Anda di halaman 1dari 47
SECTION 5 SUPPORT DESIGN GUIDELINES Architectural Design Criteria : Section 5 Support Design Guidelines CONTENTS Tite Rev Date 31 NOTAVAILABLE FOR DOWNLOAD 52 Guide tothe Layout of The Tacile Guidance System in MRT aad [ AT Tay Oy LRT Station 33 Glan Handbook I Tay oy Architectural Design Criteria : Section 5.2 Page-1/33 Guide to the Layout of The Tactile Guidance System in MRT and LRT Stations CONTENTS Basie Tactile Tie Indicators 2 ‘TACTILE ROUTE 3 Av Typical elevated Station 4 AvTypical Underground Station 6 STANDARD DETAILS 9 AL Station Entrance 10 At Junctions — 3 Ways un At Junctions —90 degrees 2 At Special Junetions| B Level - 3 Cars 4 Level ~6 Cars 15 with PSDs 16 without PSDs 0 At Concourse Level 18 AL ARC Wide Gate 20 AUPSC. 21 AULite 23 At Disabled Toilet 25 AL Staireases/Escalator 26 AtRamp 27 AU Edge of Road Kerb 28 At Auto Door Without Ramp 29 At Auto Door With Ramp 30 Homogenous Tactiles 3 Granite Tactiles 2 ‘Stainless Steel Studs Inserts 3

Anda mungkin juga menyukai