HVAC BOQ - Local

BILL OF QUANTITY SCHEDULE FOR HVAC SYSTEM


Project: BRAC School of Public Health, ICDDRB, Mohakhali, Dhaka Schedule B: Local works (Cost shall be included VAT and IT).
Ref. B1 Items Unit Qty Rate (Tk) Amount (Tk)

Checking, carrying, lifting, installation and commissioning of imported items with supply of consumable materials 1 Water Chiller (CH 01) set 1

2.0 Air Handling Units (Double skinned) 2.1 AHU 6F/1 2.2 AHU 6F/2 2.2 AHU 6F/3 2.2 AHU 6F/4 2.2 AHU 6F/5 2.2 AHU 6F/6 2.2 AHU 6F/7 2.2 AHU 6F/8 3 Cooling Tower (CT 01) set set set set set set set set set 1 1 1 1 1 1 1 1 1

4.0 Centrifugal Pumps 5.1 Primary Chilled Water Pumps (PCHWP) 5.2 Secondary Chilled Water Pumps (SCHWP) 5.3 Condenser Water Pumps (CWP) 6.0 Pipe accessories 6.1 Butterfly Valve sets sets sets 2 2 2

HVAC BOQ - Local

Dia 300mm Dia 250mm Dia 200mm Dia 150mm Dia 100mm Dia 80mm Dia 65mm 6.2 Globe valves Dia 250mm Dia 200mm 6.3 Check Valves ( swing type) Dia 250mm Dia 200mm 6.4 Y-Strainer Dia 300mm Dia 250mm Dia 80mm Dia 65mm Dia 50mm 6.5 Flexible Joints Dia 300mm Dia 250mm Dia 200mm Dia 100mm (for building expansion) 6.6 Auto Vent Valves 6.7 Ball Valve Dia 50mm Dia 40mm Dia 25mm Dia 20mm

Nos. Nos. Nos. Nos. Nos. Nos. Nos.

2 7 1 2 1 10 15

Nos. Nos.

2 4

Nos. Nos.

2 4

Nos. Nos. Nos. Nos. Nos.

2 4 2 3 3

Nos. Nos. Nos. Nos. Nos.

2 8 6 4 4

Nos. Nos. Nos. Nos.

16 2 6 20

HVAC BOQ - Local

7.0 Metering Devices 7.1 Pressure Gauge 7.2 Pipe Thermometer 7.3 Water Flow Meter Brand: Data industrial (SDI series) or equivalent For Pipe dia 250mm For Pipe dia 200mm 8.0 Automatic Control System 8.1 Variable Frequency Drive, IF44 based For AHU 6F/1 For AHU 6F/2 For AHU 6F/3 For AHU 6F/4 For AHU 6F/5 For AHU 6F/6 For AHU 6F/7 For AHU 6F/8 8.2 3-way Modulating valve with Controller Dia 80mm Dia 65mm Dia 50mm 9.0 Water Treatment Plant 10.0 Fans For Toilet exhaust 11.0 Variable Air Volume units AHU 6L/1 Air flow rate: 2112 CFM, connecting duct size: 650x400mm Air flow rate: 438 CFM, connecting duct size: 400x250mm Air flow rate: 724 CFM, connecting duct size: 400x300mm Air flow rate: 366 CFM, connecting duct size: 350x200mm Air flow rate: 326 CFM, connecting duct size: 350x200mm Air flow rate:1122 CFM, connecting duct size: 450x250mm AHU 6L/2 Air flow rate: 957 CFM, connecting duct size: 550x250mm Air flow rate:200 CFM, connecting duct size: 300x150mm AHU 6L/3

sets sets

10 4

set set

1 1

set set set set set set set set

1 1 1 1 1 1 1 1

Nos. Nos. Nos. set sets

2 3 3 1 4

set set set set set set sets sets

1 1 1 1 1 1 2 2

HVAC BOQ - Local

Air flow rate:718 CFM, connecting duct size: 450x450mm Air flow rate: 1508 CFM, connecting duct size: 500x300mm Air flow rate: 1612 CFM, connecting duct size: 500x300mm

sets set set

4 1 1

AHU 6L/4 Air flow rate: 3380 CFM, connecting duct size: 700x500mm Air flow rate: 9414 CFM, connecting duct size: 1000x800mm

sets set

3 1

AHU 6L/5 Air flow rate: 1464 CFM, connecting duct size: 600x350mm Air flow rate: 2172 CFM, connecting duct size: 650x450mm Air flow rate: 984 CFM, connecting duct size: 450x300mm Air flow rate: 2070 CFM, connecting duct size: 600x400mm

