JIMMA INSTITUTE OF TECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING HYDRAULIC STRUCTURE II (WREE 3072) GEMEDA KUMSA

AIGNMENT-2
The data given below is taken from Gidabo Dam and Irrigation Project to design a Cross Regulator on the main canal. A sample design drawing of a Cross Regulator is also attached.
Design Data Discharge F.S.L. C.B.L. Bed Width F.S.D. F.B. Top of Bank Level Manning's roughness coefficient(n) Side Slope of canal Bed Slope of canal

U/S 4.575 1206.710 1205.440 3.800 1.270 0.400 1207.110 0.025 1.50 0.0003

D/S

Units

2.735 m3/s 1206.250 m 1205.210 m 3.150 m 1.040 m 0.400 m 1206.650 m 0.025 1.50 m/m 0.0003 m/m

Q1) Design the Cross-Regulator ( Take assumptions when necessary) Q1 a) Fix the crest level and Waterway. Q1 b) Compute the level and length of downstream floor. Q1 c) Determine the U/S and D/S cutoff wall requirement. Q1 d) Calculate the total floor length. Q1 e) Calculate the uplift pressure using Khoslas theory. Q1 f) Calculate the floor thickness at different points. Q1 g) Design the upstream and downstream protection works.