Anda di halaman 1dari 2

Jesse Daniel Mote ________________________________________ Project Manager Broad experience in management of heavy construction and high-value finish const

ruction. Specialized experience with structural retrofits and remodels, post te nsion construction, TIs and negotiated contracts. ________________________________________ Relevant Skills and Strengths

Safety Practice & Procedure Estimating & Scope Evaluation Scheduling & Logistics Buyout & Procurement Self-Performed Operations Budget & Cost Control Change Order Negotiation Structural Retrofits Design Engineering Formwork Systems Crane & Hoisting Logistics Personnel Management Quality Control & Assurance Auto-Cad, OST, Timberline Punch, Closeout, Warranty Professional Highlights Perini Building Company September 18, 2006 to Present Senior Engineer Manage construction of all cast-in-place concrete structures, landscaping, and h ardscape finishes on the Cosmopolitan Resort, Hotel and Casino project in Las Ve gas, Nevada (approximately 6.5-million square-feet). Both cost control and engi neering functions performed for over $150-million of work in-place. Key Contributions: Completed construction of post-tension structures with over $20-million in effi ciency savings relative to the budgeted building cost. Developed and implemented effective quality control and assurance procedures fo r all concrete structures, landscape and hardscape finishes. Managed self-performed concrete operations for over 3-million square-feet of mi ld-steel deck and 3.5-million square-feet of post-tension deck. Managed construction of approximately 150,000 square-feet of recreation deck la ndscape and hardscape finishes, including MMA-finished pool decks, planting beds and green walls, hotel suite patios, artificial turf and plantings, artificial palm trees, tennis courts, shade structures and cabanas, pool vessels, specialty lighting and fixtures, and water features. Plant Construction Company December 28, 2004 to September 17, 2006 Estimator / Assistant Project Manager Managed construction of multiple projects totaling nearly $73-million. Performe d estimates for multiple new projects.

Key Contributions: Managed construction of specialty finishes and fixtures on the Olympic Club Cit y Club renovation in San Francisco, CA. Performed structural estimate for Mercedes-Benz Dealership in San Francisco, CA . Performed conceptual estimates for St. Anthonys Seminary renovation in Santa Ba rbara, CA. Managed construction of Hamlin School McKinne Building renovation in San Franci sco, CA. Managed construction of Gateway School Benjamin Franklin Building renovation in San Francisco, CA. Formal Education Bachelor of Arts Military History The University of Maryland.2000-2004 Certification of Completion Design, Drafting and Engineering The Shelter Institute.2002 OSHA 10-hour & 30-hour Certified

Anda mungkin juga menyukai