Anda di halaman 1dari 4

before 2 March 2012 to enjoy SGD 500 Discount!!!

RegisteR and pay

Combined

Cycle Power Generation Plants


Performance Monitoring

1-5 April 2012 Abu dhAbi 16-20 April 2012 KuAlA lumpur

About The Trainer


S. Nadeem Ahmed has more than Twenty 20 years of industrial experience with career as a Mechanical Engineer with Manufacturing and Engineering MRO Industry. He in experienced in Maintenance Repair, Overhaul, Testing and Evaluation of Turbo Machinery including Aero and Aero derivative Gas Turbine Power Plants. Have worked with various concerns on life extension and evaluation of 1400 MW +, combined cycle power plants and 1600MW +, Thermal Power Plants. As an expert in Lean Six Sigma , Maintenance programs and Reliability Programs has Provisioned various companies ( Power Generation, Oil and Gas, aviation etc) on Effective Reliability Improvement Programs, Maintenance Management Strategies and Programs optimization, Lean Maintenance and Six Sigma Process Improvement Strategies integrating the same with reliability solutions. As a Global Event Trainer has Trained Number of professionals in Reliability programs, GT Power Plants, Thermal Power Plants, Rotating equipment, Maintenance Management, lean Six Sigma within and outside organization. He is Masters in Mechanical Engineering with Major in Thermal Power Systems Engineering and Six Sigma Master Black Belt.

A course designed for Performance Monitoring of Combined Cycle Power Plant Operation, Maintenance and reliability
This five-day course deals with the design and detailed operation and maintenance characteristics of a Gas turbine combined cycle power plant, with major emphasis on the major plant Components and the performance of the plant. Overall design and operation concepts along with basic operation and maintenance problems for the various pieces of Turbo-Machinery including Gas Turbines, Steam Turbines, Generators, HRSG and Balance of plant Rotating equipment will be discussed. Discussions and design parameters of the Heat Recovery and Steam Generating (HRSG) systems, the feed water heaters and the Condensers are also included. Other topics covered include plant systems viz, fuel, electrical, pneumatic, hydraulic, instrumentation, components and BOP reliability program, Thermal performance analysis, vibration analysis and on-line condition monitoring of the Power Plant. An emphasis is placed on providing practical information with minimal theory. Case studies with an aim of thorough understanding of Combined Cycle Power Plant life extension and evaluation and Performance Benchmarking for a typical 1400MW will be discussed in detail. Participants are encouraged throughout the course to be engaged in active discussions so as to maximize sharing of knowledge.

Save time and money for this course to be conducted in-house at your own convenience. Kindly contact us @

+65 9743 4606 or linda@tun.sg for more information.

www.tun.sg

Course Benefits

Improved job performance, Decision making capabilities. Understanding the Design Concepts of CCPP Components / Systems CCPP performance Evaluation throughout life Cycle Understanding Life Extension Evaluation and Recommendations Understanding CCPP Key performance Indicators in Operational Performance and Maintenance. understanding CCPP design, operation, and maintenance requirements Technology transfer between participants Operation Cost Monitoring vs Performance Understanding

Who Should Attend


Senior Operational and Maintenance Executives Operational Managers, Engineers, Technicians Plant Reliability Engineers Maintenance Managers, Engineers Power Generation Finance Managers

Agenda Day 1 Overview of the CCPP Major Plant Equipment


Gas turbines HRSG, Steam Turbine Generators Balance of Plant, systems and components viz ~ Feed water Heaters, Condensers, Boiler Feed water Pumps Plant Layout Environmental considerations Mechanical Arrangement Aero-thermal characteristics of plant equipment. ASME, API codes for Plant Equipment Design and Operational Criteria for Performance Equipment Selection criteria for Best Integrated performance. Economic aspects of Installations, Cost Per MW-Hr Consideration Cycle Analysis of the Combined Cycle Power Plant.

