Installation Tools 2 Installation Scenarios 3 Procedure 5 BBU Hardware 6 CPRI Cable Configuration Principles 7 Installing the BBU in the APM30 9 Installing the BBU in the APM30H(Ver.A) 17 Installing the BBU in the APM30(+24V) 19 Installing the BBU in the TMC 21 Installing the BBU in the TMC11H(Ver.A) 22 Installing the BBU in the APM30H(Ver.B) 26 Installing the BBU in the TMC11H(Ver.B) 28 Installing the BBU in the APM30H (Ver.B, +24V) 30 Installing the BBU in the 19-Inch Cabinet 32 Installing the BBU on the Wall 39 Installing the BBU in the OMB Cabinet 43 BBU Hardware Installation Checklist 48 Powering On the BBU 48 Obtaining the ESN 49 Appendix 49 Change History 56

Copyright Huawei Technologies Co., Ltd. 2010. All rights reserved.

Installation Tools
Phillips screwdriver (M3 to M6) Flat-head screwdriver (M3 to M6)

Insulated screwdriver

Diagonal pliers

Combination wrench Adjustable wrench (capacity 32 mm)

Socket wrench

Torque wrench

Power cable crimping tool

RJ11 crimping tool

Cable cutter

Rubber Mallet

Soldering iron

Wire stripper

Hammer drill (16)

Heat gun

Level

Multimeter

Measuring tape

Vacuum cleaner

Installation Scenarios
1. APM30 2. APM30H(Ver.A)

3. APM30(+24V

4. TMC

5. TMC11H(Ver.A)

Installation Scenarios
6. APM30H(Ver.B) 7. TMC11H(Ver.B)

8. APM30H(Ver.B, +24V)

9. In 19-inch cabinet

10. On the Wall

11. OMB

Procedure

BBU Hardware
1. Appearance of the BBU (Unit: mm)

2. Configuration Principles of the BBU Boards

Board

Mandatory /Optional
Mandatory Mandatory

Full Configuration
2 4

Installation Slot
S6 and S7 S0 to S3

Remarks

WMPT WBBP

Preferentially configured in S7. The WBBP is installed in S3 by default. If extension CPRI ports are required, the board is installed in S2. If extension CPRI ports are not required, the priority of the installation position of the board is from s0 to S1, and then to S2.

UBFA UPEU UEIU UTRP

Mandatory Mandatory Optional Optional

1 2 1 4

S16 S18 or S19 S18 S0/S1/S4/S5

Configured in S16. Preferentially configured in S19. Preferentially configured in S18. The priority of the UTRP installation position of the board is from S4 to S5, and then to S0 and S1. -

USCU

Optional

S1 or S0

The UELP and UFLP need to be optionally configured in the BBU or SLPU on site according to the field requirements.

BBU Hardware b A Single WBBPd


6RRU:

R R U

R R U

R R U

R R U

R R U

R R U

WBBPd

c WBBPb+WBBPd

R R U

R R U

R R U

R R U

R R U

R F U

WBBPd

WBBPa/WBBPb

WBBPd

WBBPa/WBBPb

CPRI Cable Configuration Principles a A Single WBBPa or WBBPb

R R U

R R U

R R U

WBBPa/WBBPb

b A Single WBBPd
3RRU

R R U

R R U

R R U

WBBPd

Installing the BBU in the APM30 a Cable connections

a b f c b e d a e c

Cable

Connector Type
OT terminal 3V3 connector

Connects to
LOAD3 on PDU PWR on BBU E1/T1 on WMPT INSIDE on UELP OUTSIDE on UELP Transmission equipment

a b

BBU power cable

E1 transfer cable

DB26 connector DB26 connector

E1/T1 cable

DB26 connector The connector needs to be made on site according to the field requirements.

Installing the BBU in the APM30 a Cable connections


Cable Connector Type
The connector needs to be made on site according to the field requirements. DLC

Connects to
TX/RX on APMI

Monitoring cable

MON1on BBU EXT-ALM0 or EXT-ALM1 on UPEU Associated alarm device CPRI on WBBP CPRI on RRU

e f

External alarm cable

RJ45 connector RJ45 connector

CPRI optical cable

DLC DLC

b Cable connections of the BBU


Alarm Equipment Monitoring Equipment Transmission equipment

c b h h f a BBU Power Cable b E1 surge protection transfer cable c E1/T1 Cable d Monitoring Cable g b e a
Power System

e Alarm Cable f CPRI Optical cable g FE/GE Ethernet cable h FE surge protection transfer cable

10

Installing the BBU in the APM30 c Installing BBU


1. Install the mounting ears at both sides of the BBU reversely.

PDU

BBU M6 bolt

2. Slide the BBU case into the cabinet.

d Installing cables
1. Install BBU power cable.
Connect the OT terminal of the BBU power cable to the LOAD3 terminal of the PDU, and then fix the 3V3 connector of the BBU power cable to the UPEU port on the BBU.

