Construction - Earliest - Recent STEDS Subsidy Other Subsidy Audit Details Auditor Council Contact Date Commenced Date Completed Status
C 80695610.xls
Scheme Name
Working
INFRASTRUCTURE
Location : Scheme Name Audit : Working (File:80695610.xls) Existing Infrastructure Notes 1 Each stage represents a different portions of the scheme constructed at a different time. 2 All costs must be adjusted to their current or present value using an appropriate index (construction cost index) 3 Consolidate multiple stages priot to entry of cost data in financial analysis worksheet Stage 1 Service Life (yrs) 50 50 25 10 50 20 25 20 10 Optional Data Incurred Description (year)
Items Gravity Network Pumped Mains Pumping Stations Treatment Plant Reuse / Disposal Telemetry / Controls Site / Land Pumping Stations Treatment Plant Reuse / Disposal
Quantity
Type / Material
Other
Items Gravity Network Pumped Mains Pumping Stations Treatment Plant Reuse / Disposal Telemetry / Controls Site / Land Pumping Stations Treatment Plant Reuse / Disposal
Quantity
Type / Material
Other
80695610.xls
Items Gravity Network Pumped Mains Pumping Stations Treatment Plant Reuse / Disposal Telemetry / Controls Site / Land Pumping Stations Treatment Plant Reuse / Disposal
Quantity
Type / Material
Other
80695610.xls
OPERATIONS
Location : Scheme Name, , Audit : Working (File:80695610.xls)
Current Operations Items Chokes, blockages, Network Maintenace cleaning PS Refurbishment Pumping Stations WWTP Telemetary Reuse / Disposal Fixed Costs Fixed ($/yr) Frequency (yrs) Variable Costs Variable ($/connection) Frequency (yrs) Optional Data Description
Consumables
Staff / Operators
Take care to avoid duplication. Where costs are aggregated across items, note additional items included in the description field Refurbishment costs are planned maintenance program costs (ie pump rebuilds) An item may have only fixed, only variable or both fixed and variable components Add aditional or special items in the spaces provided to ensure not cost centres are omitted.
80695610.xls
COMPLIANCE
Location : Scheme Name, , Audit : Working (File:80695610.xls)
Score Compliance of the Scheme in the Matrix Below. Score 1 Non Compliant Environmental Noise Odour Effluent quality Licence conditions Planning Setbacks and buffer distances Zoning Conditions of Approval OHS&W Compliance - Safety Operations Skills / Training Operating Practices / Procedures Estimate action(s) required to be taken to achieve compliance Remedial Works / Action Timing (years) Implications Capital ($) Operating ($) Ranking based upon Risk (Relative)
2 Marginal NonCompliance
3 Compliant
4 Best Practice
80695610.xls
EXPANSION
Location : Scheme Name, , Audit : Working (File:80695610.xls)
Describe the following in the in Audit Report. - expansion / growth pressures (potential size, timing and likelyhood) - planning / strategy of Council to accommodate where this exceeds available capacity