Anda di halaman 1dari 31

Today, capital projects are increasing in size, scope and under far more scrutiny.

Without comprehensive earned value,


troubled projects can spiral out of control before anyone even recognizes a problem. Improved planning, budgeting, earned
value management and cost control are imperative to reduce project risk and secure on-time, within budget delivery.
PRISMG2 by ARES Corporation is a next generation,
integrated project cost management solution. With PRISMG2
you will combine budget, committed costs, resource
requirements and schedule dates required to effectively
communicate project performance with statistically-accurate
estimate at completion information. With PRISMG2:
Reduce project risks by aligning cost and schedule in
a single, user-friendly application
Measure earned value performance with early
warning indicators
Analyze cost tracking & variance to accurately
forecast costs
With PRISMG2 you will predict and influence project results
with real-time information required to pin-point potential
problems and react quickly to resolve issues.

Lower Project Costs with PRISMG2


Reduce project cost and schedule overruns
Optimize cash flow to increase profitability
Decrease project management overhead costs
Lower total cost of ownership with web access

Measure Program & Project Performance with


PRISMG2
Earned value management and analysis
Exceed federal government reporting requirements
View real-time cost tracking and variance analysis
Pinpoint potential problems with instant forecasting

Integrate Cost and Schedule with PRISMG2


Eliminate project risks by aligning budgeted cost and
schedule
Integrate Oracle Primavera P6, Microsoft Project, and
major financial systems
Develop time-phased budget and eliminate the need to
cost load schedules
Forecast cost, schedule, resources to completion

Why PRISMG2
Seamless data integration from conception to completion
Real-time cost tracking, variance and forecasting
Exceeds all Federal Government requirements for
Earned-Value Management
Early warning indicators to identify performance issues
and maximize productivity

Intuitive
Role-based, customizable workspace
Comprehensive and immediate communication
platform
Meet project requirements with flexible coding and
powerful reporting

Scalable and Secure


Multi-user, concurrent access
Multi-currency
Multi-language
Enterprise-wide transparency
Enterprise-wide reporting

For more information about ARES Software please contact a Sales Representative: 510/446-8750 prisminfo@arescorporation.com www.arescorporation.com/prism

Why Migrate from PRISM Classic version 5.1


to PRISMG2?
PRISMG2 Professional includes the following new features
and enhancements:
Built for the Enterprise. Supports anytime, anywhere
access without third party tools lowers total cost of
ownership!

Superior Reporting

Cost and Schedule Integration. Full integration with


Oracle Primavera P6 and MS Project
Delivers executive level reporting. Enterprise coding,
periods, control elements and reporting. 100+ standard
reports with customization using Crystal Reports.
Standardize enterprise processes and procedures.
Define required project-level codes across all projects to
deliver consistent corporate standards and reporting.
Supports multinational, global companies. Supports
regional and global project work. Multi-currency and
multi-language capabilities.

Measure performance
with custom thresholds

Staff planning. Plan and hire based on business


strategy. Optimize resources and improve productivity.
Improved workflow and communication. Improve
project controls team productivity with simpler workflows and intelligent data management.
Simplified user interface. Customizable workspace by
role. Group, sort and organize for improved navigation
and analysis.

New and improved


user interface

Streamlined security and permissions. Define roles


and establish project teams with default permissions.
Multiple levels of permissions.
Even more cost and variance controls. Multi-level
variance thresholds, risk tracking, and incurred costs.

For more information about ARES Software please contact a Sales Representative: 510/446-8750 prisminfo@arescorporation.com www.arescorporation.com/prism

Pumps Replacement Project


Your Company Name Here
PUMP

Summary by Phase
XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

10,232

10,232

-10,232

1,223

64,423

-1,223

63,200

48,910

112,110

112,110

112,110

112,110

50,000

50,000

50,000

50,000

50,000

117,028

117,028

117,028

117,028

117,028

219,637

219,637

219,637

219,637

219,637

3,512

19,352

19,352

127,723

147,075

147,075

147,075

147,075

4,544

4,544

57,960

62,504

-7,104

55,400

55,400

55,400

55,400

286,375

286,375

286,375

286,375

286,375

22,922

37,262

37,262

125,908

163,170

163,170

163,170

163,170

4,216

4,216

64,544

68,760

-4,960

63,800

63,800

63,800

63,800

711

711

-711

Print Date/Time:

PRISM G2 COSTANDCOMPSUM1
02/24/2011 7:59:48AM
Page 1 of 2

Pumps Replacement Project


Your Company Name Here
PUMP

Summary by Control Package


XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

Freight

USD

3,120

3,120

-3,120

Other

USD

711

711

6,401

7,112

-7,112

Craft Labor
USD
Construction Hours HR

0
0

0
0

0
0

0
0

44,666
104

44,666
104

44,666
104

0
0

Craft Labor
Materials
Construction Hours
Concrete
Excav & Backfill

USD
USD
HR
CY
SF

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

121,757
90,253
2,609
840
5,700

121,757
90,253
2,609
840
5,700

121,757
90,253
2,609
840
5,700

0
0
0
0
0

Craft Labor
Construction Hours
Piping
Misc Qantities

USD
HR
LF
EA

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

137,906
3,239
1,600
4

137,906
3,239
1,600
4

137,906
3,239
1,600
4

0
0
0
0

Craft Labor
USD
Subcontract
USD
Construction Hours HR

0
0
0

0
0
0

0
0
0

0
0
0

11,431
100,000
202

11,431
100,000
202

11,431
100,000
202

0
0
0

Equipment

USD

4,544

4,544

57,960

62,504

-7,104

55,400

55,400

Equipment

USD

4,216

4,216

64,544

68,760

-4,960

63,800

63,800

Print Date/Time:

0.00 Percent Complete


0
0
0.00 Percent Complete
0
0

0.00 Percent Complete


44,666
0
104
0
0.00 Percent Complete
121,757
0
90,253
0
2,609
0
840
0
5,700
0
0.00 Percent Complete
137,906
0
3,239
0
1,600
0
4
0
0.00 Percent Complete
11,431
0
100,000
0
202
0
8.20 Percent Complete
55,400
0
6.61 Percent Complete
63,800
0

PRISM G2 COSTANDCOMPDET1
02/24/2011 8:09:29AM
Page 1 of 2

Pumps Replacement Project


Your Company Name Here
PUMP

Owner Labor
Materials
Eng Hours

Summary by Control Package


XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

USD
USD
HR
HR

68,637
0
1,236

37,138
0
668

95,633
0
1,723

108,080
0
1,949

65,705
0
1,183

26,897
0
484

18,924
0
342

1,133
0
21

208
0
4

0
0
0

0
0
0

19,642
0
0

30,358
0
0

472,355
0
7,610

Craft Labor
USD
Construction Hours HR
HR

0
0

0
0

0
0

44,666
104

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

44,666
104

Craft Labor
Materials
Construction Hours
Concrete
Excav & Backfill

USD
USD
HR
CY
CY
SF

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

9,130
0
149
0
2,304

31,536
2,825
536
26
3,396

31,764
34,247
753
323
0

48,118
51,878
1,142
479
0

1,209
1,303
29
12
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

121,757
90,253
2,609
840
5,700

Craft Labor
Construction Hours
Piping
Misc Qantities

USD
HR
LF
EA
EA

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

941
26
0
0

9,694
271
3
2

67,829
1,598
701
2

59,442
1,344
896
0

0
0
0
0

0
0
0
0

137,906
3,239
1,600
4

Craft Labor
USD
Subcontract
USD
Construction Hours HR
HR

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

147
1,451
2

1,805
17,768
32

3,275
31,697
57

6,203
49,084
111

1
0
0

11,431
100,000
202

Freight

USD
USD

388

1,062

1,772

2,247

2,509

2,417

2,274

1,707

949

389

15,714

Equipment

USD

1,204

4,335

6,504

43,357

55,400

Equipment

USD

6,379

57,421

63,800

Materials

USD

8,897

80,083

88,980

PRISM G2
Print Date/Time: 02/24/2011 10:55:18AM

TIMEPHASEDBUDGET

Report 1 of 2

Page 1 of 2

Pumps Replacement Project


Your Company Name Here
PUMP

Materials

Materials
Materials

Grouping by Division
XYZ Corporation

General (Common) - Electrical Services


0
0
0
0

General (Common) - Acids and Bases Piping


0
0
0
0
General (Common) - Bulk Materials Valves
0
0
0
0

8,528

8,528

8,528

88,980

88,980

88,980

19,520

19,520

19,520

0
0

14,400
250

0
0

0
0

14,430
260

14,430
260

14,430
260

0
0

48,800
870

0
0

0
0

48,840
880

48,840
880

48,840
880

0
0

0
0

0
0

0
0

31,080
560

31,080
560

31,080
560

0
0
0

0
1,223
0

0
0
0

0
0
0

17,760
0
320

17,760
0
320

17,760
0
320

96.2 Percent Complete


14,430
260
98.9 Percent Complete
48,840
880
0.0 Percent Complete
31,080
560
0.0 Percent Complete
17,760
0
320

0.0 Percent Complete


0

Owner Lab
Materials
Eng Hours

Freight

General (Common) - Freight


0
0
0

Owner Lab
Eng Hours
Owner Lab
Eng Hours

0.0 Percent Complete


8,528

General (Common) - Engineering non-drawing, Home Office Labour


0
0
0
0
0
0
0
0
0
0
0
0
General (Common) - Design drawing, Home Office Labour
0
0
0
0
0
0
0
0
0
0
0
0
General (Common) - Construction, Home Office Labour
0
0
0
0
0
0
0
0
0
0
0
0
General (Common) - Procurement, Home Office Labour
0
0
0
0
0
0
0
0
1,223
0
0
0
0
0
0
0
0
0

Owner Lab
Eng Hours

Reporting Period 3 : Ending 31/05/2010


Cost in USD

Print Date/Time:

0.0 Percent Complete


88,980
0.0 Percent Complete
19,520

PRISM G2 ESTATCOMPANAL
02/24/2011 8:14:44AM
Page 1 of 6

Your Company Name Here


PUMP

XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

Print Date/Time:

PRISM G2 PERFHISTCURVE
Page 1 of 1
02/22/2011 2:58:39PM

Pumps Replacement Project


Your Company Name Here
PUMP

Summary by Control Package


XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

95,633

25,692

27,657

-69,941

-1,965

201,408

116,991

121,037

-84,417

-4,046

472,355

44,666

212,009

137,906

111,431

15,714

4,543

4,544

4,543

-1

4,543

4,544

4,543

-1

55,400

4,217

4,216

4,217

4,217

4,216

4,217

63,800

88,980

19,520

8,528

5,349

711

-5,349

-711

10,650

711

-10,650

-711

76,000

24.77 Percent Complete


472,355
0
0.00 Percent Complete
44,666
0
0.00 Percent Complete
212,009
0
0.00 Percent Complete
137,906
0
0.00 Percent Complete
111,431
0
0.00 Percent Complete
15,714
0
8.20 Percent Complete
55,400
0
6.61 Percent Complete
0
63,800
0.00 Percent Complete
88,980
0
0.00 Percent Complete
19,520
0
0.00 Percent Complete
8,528
0
0.00 Percent Complete
76,000
0

PRISM G2 PERFORMANCE
Print Date/Time: 02/24/2011 10:49:46AM
Page 1 of 1

Pumps Replacement Project


Your Company Name Here
PUMP

Summary by Division
XYZ Corporation

Cost in USD

General (Common) - Electrical Services


25

Electrical
0

8,528

8,528

General (Common) - Acids and Bases Piping


Common Process Materials and Methods
0

88,980

88,980

General (Common) - Bulk Materials Valves


Common Process Materials and Methods
0

19,520

19,520

General (Common) - Engineering non-drawing, Home Office Labour


Owner Indirect
260
14,430

14,430

General (Common) - Design drawing, Home Office Labour


Owner Indirect
880
48,840

48,840

90

General (Common) - Construction, Home Office Labour


Owner Indirect
560
31,080

31,080

90

General (Common) - Procurement, Home Office Labour


Owner Indirect
320
17,760

17,760

90

General (Common) - Owner Commisioning


Owner Indirect
0

50,000

01

North East Potable Water Station #2 - Examination and Preparation


General Requirements
40
0
17,179

17,179

02

North East Potable Water Station #2 - Facility Excavation and Fill


Existing Conditions and Site Construction
312
0

10,888

40

40

90

90

50,000

10,888

North East Potable Water Station #2 - Concrete General

Print Date/Time:

PRISM G2 BUDGETACCOUNT
02/22/2011 3:52:08PM
Page 1 of 3

Pumps Replacement Project


Your Company Name Here
PUMP

Summary by Cost Type


XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

Direct Costs
173.017125 Surveying, crew for pump foundations, 2 person crew
152.017125 Surveying, crew for pump foundations, 2 person crew

0
27,487
17,179

Direct Costs
152.022315.000200
152.022315.402040
152.022315.401010
152.033510.000200
152.033110.200400
152.031110.452050
152.031115.800800
152.032106.000600
152.033910.000010
152.033110.004900
173.022315.401010
173.022315.402040
173.022315.000200
173.032106.000600
173.033910.000010
173.031115.800800
173.033110.200400
173.033510.000200
173.031110.452050
173.033110.004900

0
3,099
5,282
2,507
5,753
29,200
15,360
1,187
17,189
1,472
6,768
2,507
5,282
3,099
31,513
2,945
1,187
32,120
5,753
15,360
7,445

Hauling, LCY, no loading, 6 c.y dump truck, 4 MI RT, 1.8 lds/hr


Excavating, structural, mach excav, com earth, hyd backhoe, 1 CY bkt
Excavating, structural, hand trimming, slopes & sides
Finishing floors, monolithic, screed, float, & hand trowel
Concrete, ready mix, regular weight, 5000 psi
Forms in place, SOG, curb forms, wood, 6" - 12" high, 2 use
Anchor bolt, incl. nut and washer, 1" diameter, 12" long
Reinforcing in place, A615 Gr 60, slab on grade, #3 to #7
Curing, burlap, 4 uses assumed, 7.5 oz
Placing conc, incl vib, walls, 8" thick, direct chute
Excavating, structural, hand trimming, slopes & sides
Excavating, structural, mach excav, com earth, hyd backhoe, 1 CY bkt
Hauling, LCY, no loading, 6 c.y dump truck, 4 MI RT, 1.8 lds/hr
Reinforcing in place, A615 Gr 60, slab on grade, #3 to #7
Curing, burlap, 4 uses assumed, 7.5 oz
Anchor bolt, incl. nut and washer, 1" diameter, 12" long
Concrete, ready mix, regular weight, 5000 psi
Finishing floors, monolithic, screed, float, & hand trowel
Forms in place, SOG, curb forms, wood, 6" - 12" high, 2 use
Placing conc, incl vib, walls, 8" thick, direct chute

4,800 SF

400 CY
900 CY

440 CY

Print Date/Time:

PRISM G2 BASEBUDGETDETAIL
02/24/2011 8:19:56AM
Page 1 of 5

PG2 Cost Management Training Project 1


ARES Corporation
PG2-2
Contingency Draw-down
Contingency Draw-down
Contingency Draw-down
Increased Piping Costs
Increased Piping Costs