LOAD3 NEG(-) RNT(+)

PWR

The power cable is to be made depending on field requirements.

11

Installing the BBU in the APM30 d Installing the BBU cables


2. Install optical cables.
Connect the longer end of the optical cable to the CPRI port on the WBBP. Then, connect the other end to the RRU. For details on the CPRI optical cable connections, see CPRI Cable Configuration Principles on pages 8-9.

Turn the puller on the optical module outwards, insert the optical module into CPRI ports. Turn outwards the puller on the optical module.

Optical module Puller

Remove the dustproof caps from the optical connectors. Insert the optical connector at one end of the CPRI optical cable into the optical module. lead the CPRI optical cable out of the cabinet along the left side of the cabinet.

Wrap the fiber tail with the winding pipe till the first cable tie.
Connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU. Connect the fiber tails labeled 2A and 2B to one of the CPRI ports on the WBBP

Optical cable connector

Winding pipe

12

Installing the BBU in the APM30 d Installing the BBU cables


3Install the E1 transfer cable.
Fix one end of the E1/T1 surge protection transfer cableto the INSIDE port on the UELP. Fix the other end to the E1/T1 port on the WMPT.

4Install the E1/T1 cable.


Cabling the E1/T1 cable. Fix one end of the E1/T1 cable to the OUTSIDE port on the UELP. Strip the jacket off the E1/T1 cable near the grounding point at the lower right corner of the cabinet to expose the shielding layer.
Shielding layer of the E1/T1 cable (25mm)

E1/T1 cable

E1/T1 surge protection transfer cable grounding clip

Thread the FE/GE Ethernet cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the FE/GE Ethernet cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the grounding bolt of the APM30.
Shielding layer of the FE/GE Ethernet cable

INSIDE

OUTSIDE

E1/T1

Ensure that both ends of the E1/T1 cable are disconnected. Then, weld connectors to the bare wires at one end of the E1/T1 cable all at once.

13

Installing the BBU in the APM30 d Installing the BBU Cables


5. Install the FE/GE surge protection transfer cable (FE transmission mode).
Connect one end of the FE/GE surge protection transfer cable to the FE0 port near the INSIDE label on the UFLP and the other end to the FE0 port on the WMPT.

6. Install the FE/GE Ethernet cable (FE transmission).


Connect one end of the FE/GE Ethernet cable to the FE0 port near the OUTSIDE label on the UFLP. Then, lead the other end out of the cabinet along the right side of the cabinet.
FE/GE surge protection transfer cable

Strip the jacket off the FE/GE Ethernet cable near the grounding point at the lower right corner of the cabinet to expose the shielding layer. 25mm
INSIDE FE0

FE/GE Ethernet cable

OUTSIDE FE0

FE0

Thread the FE/GE Ethernet cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the FE/GE Ethernet cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the grounding bolt of the APM30.
Shielding layer of the FE/GE Ethernet cable

14

Installing the BBU in the APM30 d Installing the BBU Cables


7. Install the monitoring signal cable between the APMI and the BBU.
Fix the RJ45 connector at one end of the cable to the MON1 port on the UPEU. MON1

TX+

RX-

TX-

RX+

Monitoring signal cable between the APMI and the BBU

EXT-ALM1 External alarm cable

8. Install the external alarm cable.


Connect one end of the alarm cable to the EXTALM port on the UPEU, and the other end to the associated alarm device. The port on the external alarm device is added depending on field requirements.

15

Installing the BBU in the APM30 d Installing the BBU Cables


9. Install the EMUA monitoring signal cable.
Cut off the RJ45 connector of the EMUA monitoring signal cable, and then connect the four exposed bare wires to the RX+, RX-, TX+, and TX- ports on the APMI. For the relationship between the ports and wires. Fix the DB9 connector to the corresponding port on the EMUA.

EMUA monitoring signal cable Pin on the RJ45 Connector


X1.1 X1.2 X1.4 X1.5

Pin on the DB9 Male Connector


X2.3 X2.7 X2.2 X2.6

Color

Type

Port on the APMI

White Orange Blue White

Twisted pair

TX+ TX-

Twisted pair

RX+ RX-

16

Installing the BBU in the APM30H(Ver.A) a BBU Cable Connections


The procedure for installing the BBU case in the APM30H is the same as that in the APM30. For details, see pages 815. The following figure shows the cable connections of the BBU. Page 17 shows how to install the monitoring signal cable between the HEUA and the BBU in the APM30H.

b f

c b

d a c e

Cable

Installation Position One end is connected to... The other end is connected to...
PWR port on the BBU INSIDE port on the UELP External transmission device MON1 port on the BBU Associated alarm device CPRI port on the RRU

