Radio Network Optimization Process


- 3G Workshop
Mohamed Arshad
MoAD RNE SSEAI
Kuala Lumpur
November 2008
All Rights Reserved Alcatel-Lucent 2008 2 | Optimization Process | Nov 2008
Agenda
1. Introduction to Optimization
2. Radio Network Planning
3. Pre Launch Optimization & Acceptance
PLO Single Site Verifications (SSV)
PLO Cluster & Network Optimizations / Acceptance
PLO Late Site Optimization (LSO)
4. Post Launch Optimization
5. Radio Network Engineering Activities
6. Optimization Tools
7. APAC 3G Success Story
All Rights Reserved Alcatel-Lucent 2008 3 | Optimization Process | Nov 2008
Introduction to Optimization
1
All Rights Reserved Alcatel-Lucent 2008 4 | Optimization Process | Nov 2008
Optimization aims at improving the network performance
and/or network capacity.
To improve the system initial performance
To enhance the subscriber satisfaction
To increase the number of subscribers
To cater varying traffic pattern & usage
Methods may differ for :
Pre-launch optimization (performed for acceptance, trials)
Post-launch monitoring and optimization (E2E performance for
in-service networks)
Introduction : Why Optimize a Network??
All Rights Reserved Alcatel-Lucent 2008 5 | Optimization Process | Nov 2008
Radio Optimization Services
Radio Optimization Services
Pre Launch
Single Site
Verification
Network
Optimisation
Network
Acceptance
Radio Network
Planning
Roll-out
& integration
Strategy
Definition
Network life
Post Launch
Cluster
Optimisation
Radio Network Optimization Radio Network Planning
Pre-Launch Optimization
-No network load (limited traffic)
-Cluster optimization on drive test data
-High optimization gains
-OCNS (optional)
Post-Launch Optimization
-Significant network load (increasing)
-Optimization based on statistical data
(counters, traces)
-Optimization gain less, but baseline
performance higher
-Periodic route drive test
Network Optimization Phases
All Rights Reserved Alcatel-Lucent 2008 6 | Optimization Process | Nov 2008
Radio Network Planning
2
All Rights Reserved Alcatel-Lucent 2008 7 | Optimization Process | Nov 2008
RNP - Design / Planning Assessment (Default)
Deliverables
Final report presenting all the agreed theoretical exclusion areas and detailed
acceptance protocol
Customer Benefits
Check of Customers RNP allows early adaptations if necessary
Clear and shared vision of future networks performances
Activities
In case Network Design & Planning is under Customers
responsibility,
assessment allows to :
-Refine targeted KPIs
-agree on detailed acceptance protocol (DT road definition, coverage holes exclusions)
-propose initial design improvements (e.g. antenna tilts, CPICH Power, SC Reuse Plan)
All Rights Reserved Alcatel-Lucent 2008 8 | Optimization Process | Nov 2008
RNP - Radio Network Planning (Alternative)
Deliverables
Final Radio Network Plan report, including final sites location, antennas, RF
parameters,
Coverage/Interferences plots of the final design
Customer Benefits
Complete Radio Network Plan based on Alcatel-Lucent 3G international expertise
Optimized CAPEX by leveraging existing sites
Risk sharing through higher Alcatel-Lucent commitments
Activities
Initial RNP :
-Coverage
-Service coverage
-Interference predictions
-Neighborhood Planning
-areas
Cell Planning :
-Site Radio Survey /
Ranking
-Continuous RNP
-Cell parameters planning
-Coexistence / Cositing / Site optimization
-HO / Scrambling code planning
-Site Search Areas to acquisition team
All Rights Reserved Alcatel-Lucent 2008 9 | Optimization Process | Nov 2008
Example: Clusterization & DriveTest Route Planning
Cluster Site Status:-
Total Sites : 26 (4 IBS Sites)
On-Air : 26
Status as 4
th
June 08
The length of this drive is around
80 Km. (~ 7 hours per test)
Comments : The drive goes
through each main road from this
area and through each cell.
Cluster Q1_KCH1 polygon
Drive Route
3G Site
All Rights Reserved Alcatel-Lucent 2008 10 | Optimization Process | Nov 2008
Timeline & Resources
O Resources
1 Drive Test team
1 RNE + 1 Back Office Support
1 Rigger team
Support from OMC and Technical Support team.