set set set set

1 1 1 1

AHU 6L/6 Air flow rate: 1026 CFM, connecting duct size: 500x300mm Air flow rate: 619 CFM, connecting duct size: 450x200mm AHU 6L/7 Air flow rate: 1452 CFM, connecting duct size: 500x400mm Air flow rate: 720 CFM, connecting duct size: 450x250mm AHU 6L/8 Air flow rate: 4656 CFM, connecting duct size: 950x500mm Air flow rate: 6288 CFM, connecting duct size: 1000x600mm 12 Preinsulated Mild Steel Pipe Dia 450 mm (thick 50mm) Dia 300 mm (thick 50mm) Dia 250 mm (thick 50mm) Dia 200 mm (thick 50mm) Dia 150 mm (thick 38mm) Dia 100 mm (thick 38mm) Dia 80 mm (thick 38mm)

set set

1 1

set sets

1 2

set set

1 1

m m m m m m m

155 20 115 65 165 140 25

HVAC BOQ - Local

Dia 65 mm (thick 38mm) Dia 50 mm (thick 38mm) Dia 40 mm (thick 38mm) Dia 32 mm (thick 38mm) Dia 25 mm (thick 25mm) 13 Mild Steel Piping works Black steel pipe of schedule 40(s) complete with bends, tees, elbows, reducers, socket, union etc. as per requirement, drawing and direction. Pipe work shall be complete with pipe hangers, vibration isolator brackets, support etc. All pipe fittings otherwise specified shall be threaded / welded end type. Cutting of pipe thread and sealing the thread with proper type of sealing compound shall be done leak proof. Pipe work along with fittings shall be suitable to withstand a test pressure of 15g/cm2 All pipe including MS materials required for pipe installation work shall be painted with two coats of red oxide primmer after proper cleaning. Synthetic enamel paint shall have to be used on red oxide primer for all pipe hangers / supports and condenser water piping. Dia 450 mm Dia 300 mm Dia 250 mm 14 Air Terminals 14.1 4-way Supply Air diffuser c/w OBD type neck damper. Neck Size: 250x250mm Neck Size: 300x300mm Neck Size: 350x350mm Neck Size: 400x400mm Neck Size: 450x450mm Neck Size: 500x500mm 14.2 Return Air Grille (Egg Crate type) Neck Size: 150x150mm Neck Size: 250x250mm Neck Size: 300x300mm Neck Size: 350x350mm Neck Size: 400x400mm Neck Size: 450x400mm Neck Size: 500x450mm Neck Size: 500x500mm Neck Size: 550x550mm

m m m m m

35 40 10 5 30

m m m

102 6 18

nos nos nos nos nos nos

16 40 38 22 22 24

nos nos nos nos nos nos nos nos nos

26 2 5 11 11 8 4 5 2

HVAC BOQ - Local

Neck Size: 600x600mm Neck Size: 850x500mm Neck Size: 1000x500mm Neck Size: 1000x550mm 14.3 Fresh Air Louver c/w G4 washable filter - with neck Damper made of Aluminum Neck Size: 600x600mm B2 1 Local supply, Installation & Commissioning works Mild Steel Piping works Black steel pipe of schedule 40(s) complete with bends, tees, elbows, reducers, socket, union etc. as per requirement, drawing and direction. Pipe work shall be complete with pipe hangers, vibration isolator brackets, support etc. All pipe fittings otherwise specified shall be threaded / welded end type. Cutting of pipe thread and sealing the thread with proper type of sealing compound shall be done leak proof. Pipe work along with fittings 2 shall be suitable to withstand a test pressure of 15g/cm All pipe including MS materials required for pipe installation work shall be painted with two coats of red oxide primmer after proper cleaning. Synthetic enamel paint shall have to be used on red oxide primer for all pipe hangers / supports and condenser water piping. Dia 200 mm Dia 150 mm Dia 100 mm Dia 80 mm Dia 65 mm Dia 50 mm Dia 40 mm Dia 32 mm Dia 25 mm Dia 20 mm 2 Pipe and fitting insulation with jacketing Bare pipe, pipe fittings and Valves shall be insulated with injectable PU foam insulation of same thickness of connected piping. Before injection of PU insulation concern area shall be jacketed with 24 SWG GI sheet. Dia 450 mm (thick 50mm) Dia 300 mm (thick 50mm)

