Anda di halaman 1dari 9

Date: 27/04/2011

DAPETCO
Daily Site Report For SD Field Activities
TO
From

: OPERATIONS GENERAL MANAGERS


: FIELD MANAGER

27-Apr-2011
DATE:
END REPORT AT 05:00 HRS.

1- HSE:-

Safety Score since last


ocuptional LTA

Dapetco :- 175 Day

Contractor :- 464 Days

Accident in 24 Hrs.
Safety Equipment Down
2- Production & Wells Changes:2.1-Production & Shipping Figures:Opening
Stock
STB

Gross Fluid
Prod. BFPD

14554

63672

Drained Water

Gas Diverted
to G.C.

BWPD

W.C.%

MMSCFD

54206

85.13

41.60

Flared gas
MMSCFD

* Net Oil Prod.


STB

EGPC April
APP. Plan

Achieved
Percentage
%

9466

10800

88

0.581

Oil Shipped To AL-Hamra

Closing Stock STB

Gross Oil
BPD

Net Oil
BOPD

BS&W %

8894

8890

0.05

Salt

PTB

5.6

15126

* Included 653 STB Cond. Prod. + Cond. separated from gas plant V-501 (317 STB/D tested on 20-04-2011) + 98 STB recovered from API.

Field Production Performance


11000

100

10000

95

W.C %

BOPD

9000

8000

90

7000

85
6000

21-Apr

22-Apr

23-Apr

24-Apr
Net oil

5000

25-Apr

26-Apr

27-Apr

W.C %

80

2.2- Wells Changes During Last 24 Hrs:-

2.2.1 Wells SD3/30,34

: S.I for 0.5 Hr., PM for the elec. Gen.

2.2.2 Sapesco fixed test package at wells SD1/22 location, test results page 7.
2.2.3 Transferred Sapesco mobile test package from well SD3/67 to well SD2/9 location, test results page 8.
Sep. Press. Sep. Temp.
Sep. oil
O
outlet meter
psi
C

Wells

Separator

Sep. Water
outlet meter
BBL/D

Gas Rate
MMSCFD

GLR

Test

SD1-

11, 23

32

20

499

2.299

4608

PENNCOR

SD3-

31, 33, 35, 38, 39 & 67

19

45

3325

3713

0.256

36

SD1-

1X, 3, 4A, 6, 13, 14, 18, 19, 20,22 & 23

SD2SD3-

1, 5 & 17

30

44

15987

17308

14.980

450

31

45

12246

25006

16.436

441

273

23

522

8.210

15731

KAVERNER 100-M-1- B

KAVERNER 100-M-1- A

KAVERNER 100-M-3
Press.)

(High

SD4-

1, 2, 3, 4, 6, 7, 8, 9, 10, 11, 12, 13, 15, 16, 18, 19, 20, 21, 23, 24, 25,
27, 29, 30, 34, 36, 37, 40, 41, 43, 46, 47, 48, 49, 51, 52, 53, 55, 56, 57,
58, 59, 61, 62, 63, 64, 65,66 & 68
1, 2, 6 & 7

SD1-

1X, 3, 4A, 6, 13, 14, 18, 19, 20,22 & 23

SD2SD3-

SD4-

1, 5 & 17
1, 2, 3, 4, 6, 7, 8, 9, 10, 11, 12, 13, 15, 16, 18, 19, 20, 21, 23, 24, 25,
27, 29, 30, 34, 36, 37, 40, 41, 43, 46, 47, 48, 49, 51, 52, 53, 55, 56, 57,
58, 59, 61, 62, 63, 64, 65,66 & 68
1, 2, 6 & 7

SD2-

2, 6, 9, 13, 14 & 15
Page 1 of 8

Date: 27/04/2011

4- Wells Status:4.1- Natural Producing Wells:4.1.1- low press. Wells:Serial

Well

Flow
Hrs.

Choke
1/64"

WHFP psi

FLP psi

Salt PTB

Last test
net oil

Last test
gas rate

Last test
GOR

Test date

SD1/11

24

56

85

60

21

60

0.969

16295

20-Jan-11

SD1/14

24

32

198

150

SD1/22

24

Open

12

10

59

85

>400

225

NA

NA

3-Apr-11

0.6

>400

175

0.481

2761

26-Apr-11

SD1/23

24

36

405

105-110

57

SD2/1

24

32

215

100

28

110

NA

NA

26-Feb-11

>400

41

1.064

26340

SD2/3

32

(SI) 260

24-Apr-11

11

1.666

149331

SD2/5

24

36

240

120

22

21-Jan-11

23

>400

40

1.237

30847

22-Apr-11

FLT OC BS&W %

Remarks

S.I for press. build-up since 13/03/2011

SD2/8

148

0.179

1207

4-Oct-10

10

SD2/17

24

24

140

100

24

47

16

0.194

22502

23-Apr-11

11

SD3/22

24

S.I for pressure build-up since 20-03-2010

12

SD3/26

28

170 (S.I)

4428

5-Jan-09

S.I for pressure build-up since 26-02-2009.

