Year 2007 2007 2007 2007 June 2010 Jun-10 Jun-10 Nov 2007

S. No.

State

Type

Gujarat

Case I

2
Nov 2007

Haryana

Case I

Feb-08 Feb-08 Feb-08

Maharashtra

Case I

Sep-09 Sep-09 Sep-09

4
Dec-09

Rajasthan

Case I

Oct-09

Bihar

Case I

Karnataka

Case 1

Foot notes:-

Adani Power PPA with GUVNL

**

M/s.KSK Mahanadi Power Company Ltd.

Total

***

Kamalang Thermal Power Project, Orissa (for PTC India Ltd GMR Project)

****

Adani Power

Therefore, longterm PPA contracted capacity for Stage 1 is 1445 MW. JSW ENERGY Ratnagiri Power Plant

Seller/Project Name

Procurer

Adani Enterprises Ltd. Mundra Phase I and II Aryan Coal Benefaciaries Pvt. Ltd. Kasaipalli Korba district Chhattisgarh Adani Power Pvt. Ltd. Mundra Phase III Essar Power Ltd. Khajurda village at Khambalia taluka in Jamnagar M/s.KSK Mahanadi Power Company Ltd. Shapoorji Pallonji Energy Gujarat Pvt. Ltd. M/s.Essar Power Gujarat Ltd. Salaya II

Gujarat Urja Vikas Nigam Ltd.

Gujarat Urja Vikas Nigam Ltd.

Mundra TPS, PhaseIV, Gujarat Adani Power Ltd. Kamalang Thermal Power Project, Orissa - PTC India Ltd GMR Project Adani Power Tiroda Power Project (Phase 1 and Phase 2) JSW Energy (Ratnagiri) Limited (JSWERL) M/s Lanco Mahanadi Power Project Ltd. Now Lanco Vidarbha Thermal Power Ltd

Haryana Power Purchase Centre UHBVNL and DHBVNL

Maharashtra State electricity Distribution Co. Ltd (MAHADISCOM)

Adani Power - Tiroda Power project Phase I and III Maharashtra State electricity Distribution Co. Ltd (MAHADISCOM) India Bulls Amravati Power Project (Phase II) GMR EMCO Warora Power Plant Phase 1 Rajasthan State Electricity Board Jaipur Vidyut Vitran Nigam Ltd, Ajmer Vidyut Adani Power - Kawai Thermal Power Project, Rajasthan Vitran Nigam Ltd, Jodhpur Vidyut Vitran Nigam Ltd.

ESSAR (Tori) - Thermal Power Project

Bihar State Electricity Board

PTC-Thermal Powertech JV (Phase 1) Power plant at Painapuram, Krishnapatnam district AP. PTC-East Coast Energy JV, Power Plant at Kakarapalli village, Santhabommali, AP PTC-Nagarjuna Construction Company JV Sompeta in Srikakulam district of Andhra Pradesh, PTC-Monnet Power JV Power Plant at Angul, Orissa PTC- Meenakshi Power JV, Coastal thermal Power Project Thamminapatnam near Krishnapatnam in Nellore district, Andhra Pradesh. JSW Energys Toranagallu Thermal Power Station in Bellary district of Karnataka (JSWEL-SBU II )

POWER COMPANY OF KARNATAKA LTD.

Long term PPA for 1,000 MW entered with GUVNL Agreement for merchant sale of up to 221 MW of surplus power entered with AEL

PPA Details: 1010 MW - GUVNL 450 MW - Goa 270 MW - CSEB 1730 MW

PPA Details: 263 MW to Govt of Orissa cost plus 300 MW tied up with UHBVNL and DHBVNL

Stage 1 : signed PPA of 1320 MW with MAHADISCOM from Tiroda Phase 1 and 2

Stage 2 : Signed PPA of 1200 MW of Tiroda Phase 3 with MAHADISCOM and an additional 125 MW from Tiroda Phase 1 erm PPA contracted capacity for Stage 1 is 1445 MW. Long-term PPA with Maharashtra State Electricity Distribution Company Limited (MSEDCL) for 300 MW; Longterm PPA with Adani Enterprises Limited (AEL) for 270 MW of net capacity out of 300 MW Long term PPA of 600 MW with Karnataka under process. Balance power to JSWPTC through short term PPA.

Capacity in PPA (MW) 1000 MW 200 MW 1000 MW 1000 MW 1010 MW 800 MW 800 MW 1424 MW 300 MW

Fuel Type Coal Supply Agmt with AEL Washery rejects/coal based Coal Supply Agmt with AEL Imported Coal - Indonesia/ South Africa Coal (Gujarat Mineral Development Corporation) Imported Coal - Expected from Indonesia/ South Africa Imported Coal - Indonesia/ South Africa Coal supply Agreement with AEL Talcher Mahanadi coal fields

Levelized tariff (Rs/kwh) 2.890 2.2498 2.3495 2.4006 2.345 2.800 2.800 2.940 2.860

