note :

AREA TABULATION
SPACE EXISTING NE SPACE EXISTING NE

KITCHEN 12.60sqm 25.20sqm BEDROOM 4 - 18.65sqm

MASTER BEDROOM 13.93sqm 20.33sqm


TOILET 2 - 7.20sqm

BEDROOM 2 18.70 28.40sqm


BALCONY 1 - 16.20sqm

BEDROOM 3 - 20.30sqm

BL BL
1000 8817 6096
BL
4408 4408 3048 3048 9090

2150 1210
PROPOSED 3600 3640 1850

BL

1000
230mm thk. clay brick party wall with
SITE

2150
new scupper drain to engnr's details
plaster on bothsides to be carried up

I 26
230mm above roof level NO. 41 (PTD 151669)

4408
A

1210
TERAT
new parapet wall to engnr's details new parapet wall with coping to engnr's detail

8817

beam lev.

JALAN
NEW ROOF CONSTRUCTION 7
- new metal roofing
-100mm x 50mm thk. hw rafter at 1200 c/c 7 5

-10mm x 50mm thk. hw struts 5 3

4408
-75mm x 75mm thk. hw wall plate 1 3 1
-50mm x 25mm thk. hw batten at 600 c/c dn dn
-double sided aluminium sinsulation paper
-150mm wide gutter to manuf's detail
3000

new steel column to manuf's detail Peringatan :


EXISTING EXISTING new sliding door to manuf's detail 6096MM SETBACK LINE
SEMUA KERJA-KERJA HENDAKLAH DIMULAKAN SETELAH MENDAPAT KEBENARAN DARI PIHAK
BEDROOM 2 BEDROOM 4
ATAI 25

3048
BERKUASA TEMPATAN SECARA BERTULIS SERTA PELAN LULUS
R
JALAN TE
new 115 mm thk. brickwall with 20mm
first flr. lev. thk. plaster on bothsides
6400

6096
new beam to engnr's detail 3048MM SETBACK LINE kerja - kerja yang baru dibina (diwarnakan merah)
existing roof to be demolished

3048
EXISTING LIVING kerja - kerja yang akan dirobohkan (diwarnakan kuning)
3200

existing window to manuf's detail

BL PROJEK :
new rc column to engnr's detail
EXISTING KITCHEN EXISTING DINING EXISTING PORCH
ground flr. lev.
TAMAN JOHOR JAYA
200

ground lev. JALAN TERATAI 25


new 150mm thk. conc floor slab with 1
layer BRC A8
PERMOHONAN PELAN CADANGAN TAMBAHAN / UBAHAN KE
ATAS 1 UNIT RUMAH TERES 2 TINGKAT SEDIADA DI NO. 28
(LOT 50342) JALAN TERATAI 25, TAMAN JOHOR JAYA, 81100
SECTION X-X SITE PLAN SITE PLAN JOHOR BAHRU, JOHOR DARUL TAKZIM.

UNTUK : MOHAMMAD FADHLI BIN MD RIZAL


TANDATANGAN DAN ALAMAT PEMILIK :
Saya/Kami bersetuju untuk mematuhi pelan bangunan yang diluluskan serta syarat-syarat untuk memulakan
pembinaan yang ditetapkan oleh pihak berkuasa tempatan. Dengan ini saya/kami bersetuju untuk dikenakan
tindakan undang-undang yang berkaitan dengannya jika gagal mematuhinya

X X
BL BL
9090 9090
3600 3640 1850 3600 3640 1850
boundary stone boundary stone

BL BL
1000

1000
230mm thk. clay brick party wall with
plaster on bothsides to be carried up W1 W1 W3
230mm above roof level
new 115 mm thk. brickwall with 20mm
thk. plaster on bothsides
EXISTING ...................................................................................
2150

2150
existing window to manuf's detail
TOILET 1 W1 NEW MOHAMMAD FADHLI BIN MD RIZAL
new window to manuf's detail BEDROOM 2
ENLARGE KITCHEN W1 existing wall to be demolished
(NO. K/P : 970722-01-7283)
tiles tiles NO 7, JALAN DESA HARMONI 4/12
NEW
4408

4408
12.60 sqm 28.40 sqm 230mm thk. clay brick party wall with
W1 TAMAN DESA HARMONI 81100
existing wall to be demolished BATH 2 plaster on bothsides to be carried up JOHOR BAHRU, JOHOR
1210

