JANUARI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Electrical Equipment System and Maintenance ELECTRICAL POWER SYSTEM ANALYSIS USING ETAP Alignment and Balancing in Rotating Equipment Basic Drilling Engineering and Environmental Safe Drilling Practice Total Productive Maintenance (TPM) Programmable Logic Controller (PLC): Basic Principles, Operation and Programming Pelumas dan Sistem Pelumasan Contract Management Budget : Planning, Controlling & Analysing Logistics and Supply Chain Management in Agriculture Sector Custom Facility, Shipping Documents & Export Import Procedure Maintenance Planning and Scheduling Risk-Based Management (M Resiko) Ri k B dM t (Manajemen R ik ) j Electric Submersible Pump : Principles, Installation, Operation, Maintenance and Troubleshooting Industrial Battery & UPS : Principles, Selection, Installation, Maintenance and Troubleshooting Mechatronics Application in Industry Steam Turbine: Principles, Operation, Maintenance and troubleshooting Energy Audit and Application Corrosion Engineering for Non Corrosion Engineers y g y y , Security Management System : Risk Analysis, Control & Audit Ilmu Komputer dan IT Praktis untuk Perkantoran PROJECT MANAGEMENT WITH MICROSOFT PROJECT APPLICATION,Win QSB & MONTE CARLO SIMULATION Perawatan Belt Conveyor Memahami Laporan Keuangan untuk Manajer Non Keuangan Heat Treatment Material SCADA: Application and Practical Design Water Treating and Chemicals n n u n y m Advanced Oil And Gas Production System ONSHORE DRILLING SAFETY OPERATIONS / HSE ASPECTS IN ASME Pressure Vessel: Design, Operation and Maintenance Basic Electrical for Non Electrician Centrifugal Pump : Selection, Operation, and Maintenance FLUID FLOW GAS METERING AND CUSTODY TRANSFER Process Control for Non Control Engineers 3-7 10 - 13 10 - 12 10 - 14 10 - 14 10 - 14 10 - 13 10 - 12 10 - 12 12 - 14 17 - 18 17 - 19 17 - 19 17 - 20 17 - 20 17 - 20 17 - 21 17 - 21 17 - 21 24 - 25 24 - 26 24 - 26 24 - 26 24 - 26 24 - 27 24 - 27 24 - 27 24 - 27 24 - 27 24 - 28 24 - 28 24 - 28 24 - 28 24 - 28 5 4 3 5 5 5 4 3 3 3 2 3 3 4 4 4 5 5 5 2 3 3 3 3 4 4 4 4 4 5 5 5 5 5 Electrical Electrical, IT and Computer Mechanical Oil & Gas,HSE Mechanical Electrical,Instrument & Process Control Mechanical management Finance Logistic, management Business, Management Mechanical Business, M Management B i t Electrical, Mechanical ,oil & gas Electrical Electrical, Instrument & Process Control Mechanical Energy, Mechanical, Electrical Chemical,Mechanical Security and Risk Management y g IT and Computer Engineering project, ,Management Mechanical Finance Mechanical Electrical,Instrument & Process Control Chemical Oil & Gas HSE, Oil & Gas Mechanical Electrical Mechanical Instrument & Process Control, Oil & Gas, Metrology Instrument & Process Control Bandung (Hotel Golden Flower) Bandung (Hotel Holiday Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Holiday Inn) Bandung (Hotel Golden Flower) Bandung (H t l B (Hotel Banana I ) Inn) B d Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Grand Aquila) Bandung (Hotel Sheraton) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) g( ) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Holiday Inn) Bandung (H n ung (Hotel Golden F w ) n Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) 7.450.000 6.950.000 5.950.000 7.950.000 7.450.000 7.450.000 6.750.000 4.950.000 4.950.000 5.950.000 2.950.000 5.250.000 4.950.000 4 950 000 7.250.000 7.250.000 6.750.000 7.450.000 7.450.000 7.950.000 2.950.000 4.950.000 4.950.000 5.500.000 4.950.000 7.250.000 7.250.000 7.250.000 7.250.000 . . 7.250.000 7.450.000 7.450.000 7.450.000 7.950.000 7.450.000
FEBRUARI
1
PRINSIP DASAR DAN PROSEDUR PENGADAAN BARANG & JASA (Global Trend In Purchasing Management And E Procurement) E-Procurement) Effective Public Speaking and Business Presentation Business Process Reengineering Solution Basic Telecommunication PABX Preventive and Predictive Maintenance (PPM) Oil Spill - Oil Boom and Environmental Management Non Destructive Test (NDT) Pneumatic System and Application Introduction to Petroleum Industry Mechanical Rotating Equipments: Operation, Maintenance, Trouble Shooting and Analysis
PLANT LIFE MANAGEMENT THROUGH RELIABILITY BASED INSPECTION
3 2 2 3 4 4 4 4 4 5 5 5 2 3 3 3 3
Logistic Human Development/Motivation management Telecommunication Mechanical Oil & Gas, HSE Mechanical Mechanical,Instrument & Process Control Oil & Gas Mechanical Mechanical Mechanical Human Development/Motivation Oil & Gas Electrical Mechanical Logistic
Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Holiday Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower)
