugan bekas tanah galian (manual) m3 0.0521 24,647.23 1,285.26
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 4" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

18 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 4" pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0521 24,647.23 1,285.26
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 4" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 143


19 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 6" pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m3 0.0600 73,941.70 4,436.50
2. Urugan bekas tanah galian (manual) m3 0.0423 24,647.23 1,043.28
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 6" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

20 Jenis Pekerjaan : Pengadaan & Pasang Pipa PVC Ø 6" pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0423 24,647.23 1,043.28
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa PVC tipe AW Ø 6" panjang 4 m Err:504 Err:504 0.2500 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

21 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 0,5 "pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1 Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m³ 0.0600 73,941.70 4,436.50
2 Urugan bekas tanah galian (manual) m³ 0.0599 24,647.23 1,475.81
3 Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4 Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1 Pipa galvanis Medium B Ø 1/2" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2 Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 144


22 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 0,5 " pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0599 24,647.23 1,475.81
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 1/2" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

23 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 3/4 "pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1 Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m³ 0.0600 73,941.70 4,436.50
2 Urugan bekas tanah galian (manual) m³ 0.0597 24,647.23 1,472.03
3 Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4 Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1 Pipa galvanis Medium B Ø 3/4" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2 Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

24 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 3/4 " pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0597 24,647.23 1,472.03
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 3/4" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 145


25 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 1 "pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m3 0.0600 73,941.70 4,436.50
2. Urugan bekas tanah galian (manual) m3 0.0595 24,647.23 1,466.74
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 1" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

26 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 1" pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0595 24,647.23 1,466.74
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 1" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

27 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 1,5" pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m3 0.0600 73,941.70 4,436.50
2. Urugan bekas tanah galian (manual) m3 0.0589 24,647.23 1,451.61
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 1 1/2" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 146


28 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 1.5" pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0589 24,647.23 1,451.61
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 1 1/2" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

29 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 2" pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m3 0.0600 73,941.70 4,436.50
2. Urugan bekas tanah galian (manual) m3 0.0580 24,647.23 1,430.44
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 2" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

30 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 2" pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0580 24,647.23 1,430.44
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 2" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 147


31 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 2,5 "pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1 Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m³ 0.0600 73,941.70 4,436.50
2 Urugan bekas tanah galian (manual) m³ 0.0569 24,647.23 1,403.22
3 Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4 Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1 Pipa galvanis Medium B Ø 2 1/2 " panjang 6 m 0.1667 450,000.00 75,000.00
2 Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

32 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 2,5 " pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0569 24,647.23 1,403.22
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 2 1/2 " panjang 6 m 0.1667 450,000.00 75,000.00
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

33 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 3" pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m3 0.0600 73,941.70 4,436.50
2. Urugan bekas tanah galian (manual) m3 0.0556 24,647.23 1,369.95
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 3" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 148


34 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 3" pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0556 24,647.23 1,369.95
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 3" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

35 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 4" pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m3 0.0600 73,941.70 4,436.50
2. Urugan bekas tanah galian (manual) m3 0.0521 24,647.23 1,285.26
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 4" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

36 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 4" pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0521 24,647.23 1,285.26
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 4" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 149


37 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 6" pada tanah biasa
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah biasa dibuang di sekitar lokasi proyek (manual) m3 0.0600 73,941.70 4,436.50
2. Urugan bekas tanah galian (manual) m3 0.0423 24,647.23 1,043.28
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 6" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

38 Jenis Pekerjaan : Pengadaan & Pasang Pipa Galvanis Medium B Ø 6" pada tanah keras
Satuan Pekerjaan : m¹
Harga Satuan
Jumlah
Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A. TENAGA KERJA
1. Galian tanah keras berbatu dibuang di sekitar lokasi proyek (manual) m3 0.0600 98,389.26 5,903.36
2. Urugan bekas tanah galian (manual) m3 0.0423 24,647.23 1,043.28
3. Pemasangan Pipa m¹ 1.0000 Err:504 Err:504
4. Pengetesan Pipa m¹ 1.0000 Err:504 Err:504
JUMLAH HARGA TENAGA KERJA Err:504
B. B a h a n
1. Pipa galvanis Medium B Ø 6" panjang 6 m Err:504 Err:504 0.1667 Err:504 Err:504
2. Assesoris PVC Err:504 Err:504 1.0000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) Err:504
E Overhead & Profit 13.5% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

AN.DIHIT - Halaman. 150


HARGA SATUAN PEKERJAAN LAIN - LAIN
dihit AD.5.1 Penanaman 1 m2 rumput gajah mini
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.057 93,597.00 5,348.40
2 Mandor L.04 OH 0.010 149,758.00 1,497.58

JUMLAH TENAGA KERJA 6,845.98


B BAHAN
1 rumput gajah mini T.216 m2 0.550 31,680.00 17,424.00
2 Media tanah + pupuk kandang T.261 zak (8kg) 2.222 10,560.00 23,466.67

JUMLAH HARGA BAHAN 40,890.67


C ALAT
1 Alat bantu alat 49 set 1.000 52,800.00 52,800.00

JUMLAH HARGA ALAT 52,800.00


D Jumlah (A+B+C) 100,536.65
E Overhead & Profit 15% 0.150 15,080.50
F Harga Satuan Pekerjaan (D+E) 115,617.00

dihit AD.5.2 Penanaman 1 m2 rumput golf


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.057 93,597.00 5,348.40
2 Mandor L.04 OH 0.010 149,758.00 1,497.58

JUMLAH TENAGA KERJA 6,845.98


B BAHAN
1 rumput golf T.217 m2 0.550 158,400.00 87,120.00
2 Media tanah + pupuk kandang T.261 zak (8kg) 2.222 10,560.00 23,466.67

JUMLAH HARGA BAHAN 110,586.67


C ALAT
1 Alat bantu alat 49 set 1.000 52,800.00 52,800.00

JUMLAH HARGA ALAT 52,800.00


D Jumlah (A+B+C) 170,232.65
E Overhead & Profit 15% 0.150 25,534.90
F Harga Satuan Pekerjaan (D+E) 195,767.00
dihit AD.5.3 Penanaman 1 m2 rumput jepang
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.057 93,597.00 5,348.40
2 Mandor L.04 OH 0.010 149,758.00 1,497.58

JUMLAH TENAGA KERJA 6,845.98


B BAHAN
1 rumput jepang T.219 m2 0.550 36,960.00 20,328.00
2 Media tanah + pupuk kandang T.261 zak (8kg) 2.222 10,560.00 23,466.67

JUMLAH HARGA BAHAN 43,794.67


C ALAT
1 Alat bantu alat 49 set 1.000 52,800.00 52,800.00

JUMLAH HARGA ALAT 52,800.00


D Jumlah (A+B+C) 103,440.65
E Overhead & Profit 15% 0.150 15,516.10
F Harga Satuan Pekerjaan (D+E) 118,956.00

dihit AD.5.4 Penyiapan media tanah dalam Polybag untuk tanaman Semak (ukuran Polibag 25/12,5 x 50 x 0,08)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.006 93,597.00 534.84

JUMLAH TENAGA KERJA 534.84


B BAHAN
1 Polibag 25 T.29 buah 1.000 1,056.00 1,056.00
2 Media tanah + pupuk kandang T.261 zak (8kg) 0.185 10,560.00 1,955.56

JUMLAH HARGA BAHAN 3,011.56


C ALAT
1 Alat bantu alat 49 set 1.000 52,800.00 52,800.00

JUMLAH HARGA ALAT 52,800.00


D Jumlah (A+B+C) 56,346.40
E Overhead & Profit 15% 0.150 8,451.96
F Harga Satuan Pekerjaan (D+E) 64,798.00
dihit AD.5.5 Penanaman 1 Pohon Peneduh cemara kipas
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.240 93,597.00 22,463.28
2 Mandor L.04 OH 0.040 149,758.00 5,990.32

JUMLAH TENAGA KERJA 28,453.60


B BAHAN
1 cemara kipas T.70 Pohon 1.000 52,800.00 52,800.00
2 Media tanah + pupuk kandang T.261 zak (8kg) 1.852 10,560.00 19,555.56

JUMLAH HARGA BAHAN 72,355.56


C ALAT
1 Alat bantu alat 49 set 1.000 52,800.00 52,800.00
2 Bambu Ø 6 - 8 cm, panjang 400 Cm M.23.a batang 1.000 11,968.00 11,968.00
3 Tali Ijuk M.556 kg 1.000 10,560.00 10,560.00

JUMLAH HARGA ALAT 75,328.00


D Jumlah (A+B+C) 176,137.16
E Overhead & Profit 15% 0.150 26,420.57
F Harga Satuan Pekerjaan (D+E) 202,557.00

dihit AD.5.6 Penanaman 1 Pohon Peneduh glodogan pecut 4 m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.240 93,597.00 22,463.28
2 Mandor L.04 OH 0.040 149,758.00 5,990.32

