Anda di halaman 1dari 8

NICETAS MANALO SAHAGUN 34 Chesapeake Road Monmouth Junction, NJ 08852 732-274-1976

OBJECTIVE: In search of a challenging position of civil and/or general engineer where I can work with diversified and creative projects in an industrial and gov ernment infrastructures. SKILLS: * Efficient management and organizational skills. * Good communication and writing skills. * Open minded and able to work in complex projects and environment. * Highly familiar with EM 385-1-1 , Manual for the safety and health requirement s for all NAVFAC and USACE MILCON projects. * Familiar with AutoCAD. * Excellent problem solving and analytical skills. * Able to operate Microsoft office tools such as word, power point, excel and ac cess. WORK EXPERIENCES: 1. General Engineer, OG-0801-11 Naval Facilities Engineering Command (NAVFAC) FAREAST Facilities Engineering and Acquisition Division (FEAD) Public Works Department, Diego Garcia, United States Navy Diego Garcia, British Indian Ocean Territory April 2004 - March 2011 Duties Performed: * Performing works as Contracting Officer's Authorized Representative in managin g and administering various contract work including building, pier, and shore pr otection construction, installation of electrical and mechanical systems such as power generating plants, telecommunication systems, fire protection systems and other environmental projects * Participate in design conference with A-E's and prepares constructability revi ew of plans and advises FEAD personnel of unique quality assurance problems. * Conducts pre-construction conference with the contractor; coordinates construc tion operations between concerned parties; inspects work in progress; reviews an d forwards contractor payment invoices, and initiates pending contract modificat ion memorandum. * Responsible for ensuring contract requirements are met, monitoring and documen ting contractor's performance, ensuring that safety hazards are eliminated or pr evented, and preparing government estimates and request for contract modificatio ns. * Reviews and analyzes contractor's proposal for modification including Value En gineering modifications. Prepares documentation and Government estimates. * Performs pre-final and final inspections, participates in turnover of complete d facility and prepares contractor/A-E's performance evaluation. * Monitors and evaluates qualifications and training needs of construction repre sentatives and inspectors. * Coordinates and monitors enforcement of command and contractor safety programs . Representative Project Experience: (1) Project No./Title/Location: FY09 MILCON P181-Controlled Humidity Warehouse a nd Wharp Upgrade , Diego Garcia Year: 2010

Description of Project: Design-build project to upgrade the existing Air Ops Wat er Treatment Plant (WTP) and Air Ops Wastewater Treatment Plant (WWTP) and const ruct a new warehouse. Role & Description on Project: Engineer-in-Charge. Assists the PWO/APWO in day a dministration of the contract. QA surveillance, testing, and inspection. Perform s Contracting Officer's Authorized Representative (COAR) functions. (2) Project No./Title/Location: FY08 P158 Wastewater Treatment Facility, Diego G arcia Year: 2009 Description of Project: Construction of improvements to the existing wastewater treatment facility at the Air Operations (Ops) such as a new sewage lagoon, modi fications to the existing sewage lagoons, and related roadway, utilities and fencing work. Role & Description on Project: Engineer-in-Charge. Assists the PWO/APWO in day a dministration of the contract. QA surveillance, testing, and inspection. Perform s Contracting Officer's Authorized Representative (COAR) functions. (3) Project No./Title/Location: Task Oder#0083, Construction of RADOME Tower for 13 meters Parabolic Antenna, Air Force Space Command, Diego Garcia Year: 2008 Description of Project: Excavation for foundations and utilities; structural bac kfill for slabs and footings; drilled pier foundations; pile cap foundation and antenna support structure; continuous spread footing and ringwall; reinforced co ncrete air locks (equipment and personnel), and mechanical room; reinforced conc rete reflector assembly pad; two reinforced concrete anemometer foundations; rei nforced concrete pad for condensers and desalinization with screen walls; miscel laneous radome equipment, steel access stairs and catwalk; interior and exterior architectural finishes, including raised access flooring; seismic control joint s; mechanical HVAC systems and controls; domestic water supply; condensate drain age; local fire alarm control panel, and fire detection and alarm devices; all a ssociated electrical power and grounding at the antenna building, including duct bank and feeders from the Ops Building Role & Description on Project: Engineer-in-Charge. Assists the PWO/APWO in day a dministration of the contract. QA surveillance, testing, and inspection. Perform s Contracting Officer's Authorized Representative (COAR) functions. (4) Project No./Title/Location: IDIQ Task Order, Diego Garcia Year: 2004-2011 Description of Project: Various IDIQ construction task orders issued to BOS Cont ractor. Projects include demolition, restoration, new facility construction, and all other projects valued up to $4.5 million. Role & Description on Project: Engineer-in-Charge. Assists the PWO/APWO in day a dministration of the IDIQ task order. QA surveillance, testing, and inspection. Performs Contracting Officer's Authorized Representative (COAR) functions. (5) Project No./Title/Location: Bonifacio Stopover Expansion Project, Fort Bonif acio Global City, Philippines Year: 2002 Description of Project: Construction of a 4 buildings clustered on a 5000 square meter site development area. Role & Description on Project: Project Manager. Responsible for the construction operation, cost analysis, control of materials and resources of the project. (6) Project No./Title/Location: Pricemart Membership Shopping Warehouse Project, Quezon City Philippines Year: 2001 Description of Project: Construction of a 5,000 square meter warehouse membershi p shopping building and an underground parking area on a 20,000 square meter sit