4.950.000 2.950.000 2.950.000 5.250.000 7.950.000 7.250.000 6.950.000 6.950.000 7.250.000 7.450.000 8.250.000 7.450.000 2.950.000 5.750.000 5.950.000 4.950.000 4.950.000 4 950 000
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Pump and Compressor: Principles, Operation, Maintenance and Troubleshooting Change & Conflict Management and Dealing with Difficult People Petroleum Engineering for Non Petroleum Engineering Lightning Protection and Grounding System for Oil and Gas Refinery and Petrochemical Installation Material Handling dan Applikasi Supply Chain Management(SCM)
18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 42
1
Petroleum Economics TRAINING NEEDS ANALYSIS(TNA),TRAINING PLAN, TRAINING BUDGET AND TRAINING IMPACT EVALUATION(TIE) Project Management (PM ) ELECTRICAL POWER SYSTEM ANALYSIS Water Treating and Chemicals Constructive Anger Management Alignment and Balancing in Rotating Equipment Perawatan Belt Conveyor Management Strategy PLC Integration to LAN/WAN Electro-Pneumatics System : Principles and Application Marine and Terminal Operation HAZID (Hazard Identification) Advanced Process Control WP and B, AFE, and POD Pump : Operation, Maintenace and Troubleshooting Safety Instrument System and Control ASME Pressure Vessel: Design, Operation and Maintenance Electrical Control Wiring Distributed Control System (DCS): Principles, Maintenance, Operation, Programming and Troubleshooting Basic Drilling Engineering, Health, Safety & and Environmental Cathodic Protection for Onshore and Offshore Structure Strategic Planning Hydraulics Power System VariableSpeed Drives : Operation, Protection & Maintenance Pelumas dan Sistem Pelumasan
16 - 18 16 - 18 16 - 18 16 - 19 16 - 19 21 - 23 21 - 23 21 - 23 21 - 23 21 - 24 21 - 24 21 - 24 21 - 24 21 - 24 21 - 24 21 - 24 21 - 24 21 - 25 21 - 25 21 - 25 21 - 25 21 - 25 21 - 25 21 - 25 21 - 25 22 - 25
28 feb-2 mar 28 feb-3 mar 28 feb-3 mar 28 feb-4 mar 01 - 02 01 - 03 01 - 03 01 - 03 01 - 04 01 - 04 03 - 04
3 3 3 4 4 3 3 3 3 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 4
3 4 4 5 2 3 3 3 4 4
Oil & Gas Management, Human Development Management Electrical Chemical Management, Human Development Mechanical Mechanical Management, Human Development Electrical,Instrument & Process Control Electrical,Mechanical,Instrument & Process Control Marine and Port HSE Electrical,Instrument & Process Control Oil & Gas Mechanical Electrical,Instrument & Process Control Mechanical Electrical,Instrument & Process Control Electrical,Instrument & Process Control HSE & Oil and Gas Mechanical,Chemical,Oil & Gas Management Mechanical Electrical Mechanical
Mechanical Electrical Mechanical Mechanical management Mechanical Mechanical Electrical,Instrument & Process Control Loogistic, Management Mechanical
Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Holiday Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Grand Seriti) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower)
Bandung (Hotel Grand Aquila)
5.950.000 4.950.000 5.250.000 7.250.000 7.250.000 4.950.000 5.950.000 5.500.000 4.950.000 7.250.000 6.950.000 7.250.000 7.250.000 7.250.000 7.250.000 7.250.000 7.250.000 7.450.000 8.250.000 7.450.000 7.950.000 7.950.000 7.750.000 7.450.000 7.450.000 6.750.000
5.750.000 6.950.000 7.250.000 7.450.000 2.950.000 5.500.000 6.500.000 5.750.000 5.950.000 7.250.000
MARET
Compressor & Prime Mover Operation & Maintenance LV Switchgear Maintenance and Coordination GAS COMPRESSOR: OPERATION, MAINTENANCE & TROUBLESHOOTING Total Productive Maintenance (TPM) Balanced Scorecard (BSC) Concept and Implementation Lubrikasi : Prinsip Dasar dan Aplikasi Risk Based Inspection (RBI) Human Machine Interface(HMI): Visualization and Monitoring Effective Inventory Management and Modern Warehousing for Support Personel Control Valve: Principles, Sizing, Selection, Installation and Maintenance Business Process Reengineering Solution
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 34
Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandun ( Hotel Banana Inn ) Bandung Bandung (Hotel Grand Seriti)
Bandung (Hotel Grand Seriti)
2 3
3 3 3 4 4 4 4 5 5
3.250.000 4.950.000
5.250.000 5.750.000 4.950.000 7.250.000 7.250.000 5.950.000 6 950 000 6.950.000 7.750.000 7.950.000
07 - 09 07 - 09 07 - 09 07 - 09
07 - 10 07 - 10 07 - 10 07 - 10 07 - 11 07 - 11 07 - 11
Programmable Logic Controller (PLC): Basic Principles, Operation and Programming Business Process Reengineering Solution
ISO 10012 : Measurement Management System for Supporting ISO 9001 Certification Batubara Managing The Integrity of Gas Pipeline System Total Quality Management (TQM) Occupational Health, Safety and Environment ( HSE ) Aspects on Paper and Pulp Industry