13

SD3/31

24

48

53

34

56

93

>400

71

NA

NA

19-Feb-11

14

SD3/35

24

56

47

33

22

90

>400

103

NA

NA

21-Feb-11

15

SD3/67

24

28

110

50

57

70

>400

222

N.A

N.A

25-Apr-11

Salt PTB

Last test
net oil

Last test
gas rate

Last test
GOR

Test date

17

1.267

74474

3-Jan-11

S.I for press. build-up since 21/03/2011

4.1.2- Medium press. Wells:Serial

Well

Flow
Hrs.

Choke
1/64"

WHFP psi

FLP psi

SD2/2

24

16

960

350

SD2/4

16

(SI) 2000

SD2/6

24

16

1020

SD2/9

24

16

1210

SD2/13

24

16

1140

SD2/14

24

16

SD2/15

24

16

FLT OC BS&W %

Remarks

21

295

21

1.600

77420

23-Jan-11

305

21

>400

25

1.621

64647

26-Apr-11

300

22

1155

300

10

42

1.692

40458

21-Nov-10

1010

300

11

29

1.722

67040

22-Oct-10

WHFP psi

FLP psi

FLT OC

Casing
Press. psi

Last test
net oil

Last test gas


rate

ceased to flow & S.I since 10/03/2011

4.2- High Pressure Gas Wells


Serial

Well

SD2/7

SD2/10

SD9/1

SD9/3

SD9/4

SD9/5

Flow
Hrs.

Choke
1/64"

24
24
0
0
0
24

32
28
24
24
24

1540
1440
-

1350
1350
-

46
30
-

0 (SI)
2750

1440

40

0
0
300

BS&W
%

Date

Last test
GOR

Remarks

Test date

Under W/O since 17/04/2011

Killed by brine 10 PPG

4.3- Artificial Lift Activities:4.3-1 Gas Lift


Serial

Well

Flow
Hrs.

Prod.
Choke
Size 1/64"

Main Line
Press. psi

Gas Choke
Size 1/64"

Inj.
Press. psi

Inj. Rate
MMSCFD

WHFP, Psi

FLP psi

FLT
OC

BS&W %

SD3/1

24

Open

940

64

940

290

285

18

88

SD3/2

24

Open

960

20

890

260

240

SD3/3

24

Open

960

10

835

280

280

17

4 at wells SD1/22
2.2 Sapesco fixed test package
test results
Open
940page 7.18
24location,

910

215

202

20

540

1.03

172

165

Last
Last test
Last test
test gas
net oil
GOR
rate

Test date

190

0.180

948

8-Apr-11

80

89

0.653

7435

14-Dec-10

89

104

0.888

8555

17-Apr-11

95

77

0.631

8181

73

106

1.147 10786

10-Mar-11

Remarks

8-Feb-11

SD3/6

24

Open

930

SD3/7

24

Open

980

850

300-380 300-380

21

86

91

1.055 11854

27-Jan-11

SD3/8

24

Open

930

18

730

255-285 250-280

17

77

135

1.669 12452

28-Jan-11

SD3/9

24

Open

930

170

170

94

120

0.294

2494

17-Apr-11

SD3/10

24

Open

960

10

880

185

180

88

56

0.345

6358

25-Jan-11

10

SD3/11

24

Open

950

10

335

0.87

155

150

15

290

0.904

3119

8-Apr-11

11

SD3/12

24

Open

960

10

840

218

208

93

95

0.620

6523

5-Feb-11

12

SD3/13

24

Open

930

12

440

59

136

1.129

8304

4-Feb-11

Gas injection through the SSD

13

SD3/14

32

14

0.864 61712

30-Jun-09

To reduce back press. on other gas lift wells

14

SD3/15

24

Open

520

205

200

68

63

1.620 26711

22-Feb-11

Installed 1/4" st. st. connection instead of gas choke

15

SD3/16

24

Open

930

450

195

190

93

16

1.312 81976

7-Jul-09

Installed 3/8" st. st. connection instead of gas choke.

