Promoted by Mr. B.G. Raghupathy (BGR) as a joint venture with GEA Energietechnik GmbH, Germany in 1985 Business in two segments for Power, Oil & Gas sector
Turnkey project engineering and contracting; and Supply of systems and equipment for Power, Oil & Gas industries
Accreditations
ISO:9001 Certification for three Manufacturing Units ASME U Stamp for two Manufacturing Units ASME S certification for one Manufacturing Unit Approved by Indian Boiler Regulations (IBR)
Joint Venture and strategic alliances with multinational companies to cater to Power, Oil and Gas sectors Recipient of 14 prestigious awards for export performance Global operations executed more than 520 contracts in 59 countries Orders on hand INR 72669 Million as on 30th September 2011 In the Domestic market, the Company has executed more than 1000 Contracts.
2
Proven track record in Design, Engineering and Turnkey Project Management capabilities across business divisions
Power Projects Division Oil & Gas Equipment Division Air Fin Cooler Division
Group Companies
GEA BGR Energy System India Limited Progen Systems & Technologies Limited
GEA Cooling Tower Technologies (India) Private Limited BGR Boilers Private Limited BGR Turbines Company Private Limited
3
Business Divisions
Revenue break up for Year ended 31st March 2011
2% 3% 1% 1%
Order backlog as of
In INR Million
Key Milestones
GEA Energietechnik divested its stake to promoters
Technical collaboration agreement with TME, Italy for CPP and NE USA for HRSG
2011 2010
Received Order for Supercritical BoP 2x660 MW
2006
2003 2000 1998
Won a contract for large gas processing complex from SCOP, Iraq
Technical collaboration agreement with HPE & HTC for Boilers and Steam Turbines & Generators
1994 1993
Collaboration agreement with Crane Environment Inc, USA
1985
Turnkey Engineering, Procurement & Construction (EPC) Contracting 3 x 600 MW Balance of Plant (BOP) Contracting 5 x 500 MW, 2 x 660 MW In-house design and engineering capabilities, gives edge in Cost , design and Project Schedule 40 50% of Balance of Plant systems manufactured in-house Early adopter of BOP concept in India Income of Rs.44105 Million in FY 10-11 Order backlog of Rs.61492 Million as of 30th September 2011
INR Million
28876 16440
FY09
FY10
FY11
PROJECTS COMPLETED - BoP PROJECTS COMPLETED PROJECT Grasim Industries - CPP, Chittorgarh, Rajasthan TNEB - CCPP, Valathur (Phase I), Tamil Nadu RRVUNL - CCPP, Dholpur, Rajasthan APGENCO Vijayawada TPS, Andhra Pradesh APGENCO - Kakatiya TPS, Andhra Pradesh MAHAGENCO - Khaperkheda TPS, Maharashtra CAPACITY (MW) 23 95 330 500 500 500 FUEL Coal Gas Gas Coal Coal Coal ORDER VALUE ( Rs. in Million) 444 594 2095 5788 6949 9980
PROJECT
Aban Power - CCPP, Karuppur, Tamil Nadu TNEB - CCPP, Valathur (Phase II), Tamil Nadu Madras Aluminium Company Limited Mettur
FUEL
Gas Gas Coal
POWER PROJECTS DIVISION EPC PROJECTS UNDER EXECUTION PROJECT RRVUNL - Kalisindh TPS, Rajasthan TNEB - Mettur TPS, Tamil Nadu CAPACITY (MW) 2 x 600 1 x 600 FUEL Coal Coal ORDER VALUE ( Rs. in Million) 49000 31000 Contractual Completion Schedule 42 Months 39 Months
10
POWER PROJECTS DIVISION BoP PROJECTS UNDER EXECUTION PROJECT TPCIL - Krishnapatnam TPP, Andhra Pradesh CSPGCL- Marwa TPS, Chhattisgarh MAHAGENCO - Chandrapur STPS, Maharashtra APGENCO - Kothagudem TPS, Andhra Pradesh CAPACITY (MW) 2 x 660 2 x 500 2 x 500 500 FUEL Coal Coal Coal Coal ORDER VALUE ( Rs. in Million) 21680 16330 16320 7930
11
Products and turnkey services for the Oil & Gas industry
Process Equipment Package and Systems - 2/3 Phase Separator System / Skids - Indirect Water Bath Heater - Gas Conditioning, Regulating & Metering Systems
Income of Rs.871 Million in FY 10-11 Order backlog of Rs.3547 Million as on 30th September 2011
12
Compressor Packaging
S/N
Customer
Scope
Engineering, Procurement & Supply of Gas Gathering Station Engineering, Procurement & Supply of Oil Storage Tanks Engineering, Procurement & Supply of Double Deck Oil Storage Tanks
80.5
8.57
8.75
13
Turnkey supply of Air Cooled Heat Exchangers for Oil & Gas processes and Power sector industries Capable of producing all three variations of finned tubes embedded, extruded and welded finned tubes Certified by ASME with U, U2 & R stamp Key markets - India, Middle East, Southeast Asia and North Africa List of clients include Larsen & Toubro Limited, Cameron Systems, Petrofac, Petrojet, Technip KT India Limited, KazStoryService Infrastructure India Pvt Ltd. Subsidiary Company qualified under Boiler regulations IBR Income of Rs.1305 Million in FY 10-11 Order backlog of Rs.1266 Million as on 30th September 2011