5 2
2 3 3 3 4
Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung ( Hotel Banana Inn ) Bandung ( Hotel Grand Seriti ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower)
7.450.000 2.950.000
3.000.000
10 - 11
12 - 13 14 - 16 14 - 16 14 - 16 14 - 17 14 - 17 14 - 17 14 - 18 14 - 18 14 - 18 14 - 18 14 - 18
Mining Mechanical
Management HSE
5.450.000 5.750.000
4.950.000 4 950 000 7.250.000
4 4
5 5 5
Mechanical Chemical
Communication, HRD, Management, Motivation Electrical Oil & Gas
6.750.000 7.250.000
7.250.000 7.450.000 7.950.000
5
5
7.950.000
7.750.000 7 750 000
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62
LOGISTICS AND SUPPLY CHAIN MANAGEMENT: CONCEPT, STRATEGY AND IMPLEMENTATION Job Description Analysis, Development and Design Cost Control Sistem Hydrolik dan Pneumatik Motivating Staff For Exellent Performance Project Cost Estimation & Cost Control
15 - 18 21-22
4 2 3 3 3 3
Logistic, Management Human Resource Development, Management management, Finance Mechanical Communication, HRD, Management, Communication HRD Management Motivation management, Finance
Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Grand Seriti ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower)
21 - 23 21 - 23 21 - 23 21 - 23 21 - 23 21 - 24 21 - 24 21 - 24 21 - 24 21 - 24 21 - 24 21 - 25
28 - 29 28 - 29 28 - 30 28 - 30 28 - 31 28 - 31 28 - 31 28 - 31 28 - 1 A 28 - 1 A 28 - 1 A 28 - 1 A 28 - 1 A 30 - 31
PROJECT MANAGEMENT WITH MICROSOFT PROJECT APPLICATION,Win QSB & MONTE CARLO SIMULATION Safety Instrument System and Control ELECTRICAL POWER SYSTEM ANALYSIS USING ETAP Oil and Gas Production System Choke and Control Valve
Heat Exchanger : Operation, Maintenance, Troubleshooting WP and B, AFE, and POD Training untuk Pegawai Persiapan Masa Pensiun (Training Pra-Purnabakti) Dynamic Interpersonal & Communication Skills Integrated Procurement Management Air Compressor Strategic Human Resources Management and Organization Development Basic Reservoir Engineering for Non Petroleum Engineer Refractory & Heat Insulation Advanced Oil And Gas Production System Hazardous Material Handling Corrosion Engineering for Non Corrosion Engineers Energy Audit and Application Safety Relief Valve : Fundamental, Concepts, sizing and Selection Teknik Pemeliharaan Kendaraan ( Preventive Maintenance untuk Kendaraan) LV and MV Generator : Operation, Protection & Maintenance) Holistic CSR and Sustainable Community Development(Strategi Memperkuat Reputasi dan Ketahanan Perusahaan)
3 4 4 4 4
4 4 5 2 2 3 3 4 4 4 4
Engineering project, ,Management Electrical,Instrument & Process Control Electrical, IT and Computer Oil & Gas Mechanical
Mechanical Oil & Gas Human Development/Motivation Human Development/Motivation Management, Logistic Mechanical Human Development, Management Oil & Gas Mechanical Oil & Gas Chemical, Health, Safety & Environment
5
5 5 5 5 2
Chemical,Mechanical Energy, Mechanical, Electrical instrument & Process Control, Mechanical Mechanical Electrical
Management
APRIL
1
Effective Public Speaking and Business Presentation Reliability Centered Maintenance(RCM) Strategi Pengembangan Bisnis Effective Presentation and Report Writing Heat Treatment Material Refrigeration : Operation, Maintenace and Troubleshooting Electronic Shutdown & Logic System SCADA: Application and Practical Design Oil & Gas Wells Stimulation By Acidizing & Hydraulic Fracturing Bearing Lubrication Technology Ultrasonic Gas Flow Meter Centrifugal Pump : Selection, Operation, and Maintenance Sikap Kerja 5S Electronic Filing & Document Management System Teknik & Metode Penyusunan HPS/OE (Harga Perkiraan Sendiri) atas Pengadaan Barang Jasa Warehousing & Distribution Management Machinery Fluid Mechanic Integrated and Effective Logistic Management Oil and Gas Handling Facilities Gas Turbine : Principles, Inspection, Operation, Maintenance and Troubleshooting Electro-Pneumatics System : Principles and Application Onshore Drilling Safety Operations / HSE Aspects in Onshore Drilling Operations DCS (Distributed Control System) for Operator Chemical Hazard Safety in Mining and Workplace Transmission and Distribution : Operation & Maintenance Welding Metallurgy Project Management (PM ) Thermal Spray Coating Menjadi Pribadi Yang Asertif Supply Chain Management(SCM) Strategic Human Resources Management
04 - 05 04 - 06 04 - 06 04 - 06 04 - 07 04 - 07 04 - 07 04 - 07 04 - 07 04 - 07 04 - 08 04 - 08 11 - 12 11 - 13 11 - 13 11 - 13 11 - 14 11 - 14 11 - 14 11 - 14 11 - 14 11 - 14 11 - 14 11 - 15 11 - 15 11 - 15 11 - 15 12 - 15 18 - 20 18 - 20 18 - 20