BBU power cable

LOAD3 terminal of the PDU E1/T1 port on the WMPT OUTSIDE port on the UELP COM IN port on the HEUA EXT-ALM0 or EXT-ALM1 on UPEU CPRI port on the WBBP

b E1 transfer cable c E1/T1 cable d e f


Monitoring signal cable External alarm cable CPRI optical cable

17

Installing the BBU in the APM30H(Ver.A) b Installing the Monitoring Signal Cable between the HEUA and
the BBU

HEUA

COM IN MON1

UPEU on the BBU

18

Installing the BBU in the APM30(+24 V) a BBU Cable Connections


The procedure for installing the BBU in the APM30 (+24 V) is the same as that in the APM30. For details, see pages 815. The following figure shows the cable connections of the BBU. Page 19 shows how to install the monitoring signal cable of the cabinet.

a b c b f d a e

Cable

Installation Position One end is connected to... The other end is connected to...
PWR port on the BBU INSIDE port on the UELP External transmission device EXT-ALM1 on the UPEU

BBU power cable

LOAD6 terminal of the DCDU E1/T1 port on the WMPT OUTSIDE port on the UELP Monitoring port on the cabinet

b E1 surge protection
transfer cable

c d

E1/T1 cable

Monitoring signal cable for the cabinet External alarm cable CPRI optical cable

e f

EXT-ALM0 or EXT-ALM1 on UPEU CPRI port on the WBBP

Associated alarm device CPRI port on the RRU

19

Installing the BBU in the APM30(+24 V) b Installing the Monitoring Signal Cable of the Cabinet

Pin assignment of the monitoring signal cable of the cabinet Pin on the RJ45 Connector Pin on the RJ45 Connector Wire Color Wire Type Monitoring equipment

X1.1 X1.2 X1.3 X1.6 X1.5 X1.4 X1.7 X1.8

X2.1 X2.2 X2.3 X2.6 X2.5 X2.4 X2.7 X2.8

White/orange Orange White/green Green White/blue Blue White/brown Brown

Twisted pair

APMI

Twisted pair

DCDU-03B

Twisted pair

Door status sensor

Twisted pair

DC/DC Power System

20

Installing the BBU in the TMC a


BBU Cable Connections

The procedure for installing the BBU in the TMC is the same as that in the APM30. For details, see pages 815.

a b e c b d a

Cable From...

Installation Position To...


PWR port on the BBU INSIDE port on the UELP External transmission device ALM1 port on the BBU CPRI port on the RRU

a BBU power cable b E1 transfer cable c E1/T1 cable d e


Monitoring signal cable CPRI optical cable

LOAD6 terminal of the PDU E1/T1 port on the WMPT OUTSIDE port on the UELP Wiring terminal of cabinet monitoring CPRI port on the WBBP

21

Installing the BBU in the TMC b Installing the BBU Cables


APMI Wiring terminals for the surge protection and alarm cables

c d b a
Door status sensor

Installing the TMC alarm cable: a. Fix the RJ45 connector at one end of the alarm cable to the EXT_ALM1 port on the BBU. b. Connect the two bare terminals X1.4 (blue) and X1.5 (white) to the alarm wiring terminals on the door status sensor. c. Connect the two bare terminals X1.1 (white) and X1.2 (orange) to the OUT+ and OUT- alarm wiring terminals on the APMI. d. Connect the two bare terminals X1.3 (white) and X1.6 (green) to the alarm wiring terminals on the DCDU.

The white and green bare wire terminals are not distinguished from different wiring terminals.

22

Installing the BBU in the TMC11H(Ver.A) a


Installing the BBU

The procedure for installing the BBU in the TMC11H is the same as that in the APM30. For details, see pages 815.

d a b e c b a d

Cable From...

Installation Position To...


PWR port on the BBU INSIDE port on the UELP External transmission device MON1 port on the BBU CPRI port on the RRU

a BBU power cable b E1 transfer cable c E1/T1 cable d e


Monitoring signal cable CPRI optical cable

LOAD6 terminal on the DCDU E1/T1 port on the WMPT OUTSIDE port on the UELP Wiring terminal of cabinet monitoring CPRI port on the WBBP

23

Installing the BBU in the APM30H(Ver.B) a Installing the BBU Case


1. Installing the BBU Case Slide the BBU close to the EPS to the 2 U space along the guide rails, and then tighten the four M6 screws on the BBU panel.
M6X16

2. Installing the SLPU Case Slide the SLPU box into the 1U space above the EPS in the cabinet, and then fasten the four M6 screws on the panel.
M6X16

EPS

2Nm

2Nm

BBU SLPU

M6 screws.