Reporting Period 2: Ending 3/31/2011 12:00


Cost in USD

Petro-R-Us
T Martin
T Martin
T Martin
R Rodgers
R Rodgers

03/20/2011
03/20/2011
03/20/2011
03/25/2011
03/25/2011

APPROVED
APPROVED
APPROVED
NTP
NTP

03/20/2011
03/20/2011
03/20/2011
03/10/2011
03/10/2011

100,000
15,000
-115,000
25,000
50,000

PRISM G2 CHANGEMGMTSUM
Print Date/Time: 02/24/2011 11:18:28AM
Page 1 of 1

Your Company Name Here


PUMP

Budget Comparison S_Curve


XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

Print Date/Time:

PRISM G2 BUDGETCURVE
Page 1 of 1
02/22/2011 3:20:57PM

Pumps Replacement Project


Your Company Name Here
PUMP

Summary by Cost Type


XYZ Corporation

Indirect Costs
04/30/2010
04/30/2010
04/30/2010

Reporting Period 3 : Ending 31/05/2010


Cost in USD

Procurement
Engineering
Procurement

FIN
FIN
FIN
MAN

Owner Labor
Owner Labor
Owner Labor
Materials

62
323
85

3,512
18,112
4,810
1,223

p001

01

Direct Costs
04/30/2010
04/30/2010
04/30/2010
04/30/2010

0001
0001
0001
0001

01
02
03
04

Water Pumps
Water Pumps
Motor
Motor

FIN
FIN
FIN
FIN

Equipment
Equipment
Equipment
Equipment

2,092
2,092
180
180

Direct Costs
04/30/2010
04/30/2010
04/30/2010
04/30/2010

0002
0002
0002
0002

01
03
02
04

Fuel Pumps
Fuel Pumps
Motor
Motor

FIN
FIN
FIN
FIN

Equipment
Equipment
Equipment
Equipment

1,940
1,940
168
168

04/30/2010
04/30/2010

0001
0002

F
E

Taxes
Taxes

FIN
FIN

Other
Other

375
336

PRISM G2 PERIODACTUALS
Print Date/Time: 02/24/2011 10:34:27AM
Page 1 of 1

Your Company Name Here


PUMP

Summary by Cost Type


XYZ Corporation
North East Potable Water Station #2

Reporting Period 3 : Ending 31/05/2010


Cost in

PRISM G2
Print Date/Time: 02/24/2011 11:08:40AM

ActualBarCurve
Page 2 of 4

Your Company Name Here


PUMP

Grouped by Control Package


XYZ Corporation
C001

Reporting Period 3 : Ending 31/05/2010


Cost in USD

PRISM G2
Print Date/Time: 02/24/2011 11:11:28AM

ActualHistCurve
Page 1 of 12

Pumps Replacement Project


Your Company Name Here
PUMP

Indirect Costs
1 01/01/1900
1 01/01/1900
2 01/01/1900 C001
3
p001

Direct Costs
3 04/30/2010
3 04/30/2010
3 04/30/2010
3 04/30/2010

0001
0001
0001
0001

Summary by Cost Type


XYZ Corporation

Indirect Costs
2 01/01/1900 C001
2 01/01/1900 C001
2 01/01/1900 C001
3 04/30/2010

Direct Costs
3 04/30/2010
3 04/30/2010
3 04/30/2010
3 04/30/2010

0002
0002
0002
0002

Engineering
Engineering
Engineering

FIN
FIN
FIN
MAN

Owner Labor
Owner Labor
Owner Labor
Materials

Motor
Water Pumps
Motor
Water Pumps

FIN
FIN
FIN
FIN

Equipment
Equipment
Equipment
Equipment

Engineering
Engineering
Engineering
Procurement

FIN
FIN
FIN
FIN

Owner Labor
Owner Labor
Owner Labor
Owner Labor

Fuel Pumps
Motor
Fuel Pumps
Motor

FIN
FIN
FIN
FIN

Equipment
Equipment
Equipment
Equipment

01

03
01
04
02

03
04
01
02

Reporting Period 3 : Ending 31/05/2010


Cost in USD

850
250
20

47,900
14,400
900
1,223

180
2,092
180
2,092

100
100
80
62

5,200
6,200
4,440
3,512

1,940
168
1,940
168

PRISM G2 ACTUALSHISTORY1
Print Date/Time: 02/24/2011 10:35:25AM
Page 1 of 2

Your Company Name Here


PUMP

XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

Print Date/Time:

PRISM G2
02/22/2011 3:15:45PM

ActualCurve
Page 1 of 1

Pumps Replacement Project


Your Company Name Here
PUMP

P001
P002

Grouped by PO
XYZ Corporation

General (Common) - Freight


04/30/2006 E
04/30/2006 D

Reporting Period 3 : Ending 31/05/2010


Cost in USD

FREIGHT
FREIGHT

FIN
FIN

Freight
Freight

1,520
1,600

TAX
TAX

FIN
FIN

Other
Other

3,360
3,752

General (Common)
P002
P001

04/30/2006 E
04/30/2006 F

P001
P001
P001
P001
P001
P001

North East Potable Water Station #2 - Liquid Pumps


04/30/2006 01
04/30/2006 02
04/30/2006 03
04/30/2006 04
04/30/2006 A
04/30/2006 B
CO001

POTABLE WATER FEED PUMP_x000D_Capacit FIN


POTABLE WATER FEED PUMP_x000D_Capacit FIN
MOTOR, POTABLE WATER FEED PUMP_x000D FIN
MOTOR, POTABLE WATER FEED PUMP_x000D FIN
Special tools required for installation, operation, an FIN
List of recommended spare parts for two years of o FIN

