Director : Rune Stroem Head, Project Administration Unit: Nariman Mannapbekov Project Officers: Bouadokpheng Chansavat; Joonho Hwang; Cleo Kawawaki; Pei Ling Koh; Jim Liston; Lin Lu; Tianhua Luo; Jacobo Marin; Keiju Mitsuhashi; Levan Mtchedlishvli; Cindy Tiangco; Yi Xu
CWRD Countries
CWRD Countries
South Caucuses
~100% electrification fossil fuel/hydro resource rich high losses/low energy efficiency old generation/transmission/distribution assets
South West Asia low level of electrification net energy importers high losses/low energy efficiency old generation/transmission/distribution assets
Infrastructure Development
Power generation/transmission/distribution Renewable energy (wind/solar/hydro) Energy efficiency/loss reduction (supply/demand) Gas well rehabilitation/pipeline
Central Asia Regional Economic Cooperation (CAREC) Regional Power Master Plan
EE/
Loss Red.
RE
Reform/ Modernize
Gas
Turkmenistan
Uzbekistan Regional
TKM-AFG - 1
EE/
Loss Red.
RE
Reform/ Modernize
Gas
Turkmenistan
Uzbekistan Regional
1
1 1 1 2
TAPI - 3, TKM-AFG - 1, CAREC - 2
TA
Projects 1 1 1 1
2 11 2
500.115
3
25
4 3 11
Opportunities
Firms Individuals
Usually firms
Suggestions
Unique, challenging countries
Experts with regional experience (incl. language) Keep up with developments in the region Project preparation at times start from scratch Comprehensive support required Need to be flexible
Keep in touch with project officers Check CSRN
Mr. Rune Stroem Director, Energy Division Central West Asia Department rstroem@adb.org
Subsector Generation Generation Transmission Transmission Transmission Transmission Regional Transmission Distribution Transmission
Reform/modernization
Status Ongoing Pipeline Ongoing Ongoing Ongoing Ongoing Pipeline Ongoing Pipeline Pipeline Ongoing Pipeline Ongoing Ongoing
AZE
GEO KGZ
Regional Power Transmission Enhancement L2671/G0218: Power Sector Improvement Power Rehabilitation
PAK
Project L2846: Power Transmission Enhancement T3 L2438/2439: Power Distribution Enhancement T1 L2727: Power Distribution Enhancement T2 Power Distribution Enhancement T3 L2552/2553/8246: Energy Efficiency Investment T1 Energy Efficiency Investment Program T2 L2286/2287: Renewable Energy Development T1 Diamer Basha Dam
Subsector Transmission Distribution Distribution Distribution Energy efficiency Energy efficiency Renewable energy Generation Pipeline Transmission Transmission
Reform/modernization
Status Ongoing Ongoing Ongoing Pipeline Ongoing Pipeline Ongoing Pipeline Ongoing Ongoing Ongoing Ongoing Pipeline Ongoing
TAJ
L2303: Regional Power Transmission Interconnection G0213: Regional Power Transmission G0124: Nurek 550 kV Switchyard Reconstruction
UZB
CAREC
Regional
Regional Transmission Energy efficiency Transmission Reform/modernization Reform/modernization Regional Regional Regional Generation Generation Transmission Distribution Renewable energy Renewable energy
Ongoing
Pipeline Ongoing Pipeline Ongoing Pipeline Pipeline Ongoing Ongoing Pipeline Pipeline Ongoing Pipeline Ongoing Ongoing Ongoing
T7559: Power Transmission Preparing the Energy Efficiency Project T7704: Power Rehabilitation Mainstreaming the Pakistan Integrated Energy Model Support for Central Power Purchasing Agency
TAPI
T7632: Natural Gas Pipeline T7756: Natural Gas Pipeline (Phase 2) Natural Gas Pipeline (Phase 3)
TKM UZB
Rehabilitation of Mary Power Station T7350: Talimarjan Power Generation and Transmission Namangan Transmission T7740: Advanced Electricity Metering T7846: Design and Strengthening of the Solar Energy Institute T8008: Solar Energy Development