EXISTING

1210
tiles 230mm above roof level
BATH 1 D1 D2 7.20 sqm
Tandatangan dan Alamat Arkitek :
14

1049
new door to manuf's detail Saya memperakui bahawa butiran di dalam pelan ini adalah menurut kehendak Undang - Undang
new 150mm thk. conc floor slab with 1
EXISTING DINING Kecil Bangunan Seragam 1986 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.
8817

8817
layer BRC A8 11
W2 W1 9 9
ENLARGED new window to manuf's detail
W2 7 W1 7 7
MASTER BEDROOM D1
2742

2742

tiles 7 5 NEW BEDROOM 3 5 5


6.40 sqm tiles
304

304
existing window to be demolished 20.30 sqm
5 3 NEW 3
8MM

8MM
1 3 1 W1
BEDROOM 4 1 Ahmad Bin Omar
W2 tiles
SET

SET
EXISTING LIVING dn dn new window to manuf's detail 16.20 sqm
dn LEM BA G A PELUKIS PELAN BANGUNAN

BAC
BAC

W2 W1 A R K IT E K
No Pendaftaran LAM : BD / A33
1666

1666

KL
K LIN

M A L AYS I A
existing wall to be demolished No. K/P : 400105-01-5069

INE
existing window to be demolished
E

new 115 mm thk. brickwall with 20mm


thk. plaster on bothsides
6096MM SETBACK LINE 6096MM SETBACK LINE
W2 W2 W2 W1 W1 W1
existing door to manuf's detail
new 115 mm thk. brickwall with 20mm new sliding door to manuf's detail AHMAD BIN OMAR ( BD / A33 )
thk. plaster on bothsides PELUKIS PELAN BANGUNAN BERDAFTAR
3048

3048

new window to manuf's detail EXISTING PORCH NO. 2, JALAN NONG CHIK HEIGHTS 4,
NEW BALCONY 1
tiles TAMAN NONG CHIK HEIGHTS,
new 150mm thk. conc floor slab with 1 16.20 sqm 80100 JOHOR BAHRU, JOHOR D.T.
layer BRC A8 TEL: 07-5544850 FAX: 07-5577852
6096

6096

new steel column to engnr's detail


new rc column to engnr's detail
new glass railing to manuf's detail TAJUK :
3048

3048

BL BL
boundary stone boundary stone
JALAN TERATAI 25 JALAN TERATAI 25

GROUND FLOOR PLAN X FIRST FLOOR PLAN X

drawn : ji date : December 2023

scale : as shown checked : ApipO

job no. : drawing no. : 01

FOR SUBMISSION
note :

new 900mm x 2100mm metal frame


with solid timber door to manuf's detail

DOOR SCHEDULE WINDOW SCHEDULE


new 900mm x 2100mm solid timber door 600mm x 1750mm timber frame casement
D1 with metal frame to manuf's detail W1 window w/ top hung to manuf's detail

new 750mm x 2100mm solid timber door 600mm x 1200mm timber frame casement
D2 with metal frame to manuf's detail W2 window to manuf's detail 4408
2150 1210
600mm x 600mm top hung window to manuf's
BL BL
new 2700mm x 2100mm sliding door
D3 with metal frame to manuf's detail W3 detail 1000 8817 6096
4408 2742 1666 3048 3048
2150 1210 1049

new parapet wall with coping to engnr's


detail

NEW ROOF CONSTRUCTION


- new metal roofing
-100mm x 50mm thk. hw rafter at 1200 c/c
beam lev. -10mm x 50mm thk. hw struts
-75mm x 75mm thk. hw wall plate
-50mm x 25mm thk. hw batten at 600 c/c
-double sided aluminium sinsulation paper
RWDP to engnr's details -150mm wide gutter to manuf's detail
Peringatan :
new steel column to manuf's detail SEMUA KERJA-KERJA HENDAKLAH DIMULAKAN SETELAH MENDAPAT KEBENARAN DARI PIHAK

3000
BERKUASA TEMPATAN SECARA BERTULIS SERTA PELAN LULUS
new window to manuf's detail

X kerja - kerja yang baru dibina (diwarnakan merah)


BL first flr. lev.
W1 W1 W1 W1 W1 W1 W1

6400
9090 kerja - kerja yang akan dirobohkan (diwarnakan kuning)
3600 3640 1850 new rc column to engnr's detail
boundary stone new 115 mm thk. brickwall with 20mm PROJEK :