e development lot. Role & Description on Project: Project Superintendent. Responsible for the imple mentation and day to day activities of the project. (7) Project No./Title/Location: Luisita Industrial Park 2 Project Haci enda Luisita, Tarlac City, Philippines Year: 1998 Description of Project: 300 hectares land development project in Hacienda Luisit a, San Miguel, Tarlac City Role & Description on Project: Chief Engineer. Assists the project manager in th e overall civil works operation, design of main drainage system, and evaluate su b-contractor payment requests. (8) Project No./Title/Location: Various CNMI Surveying Projects. Year: 1988-1996 Description of Project: Construction and land surveying projects in CNMI which i ncludes Saipan Harbor Improvement, a 250 hectares golf course, and topographic, relocation and construction survey of 500 hectares government lands for homestea d recipients in the Commonwealth of Northern Mariana Islands. Role & Description on Project: Survey Party Chief. Other Projects Involved: * QS8034, Repairs to Deep Draft Wharf, Award amount - $4.8 million. * QC6022, Construct Four Radomes C-site, Award amount - $904,598.00 * Diego Garcia Shoreline Erosion Control Project, Award amount - $8.9 million * Various IDIQ Projects with an Aggregate amount of $80 million. * QC0152, Repair Cracks and Spalls/Replace Joint Sealants @ Taxiway, Award Amoun t - $409,406.84 * Medical Clinic Renovation, Award amount - $6.8 million Highest US Federal Civilian Grade : OG 11 (Equivalent to GS-11) 2. Quality Assurance Engineer DG 21(Base Operating Support Contractor) BOSC Contractor Diego Garcia, British Indian Ocean Territory January 2003 - April 2004 * Monitor project activities of Indefinite Quantity (IQ) projects of DG 21. Ensu res that contract requirements are met per contract as Quality Assurance special ist. * Conducts technical reviews of the BOS contractor engineering works, final job plans, cost estimate, modification request, and other changes. * Attend pre construction meeting and conference related to the proposed or on g oing Indefinite Quantity projects. * Performs technical evaluation and project inspection to assure implementation of required engineering procedure, plans, and specifications. * Conducts quality control inspections and test in accordance with Quality Control procedure. * Conduct pre-final inspection of all IQ projects in accordance with the final j ob plan. * Investigates courses of project deficiencies, follow-ups, and implement correc tive action in coordination with the respective work center. * Liaise closely with Resident Office in Charge of Construction (ROICC) personne l, Technical Representative of Commanding Officer (TRCO), QAE's, BOS Directors a nd Managers during technical development, planning, and implementation of work o rders and job accomplishments. * Arrange a final inspection schedule with ROIC personnel, TRCO's or/and QAE's f or project acceptance of all IQ projects. * Attend the weekly IQ production meeting with ROIC, Air Force QAE and deployed