2 3 3 3 4 4 4 4 4 4 5 5 2 3 3 3 4 4 4 4 4 4 4 5 5 5 5 4 3 3 3
Human Development/Motivation Mechanical Business, Management Communication, Management, Secretary Mechanical Mechanical, Refrigrasi Electrical,Instrument & Process Control Electrical,Instrument Electrical Instrument & Process Control Oil & Gas Mechanical instrument & Process Control Mechanical Management, Human Development Management Management, Logistic Logistic Mechanical Logistic Oil & Gas Mechanical Electrical,Instrument & Process Control HSE, Oil & Gas Electrical,Instrument & Process Control Mining, Chemical, HSE Electrical Mechanical Engineering project & Management Mechanical Comunication, Management, Human Resource Development/Motivation Logistic Management, Management Human Resource Development
Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung ( Hotel Grand Seriti ) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Holiday Inn) Bandung (Hotel Golden Flower) Bandung ( Hotel Grand Seriti ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower)
2.950.000 5.500.000 4.950.000 4.950.000 7.250.000 7.250.000 6.950.000 7.250.000 7.250.000 7.250.000 7.450.000 7.750.000 2.950.000 5.250.000 4.950.000 4 950 000 4.950.000 6.950.000 5.950.000 7.750.000 7.250.000 6.950.000 7.250.000 7.250.000 7.950.000 7.450.000 7.450.000 7.950.000 7.250.000 4.950.000 4.950.000 5.250.000
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
32 33 34 35 36 37 38 39 40 40 41 42 43 44
18 - 20 18 - 20 18 - 20 18 - 21 18 - 21 18 - 21 25 - 27 25 - 27 25 - 27 25 - 27 25 - 28 25 - 28 25 - 28 25 - 29
3 3 3
4
Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Grand Seriti ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta )
RELIABILITYCENTEREDMAINTENANCE(RCM)IncreasingSafety&Reliabilityin GasPipelineSystem
GAS COMPRESSOR: OPERATION, MAINTENANCE & TROUBLESHOOTING
4 4 3 3 3 3 4 4 4 5
Mechanical Electrical, Mechanical ,oil & gas Mechanical Human Development/Motivation Management, Human Development Human Development/Motivation Oil & Gas, HSE Mechanical Oil & Gas Electrical, Instrument & Process Control management Human Development/Motivation Finance Civil, Mining Mechanical Oil & Gas Chemical Electrical, Instrument & Process Control Electrical Mechanical Electrical,Instrument & Process Control Mechanical management IT and Computer Legal, Legal management Logistic Business, Management Mining Mechanical Electrical Chemical, Mechanical Oil & Gas, Instrument & Process HSE H E Mining, Geodetic Mechanical Electrical,Instrument & Process Control Electrical,Instrument & Process Control Mechanical Management Electrical Mechanical Oil & Gas management Management Elactrical Mechanical Human Resource Development, Motivation Engineering project, ,Management Mechanical
Management
7.250.000 7 250 000 7.250.000 5.750.000 4.950.000 4.950.000 5.250.000 7.250.000 7.250.000 7.250.000 7.450.000
MEI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
Business Process Reengineering Solution
02 - 03 02 - 04 02 - 04 02 - 04 02 - 05 02 - 05 02 - 05 02 - 05 02 - 05 02 - 05 02 - 05 02 - 06 09 - 10 09 - 11 09 - 11 09 - 11 09 - 11 09 - 11 09 - 11 09 - 11 09 - 12 09 - 12 09 - 12 09 - 12 09 - 13 09 - 13 09 - 13 09 - 13 09 - 13 09 - 13 09 - 13 16 - 20 18 - 19 18 - 20 18 - 20 18 - 20 18 - 20 18 - 20 18 - 21
23 - 25 23 - 25
2 3 3 3 4 4 4 4 4 4 4 5 2 3 3 3 3 3 3 3 4 4 4 4 5 5 5 5 5 5 5 5 2 3 3 3 3 3 4
3 3
Bandung (Hotel Golden Flower) Bandung (Hotel Grand Seriti) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung(Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (H B d (Hotel G ld Fl l Golden Flower) ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower)
3.250.000 4.950.000 4.950.000 5.450.000 7.250.000 7.250.000 7.250.000 7 250 000 6.950.000 6.950.000 6.950.000 7.250.000 7.750.000 2.950.000 4.950.000 4.950.000 4 950 000 4.950.000 4.950.000 5.450.000 5.750.000 5.750.000 7.250.000 7.250.000 7.250.000 250 000 7.250.000 7.750.000 7.450.000 7.450.000 7.450.000 7.750.000 7.450.000 7.750.000 7.950.000 2.950.000 5.250.000 5.250.000 5.750.000 4.950.000 4.950.000 7.250.000
5.250.000 5.750.000
