Anda di halaman 1dari 3

PEMBINAAN AZIM YAHYA SDN. BHD.

PT 11257, Tingkat 1, Taman Chukai Utama, Fasa 3, 24000 Kemaman, Terengganu Tel: 09-8589 671 Fax: 09-8589 670 Email: azimyahya@yahoo.com HOW TO USE THIS FORM: 1) Crew performing task reviews ALL generic JHA considerations. 2) Review previous JHA update(s) for useful information which will help this task 3) Create new JHA update with generic form and ALL considerations for this task 4) Carry out task as per plan. If any condition change - STOP & RE-ASSESS 5) File JHA update for future reference WORK ACTIVITY Job Description of Job Step Step 1 Request Permit 2 Remove material / equipment from tool box

(874195-V)

Installation/Facility Location Associated Work Permit Type Associated Work Permit Number Electrical Isolation Certificate Number Physical Isolation Certificate Number JHA Cross-Reference Number

Potential Hazard/s 1. Miscommunication 1. Manual handling 2. Unfamiliar Surrounding (New starts)

Control/Recovery Measures Operator to be present at start of the job. Use mechanical means of lifting and lowering wherever possible with safe handling technique.Work area must be clean and tidy.Container lid must be secured.Competent personnel must receive full training/inductions on arrival at opperators facility complete with PPE attire. Use mechanical means of lifting and lowering wherever possible with safe handling technique.Work area must be clean ang tidy.Container lid must be secured.Competent personnel must receive full training / induction on arrival at operators facility complete PPE attire. PHSE supported by valid scaffold frame and/ or platform structure.Avoid the use of knives where possible and according to operator policy.Where required.only safety knives to be used.All tools checked prior to task and in good condition.Gloves to be worn at all times.Ladders must be secured at the

Result

Assemble Equipments / materials to sit

1. Manual Handling 2. Slips and Trips. 3 .Unfamiliar Surroundings (New Site)

Erect PHSE Using Hand Tools Only

1. Collapse of PSHE Scaffold frame 2. Knives 3. Hand Tools 4. Working at Height (ladders scaffolding)

PEMBINAAN AZIM YAHYA SDN. BHD.


PT 11257, Tingkat 1, Taman Chukai Utama, Fasa 3, 24000 Kemaman, Terengganu Tel: 09-8589 671 Fax: 09-8589 670 Email: azimyahya@yahoo.com 5. Unfamiliar 6. Unfamiliar

(874195-V)

Pressurize PSHE

1. Pressurized Hoses (connection failure) 2. Gas Ingress (external gas release) 1.Fire in PHSE 2.Dropped Objects ( PHSE wall are PVC only) 3. Restricted Access 4. Lighting (Failure of lighting)

Monitor Hot Wok Inside PHSE

top or a second person to foot the ladder.Maintain three-point contact at all times.Never climb higher that the second top rung of step ladders.Avoid working from ladder if possible.Only certified scaffolding to be used.If harnesses be used personnel to be used. Personnel toreceive full induction preceding / on arrival at operators facility. Use hearing protection at alltimes in accordance with operator policy. Only platform-supplied certified hoses with good quality connections to be used.Portable Gas detection equipment is made available at all times during hot work.Air supply to be taken from a designated safe area air supply at all times. PHSE will constantly monitor for security of fire protection.Anti-Spatter Fire blankets and silica panels will be used to prevent hot material contacting flame retardant material.Competent Firewatcher in attendance at all times.Foam extinguisher to beinside PHSE and dry powder extinguisher to be outside habitat during hot work. Charged fire hose set on spray pattern to be run out to habitat.Welding set and gas cylinders must not belocated inside PHSE.Platform to control fire risk formsimultaneous breaking of containment work.Firewatcher will remain at side for 30 minutes after cessation of hot work.If PHSE roofis unprotected, no lifting operations to take place over the PHSE when personnel are inside.Barriers to be arected around worksite. Area above the PHSE to be clear of any potential dropped objects.Integral escape panels can be opened using zip connections.Area outside PHSE to be kept clear of obstructions.Use hearing protection at all times in

PEMBINAAN AZIM YAHYA SDN. BHD.


PT 11257, Tingkat 1, Taman Chukai Utama, Fasa 3, 24000 Kemaman, Terengganu Tel: 09-8589 671 Fax: 09-8589 670 Email: azimyahya@yahoo.com

(874195-V)

accordance with operator policy. 7 Rigged off PHSE 1.Hand Tools 2.Pinch Points 3.Woprking at Height (ladders and scaffolding) All tools checked prior to task and in good condition.Glove to be worn at all times.Ladders must be secured at the top or a second person to foot the ladder.Avoid working from ladder ifpossible.Only certified scaffolding to be used.If harnesses to be used personnel to becompetent in their use and fall arrest harness conforming to EN361 and shock sbsorbing component to EN 355.Use hearing protection at all times. Use mechanical means of lifting and lowering where possible.Use safe manual handling techniques at all times.Ensure work area is kept clean and tidy.Ensure container lid is secure using locking struts.Competent personnel.Use hearing protection at all times in accordance with operator policy.

Arranged material/equipment to container

1.Manual handling

L - LIKELIHOOD CATEGORY DEFINITION LOW 1 Remote MEDIUM 2 Possible HIGH 3 Probable

CATEGORY LOW 1 MEDIUM 2 HIGH 3

S - SEVERITY DEFINITION No Injury No Damage Non LTI Minor Damage Lost Time Injury Major Damage

No Pollution Minor Pollution Major Pollution

S E V E R T

H M L

R - RATING 3 6 9 2 4 6 1 2 3 L M H LIKELIHOOD

6 to 9 3 to 4 1 to 2

RESULT UNACCEPTABLE TOLERABLE ACCEPTABLE

IS THERE A SAFER WAY TO COMPLETE THE JOB? ARE THERE ALTERNATIVES WITH LESS RISK?

Anda mungkin juga menyukai