b BBU Cable Connections


Alarm Equipment Monitoring Equipment

e d
Transmission equipment

h f b h a BBU Power Cable b E1 surge protection transfer cable c E1/T1 cable d Monitoring Cable 24

a
Power System

g e Alarm Cable f CPRI Optical cable g FE/GE Ethernet cable h FE surge protection transfer cable

Installing the BBU in the APM30H(Ver.B) c Installing the BBU cables


1. Install BBU power cable. Connect the OT terminal at one end to the LOAD1 terminal of the EPS01, and then link the 3V3 connector at the other end to the -48V port on the BBU. LOAD1

2. Install the CPRI optical cable . Fix one end of the CPRI optical cable to the CPRI port on the WBBP, fix the other end to the port labeled CPRI_W on the RRU. For details on the CPRI optical cable connections, see CPRI Cable Configuration Principles on pages 8-9.
2.1. Turn the puller on the optical module outwards, insert the optical module to the port CPRI 0 to CPRI2. 2.2. Remove the dustproof caps from the optical connectors. Insert the optical connector at one end of the CPRI optical cable into the optical module. lead the CPRI optical cable out of the cabinet along the left side of the cabinet. 2.3. Wrap the winding pipe at the fiber tails.

Optical module Puller

TX

RX

Winding pipe

Connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU. Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI2 ports on the WMPT

25

Installing the BBU in the APM30H(Ver.B) c Installing the BBU cables


3. Install the E1 transfer cable. 3.1. Fix one end of the E1/T1 surge protection transfer cableto the INSIDE port on the UELP . 3.2. Fix the other end to the E1/T1 port on the WMPT.

4. Install the E1/T1 cable. 4.1. Cabling the E1/T1 cable. 4.2. Fix one end of the E1/T1 cable to the OUTSIDE port on the UELP.

Ensure that both ends of the E1/T1 cable are disconnected. Then, weld connectors to the bare wires at one end of the E1/T1 cable all at once.

E1/T1 surge protection transfer cable

E1/T1 cable

5. Install the FE/GE surge protection transfer cable (FE transmission mode). Connect one end of the FE/GE surge protection transfer cable to the FE0 port near the INSIDE label on the UFLP and the other end to the FE0 port on the WMPT. 6. Install the FE/GE Ethernet cable (FE transmission). Connect one end of the FE/GE Ethernet cable to the FE0 port near the OUTSIDE label on the UFLP. Then, lead the other end out of the cabinet along the right side of the cabinet.

FE transfer cable FE/GE Ethernet cable

26

Installing the BBU in the APM30H(Ver.B) c Installing the BBU Cables


7. Install the monitoring signal cable between the CMUA and the BBU.

COM_IN

MON1

27

Installing the BBU in the TMC11H(Ver.B) a Installing the BBU


1. Slide the BBU to the TMC11H along guide rails, and then tighten the four M6 screws on the BBU panel.
M6X16

2. Slide the SLPU to the TMC11H along guide rails, and then tighten the four M6 screws on the SLPU panel.
M6X16

DCDU

2Nm

2Nm

SLPU BBU

b Installing BBU Cables


Installation the BBU power cable.

LOAD6

28

Installing the BBU in the TMC11H(Ver.B) b Installing BBU Cables


The procedure for installing BBU cables (except the power cable) in the TMC11H cabinet is the same as that in the APM30H(Ver.B). For details, see the description on pages 23 to 26. For details on the BBU cable connections, see BBU Cable Connections on pages 23.

Cable
CPRI optical cable

Connector Type
DLC

Connects to
The connectors labeled 2A and 2B are connected to the optical module on the port labeled CPRI0 to CPRI2 on the WBBP. The connectors labeled 1A and 1B are connected to the optical module on the port labeled CPRI_W on the RRU. OUTSIDE port on the UELP Port on the transmission device

DLC

E1/T1 cable

DB26 connector The connector needs to be made on site according to the field requirements.

E1 Surge Protection Transfer Cable

DB26 connector DB25 connector

E1/T1 port on the WMPT INSIDE port on the UELP FE0 port at the OUTSIDE side on the UFLP Port on the transmission device FE0 port at the INSIDE side on the UFLP FE0 port on the WMPT MON1 port on the BBU COM_IN port on the CMUA -48V port on the UPEU LOAD6 port on the DCDU-03B

FE/GE Ethernet cable

RJ45 connector RJ45 connector

FE Surge Protection Transfer Cable Monitoring signal cable between the CMUA and the BBU BBU power cable

RJ45 connector RJ45 connector RJ45 connector RJ45 connector 3V3 connector OT terminal

29

Installing the BBU in the APM30H(Ver.B, +24V) a Installing the BBU


1. Slide the BBU to the APM30H (+24V) along guide rails, and then tighten the four M6 screws on the BBU panel.
M6X16

2. Slide the SLPU to the APM30H (+24V) along guide rails, and then tighten the four M6 screws on the SLPU panel. M6X16

2Nm

2Nm

EPS48100D

SLPU

BBU

b Installing BBU Cables


Installing the monitoring signal cable for the PSU and the in-position signal cable for the PSU ALM PRESENT

EXT-ALM1

EXT-ALM0

30

Installing the BBU in the APM30H(Ver.B, +24V) b Installing BBU Cables


The procedure for installing BBU cables (except the power cable) in the APM30H(+24 V) cabinet is the same as that in the APM30H(Ver.B). For details, see the description on pages 23 to 26. For details on the BBU cable connections, see BBU Cable Connections on pages 23.

