Anda di halaman 1dari 1

NAEEM ENGINEERING SOLUTIONS

CHICAGO PROJECT FOR WABASH AVENU UNDER BRIDGE CONNECTION AND RIVERWALK
1-Concrete pile cap quantity(CY) and form work area(SF)
calculations:

Note:
1- Stations numbering are considered in metric system.
Start
station

L(ft)

Level 1

Level2

A0

V0

Form
parameter0

S.F0

h1

h2

V1

SF1

86565.37

67.96

5'0''

4'6''

20.416

1387.47136

14.08

3140.02

5'

5'

323.069

646.138

86540.91

24.46

4'6''

3'4''

20.416

499.37536

14.08

1129.9

5'

5'

95.799

191.598

End station

86633.33
86565.37
86540.91

86491.55

49.36

3'4''

1'0''

14.291

705.40376

11.083

1794.857

3'6''

3'6''

180.984

361.968

86491.55

86435.00

56.55

1'0''

1'0''

14.291

808.15605

11.083

2056.23

3'6''

3'6''

141.375

282.75

86435.00

86416.73

18.27

1'0''

1'0''

14.29

261.09657

11.08

664.32

3'6''

3'6''

45.675

91.35

86416.73

86336.45

80.28

1'0''

1'0''

20.416

1638.99648

14.08

3708.39

5'

5'

80.82

161.64

86336.45

86283.69

52.76

1'0''

1'0''

14.291

753.99316

11.083

1918.35

3'6''

3'6''

131.9

263.8

86283.69

86207.61

76.08

1'0''

2'6''

14.291

1087.25928

11.083

2766.38

3'6''

3'6''

247.259

494.518

86207.61

86084.85

122.76

2'6''

5'0''

20.416

2506.26816

14.08

5670.79

5'0''

5'0''

460.349

920.698

86084.85

85990.78

94.07

5'0''

5'0''

20.416

1920.53312

14.08

4345.37

5'0''

5'0''

470.35

940.7

85990.78

85952.55

38.23

5'0''

3'0''

20.416

780.50368

14.08

1766.05

5'0''

5'0''

152.92

305.84

85952.55

85878.9

73.65

3'0''

3'0''

20.416

1503.6384

14.08

3402.15

5'0''

5'0''

220.95

441.9

15.67

5'0''

5'0''

10.79

(-)169.094

(-)48.316

16.5

5'0''

5'0''

6.11

201.63

280.5

13885.231

32033.98

2551.45

5102.9

Special plan (M)-S 5


(Subtraction)
Special plan (M)-S 5
(Addition)

Notes:
1The concrete sectional area was devided into two parts: (A0 with Vo and SF0 )and( elemnt 1 with V1 and SF1) , This procdure was taken according to the pouring
sequence of concrete.
2- The total concrete volume =
V0 + V1 = 13885.231 + 2551.45 = 116436.681 ft^3
3- The total area requiring form work =
SF0 + SF1 = 32033.98 + 5102.9 = 37136.88 ft^2
4-It's highly recomended to patch the
concrete area subjected to the structural slab side with bitomen so as to protect it from seepage water.
5-It's highly recomended to patch the concrete area opposing the river side with epoxy paint to reduce its cracks as it faces a big amount of vaporated water from
the river.
6-The curing time is up to 5
days for the presence of sheet piles and studs which represent a big restraint for the concrete and cause shrinkage cracks.
7- DO NOT use any "FAST setting cement" type for any reason, it produce high temprature during hardening--THe CONCRETE PILE CAP IS A MASSIVE ONE-- and
there should be precautions in pouring it. it's a must that the concrete mix designer should be there while pouring process.

2- Sheet pile wall parameters and studs


Studs for sheet Studs for hand Special waler Plate(area) for
piles (0.75''
rail 7/8''*
studs
handrail
*4.19'',22.64''
4.19', 8''
0.75*4.19'', 1'
0.75''*8''
O.C (count)
O.C(count)
O.C(count)
Continous.

bottom pile
level

Depth of
the sheet
pile(D)ft

sheet pile Area


(SF) ft2

(-)0'6''

(-)54'0''

53.5

4944.47

122

139

none

61.6133333

S14-8

(+)1'0''

(-)54'0''

55

6829.9

165

186

124

82.7866667

S14-6

(-)1'0''

(-)54'0''

53

4254.84

106

120

none

53.52

S14-8

128.84

(+)1'0''

(-)54'0''

55

7086.2

171

193

129

85.8933333

S14-6

65.93

(-)1'0''

(-)54'0''

53

3494.29

87

99

none

43.9533333

S14-8

86084.85

56.83

0'0''

(-)54'0''

54

3068.82

75

85

none

37.8866667

S14-8

86084.85

85990.78

94.07

(-)1'6''

(-)54'0''

52.5

4938.675

125

141

none

62.7133333

S14-8

85990.78

85952.55

38.23

(-)0'6''

(-)54'0''

53.5

2045.305

51

57

none

25.4866667

S14-8

85952.55

85878.9

73.65

(-)0'6''

(-)54'0''

53.5

3940.275

98

110

none

49.1

S14-8

55

1045

6 ,see sec
s15-5

no hand rail
here

S14-6

41647.775

1006

START
STATION

END STATION

86633.33

86540.91

92.42

86540.91

86416.73

124.18

86416.73

86336.45

80.28

86336.45

86207.61

86207.61

86141.68

86141.68

Special S15-M

Length of
top pile level
sheet pile (LF)

19

(+)1'0''

(-)54'0''

no hand rail 38, see Sec


here
S15-5

1132

291

SECTION
INVOLVED

502.9533

3-Sheet pile Wall waler and Tie back system and material list
Tie rod 1.75'', exits 10' on continous
START
END STATION
STATION

Tie rod accessories

Total wight

plate with new


concrete cap
2''*8''*8''
"count"

L(ft)
Count

L (average) L(total),ft

lb/ft

plate with
exisiting
concrete cap
2''*24''*4''
"count"

Waler C15*33.9, 33.9 lb/ft

embeded
stainless steel
rod 1.25''
*15'', 7 per one
rod "count"

L(total)

total wight

Waler-sheet pile wall Bolts and plate


3/4'' *2'' sch.
40 ,4/3' O.C
"Count"

1'' A449
"Count"

1.5''*4''*8''
plate (Galv.)
"Count"

86633.33

86565.37

67.96

17

115.532

8.19

946.20708

14

48

190.288

6450.7632

63

32

32

86565.37

86416.73

148.64

15

23.33

346.777

8.19

2840.10461

30

15

104

416.192

14108.9088

139

69

69

86416.73

86283.69

133.04

13

41.65

554.112

8.19

4538.174

27

13

93

372.512

12628.1568

124

62

62

86283.69

86084.85

198.84

20

23.33

463.894

8.19

3799.28957

40

20

139

556.752

18873.8928

186

93

93

86084.85

85952.55

132.3

13

26.33

348.346

8.19

2852.95292

26

13

93

370.44

12557.916

123

62

62

85952.55

85878.9

73.65

26.5

195.173

8.19

1598.46278

15

52

206.22

6990.858

69

34

34

16575.191

151

75

528

71610.4956

704

352

352

**Special Plan S1-M--->S15 material list**


6'' Sch. 80 compression strut

plate 1/2''
*10'' *1''

Waler Details

3/4'' A325
Bolts

Thickness

length

count

count

count

Section

length(ft)

count

lb/ft

wight(lb)

3/16''

12'0''

16

HP14*73

16.25

73

2372.5

Anda mungkin juga menyukai