JUMLAH TENAGA KERJA 28,453.60


B BAHAN
1 glodogan pecut 4 m T.96 Pohon 1.000 633,600.00 633,600.00
2 Media tanah + pupuk kandang T.261 zak (8kg) 3.200 10,560.00 33,792.00

JUMLAH HARGA BAHAN 667,392.00


C ALAT
1 Alat bantu alat 49 set 1.000 52,800.00 52,800.00
2 Bambu Ø 6 - 8 cm, panjang 400 Cm M.23.a batang 2.000 11,968.00 23,936.00
3 Tali Ijuk M.556 kg 1.000 10,560.00 10,560.00

JUMLAH HARGA ALAT 87,296.00


D Jumlah (A+B+C) 783,141.60
E Overhead & Profit 15% 0.150 117,471.24
F Harga Satuan Pekerjaan (D+E) 900,612.00
dihit AD.5.7 Penanaman 1 Pohon Peneduh ketapang kencana
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.240 93,597.00 22,463.28
2 Mandor L.04 OH 0.040 149,758.00 5,990.32

JUMLAH TENAGA KERJA 28,453.60


B BAHAN
1 ketapang kencana T.135 Pohon 1.000 79,200.00 79,200.00
2 Media tanah + pupuk kandang T.261 zak (8kg) 1.852 10,560.00 19,555.56

JUMLAH HARGA BAHAN 98,755.56


C ALAT
1 Alat bantu alat 49 set 1.000 52,800.00 52,800.00

JUMLAH HARGA ALAT 52,800.00


D Jumlah (A+B+C) 180,009.16
E Overhead & Profit 15% 0.150 27,001.37
F Harga Satuan Pekerjaan (D+E) 207,010.00

dihit AD.5.8 Penanaman 1 Pohon Peneduh palem botol


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.240 93,597.00 22,463.28
2 Mandor L.04 OH 0.040 149,758.00 5,990.32

JUMLAH TENAGA KERJA 28,453.60


B BAHAN
1 palem botol T.168 Pohon 1.000 118,800.00 118,800.00
2 Media tanah + pupuk kandang T.261 zak (8kg) 3.200 10,560.00 33,792.00

JUMLAH HARGA BAHAN 152,592.00


C ALAT
1 Alat bantu alat 49 set 1.000 52,800.00 52,800.00
2 Bambu Ø 6 - 8 cm, panjang 400 Cm M.23.a batang 2.000 11,968.00 23,936.00
3 Tali Ijuk M.556 kg 1.000 10,560.00 10,560.00

JUMLAH HARGA ALAT 87,296.00


D Jumlah (A+B+C) 268,341.60
E Overhead & Profit 15% 0.150 40,251.24
F Harga Satuan Pekerjaan (D+E) 308,592.00
dihit AD.5.9 Penanaman 1 Pohon Peneduh palem ekor tupai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.240 93,597.00 22,463.28
2 Mandor L.04 OH 0.040 149,758.00 5,990.32

JUMLAH TENAGA KERJA 28,453.60


B BAHAN
1 palem ekor tupai T.170 Pohon 1.000 317,856.00 317,856.00
2 Media tanah + pupuk kandang T.261 zak (8kg) 3.200 10,560.00 33,792.00

JUMLAH HARGA BAHAN 351,648.00


C ALAT
1 Alat bantu alat 49 set 1.000 52,800.00 52,800.00

JUMLAH HARGA ALAT 52,800.00


D Jumlah (A+B+C) 432,901.60
E Overhead & Profit 15% 0.150 64,935.24
F Harga Satuan Pekerjaan (D+E) 497,836.00

dihit AD.5.10 Penanaman 1 Pohon Peneduh pucuk merah


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.240 93,597.00 22,463.28
2 Mandor L.04 OH 0.040 149,758.00 5,990.32

JUMLAH TENAGA KERJA 28,453.60


B BAHAN
1 pucuk merah T.201 Pohon 1.000 10,560.00 10,560.00
2 Media tanah + pupuk kandang T.261 zak (8kg) 1.185 10,560.00 12,515.56

JUMLAH HARGA BAHAN 23,075.56


C ALAT
1 Alat bantu alat 49 set 1.000 52,800.00 52,800.00

JUMLAH HARGA ALAT 52,800.00


D Jumlah (A+B+C) 104,329.16
E Overhead & Profit 15% 0.150 15,649.37
F Harga Satuan Pekerjaan (D+E) 119,978.00
dihit AD.5.11 Penanaman 1 Pohon Peneduh tabebuya kuning
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.240 93,597.00 22,463.28
2 Mandor L.04 OH 0.040 149,758.00 5,990.32
#N/A
JUMLAH TENAGA KERJA 28,453.60
B BAHAN
1 tabebuya kuning T.248 Pohon 1.000 846,384.00 846,384.00
2 Media tanah + pupuk kandang T.261 zak (8kg) 3.200 10,560.00 33,792.00

JUMLAH HARGA BAHAN 880,176.00


C ALAT
1 Alat bantu alat 49 set 1.000 52,800.00 52,800.00
2 Bambu Ø 6 - 8 cm, panjang 400 Cm M.23.a batang 2.000 11,968.00 23,936.00
3 Tali Ijuk M.556 kg 1.000 10,560.00 10,560.00

JUMLAH HARGA ALAT 87,296.00


D Jumlah (A+B+C) 995,925.60
E Overhead & Profit 15% 0.150 149,388.84
F Harga Satuan Pekerjaan (D+E) 1,145,314.00

dihit AD.5.12 Penanaman 1 Pohon Peneduh trembesi 4 m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.240 93,597.00 22,463.28
2 Mandor L.04 OH 0.040 149,758.00 5,990.32

JUMLAH TENAGA KERJA 28,453.60


B BAHAN
1 trembesi 4 m T.254 Pohon 1.000 369,600.00 369,600.00
2 Media tanah + pupuk kandang T.261 zak (8kg) 3.200 10,560.00 33,792.00

JUMLAH HARGA BAHAN 403,392.00


C ALAT
1 Alat bantu alat 49 set 1.000 52,800.00 52,800.00
2 Bambu Ø 6 - 8 cm, panjang 400 Cm M.23.a batang 2.000 11,968.00 23,936.00
3 Tali Ijuk M.556 kg 1.000 10,560.00 10,560.00

JUMLAH HARGA ALAT 87,296.00


D Jumlah (A+B+C) 519,141.60
E Overhead & Profit 15% 0.150 77,871.24
F Harga Satuan Pekerjaan (D+E) 597,012.00
HARGA SATUAN PEKERJAAN LAIN - LAIN
dihit AD.6.1 Sewa Scaffolding (m3 ruang)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 8.000 93,597.00 748,776.00
2 Mandor L.04 OH 0.250 149,758.00 37,439.50

JUMLAH TENAGA KERJA 786,215.50


B BAHAN
1 Scaffolding ukuran : 1,7x1,2x1,5 m alat 63 unit 30.000 67,885.71 2,036,571.43
termasuk aksesoris lengkap ( sewa )
JUMLAH HARGA BAHAN 2,036,571.43
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) Harga per 30 unit 2,822,786.93
E Harga per m3 ruang 15,375.00
F Overhead & Profit 15% 0.150 2,306.25
G Harga Satuan Pekerjaan (D+E) 17,681.00

dihit AD.6.2 Pemasangan plastik cor


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.002 93,597.00 187.19
Mandor L.04 OH 0.000 149,758.00 29.95
JUMLAH TENAGA KERJA 217.15
B BAHAN
Plastik cor/Polytene 125 mikron M.112 kg 0.015 46,560.00 698.40
JUMLAH HARGA BAHAN 698.40
C ALAT
Alat bantu alat 49 set 0.001 52,800.00 52.80
JUMLAH HARGA ALAT 52.80
D Jumlah (A+B+C) 968.35
E Overhead & Profit 15% 0.150 145.25
F Harga Satuan Pekerjaan (D+E) 1,113.00

dihit AD.6.4 1 m3 bronjong penahan kawat Ø 3 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.750 93,597.00 70,197.75
Tukang batu L.02 OH 0.375 121,674.00 45,627.75
Mandor L.04 OH 0.125 149,758.00 18,719.75
JUMLAH TENAGA KERJA 134,545.25
B BAHAN
Kawat bronjong Ø 3 mm M.53.b Kg 15.000 37,440.00 561,600.00
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.100 418,880.00 460,768.00
JUMLAH HARGA BAHAN 1,022,368.00
C ALAT
alat bantu alat 49 OH 1.000 52,800.00 52,800.00
JUMLAH HARGA ALAT 52,800.00
D Jumlah (A+B+C) 1,209,713.25
E Overhead & Profit 15% 0.150 181,456.99
F Harga Satuan Pekerjaan (D+E) 1,391,170.00
dihit AD.6.5 Penyediaan dan pemasangan rangka panggung besi IWF
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.00029 93,597.00 26.85
Tukang batu L.02 OH 0.00073 121,674.00 89.00
Mandor L.04 OH 0.00288 149,758.00 431.75
JUMLAH TENAGA KERJA 547.60
B BAHAN
Besi IWF M.46.i Kg 1.000 17,600.00 17,600.00