Cable
CPRI optical cable

Connector Type
DLC

Connects to
The connectors labeled 2A and 2B are connected to the optical module on the port labeled CPRI0 to CPRI2 on the WBBP. The connectors labeled 1A and 1B are connected to the optical module on the port labeled CPRI_W on the RRU. E1/T1 port on the WMPT Port on the transmission device

DLC

E1/T1 cable

DB26 Connector The connector needs to be made on site according to the field requirements.

E1 Surge Protection Transfer Cable FE/GE Ethernet cable

DB26 connector DB25 connector RJ45 connector RJ45 connector RJ45 connector RJ45 connector RJ45 connector RJ45 connector RJ-45 RJ-45 RJ-45 Cord end terminal 3V3 OT

E1/T1 port on the WMPT INSIDE port on the UELP FE0 port on the WMPT Port on the transmission device FE0 port at the INSIDE side on the UFLP FE0 port on the WMPT MON1 port on the BBU COM_IN port on the CMUA EXT-ALM0 port on the UPEU ALM port on the EPS48100D EXT-ALM1 port on the UPEU PRESENT port on the EPS48100D -48V port on the UPEU LOAD6 port on the DCDU-03

FE Surge Protection Transfer Cable Monitoring signal cable between the CMUA and the BBU Monitoring signal cable for the PSU In-position signal cable for the PSU BBU power cable

31

Installing the BBU in the 19-Inch Cabinet a BBU Cable Connections


k i f g c e j
Cable Connector Type
OT terminal 3V3 connector

d b a

Connected to
LOAD6 port on the DCDU PWR port on the BBU External transmission equipment

a b c d e f g

BBU power cable

E1/T1 cable

Prepared according to actual requirements at sites

DB26 connector FE/GE Ethernet cable RJ45 connector RJ45 connector Monitoring signal cable RJ45 connector RJ45 connector CPRI optical fiber DLC connector DLC connector PPS signal cable RJ45 connector Prepared according to actual requirements at sites

E1/T1 port on the WMPT External transmission equipment FE0 port on the WMPT External transmission equipment MON or ALM port on the BBU CPRI port on the RRU CPRI port on the BBU PPS port on the WGRU RGPS port on the USCU

GPS signal cable

Prepared according to actual requirements at sites

COM1 port on the WGRU

RJ45 connector

RGPS port on the USCU LOAD7 to LOAD8 ports on the DCDU POWER port on the rear panel of the WGRU External power supply equipment NEG(-) and RTN(+) ports on the DCDU Ground terminal of the BBU Outdoor ground bar GPS antenna ATN port on the rear panel of the WGRU

h i j k

WGRU power cable

OT terminal Two-hole male connector

DCDU power cable

OT terminal OT terminal

PGND cable of the BBU

OT terminal (6mm-M4) OT terminal (6mm-M8)

Clock signal cable

SMA male connector N-shaped female connector

32

Installing the BBU in the 19-Inch Cabinet b Space Requirements

25 mm on the left of the BBU for ventilation 25 mm on the right of the BBU for ventilation 70 mm in front of the BBU for cabling A minimum of 800 mm in front of the panel for maintenance

c Installing the BBU Case


Slide the BBU case into the cabinet. Then, tighten the four M6 screws.

33

Installing the BBU in the 19-Inch Cabinet d Installing the WGRU (optional)
Slide the WGRU case into the cabinet, and tighten the four M6 screws.

Front

Back

WGRU

25 mm on the left of the WGRU for ventilation 25 mm on the right of the WGRU for ventilation 70 mm in front of the WGRU for cabling A minimum of 800 mm in front of the panel for maintenance

e Installing the DCDU-03B


Slide the DCDU-03B case into the cabinet, and tighten the four M6 screws.

34

Installing the BBU in the 19-Inch Cabinet f


Installing BBU Cables

1. Install the PGND cable.

Grounding bolt on the right side of the BBU

Grounding bar

2. Install the power cable.

LOAD6

PWR

3. Install the signal cable.

EXT-ALM0/1

MON0/1

35

Installing the BBU in the 19-Inch Cabinet f


Installing BBU Cables
4. Install the CPRI optical cable and the E1/T1 cable.
Connect the longer end of the optical cable to CPRI0, CPRI1, or CPRI2 on the WBBP. Then, connect the other end to the RRU.