Modular Design Concept, Aero derivative vs Industrial Gas turbines Methods of increasing cycle efficiency and the output power Overview of fuels and materials considerations. High temperature turbines, closed cycles and other developments. Aero thermodynamic considerations, Cycle analysis of gas turbines and centrifugal compressors. Gas turbine and Axial Compressor performance calculations, Operating maps Mechanical, performance and aerodynamic aspects of gas turbines, Axial Compressors

High Temperature Materials / Coatings


Gas Turbine Materials, Turbine Blades, NGVs ( Nozzles ) Design and Operational considerations Material Behavior ~ Hot Corrosion, High Cycle and Low Cycle Fatigue ~ Effect of Fuel on GT integrated performance ~ Advance Coatings as applied to both the Hot Section Components and the Compressor

Agenda Day 2 Major Equipment Advanced Gas Turbine Technology


Classification, Types and sizes of gas turbines in combined Cycle Power Generation Technological Development Trends in Gas Turbine technology

Save time and money for this course to be conducted in-house at your own convenience. Kindly contact us @

+65 9743 4606 or linda@tun.sg for more information.

www.tun.sg

Agenda Day 3 Fuels


Types of fuels ~ Natural Gas to Heavy Fuel Oil to Low Btu Gas. Gas Turbine Performance with different fuels Variable Load Conditions, Base Load, Full Load Effects on Downstream components, HRSG , Steam turbine etc. Duct burners use in the system.

Bench Marking of CCGTPP Analysis Techniques / Tools for Power generation Data

Performance, Life Assessment for Combined Cycle Power Plant


Life Assessment Principles Stages Approach to Life Assessment Cost Effective Management Strategies Component Specific techniques Performance Targets Vs Actual

Steam Turbine Technology


Design of the Steam Turbines, Materials Sub, Super Critical cycles in Power generation High Pressure Turbine, IP and LP turbines, Performance Analysis of Steam Turbines

Agenda Day 5 Maintenance, Reliability Programs to meet Performance Targets

HRSG (Heat Recovery Steam Generator)


HRSG Design for performance, Criterias, materials Feed Water Heaters Dearators, Economizers, Preheaters, Evaporators, and Superheaters Cycling Issues, Thermal & Mechanical Fatigues. Performance Optimization techniques to assure maximum effectiveness of the HRSG. Corrosion Control programs

Power Plant Maintenance program ~ Maintenance Planning and Scheduling ~ Applying Best Maintenance Strategies and Philosophies ~ Integrating Maintenance & reliability with CCPP performance ~ Performance Documents, Review reports ~ Reliability Program, Reports ~ Condition Monitoring techniques ~ RCM program, Integrating between system, component Performance ~ Repair Vs replace decisions for Combined Cycle power Plant

BOP, Condensers, Feed Water Pumps


Condensers, Pumps performance Analysis Effects on Power Plant output & Performance Design characteristics, Charts, Maps Piping, Structure Reliability Programs Life Cycle performance Analysis Generator Performance, Load curves, Optimum Operation

Case Studies
1400 MW combined Cycle gas turbine Power plant life Extension study evaluation and Performance bench marking. Participants Interactive performance calculation workshop.

Agenda Day 4 Combined Cycle Power Plant Performance and Optimization


Power Plant Life Cycle Plant Degradation with age, Performance deterioration Maintenance program Effectiveness, Cost over life cycle Performance calculations / API, ASME PTC Performance Test Codes Performance maps / Margins for ~ Gas Turbine, Compressor, HRSG, Steam Turbine ~ BOP Rotating Equipment ~ Generators / Transformers Performance KPIs for combined Cycle Power Plant Integrating the performance together,

Save time and money for this course to be conducted in-house at your own convenience. Kindly contact us @

+65 9743 4606 or linda@tun.sg for more information.

www.tun.sg

T.U.N International 16 Jalan Kilang Timor, Redhill Forum, #03-07 Singapore 159308 Tel: 65 6376 3175 Fax: 65 6271 9029