JUMLAH HARGA BAHAN 17,600.00


C ALAT
alat bantu alat 49 OH 1.000 52,800.00 52,800.00
JUMLAH HARGA ALAT 52,800.00
D Jumlah (A+B+C) 70,947.60
E Overhead & Profit 15% 0.150 10,642.14
F Harga Satuan Pekerjaan (D+E) 81,589.00

dihit AD.6.6 Pasang penutup panggung multiplek 18 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.30000 93,597.00 28,079.10
Tukang batu L.02 OH 0.30000 121,674.00 36,502.20
Kepala tukang L.03 OH 0.03000 128,226.00 3,846.78
Mandor L.04 OH 0.03000 149,758.00 4,492.74
JUMLAH TENAGA KERJA 72,920.82
B BAHAN
Multipleks t= 18 mm M.35.f Lembar 0.128 217,000.00 27,776.00
Kayu kamper (kaso 5x7) M.26.a m3 0.006 7,200,000.00 43,200.00
Paku 7 cm M.56.e Kg 0.280 23,232.00 6,504.96
JUMLAH HARGA BAHAN 77,480.96
C ALAT
alat bantu alat 49 OH 1.000 52,800.00 52,800.00
JUMLAH HARGA ALAT 52,800.00
D Jumlah (A+B+C) 203,201.78
E Overhead & Profit 15% 0.150 30,480.27
F Harga Satuan Pekerjaan (D+E) 233,682.00
HARGA SATUAN PEKERJAAN LAIN - LAIN
###
dihit AD.7.1 Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm, kayu lama dipakai kembali ###
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA ###
1 Pekerja L.01 OH 0.120 93,597.00 11,231.64
2 Tukang Batu L.02 OH 0.120 121,674.00 14,600.88
3 Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
4 Mandor L.04 OH 0.006 149,758.00 898.55
JUMLAH TENAGA KERJA 28,269.78
B BAHAN ###
1 Kayu bengkirai (papan) M.17.b m3 0.003 13,230,000.00 39,690.00
2 Paku sekrup M.56.j Kg 0.050 5,208.75 260.44
JUMLAH HARGA BAHAN 260.44
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 28,530.22
F Overhead & Profit 15% 0.150 4,279.53
G Harga Satuan Pekerjaan (D+E) 32,809.75

dihit AD.7.2 Pasang kusen pintu/ jendela/ boven lama


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.800 93,597.00 74,877.60
2 Tukang kayu L.02 OH 2.400 121,674.00 292,017.60
3 Kepala tukang L.03 OH 0.240 128,226.00 30,774.24
4 Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 403,659.76
B BAHAN

JUMLAH HARGA BAHAN -


C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 403,659.76
F Overhead & Profit 15% 0.150 60,548.96
G Harga Satuan Pekerjaan (D+E) 464,208.72

dihit AD.7.3 Pasang daun pintu lama


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.800 93,597.00 74,877.60
2 Tukang kayu L.02 OH 2.400 121,674.00 292,017.60
3 Kepala tukang L.03 OH 0.240 128,226.00 30,774.24
4 Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 403,659.76
B BAHAN
1 Engsel pintu (kw 1) M.305.b set 1.000 158,400.00 158,400.00

JUMLAH HARGA BAHAN 158,400.00


C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 562,059.76
F Overhead & Profit 15% 0.150 84,308.96
G Harga Satuan Pekerjaan (D+E) 646,368.72
dihit AD.7.4 Pasang daun jendela / boven lama
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.800 93,597.00 74,877.60
2 Tukang kayu L.02 OH 2.400 121,674.00 292,017.60
3 Kepala tukang L.03 OH 0.240 128,226.00 30,774.24
4 Mandor L.04 OH 0.040 149,758.00 5,990.32
JUMLAH TENAGA KERJA 403,659.76
B BAHAN
1 Engsel jendela M.304 set 1.000 18,304.00 18,304.00

JUMLAH HARGA BAHAN 18,304.00


C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 421,963.76
F Overhead & Profit 15% 0.150 63,294.56
G Harga Satuan Pekerjaan (D+E) 485,258.32

dihit AD.7.5 Pemasangan 1 m’ pipa AC 1/2 x 1/4


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.036 93,597.00 3,369.49
2 Tukang batu L.02 OH 0.060 121,674.00 7,300.44
3 Kepala Tukang L.03 OH 0.006 128,226.00 769.36
4 Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 11,738.80
B BAHAN
1 Pipa AC 1/2 x 1/4 M.592 m¹ 1.200 185,856.00 223,027.20
Perlengkapan % 35.000 8,400.00 2,940.00
JUMLAH HARGA BAHAN 223,027.20
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 234,766.00
F Overhead & Profit 15% 0.150 35,214.90
G Harga Satuan Pekerjaan (D+E) 269,980.90

dihit AD.7.6 Pemasangan 1 m’ pipa AC 5/8 x 1/4


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.036 93,597.00 3,369.49
2 Tukang batu L.02 OH 0.060 121,674.00 7,300.44
3 Kepala Tukang L.03 OH 0.006 128,226.00 769.36
4 Mandor L.04 OH 0.002 149,758.00 299.52
JUMLAH TENAGA KERJA 11,738.80
B BAHAN
1 Pipa AC 5/8 x 1/4 M.592.a m¹ 1.200 214,368.00 257,241.60
Perlengkapan % 35.000 8,400.00 294,000.00
JUMLAH HARGA BAHAN 257,241.60
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 268,980.40
F Overhead & Profit 15% 0.150 40,347.06
G Harga Satuan Pekerjaan (D+E) 309,327.46
dihit AD.7.7 Tabung FRP 1054 (10 inci) Kapasitas 700 lt / jam
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 3.000 93,597.00 280,791.00
2 Tukang batu L.02 OH 4.500 121,674.00 547,533.00
3 Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
4 Mandor L.04 OH 0.900 149,758.00 134,782.20
JUMLAH TENAGA KERJA 969,517.50
B BAHAN
1 Tabung FRP 1054 (10 inci) 1000 gr M.593 unit 1.000 1,184,832.00 1,184,832.00
2 Pasir silika 20 k M.594 pkt 1.000 776,160.00 776,160.00
3 carbon active 25 kg M.595 pkt 1.000 1,011,120.00 1,011,120.00
4 3 way manual valve M.596 set 1.000 333,696.00 333,696.00
5 Pemipaan 3/4 M.597 m' 10.000 31,935.55 319,355.52
JUMLAH HARGA BAHAN 3,625,163.52
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,594,681.02
F Overhead & Profit 15% 0.150 689,202.15
G Harga Satuan Pekerjaan (D+E) 5,283,883.17

dihit AD.7.8 Tabung FRP 1054 (10 inci) Kapasitas 700 lt / jam,softener
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 3.000 93,597.00 280,791.00
2 Tukang batu L.02 OH 4.500 121,674.00 547,533.00
3 Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
4 Mandor L.04 OH 0.900 149,758.00 134,782.20
JUMLAH TENAGA KERJA 969,517.50
B BAHAN
1 Tabung FRP 1054 (10 inci) 1000 gr M.593 unit 1.000 1,184,832.00 1,184,832.00
2 25 ltr Cation resin Purolite @25 kg M.598 pkt 2.000 3,003,264.00 6,006,528.00
3 Garam krosok 10 kg M.599 pkt 1.000 269,280.00 269,280.00
4 3 way manual valve M.596 set 1.000 333,696.00 333,696.00
5 Pemipaan 3/4 M.597 m' 10.000 31,935.55 319,355.52
JUMLAH HARGA BAHAN 8,113,691.52
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 9,083,209.02
F Overhead & Profit 15% 0.150 1,362,481.35
G Harga Satuan Pekerjaan (D+E) 10,445,690.37

dihit AD.7.9 Pemasangan 1 buah floor drain stainles steel


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.010 93,597.00 935.97
2 Tukang batu L.02 OH 0.100 121,674.00 12,167.40
3 Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
4 Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 15,134.42
B BAHAN
1 Floor drain stainles steel M.375.a unit 1.000 88,000.00 88,000.00
JUMLAH HARGA BAHAN 88,000.00
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 103,134.42
F Overhead & Profit 15% 0.150 15,470.16
G Harga Satuan Pekerjaan (D+E) 118,604.58
dihit AD.7.10 (K3) Pemasangan 1 buah closet duduk (Merk TOTO COUPLED TOILET CW 631 J / SW 631 J)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 3.300 93,597.00 308,870.10
2 Tukang batu L.02 OH 1.100 121,674.00 133,841.40
3 Kepala Tukang L.03 OH 0.010 128,226.00 1,282.26
4 Mandor L.04 OH 0.160 149,758.00 23,961.28
JUMLAH TENAGA KERJA 467,955.04
B BAHAN
1 Kloset duduk/monoblok (biasa / KW) M.376.a unit 1.000 1,147,643.20 1,147,643.20
2 Perlengkapan % 6.000 1,086,783.33 65,207.00
JUMLAH HARGA BAHAN 1,212,850.20
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,680,805.24
F Overhead & Profit 15% 0.150 252,120.79
G Harga Satuan Pekerjaan (D+E) 1,932,926.03

