STANDARD OPERATIONAL
PROCEDURE,
FOR DUMP TRUCK
Nomor Halaman
: PT. VALE INDONESIA TRK
PT. WHAYA KARYA (PERSERO) TBK
+ CANAL WALL STRENGTHENING
+ SOROWAKO SULAWESI SELATAN INDONESIA
4600062695
PT. VALE INDONESIA Tbk |
] approveo
APPROVED Wit comMeNT
[| Not approveo with Reasons
‘TEAM ANALIS
rn
Construction Manager PT.WIKA
Tanggal: /03/2021
HSE Coordinator PT.
Fuad Alfiansyal
nKA, Project Manager PT.WIKA
Tanggal:_/03/2021 Tanggal: /03/2021
Reviewed by (PTVI):
~fh
\ V. HUbIe tor
Project Safety Inspector
Tanggal:i/04/2021
Approved by (PTVI): Aknowledgement (PTVI):
= (% ae
Project Manager
‘Snr Coord EHS Improvement
Tanggal :11/04/2021
Tanggal (7704/2021vy. GUIDELINE FOR EQUIPMENT OPERATION
VALE
PANDUAN PENGGUNAAN ALAT ( pind)
VALID FOR : DUMP TRUCK:
Initial issued : Maret 2021
‘Nos CWS-PR-10-017
See tie LL ee eee Seek
Hesham uet cate) ame ar a Cee ae
Hs biel i rhea oud LL Ps Pee a Ra coe
eure eters
A. PEMERIKSAAN AWAL
1. Dally inspection
Br Syckukan Setian har sebelum menghidupkan mesin DT pada setiap shit.
P43 ade temuan, maka harus dlaporkan segera ke Sopenere Juntuk diindak lanjuti ke team terkait,
6 teongigt — (evhbar i
2. Standard veselamatay a at ananee
B Kenakan can Tecbox Meeting sebelum memull pekerean untuk membahas terkalt SHE, pekerjaan dan USA,
meena enaemUNl Hanus mematkan Kendaraannya barca ser ee, Pada lokasi yang aman bar.
‘menerima panggilan telepon,
Slo ai rea to" Uh tka tam cain dn pengemua. serumpang dlvang esos