Equipment
Equipment
Equipment
Equipment
Equipment
Equipment

28,932
28,932
1,800
1,800
840
200

P002
P002
P002
P002
P002
P002

North East Fuel Storage Station #3 - Liquid Pumps


04/30/2006 01
04/30/2006 02
04/30/2006 03
04/30/2006 04
04/30/2006 A
04/30/2006 B

PUMP, FUEL OIL SUPPLY 4.8 US gpm, 100 psig FIN


MOTOR, PUMP, FUEL OIL SUPPLY 4.8 US gpm, FIN
PUMP, FUEL OIL SUPPLY 4.8 US gpm, 100 psig FIN
MOTOR, PUMP, FUEL OIL SUPPLY 4.8 US gpm, FIN
Special Tools Notes_x000D_Special tools required FIN
SPARES LIST_x000D_List of recommended spar FIN

Equipment
Equipment
Equipment
Equipment
Equipment
Equipment

31,400
2,400
31,400
2,400
940
220

Print Date/Time:

PRISM G2 COSTCOMMITMENTS
02/24/2011 8:23:14AM
Page 1 of 1

Pumps Replacement Project


Your Company Name Here
PUMP

Summary by Control Account


XYZ Corporation

General (Common) - Engineering non-drawing, Home Office Labour


Non-Contract/PO Cost
Engineering
General (Common) - Design drawing, Home Office Labour
Non-Contract/PO Cost
Engineering
C001
Engineering
General (Common) - Procurement, Home Office Labour
p001
General (Common) - Freight
P001
FREIGHT
P002
FREIGHT
General (Common)
P001
TAX
P002
TAX
North East Potable Water Station #2 - Liquid Pumps
0001
Motor
P001
List of recommended spare parts for two years o
North East Potable Water Station #2 - Engineering non-drawing, Hom
C001
Engineering
North East Potable Water Station #2 - Design drawing, Home Office L
C001
Engineering
North East Potable Water Station #2 - Procurement, Home Office Lab
Non-Contract/PO Cost
Procurement
C001
Engineering
North East Fuel Storage Station #3 - Liquid Pumps
0002
Fuel Pumps
P002
MOTOR, PUMP, FUEL OIL SUPPLY 4.8 US gpm
North East Fuel Storage Station #3 - Engineering non-drawing, Home
C001
Engineering

96.15
98.86

0.00
0.00

0.00

8.20

100.00
4.15
100.00

6.61

100.00

100.00
0.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.27
0.00
0.00
100.00
0.00
100.00
0.00
100.00
0.00
0.00
6.13
0.00
0.00
100.00
0.00

Reporting Period 3 : Ending 31/05/2010


Cost in USD

14,400
14,400

0
0

14,400
14,400

0
0

48,800
47,900
900
1,223
1,223

0
0
0
-1,223
-1,223

48,800
47,900
900
0
0

0
0
0
0
0

0
0
0

3,120
1,520
1,600

3,120
1,520
1,600

0
0
0

0
0
0

7,112
3,752
3,360

7,112
3,752
3,360

0
0
0

4,544
4,544
0

57,960
-4,544
62,504

62,504
0
62,504

0
0
0

4,440
4,440

0
0

4,440
4,440

0
0

5,200
5,200

0
0

5,200
5,200

0
0

9,712
3,512
6,200

0
0
0

9,712
3,512
6,200

0
0
0

4,216
4,216
0

64,544
-4,216
68,760

68,760
0
68,760

0
0
0

4,440
4,440

0
0

4,440
4,440

0
0

Print Date/Time:

PRISM G2 OPENCOMMITMENTS
02/22/2011 4:16:07PM
Page 1 of 2

Pumps Replacement Project


Your Company Name Here
PUMP

Budget
Funding
Actual
Budget
Funding
Actual
Budget
Funding
Actual
Budget
Funding
Actual
Budget
Funding
Actual
Budget
Funding
Actual
Budget
Funding
Actual
Budget
Funding
Actual
Budget
Funding
Actual

General (Common) - Electrical Services


0
0
0
0
0
0
0
0
0
0
0
General (Common) - Acids and Bases Piping
0
0
0
0
0
0
0
0
0
0
0
General (Common) - Bulk Materials Valves
0
0
0
0
0
0
0
0
0
0
0
General (Common) - Engineering non-drawing, Home Office Labour
14,430
0
0
0
0
0
0
0
14,400
0
0
General (Common) - Design drawing, Home Office Labour
48,300
540
0
0
0
0
0
0
47,900
900
0
General (Common) - Construction, Home Office Labour
0
0
1,295
7,252
10,342
0
0
0
0
0
0
General (Common) - Procurement, Home Office Labour
0
0
0
0
0
0
0
0
0
0
1,223
General (Common) - Freight
0
0
0
0
0
0
0
0
0
0
0
General (Common)
0
0
0
0
0
0
0
0
0
0
0