Captive mines allocated by Ministry of Coal for 1320 MW generating up to 1,000 MW of power; Coal linkage of 1,180 MW recommended China National Mineral Company Limited and PT. 300 MW Sungai Belati Coal, Indonesia. Coal Mines from Chhattisgarh & Coal Linkage 680 MW allotment letter is procured Captive Coal Blocks (800 MW) coal blocks at Lohara West and Lohara Extension 1200 MW (P III) + South Eastern Coal Fields Limited/Western Coal 125 MW(P I) Fields Limited (1180 MW) Imported Coal Supply FSA for 5 years and Long Term Coal Linkage (1320 MW) 450 MW + 750 Domestic Coal (CIL) South Eastern Coal Fields Ltd and Western Coal Fields Ltd MW Coal India Linkage,Western Coal Fields and South 200 MW Eastern Coal fields 1000 MW + Additional 200 MW

2.642 2.716 2.700

3.280

3.260 2.879

Domestic Coal (CIL) South Eastern Coal Fields Ltd and Western Coal Fields Ltd

3.2483

450 MW

Captive pit-head coal-fired, Chakla and Ashok Karkata coal blocks.

3.057

430 MW

Blended Coal ratio of 3:1 (Indigenous-Coal India Orissa to imported) MCL Coal (Talcher valley coal mines) and imported coal from Indonesia and others. Mahanadi Coalfields and South Eastern Coalfields; Import about 30% of the coal Utkal B2 and Mandakini coal block in Angul, OrissaCaptive coal blocks of Monnet. Power Tolling Arrangement of 160 MW with PTC (purchase the coal from the Indonesian coal mines) Mahanadi Coal Fields Ltd for domestic coal supply. PT Sungai Belati Coal, Indonesia.

3.770

400 MW

3.890

400 MW 150 MW

3.890 3.760

200 MW

3.800

600 MW

3.810

##

Adani Power kawai Power Project

PPA details: Long term PPA of 1200 MW with RRVPNL Short term PPA of 120 MW

###

Essar Tori I Power Project Bihar

60% -PPA (inc 450 MW signed with BSEB) , 13% Jharkhand Government, ROFR: 12.0% on VC basis to SEB, 15% Merchant Power

####

Long term PPA signed with PTC-Thermal Powertech JV (Phase 1) Power plant at PTC for phase 1 of Painapuram, Krishnapatnam district AP. (Details of 70 % Long term Phase 1 available)

PTC-Thermal Powertech JV (Phase 1) Power plant at Painapuram, Krishnapatnam district AP. (Details of Phase 1 available) 30 % merchant sale Only 430 MW tied for long term with Karnataka

PTC-East Coast Energy JV, Power Plant at Kakarapalli village, Santhabommali, AP Long term PPA signed with PTC for entire 1320 MW of 1320 MW of Phase 2 for Phase 1. merchant sale

PTC-Monnet Power JV Power Plant at Angul, Orissa Longterm PPA with GRIDCO Orissa (@ Rs 2.85/unit) PTC (Min rate - 2.3 per Kwh + 90% share of incremental revenue) PTC (Min rate - 2.55 per Kwh + 90% share of incremental revenue) Merchant sale in Open Market

PPA details 250 MW 400 MW 200 MW 200 MW

Total Capacity (2*330) *2 = 1320 MW 270 MW 2*660 = 1320 MW 2*600 = 1200 MW 3*660 = 1800 MW 2*660 = 1320 MW 2*660 = 1320 MW 3*660 = 1980 MW 3*350 = 1050 MW P 1 = 2*660 MW P 2 = 1*660 MW 1980 MW 4*300 = 1200 MW 2*660 = 1320 MW

% for Longterm PPA 75.75% 74.07% 83.26% 83.33% 96.11% 60.61% 60.61% 71.92% *** 28.57%

Contracted Capacity for longterm PPA 1000 MW 200 MW 1000 MW 1000 MW 1730 MW 800 MW 800 MW 1424 MW 300 MW

% for Merchant Power Sale 24.25% 25.93% 16.74% 16.67% 3.89% 39.39% 39.39% 28.08% 46.38%

72.98% 100%

****1445 MW # 1200 MW

27.02% 0%

PPA for balance power to be signed in future (under process)

2*660 = 1320 MW

90.91%

1200 MW

9.09%

2*660 = 1320 MW 1*300 = 300 MW

90.91% 66.67%

1200 MW 200 MW

9.09% 33.33%

2*660 = 1320 MW

90.010%

1200 MW

##

0%

2*600 = 1200 MW

60%

450 MW

### 15%

Phase 1 = 2*660 MW 2 = 1*660 MW 1980 MW Phase 1 = 2*660 MW 2 = 2*660 MW 2640 MW 4 * 660 = 2640 MW 2*525 = 1050 MW Phase 1 = 1* 600 MW = 1* 300 MW MW 300 *2 = 600 MW

Phase 70% Phase 50% 1320 MW 50% 924 MW #### 30%

85% 80.95% Phase 2 900

2244 MW 850 MW

15% 19.05 %

PPA details of the given power plant not available.

100%

600 MW

0%

Merchant Power Capacity in MW 320 MW 70 MW 221 MW * 200 MW 70 MW ** 520 MW 520 MW 556 MW 487 MW

535 MW 0 MW

n future (under process)

120 MW

120 MW 100 MW

0 MW

180 MW

396 MW

1320 MW

396 MW 200 MW

plant not available.

0 MW