Support from ROM team.
During the Cluster Acceptance, one person from Operator to verify testing
procedures and results
O Timeline
Week Wk N-1 Wk N+0 Wk N+1 Wk N+2 Wk N+3 Wk N+4 Wk N+5 Wk N+6 Wk N+7 Wk N+8 Wk N+9 Wk >> N+9
Site Database
SSV
PLO - Cluster Optimization
PLO - Network Optimization
PLO Acceptance
PLO Report & Presentation
Post Launch Optimization - E2E
All Rights Reserved Alcatel-Lucent 2008 11 | Optimization Process | Nov 2008
Test Methodology
Test Test name Fix/mob Mobile Trace mobile Samples Protocol
1 Voice 3G Mobile to PSTN Mobility Dual Mode MOC 200 90s,30s
2 PS DL 384 kbps Mobility Lock MOC
Complete
Route 5M
3 PS UL 128 kbps Mobility Lock MOC
Complete
Route 2M
4 Video 3G mobile to 3G Mobility Lock MOC 200 90s,30s
5 Voice 3G Mobile to 3G Mobile Mobility Dual Mode MOC 200 90s,30s
6 RTT 64/64; 64/128; 64/384 Fix Lock Static
100 for each
Test
(1 location)
7 PS attach + PDP activation Fix Lock Static
100 for each
Test
(1 location)
- In-car measurements for the UEs and outdoor for the scanner
- No attenuation chain
- For MTM tests, the terminating mobile will be under good radio condition (Static)
- In parallel Iu Iub traces will be taken. (CTb trace)
All Rights Reserved Alcatel-Lucent 2008 12 | Optimization Process | Nov 2008
Pre Launch Optimization &
Acceptance
3
All Rights Reserved Alcatel-Lucent 2008 13 | Optimization Process | Nov 2008
Pre-Launch Optimization Process View
PLO Standard Process:
Site Verification Site Implementation Audit
Cluster Optimization Antenna/Parameters/Neighbour
Network Optimization KPIs Assessment
Acceptance phase KPIs Acceptance
Based on drive-test measurements
All Rights Reserved Alcatel-Lucent 2008 14 | Optimization Process | Nov 2008
PLO Process Single Site Verification (SSV)
1. Sites Verification
Objectives:
Checking the consistency between the planned
parameters and the ones applied. SC, LAC, RAC, CID..
Drive Tests procedure:
Scanner + Mobile unlocked
AMR + CS64 + PS Call / HSxPA
Incar measurements
Optimisation tasks:
Validate Softer HO for each sector.
Validate Inter-RAT(3G2G) HO
No cross sector.
Reliability of site identifiers applied at OMC (LAC, RAC, SC, etc)
Site report
SSV Check list
A site report embedded to the commissioning report in order to validate the site.
All Rights Reserved Alcatel-Lucent 2008 15 | Optimization Process | Nov 2008
Single Site Verification Flow
SDP List
OMC Parameters and
Site information Check
DriveTest
measurement
Data Storage
Close TT (if any)
Site Validation Report &
Update ready for Optimlist
OK?
Parameter, SC or
Softer HO Problem
Crossed Sectors /
Hw Failures
Call Test
for investigation
Data Storage
Trouble Ticket
Process
TT resolution
notification
Validation Report (per site) includes:
CPICH RSCP & EcN0 Plot
Best SC Plot
Ue TxPwr Plot
CS, Video & Data Call Test
SHO & HHO Test
Detected Issues
Yes
No
Problem
Found?
.
No
Yes
RNO Team Leader
Drive Test Technician
O&M
RNO Team
Datafillers
WO Creation
NMS Operator
WO Execution
Data Storage
Drive Test Route Plan
OK?
Yes
No Network Change
Request (NCR)
Network Change
Request (NCR)
Off-line analysis
All Rights Reserved Alcatel-Lucent 2008 16 | Optimization Process | Nov 2008
Single Site Verification Report
All Rights Reserved Alcatel-Lucent 2008 17 | Optimization Process | Nov 2008
Split the network into smaller areas Cluster (~20sites)
Objectives
identifying coverage & quality problem spots
recommend aerial and adjacency modifications
Analysis
Interference
Quality & RF coverage
SHO & HHO area
Drop and Establishment Failures
HSxPA Performance
Typical problems
Pilot overshooting
Weak coverage
Missing neighbor
Corrective tasks performed
Tilt and azimuth modification
Neighbor declaration (inter system included)
Parameter modification.
