KM
SAND/
GRAVEL
METAL
BRICKS
KM
SAND/GRAVEL/
METAL
BRICKS
KM
SAND/GRAVEL
/METAL
23.80
21.40
35.68
41
387.90
582.69
81
703.90
33.30
30.00
49.95
42
395.80
594.58
82
711.80
44.50
44.50
66.61
43
403.70
606.47
83
719.70
54.00
54.00
80.88
44
411.60
618.36
84
727.60
63.50
63.50
95.15
45
419.50
630.25
85
735.50
73.00
73.00
109.42
46
427.40
642.14
86
743.40
82.50
82.50
123.69
47
435.30
654.03
87
751.30
92.00
92.00
137.96
48
443.20
665.92
88
759.20
101.50
101.50
152.23
49
451.10
677.81
89
767.10
10
111.00
111.00
166.50
50
459.00
689.70
90
775.00
11
120.50
120.50
180.77
51
466.90
701.59
91
782.90
12
130.00
130.00
195.04
52
474.80
713.48
92
790.80
13
139.50
139.50
209.31
53
482.70
725.37
93
798.70
14
149.00
149.00
223.58
54
490.60
737.26
94
806.60
15
158.50
158.50
237.85
55
498.50
749.15
95
814.50
16
168.00
168.00
252.12
56
506.40
761.04
96
822.40
17
177.50
177.50
266.39
57
514.30
772.93
97
830.30
18
187.00
187.00
280.66
58
522.20
784.82
98
838.20
19
196.50
196.50
294.93
59
530.10
796.71
99
846.10
20
206.00
206.00
309.20
60
538.00
808.60
100
854.00
21
215.50
215.50
323.47
61
545.90
820.49
101
861.90
22
225.00
225.00
337.74
62
553.80
832.38
102
869.80
23
234.50
234.50
352.01
63
561.70
844.27
103
877.70
24
244.00
244.00
366.28
64
569.60
856.16
104
885.60
25
253.50
253.50
380.55
65
577.50
868.05
105
893.50
26
263.00
263.00
394.82
66
585.40
879.94
106
901.40
27
272.50
272.50
409.09
67
593.30
891.83
107
909.30
28
282.00
282.00
423.36
68
601.20
903.72
108
917.20
29
291.50
291.50
437.63
69
609.10
915.61
109
925.10
30
301.00
301.00
451.90
70
617.00
927.50
110
933.00
31
308.90
308.90
463.79
71
624.90
939.39
111
940.90
32
316.80
316.80
475.68
72
632.80
951.28
112
948.80
33
324.70
324.70
487.57
73
640.70
963.17
113
956.70
34
332.60
332.60
499.46
74
648.60
975.06
114
964.60
35
340.50
340.50
511.35
75
656.50
986.95
115
972.50
36
348.40
348.40
523.24
76
664.40
998.84
116
980.40
37
356.30
356.30
535.13
77
672.30
1010.73
117
988.30
38
364.20
364.20
547.02
78
680.20
1022.62
118
996.20
39
372.10
372.10
558.91
79
688.10
1034.51
119
1004.10
40
380.00
380.00
570.80
80
696.00
1046.40
120
1012.00
75945805.xls.ms_office
BRICKS
Sl No.
Rubble/
Earth /
size
Sand
stone/ cut
brick
/Gravel
Descriptio
stone/ cement in steel in
work
n of item Murrum/ Coarse Rs/tonne Rs./tonne Rs/1000
No
/ Surki/ aggregate
, Lime in
Rs / cum Rs/cum
2
3
4
5
6
7
Loading
76.50
88.00
109.90
117.60
149.90
Unloading
27.40
44.00
109.90
117.60
149.90
Note: The lead & lift charges are inclusive of 14% Contractor Profit and
Over Head charges.
Sl No.
Earth / Sand
Descriptio
/Gravel/Murrum/ /
n of item
Surki/ Rs / cum
Loading
38.10
75.70
Unloading
12.00
12.00
Note: The lead & lift charges are inclusive of 14% Contractor Profit and
Over Head charges
75945805.xls.ms_office
Sl. No.
