Anda di halaman 1dari 3

SUMMARY OF EXPERIENCE: I have 30+ years of Electrical and Instrument Engineering Design and Maintenance experience.

This includes working with power generators, power distribution (48 0V through 15KV), and motor control centers (480V and 2300V). My instrumentation experience includes working with programmable controllers, distributed controls and process instrumentation (batch and continuous) and Safety Instrumentation S ystems. I have experience with writing purchase orders and - expediting equipmen t as required. I've generated and issued instrument specs and power distributio n equipment specs along with drawing/design reviews. I have also handled bid/con tractor evaluations, bid packages, drawing packages, instrumentation project boo ks, development of P&IDS, and Design, Field, Installation and Start-up Engineeri ng. My E&I Maintenance Engineering experience was in a sugar processing plant in the process and packaging areas. My paper mill experience includes work in a bleac h plant, paper machine, pulp mill, and utilities. The offshore industry (oil an d gas) experience includes Instrumentation Engineering Design. The Petrochem wor k at Chevron Oronite Additives Plant was in the additives plant, batch processin g area, utilities and landfill area. I am presently employed by Wink Engineerin g as a Senior Staff Engineer and am involved with the ConocoPhillips Refinery Sm all Projects Group as a Project Execution Engineer on Capitol Projects. EDUCATION: Louisiana Tech University Bachelor of Science (Engineering) Electrical Engineering Technology Graduated: 1977 EMPLOYMENT SUMMARY: WINK Engineering, LLC: 2005 - Present W.H. Linder & Associates: 1995 -- 1998 Self-Employed: 1993 -- 1995; 1998-2005 Universal Technical Services: 1990 - 1992 Brown & Root USA, Inc.: 1987 -- 1990 B.E. & K., Inc.: 1984 -- 1987 Godchaux-Henderson Sugars, Inc.: 1980 -- 1984 Colonial Sugars, inc.: 1977 - 1980 PROJECT TYPES: ACTIVITIES: Coker Interlocks Safety System: Project Execution Engineer Refinery Heaters Safety Shutdown Systems: Project Execution Engineer Offshore Design: Design/Lead Engineer Paper Machine Rebuild: Design Engineer Coater Installation: Field Engineer Boiler E&I Rebuild: Field/Startup Engineer Waste Paper Upgrade: Field/Startup Engineer Bleach Plant Upgrade: Field/Startup Engineer Instrument Upgrade: Design/Field Engineer Variable Speed Drive System: Field Engineer Synchronous Motor Control: Field/Inspection Engineer Conveying/packaging Equipment: Field/Inspection Engineer DCS Instrumentation: Design/Field Engineer Power Generator: Maintenance/Operation Engineer

WORK EXPERIENCE SUMMARY: Wink Companies, LLC. (2005 - Present) Motiva Refinery, Norco, La.: Instrumentation Design Engineer; In-house work includes Instrument Engineering e stimates for small projects work on the refinery. Specified and purchased Process Control Instrumentation ExxonMobil Refinery, Chalmette, La.: Instrumentation Design Engineer; In-house work includes Instrument Engineering e stimates for small projects work on the refinery. Specified and purchased Process Control Instrumentation Valero Refinery, Memphis, TN: Alky Area HF Gas Remediation; This work involved project and schedule estimates for the installation of HF Gas Sensors, water monitors (remote and local) , wate r pumps, storage tanks and associated piping with structural supports. ConocoPhillips Alliance Refinery, Belle Chase, La. (Onsite): Project Execution Engineer; I am working in the Small Projects Group at the Alli ance Refinery, as a Project Execution Engineer coordinating outside engineering firms' project work, within the realm of the refinery projects group. I am mon itoring the projects costs and schedule, from "cradle to grave", writing MOCs, A FEs, coordinating construction packages reviews. I am coordinating the construc tion schedule with the Operations and Maintenance Departments and completing che ckout of Safety Instrumented Systems and Process Control Systems. W.H. Linder & Associates (1995-1998) Shell Deepwater Development; New Orleans, La.; Project work included Instrument cable tag logging and panel assignment (Ram-Pow ell TLP.) Drilling Module Instrument Engineer (URSA TLP) Specify and purchase Flow meters, process field controllers and misc, instrument and developed instrument install ation details. Chevron/Texaco; Gemini Phase One: Instrument Design Engineer on the Gemini Phase One project. Generated in-line, o n-vessel instrument specs and skid mounted instrumentation pkg. specs. Specified various flow meters including sales/sales check meters and high pressure methan ol subsea metering. Texaco Exploration; Petronius Spur Platform: Work included spec. checking, Instrument installation detail development work. Additional in-house work includes Instrument Engineering estimates for offshore instrumentation design and also small projects work for Cytec Industries. Universal Technical Services (1990-1992) Chevron Chemical Company; Belle Chase, Louisiana (Onsite): Job duties include Engineering in different areas of the plant. Major jobs were: 1. In the B&S area, purchasing and connecting field instruments to a Fisher-Port er DCS. 2. Company Rep. on a landfill expansion involving 15KV power distribution switch gear, Transformer and feeder (specify and purchase).

3. Field and Start-up Engineering on a compressor installation (15KV). Brown & Root USA, Inc. (1987-1990): Inland Container; New Johnsonville, Tennessee (In Mobile, Ala. office Mill Betterment Project. Responsible for instrument design for this $2OMM paper machine rebuild project including a waste paper recycling system upgrade. Gaylord Container; Bogalusa, Louisiana (Onsite): Various paper mill projects, major projects involved: 1. Rebuild of power bark boiler. 2. Retrofit of 15KV switchgear with a PLC for enhanced remote control and monito ring abilities. 3. Installation and startup of a waste paper recycling system. 4. Installation and startup of a variable-speed couch drive. 5. Estimate to rehabilitate an old maintenance bldg. for reuse as a general main tenance shop. Shell Packaging; Metairie, Louisiana: Projects included: 1. Pump installation. 2. Transformer inspection program development. 3. PLC training station. B.E. & K., Inc. (1984 - 1987) Bowater Inc.; Catawba, South Carolina (Onsite): Electrical and Instrument Field Engineering; I provided installation and start-u p assistance of the coater section of a paper machine installation. Scott Paper Company; Mobile, Ala. (In Mobile, Ala. office): Worked on various projects: 1. Automating digester fill and dump controls utilizing a PLC. 2. Office lighting/power design. 3. Installing 2300 VAC starters. 4. Investigation of a 15KV motor protection failure. International Paper; Mobile, Ala. (Onsite): I worked in various areas as an Electrical Field Engineer during the Mill Reconf iguration Project. Godchaux-Henderson Sugars, Inc.; Reserve, La. (1980 - 1984) Responsibilities Included: 1. Manager E&I Maintenance Department (26 people) 2. Indirect Supervision Power Generator and Boiler Operation and Maintenance 3. Participated in the Modernization of the Packaging Department 4. Participated in the Modernization of the Clarification Department 5. Start-up of 11 Programmable Controllers (conveyor, packaging machines and pal letizers) 6. Preventative maintenance program set-up Colonial Sugars, Inc.; Gramercy, La. (1977 - 1980) Work included: 1. Supervising night shift electricians 2. Monitoring supplies in the Electrical Dept. 3. Technical backup for the day and night shift electrician.

Anda mungkin juga menyukai