strategic time management Budget : Planning, Controlling & Analysing Pemindahan Tanah Mekanis Machinery Diagnostic Basic Petroleum Engineering Water Treating and Chemicals Mechatronics Application in Industry Electrical Power System Protection Non Destructive Test (NDT) PLC Integration to LAN/WAN Lubrication and Bearing Technology Sikap Kerja 5S Ilmu Komputer dan IT Praktis untuk Perkantoran Contract Management PRINSIP DASAR DAN PROSEDUR PENGADAAN BARANG & JASA (Global Trend In Purchasing Management And E-Procurement) Risk-Based Management (Manajemen Resiko) Batubara Pipelin Pigging Operations & Equipment Lightning Protection and Grounding System for Power Plant, Transmission, Distribution and Large Industry Pipeline Internal Corrosion Control & Monitoring Oil & Gas: Measurement and Calculation Modern Safety and L M d f d Loss C Control Management lM GPS(Global Positioning System) for Mining and Petroleum: Principles, Equipment, Data Collecting, Data Processing, and Application Pump & Compressor : Operation, Maintenace and Troubleshooting Programmable Logic Controller (PLC): Basic Principles, Operation and Programming Distributed Control System (DCS): Principles, Maintenance, Operation, Programming and Troubleshooting Pump and Compressor: Principles, Operation, Maintenance and Troubleshooting Strategic Planning Electrical Equipment System and Maintenance Hydraulics Power System Oil Field and 100 Methods to maintain and Increase Production Holistic CSR and Sustainable Community Development (Strategi Memperkuat Reputasi dan Ketahanan Perusahaan) Project Management (PM ) Basic Electrical Production Opimization & Minimize Down Time Stress Management Strategies PROJECT MANAGEMENT WITH MICROSOFT PROJECT APPLICATION,Win QSB & MONTE CARLO SIMULATION Pipeline : Design, Testing, Inspection & Maintenance
Strategic Performance Management QA & QC Inspection Program
Rekayasa Elektro Hidrolik and Aplikasi SCADA (Supervisory Control & Data Acquisition) : Principles, Design, Operation and Application Creative Problem Solving : Developing Skill for Decision Making and
LOGISTICS AND SUPPLY CHAIN MANAGEMENT: CONCEPT STRATEGY AND CONCEPT, IMPLEMENTATION
23 - 26 23 - 26 23 - 26 23 - 26
4 4 4
4
Inovation
46 47 48 47 47 48 49 50
Manajemen Produksi dan Operasi Water Treatment Electrical Power Generator : Operation, Protection & Maintenace Rotating Equipment : Operation, Maintenace, Troubleshooting and Analysis Piping & Pipeline System: Design, Specification, Installation & Maintenance Production Downhole and Subsurface Equipments Petroleum Engineering for Non Petroleum Employee
Integrated Procurement Management
23 - 26 23 - 27 23 - 27 23 - 27 23 - 27 23 - 27 23 - 27
30 - 31
4 5 5 5 5 5 5
2
Mechanical Chemical, Health, Safety & Environment Electrical Mechanical Mechanical Oil & Gas Oil & Gas
Management, Logistic
Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn)
Juni
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Effective Time Management Compressor : Operation ,Maintenance & Troubleshooting Vibration Monitoring & Control System Menjadi Pribadi yang Berpengaruh Strategi Pengembangan Bisnis Alignment and Balancing in Rotating Equipment Cathodic Protection for Mine Steel Structure and Mining Supporting Facility Basic Surface Safety System Pelumas dan Sistem Pelumasan Water Treating and Chemicals Centrifugal Pump : Selection, Operation, and Maintenance Distribution System Protection Gas & Steam Turbine: Operation, Maintenance and troubleshooting
Job Description Analysis, Development and Design
30 M - 1 30 M - 1 30 M - 1 06 - 08 06 - 08 06 - 08 06 - 09 06 - 09 06 - 09 06 - 09 06 - 10 06 - 10 06 - 10
13 - 14 13 - 15 13 - 15 13 - 16
3 3 3 3 3 3 4 4 4 4 5 5 5
2
Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Grand Seriti) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Grand Seriti) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower)
4.950.000 5.500.000 5.750.000 4.950.000 4.950.000 5.950.000 7.250.000 7.250.000 6.750.000 7.250.000 7.750.000 7.450.000 7.750.000
3.500.000
Business, Management Mechanical Mining, Chemical, Mechanical HSE, Oil & Gas Mechanical Chemical Mechanical Electrical Mechanical
Human Resource Development, Management
Teknik & Metode Penyusunan HPS/OE (Harga Perkiraan Sendiri) atas Pengadaan Barang Jasa
Compressor & Prime Mover Operation & Maintenance
3
3
Management, Logistic
Mechanical
4.950.000
5.750.000
Pump : Operation, Maintenace and Troubleshooting Pump Selection : Design and Operation for Oil & Gas Surface Production Facilities Internal & External Corrosion Control and Monitoring for Pipeline and Suface Facility Grounding System and Lightning Protection Project Management (PM ) : dari Konseptual hingga Operational Supply Chain Management(SCM)
Sistem Hydrolik dan Pneumatik
4 4 4 5 4 3
3 3 3 3 3
Mechanical Mechanical, Oil & Gas Chemical, Mechanical Electrical Management, Engineering Project Logistic
Mechanical
13 - 16 13 - 16 13 - 17 14 - 17
20 - 22 20 - 22 20 - 22 20 - 22 20 - 22 20 - 22
4.950.000
5.500.000 5.750.000 5.250.000 5 250 000
20 - 23 20 - 23 20 - 23 20 - 23 20 - 24 27 - 28
4 4 4
4 5
Mechanical management
7.500.000 3.250.000
Juli
1 2 3 4 5 6 6 7 8 9 10 11 12 13 14 15 16