1
1
Machine
2
Dozer( D 80 )
Mortor Grader
Hydraulic Excavator
8
9
10
11
12
13
14
15
16
17
Emulsion Pressure
Distributor
Hot mix Plant 120 TPH
capacity
18
19
20
Unit
Activity
3
Spreading
Cutting
Cleaning
Clearing
Spreading
GSB
WMM
Soil Ordinary
Soil Marshy
Soil unsuitable
Soil loading
Aggregate loading
Transportation of soil,
GSB,WMM, Hot mix
etc
SoRate for
2011-12
( Rupees)
4
Per Hour
5
1881.00
Per Hour
2600.00
Per Hour
2009.50
Per Hour
Per Hour
Per Hour
Per tonne
Km
Per Km
Per Hour
1320.00
Per Hour
844.40
Per
Per
Per
Per
Hour
Hour
Hour
Hour
345.00
345.00
345.00
345.00
General purpose
Wet mix
Surface cleaning
Per Hour
Per Hour
Per Hour
370.00
1320.00
290.00
Per Hour
940.00
Applying emulsion
tack coat
DBM/BM/SDC
/Premix
DBM/BM/SDC
/Premix
DBM/BM/SDC
/Premix
DBM/BM/SDC
/Premix
Per Hour
690.00
Per Hour
23000.00
Per Hour
19550.00
Per Hour
17250.00
Per Hour
15525.00
Earth/Soil, GSB,
WMM
Soil compaction ,BM
compaction
Water transport
Pulling
Scarifying
Scarifying
Page 3 of 5
696.40
1886.90
Sl. No.
23
24
Machine
2
Paver Finisher Hydrostatic
with sensor control 100
TPH
Paver finisher Mechanical
100
Hydraulic Chip Spreader
Tandem Road roller
25
26
27
28
29
30
1
21
Unit
Activity
3
DBM/BM/SDC
/Premix
SoRate for
2011-12
( Rupees)
4
Per Hour
5
2530.00
Paving of WMM,
paving of DLC
Surface dressing
Rolling of Asphaltic
surface
Rolling of Asphaltic
surface
Repair of pot-holes
Bitumen Spraying
Producing GSB
Mastic wearing coat
Concrete mixing
Per Hour
1090.00
Per Hour
Per Hour
2070.00
1320.00
Per Hour
1035.00
Per
Per
Per
Per
Per
Hour
Hour
Hour
Hour
Hour
750.00
170.00
920.00
52.00
2130.00
Concrete mixing
Per Hour
1670.00
31
Transit mixer
Per Hour
1467.20
32
Transportation of
concrete mix
Pumping of Concrete
Per Hour
630.00
Lifting purpose
Per Hour
Well foundation
Per Hour
950.00
630.00
280.00
1725.00
Well foundation
Per Hour
2875.00
Per Hour
Per Hour
12.80
250.00
Concrete mixing
Concrete mixing
0.75 m dia to 1.20 m
dia boring attachment
Per Hour
Per Hour
Per Hour
345.00
520.00
4485.00
Paving of concrete
Per Hour
surface
Crushing of spalls 100 Per Hour
TPH
Crushing of spalls 200 Per Hour
TPH
Stressing of steel
Per Hour
wires/ stands
2360.00
22
33
34
35
36
37
38
39
40
Concrete mixer
(a)0.28 cum
(b) 1.0 cum
Piling rig with bantonite
pump
Concrete paver finisher
with 40 HP motor
Integrated stone crusher
Page 4 of 5
7070.00
14880.00
110.00
42
43
44
45
Description
Machine
2
Generator
250 KVA
125 KVA
100 KVA
35 KVA
Pneumatic sinking of
Plants
Truck 5.5 cum per 10
tonnes
Unit
Activity
3
Generation of electric
energy
Pneumatic sinking of
wells
Material transport
Material transport
SoRate for
2011-12
( Rupees)
4
per
per
per
per
Per
hour
hour
hour
hour
K.m.
Per Km.
Per tonne
per km
Per Hour
Per Hour
5
1550.00
1090.00
920.00
620.00
3740.00
45.00
4.50
90.00
Road marking
920.00
Mixing and laying
slurry seal
40.00
46
For compacting in
Per Hour
medians
1035.00
47
Drilling equipment
For drilling
Per Hour
Note: The above hire charges of machinery & plant includes crew, oils, conveyance
of machinery to site and all other incidental charges.
Page 5 of 5