dihit AD.7.11 (K3) Pemasangan 1 buah wastafel (Merk KOHLER K-90012T-053010000)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 1.200 93,597.00 112,316.40
2 Tukang batu L.02 OH 1.450 121,674.00 176,427.30
3 Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
4 Mandor L.04 OH 0.060 149,758.00 8,985.48
JUMLAH TENAGA KERJA 316,963.08
B BAHAN
1 Wastafel Merk KOHLER K-90012T-053010000 M.599.a unit 1.000 3,242,764.80 3,242,764.80
2 Portland cement M.245.a Kg 6.000 1,375.00 8,250.00
3 Pasir Pasang M.8.c m3 0.010 300,000.00 3,000.00
4 Perlengkapan % 12.000 468,000.00 56,160.00
JUMLAH HARGA BAHAN 3,310,174.80
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,627,137.88
F Overhead & Profit 15% 0.150 544,070.68
G Harga Satuan Pekerjaan (D+E) 4,171,208.56

dihit AD.7.12 (K3) Pemasangan 1 buah wastafel (MERK TOTO VESSEL CONTER LAVATORY LW 574 J (BODY OLY))
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 1.200 93,597.00 112,316.40
2 Tukang batu L.02 OH 1.450 121,674.00 176,427.30
3 Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
4 Mandor L.04 OH 0.060 149,758.00 8,985.48
JUMLAH TENAGA KERJA 316,963.08
B BAHAN
1 Wastafel MERK TOTO VESSEL CONTER LAVATORYM.599.b unit 1.000 3,242,764.80 3,242,764.80
2 Portland cement M.245.a Kg 6.000 1,375.00 8,250.00
3 Pasir Pasang M.8.c m3 0.010 300,000.00 3,000.00
4 Perlengkapan % 12.000 468,000.00 56,160.00
JUMLAH HARGA BAHAN 3,310,174.80
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,627,137.88
F Overhead & Profit 15% 0.150 544,070.68
G Harga Satuan Pekerjaan (D+E) 4,171,208.56
dihit AD.7.13 Pemasangan 1 buah kran Merk TOTO 116 LEVAN
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 1.200 93,597.00 112,316.40
2 Tukang batu L.02 OH 1.450 121,674.00 176,427.30
3 Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
4 Mandor L.04 OH 0.060 149,758.00 8,985.48
JUMLAH TENAGA KERJA 316,963.08
B BAHAN
1 Kran Merk TOTO 116 LEVAN M.599.c unit 1.000 2,930,400.00 2,930,400.00
2 Seal tape M.559 Buah 0.250 5,750.00 1,437.50
JUMLAH HARGA BAHAN 2,931,837.50
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,248,800.58
F Overhead & Profit 15% 0.150 487,320.09
G Harga Satuan Pekerjaan (D+E) 3,736,120.67

dihit AD.7.13.a Pemasangan 1 buah kran Merk KOHLER K-18872 K


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 1.200 93,597.00 112,316.40
2 Tukang batu L.02 OH 1.450 121,674.00 176,427.30
3 Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
4 Mandor L.04 OH 0.060 149,758.00 8,985.48
JUMLAH TENAGA KERJA 316,963.08
B BAHAN
1 Kran Merk KOHLER K-18872 K M.599.d unit 1.000 4,324,320.00 4,324,320.00
2 Seal tape M.559 Buah 0.250 5,750.00 1,437.50
JUMLAH HARGA BAHAN 4,325,757.50
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,642,720.58
F Overhead & Profit 15% 0.150 696,408.09
G Harga Satuan Pekerjaan (D+E) 5,339,128.67

dihit AD.7.13.b Pemasangan 1 buah kran Merk KOHLER 32640000


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 1.200 93,597.00 112,316.40
2 Tukang batu L.02 OH 1.450 121,674.00 176,427.30
3 Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
4 Mandor L.04 OH 0.060 149,758.00 8,985.48
JUMLAH TENAGA KERJA 316,963.08
B BAHAN
1 Kran Merk KOHLER 32640000 M.599.e unit 1.000 5,956,473.60 5,956,473.60
2 Seal tape M.559 Buah 0.250 5,750.00 1,437.50
JUMLAH HARGA BAHAN 5,957,911.10
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,274,874.18
F Overhead & Profit 15% 0.150 941,231.13
G Harga Satuan Pekerjaan (D+E) 7,216,105.31
dihit AD.7.13.c Pemasangan 1 buah kran Merk Toto tx 443 MMA
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 1.200 93,597.00 112,316.40
2 Tukang batu L.02 OH 1.450 121,674.00 176,427.30
3 Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
4 Mandor L.04 OH 0.060 149,758.00 8,985.48
JUMLAH TENAGA KERJA 316,963.08
B BAHAN
1 Kran Merk Toto tx 443 MMA M.599.f unit 1.000 4,819,584.00 4,819,584.00
2 Seal tape M.559 Buah 0.250 5,750.00 1,437.50
JUMLAH HARGA BAHAN 4,821,021.50
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,137,984.58
F Overhead & Profit 15% 0.150 770,697.69
G Harga Satuan Pekerjaan (D+E) 5,908,682.27

dihit AD.7.14 Pemasangan 1 buah Shower Merk TOTO SHOWER SPRAY TX 403 SMCRB
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 1.200 93,597.00 112,316.40
2 Tukang batu L.02 OH 1.450 121,674.00 176,427.30
3 Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
4 Mandor L.04 OH 0.060 149,758.00 8,985.48
JUMLAH TENAGA KERJA 316,963.08
B BAHAN
1 Shower Merk TOTO SHOWER SPRAY TX 403 SMC M.599.g unit 1.000 477,523.20 477,523.20
2 Seal tape M.559 Buah 0.025 5,750.00 143.75
JUMLAH HARGA BAHAN 477,666.95
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 794,630.03
F Overhead & Profit 15% 0.150 119,194.50
G Harga Satuan Pekerjaan (D+E) 913,824.53

dihit AD.7.14.a Pemasangan 1 buah Shower Merk KOHLER 26238000


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 1.200 93,597.00 112,316.40
2 Tukang batu L.02 OH 1.450 121,674.00 176,427.30
3 Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
4 Mandor L.04 OH 0.060 149,758.00 8,985.48
JUMLAH TENAGA KERJA 316,963.08
B BAHAN
1 Shower Merk KOHLER 26238000 M.599.h unit 1.000 9,161,856.00 9,161,856.00
2 Seal tape M.559 Buah 0.025 5,750.00 143.75
JUMLAH HARGA BAHAN 9,161,999.75
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 9,478,962.83
F Overhead & Profit 15% 0.150 1,421,844.42
G Harga Satuan Pekerjaan (D+E) 10,900,807.25
dihit AD.7.14.b Pemasangan 1 buah Shower Merk Kohler 264254000
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 1.200 93,597.00 112,316.40
2 Tukang batu L.02 OH 1.450 121,674.00 176,427.30
3 Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
4 Mandor L.04 OH 0.060 149,758.00 8,985.48
JUMLAH TENAGA KERJA 316,963.08
B BAHAN
1 Shower Merk Kohler 264254000 M.599.i unit 1.000 1,416,096.00 1,416,096.00
2 Seal tape M.559 Buah 0.025 5,750.00 143.75
JUMLAH HARGA BAHAN 1,416,239.75
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,733,202.83
F Overhead & Profit 15% 0.150 259,980.42
G Harga Satuan Pekerjaan (D+E) 1,993,183.25

dihit AD.7.15 (K3) Pemasangan 1 buah bathcuip porselen MERK TOP BATH TP-TC-S52-1
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.075 93,597.00 7,019.78
2 Tukang batu L.02 OH 0.750 121,674.00 91,255.50
3 Kepala Tukang L.03 OH 0.075 128,226.00 9,616.95
4 Mandor L.04 OH 0.003 149,758.00 449.27
JUMLAH TENAGA KERJA 108,341.50
B BAHAN
1 Bathcuip porselen MERK TOP BATH TP-TC-S52-1 M.599.j unit 1.000 37,584,729.60 37,584,729.60
2 Perlengkapan % 20.000 37,584,729.60 7,516,945.92
JUMLAH HARGA BAHAN 45,101,675.52
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 45,210,017.02
F Overhead & Profit 15% 0.150 6,781,502.55
G Harga Satuan Pekerjaan (D+E) 51,991,519.57

