Presented by
Hedayat Omidvar Member of IGU Marketing Committee Head of Communication Affairs with Science & Research Centers, Research & Technology Dept., National Iranian Gas Company No.77-Southern Aban St.-Karimkhan Ave.-Tehran-1598753113-Iran Tel:+98-21-81315646 Fax:+98-21-81315682 Email:omidvar@nigc.ir
Overview
NIGC Organization 2008 Natural Gas Refineries & Dehydration Units Iran In 2007 NIGC Transmission Systems Pipeline Projects Compressor Stations Plans Underground Gas Storage Projects Gas Treatment Capacity LNG Production Investment on Gas Infrastructure Achievements in 2025
44 Sub Companies
8 Gas Ref. Co. 30 Province Gas Co. UGS Co. Eng & Dev Co. Transmission Co CNG Co.
Commercial Co.
TMC
Caspian Sea
Shorijeh
Hashemi nejad
Gonbadly
Sarajeh Ilam
Plan
In Operation
Refinery
Fajr
South Pars Gavarzin Sarkhon
Dehydration units
BCM
77
87
2006
2007
2008
2009
2010
2011
2012
545; 19%
132; 4%
BCM;%
Source: BP Statistical Review 2008
300
245
250
277
205
200
BCM
150 100 50 0
68
78
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
132; 5%
Iran in 2007
High pressure Gas Transmission pipelines Gas Distribution Networks No. of Natural Gas Consuming Cities No. of Natural Gas Consuming Rural Areas 28000 Km 150000 Km 660 5700
76%
61% 18000 5.6 BCM 6.2 BCM
44.6
Iran
27.8 25.6 6
Saudi Arabia
7.1
TCM
Source: BP Statistical Review 2008
Qatar
16; 12%
BCM(%)
IGAT- V IGAT- VI IGAT- VII IGAT- VIII IGAT- IX IGAT- X IGAT- XI IGAT- III Last segment (Saveh-Qazvin-Rasht) North-Northeast Pipeline Northwest Pipeline
IGAT 5
Length Diameter Capacity Investment 504 km 56 inches 95 MMCM/D 2000 millions
USD
Compressor St. Commencement date 5 2008
IGAT 6
Length Diameter Capacity Investment 510 km 56 inches 95 MMCM/D 900 millions USD
Compressor St.
Commencement date
5
2008
IGAT 7
Length Diameter Capacity Investment 902 km 56 inches 110 MMCM/D 2 billions
USD
Compressor St. Commencement date 2 2009
IGAT 8
Length Diameter Capacity Investment 1050 km 56 inches 100 MMCM/D 3.3 billions
USD
Compressor St. 10
IGAT 9
Length
Diameter Capacity Investment Compressor St.
1860 km
56 inches 110 MMCM/D 8 billions USD 17
IGAT 10
Length Diameter Capacity Investment 824 km 56 inches 65 MMCM/D 635 millions
USD
Compressor St. 4
IGAT 11
Length Diameter Compressor St.
570 km 56 inches 4
Diameter
Investment
56 inches
500 millions USD
Source of gas
Commencement date
North-Northeast Pipeline
Length 790+105 km
Diameter
Investment
48,42 inches
1.5 billions USD
6 2009
Northwest Pipeline
Length Diameter Investment 280 km ,190 km 48,40 inches 750 millions USD Compressor St. Commencement date 3 2008
AZAR I
Caspian Sea
AZAR II AZAR III
Sarakhs-Neka-Rasht
IGAT I
Parchin-Mashhad
IGAT VII
Pipeline Projects
(2005-2025) Total (2025)
-
Facilities
4th Plan
5th plan
6th Plan
7th Plan
Major Pipelines
4,6,7,8,9
9,10,11,12
13,14
15,16
8262
11105
5100
5100
29567 31938
8923
11994
5511
5510
17180
23100
10600
10600
61500
Facilities
4th Plan
5th plan
6th Plan
7th Plan
Total (2025)
Compressor Stations(NO.)
35
40
35
30
140
No. of Storages
Operating capacity
60 MMSCMD (3 Months)
USD 560 Million
Investment
Refinery
Capacity(MMSCMD)
57 3.4 100 50 100 80 38
Commencement date
2011 2010 2008 2008 2012 2013 2014
Bidboland-II Ilam (Expansion) South Pars (Phases 6,7,8) South Pars (Phases 9,10) South Pars (Phases15,16,17,18) South Pars (Phases 19,20,21) South Pars (Phases 22,23,24)
LNG Production
Projects Capacity (mt/y)
10
Commencement date
2011
Iran LNG
Pars LNG
Persian LNG
10
16.2
2012
2013
Investment in 2007
Plans and Projects under implementation
(Downstream)
Achievements in 2025
The third natural gas producer in the world 10 percent share in global natural gas trade, through pipeline or by LNG Domestic pricing deregulation on the track Natural gas, dominant energy as feed stack and fuel Privatization based on article 44 of constitution completely achieved