Managing The Integrity of Gas Pipeline System 04 - 06 04 - 06 3
Mechanical Management, Human Development Oil & Gas, Mechanical Oil & Gas Mechanical Mechanical Management, Human Resource Development Electrical
Mechanical
Bandung ( Hotel Jayakarta ) Bandung (Hotel Jayakarta) Bandung (Hotel Jayakarta) Bali Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Grand Seriti) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower)
Management Strategy Gas, Oil & Water Pipeline Design and Maintenance Production Operational Management for Manager Machinery Fluid Mechanic Heat Treatment Material Excelent Supervisory VariableSpeed Drives : Operation, Protection & Maintenance
Steam Turbine: Principles, Operation, Maintenance and troubleshooting
3 4 4 4 4 4 5
5
04 - 07 04 - 07 04 - 07 04 - 07 04 - 07 04 - 08 04 - 08 04 - 08 11 - 12 11 - 13 11 - 13 11 - 14 11 - 14 11 - 14 11 - 14
Project Management (PM ) Sikap Kerja 5S Strategic Human Resources Management Risk-Based Management (Manajemen Resiko) Corroion and Scaling Prevention
GAS COMPRESSOR: OPERATION, MAINTENANCE & TROUBLESHOOTING LV Switchgear Maintenance and Coordination
5 2 3 3
4 4 4
Engineering project & Management Management, Human Development Management, Human Resource Development Business, Management Chemical, Mechanical
Mechanical Electrical
Mechanical
7.250.000
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
11 - 14 11 - 15 11 - 15 18 - 20 18 - 20 18 - 20 18 - 20
18 - 21 18 - 21 18 - 21
4
5
Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Banana Inn ) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (H t l G ld Fl B d (Hotel Golden Flower) ) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung ( Hotel Banana Inn )
Bandung (Hotel Grand Seriti)
5.950.000
7.750.000
5
3
7.950.000
5.750.000
Petroleum Engineering for Non Petroleum Engineering TRAINING NEEDS ANALYSIS(TNA),TRAINING PLAN, TRAINING BUDGET AND TRAINING IMPACT EVALUATION(TIE) Human Resource Planning and Productivity
LOGISTICS AND SUPPLY CHAIN MANAGEMENT: CONCEPT, STRATEGY AND IMPLEMENTATION Heat Exchanger : Operation, Maintenance, Troubleshooting AC/DC ELECTRICAL MOTOR CONTROL
3 3 3
4 4 4
Thermal Spray Coating PROJECT MANAGEMENT WITH MICROSOFT PROJECT APPLICATION,Win QSB & MONTE CARLO SIMULATION Constructive Anger M C st ti A Management t Gas Dehydration and Glycol Regeneration Bearing Lubrication Technology
Refractory & Heat Insulation Basic Electrical for Non Electrician Surface Production Operation & Equipment
19 - 22 25 - 27 25 - 27 25 - 28 25 - 28 25 - 28
25 - 29 25 - 29
4 3 3 4 4
4 5 5
Mechanical
Mechanical Electrical Oil & Gas
Agustus
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Strategi Pengembangan Bisnis
Effective Inventory Management and Modern Warehousing for Support Personel 01 - 03 01 - 04 01 - 04 01 - 04 01 - 04 01 - 05 01 - 05 01 - 05 01 - 05 08 - 10 08 - 10 08 - 10 08 - 10 08 - 11 08 - 11 08 - 12 08 - 12 15 - 16 21-23 11 -13
3
4
Business, Management
Loogistic, Management
Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Grand Seriti ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) g Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung ( Hotel Grand Seriti ) Bandung ( Hotel Jayakarta ) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower)
4.950.000
5.950.000
Refrigeration : Operation, Maintenace and Troubleshooting ELECTRICAL POWER SYSTEM ANALYSIS USING ETAP Gas Turbine : Operation & Maintenance Cathodic Protection for Onshore and Offshore Structure Hydraulics Power System
Well Complition and Workover
4 4 4 5 5
5
Mechanical, Refrigrasi Electrical, IT and Computer Mechanical Mechanical,Chemical,Oil & Gas Mechanical
Oil & Gas
Strategic Planning
5 3 3
3
Project Management (PM ) Oil and Gas Production System Gas Turbine : Principles, Inspection, Operation, Maintenance and Troubleshooting
Corrosion Engineering for Non Corrosion Engineers LV and MV Generator : Operation, Protection & Maintenance) Integrated Procurement Management Motivating Staff For Exellent Performance Strategic Performance Management
3 4 4 5
5 2 3 3
14 - 16
21 - 23
3
3
Communication, Management,
Communication, HRD, Management, Motivation
Secretary
4.950.000
4.950.000
September
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Pelumas dan Sistem Pelumasan Water Treating and Chemicals
Job Description Analysis, Development and Design 05 - 08 05 - 08 12 - 13
4 4
2
Mechanical Chemical
Human Resource Development, Management
Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung ( Hotel Grand Seriti ) Bandung ( Hotel Jayakarta ) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower)
6.750.000 7.250.000
3.500.000
12 - 14 12 - 14
12 - 15 12 - 15 12 - 16 12 - 16 12 - 16