nos nos nos nos

8 2 5 6

nos

m m m m m m m m m m

1 1 1 1 1 1 1 1 1 1

m m

1 1

HVAC BOQ - Local

Dia 250 mm (thick 50mm) Dia 200 mm (thick 50mm) Dia 150 mm (thick 38mm) Dia 100 mm (thick 38mm) Dia 80 mm (thick 38mm) Dia 65 mm (thick 38mm) Dia 50 mm (thick 38mm) Dia 40 mm (thick 38mm) Dia 32 mm (thick 38mm) Dia 25 mm (thick 25mm) Dia 20 mm (thick 25mm) 3 Sheet metal Ducting Duct works include Tees, bends, elbows, reducers, offsets, etc. with prime quality sheet. The ducts shall be complete with necessary angle, flange bracing. Stiffeners etc. made of M.S. Angle / Flat bar. Approved sealant shall have to be used to make duct leak proof. Before installation duct inside shall be cleaned. All hangers shall have to be painted with red oxide paint. SMACNA standards shall have to be followed for construction. Duct made of 20 SWG sheet Duct made of 22 SWG sheet Duct made of 24 SWG sheet 4 Duct External Insulation Supply and fixing of duct insulation of Poly Elastomeric Foam lnsulation with Thermal conductivity i.e. K value shall not be more than 0.27 KkCal/m.h. deg C at 50 to 90 F mean temperature. density shall be minimum 30 kG/m3. Insulation shall have Aluminum Foil pasted vapor barrier. Use self adhesive Aluminum tape, glue and all other accessories for fixing insulation. Before fixing duct surface shall be cleaned properly. Air gap below insulation will not be permitted. For supply air duct (15mm thick) For return air duct (12mm thick) 5 Duct Acoustic Lining Supply and fixing of self adhesive type Duct acoustic lining made of elastomeric nitrile rubber open cell foam, specially made for Thermal conductivity: 0.045W/m.K@20 C

m m m m m m m m m m m

1 1 1 1 1 1 1 1 1 1 1

sqm sqm sqm

850 1250 3000

sqm sqm

3500 1600

sqm

800

HVAC BOQ - Local

Thickness: 10mm, density: Min 140 kg/m3 Surface spread of Flame: Class 1 6 Air Terminals Air terminals shall be constructed with extruded aluminum with powder coating finishing. Thickness shall be not less than 18 SWG. 4-way Supply Air diffuser c/w Opposed blade type neck damper. Damper shall have worm gear for operating from room side. Neck Size: 250x250mm Neck Size: 300x300mm Neck Size: 350x350mm Neck Size: 400x400mm Neck Size: 450x450mm Neck Size: 500x500mm 6.2 Return Air Grille (Egg Crate type) Neck Size: 150x150mm Neck Size: 250x250mm Neck Size: 300x300mm Neck Size: 350x350mm Neck Size: 400x400mm Neck Size: 450x400mm Neck Size: 500x450mm Neck Size: 500x500mm Neck Size: 550x550mm Neck Size: 600x600mm Neck Size: 850x500mm Neck Size: 1000x500mm Neck Size: 1000x550mm 6.3 Fresh Air Louver c/w G4 washable filter - with neck Damper made of Aluminum Neck Size: 600x600mm 7.0 Duct Flexible Joint Duct connected with Fan Coil Units, Air Handling Units, Fans shall be done with Nylex or equivalent Flexible connection. Width shall be 250 mm. Constructional details shall have to be shown in Shop drawing. 8.0 Volume Control Dampers
8

6.1

nos nos nos nos nos nos

16 40 38 22 22 24

nos nos nos nos nos nos nos nos nos nos nos nos nos

26 2 5 11 11 8 4 5 2 8 2 5 6

nos nos

4 8

sqm

20

HVAC BOQ - Local

Opposed blade type Volume Control Damper shall be made with 18 SWG Galvanized iron sheet metal construction painted with 2 coats of synthetic black paint. The Damper shall be flanged end type suitable to mount on flanged end duct. The depth of Damper shall be 150-160 mm. The Damper shall have adjustable locking arrangement from outside duct. Before positioning the Contractor will coordinate with the Client for keeping ceiling opening for maintenance and operation. Damper sizes and location shall be as per drawing. 9.0 Split Damper Split Damper shall be constructed with 24 BWG sheet steel wrapped over aerofoil type wooden frame. Damper shall be complete with adjustable locking arrangement and suitable to operate from outside of duct. Constructional details shall have to be shown in Shop drawing. 10.0 Expansion Tank Expansion Tank shall have to be constructed with double layered PVC tank equivalent to Gazi/Padma/Polycon. It shall be complete with water line with float valve assembly, quick fill arrangement, over flow line, drain line and chilled water system pipe connection line and inspection door. Capacity : 2500 liter 11.0 Mechanical Services Switch Board (MSSB) Electrical power distribution board shall be constructed with16 SWG sheet steel painted with epoxy paint and shall house MCCBs, MCBs, Busbars, Starters, Overload protector for motors, etc. All MCCBs, MCBs, shall be of brand DORMAN SMITH / SIEMENS /ABB or equivalent. Front panel shall be with Voltmeter, Ampere meter, phase indicators, Start stop button, etc. Other details shall be as per drawing and corresponding technical Specifications. kW rating mentioned are approximate. Bidders must have to consider components sizing based on kW rating of their selected equipment. 11.1 MSSB 01 for Chiller Plant Room Details shall be as per Schematic drawings Major components Incoming MCCB, 1000A, TP, 50kA Copper Busbar, TPNE Outgoing MCCB, TP 800A, 50kA for one Chiller Outgoing MCBs, 50A, TP, 25kA for two PCHWPs (1 SB) Outgoing MCCBs, 80A, TP, 25kA for two SCHWPs (1 SB) Outgoing MCCBs, 125A, TP, 25kA for two CWPs (1 SB)
9