E1/T1

Turn the puller on the optical module outwards, insert the optical module into CPRI ports. Turn outwards the puller on the optical module.

Optical module Puller

Remove the dustproof caps from the optical connectors. Insert the optical connector at one end of the CPRI optical cable into the optical module. Lead the CPRI optical cable out of the cabinet along the left side of the cabinet.

CPRI optical cable

Winding pipe

36

Installing the BBU in the 19-Inch Cabinet g


Installing the WGRU Cables

1. Install the PGND cable.


Back Grounding bar

Grounding bolt on the right side of the WGRU

The PGND cable is connected to the closest grounding bar.

2. Install the GPS clock signal cable.

Back

The GPS clock signal cable is routed upwards along the column of the cabinet.

ANT

3. Install the power cable.


Back

POWER LOAD8

The power cable is routed from the output terminal on the DCDU to the back, avoiding the front panels of the DCDU and WGRU.

37

Installing the BBU in the 19-Inch Cabinet g


Installing the WGRU Cables

4. Install the signal cable.

The GPS signal is transmitted over the COM1 port and the PPS signal is transmitted over the PPS1 port.

Port

Pin

Port

Silkscre en 1S+

Wire Color Orange and white Orange Orange and white Orange

WGRU-PPS1

Pin 1CLK1_PPS_TXD+ Pin 2-CLK1_PPS_TXDPin 1COM1_COMRXD+ Pin 2COM1_COMRXDPin 3COM1_COM_TXD+ Pin 6COM1_COM_TXD-

USCU-RGPS

WGRU-PPS1 WGRU-COM1

USCU-RGPS USCU-RGPS

1STX+

WGRU-COM1

USCU-RGPS

TX-

WGRU-COM1

USCU-RGPS

RX+

Green and white Green

WGRU-COM1

USCU-RGPS

RX-

38

Installing the BBU on the Wall a BBU Cable Connections

e c b d

a f

Cable

Connector Type
OT terminal (6mm-M4) OT terminal (6mm-M8)

Connects to
Grounding bolt on the BBU Nearest grounding bar The connectors labeled 2A and 2B are connected to the optical module on the port labeled CPRI0 to CPRI2 on the WBBP. The connectors labeled 1A and 1B are connected to the optical module on the port labeled CPRI_W on the RRU.

a b

BBU PGND cable

CPRI optical cable

DLC

DLC

E1/T1 cable

DB26 Connector The connector needs to be made on site according to the field requirements.

E1/T1 port on the WMPT


Port on the transmission device

FE/GE Ethernet cable

RJ45 connector RJ45 connector


RJ-45 RJ-45

FE0 port on the WMPT


Port on the transmission device

e
BBU alarm cable (optional) MON1 port on the BBU Port on the external monitoring device

f
BBU power cable

3V3 OT

-48V port on the UPEU LOAD6 port on the DCDU-03

39

Installing the BBU on the Wall a Space Requirements


A single BBU BBUDCDU-03B DCDU-03B 20mm BBU
50 50 mm
60 0m

mm

0mm 10
m

800mm

The DCDU is installed near the BBU.

a Installing the BBU Case b


Install the mounting ears for wall installation.
M6X12

Mounting ear on the BBU case


2Nm

Mounting ear for wall installation

40

Installing the BBU on the Wall c Installing the BBU


Place the mounting ears for wall installation against the wall, and then use the marking pen to mark the holes of the mounting ears for wall installation.

wall

BBU

a a Install the expansion bolts. e Installing the BBU Case d


Bolt M660 Spring washer 6 Flat washer 6 Expansion tube

Flat washer Spring washer M6X60

45Nm

41

Installing the BBU on the Wall f


Installing the DCDU-03B Case
1. Installing the mounting ears of the DCDU-03B. 2. Place the mounting ears for wall installation against the wall, and then use the marker to mark the holes of the mounting ears for wall installation.

Wall
M6X12

2Nm

3. Install the expansion bolt.

4. Install the DCDU-03 on the wall.


Bolt M6 x 60 Nut Spring washer 6 Flat washer 6

Expansion tube

55mm60mm

M6X60

45Nm
20mm

42

Installing the BBU in the OMB Cabinet a Installing the brackets on the metal pole and mounting plate
1. Install the brackets on the metal pole.
Use a level bar to adjust the levelness of the brackets to ensure that the front and back brackets are on the same plane.
M10x110
Flat washer Spring washer Bolt

255-306 kgfcm

2. Install the mounting plate.


M10X40

255~306kgfcm

Flat Spring washer washer Bolt

appearance of the mounting plate

43

Installing the BBU in the OMB Cabinet b Installing the OMB Cabinet
Slide the BBU case into the OMB cabinet gently. Then, tighten the four M6 screws.