16

SD3/17

Open

26

S.I since 23/07/2010 Due to low productivity

17

SD3/18

Open

18

SD3/19

24
24

Open

950
-

8
15

300
450

0.71
-

19

SD3/20

24

Open

960

10

880

260

20

SD3/21

24

Open

930

10

550

21

SD3/24

24

Open

950

940

22

SD3/25

24

Open

940

12

420

23

SD3/27

24

Open

920

760

24

SD3/29

24

Open

950

20

435

25

SD3/40

24

Open

960

10

270

0.77

26

SD3/43

24

Open

920

830

27

SD3/46

24

Open

950

14

460

170

28

SD3/51

24

Open

950

900

29

SD3/52

24

Open

940

910

30

SD3/53

24

Open

940

940

31

SD3/63

24

Open

920

760

32

SD3/65

24

Open

950

10

880

33

SD3/66

24

Open

950

14

950

34

SD3/68

24

Open

940

64

940

170-230 170-230

Installed 3/8 st. st. connection instead of gas choke

1.269

1527697

22-Jul-10

0
-

20
55

69

0.706 10611

25-Feb-11

202

1.460

8513

6-Apr-11

235

18

91

184

0.750

4082

6-Feb-11

195

180

67

178

1.230

6899

2-Apr-11

182

93

155

0.211

1373

7-Apr-11

150-195 150-190

39

55

166

0.766

4955

12-Apr-11

380-450 380-450

99

41

1.185 28903

130-180 130-180

33

224

1.286

5733

8-Apr-11

10

122

0.522

4266

9-Mar-11

90

60

0.652 10955

8-Jan-11

160

59

118

0.747

6358

15-Apr-11

158

155

94

35

0.118

3429

25-Dec-10

195

188

94

45

0.143

4006

22-Dec-10

Installed 3/8 st. st. connection instead of gas choke

200

190

16

66

43

0.204

4925

20-Feb-11

Installed 1/2" st. st. connection instead of gas choke.

75

63

0.652 12679

30-Jan-11

Installed 1/2" st. st. connection instead of gas choke

92

113

0.820

7365

16-Apr-11

140-230 140-230

21

79

83

0.567

6983

24-Dec-10

150-190 150-190

61

339

0.446

1336

9-Apr-11

184
184
235-265 230-260

160

155

235-285 235-285

400-470 400-470
-

220

Page 2 of 8

10-Nov-09

Gas injection through the SSD.

Installed 1/2" st. st. connection instead of gas choke

Installed 1/2" st. st. connection instead of gas choke

Installed 3/8 st. st. connection instead of gas choke

Date: 27/04/2011
4.3.2- ESP Pump:Serial

Well

Flow
Hrs.

WHFP psi

FLP psi

SD1/13
SD3/30
SD3/34
SD3/32
SD3/33
SD3/36
SD3/38
SD3/39
SD3/42
SD3/47
SD3/48
SD3/49
SD4/2
SD4/6

24
23.5
23.5
0
24
24
24
24
0
24
24
24
0
24

235
255
195
100
170
100
60
155
170
400
180

135
180
185
90
165
95
55
155
165
160
165

2
3
4
5
6
7
8
9
10
11
12
13
14

FLT

OC

Annulus Press. Psi

Average AMP.

Last test net oil

Last test GOR

Test date

BS&W %

Last P.M Date

No. of Restart

140
180
185
55
167
52
30
155
115
155
20

9
11
8
16
9
15
16
22
24
21
22

311
221
115
189

NA
N.A
NA

18-Apr-11

10-Apr-11

17-Dec-10

N.A

27-Dec-10

82
79
83
81

75
82
73
56
39

NA
NA
N.A
N.A

17-Jan-11

NA

26-Mar-10

646
146
201
188
166

NA
NA
NA
N.A
NA

13-Apr-11

10
29
106
43
111
41
179
177
63
30
72
89
16
76

Sam Est.
gross BFPD

Last test net


oil

60
32
64
50
56
50
62
77

10-Apr-11

92
95
83
84
75

11-Apr-11
28-Dec-10
29-Dec-10

28-Feb-11

55
69
91
88

Last test GOR

Test date

BS&W %

28-Dec-10
14-Apr-11
2-Mar-11

26-Apr-11
24-Jan-11
12-Apr-11
13-Apr-11
13-Apr-11
11-Jun-10
14-Apr-11
15-Apr-11
16-Apr-11
6-Apr-11
9-Apr-11

Remarks

36/64" choke beam on 06-01-2011.

32/64" choke beam on SD3/30 on 17-06-2010.


PM for the elec. Gen.
Stopped since 02/03/2011 due to down hole motor burnt
windings.