Lessons learnt from customer roll-out
Roll-out should be driven by cluster in order to ensure start the optimal optimization work ASAP
AMR services only to be tested (Mobile 3G lock and unlock)
The drive test routes To be defined by RNP study
Shall starts with 90% cluster sites readiness
PLO Process - Cluster Optimization / 1
All Rights Reserved Alcatel-Lucent 2008 18 | Optimization Process | Nov 2008
Cluster Optimization : Only voice services: 2 drives
Drive 1:Voice lock + unlock (Before Optimisation work)
Drive 2:Voice lock + unlock (After optimisation work)
Analysis
Interference / Pilot Pollution
Quality & RF coverage
SHO & HHO area
Drop and Establishment Failures
HSxPA Performance
PLO Process - Cluster Optimization / 2
Drive Test Test name Fix/mob Mobile
Trace
mobile
Protocole
Before Optimisation
1 1 Voice 3G Mobile to Test Number Mobility Lock MOC 3600s, 45s
1 2 Voice 3G Mobile to Test Number Mobility Unlock MOC 90s, 45s
After Optimisation
2 1 Voice 3G Mobile to Test Number Mobility Lock MOC 3600s, 45s
2 2 Voice 3G Mobile to Test Number Mobility Unlock MOC 90s, 45s
All Rights Reserved Alcatel-Lucent 2008 19 | Optimization Process | Nov 2008
Cluster Optimization Analysis Plot
All Rights Reserved Alcatel-Lucent 2008 20 | Optimization Process | Nov 2008
PLO Process - Network Optimization / 1
Network optimization Optimize a group of clusters covering a
certain region or a complete Network.
Same activities as in cluster optimization but on network (Network) wide,
to ensure the homogeneous quality of the network
Focus done in the inter-cluster areas
Lessons learnt from customer roll-out
Drive test roads should be defined thanks to a RNP study and the Cluster
Optimization.
AMR, Video, PS DL service will be tested (including HSxPA features)
Mobile for voice service can be in dual mode (3G-2G) (to test
mobility to 2G)
Main routes only can be driven To be defined by RNP study
All Rights Reserved Alcatel-Lucent 2008 21 | Optimization Process | Nov 2008
Network Optimization: Main roads
Analysis
Quality & RF coverage
SHO & HHO area for each services
Drop and Establishment Failures
HSPA Performance
Drive Test Test name Fix/mob
Mobil
e
Trace
mobile
Protocole
AMR Voice
1 1 Voice 3G Mobile to Test Number Mobility Unlock MOC 90s, 45s
Video CS64
2 2 Video 3G Mobile to 3G Mobile Mobility Lock MTM 90s, 15s
PS DL
3 3 PS DL384 kps Mobility Lock MOC 5 MB
PLO Process - Network Optimization / 2
All Rights Reserved Alcatel-Lucent 2008 22 | Optimization Process | Nov 2008
Network Optimization Plots
All Rights Reserved Alcatel-Lucent 2008 23 | Optimization Process | Nov 2008
Cluster & Network Optimization Readiness
Cluster Definition
DT Route Definition
DT Planification
(Reg. Manager + Team Leader)
Ready for Optim
List
Cluster sites
ready > 90% ?
Yes
No
Drive Test
DT Route
Definition
DT Planification
(Reg. Manager + Team Leader)
Optimised Cluster
List
Optimised
Cluster = 100% ?
Yes
No
Drive Test
RNP
Drive Test Technician
RNO Team
Regional Manager
Cluster Optimization Network Optimization
All Rights Reserved Alcatel-Lucent 2008 24 | Optimization Process | Nov 2008
Drive Test Troubleshooting Flow
Drive Test
Data Storage
RNO Analysis
(Pilot Pollution, coverage hole,
HO Fail, missing neighb., etc)
Perf. OK ?
High Level
Radio Support
Network Modification
(param, aerial, neighb.)
Non identified
Problem
System Problem
Validation Process
with Operator
Validation DT
Planification
Validation DT
TT Closure
No
Yes
Cluster Drive Test
planned
Network Drive Test
planned
Drive Test Technician
Operator
RNO Team Leader
RNO Team
Problem Identification
Planned Operations
Process
Trouble Ticket
Process
O&M
All Rights Reserved Alcatel-Lucent 2008 25 | Optimization Process | Nov 2008
Network Change Request Flow
Problem Detected during
Drive Test
Aerial modification
Cell Change Simulation
Before / After
2G impact?
