GAMBAR RENCANA
T BELAKANG
TAMPAK
Skala 1 : 100 T KIRI
DAN
PERUMAHAN RAKYAT TAHUN ANGGARAN SUB KEGIATAN LOKASI DI GAMBAR SKALA JML LBR
+ 3.50
RING BALK 15/20
+ 3.25
571
TITIK 0.00
- 0.20
- 0.30
20
- 1.70
SEPCI
POTONGAN A A
Skala 1 : 50
POTONGAN A A
GORDING 5/10
IKAT ANGIN PAPAN 4cm 4/10
BALOK BUMBUNGAN 5/10
KUDA KUDA UATAMA
+ 3.50
+ 3.25
192
+ 2.85
TITIK 0.00
- 0.20
- 0.30
PONDASI JALUR
PAS BATU KALI
PONDASI JALUR B
PAS BATU KALI
PONDASI JALUR
PAS BATU KALI
DAN
PERUMAHAN RAKYAT TAHUN ANGGARAN SUB KEGIATAN LOKASI DI GAMBAR SKALA JML LBR
80
80
323
31°
292
45
6
80
97
47
0
13
322
196
243
249
266
14
1
7
11
135
100
94
BALOK BUMBUNGAN 5/10
6
45
74
5
32
63
192
31
31°
4
223
DINDING BANGUNAN
5
25
PLAT TERAS
KUDA KUDA JURAI LUAR 6/12
JURAI DALAM
KUDA KUDA JURAI LUAR 6/12
GORDING 5/10 KUDA KUDA JURAI LUAR 6/12
39
80
80
36
4
80
80
571
RENCANA ATAP
RENCANA ATAP
Skala 1 : 100
MUKA TANAH 39
URUGAN TANAH
URUGAN TANAH
130
100
PAS. PONDASI BIASA
CAM. 1PC : 5Psr 91
PAS. PONDASI BIASA
CAM. 1PC : 5Psr
15
ANSTAMPING
5
URUGAN PASIR
15
ANSTAMPING
15 5
30
15 URUGAN PASIR
90
30
110
90
110
DAN
PERUMAHAN RAKYAT TAHUN ANGGARAN SUB KEGIATAN LOKASI DI GAMBAR SKALA JML LBR
2
TULANGAN POKOK 4∅10mm
BEGEL ∅6mm
20
2 16
11
BEGEL ∅6mm
15 11
15
2
BEGEL ∅6mm
20
2 16
11
2 2
KLOSED JONGKOK
PIPA PVC WAVIN/RUCIKA ∅43"
FLOOR DRAIN
BAK AIR
LUBANG ZINK
PIPA PVC 2"
PIPA PVC 3"
PIPA PVC 4 "
KLOSED JONGKOK
FLOOR DRAIN
J1
J1
P1
P1
J1
P1
P1
J1
BV
P2
5 7 27 27 27 5
5 7 27 27 27 5
4
5
9
2
37
44
4
10 90 10
10 90 10 3 9 POT A
B
2
4
5
9
2
12
44
5 7 27 27 27 5
44
210
2
206
45
A
44
44
70
10 4
5
9
210
2
206
206
A
44
44
A
2
10
2
120
120
92
92
75 POT B
44
67
4 10 2 43 2 10 4
2
4 10
9
10
9 3
5
90 POT B 70 3 9
5 9 43 9 5 12
2 2
POT B
4 10 2
82
58 2 10 4
POT A
10 5 9 42 9 5
60
9 3
70
POT A
5 9
2
58
2
9 5 POT A
PIPA UDARA
PIPA MASUKDARI CLOSED
DINDING PAS BATA MERAH DINDING PAS BATA MERAH
PIPA PEMBUANGAN
132
120 LAPISAN IJUK
80
100 SEMEN LANTAI 100
PIPA PEMBUANGAN PIPA PEMBUANGAN
160
140
PASIR SILIKA
TANAH ASLI
SLOOF 15/20
SLOOF 15/20 KERIKIL 20
SEMEN LANTAI
LAPISAN BATU BERPORI
40 RABAT BETON RABAT BETON
80
80 80 80
240
DAN
PERUMAHAN RAKYAT TAHUN ANGGARAN SUB KEGIATAN LOKASI DI GAMBAR SKALA JML LBR