Stopped since 06-07-2010 due to short circut in cable or


motor, Opened the SSD for W/O job

32/64" choke beam on 21-09-2008


Stopped since 11/04/2011 due to down hole problem

4.3.3- S/R Pump :Serial

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

pesco fixed test package


27

Well

Pump Specs

Operating Date

L 126", Sh 7", D
WSD1/1X 1.5", SPM 5.37,
3740'
2.25", SPM 7, L 106", Sh 10", D
SD1/3
4249'
L 102", Sh 10", D
SD1/4A 2.25", SPM 7,42137'
1.75", SPM 7, L 144", Sh 10", D
SD1/5
4241'
1.5", SPM 7, L 106", Sh 10", D
SD1/6
4250'
L 120", Sh 9", D
SD1/17 1.5", SPM 6.46,
3877'
1.75"DV", SPM 7, L 120", Sh 10",
SD1/18
D 4358'
6, L 106", Sh 8",
SD1/19 2.25"DV", SPM
D 4075'
L 144", Sh 7", D
SD1/20 1.5", SPM 4.8,4000'
L 144", Sh 7", D
SD3/23 1.5", SPM 5.4,3850'
1.5", SPM 7, L 144", Sh 8", D
SD3/37
3767'
L 106", Sh 7",
SD3/41 1.5"DV, SPMD5.7,
3701'
1.5", SPM 6.29, L 100", Sh 8", D
SD3/50
3808'
L 106", Sh 10", D
SD3/54 2.25", SPM 7,3582'
1.5"DV, SPM 7.7, L 100", Sh 10",
SD3/55
D 3667'
L 106", Sh 8", D
SD3/56 1.5", SPM 5.9,3969'
1.5", SPM 5.9, L 106", Sh 8", D
SD3/57
3966'
L 106", Sh 8", D
SD3/58 1.5", SPM 5.5,3960'
L 120", Sh 8", D
SD3/59 1.75", SPM 4.97,
3687'
L 106", Sh 7", D
SD3/60 1.5", SPM 5.5,3947'
L 144", Sh 7", D
SD3/61 1.5", SPM 5.46,
3943'
L 126", Sh 8", D
SD3/62 1.5", SPM 6.02,
3706'
1.5", SPM 6.16, L 126", Sh 8", D
SD3/64
3971'
1.5", SPM 7, L 106", Sh 10", D
SD4/1
7382'
1.5"DV, SPM 7.02, L 106", Sh
SD4/3
10", D 6995'
2.25", SPM 6.35, L 144", Sh 10",
SD4/4
D 6365'
1.75", SPM 7.87, L 144", Sh 10",
at wells SD1/22
location,
test results
D 5990'

4.4- Shut-in Wells:4.3.1- More than 24 Hrs. :4.3.1.1 Intermittent flow


4.3.1.2 Low oil productivity
4.3.1.3 Converted to injector
4.3.1.4 Gas well
4.3.1.5 Wait for A.L by W/O rig.

Flow Hrs.

FLP

psi

Gen. Amp.

Beam pump
unit

Remarks

4-Sep-09

12.5

63

63

N.A

17-Feb-11

0.5

140

C-320D

Low fillage pump

4-Aug-06

106

115

NA

31-Jan-11

135

35-60

C-640D

Low fillage pump

7-Mar-10

24

127

44

N.A

13-Feb-11

50

130

C-456D

18-May-10

38

NA

31-Dec-10

C-640D

22-Aug-08

13

69

26

NA

15-Feb-11

72

100-160

C-640D

Low fillage pump

20-Apr-10

14

N.A

15-Jun-10

C-456D

S.I since 18-06-2010

18-May-10

10.5

62

33

N.A

14-Feb-11

77

140

C-456D

Low fillage pump

27-Jan-10

24

31

10

NA

21-Apr-11

94

130

C-640D

Low fillage pump

6-Apr-10

24

158

27

N.A

17-Feb-11

76

140

C-320D

16-Apr-10

20

24

NA

5-Mar-11

20

130-170

C-320D

31-Jul-07

50

40

NA

6-Mar-11

18

145

35-50

C-320D

Low fillage pump

19-Aug-07

5.5

21

22

NA

18-Feb-11

NA

155

C-320D

Low fillage pump.

24-May-09

N.A

12-Oct-10

C-320D

S.I since 15-10-2010

3-Mar-08

NA

13-Nov-10

55

C-912D

Pump stuck since 09/02/2011

26-May-09

24

124

111

NA

6-Mar-11

76

160

C-320D

9-May-08

24

135

104

NA

16-Nov-10

43

160-180

40-70

C-320D

3-Jul-08

8.5

42

55

NA

4-Mar-11

160

C-320D

Low fillage pump

2-Jul-08

9.5

43

50

NA

4-Mar-11

155

35-65

C-320D

Low fillage pump.