dihit AD.7.16 Pemasangan 1 m’ pipa air panas diameter 1/2”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.081 93,597.00 7,581.36
2 Tukang batu L.02 OH 0.135 121,674.00 16,425.99
3 Kepala Tukang L.03 OH 0.014 128,226.00 1,731.05
4 Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 26,337.43
B BAHAN
1 Pipa PVC tipe AW Ø 1/2" panjang 4 m M.40.a unit 1.000 33,800.00 33,800.00
2 Perlengkapan % 35.000 33,800.00 11,830.00
JUMLAH HARGA BAHAN 45,630.00
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 71,967.43
F Overhead & Profit 15% 0.150 10,795.11
G Harga Satuan Pekerjaan (D+E) 82,762.54
dihit AD.7.16.a Pemasangan 1 m’ pipa air panas diameter 3/4”
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.081 93,597.00 7,581.36
2 Tukang batu L.02 OH 0.135 121,674.00 16,425.99
3 Kepala Tukang L.03 OH 0.014 128,226.00 1,731.05
4 Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 26,337.43
B BAHAN
1 Pipa PVC tipe AW Ø 3/4" panjang 4 m M.40.b unit 1.000 42,541.71 42,541.71
2 Perlengkapan % 35.000 42,541.71 14,889.60
JUMLAH HARGA BAHAN 57,431.31
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 83,768.74
F Overhead & Profit 15% 0.150 12,565.31
G Harga Satuan Pekerjaan (D+E) 96,334.06

dihit AD.7.16.b Pemasangan 1 m’ pipa Alderon diameter 3/4”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.081 93,597.00 7,581.36
2 Tukang batu L.02 OH 0.135 121,674.00 16,425.99
3 Kepala Tukang L.03 OH 0.014 128,226.00 1,731.05
4 Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 26,337.43
B BAHAN
1 Pipa Alderon Ø 3/4" panjang 6 m M.44.k unit 1.000 23,232.00 23,232.00
2 Perlengkapan % 35.000 23,232.00 8,131.20
JUMLAH HARGA BAHAN 31,363.20
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 57,700.63
F Overhead & Profit 15% 0.150 8,655.09
G Harga Satuan Pekerjaan (D+E) 66,355.72

dihit AD.7.17 (K3) Pemasangan 1 buah MCB (16 A)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 % 100.000 121,674.00 121,674.00
JUMLAH TENAGA KERJA 121,674.00
B BAHAN
Pipa listrik 5/8” M.475 btg 3.000 9,445.33 28,336.00
Kabel NYA 2.5 mm M.507.b m 15.000 7,656.00 114,840.00
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
L Bow M.478 buah 2.000 1,254.00 2,508.00
Klem Pipa Listrik M.480 buah 24.000 7,216.00 173,184.00
MCB 16 A, 1 Phase M.500.g buah 1.000 158,400.00 158,400.00
JUMLAH HARGA BAHAN 479,168.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 600,842.80
E Overhead & Profit 15 % 0.150 90,126.42
F Harga Satuan Pekerjaan (D+E) 690,969.22
dihit AD.7.18 Pemasangan Lampu Led strip
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 % 100.000 121,674.00 121,674.00
JUMLAH TENAGA KERJA 121,674.00
B BAHAN
Adaptor M.599.k btg 1.0000 16,896.00 16,896.00
Kabel NYM 3 x 1.5 mm2 M.504.d m 2.0000 12,883.20 25,766.40
Double seal tape M.599.l buah 1.1000 6,969.60 7,666.56
Lampu Led Strip M.599.m buah 1.1000 8,976.00 9,873.60
JUMLAH HARGA BAHAN 60,202.56
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 181,876.56
E Overhead & Profit 15 % 0.150 27,281.48
F Harga Satuan Pekerjaan (D+E) 209,158.04

dihit AD.7.19 Pemasangan box panel 80 x 100cm 1 unit (Panel SDP 1 Gedung Utama)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 1.500 93,597.00 140,395.50
2 Tukang listrik L.02 OH 1.500 121,674.00 182,511.00
3 Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
JUMLAH TENAGA KERJA 342,140.40
B BAHAN
1 Box Panel 80 x 100 cm M.510.h unit 1.000 61,881.60 61,881.60
2 Begel steel box panel M.511.a buah 2.000 61,881.60 123,763.20
3 Begel steel infoor M.511.b buah 2.000 61,564.80 123,129.60
4 Ampere Meter + CT 200 / 5A M.541 set 3.000 385,440.00 1,156,320.00
5 Volt Meter M.541.a bh 1.000 163,680.00 163,680.00
6 Selector Volt M.541.b bh 1.000 128,832.00 128,832.00
7 Pilot Lamp + Fuse M.541.c set 1.000 63,360.00 63,360.00
8 Magnetic Contactor SN.65 M.512 buah 2.000 818,400.00 1,636,800.00
9 Timer Theben (b) M.528.b buah 2.000 195,360.00 390,720.00
10 Pipa infoor galvanis Ø 2" M.513 batang 1.000 272,448.00 272,448.00
11 Pipa flexibel M.514 m 1.000 4,224.00 4,224.00
12 Kawat BC - 6 mm M.515 m 2.500 11,616.00 29,040.00
13 Besi Canal (untuk Box Panel) M.531 m 1.000 31,416.00 31,416.00
14 Busbar RST M.541.d set 1.000 1,320,000.00 1,320,000.00
15 Mur baut M.75.e buah 4.000 13,728.00 54,912.00
16 MCCB 200 A 3 Phasa ex Schneider M.541.e buah 1.000 2,904,000.00 2,904,000.00
17 MCCB 100 A 3 Phasa ex Schneider M.541.f buah 2.000 1,425,600.00 2,851,200.00
18 MCB 16 A, 1 Phase M.500.g buah 4.000 158,400.00 633,600.00
19 Ground rood 5/8" M.516 unit 1.000 929,280.00 929,280.00
20 T. infooring M.517 buah 1.000 35,904.00 35,904.00
21 Assesoris panel M.530 buah 1.000 66,528.00 66,528.00
JUMLAH HARGA BAHAN 12,981,038.40
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,323,178.80
E Overhead & Profit 15% 0.150 1,998,476.82
F Harga Satuan Pekerjaan (D+E) 15,321,655.62
dihit AD.7.19.a Pemasangan box panel 60 x 80cm 1 unit (Panel SDP 1 Gedung Utama)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 1.500 93,597.00 140,395.50
2 Tukang listrik L.02 OH 1.500 121,674.00 182,511.00
3 Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
JUMLAH TENAGA KERJA 342,140.40
B BAHAN
1 Box Panel 60 x 80 cm M.510.i unit 1.000 61,564.80 61,564.80
2 Begel steel box panel M.511.a buah 2.000 61,881.60 123,763.20
3 Begel steel infoor M.511.b buah 2.000 61,564.80 123,129.60
4 Ampere Meter + CT 200 / 5A M.541 set 3.000 385,440.00 1,156,320.00
5 Volt Meter M.541.a bh 1.000 163,680.00 163,680.00
6 Selector Volt M.541.b bh 1.000 128,832.00 128,832.00
7 Pilot Lamp + Fuse M.541.c set 1.000 63,360.00 63,360.00
8 Magnetic Contactor SN.65 M.512 buah 2.000 818,400.00 1,636,800.00
9 Timer Theben (b) M.528.b buah 2.000 195,360.00 390,720.00
10 Pipa infoor galvanis Ø 2" M.513 batang 1.000 272,448.00 272,448.00
11 Pipa flexibel M.514 m 1.000 4,224.00 4,224.00
12 Kawat BC - 6 mm M.515 m 2.500 11,616.00 29,040.00
13 Besi Canal (untuk Box Panel) M.531 m 1.000 31,416.00 31,416.00
14 Busbar RST M.541.d set 1.000 1,320,000.00 1,320,000.00
15 Mur baut M.75.e buah 4.000 13,728.00 54,912.00
17 MCB 16 A, 1 Phase M.500.g buah 10.000 158,400.00 1,584,000.00
18 Ground rood 5/8" M.516 unit 1.000 929,280.00 929,280.00
19 T. infooring M.517 buah 1.000 35,904.00 35,904.00
20 Assesoris panel M.530 buah 1.000 66,528.00 66,528.00
JUMLAH HARGA BAHAN 8,175,921.60
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 8,518,062.00
E Overhead & Profit 15% 0.150 1,277,709.30
F Harga Satuan Pekerjaan (D+E) 9,795,771.30
dihit AD.7.19.b Pemasangan box panel 50 x 70cm 1 unit (Panel SDP 2 Gedung Utama)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 1.500 93,597.00 140,395.50
2 Tukang listrik L.02 OH 1.500 121,674.00 182,511.00
3 Kepala Tukang L.03 OH 0.150 128,226.00 19,233.90
JUMLAH TENAGA KERJA 342,140.40
B BAHAN
1 Box Panel 50 x 70 cm M.510.j unit 1.000 818,400.00 818,400.00
2 Begel steel box panel M.511.a buah 2.000 61,881.60 123,763.20
3 Begel steel infoor M.511.b buah 2.000 61,564.80 123,129.60
4 Ampere Meter + CT 200 / 5A M.541 set 3.000 385,440.00 1,156,320.00
5 Volt Meter M.541.a bh 1.000 163,680.00 163,680.00
6 Selector Volt M.541.b bh 1.000 128,832.00 128,832.00
7 Pilot Lamp + Fuse M.541.c set 1.000 63,360.00 63,360.00
8 Magnetic Contactor SN.65 M.512 buah 2.000 818,400.00 1,636,800.00
9 Timer Theben (b) M.528.b buah 2.000 195,360.00 390,720.00
10 Pipa infoor galvanis Ø 2" M.513 batang 1.000 272,448.00 272,448.00
11 Pipa flexibel M.514 m 1.000 4,224.00 4,224.00
12 Kawat BC - 6 mm M.515 m 2.500 11,616.00 29,040.00
13 Besi Canal (untuk Box Panel) M.531 m 1.000 31,416.00 31,416.00
14 Busbar RST M.541.d set - 1,320,000.00 -
15 Mur baut M.75.e buah 4.000 13,728.00 54,912.00
17 MCCB 100 A 3 Phasa ex Schneider M.541.f buah 2.000 1,425,600.00 2,851,200.00
18 MCB 16 A, 1 Phase M.500.g buah 12.000 158,400.00 1,900,800.00
19 Ground rood 5/8" M.516 unit 1.000 929,280.00 929,280.00
20 T. infooring M.517 buah 1.000 35,904.00 35,904.00
21 Assesoris panel M.530 buah 1.000 66,528.00 66,528.00
JUMLAH HARGA BAHAN 10,780,756.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 11,122,897.20
E Overhead & Profit 15% 0.150 1,668,434.58
F Harga Satuan Pekerjaan (D+E) 12,791,331.78