Reporting Period 3 : Ending 31/05/2010


Cost in USD

XYZ Corporation

852

3,901

3,775

0
8,528
8,528

8,528
8,528
8,528

8,897

80,083

0
88,980
88,980

88,980
88,980
88,980

1,951

17,569

0
19,520
19,520

19,520
19,520
19,520

0
14,430
30

14,430
14,430
14,430

0
48,840
40

48,840
48,840
48,840

7,926

2,969

1,088

208

0
31,080
31,080

31,080
31,080
31,080

4,040

13,675

45

0
17,760
16,537

17,760
17,760
17,760

0
0
0

0
0
0

0
0
0

0
0
0

Print Date/Time: 02/24/2011 10:57:29AM

PRISM G2 TIMEPHASEDFUND
Report 1 of 2
Page 1 of 4

Pumps Replacement Project


Your Company Name Here
PUMP

Summary by Control Package


XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

27,657

121,037

-1,223

119,814

352,541

472,355

472,355

472,355

44,666

44,666

44,666

44,666

212,009

212,009

212,009

212,009

137,906

137,906

137,906

137,906

111,431

111,431

111,431

111,431

3,120

3,120

12,594

15,714

15,714

15,714

4,544

4,544

57,960

62,504

-7,104

55,400

55,400

55,400

4,216

4,216

64,544

68,760

-4,960

63,800

63,800

63,800

88,980

88,980

88,980

88,980

19,520

19,520

19,520

19,520

8,528

8,528

8,528

8,528

711

711

6,401

7,112

68,888

76,000

76,000

76,000

Print Date/Time:

24.77 Percent Complete


0
-472,355
0.00 Percent Complete
0
-44,666
0.00 Percent Complete
0
-212,009
0.00 Percent Complete
0
-137,906
0.00 Percent Complete
0
-111,431
0.00 Percent Complete
0
-15,714
8.20 Percent Complete
0
-55,400
6.61 Percent Complete
0
-63,800
0.00 Percent Complete
0
-88,980
0.00 Percent Complete
0
-19,520
0.00 Percent Complete
0
-8,528
0.00 Percent Complete
0
-76,000

PRISM G2
02/24/2011 8:17:35AM

FUNDINGCOMP
Page 1 of 1

Pumps Replacement Project


Your Company Name Here
PUMP

Grouped by Control Package/Area


XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

96.15
98.86
0.00
0.00
0.00

HAE
HAE
HAE
HAE
CAE

North East Potable Water Station #2 - Engineering non-drawing, Home Office Labour
North East Potable Water Station #2 - Design drawing, Home Office Labour
North East Potable Water Station #2 - Procurement, Home Office Labour

100.00
4.15
100.00

HAE
HAE
HAE

North East Fuel Storage Station #3 - Engineering non-drawing, Home Office Labour
North East Fuel Storage Station #3 - Design drawing, Home Office Labour
North East Fuel Storage Station #3 - Procurement, Home Office Labour

100.00
15.11
100.00

HAE
HAE
HAE

North East Potable Water Station #2 - Examination and Preparation

0.00

MAN

North East Fuel Storage Station #3 - Examination and Preparation

0.00

MAN

General (Common) - Engineering non-drawing, Home Office Labour


General (Common) - Design drawing, Home Office Labour
General (Common) - Construction, Home Office Labour
General (Common) - Procurement, Home Office Labour
General (Common) - Owner Commisioning

PRISM G2 PHYSICALPROGRESS
Print Date/Time: 02/24/2011 10:45:46AM
Page 1 of 4

Pumps Replacement Project


Your Company Name Here
PUMP

General (Common)
0
1,223
North East Potable Water Station #2
7,873
8,056
North East Fuel Storage Station #3
26,579
27,138
Indirects
0
711

Summary by Area
XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

0.00

0.00

62,158

64,423

0.96

22.27

279,138

279,138

1.00

0.98

1.87

23,414

23,896

0.98

5.55

422,112

422,112

1.00

0.98

5.18

40,180

41,478

0.97

7.83

513,345

513,345

1.00

0.00

0.00

711

0.00

0.00

91,714

91,714

0.00

PRISM G2
Print Date/Time: 02/24/2011 10:48:14AM

PRODUCTIVITY
Page 1 of 1

Your Company Name Here


PUMP

XYZ Corporation
C001

Reporting Period 3 : Ending 31/05/2010


Cost in USD

Print Date/Time:

PRISM G2
02/22/2011 3:05:22PM

ProgHistCurve
Page 1 of 12

Pumps Replacement Project


Your Company Name Here
PUMP
General (Common)
Owner Labor
USD
62,730
Materials
USD
0
Freight
USD
0
Other
USD
0
Eng Hours
HR
1,130
HR
North East Potable Water Station #2
Owner Labor
USD
4,686
Craft Labor
USD
0
Materials
USD
0
Subcontract
USD
0
Equipment
USD
0
HR
Eng Hours
84
Construction Hours HR
0
Concrete
CY
0
Excav & Backfill
SF
0
LF
Piping
0
Misc Qantities
EA
0
EA
North East Fuel Storage Station #3
Owner Labor
USD
1,221
Craft Labor
USD
0
Materials
USD
0
Subcontract
USD
0
Equipment
USD
0
HR
Eng Hours
22
Construction Hours HR
0
Concrete
CY
0
Excav & Backfill
CY
0
LF
Piping
0
Misc Qantities
EA
0
EA
Indirects
USD
Freight
0
Other
USD
1,816
USD