Ensure the FAN is in the bottom when installing the BBU.

c Installing the BBU Cables


1. Install the PGND cable of OMB cabinet.

Grounding bar

44

Installing the BBU in the OMB Cabinet c Installing the BBU Cables
2. Install the input power cable.

NEG(-) RNT (+)

3. Install the BBU power cable.

LOAD6

45

Installing the BBU in the OMB Cabinet c Installing the BBU Cables
4. Install the E1/T1 cable (E1 transmission). a
OUTSIDE E1/T1 surge protection transfer cable E1/T1

E1/T1 cable INSIDE

E1/T1 surge protection transfer cable

a d c

b c

PGND

Shielding layer (25 mm)

Shielding layer

46

Installing the BBU in the OMB Cabinet c Installing the BBU Cables
5. Install the FE/GE Ethernet cable (FE transmission). c a
FE/GE Ethernet cable
OUTSIDE FE0

FE/GE surge protection transfer cable

FE0

a
INSIDE FE0

c b

FE/GE surge protection transfer cable

6. Install the CPRI optical cable.


Connect the longer end of the optical cable to CPRI0, CPRI1, or CPRI2 on the WBBP. Then, connect the other end to the RRU.

1. Insert the optical module into the CPRI0, CPRI1, or CPRI2 port. 2. Turn outwards the puller on the optical module.

Optical module

Puller

3. Remove the dustproof caps from the optical connectors. 4. Insert the optical connector at one end of the CPRI optical cable into the optical module. lead the CPRI optical cable out of the cabinet along the left side of the cabinet.

47

BBU Hardware Installation Checklist


SN
1

Item
All self-made PGND cables are copper-based with the proper wire diameters. No breaking device such as switch and fuse is allowed for the electric connection of the grounding system. No short circuit is allowed. Each terminal on the grounding bar can be connected with only one wiring terminal of the PGND cable. The redundant part of the power cable or PGND cable is stripped off rather than coiled. The terminals at both ends of the power cable or PGND cable are securely soldered or crimped. The bare wires and the terminal handles at the wiring terminals are coated with heat-shrinkable tubes. The flat washer and the spring washer are well mounted on all OT terminals. All cables are connected securely and reliably. Pay special attention to the cable connections at the bottom of the cabinet. The cables are neatly and tightly bound. The cable ties are evenly spaced and face the same direction. The power cable, PGND cable, feeder, optical cable and the E1/T1/FE signal cable are bound separately with a spacing of larger than 3 cm. The cable layout facilitates maintenance and future capacity expansion. And the bending radius of the cables meet the requirements. All the labels at both ends of the cables are legible. The extra length of each indoor cable tie is cut, and the cut surface is smooth without sharp edges. An extra length of 3 mm to 5 mm is resereved for each outdoor cable tie. The idle connectors of the cables are properly protected.

2 3 4 5 6 7 8 9 10 11 12

Powering On the BBU


Start a The input voltage of the BBU stays within a normal range. If +24 V DC power is used, the input voltage ranges from +21.6 V DC to +29 V DC. If -48 V DC power is used, the input voltage ranges from -38.4 V DC to -57 V DC. If 220 V AC power is used, the input voltage rages from 176 V AC to 290 V AC. b Is the status of the LEDs on the BBU normal? No
Status of the LEDs on the BBU: When the WMPT or WBBP runs properly, RUN LED: ON for 1s and OFF for 1s ALM: OFF ACT: ON When the UPEU runs properly, RUN LED: ON

a Does the input voltage of the BBU stay within a normal range? Yes

No Rectify the fault

Power on the BBU

Rectify the fault

Yes End

48

Obtaining the ESN


Record the Electronic Serial Number (ESN) shown on the label attached to the mounting ear of the BBU, and report the ESN to the engineer for the commissioning of the base station.

ESN

Appendix a
Checking the DIP Switches of the BBU

Wear an ESD wrist strap or a pair of ESD gloves when performing operations related to the boards, as shown in the figure below.

ESD strap

ESD gloves

Removing the BBU Boards

49

Appendix c Setting the DIP Switches of the PMU


No. 15 Function Defining the communication address of the PMU Operation (1) Switches 1 to 5 correspond to bits 0 to 4. ON:1; OFF: 0 For example: to set the address of PMU to 3, set switches 3 to 5 as OFF. (2) Default setting before delivery: 1 (BIT0), ON 2 (BIT1), ON 3 (BIT2), OFF 4 (BIT3), OFF 5 (BIT4), OFF 6 Selecting baud rate for communicating with the BTS Set as ON, indicating that the baud rate is 9600. (If it is set as OFF, the baud rate is 19200.) 7 and 8 Reserved and not defined Set as OFF

Set the DIP switches of the PMU

50

Appendix d Checking the DIP Switches of the UELP


The black part indicates the position of a DIP switch.