dihit AD.7.20 Pasang Saklar Tunggal Panasonic


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 OH 0.050 121,674.00 6,083.70
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 11,512.34
B BAHAN
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
Saklar Tunggal Panasonic M.541.g buah 1.000 31,680.00 31,680.00
JUMLAH HARGA BAHAN 33,580.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 45,093.14
E Overhead & Profit 15% 0.150 6,763.97
F Harga Satuan Pekerjaan (D+E) 51,857.11
dihit AD.7.20.a Pasang Lampu Downlight Philips
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 OH 0.050 121,674.00 6,083.70
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 11,512.34
B BAHAN
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
Lampu Downlight 8watt (Philip Komplit set) M.541.h buah 1.000 73,920.00 73,920.00
Perlengkapan Ls 0.288 73,920.00 21,288.96
JUMLAH HARGA BAHAN 97,109.76
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 108,622.10
E Overhead & Profit 15% 0.150 16,293.32
F Harga Satuan Pekerjaan (D+E) 124,915.42

dihit AD.7.20.b Pasang Saklar Ganda Panasonic


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 OH 0.050 121,674.00 6,083.70
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 11,512.34
B BAHAN
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
Saklar Ganda Panasonic M.541.i buah 1.000 68,428.80 68,428.80
JUMLAH HARGA BAHAN 70,329.60
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 81,841.94
E Overhead & Profit 15% 0.150 12,276.29
F Harga Satuan Pekerjaan (D+E) 94,118.23

dihit AD.7.20.c Pasang Saklar Triple Panasonic


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 OH 0.050 121,674.00 6,083.70
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 11,512.34
B BAHAN
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
Saklar Triple Panasonic M.541.j buah 1.000 101,376.00 101,376.00
JUMLAH HARGA BAHAN 103,276.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 114,789.14
E Overhead & Profit 15% 0.150 17,218.37
F Harga Satuan Pekerjaan (D+E) 132,007.51
dihit AD.7.20.d Pasang Stop Kontak 2 gang Panasonic
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 OH 0.050 121,674.00 6,083.70
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 11,512.34
B BAHAN
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
Stop Kontak 2 Gang Panasonic M.541.k buah 1.000 154,176.00 154,176.00
JUMLAH HARGA BAHAN 156,076.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 167,589.14
E Overhead & Profit 15% 0.150 25,138.37
F Harga Satuan Pekerjaan (D+E) 192,727.51

dihit AD.7.20.e Pasang Stop Kontak lantai Panasonic


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 OH 0.050 121,674.00 6,083.70
Pekerja L.01 OH 0.050 93,597.00 4,679.85
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 11,512.34
B BAHAN
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
Stop Kontak lantai Panasonic M.541.l buah 1.000 454,080.00 454,080.00
JUMLAH HARGA BAHAN 455,980.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 467,493.14
E Overhead & Profit 15% 0.150 70,123.97
F Harga Satuan Pekerjaan (D+E) 537,617.11

dihit AD.7.20.f 1 m' memasang kabel LVTC 3 x 70


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 OH 0.005 121,674.00 608.37
Pekerja L.01 OH 0.005 93,597.00 467.99
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 1,825.15
B BAHAN
Pipa listrik 5/8” M.475 buah 0.250 9,445.33 2,361.33
Kabel LVTC 3 x 70 M.541.m buah 1.000 103,488.00 103,488.00
JUMLAH HARGA BAHAN 105,849.33
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 107,674.48
E Overhead & Profit 15% 0.150 16,151.17
F Harga Satuan Pekerjaan (D+E) 123,825.65
dihit AD.7.21 Penambahan daya dari 11 KVA ke 105 KVA
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
- Biaya Penyambungan ( BP ) 105.000 - 11.000 VA 94,000.00 969.00 91,086,000.00
- PPN R3 Ls 1.00 9,108,600.00 9,108,600.00
- Uang Jaminan Langganan ( UJL ) VA 105,000.00 121.98 12,808,000.00
- Meterai lbr 4.00 10,000.00 40,000.00
- Paket Sertifikat Laik Operasi ( SLO ) VA 105,000.00 40.00 4,200,000.00
- SJIBTL VA 105,000.00 50.00 5,250,000.00

JUMLAH HARGA BAHAN 122,492,600.00


C PERALATAN
Truck Crane 5 ton alat 95 jam 8.00 75,428.57 603,428.57

JUMLAH HARGA ALAT 603,428.57


D Jumlah (A+B+C) 123,096,028.57
E Overhead & Profit 15% 0.150 18,464,404.29
F Harga Satuan Pekerjaan (D+E) 141,560,432.86

dihit AD.7.22 Pemasangan 1 buah Reservoir fibreglass vol 1.5 m3 (Roof tank)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 3.000 93,597.00 280,791.00
Tukang batu L.02 OH 4.500 121,674.00 547,533.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.900 149,758.00 134,782.20
JUMLAH TENAGA KERJA 969,517.50
B BAHAN
Tandon Reservoir fibreglass (kapasitas 1550 liter) M.373.d Unit 1.000 2,868,800.00 2,868,800.00
Perlengkapan % 12.000 2,868,800.00 344,256.00
JUMLAH HARGA BAHAN 3,213,056.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,182,573.50
E Overhead & Profit 15% 0.150 627,386.03
F Harga Satuan Pekerjaan (D+E) 4,809,959.53

dihit AD.7.22.a Pemasangan 1 buah Reservoir fibreglass vol 2m3 (Roof tank)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 3.000 93,597.00 280,791.00
Tukang batu L.02 OH 4.500 121,674.00 547,533.00
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.900 149,758.00 134,782.20
JUMLAH TENAGA KERJA 969,517.50
B BAHAN
Tandon Reservoir fibreglass (kapasitas 2000 liter) M.373.e Unit 1.000 2,608,320.00 2,608,320.00
Perlengkapan % 12.000 2,608,320.00 312,998.40
JUMLAH HARGA BAHAN 2,921,318.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,890,835.90
E Overhead & Profit 15% 0.150 583,625.39
F Harga Satuan Pekerjaan (D+E) 4,474,461.29
dihit AD.7.23 Pemasangan 1 buah Pompa Shimizu 130 PS
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 OH 3.000 121,674.00 365,022.00
Pekerja L.01 OH 4.500 93,597.00 421,186.50
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.900 149,758.00 134,782.20
JUMLAH TENAGA KERJA 927,402.00
B BAHAN
Pompa Shimizu PS 130 M.599.n Unit 1.000 765,600.00 765,600.00
Perlengkapan % 12.000 765,600.00 91,872.00
JUMLAH HARGA BAHAN 857,472.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,784,874.00
E Overhead & Profit 15% 0.150 267,731.10
F Harga Satuan Pekerjaan (D+E) 2,052,605.10