Summary by Area
XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

540
0
0
0
10

1,295
0
0
0
23

7,252
0
0
0
131

10,342
0
0
0
186

11,966
0
0
0
215

16,644
0
0
0
300

1,133
11,700
0
0
21

208
101,553
0
0
4

0
3,775
0
0
0

0
0
0
0
0

19,642
0
0
0
0

30,358
0
0
0
0

162,110
117,028
0
0
2,020

26,590
0
0
0
0
479
0
0
0
0
0

51,596
0
0
0
0
930
0
0
0
0
0

42,010
17,179
0
0
1,204
757
40
0
0
0
0

17,229
9,130
0
0
4,335
310
149
0
2,304
0
0

4,700
11,529
1,764
0
0
85
201
17
2,496
0
0

264
17,055
18,389
0
0
5
404
184
0
0
0

0
19,431
19,935
0
6,504
0
464
199
0
0
0

0
9,365
0
1,451
43,357
0
261
0
0
3
2

0
42,732
0
17,768
0
0
958
0
0
597
0

0
3,004
0
29,561
0
0
53
0
0
0
0

0
124
0
1,220
0
0
3
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

147,075
129,549
40,088
50,000
55,400
2,650
2,533
400
4,800
600
2

10,008
0
0
0
0
179
0
0
0
0
0

42,742
0
0
0
0
770
0
0
0
0
0

58,818
27,487
0
0
0
1,061
64
0
0
0
0

38,134
0
0
0
6,379
687
0
0
0
0
0

10,231
20,007
1,061
0
0
184
335
9
900
0
0

2,016
14,709
15,858
0
0
37
349
139
0
0
0

0
29,628
31,943
0
0
0
704
280
0
0
0

0
1,685
1,303
0
57,421
0
41
12
0
0
0

0
26,902
0
0
0
0
672
0
0
104
2

0
59,713
0
2,136
0
0
1,348
0
0
896
0

0
6,079
0
47,864
0
0
108
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

163,170
186,210
50,165
50,000
63,800
2,940
3,621
440
900
1,000
2

0
3,485

0
5,349

388
6,758

1,062
8,480

1,772
9,034

2,247
8,792

2,509
8,858

2,417
8,048

2,274
6,662

1,707
4,646

949
2,665

389
1,407

15,714
76,000

PRISM G2
Print Date/Time: 03/17/2011 8:22:55AM

TIMEPHASEDBUDGET

Report 1 of 2

Page 1 of 2

Pumps Replacement Project


Your Company Name Here
PUMP

Summary by Control Package


XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

Budget
Funding
Actual

62,730
0
62,300

540
0
900

1,295
0
1,223

7,252

10,342

11,966

16,644

1,133

208

19,642

30,358
162,110
97,687

162,110
162,110
162,110

Budget
Funding
Actual

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

Budget
Funding
Actual

0
0
0

0
0
0

0
0
0

8,897

80,083

0
88,980
88,980

88,980
88,980
88,980

Budget
Funding
Actual

0
0
0

0
0
0

0
0
0

1,951

17,569

0
19,520
19,520

19,520
19,520
19,520

Budget
Funding
Actual

0
0
0

0
0
0

0
0
0

852

3,901

3,775

0
8,528
8,528

8,528
8,528
8,528

Budget
Funding
Actual

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

Budget
Funding
Actual

4,686
0
0

26,590
0
15,840

51,596
0
3,512

42,010

17,229

4,700

264

0
147,075
127,723

147,075
147,075
147,075

Print Date/Time: 03/17/2011 8:34:45AM

PRISM G2 TIMEPHASEDFUND
Report 1 of 2
Page 1 of 3

Pumps Replacement Project


Your Company Name Here
PUMP
General (Common)
6.1
Budget FTE
1,130
Budget Hours
62,730
Budget Cost
6.0
Earned FTE
1,100
Earned Hours
61,049
Earned Cost
6.0
Actual FTE
1,100
Actual Hours
62,300
Actual Cost
North East Potable Water Station #2
0.5
Budget FTE
84
Budget Hours
4,686
Budget Cost
0.0
Earned FTE
0
Earned Hours
0
Earned Cost
0.0
Actual FTE
0
Actual Hours
0
Actual Cost
North East Fuel Storage Station #3
0.1
Budget FTE
22
Budget Hours
1,221
Budget Cost
0.0
Earned FTE
0
Earned Hours
0
Earned Cost
0.0
Actual FTE
0
Actual Hours
0
Actual Cost
Indirects
1,816
Budget Cost
0
Earned Cost
0
Actual Cost