personnel, and Annex Managers. Report all related quality assurance matters and completed projects in this meeting. * Enforce safety rules, standards and regulation. Report to the Annex manager al l and any safety related issues found out during daily surveillance. * As a member of the design review board, review engineering drawings to ensure maximum complacency of the design drawings. * Tabulate results for submission to the engineering and QA/QC managers, prepare s graphical representation of comments for architectural, civil/structural, elec trical, and mechanical discipline. 3. New Kanlaon Construction Inc. Unit 305 Prestige Tower Condominium Emerald Avenue, Ortigas Center Pasig City, Metro Manila Philippines Tel. No. 63-2-636-5200 a. Project Manager Bonifacio Stopover Expansion Project Fort Bonifacio, Taguig, Metro Manila May 2002 - October 2002 * Responsible for the overall construction operation of a * 4 buildings clustered on a 5000 square meter site development area. Total buil ding footprints is 900 square meters. * Liaise with the architectural, structural, electrical, mechanical and plumbing designer for the finalization of construction drawings. * Coordinates with the representative of Bovis Lend Lease, the construction mana gers, for the implementation and proper scheduling to comply with the project's limited time frame. * Prepares project quality and safety plan. * Preside weekly conference with project management team and subcontractors for civil, structural, electrical, and mechanical disciplines. * Preside the daily morning meetings with my subordinates; superintendent, engin eers, and supervisor. Ensure that everyone is aware that quality and safety are our number one priority. * Evaluate the performance of all project staff. * Responsible for cost analysis, control of materials and resources to ensure th e most cost effective engineering procedure without sacrificing quality and safe ty. * Evaluate project accomplishment, critical path, PERTH/CPM analysis, in accorda nce with plan and specifications. * Reports directly to the company's vice president for operation. b. Project Superintendent Pricemart Membership Shopping Warehouse Project Congressional Avenue, Quezon City Metro Manila, Philippines September 2001 - April 2002 * Responsible for the construction implementation of Pricemart Congressional, a 5,000 square meter warehouse membership shopping building and an underground par king area on a 20,000 square meter site development lot. * Prepares weekly construction schedule for all discipline. * Formulate methodologies to determine the priority in accordance with the maste r schedule. * Monitor, integrate, and directs the priorities of electrical, mechanical, and plumbing (MEP) contractors in conjunction with planned activities. * Monitor, receive reports from site engineers, MEP contractors, project planner

and scheduler, purchaser, and warehouse personnel to ensure compliance with pla nned action. * Reports directly to the project manager. 4. Private Contractor SUMITOMO/ROMELECTRO Joint Venture National Power Corporation Ilijan Natural Gas Power Project Batangas City, Philippines August 2000 - February 2001 Hours per week: 48 * Responsible in the construction of transmission line foundation for the 500KV transmission line project. * Directly supervised my employees for the excavations, hauling, rebar installat ion, stub and ground wire setting, formworks, concreting, and backfilling of two massive foundation structures of Philippine National Power Corporation's transm ission tower. * Prepares accomplishment report to support billings and invoices. * Conduct field density and concrete compressive strength test in the presence o f National Power Corporation and general contractor's engineers.

5. Senior Site Engineer Sohbi Kohgei Factory Project Lima Technology Center Lipa City, Batangas, Philippines July 1999 - March 2000 Main Office: HAZAMA PHILIPPINES INC. Unit 11-C, The Valero Tower 122 Valero Street, Salcedo Village Makati City, Philippines Tel Nos. 63-2-893-7429 63-2-893-7526 * Design and construction supervision of drainage system, sewerage, and road net work of the 2 hectares factory site. * Construction planning and supervision of main factory, canteen, and administra tion buildings of a 400ton press machine factory. * Proper coordination with the sub-contractor regarding schedule, delivery of ma terials and other matters that affects construction methodologies. * Enforcement of safety rules and regulations. 6. Senior Operation Engineer Fujitsu Computer Products Philippine Project First Philippine Industrial Park, Batangas, Philippines July 1998 - June 1999 Main Office : TAISEI Philippine Construction Inc. 6th Floor Champaca Building II Building Alfaro Street, Salcedo Village Makati City Philippines Tel. No. 63-2-814-0463 * Building layout and supervision of a 2.4 hectares industrial plant, administra tion building, wastewater treatment plant, and generator house building. * Construction planning and inspection for the construction of main factory buil ding, i.e., foundation works, reinforcement, formation level, alignment, and for