3 3
4
Mechanical Logistic
Oil & Gas
5.750.000 4.950.000
7.250.000
HighPressurePump(HPP):Operation,MaintenaceandTroubleshooting
Chemical Hazard Safety in Mining and Workplace
Teamwork : "Cara Menyenangkan Membangun Impian
4 5
5
7.250.000 7.950.000
7.250.000
5
3
Mechanical
Human Development, Management
7.750.000
5.250.000
19 - 21 19 - 21 19 - 22 19 - 22 19 - 22 19 - 22 19 - 22
Management Strategy Integrated and Effective Logistic Management Oil & Gas Wells Stimulation By Acidizing & Hydraulic Fracturing Pressure Vessel : Calculation, Codes, Production, Operation & Safeties Machinery Diagnostic
Hazardous Material Handling
3 4 4 4 4
4
18 19 20 21 22 23 24 25 26 27 27 28
19 - 23 19 - 23 26 - 27 26 - 28 26 - 28 26 - 28 26 - 28 26 - 29 26 - 29 26 - 30 26 - 30
Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung ( Hotel Grand Seriti ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower)
5 2 3
3
Electrical Calibration
Sistem Hydrolik dan Pneumatik
Pipelin Pigging Operations & Equipment Menjadi Pribadi Yang Asertif Oil Spill - Oil Boom and Environmental Management Oil and Gas Handling Facilities Lubrication and Bearing Technology Project Management (PM )
3 3 4 4 5 5
Mechanical Comunication, Management, Human Resource Development/Motivation Oil & Gas, HSE Oil & Gas Mechanical Engineering project & Management
Oktober
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 25 26 27 28 29 30 31 29 30 30 31 1 2 3 3 4 5 6 7 8 9 10 11 Strategic Human Resources Management Leadership Skill : How Become a More Effective Leader Production Opimization & Minimize Down Time Risk-Based Management (Manajemen Resiko) Machinery Fluid Mechanic Electrical Submersible Pump : Principles, Installation, Operation, Maintenance and Troubleshooting Pipeline Internal Corrosion Control & Monitoring Programmable Logic Controller (PLC) Pump & Compressor : Operation, Maintenace and Troubleshooting Sikap Kerja 5S strategic time management
QA & QC Inspection Program
03 - 05 03 - 05 03 - 05 03 - 05 03 - 06 03 - 06 03 - 06 03 - 07 03 - 07 10 - 11 10 - 12 10 - 12 10 - 12 10 - 13 10 - 13 10 - 13 10 - 13 10 - 13 10 - 13 17 - 19 17 - 19 17 - 19 17 - 20
17 - 21 17 - 21 17 - 21 17 - 21
3 3 3 3 4 4 4 5 5 2 3
3
Management, Management Human Resource Development Human Development/Motivation Mechanical Business, Management Mechanical Electrical, Mechanical ,oil & gas Chemical, Mechanical Electrical, Instrument & Process Control Mechanical Management, Human Development Human Development/Motivation Mechanical Human Development/Motivation
Oil & Gas Mechanical
Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung ( Hotel Grand Seriti ) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Grand Seriti ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Jakarta Bandung (Hotel Golden Flower) Bandung(Hotel Golden Flower) Bandung (Hotel Golden Flower) g Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Grand Seriti) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) g( ) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower)
5.250.000 4.950.000 5.750.000 4.950.000 6.950.000 7.250.000 7.250.000 7.450.000 7.750.000 2.950.000 4.950.000
5.750.000
3
4 4
5.250.000
7.250.000 7.250.000
4
4
Electrical
Logistic, Management
6.950.000
7.250.000
Pipeline : Design, Testing, Inspection & Maintenance Advance Oil & Gas Production System PROJECT MANAGEMENT WITH MICROSOFT PROJECT APPLICATION,Win QSB & MONTE CARLO SIMULATION Contract Management Vibration Monitoring & Control System Basic Petroleum Engineering Rotating Equipment : Operation, Maintenace, Troubleshooting and Analysis Water Treatment Electrical Equipment System and Maintenance Strategic Planning
Integrated Procurement Management
4 4 3 3 3 4 5 5 5 5
2
7.250.000 7.250.000 4.950.000 4.950.000 5.750.000 7.250.000 7.750.000 7.950.000 7.450.000 7.750.000
3.250.000
Oil & Gas Mechanical Chemical, Health, Safety & Environment E i t Electrical Management
Management, Logistic
24 - 25 24 - 26 24 - 26 24 - 26 24 - 26 24 - 26 24 - 27 24 - 27 24 - 28 31 Ok - 02 31 Ok - 04 31 Ok - 04 31 Ok - 04
01 - 03
Project Management (PM ) Alignment and Balancing in Rotating Equipment Basic Electrical Compressor : Operation ,Maintenance & Troubleshooting Stress Management Strategies Cathodic Protection for Mine Steel Structure and Mining Supporting Oil & Gas: Measurement and Calculation Hydraulics Power System
3 3 3 3 3 4 4 5
3
Human Resource Development, Motivation Mining, Chemical, Mechanical Oil & Gas, Instrument & Process Control Mechanical
Mechanical
Nopember
Compressor & Prime Mover Operation & Maintenance