dihit AD.7.23.a Pemasangan 1 buah Pompa Shimizu 230 PS


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 OH 3.000 121,674.00 365,022.00
Pekerja L.01 OH 4.500 93,597.00 421,186.50
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.900 149,758.00 134,782.20
JUMLAH TENAGA KERJA 927,402.00
B BAHAN
Pompa Shimizu PS 230 M.599.o Unit 1.000 1,135,200.00 1,135,200.00
Perlengkapan % 12.000 1,135,200.00 136,224.00
JUMLAH HARGA BAHAN 1,271,424.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,198,826.00
E Overhead & Profit 15% 0.150 329,823.90
F Harga Satuan Pekerjaan (D+E) 2,528,649.90

dihit AD.7.23.b Pemasangan 1 buah Heater Ariston 30 ltr


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 OH 3.000 121,674.00 365,022.00
Pekerja L.01 OH 4.500 93,597.00 421,186.50
Kepala Tukang L.03 OH 0.050 128,226.00 6,411.30
Mandor L.04 OH 0.900 149,758.00 134,782.20
JUMLAH TENAGA KERJA 927,402.00
B BAHAN
Heater Ariston 30 ltr M.599.p Unit 1.000 3,573,504.00 3,573,504.00
Perlengkapan % 12.000 3,573,504.00 428,820.48
JUMLAH HARGA BAHAN 4,002,324.48
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,929,726.48
E Overhead & Profit 15% 0.150 739,458.97
F Harga Satuan Pekerjaan (D+E) 5,669,185.45
dihit AD.7.23.c (K3) Pemasangan 1 buah Contactor Pump
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 % 100.00 121,674.00 121,674.00
JUMLAH TENAGA KERJA 121,674.00
B BAHAN
Pipa listrik 5/8” M.475 btg 2.000 9,445.33 18,890.67
Kabel NYM 2 x 1.5 mm2 M.504.a m 10.000 11,019.36 110,193.60
T Dus (biasa) M.476.b buah 1.000 1,900.80 1,900.80
L Bow M.478 buah 2.000 1,254.00 2,508.00
Las Dop M.479 buah 3.000 1,056.00 3,168.00
Klem Pipa Listrik M.480 buah 12.000 7,216.00 86,592.00
Mongkok (Listrik) M.481 buah 1.000 1,936.00 1,936.00
Contactor pump M.599.q buah 1.000 396,000.00 396,000.00

JUMLAH HARGA BAHAN 621,189.07


C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 742,863.07
E Overhead & Profit 15 % 0.150 111,429.46
F Harga Satuan Pekerjaan (D+E) 854,292.53

dihit AD.7.24 Pemasangan 1 m' Rangka Drop Plafon


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Khusus Alumunium L.02 OH 0.150 121,674.00 18,251.10
Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 30,282.98
B BAHAN
Hollow galvanis 40x40x0,4 mm M.437.b Btg 0.250 29,304.00 7,326.00
Hollow galvanis 20x40x0,4 mm M.437.a Btg 0.250 19,008.00 4,752.00
Paku sekrup M.56.j Buah 6.000 5,208.75 31,252.50
JUMLAH HARGA BAHAN 43,330.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 73,613.48


E Overhead & Profit 15% 0.150 11,042.02
F Harga Satuan Pekerjaan (D+E) 84,655.50

dihit AD.7.24.a Pemasangan 1 m' Rangka Cove Lamp


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Khusus Alumunium L.02 OH 0.150 121,674.00 18,251.10
Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 30,282.98
B BAHAN
Hollow galvanis 40x40x0,4 mm M.437.b Btg 0.300 29,304.00 8,791.20
Hollow galvanis 20x40x0,4 mm M.437.a Btg 0.300 19,008.00 5,702.40
Paku sekrup M.56.j Buah 15.000 5,208.75 78,131.25
JUMLAH HARGA BAHAN 92,624.85
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 122,907.83


E Overhead & Profit 15% 0.150 18,436.17
F Harga Satuan Pekerjaan (D+E) 141,344.00
dihit AD.7.24.b Pemasangan Cove curtain plywood
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Khusus Alumunium L.02 OH 0.150 121,674.00 18,251.10
Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 39,642.68
B BAHAN
Hollow galvanis 40x40x0,4 mm M.437.b Btg 0.600 29,304.00 17,582.40
Hollow galvanis 20x40x0,4 mm M.437.a Btg 0.300 19,008.00 5,702.40
Paku sekrup M.56.j Buah 25.000 5,208.75 130,218.75
Plywood 12 mm (120x240) M.32.d lembar 0.174 147,250.00 25,564.24
JUMLAH HARGA BAHAN 179,067.79
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 218,710.47


E Overhead & Profit 15% 0.150 32,806.57
F Harga Satuan Pekerjaan (D+E) 251,517.04

dihit AD.7.24.c Pemasangan Cove lamp


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Khusus Alumunium L.02 OH 0.150 121,674.00 18,251.10
Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 39,642.68
B BAHAN
Hollow galvanis 40x40x0,4 mm M.437.b Btg 0.600 29,304.00 17,582.40
Hollow galvanis 20x40x0,4 mm M.437.a Btg 0.300 19,008.00 5,702.40
Paku sekrup M.56.j Buah 25.000 5,208.75 130,218.75
Gypsum Board (120 cm x 240 cm x 9 mm) M.151.a lembar 0.174 61,600.00 10,694.44
JUMLAH HARGA BAHAN 164,197.99
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 203,840.67


E Overhead & Profit 15% 0.150 30,576.10
F Harga Satuan Pekerjaan (D+E) 234,416.78

dihit AD.7.24.d Pemasangan Shadowline


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Khusus Alumunium L.02 OH 0.150 121,674.00 18,251.10
Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 39,642.68
B BAHAN
Rangka shadowline (10x10x25,t=0.3 mm - 3m) M.599.r Btg 0.600 24,288.00 14,572.80
Paku sekrup M.56.j Btg 10.000 5,208.75 52,087.50
Gypsum Board (120 cm x 240 cm x 9 mm) M.151.a Buah 0.069 61,600.00 4,277.78
JUMLAH HARGA BAHAN 70,938.08
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 110,580.76


E Overhead & Profit 15% 0.150 16,587.11
F Harga Satuan Pekerjaan (D+E) 127,167.87

dihit AD.7.24.e Pemasangan Nat tali air


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 93,597.00 18,719.40
Tukang Khusus Alumunium L.02 OH 0.150 121,674.00 18,251.10
Kepala tukang L.03 OH 0.015 128,226.00 1,923.39
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 39,642.68
B BAHAN
Rangka shadowline (10x10x25,t=0.3 mm - 3m) M.599.r Btg 0.600 24,288.00 14,572.80
Paku sekrup M.56.j Btg 10.000 5,208.75 52,087.50
JUMLAH HARGA BAHAN 66,660.30
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 106,302.98


E Overhead & Profit 15% 0.150 15,945.45
F Harga Satuan Pekerjaan (D+E) 122,248.43

dihit AD.7.24.f Pemasangan 1 m' gypsum drop


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 93,597.00 9,359.70
Tukang Khusus Alumunium L.02 OH 0.050 121,674.00 6,083.70
Kepala tukang L.03 OH 0.005 128,226.00 641.13
Mandor L.04 OH 0.005 149,758.00 748.79
JUMLAH TENAGA KERJA 16,833.32
B BAHAN
Gypsum Board (120 cm x 240 cm x 9 mm) M.151.a Btg 0.182 61,600.00 11,211.20
Paku sekrup M.56.j Btg 0.055 5,208.75 286.48
JUMLAH HARGA BAHAN 11,497.68
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 28,331.00


E Overhead & Profit 15% 0.150 4,249.65
F Harga Satuan Pekerjaan (D+E) 32,580.65

dihit AD.7.25 Pemasangan 1 m2 Rockwool


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang Kayu L.02 OH 0.050 121,674.00 6,083.70
Kepala Tukang L.03 OH 0.005 128,226.00 641.13
Mandor L.04 OH 0.008 149,758.00 1,198.06
JUMLAH TENAGA KERJA 21,962.44
B BAHAN
Rockwool 5cm dsb 60 m3 M.599.s M2 1.050 89,760.00 94,248.00
Perlengkapan % 12.000 89,760.00 10,771.20
JUMLAH HARGA BAHAN 105,019.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 126,981.64
E Overhead & Profit 15 % 0.150 19,047.25
F Harga Satuan Pekerjaan (D+E) 146,028.89
dihit AD.7.26 Pekerjaan Compund Tembok Baru dan Lama
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 93,597.00 14,039.55
Tukang cat L.02 OH 0.001 121,674.00 121.67
Kepala Tukang L.03 OH 0.000 128,226.00 12.82
Mandor L.04 OH 0.003 149,758.00 374.40
JUMLAH TENAGA KERJA 14,548.44
B BAHAN
Compound gypsum M.251 Kg 0.300 3,504.60 1,051.38
Ampelas M.271 Lembar 0.250 5,350.00 1,337.50