24-May-10

24

69

220

N.A

9-Feb-11

41

160

C-456D

16-Aug-09

10

N.A

11-Feb-10

C-320D

S.I since 23-02-2010

10-Apr-10

11

61

78

N.A

12-Dec-10

160

C-320D

Low fillage pump.

20-May-10

24

93

58

N.A

30-Dec-10

165

C-320D

19-Feb-10

12.5

74

83

N.A

27-Feb-11

100-150

C-320D

6-Mar-10

6.5

35

26

N.A

1-Mar-11

0.7

150

C-640D

Low fillage pump

17-May-10

NIL

N.A

16-Jul-10

100

C-912D

S.I since 17-07-2010

17-May-10

225

NA

9-Oct-10

C-912D

Rod parted since 08-11-2010

page
7.
25-Apr-10

35

23

NA

1-Mar-11

0.3

150

C-912D

Low fillage pump.

(SD3/22)
(SD1/5, 16, SD3/14,17, 26, 44, 50, 60 & SD4/8)
(SD3/28) W.H.S.I.P= 80 PSI
(SD1/1, 8, 9, 12, SD3/5 & 45)
(SD1/17, SD3/32, 42, 54, SD4/2, 4 & 5)

S.I since 27-01-2011, no productivity, transferred


surface motor to well SD 1/19 on 18-04-2011.

Low fillage pump

Low fillage pump.

4.3.1.6 Watered out.


4.3.1.7 Due to H2S content
4.3.1.8 Under W/O job.

(SD1/10 & SD4/3)


(SD1/7)
(SD9/3)

4.5-During Last 24 Hrs.: Well

S.I.

SD3/30,34

Hrs.

Last Test losses STB (


Net oil)

Remarks

PM for the elec. Gen.

0.5

4.6 - Well test results:Wells

SD1/22

Duratio Separato
n Hrs.
r

24
20
8

FTP

4.6.1:- (Fixed test package)


Status

DATE

CHOKE
SIZE
1/64

Current

26-Apr-11
25-Apr-11
21-Apr-11

Open
Open
Open

Previous

WHFP PSI

10
10
10

D/St.
PSI

8
8
8

FLT
C

SEP.
PRESS.
PSI

GROSS FLUID
PROD. STB/D

NET OIL
PROD.
STB

Produced
gases
MMSCFD

GOR

BS&W %

4
4
4

176
183
172

175
182
170

0.481
0.51
0.448

2761
2807
2633

0.6
0.3
0.9

25
23
25

4.6.2:- (Mobile test package)


Well

Duratio Separato
n Hrs.
r

17
SD2/9

Status

DATE

Choke size 1/64"

WHP
psi

D/St.
Press. psi

FLT
OC

SEP.
PRESS.
PSI

GROSS FLUID
PROD. STB/D

NET OIL
PROD.
STB

Produced
gases
MMSCFD

GOR

BS&W
%

Current

26-Apr-11

16

1210

315

21

310

26

25

1.621

64647

2.3

25-Oct-10

16

1450

315

14

310

36

35

1.892

55399

3.9

16-Feb-10

28

360

310

29

305

102

67

0.857

12798

34.1

MTP
Previous

17

Page 3 of 8

Date: 27/04/2011
5- Movement Through SD Tanks:A- SD Crude:TK

Opening Stock
STB

Prod. STB

Recovered
oil

Recycled oil
for treatment

Drain
BBLs

Off spec.oil

Oil Shipped To ALHamra STB


Gross

Net

Closing
Stock STB

223

226

226

230

230

229

653

353

302

302

227

227

663

133

548

475

347

133

133

347

505

279

279

225

171

171

Salt PTB

BS&W %

API

0.05

35.4

0.05

35.5

Remarks

223

1A

1B

2259

3263

1949

1363

1362

2210

0.05

35.5

2A

5294

6785

2891

6950

6947

2238

0.05

37.0

2B

1762

5495

682

2437

5502

2C

2D

200A

1879

682

1197

200B

1202

653

1855

Total

14554

17512

133

815

8179

815

8894

8890

15126

B- Agiba Crude:Opening Stock


STB

TK

Oil Shipped To AL-Hamra STB

Gross Oil Received From


Raml
STB

Water Drained

BBLs

Closing Stock
Gross

Net

Salt PTB

BS&W %

API

2C

6404

27

3846

3844

0.05

35.6

2531

2D

2105

3628

5733

Total

8509

3628

27

3846

3844

STB

Remarks

8264

See the attached calculation sheet of Agiba crude (page No. 6)


6- Chemical Status:Chemical

Type

Demulsifier

CECA PROCHINOR-501

Average
PPM

Daily consumption gallons

31

Stock Drums

Min.
stock
drums

65

20

12.34

Corrosion Inhibitor

Remarks

Wells SD3/3

9.3

25

8.4

12

Injected in 12" shipping line to Al-Hamra


Injected at test, Kav. A & B seps.