3200
thk. plaster on bothsides

BL TAMAN JOHOR JAYA


1000

rwo to engnr's detail W2 W2 W2 W2 new window to manuf's detail


ground flr. lev. PERMOHONAN PELAN CADANGAN TAMBAHAN / UBAHAN KE

200
new scupper drain to engnr's detail
ground lev. new window to manuf's detail ATAS 1 UNIT RUMAH TERES 2 TINGKAT SEDIADA DI NO. 28
2150

230mm thk. clay brick party wall with (LOT 50342) JALAN TERATAI 25, TAMAN JOHOR JAYA, 81100
plaster on bothsides to be carried up
230mm above roof level JOHOR BAHRU, JOHOR DARUL TAKZIM.
4408

SIDE ELEVATION
1210

NEW ROOF CONSTRUCTION


- new metal roofing
1049

-100mm x 50mm thk. hw rafter at 1200 c/c


-10mm x 50mm thk. hw struts
-75mm x 75mm thk. hw wall plate
8817

-50mm x 25mm thk. hw batten at 600 c/c


-double sided aluminium sinsulation paper
-150mm wide gutter to manuf's detail
304
4408

8MM

new parapet wall with coping to engnr's


SET

detail
UNTUK : MOHAMMAD FADHLI BIN MD RIZAL
BAC
K LIN

TANDATANGAN DAN ALAMAT PEMILIK :


BL BL
E

Saya/Kami bersetuju untuk mematuhi pelan bangunan yang diluluskan serta syarat-syarat untuk memulakan
pembinaan yang ditetapkan oleh pihak berkuasa tempatan. Dengan ini saya/kami bersetuju untuk dikenakan
6228 9090 tindakan undang-undang yang berkaitan dengannya jika gagal mematuhinya
6096MM SETBACK LINE
3600 3640 1850
3048

NEW ROOF CONSTRUCTION


- new metal roofing
-100mm x 50mm thk. hw rafter at 1200 c/c
-10mm x 50mm thk. hw struts
-75mm x 75mm thk. hw wall plate
-50mm x 25mm thk. hw batten at 600 c/c
6096

-double sided aluminium sinsulation paper


-150mm wide gutter to manuf's detail
new parapet wall with coping to engnr's detail

NEW ROOF CONSTRUCTION


- new metal roofing
3048

beam lev. -100mm x 50mm thk. hw rafter at 1200 c/c


-10mm x 50mm thk. hw struts
-75mm x 75mm thk. hw wall plate
-50mm x 25mm thk. hw batten at 600 c/c
-double sided aluminium sinsulation paper
-150mm wide gutter to manuf's detail
...................................................................................
SD1 MOHAMMAD FADHLI BIN MD RIZAL

3000
new window to manuf's detail
BL F F new sliding door to manuf's detail
(NO. K/P : 970722-01-7283)
NO 7, JALAN DESA HARMONI 4/12
new steel column to manuf's detail
TAMAN DESA HARMONI 81100
JALAN TERATAI 25 new 115 mm thk. brickwall with 20mm
thk. plaster on bothsides
W1 W1 W1
JOHOR BAHRU, JOHOR
6400 first flr. lev.
existing roof to to be demolished
new beam to engnr's detail Tandatangan dan Alamat Arkitek :

ROOF PLAN X Saya memperakui bahawa butiran di dalam pelan ini adalah menurut kehendak Undang - Undang
Kecil Bangunan Seragam 1986 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.
3200

boundary stone existing door to manuf's detail


new window to manuf's detail existing window to manuf's detail

W2 W2 W2
new rc column to engnr's detail
ground flr. lev.
200

ground lev.
Ahmad Bin Omar
LEM BA G A PELUKIS PELAN BANGUNAN
A R K IT E K
M A L AYS I A
No Pendaftaran LAM : BD / A33
No. K/P : 400105-01-5069
FRONT ELEVATION
AHMAD BIN OMAR ( BD / A33 )
PELUKIS PELAN BANGUNAN BERDAFTAR
NO. 2, JALAN NONG CHIK HEIGHTS 4,
TAMAN NONG CHIK HEIGHTS,
80100 JOHOR BAHRU, JOHOR D.T.
TEL: 07-5544850 FAX: 07-5577852

TAJUK :

drawn : ji date : December 2023

scale : as shown checked : ApipO

job no. : drawing no. : 02

FOR SUBMISSION