Gas & Steam Turbine: Operation, Maintenance and troubleshooting Electrical Power Generator : Operation, Protection & Maintenace Oil Field and 100 Methods to maintain and Increase Production g g m g Strategi Pengembangan Bisnis Thermal Spray Coating Creative Problem Solving : Developing Skill for Decision Making and Inovation Effective Time Management
Reliability Centered Maintenance(RCM)
5 5 5 3 4 4 3
3
Mechanical Electrical Oil & Gas Business, Management , g m Mechanical Human Resource Development, Management
Human Development, Management Mechanical
01 - 04 01 - 04
07 - 09 07 - 09 07 - 09 07 - 09 07 - 10
Teknik & Metode Penyusunan HPS/OE (Harga Perkiraan Sendiri) atas Pengadaan Barang Jasa
Strategic Performance Management
3
3
Management, Logistic
Management
4.950.000
5.250.000
Internal & External Corrosion Control and Monitoring for Pipeline and Suface F ilit S f Facility
Chemical, Mechanical
7.250.000
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 1 2 2 3 4 5 6 7 8 9 10 11 12 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Heat Treatment Material Pump : Operation, Maintenace and Troubleshooting Centrifugal Pump : Selection, Operation, and Maintenance Distribution System Protection Production Downhole and Subsurface Equipments
Lubrikasi : Prinsip Dasar dan Aplikasi
07 - 10 07 - 10
4 4 5 5 5
3
Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (H t l G B d (Hotel Grand S iti) d Seriti) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Grand Seriti) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Jayakarta) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bali Bandung ( Hotel Jayakarta ) Bandung (Hotel Golden Flower) Bandung ( Hotel Banana Inn ) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung (Hotel Banana Inn) Bandung (Hotel Golden Flower) Bandung (Hotel Golden Flower) Bandung ( Hotel Banana Inn )
07 - 11 07 - 11 07 - 11 14 - 16 14 - 16 14 - 17 14 - 17 14 - 17 14 - 17 14 - 17 14 - 18
21 - 22
3 4
4
4.950.000 7.250.000
7.250.000
Pelumas dan Sistem Pelumasan Choke and Control Valve Basic Surface Safety System Grounding S st G di System and Li ht i P t ti d Lightning Protection
Job Description Analysis, Development and Design Sistem Hydrolik dan Pneumatik
4 4 4 5
2 3
26 - 28 21 - 23 21 - 23 21 - 24 21 - 24 21 - 24 21 - 24 21 - 25
28 - 30 28 - 30 28 - 30 28 - 30
RELIABILITYCENTEREDMAINTENANCE(RCM)IncreasingSafety&ReliabilityinGas PipelineSystem PROJECT MANAGEMENT WITH MICROSOFT PROJECT APPLICATION,Win QSB & MONTE CARLO SIMULATION Gas, Oil & Water Pipeline Design and Maintenance ELECTRICAL POWER SYSTEM ANALYSIS Pump Selection : Design and Operation for Oil & Gas Surface Production Project Management (PM ) : dari Konseptual hingga Operational
Steam Turbine: Principles, Operation, Maintenance and troubleshooting
3 3 4 4 4 4
5
Mechanical Engineering project, Management Oil & Gas, Mechanical Electrical Mechanical, Oil & Gas Management, Engineering Project
Mechanical
3
3 3
Mechanical
Human Development, Management
5.750.000
5.250.000
Effective Business Letters Writing Risk-Based Management (Manajemen Resiko) Formation Damage and Well Stimulation
3 4
5
28 - 1 D 28 N - 2 28 N - 2 05 - 07 05 - 08 05 - 08 05 - 08 05 - 08 05 - 08
05 - 08
Desember
Boiler : Operation Maintenace and Troubleshooting Operation,
VariableSpeed Drives : Operation, Protection & Maintenance Management Strategy Excelent Supervisory
Heat Exchanger : Operation, Maintenance, Troubleshooting
5 3 4
4 4 4
Chemical, Mechanical
Electrical
Machinery Diagnostic Water Treating and Chemicals Project Management (PM ) Electrical Calibration Basic Drilling Engineering, Health, Safety & and Environmental Sikap Kerja 5S Pipelin Pigging Operations & Equipment Teknik & Metode Penyusunan HPS/OE (Harga Perkiraan Sendiri) atas Strategic Human Resources Management
GAS COMPRESSOR: OPERATION, MAINTENANCE & TROUBLESHOOTING
4 4 5 3 5 2 3 3 3
4
Mechanical Chemical Engineering project & Management Electrical HSE & Oil and Gas Management, Human Development Mechanical Management, Logistic Management, Human Resource Development
Mechanical
05 - 09 05 - 09 11 - 15 12 - 13 12 - 14 12 - 14 12 - 14 12 - 15 12 - 15 12 - 15 12 - 15 12 - 15 12 - 15 19 - 21 19 - 21 19 - 21 19 - 22 19 - 22 19 - 22 19 - 22 19 - 23
Production Operational Management for Manager Electronic Shutdown & Logic System
Refractory & Heat Insulation AC/DC ELECTRICAL MOTOR CONTROL
4 4
4 4
9.750.000 6.950.000
7.250.000 6.950.000
4
3
5.950.000
5.750.000
Human Resource Planning and Productivity Supply Chain Management(SCM) Gas Dehydration and Glycol Regeneration Machinery Fluid Mechanic
Hazardous Material Handling
3 3 4 4
4
Mechanical
Chemical, Health, Safety & Environment
4
5
Mechanical, Refrigrasi
Electrical
7.250.000
7.450.000