Combined CyCle Power generation PlantS PerformanCe monitoring


1-5 ApRIl 2012, AbU dhAbI 16-20 ApRIl 2012, KUAlA lUmpUR
Event Code: WpTAIm12

4 Easy Ways to REgistER


This label contains your priority booking code. To expedite registration, please do not remove label. If you have already received a copy of this brochure, we apologise. For reasons of confidentiality, your full particulars were not available to T.U.N. International for dedupulication prior to mail drop.

phone : Fax :

+65 9743 4606 +65 6271 9029

early bird team diSCoUnt


5% off
groUP of 3 or more

7% off

groUP of 5 or more

10% off

groUP of 7 or more

Email : linda@tun.sg Online : www.tun.sg

RESERVE A SPAcE now!


q Yes! I/We Will attend Combined Cycle Power generation Plants Performance monitoring q 1-5 april 2012, abu dhabi q 16-20 april 2012, Kuala lumpur q I would like to purchase the course documentation at SGD 500 per set

CristalHotelAbuDhabi POBox72898 AbuDhabi UnitedArabEmirates


Payment methods

VEnuE & accommodation

ConcordeHotelKL, 2JalanSultanIsmail, 50250KualarLumpur, Malaysia

Cheque/Bank Draft made payable To: T.U.N INTERNATIONAl Redhill Forum, 16 Jalan Kilang Timor, #03- 07Singapore 159308 Bank Transfer Account Name Bank Name Account No Bank No branch Code Swift Code Bank Address : T.U.N INTERNATIONAl : OCBC Bank : 569-034796-001 : 7339 569 : OCBCSGSG : 65 Chulia Street, OCBC Centre, Singapore 049513 *Please Quote Ref WPTAIM12 and Invoice No. Hotel accommodation & travel costs are not included in the registration fee. A reduced corporate room rate has been arranged at the hotel for attendees at this conference. To take advantage of this special rate, please process the hotel room reservation form provided upon confirmation of your attendance.

Payment Policy
Full payment of course fee to be received by the stipulated date of training, failing which T.U.N INTERNATIONAL will exercise the right to refuse entry to the delegate.

Program Change Policy

PAckAgES - fEE PER dElEgAtE (Please tick accordingly)


FEE pER DELEGATE EARly bIRd
(Register & pay by 2 March 12)

STANdARd RATE

T.U.N INTERNATIONAL reserves the right to replace or modify the advertised speakers/topics should there be circumstances beyond the control of the organizers before the event. Any changes will be updated on our website as soon as possible.

Cancellations
If you are unable to attend the training course for which you have registered, you may send a substitute free of charge. If you cannot send a substitute or otherwise need to cancel your class registration, please provide written notice to us via e-mail at admin@tun.sg. Cancellation requests received by T.U.N INTERNATIONAL seven (7) days or more prior to the course start date will receive full credit for use in another future course with no time limit. Credit is not available for cancellation requests received by T.U.N INTERNATIONAL seven (7) or fewer days before the course start date. T.U.N INTERNATIONAL reserves the right to alter or change any part of the course. In the event T.U.N INTERNATIONAL cancel a course due to inclement weather, or other events beyond our control, the fees will be credited to a future seminar of the registrants choice. Upon registration, the registrant acknowledges that T.U.N INTERNATIONAL will not be held liable for any charges or fees incurred due to the cancellation of travel or accommodation reservations.
T.U.N INTERNATIONAL - BIz REgIsTRATION NO 53128089J

q Combined Cycle power generation plants performance Monitoring q 1-5 April 2012, Abu dhabi q 16-20 April 2012, Kuala lumpur

q SGD 5399 (Save SGD 500)

q SGD5,899

Above fees exclude any withholding taxes. Above fee includes refreshments, lunches & course materials *If you do not receive a confirmation from us within 1 business day of sending in your form, kindly contact us to re-confirm your seat.

Anda mungkin juga menyukai