REQUEST FOR INSPECTION

Project Name: Al Nour Tower Client : H.E. Sheik Khalid Bin Hamad Al Thani Consultant: James Cubitt & Partners Engineering Consultancy Contractor : Orientals Enterprises L.L.C.
To the Consultant Engineer`s Attn.: We request your attendance to inspect the following works: 1. Inspection Level 2. Type: 3. Works Involve: 4. Inspection Date: 5. Drawing Ref.: 6. Const. Zone: Description of Work: FIXING OF TOWER CRANE TIE-INS AT COLUMNS Contractor`s QC Verification Report: Hold STRUCTURAL TOWER CRANE TIE-IN 3-Mar-12 Witness Surveillance AL NOUR TOWER
7th FLOOR, C3 GL (M1,Y1) & (Q1,Y2)

Project No. : Date : Ref. No. : Rev. No. :

C-210 4-Mar-12 OE-IR-ST-03 0

Inspection

7. Building No. and Name: 8. Location: 9. Inspection Time: 10. Specs.:

10:00 AM

FOR INSPECTION & APPROVAL

Signature:

Date:

We certify that these works have been executed in accordance with the contract specifications and approved drawings. The subject works were also subject to quality control inspection and have been coordinated with future works of other trades.

For the Contractor: Name: Signature: Date: Engineer`s Inspection Comments: ENG. JOSEPH GEORGE

Received by Consultant Name: Signature: Date:

Inspection Date: Action Code: Approved Approved as Noted

Time of Inspection:

Revised -Resubmit

Rejected

Receipt for Acknowwledge

To the Contractor: We return hereby this action taken submittal for time schedule. The approval shall not releive the contractor of its obligations and liabilities under the contract or constitute authorization of any change of contract documents, and therefore, shall imply any recognition to contract documents, and therefore, shall not imply ang recognition whatsoever of additional time or cost to the contract. Received by Contractor: Name:

Signature:

Date:

UEST FOR INSPECTION

Inspection

7th FLOOR, C3 GL (M1,Y1) & (Q1,Y2)

e with the contract specifications and approved drawings. The subject works were also subject to e works of other trades.

Received by Consultant

Receipt for Acknowwledge

e schedule. The approval shall not releive the contractor of its obligations and liabilities nge of contract documents, and therefore, shall imply any recognition to contract n whatsoever of additional time or cost to the contract.

REQUEST FOR INSPECTION


Project Name: Al Nour Tower Client : H.E. Sheik Khalid Bin Hamad Al Thani Consultant: James Cubitt & Partners Engineering Consultancy Contractor : Orientals Enterprises L.L.C.
To the Consultant Engineer`s Attn.: We request your attendance to inspect the following works: 1. Inspection Level 2. Type: 3. Works Involve: 4. Inspection Date: 5. Drawing Ref.: 6. Const. Zone: Description of Work: CONCRETING OF TRANSFORMER PLINTH PAD & LINTEL Contractor`s QC Verification Report: Hold STRUCTURAL CONCRETING 21-Jan-12 Witness Surveillance AL NOUR TOWER
BASEMENT TRANSFORMER ROOM

Project No. : Date : Ref. No. : Rev. No. :

C-210 19-Jan-12 OE-IR-ST-02 0

Inspection

7. Building No. and Name: 8. Location: 9. Inspection Time: 10. Specs.:

10:00 AM

FOR INSPECTION & APPROVAL

Signature:

Date:

We certify that these works have been executed in accordance with the contract specifications and approved drawings. The subject works were also subject to quality control inspection and have been coordinated with future works of other trades.

For the Contractor: Name: Signature: Date: Engineer`s Inspection Comments: ENG. JOSEPH GEORGE

Received by Consultant Name: Signature: Date:

Inspection Date: Action Code: Approved Approved as Noted

Time of Inspection:

Revised -Resubmit

Rejected

Receipt for Acknowwledge

To the Contractor: We return hereby this action taken submittal for time schedule. The approval shall not releive the contractor of its obligations and liabilities under the contract or constitute authorization of any change of contract documents, and therefore, shall imply any recognition to contract documents, and therefore, shall not imply ang recognition whatsoever of additional time or cost to the contract. Received by Contractor: Name:

Signature:

Date:

UEST FOR INSPECTION

Inspection

BASEMENT TRANSFORMER ROOM

e with the contract specifications and approved drawings. The subject works were also subject to e works of other trades.

Received by Consultant

Receipt for Acknowwledge

e schedule. The approval shall not releive the contractor of its obligations and liabilities nge of contract documents, and therefore, shall imply any recognition to contract n whatsoever of additional time or cost to the contract.

REQUEST FOR INSPECTION


Project Name: Al Nour Tower Client : H.E. Sheik Khalid Bin Hamad Al Thani Consultant: James Cubitt & Partners Engineering Consultancy Contractor : Orientals Enterprises L.L.C.
To the Consultant Engineer`s Attn.: We request your attendance to inspect the following works: 1. Inspection Level 2. Type: 3. Works Involve: 4. Inspection Date: 5. Drawing Ref.: 6. Const. Zone: Description of Work: REMOVAL OF OLD SLAB FORMWORKS Contractor`s QC Verification Report: Hold STRUCTURAL DESHUTTERING 10-Jan-12 Witness Surveillance AL NOUR TOWER 19TH & 20TH FLOOR 10:00 AM Inspection

Project No. : Date : Ref. No. : Rev. No. :

C-210 10-Jan-12 OE-IR-ST-01 0

7. Building No. and Name: 8. Location: 9. Inspection Time: 10. Specs.:

FOR INSPECTION & APPROVAL

Signature:

Date:

We certify that these works have been executed in accordance with the contract specifications and approved drawings. The subject works were also subject to quality control inspection and have been coordinated with future works of other trades.

For the Contractor: Name: Signature: Date: Engineer`s Inspection Comments: ENG. ALI H. MAHDI

Received by Consultant Name: Signature: Date:

Inspection Date: Action Code: Approved Approved as Noted

Time of Inspection:

Revised -Resubmit

Rejected

Receipt for Acknowwledge

To the Contractor: We return hereby this action taken submittal for time schedule. The approval shall not releive the contractor of its obligations and liabilities under the contract or constitute authorization of any change of contract documents, and therefore, shall imply any recognition to contract documents, and therefore, shall not imply ang recognition whatsoever of additional time or cost to the contract. Received by Contractor: Name:

Signature:

Date:

UEST FOR INSPECTION

Inspection

e with the contract specifications and approved drawings. The subject works were also subject to e works of other trades.

Received by Consultant

Receipt for Acknowwledge

e schedule. The approval shall not releive the contractor of its obligations and liabilities nge of contract documents, and therefore, shall imply any recognition to contract n whatsoever of additional time or cost to the contract.