15

49

NORUST-211

injected in SD-4 6" line.

Scale inhibitor

INIPOL AD-900

20
-

8.8
-

14

12

Diesel fuel Pour point


reducer

Prochenor AP4138

BACTIRAM (C-505)

20

BACTIRAM (C-455)

Nil

20

MI (HR-2590)

138

10 Tank

Injected at test, Kav. A, B&Penncor seps.

Biocide

H2S Scavenger

Injected at Kaverner (A) gas outlet

2.2.2 Sapesco fixed test package at wells SD1/22 location, test results page 7.

7- Utilities Stock:Delivered
Plant
to
Received Consumptio
GHAZALA
n
T

Delivered
to EDC
rigs #10.

Delivere
Total
Delivered Delivere
d to
to ESP &
d to
consumpti
New
S.R wells Sapesco
on
Camps

Type

Opening
Stock

Diesel at EPF tanks (M 3)

34.24

0.17

17.4

0.2

Diesel at PPF tanks (M 3)

90

EPF Fire Water (M3)

385

PPF Fire Water (M3)

3540

63

17

52

17

25

Fresh Water at old camp


(M3)
Fresh Water at new
camp (M3)
Fresh Water at ABB
camp (M3)

Closing
Stock

Min.
stock

17.77

16.47

50

90

50

385

200

3540

2000

17

46

35

17

35

35

18

10

Page 4 of 8

Required quantity

Date: 27/04/2011
8- Maintenance Activities and Rental Equipment:8.1 Ajax compressors # B is on stand-by & Ajax compressors # A is out of service due to lubricator switch installed on gas
compressor # A.
8.2 Gas turbine # B is running, Gas turbine # C on stand by, Gas turbine # A is out of service due to the defected lube oil tank
pressure switch (Waiting spare parts MR SDMA 2/2011 Dated on 11/01/2011).
8.3 Received a new UPS unit for EPF control room, not installed yet as the power connector part is missing.
8.4 Mobilized triplex pump motor # D to Cairo for repairing on 25-03-2011.

Equipment

No.

Company

Remarks

Dapetco Surface Pumping Unit (J.P)

Dapetco

1 Stand-by + 1 Out of service

Mobile Test Package

Sapesco

Operated

Fixed Test Package

Sapesco

Operated

Wells SD1/1X,3,6,20

EMC

Operated

Diesel truck

EL-Sherief

Operated.

Oil Truck

Elhami

Released on 17-03-2011

30 Ton Truck

Alaa EL-Gendy

Stand-by.

Slick Line Unit

Halliburton S/L

Operated @ EDC rig # 92.

Crane

Mova

Stand-by.

Wells SD1/4A,13, 18, SD3/23, (30&34), 33, 36,


37, (38,39), 41, 47, 48,49, 55, 56, 57, 58, 59, 61,
62, 64, SD4/1, 2,6, 7 + 3 new camp + 1 ABB
camp + 1 GZ Plant.

30

Asfour

26 Operated + 4 Stand by

9- Administration:9.1- Field Man Power:HBS

Service &
Sister
Companies

Total

51

154

DAPETCO
Visitors

Catering (New Prosper)

SD
60

38

Mova Crane

Shrif Abdou

Hanover

EMEC

Total Service
Companies

Hall( S/L)

ECC

Alaa EL-Gendy

ITEC

OPCO

11

Future

Petromaint

Vetco

Sapesco (test
packages)

Full Accommodation

Queen Service for


Security
Redimpex

Company

Bapetco

9.2- Service and Sister Companies:-

51
0
0

Catering Only
Lodging
Payment By

DAPETCO

10- General remarks:-

10.1 Tank 1-A repairing works:- Waiting to change the defective tank bottom plate sheets.
10.2 ECC crew arrived at site to collect formation water samples to conduct lab. tests for biocide, corrosion inhibtion & anti-scale chemicals.

Medhat Kamel
SD Field Manager
Page 5 of 8

compressors # A is out of service due to lubricator switch installed on gas

on stand by, Gas turbine # A is out of service due to the defected lube oil tank
2/2011 Dated on 11/01/2011).
not installed yet as the power connector part is missing.

pairing on 25-03-2011.

he defective tank bottom plate sheets.

r samples to conduct lab. tests for biocide, corrosion inhibtion & anti-scale chemicals.