14
Undertakes Turnkey contracting for supply of Electrical Systems and Equipment for Power stations and process industries Offering Turnkey solutions for:
EHV Substations EHV Transmission Lines Plant Electricals Gas Insulated Switchgear Substations Optical Fiber Communication Network OPGW, ADSS & OLTE Rural Electrification
Electrical Balance of Plant for Thermal/ Hydro & Nuclear Power Projects Power Trading Category-I Licensee Exclusive partnership with JZT provides turnkey solutions for OPGW communication networks Offers GIS Substations in association with leading manufacturers on case to case basis Income of Rs.706 Million in FY 10-11 Order Backlog as on 30th September 2011 is Rs.5672 Million
15
16
Deaerators Effluent Treatment & Recycling Plants leading to zero discharge Water Treatment Plants (Pre-Treatment & DM Plant) RO based Desalination Plants CPP Condensate Polishing Plants
Exclusive Technical Collaboration with TERMOMECCANICA, Italy for Condensate Polishing Plants Supplied on turnkey basis the largest ever Deaerator in India for NPC (Tarapur) with capacity of 3,013 TPH Commissioned- Deaerators for SIPAT Supercritical 3 x 660 MW Power Plant, NTPC Under execution - Six large-size Deaerators for Marfiq in Saudi Arabia, Hyundai Heavy Industries, Korea Income of Rs.485 Million in FY 10-11 Order backlog of Rs.692 Million as on 30th September 2011
17
Four large-size Membrane-based Effluent Recycling Plants at Tiruppur largest in capacity in India for treating textile dye effluents Sold over 100 Deaerators in India, Asia, Middle East and Africa, ranging in capacity from 10 TPH to 3,103 TPH
Key Differentiators
Dedicated to Power and Oil & Gas sector Undertakes turnkey EPC projects for large Utility Power Plants upto 600 MW
Ability to Design & Manufacture customised products In-house Design & Engineering gives control over costs, design, time and competitive edge
Significant synergies through complementary operations Ability to service both large and small scale projects Project management system and policy enable execution of large, multifaceted, complex projects Manufacturing capability is an added advantage in EPC projects
Cost Competitiveness
Technology tie-ups
Successfully tied up with several international companies to obtain technology and know-how
19
20
Board of Directors
S/N
1 2 3 4 5
Designation
Chairman & Managing Director Managing Director Director (Finance) Director (Technologies, HR & Infrastructure) Director (Sales & Marketing)
6
7
44
51
Independent Director
Independent Director
8 9 10 11 12
46 38 30 25 26
The company is managed by a highly motivated team of professionals The Management of the company has rich and deep experience in the industry Average industry experience of the management is more than 25 years
Name Mr. B.G. Raghupathy Mr. T. Sankaralingam Mr. S. Rathinam Mr. V.R. Mahadevan Mr. A. Swaminathan Mr. R. Ramesh Kumar Mr. P. R. Easwar Kumar Position Chairman & Managing Director Managing Director Director (Finance) Director (Technologies, HR & Infrastructure) Director (Sales & Marketing) President, Corporate & Secretary President & Chief Financial Officer Industry Exp (Years) 37 41 32 29 32 23 18 Exp with BGR Energy 26 2 19 24 14 18 17
Mr. S. Venkataraman
Mr. G. Amudhan Mr. Ashish Tandon Major H.L. Khajuria
35
33 29 40
1
1 13
Mr. V. Balakrishnan
Mr. N. Murali Mr. S. Ilanchezhiyan
29
31 25
8
5 4
22
Human Resources
As on 30th November11
No. of Employees
2212
1844 625
308 849 62 239 110
129
129
23
Audited Year ended 31.3.2009 (12 months) TURNOVER EBIDTA PBT PAT 19221 2081 1747 1151
Audited Year ended 31.3.2010 (12 months) 30693 3480 3047 2010
Audited Year ended 31.3.2011 (12 months) 47475 5507 4820 3242
24
Robust Financials
Total Revenues
47475 INR Million
30692
19221
FY 09
FY 10
FY 11
EBITDA
EBITDA Margin
INR
15.98
1151
FY 09 PAT FY 10 PAT Margin FY 11 FY 09 FY 10 FY 11
25
Quarterly Financials
FY 08-09 Q2
Total Revenues
FY 09-10
11337 7706
Q3 7183 Q4
16571 14573
Q1
1323 1102
EBIDTA
536
714 1472
836
1752 1674
Quarterly Financials
PAT
1083 984 INR Million 605 503 778 514 876 419 470
237 306
172 202
8.41 6.96
INR
FY 08-09
FY 09-10
FY 10-11
FY 11-12
10.79 7.12
3.29 4.25
2.39 2.81
Q1
FY 08-09
Q2
FY 09-10
3.78 Q3
FY 10-11 FY 11-12
5.82
12.14
Q1
Q2
272 Q3
Q4
Q4
27