Settings of the DIP switches on the UELP


75-ohm E1 Mode

Other Modes

Checking the DIP Switches of the WMPT


T1 Mode

Settings of the DIP switches on the WMPT

75-ohm E1 Mode

120-ohm E1 Mode

f Reinstalling the Boards

51

Appendix g Pin Assignment of the BBU Signal Cables


75-ohm E1/T1 cable Pin on the DB26 Male Connector X1.1 X1.2 X1.3 X1.4 X1.5 X1.6 X1.7 X1.8 X1.19 X1.20 X1.21 X1.22 X1.23 X1.24 X1.25 X1.26 Wire Type Tip Ring Tip Ring Tip Ring Tip Ring Tip Ring Tip Ring Tip Ring Tip Ring 8 6 4 2 7 5 3 Coaxial SN. 1 Label RX1+ RX1RX2+ RX2RX3+ RX3RX4+ RX4TX1+ TX1TX2+ TX2TX3+ TX3TX4+ TX4-

52

Appendix g
Pin Assignment of the BBU Signal Cables

120-ohm E1/T1 cable Pin on the DB26 Male Connector X1.1 X1.2 X1.3 X1.4 X1.5 X1.6 X1.7 X1.8 X1.19 X1.20 X1.21 X1.22 X1.23 X1.24 X1.25 X1.26 Wire Color Blue Twisted pair White Orange White Green Twisted pair White Brown Twisted pair White Grey Twisted pair White Blue Twisted pair Red Orange Twisted pair Red Green Twisted pair Red TX4TX3TX4+ TX2TX3+ TX1TX2+ RX4TX1+ RX3RX4+ Twisted pair RX1RX2+ RX2RX3+ Wire Type Label RX1+

53

Appendix g Pin Assignment of the BBU Signal Cables


FE/GE Ethernet cable Pin on the RJ45 Connector X1.2 X1.1 X1.6 X1.3 X1.4 X1.5 X1.8 X1.7 Wire Color Wire Type Pin on the RJ45 Connector X2.2 X2.1 Twisted pair X2.6 X2.3 Twisted pair X2.4 X2.5 Twisted pair X2.8 X2.7

Orange White/orange Green White/green Blue White/blue Brown White/brown

Twisted pair

Monitoring signal cable between the APMI and the BBU Pin on the RJ45 Connector Wire Color Pins on the X2, X3, X4, and X5 Wire Type Port on the APMI

X1.1 X1.2

White Orange

X2 X3

Twisted pair Twisted pair

TX+ TX-

X1.4 X1.5

Blue White

X4 X5

Twisted pair Twisted pair

RX+ RX-

54

Appendix g Pin Assignment of the BBU Signal Cables


EMUA monitoring signal cable Pin on the RJ45 Connector X1.1 Pin on the DB9 Male Connector X2.3 Wire Color White Wire Type Port on the APMI

Twisted pair Twisted pair Twisted pair Twisted pair

TX+

X1.2

X2.7

Orange

TX-

X1.4

X2.2

Blue

RX+

X1.5

X2.6

White

RX-

Alarm cable Pin on the RJ45 Connector X1.1 X1.2 X1.3 X1.6 X1.5 X1.4 X1.7 X1.8 Pin on the RJ45 Connector X2.1 X2.2 X2.3 X2.6 X2.5 X2.4 X2.7 X2.8 Wire Color Wire Type

White/orange Orange White/green Green White/blue Blue White/brown Brown

Twisted pair

Twisted pair

Twisted pair

Twisted pair

55

Change History
10 (2010-03-05) This is the tenth commercial release. Compared with issue 09 (2009-11-25), Obtaining the ESN is added. 09 (2009-11-25) This is the ninth commercial release. Compared with issue 08 (2009-09-30), the figure of installing the WGRU signal cable is modified. 08 (2009-09-30) This is the eighth commercial release. Compared with issue 07 (2009-08-30), the configuration principles of the BBU boards are modified. Compared with issue 07 (2009-08-30), the installation scenarios of APM30H(Ver.B), TMC11H(Ver.B) and APM30H(Ver.B, +24V) are added. 07 (2009-08-30) This is the seventh commercial release. Compared with issue 06 (2009-06-30), the installation of WGRU is added. 06 (2009-06-30) This is the sixth commercial release. Compared with issue 05 (2009-01-23), the configuration principles of the BBU boards is modified.

56

HUAWEI TECHNOLOGIES CO., LTD.


Huawei Industrial Base Bantian Longgang Shenzhen 518129 Peoples Republic of China www.huawei.com

Anda mungkin juga menyukai