Date: 27/04/2011
Page 6 of 8

Movement of Oil Tanks Didicated to Agiba Crude


From 05:00 AM on 26/04/2011 To 05:00 AM on 27/04/2011
Field: Raml

Ticket no.: 838

Measured values:
Start Time
Tank No.

Dip.cm

Table vol.

BBLs

Net Stock After


Drain

Gross Oil Received

End Time

Oil Temp corr.


Factor

Shell corr. Factor

Final Vol.

63

2118.50

74

72

74

0.9933

1.00017

2105

4:00

198

5786.45

80

54

77

0.9905

1.00021

5733

Tank No.

Time

Dip.cm

Oil Temp corr.


Factor

Shell corr. Factor

Final Vol.

Water Drained

2C

6:00

221

0.9909

1.00020

6377

27

Oil Temp corr.


Factor

Shell corr. Factor

Final Vol.

Gross Vol.

Table vol.

BBLs

6434.49

Start Time
Dip.cm

Table vol.

BBLs

End Time

2C

Oil Temp Ambient


Shell
o
o
o
F
Temp F Temp F

79

52

76

Oil Temp Ambient


Shell
o
o
o
F
Temp F Temp F

6:00

221

6434.49

79

52

76

0.9909

1.00020

6377

9:10

78

2549.18

75

73

75

0.9928

1.00019

2531

Salt PTB

API

35.6

BS&W
%

0.05

Water in crude oil


BBLs

Total Crude Received From Agiba (BBLs) =


Total Crude Pumped EL-Hamra (BBLs)

Total Net Oil pumped to EL-Hamra (STB) =

3628
3846
3844

Total water drained (BBLs) =

27

BS&W % =

0.05

Dapetco Rep. :

Agiba Rep. :

Name

Name

: Salah Eldeen

Name

: A. Attia

Signature

Signature

Signature

Gross Vol.

6:00

2D

Tank No.
Oil Pumped to ELHamra

Oil Temp Ambient


Shell
o
F
Temp o F Temp o F

: Tarek Abdelfattah
:

Dapetco Shift Eng. :

3628

3846

27-04-2011
Page 7 of 8

WELL TEST DATA REPORT.


CLIENT :
DABAA
FIELD :
SD 1
STATUS : NATURAL
WELL :
SD 1- 22
14.73
Psi
and
60
F
Gas Meter Run Size = 5.761"
Reference Conditions :
OIL RATE CAL.
DATE CHOKE
SEP.
Water
WHP DSP
PRESS.OIL T. Mtr red. Mtr Inc. Gr. BS&W Oil rate rate
TIME
ID
HH:MM 64th"
5:00
OP.
6:00
OP.
7:00
OP.
8:00
OP.
9:00
OP.
10:00
OP.
11:00
OP.
12:00
OP.
13:00
OP.
14:00
OP.
15:00
OP.
16:00
OP.
17:00
OP.
18:00
OP.
19:00
OP.
20:00
OP.
21:00
OP.
22:00
OP.
23:00
OP.
0:00
OP.
1:00
OP.
2:00
OP.
3:00
OP.
4:00
OP.
5:00
OP.
AVE.

psig
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10

psig
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8

psig
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4

F
60
62
66
70
74
76
84
90
92
96
96
90
88
84
80
78
74
70
70
70
70
70
68
68
68
77

bbls
0.0

bbls
API
INITIAL
7.5
7.6
7.4
7.5
7.2
7.3
7.5
7.4
7.6
7.4
7.5
7.3
7.6
7.4
7.5
7.5
7.4
7.3
7.4
7.1
7.1
7.2
7.0
7.1

%
0.3
0.2
0.5
0.3
0.2
0.5
0.3
0.2
0.5
0.2
0.5
0.7
0.9
0.6
1.0
0.8
1.0
0.9
1.0
0.9
0.8
0.9
1.0
1.0
0.6

STB/D bbls/d
179.3
181.6
176.0
178.5
171.4
172.7
177.3
175.0
178.9
174.7
177.0
172.1
179.0
175.1
176.9
177.6
175.1
172.9
175.1
168.2
168.4
170.7
165.8
168.2
174.5

0.5
0.4
0.9
0.5
0.3
0.9
0.5
0.4
0.9
0.4
0.9
1.2
1.6
1.1
1.8
1.4
1.8
1.6
1.8
1.5
1.4
1.6
1.7
1.7
1.1

DATE .
:4/26/2011
CLIENT REP . :Eng.
SAPESCO REP. :Mohamed Ibrahim
GAS RATE CAL.

