Maretial data

Grade of steel fy

Gepometric information
50 span no. 50 Length of spans c/c distance of beams Secondary beams Deck rib height(hr) Thickness of concrete deck Average thickness of concrete slab,t Stud length

Loading informations
4 20' 5' perpendicular to the ribs 3" 4.5" 5.25" 4.5" Weight of the concrete Self weight of beam Weight of steel deck Construction LL PW load FF load Miscellaneous 145pcf 10% of slab self weight 30% of beam weight 41.78 psf 25psf 25psf 10psf

Maretial data
Grade of steel fy f'c

Gepometric information
50 span no. 50 Length of spans 4 c/c distance of beams(ft) Secondary beams Deck rib height(hr) Thickness of concrete deck Average thickness of concrete slab,t Stud length

DEAD LOAD 1.Slab weight 2.Beam weight 3.Deck slab weight 4.FF+PW 5.Miscellaneous Total DL Live load Dead load on 5' span Live load on 5'span Construction dead load(ib/ft) Construction live load(lb/ft)

Factored load,Wu Factored moment, Mu Effective width (a )1/8 of beam span(ft) (b) .5 of c/c distance(ft) b-eff(ft) assume, a(in)

Y2 Select section LRFD, bMp(k-ft) Check deflection I req(in4) I from chart(in4) for PNA location 7

check selected member strength as an unshored beam under construction loads as LRFD, Stage 1 DL: Self Weight of beam(lb/ft) LL: 1.4DL Wu=1.2DL+1.4LL(lb/ft) Mu(lb-ft) (top) ksi (bottom) ksi

Check a Qn ,Kip b, in a, in a assumed = 1in. so OK Check Live Load deflection Allowable deflection l/360 (in) LL(in) Determine required number of shear stud connectors

Qn(kip) Use perpendicular deck with one 1/2-in diameter weak stud per rib in normal weig Qn(kip) Number of shear studs on each side of the beam Total number of shear connectors

Check spacing of shear connectors Since each flute is 40 in, use one stud every flute, starting at each support and proc

04 20 5 perpendicular to the ribs 3" 4.5" 5.25 4.5"

72.5 7.25 2.175 50 10

psf psf psf psf psf

142 lb/ft2 60 lb/ft2 710 300 409.625 210

1332 66578

5 5 5 1

7 W 10 x 12 83.1 deflection limited to 2.5" for construction dead load 20.34 155

h as an unshored beam under construction loads assuming adequate lateral bracing through the deck attachment to the beam flange LRFD,Stage 2 12DL:Self weight of beam+weight of deck slab+weight of wet concrete (lb/ft) 210 LL: 16.8 1.4DL 308.4 Wu=1.2DL+1.4LL 15420 Mu(lb-ft) 5.969032258 (top) ksi 5.969032258 (bottom) ksi

44.2 12 1.083333333

0.666666667 0.576640712

shear stud connectors

44.2 e 1/2-in diameter weak stud per rib in normal weight 4 ksi concrete. 7.66 6 12

stud every flute, starting at each support and proceed for 6 studs on each side of the span.

Loading informations
Weight of the concrete Self weight of beam Weight of steel deck Construction LL PW load FF load Miscellaneous 145pcf 10% of slab self weight 30% of beam weight 41.78 psf 25psf 25psf 10psf

bracing through the deck attachment to the beam flange 440.5 210 616.7 822.6 41130 15.92129032 15.92129032

de of the span.

Check with the problem of AISC manual