RUSTOMJEE REALTORS PVT. LTD.

RATE ANALYSIS

Date Page No. Unit m2 Qty. BOQ pg. No Waterproofing to RCC toilet slab 8'' sunk, Laying Basecoat on floor in CM 1:5, including shifting of Item no. material, cost of waterproofing compund (Conplast of Fosroc) consumption of Conplast : 200ml / Cement bag(50Kg), Thickness of basecoat 15mm Mode of Measurement : Plan Area Sr. No. A) 1 2 3 4 Particulars MATERIAL COST (M) Cement (Considered 3% Wastage) Sand (Considered 5% Wastage) Conplast chemical (200ml/bag of cement) Shifting of material & curing TOTAL MATERIAL COST (A) LABOUR COST (L) Labour TOTAL LABOUR COST (B) C) (M+L) RATE (A+B) ADD OHP 15%
TOTAL AMOUNT

Unit Bag Cum Lit L.S

Qty. 0.1002 0.0177 0.02 1

Rate Rs. 215 1100 100 22

Amount Rs. 21.54 19.49 2.00 22.00 65.03

B)

m2

135

135.00 135.00 200.00 / m2 30


230.00 / m2

Prepared by

Checked by

Approved by

RUSTOMJEE REALTORS PVT. LTD. RATE ANALYSIS

Date Page No. Unit m3 Qty. BOQ pg. No Waterproofing by, Laying Brickbat coba in CM 1:5, including shifting of material, cost of waterproofing Item no. compund,

Sr. No. Particulars A) MATERIAL COST (M) 1 Brickbat (Considered 10% wastage) Considering 60% brickbat & 40% Mortar 2 Cement Mortar 40% 3 Cement (Considered 3% Wastage) 4 Sand (Considered 5% Wastage) 5 W/P compound (0.5kg / bag) 6 Shifting of material & curing TOTAL MATERIAL COST (A) LABOUR COST (L) Labour TOTAL LABOUR COST (B) C) (M+L) RATE (A+B) ADD OHP 15%
TOTAL AMOUNT

Unit M3

Qty. 0.66

Rate Rs. 1250

Amount Rs. 825.00

Bag Cum Kg L.S

2.67 0.47 1.34 1.00

215 1100 35 110

574.37 519.75 46.75 110.00 2075.87

B)

m3

1.00

325

325.00 325.00 2401.00 m3 360.15


2761.15 / m3

Prepared by

Checked by

Approved by

RUSTOMJEE REALTORS PVT. LTD. RATE ANALYSIS

Date Page No. Unit m2 Qty. BOQ pg. No Waterproofing by, Laying 18mm thick jointless waterproof layer which is continued on the wall above Item no. the floor level to the height of 1mtr in CM 1:5, including cost of waterproofing compund.

Sr. No. A) 1 2 3 4

Particulars MATERIAL COST (M) Cement (Considered 3% Wastage) Sand (Considered 5% Wastage) W/P compound (0.5kg / bag) Shifting of material & curing TOTAL MATERIAL COST (A) LABOUR COST (L) Labour TOTAL LABOUR COST (B)

Unit Bag Cum Kg L.S

Qty. 0.12 1.18 0.06 1.00

Rate Rs. 215 1100 35 22

Amount Rs. 25.85 1299.38 2.10 22.00 1349.33

B)

m2

1.00

160

160.00 160.00 1509.00 / m2 226.35


1735.35 / m2

C)

(M+L) RATE (A+B) ADD OHP 15%


TOTAL AMOUNT

Prepared by

Checked by

Approved by

RUSTOMJEE REALTORS PVT. LTD. RATE ANALYSIS

Date Page No. Unit Qty. BOQ pg. No Item no.

m2

Fixing of China mosaic over the waterproofing treatment including selection,sorting & breaking the chips to req. size, it also includes ponding,curing,shifting of material & acid cleaning

Sr. No. Particulars A) MATERIAL COST (M) 1 2 3 4 5 China Mosaic (considered 750 to 800 sqft / MT) Cement (Considered 3% Wastage) Sand (Considered 5% Wastage) Acid Cleaning Shifting of material & curing TOTAL MATERIAL COST (A) LABOUR COST (L) Labour TOTAL LABOUR COST (B) C) (M+L) RATE (A+B) ADD OHP 15%
TOTAL AMOUNT

Unit Kg Bag Cum m2 LS

Qty. 14.28 0.08 0.01 1.00 1.00

Rate Rs. 5.5 215 1100 22 22

Amount Rs. 78.54 17.23 12.47 22.00 22.00 152.24

B)

m2

1.00

215

215.00 215.00 367.00 / m2 55.05


422.05 / m2

Prepared by

Checked by

Approved by