GROSS
Oil&H2O Sp.Gr.

Hw

GAS T. Orif. Id

STB/D

Air =1

"H2O

in.

179.8
182.0
176.9
179.0
171.7
173.5
177.9
175.4
179.8
175.1
177.9
173.3
180.7
176.2
178.7
179.0
176.9
174.5
176.9
169.7
169.7
172.2
167.5
169.9
175.6

0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966
0.966

28
28
28
28
28
29
30
30
30
30
30
29
28
28
28
28
28
28
28
29
29
29
29
29

52
56
60
64
66
74
80
82
86
86
80
78
74
70
68
64
60
60
60
60
60
58
58
58

2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000

Test Duration = 24 Hrs.

Gas rate

GOR

Remarks

MMscft/d Scft/STB
0.482
0.480
0.478
0.476
0.475
0.481
0.487
0.486
0.485
0.485
0.487
0.479
0.472
0.474
0.475
0.476
0.478
0.478
0.478
0.487
0.487
0.488
0.488
0.488
0.481

2687.704
2643.455
2716.778
2669.069
2774.356
2785.321
2747.389
2778.758
2708.066
2772.897
2752.911
2784.872
2635.171
2704.180
2681.891
2682.522
2730.499
2765.110
2730.499
2898.025
2895.103
2861.078
2945.796
2904.306
2760.7

4/27/2011

27-04-2011
Page 8 of 8

WELL TEST DATA REPORT.


CLIENT :
DATE .
:4/26/2011
DABAA
FIELD :
CLIENT REP . :Eng.
SD 2
STATUS : Natural
WELL :
SAPESCO REP. :Eng.Osama Aly
SD 2 -9
Gas Meter Run Size = 2.9"
Reference Conditions :14.73 Psi and 60 F
OIL RATE CAL.
GAS RATE CAL.
DATE CHOKE
SEP.
Water GROSS
WHP DSP
PRESS.OIL T. Mtr red. Mtr Inc. Gr. BS&W Oil rate rate Oil&H2O Sp.Gr.
Hw
GAS T. Orif. Id Gas rate
TIME
ID
HH:MM 64th"

psig

psig

psig

bbls

bbls

API

STB/D bbls/d

STB/D

Air = 1

"H2O

in.

33.5
23.9
26.3
28.7
23.9
28.7
28.7
23.9
28.7
23.9
21.5
21.5
26.3
26.3
28.7
23.9
23.9
26.3
26.0

0.680
0.680
0.680
0.680
0.680
0.680
0.680
0.680
0.680
0.680
0.680
0.680
0.680
0.680
0.680
0.680
0.680
0.680

34
35
34
35
36
37
38
40
40
40
42
41
42
42
42
41
42
42

60
60
60
60
60
60
60
60
60
60
60
60
58
58
58
56
56
56

1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500

GOR

Remarks

MMscft/d Scft/STB

The trailers arrived @ well site, start rig up.


Finish rig up.
11:30
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
0:00
1:00
2:00
3:00
4:00
5:00
AVE.

Divert flow to separator.


16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
16/64 1210
315
1210
315

310
310
310
310
310
310
310
310
310
310
310
310
310
310
310
310
310
310
310
310

70
70
70
70
70
70
70
70
70
70
70
70
70
68
68
68
66
66
66
69

INITIAL TANK
0.7
1.0
1.1
1.2
1.0
1.2
1.2
1.0
1.2
1.0
0.9
0.9
1.1
1.1
1.2
1.0
1.0
1.1

4.0
2.0
3.0
3.0
2.0
2.0
2.0
2.0
2.0
3.0
2.0
2.0
2.0
2.0
3.0
2.0
2.0
2.0
2.3

32.1
23.4
25.5
27.8
23.4
28.1
28.1
23.4
28.1
23.2
21.1
21.1
25.8
25.8
27.8
23.5
23.5
25.8
25.4

1.3
0.5
0.8
0.9
0.5
0.6
0.6
0.5
0.6
0.7
0.4
0.4
0.5
0.5
0.9
0.5
0.5
0.5
0.6

Test Duration =17 Hrs.

1.512
1.534
1.512
1.534
1.556
1.577
1.599
1.640
1.640
1.640
1.681
1.661
1.685
1.685
1.685
1.669
1.689
1.689
1.621

47062.918
65486.964
59280.752
55135.073
66417.165
56112.155
56866.453
70015.160
58345.966
70736.966
79718.795
78762.548
65331.141
65331.141
60504.270
71119.546
71983.001
65439.092
64647.2

4/27/2011