No. 1. KAPASITAS 2.

BOILER - Type

Uraian

Unit MW

- Manufacture T/h - Boiler Capacity T/h - Boiler Fuel Comsumtion (Coal) - Plant Heat Rate - Boiler Thermal Efficiency % 3. STEAM TURBINE AND AUXiLIARY EQUIPMENT - Type - Manufacture - Speed rpm - Number of Extraction - Output MW - Gross turbine-generator heat rate kcal/KWH - Make Up Water % - Generator Power Faktor 3 GENERATOR - Type - Manufacture - Cooling System - Capacity kW WATER TREATMENT SYSTEM - Sea Water Tank
- Reverse Osmosis Plant - Demin Water Tank - Raw Water Tank - Water Treatment System - Waste Water Treatment Plant COOLING TOWER - Type '- Flowrate - Number m3/hour m3 m3 ton/days m3/hour

FIRE PROTECTION SYSTEM LIMESTONE HANDLING SYSTEM - Size


- Limestone Stockpile - Limestone Handling - Limestone Spesification BED HANDLING SYSTEM - Capacity m3 m3

COAL HANDLING SYSTEM

- Ship Unloader - Trestle - Belt Conveyor Capacity - Coal Stockyard - Dry Coal sheed - Coal Spesification/HHV - Draught Jetty - Barge Capacity

ton/hour m ton/hour ton/hour ton kKal m dwt

ASH HANDLING SYSTEM - Fly Ash Silo Capacity


- Type

- Number
Chimney - High - Type Intake & Discharge - Lenght - Type Building - Mosque - Sport Facility - Landscape Commissioning Consumption - Coal - Limestone - HSD - Sand GENERATOR TRANSFORMER m

ton ton KL m3 or ton

- Type - Manufacture - Capacity


- Type of Cooling FUEL OIL SYSTEM - Capacity Location / Coordinate

SPESIFIKASI TEKNIK PLTU 3 BABEL 2 x 30 MW UG-130/9.8-M Sichuan Chuanguo Boiler 130 t/h 47.98 t/h (2 boiler) 3430 kCal/kWH 82.20% PLTU 4 BABEL 2 x 16,5 MW YG-75/5.29-M21
JINAN BOILER

75 t/h 27.62 t/h (2 boiler) 87 % Condensing Steam Turbine Later 3000 3 16.5 2673 0 0.85 QF-15-2 10500V Shan Dong Ji Nan / Nan Jing Air Cooling 16500

China Chang Jiang Energy CO.

2 x 20 t/h 2 x 350 m3 350 m3 320 t/day 100 m3/h

55 2 x 150 2 x 250 7 Ton/h 15

4000 ton 2 x 6 t/h

180 150

150 2 x 120 33400 ton 9m3 x 27 mx 7 m 3700 - 4300 kcal/kg 6,24 m 5000 ton 500 m2

2 x 80 m ncrete & Steel Liner Intak = 40; Discharge = 360 m Geotextile & Stone 1 Unit 1 Unit 1 Unit 30,055 ton 2,882 ton 185 KLiter 131 ton

PT. Trafoindo Prima Perkasa 20 MVA ONAN 2 x 100 kL

SPESIFIKASI TEKNIK PLTU 1 Kalbar (2 x 50 MW) PLTU 2 Kalbar (2 x 27,5 MW) UG-130/5.3-M (CFB)
JINAN BOILER

PLTP Ulubelu (2 x 55 MW)

220 t/h 70 t/h 85%

Wuxi Huaguang Boiler Co. Ltd 2 x 143 t/h

N27.5-4.90-1 Nanjing I Jieneng { Hangzhou 3000 (2 Hp + 2 LP) 275 2495.5 0.272 0.8 Synchronous Generator Nanjingl Oingdao IJinan Air Cooled 27.5 MW

LATER 2 x 500 2 x 1000 400 tons/day (20 hrs operation time and 4 hrs regeneration time) LATER

4 x 7,2 t/h

Later Later Later 7 10

BT-P-lOORT 50 m3/h 1 Set

400 N/A 2 x 400 800/400 11760 3700-4500 N/A 5000

8 t/h

325 t Cylindrical steel silo with conical bottom 2 < 1 mm Mesh N/A purity > 90 %

PLTU Sintang 3 x 7 MW

PLTU Sangau 2 x 7 MW

ALBOK BOILER or equal

44 t/h 262 t/h 3450 kCal/kWH 85%

PT. ZUG IND. INDONESIA or Equal 40 t/h 60 t/h

85%

CCJEC or Equal

72 80 150 7 10

Later Later 70 t/h Later Later 3800 kCal 5.0 m MRL 3500 DWT

LATER LATER 50 LATER LATER 3800 LATER 5000

Approximately 40 Later Later Later Later Later Later Later Later Later Later

minimum 40 LATER

No. Uraian 1. Kapasitas 2. BOILER & AUX EQUIPMENT - Type - Manufacture

Unit

PLTU Lampung (2 x 100 MW)

- Steam generating capacity at boiler (Main Steam Flow) T/h - Design pressure (Drum) Kg/cm2 g - Design temperature at Superheater Outlet C - Boiler heat release rate at MCR: Main steam flow 3. STEAM TURBINE AND AUXiLIARY EQUIPMENT - Type - Manufacture - Speed - Number of Extraction - Output - Gross turbine-generatoj heat rate - Main Steam Pressure - Main Steam Temperature - Main Steam Flow - Exhaust Steam Pressure - Exhaust Steam Flow - Feedwater Temperature at HP Final Heater Outlet - Make Up Water - Generator Power Faktor 4 CONDENSER AND FEED WATER HEATING PLANT Vacuum Pump - Type - Manufacture - Number of Unit T/h

rpm MW kcal/KWH C Kg/cm2 g Kg/h mmHG abs Kg/h C %

CIRCULATING WATER PUMP( Sea water cooling pump) - Type - Manufacture - Number - Capacity CONDENSATE PUMP

m3/H

PLTU Sumatera Barat (2 x 112 MW) CFB (Circulating Fluidized Bed Boiler) / UG130/5,3-M Wuxi Huaguang Boiler Co. Ltd 143 61 485 130

SPESIFIKASI TEKNIK PLTU 3 BABEL PLTU 4 BABEL PLTU 1 Kalbar PLTU 2 Kalbar (2 x 30 MW) (2 x 16,5 MW) (2 x 50 MW) (2 x 27,5 MW)

N27.5 - 4,90-1 Nanjing/Jieneng/Hangzhou 3000 2 PH + 2 LP 27.5 2495.5 49 470 110000

0.272 0.8

32 SAP - 10 JA Later 3 6300

PLTP Ulubelu PLTU Sintang PLTU Sangau (2 x 55 MW) 3 x 7 MW) (2 x 7 MW)