pcs

85

set

HVAC BOQ - Local

Outgoing MCBs, 50A, TP, for one Cooling Tower Star-Delta starter for PCHWPs Star-Delta starter for SCHWPs Star-Delta starter for CWPs Star-Delta starter for Cooling Tower Reverse Phase protector Ampere meters for all Chiller, Pumps and Cooling Tower. Spare CB SP, 0.5 kW rating 11.2 MSSB for AHU 6F/1 & 6F/2 Incoming Circuit Breaker (MCCB, 50A, TP, 25 kA ) Copper Busbar, TPNE Outgoing MCB for VSDs of AHU 6F/1, 20A, 6kA Outgoing MCB for VSDs of AHU 6F/2, 32A, 6kA Spare CB SP, 0.25 kW rating 11.3 MSSB for AHU 6F/3 & 6F/4 Incoming Circuit Breaker (MCCB, 80A, TP,25 kA ) Copper Busbar, TPNE Outgoing MCB for VSDs of AHU 6F/3, 32A, 6kA Outgoing MCB for VSDs of AHU 6F/4, 50A, 6kA Spare CB SP, 0.25 kW rating 11.4 MSSB for AHU 6F/5 & 6F/6 Incoming Circuit Breaker (MCCB, 50A, TP,25 kA ) Copper Busbar, TPNE Outgoing MCB for VSDs of AHU 6F/5, 32A, 6kA Outgoing MCB for VSDs of AHU 6F/6, 20A, 6kA Spare CB SP, 0.25 kW rating 11.5 MSSB for AHU 6F/7 & 6F/8 Incoming Circuit Breaker (MCCB, 63A, TP,25 kA ) Copper Busbar, TPNE Outgoing MCB for VSDs of AHU 6F/7, 32A, 6kA Outgoing MCB for VSDs of AHU 6F/8, 40A, 6kA Spare CB SP, 0.25 kW rating 12.0 Electrical Works PVC insulated PVC sheathed copper conductor single / multicore cable complete with PVC conduit, Tray / Ladder and copper conductor (ECC). Conduit works shall be complete with Bends, Tees, Junction box, etc. The others details shall be as per Technical Specifications and drawing. set 1

set

set

set

10

HVAC BOQ - Local

kW rating mentioned here are approximate. Bidders must have to consider cable sizing based on kW rating of their selected equipment. Power cable 12.1 For Chiller 325 kW (5 lines) NYY 3x1cx630 rm+ BYA 1cx300 sm +BYA 1cx6 rm 12.2 For PCHWPs, NYY 6x1c-10rm + BYA 1cx10 rm 12.3 For SCHWPs, NYY 6x1c-16rm + BYA 1cx16 rm 12.4 For CWPs, NYY 6x1c-35rm + BYA 1cx16 rm 12.5 For CT, NYY 6x1c-10rm + BYA 1cx10 rm 12.6 For AHU 6F/6, (7.5 kW, Via VSD) NYY 3x1c-4rm + BYA 1cx4 rm 12.7 For AHU 6F/1, 6F/3, 6F/5, 6F/7, (11 kW , Via VSD) NYY 3x1c-6rm + BYA 1cx6 rm 12.8 For AHU 6F/2 and 6F/4 (15 kW & 18 kW , Via VSD) NYY 3x1c-10rm + BYA 1cx10 rm 12.9 Control wiring 13.0 Split type Air conditioners Split Air conditioners shall be composed of one outdoor Condensing unit and one Indoor Fan Coil Unit. The Condensing unit shall be consisted of compressor(s), Air Cooled condenser, Condenser Fan, etc. The Indoor Fan Coil units are consisted of evaporator coils with fans, etc. These units shall be factory assembled, internally wired, fully refrigerant charged condensing unit, tested under strict quality standards. The Condensing unit shall be suitable for outdoor installation. Capacity be as per following schedule. Entering air temp to FCU: 25 C DB / 18 C WB Entering air temp to Condenser: 37 C DB / 29.5 C WB Accessories: Wall mounted Room Thermostat 13.1 Cooling capacity: 18,000 BTU/hr Evaporator / FCU Air Flow rate: 600 CFM 13.2 Cooling capacity: 12,000 BTU/hr Evaporator / FCU Air Flow rate: 400 CFM sets 2