JUMLAH HARGA BAHAN 2,388.88


C PERALATAN
Alat bantu alat 49 set 0.088 52,800.00 4,629.88
JUMLAH HARGA ALAT 4,629.88
D Jumlah (A+B+C) 21,567.20
E Overhead & Profit 15 % 0.150 3,235.08
F Harga Satuan Pekerjaan (D+E) 24,802.28

dihit AD.7.27 Pemasangan 1 m’ pipa Air, limbah jenis pipa tanah diameter 20 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.080 93,597.00 7,487.76
2 Tukang batu L.02 OH 0.040 121,674.00 4,866.96
3 Kepala Tukang L.03 OH 0.004 128,226.00 512.90
4 Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 13,466.66
B BAHAN
1 Pipa tanah Ø 200 mm SDR-41 (air limbah) M.608.b buah 1.600 375,328.80 600,526.08
2 Portland cement M.245.a Kg 35.000 1,375.00 48,125.00
3 Pasir Beton (m3) M.9.c m3 0.014 339,234.40 4,749.28
4 Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.014 266,640.00 3,732.96
JUMLAH HARGA BAHAN 657,133.32
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 670,599.98
E Overhead & Profit 15 % 0.150 100,590.00
F Harga Satuan Pekerjaan (D+E) 771,189.97

dihit AD.7.27.a Pemasangan 1 m’ pipa Air, limbah jenis pipa tanah diameter 16 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.080 93,597.00 7,487.76
2 Tukang batu L.02 OH 0.040 121,674.00 4,866.96
3 Kepala Tukang L.03 OH 0.004 128,226.00 512.90
4 Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 13,466.66
B BAHAN
1 Pipa tanah Ø 160 mm SDR-41 (air limbah) M.608.a buah 1.600 237,547.20 380,075.52
2 Portland cement M.245.a Kg 35.000 1,375.00 48,125.00
3 Pasir Beton (m3) M.9.c m3 0.014 339,234.40 4,749.28
4 Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.014 266,640.00 3,732.96
JUMLAH HARGA BAHAN 436,682.76
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 450,149.42
E Overhead & Profit 15 % 0.150 67,522.41
F Harga Satuan Pekerjaan (D+E) 517,671.83
dihit AD.7.28 Pembuatan 1 m’ nat ornamen garis 1SP : 3PP lebar 0.5 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.080 93,597.00 7,487.76
Tukang Batu L.02 OH 0.400 121,674.00 48,669.60
Kepala Tukang L.03 OH 0.040 128,226.00 5,129.04
Mandor L.04 OH 0.004 149,758.00 599.03
JUMLAH TENAGA KERJA 61,885.43
B BAHAN
Portland cement M.245.a Kg 0.500 1,375.00 687.50
Pasir Pasang M.8.c m3 0.013 300,000.00 3,900.00
JUMLAH HARGA BAHAN 4,587.50
C PERALATAN
Alat bantu set alat 49 0.500 50000 25,000.00
JUMLAH HARGA ALAT 25,000.00

D Jumlah (A+B+C) 91,472.93


E Overhead & Profit 15 % 0.150 13,720.94
F Harga Satuan Pekerjaan (D+E) 105,193.87

dihit AD.7.29 Pemasangan 1 m2 Dinding Granit 30 x 60 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.900 93,597.00 84,237.30
Tukang batu L.02 OH 0.450 121,674.00 54,753.30
Kepala Tukang L.03 OH 0.045 128,226.00 5,770.17
Mandor L.04 OH 0.045 149,758.00 6,739.11
JUMLAH TENAGA KERJA 151,499.88
B BAHAN
Granit tile 30 x 60 cm ( double loading ) M.191.e Buah 6.500 43,296.00 281,424.00
Portland cement M.245.a Kg 9.300 1,375.00 12,787.50
Semen warna M.244 Kg 1.620 18,666.67 30,240.00
Pasir Beton (m3) M.9.c m3 0.018 339,234.40 6,106.22
JUMLAH HARGA BAHAN 330,557.72
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 482,057.60


E Overhead & Profit 15% 0.150 72,308.64
F Harga Satuan Pekerjaan (D+E) 554,366.24

dihit AD.7.29.a Pemasangan 1m2 lantai Decking Kayu ukuran 15cm x 90cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.240 93,597.00 22,463.28
Tukang Batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.012 149,758.00 1,797.10
JUMLAH TENAGA KERJA 40,399.97
B BAHAN
Lantai Decking kayu 15 x 90 cm( double loading ) M.216.c buah 7.282 57,880.22 421,456.22
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 1.500 18,666.67 28,000.00
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 478,471.77
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 518,871.73
E Overhead & Profit 15% 0.150 77,830.76
F Harga Satuan Pekerjaan (D+E) 596,702.49
dihit AD.7.29.b Pemasangan 1m2 lantai Tako White ukuran 15cm x 7,5cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.240 93,597.00 22,463.28
Tukang Batu L.02 OH 0.120 121,674.00 14,600.88
Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
Mandor L.04 OH 0.012 149,758.00 1,797.10
JUMLAH TENAGA KERJA 40,399.97
B BAHAN
Tako White 15 x 17 cm (double loading ) M.216.d buah 88.890 5,552.90 493,597.18
Portland cement M.245.a kg 10.000 1,375.00 13,750.00
Semen Warna M.244 Kg 1.500 18,666.67 28,000.00
Pasir Beton (m3) M.9.c m3 0.045 339,234.40 15,265.55
JUMLAH HARGA BAHAN 550,612.73
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 591,012.70
E Overhead & Profit 15% 0.150 88,651.90
F Harga Satuan Pekerjaan (D+E) 679,664.60

dihit AD.7.30 Pemasangan 1m2 lantai rubber crumb cat warna standar
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.240 93,597.00 22,463.28
2 Tukang L.02 OH 0.120 121,674.00 14,600.88
3 Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
4 Mandor L.04 OH 0.012 149,758.00 1,797.10
JUMLAH TENAGA KERJA 40,399.97
B BAHAN
1 Rubber Karet M.587 m2 1.000 52,800.00 52,800.00
2 Lem Rubber Crumb M.599.t Kg 1.300 110,880.00 144,144.00
3 Cat Rubber Tennokote Warna Standar M.282 pail 0.650 1,187,500.00 771,875.00
JUMLAH HARGA BAHAN 968,819.00
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,009,218.97
F Overhead & Profit 15% 0.150 151,382.85
G Harga Satuan Pekerjaan (D+E) 1,160,601.81

dihit AD.7.30.a Pemasangan 1m2 lantai rubber crumb cat warna spesial
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
1 Pekerja L.01 OH 0.240 93,597.00 22,463.28
2 Tukang L.02 OH 0.120 121,674.00 14,600.88
3 Kepala Tukang L.03 OH 0.012 128,226.00 1,538.71
4 Mandor L.04 OH 0.012 149,758.00 1,797.10
JUMLAH TENAGA KERJA 40,399.97
B BAHAN
1 Rubber Karet M.587 m2 1.000 52,800.00 52,800.00
2 Lem Rubber Crumb M.599.t Kg 1.300 110,880.00 144,144.00
3 Cat Rubber Tennokote Warna Spesial M.283 pail 0.650 1,187,500.00 771,875.00
JUMLAH HARGA BAHAN 968,819.00
C ALAT
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,009,218.97
F Overhead & Profit 15% 0.150 151,382.85
G Harga Satuan Pekerjaan (D+E) 1,160,601.81
dihit AD.7.31 Pemasangan 1m2 Tactile Stainless Steel
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN
Tactile Stainless Steel M.599.y unit 16.000 19,008.00 304,128.00
Portland cement M.245.a Kg 8.190 1,375.00 11,261.25
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
Semen warna M.244 Kg 2.750 18,666.67 51,333.33
JUMLAH HARGA BAHAN 380,222.58
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 498,055.82
E Overhead & Profit 15 % 0.150 74,708.37
F Harga Satuan Pekerjaan (D+E) 572,764.00

dihit AD.7.31.a Pemasangan 1m2 Tactile Alumunium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 93,597.00 65,517.90
Tukang Batu L.02 OH 0.350 121,674.00 42,585.90
Kepala Tukang L.03 OH 0.035 128,226.00 4,487.91
Mandor L.04 OH 0.035 149,758.00 5,241.53
JUMLAH TENAGA KERJA 117,833.24
B BAHAN
Tactile Alumunium M.599.z unit 16.000 17,952.00 287,232.00
Portland cement M.245.a Kg 8.190 1,375.00 11,261.25
Pasir Pasang M.8.c m3 0.045 300,000.00 13,500.00
Semen warna M.244 Kg 2.750 18,666.67 51,333.33
JUMLAH HARGA BAHAN 363,326.58
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 481,159.82
E Overhead & Profit 15 % 0.150 72,173.97
F Harga Satuan Pekerjaan (D+E) 553,333.00