mworks in conformance with the design and specifications. * Structural steel erection, alignment, and anchor bolt setting. * Documentation and paper works in compliance with ISO 9002 requirements. * Enforcement of safety rules and regulations. 7. Chief Engineer HAZAMA Philippines Inc. Luisita Industrial Park 2 Project Hacienda Luisita, Tarlac City, Philippines March 1996 - June 1998 * Assists the project manager in the overall civil works operation of Luisita In dustrial Park 2(LIP2), a 300 hectares land development project in Hacienda Luisi ta, San Miguel, Tarlac City. * Supervise the activities of the sub-contractor in topographic surveying of the proposed industrial subdivision. * Liaise with the top management of Hacienda Luisita Inc., a family owned corpor ation of the former Philippine president Corazon C. Aquino. * Design the main drainage system of the project with the aid of Autocad/AutoSur vey computer program. * Supervise the activities of the sub-contractor in the construction of road net work, main drainage canal and drainage system of LIP2 project. * Analyze progress of work, bar chart schedule, and critical path, using Primave ra Suretrack. * Device plan, supervise the implementation, and monitor the activities of sub-c ontractors in the construction of main access road, basketball court, parking an d landscaping area, and drainage system of Sanyo Semiconductor Manufacturing Phi lippines(SSMP) in Luisita Industrial Park 1( LIP1), a 4.0 hectares semiconductor factory building in Tarlac City. 8. Survey Party Chief Ben Songsong & Sons' Land Surveying and Construction Co. Saipan, CNMI USA April 1988 - December 1994 * Responsible in the topographic and construction surveying of a 250 hectares la nd development project, which includes 18 holes golf course and clubhouses. * Subdividing land, retracing old boundaries, analyzing evidence as to the legal ity of boundaries, identifying boundaries, and making surveys of properties. * Topographic, relocation and construction survey of 500 hectares government lan ds for homestead recipients in the Commonwealth of Northern Mariana Islands. * Layout and construction surveying of Saipan International Airport rehabilitati on project. * Construction surveying of Saipan Harbor Improvement Project, establishing cont rol points along the coast of Saipan harbor. * Analyze plan, prepare surveying layout and methods utilizing AutoCAD V12 and A utoCivil/AutoSurvey computer program. TRAININGS Quality Verification - Masonry Construction February Naval Facilities Acquisition Center for Training Quality Verification - Concrete February 2011 Naval Facilities Acquisition Center for Training General Crane Safety Course NAVFAC Far East Diego Garcia Nov 1-5, 2010 Jan 25-29, 2010 2011

Estimating for Construction Modifications Baltimore, Maryland

Quality Verification- General Construction Sept 03, 2009 Naval Facilities Acquisition Center for Training

Facilities Engineering Command Course #08030 March 17-28, 2008 Naval CECOS, Port Hueneme California NAS Project Scheduling March 19 - 23, 2007 Kansa s City, Missouri Contracting for Mission Support 07-016 March 5 - 16, 2007 (CON 120) Defense Acquisition University, Warren Michigan Naval Facilities Engineering Command 31 July - 01 Aug 2006 Performance Assessment Training NAVFAC Web Based Construction Management (WebCM) May 2006 NA VFAC Far East Yokosuka Mission Performance Assessment April 2006 (CON 112) Section 315 , Defense Acquisition University Mission Strategy Execution March 2006 (CON 111)Se ction 317, Defense Acquisition University Ethics Training for Acquisition Technology and Logistics April 2005 (CLM 003) Section 879, Defense Acquisition University NAVFAC 40-hr Construction Hazard Awareness Course February 2005 NAVFAC PACIFIC NAVFAC Construction Safety Correspondence Course Level 1 February 2005 NAVFAC P ACIFIC Contract Administration v4.2.2 Course for PD2 January 2005 CTC-342 NAVFAC Contracting Officer Representative December 2004 C OR/COAR/NTR, NAVFAC Facilities Institute Fundamentals of Systems Acquisition Management November 2004 (ACQ101) Section 315, DAU ROICC Office Operations Course #04040 CIN: A-4A-0032 July 2004 Na val CECOS, Port Hueneme California Introduction to Base Operating Support (BOS) Contract Quality April 2004 Assu rance, NSF Diego Garcia 10 Hr OSHA Outreach Class Construction Standards September 2003 10 Hr OSHA Outreach - General Industry Standards September 2003 ISO 9001/QMS Internal Quality Auditing May 2003 Construction Fall Protection May 2003 Class II Asbestos Work May 2003 EDUCATIONAL BACKGROUND: Highest Education : Bachelor of Science in Civil Engineering Name of Institution : Mapua Institute of Technology Location : Manila, Philippines Graduation Date : November 1987 United States Equivalency : Bachelor's Degree in Civil Engineering Issued By : Educational Credentials Evaluators Inc. P.O. Box 514070 Milwaukee, Wisconsin 53203-3470 USA Reference No. : 170172/KCR World Education Services, Inc. P.O. Box 5087 Bowling Green Station New York, NY 10274-5087 Reference No. : 524550/dm Certification : Philippine Registered Civil Engineer Year : 1996 Professional License Number : 0076993 Affiliation : Member - American Society of Safety Engineers PERSONAL INFORMATION:

Date of Birth : March 20, 1966 Sex : Male Civil Status : Married with 4 Children Mobile Phone No. :

818-397-9348

Anda mungkin juga menyukai