rm rm rm rm rm

20 30 20 40 40

rm

10

rm

40

rm lot

20 1

sets

11

HVAC BOQ - Local

14.0 MS Flange with dead Flanges, Nut-bolts, gaskets For making future connection with Master HVAC layout Dia 300mm Dia 250mm Dia 200mm Dia 150mm sets sets sets sets 3 12 9 14

15.0 Water Treatment Chemicals Bidders are requested to submit calculation of Chemical requirement from their respective water treatment service provider regarding chemical requirements on following basis:

lot

Condenser Water flow rate: 1667 l/s Average evaporation loss: 1% Operating hour: 9 hour/day 5 days per week 16.0 Shop drawing and Documentation Preparation of detail Shop drawing including, layout drawing, section details, schematic drawing, etc. Get approval of shop drawing before any fabrication or installation works. Shop drawing must be coordinated with other services likely Electrical cabling, Light Fixtures, False Ceiling and Interior design. The work also includes: a). Show actual dimension of Equipment. b) Submit actual kW rating of all equipment c) Reconfirm Electrical cable sizing d) Reconfirm Ampere ratings of AC Panels' components. e) Submit Electrical connection diagram of AC Panels f) Submit General arrangement of AC Panels g) Submit Plinth drawing for Chillers, Pumps, Pipe supports h) Submit Electrical and P&I Diagram of Chiller i) Submit advance copy of Installation, Operation and maintenance manuals of Chillers, Pumps, FCUs, etc . Contractor should prepare this drawing at site coordinating with other services. 17.0 Tagging and Identification Tagging and identification of Chillers, Pumps, AHUs, Fans, Pipings, Cablings, etc. as per recommendation of the Consultant. As-Built drawing Preparation and submission of As-built drawing in following forms: job 1 job 1

18.0

job

12

HVAC BOQ - Local

One set in tracing paper, size A1 Two sets print out in A1 Paper Soft Copy in CD in AutoCAD Version 2004 Soft Copy in PDF Version 19.0 Testing, Commissioning and Balancing After proper installation and certification the system shall be tested, commissioned and balanced as per direction and recommendation by the Manufacturer as well as HVAC Designer. Contractor shall do (but not limited to) following works under this clause. a. Prepare and submit Commissioning protocol and get approval from Consultant. b. Carry out duct inspection c. Carry out pipe pressure testing d. Carry our Electrical Cabling testing e. Pipe flushing and charging of Treated Water f. Chemical cleaning of rust, etc. g. Testing of condensate water drainage slope with water h. Testing of AHU, Fans with Air and Water Balancing. i. Testing and Balancing of Pumps with Chilled water j. Cleaning of Y Strainers k. Commissioning of Chillers l. Safety protection and cutouts shall be tested individually m. Commissioning of Automatic Control system All testing and commissioning works must be documented in approved formats. All of these documents must be jointly witnessed and signed by the Client and Contractor's authorized Engineer. Documentation Compiling Documents with followings Name plate data of all equipments Recommended list of Spare parts. Submission of Operational and Maintenance manual for Chillers, Pumps, etc. Submission of Control schematic drawing, operation procedure and maintenance - trouble shooting manuals for Automatic Control systems. Compiling of certified Testing and Commissioning Documents. Compiling of certified As-built drawings. Preparation of periodic servicing and maintenance schedule. etc. 21.0 Operation and maintenance (9 hr/day basis) year 1 job 1

20.0

job

13

HVAC BOQ - Local

During operation and maintenance work, the Contractor shall have to depute one Electrical / Mechanical Engineer, one technician and one operator. All must have experience in this field for operation and maintenance of the system. During operation and maintenance if any defects is detected, it is to be rectified by the contractor at his own cost. Log book for one hourly record shall be maintained by the Contractor and shall be submitted to the Owner in every week. Total Tk. Note: Quantity mentioned are estimated. Actual payment shall be made based on work measurement.