Summary by Area
XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

0.1
10
540
0.1
20
1,109
0.1
20
900

0.1
23
1,295
0.0
0
0
0.0
0
1,223

0.7
131
7,252

1.1
186
10,342

1.2
215
11,966

1.7
300
16,644

0.1
21
12,833

0.0
4
101,761

0.0
0
3,775

0.0
0
0

0.0
0
19,642

-10.4
0
30,358
-5.3
900
216,980
-5.3
900
214,715

0.8
2,020
279,138
0.8
2,020
279,138
0.8
2,020
279,138

2.7
479
26,590
1.6
280
15,541
1.6
280
15,840

5.5
930
51,596
0.4
60
7,873
0.4
62
8,056

4.5
797
60,393

2.6
459
30,694

1.6
286
17,993

2.3
409
35,708

2.8
464
45,870

1.5
261
54,173

5.2
958
60,500

0.3
53
32,565

0.0
3
1,344

-27.5
0
0
0.2
4,843
398,698
0.2
4,841
398,216

2.1
5,183
422,112
2.1
5,183
422,112
2.1
5,183
422,112

1.0
179
10,008
1.4
245
13,600
1.4
245
14,340

4.6
770
42,742
2.4
403
26,579
2.4
408
27,138

6.4
1,125
86,305

3.9
687
44,513

2.9
519
31,299

2.2
386
32,583

4.2
704
61,571

0.2
41
60,409

3.7
672
26,902

8.0
1,348
61,849

0.7
108
53,943

-35.2
0
0
-1.1
5,913
473,166
-1.1
5,908
471,867

2.7
6,561
513,345
2.7
6,561
513,345
2.7
6,561
513,345

3,485
0
0

5,349
0
711

7,146

9,542

10,806

11,039

11,367

10,465

8,936

6,353

3,614

1,796
91,714
91,003

91,714
91,714
91,714

Print Date/Time: 03/17/2011 8:31:05AM

PRISM G2 TIMEPHASEDFTE
Report 1 of 2
Page 1 of 2

Pumps Replacement Project


Your Company Name Here
PUMP

Summary by Control Package


XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

Budget
Earned
Actual/ETC

68,637
61,049
62,300

37,138
30,250
31,080

95,633
25,692
27,657

108,080
110,350
110,404

65,705
91,054
91,052

26,897
35,932
35,926

18,924
23,351
23,348

1,133
2,260
2,260

208
346
346

0
0
0

0
0
0

19,642
19,642
19,642

30,358
72,429
68,340

472,355
472,355
472,355

Budget
Earned
Actual/ETC

0
0
0

0
0
0

0
0
0

44,666
0
0

0
44,666
44,666

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

44,666
44,666
44,666

Budget
Earned
Actual/ETC

0
0
0

0
0
0

0
0
0

0
0
0

9,130
2,627
2,627

34,361
35,312
35,312

66,011
34,922
34,922

99,996
112,939
112,939

2,512
26,210
26,210

0
0
0

0
0
0

0
0
0

-1
-1
-1

212,009
212,009
212,009

Budget
Earned
Actual/ETC

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

941
333
333

9,694
9,826
9,826

67,829
68,305
68,305

59,442
59,442
59,442

0
0
0

0
0
0

137,906
137,906
137,906

Budget
Earned
Actual/ETC

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

1,598
770
770

19,573
16,671
16,671

34,972
38,576
38,576

55,287
55,413
55,413

1
1
1

111,431
111,431
111,431

Budget
Earned
Actual/ETC

0
0
0

0
0
0

0
0
0

388
0
0

1,062
418
418

1,772
1,300
1,300

2,247
2,117
2,117

2,509
2,702
2,702

2,417
2,730
2,730

2,274
2,696
2,696

1,707
2,166
2,166

949
1,148
1,148

389
437
437

15,714
15,714
15,714

Budget
Earned
Actual/ETC

0
0
0

0
0
0

0
4,543
4,544

1,204
1,204
1,204

4,335
4,335
4,335

0
0
0

0
0
0

6,504
6,504
6,504

43,357
43,357
43,357

0
0
0

0
0
0

0
0
0

0
-4,543
-4,544

55,400
55,400
55,400

Budget
Earned
Actual/ETC

0
0
0

0
0
0

0
4,217
4,216

0
0
0

6,379
6,379
6,379

0
0
0

0
0
0

0
0
0

57,421
57,421
57,421

0
0
0

0
0
0

0
0
0

0
-4,217
-4,216

63,800
63,800
63,800

Budget
Earned
Actual/ETC

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

8,897
8,897
8,897

80,083
80,083
80,083

0
0
0

0
0
0

0
0
0

0
0
0

88,980
88,980
88,980

Print Date/Time: 03/17/2011 8:27:34AM

PRISM G2 TIMEPHASEDPERF
Report 1 of 2
Page 1 of 2

Your Company Name Here


PUMP

XYZ Corporation

Reporting Period 3 : Ending 31/05/2010


Cost in USD

Print Date/Time:

PRISM G2 EXECUTIVESUMMARY
Page 1 of 1
02/22/2011 3:07:51PM

Copyright 2011 ARES Software Corporation. All Rights Reserved. ARES Software & ARES Corporation logos, and trademarks or registered trademarks
of ARES Holding Corporation in the United States and other countries. All Rights Reserved.
Other names and brands may be claimed as the property of others. Information regarding third party products is provided solely for educational purposes.
ARES Software Corporation is not responsible for the performance or support of third party products and does not make any representations or warranties
whatsoever regarding quality, reliability, functionality, or compatibility of these devices or products.

Anda mungkin juga menyukai