Aerial Modification Proposal
Operator
sub-region
validation
Modification proposal
ACCEPTED
PLANNED OPERATIONS
PROCESS
Operator
2G validation
Modification proposal
REJECTED
Issue Raised during
weekly Optimization
meetings
Parameter or neighbours
modification
Parameter Modification
Proposal
Sub-region
RNP
Sub-region
RNO Team Leader
Sub-region
RNO Team
Operator
Regional Manager
Yes
No
Yes
No Yes
No
Modification Rejected
Cause 2G
Modification request
to O&M Co-ordinator
All Rights Reserved Alcatel-Lucent 2008 26 | Optimization Process | Nov 2008
PLO Process - Network Acceptance
Network Acceptance Report:
Include drive tests plots and KPIs results
Drive Tests protocol:
Drive1: Test 1 and Test 3 (Voice 3G -> PSTN + Video MTM)
Drive2: Test 2 and 6 (Voice MTM + PS UL)
Drive3: Test 5 (PS DL)
Drive4: Test 4 (PS attach+ PDP+RTT)
Drive 5: Test 7 (Intra RAT HO AMR & PS)
Drive Test Test name Fix/mob
Mobil
e
Trace
mobile
Protocole Samples
1 1 Voice 3G Mobile to PSTN Mobility Unlock MOC 90s, 45s 200 or Complete DT routes
2 2 Voice 3G Mobile to 3G Mobile Mobility Unlock MTM 90s, 45s 200 or Complete DT routes
1 3 Video 3G Mobile to 3G Mobile Mobility Lock MTM 90s, 15s 200 or Complete DT routes
4 4
PS attach + PDP activation
+ RTT 64/64; 64/128; 64/384 Fix Lock
Payload 32
Bytes 100 or Complete DT routes
3 5 PS DL384 kps Mobility Lock MOC 5 MB 5 or Complete DT routes
2 6 PS UL 128kps Mobility Lock MOC 2 MB 5 or Complete DT routes
5 7 Intra RAT Handover AMR and PS
2/3
roads
Border Unlock MOC
As soon HHO
to 2G + 20s
All Rights Reserved Alcatel-Lucent 2008 27 | Optimization Process | Nov 2008
PLO Process Example of Network Acceptance KPI
KPI CBD/ DU Polygon Urban Polygon SubUrban Polygon Rural/ Highway Polygon
CS
CS AMR12,2 kps VOICE CALL
CPICH RSCP > = -80dBm @ 95%> = -87dBm @ 95%> = -93dBm @ 95%> = -95dBm @ 95%
CPICH EcIo > = -10 dB @ 95% > = -10 dB @ 95% > = -12 dB @ 95% > = -14 dB @ 95%
Call Setup Time
3G mob to 3G mob < = 8 sec @ 80% < = 8 sec @ 80% < = 8 sec @ 80% < = 8 sec @ 80%
3G mob to PSTN < = 6 sec @ 80% < = 6 sec @ 80% < = 6 sec @ 80% < = 6 sec @ 80%
Call Setup Success
3G mob to 3G mob > = 98% > = 98% > = 98% > = 98%
3G mob to PSTN > = 98% > = 98% > = 98% > = 98%
Call Quality
Call Drop Rate < = 2% < = 2% < = 2% < = 2%
BLER% (2) < = 2% < = 2% < = 2% < = 2%
Inter RAT HHO succ rate > = 95% > = 95% > = 95% > = 95%
inter RNC Soft HO Success rate (3) > = 95% > = 95% > = 95% > = 95%
intra RNC Softer HO Success rate (3) > = 95% > = 95% > = 95% > = 95%
CS 64 VIDEO CALL
VT Call: 3G mob to 3G mob setup delay < = 12 sec @ 80% < = 12 sec @ 80% < = 12 sec @ 80% < = 12 sec @ 80%
VT callSetup success rate > = 98% > = 98% > = 98% > = 98%
VT call drop rate < = 3% < = 3% < = 3% < = 3%
BLER% (2) < = 2% < = 2% < = 2% < = 2%
PS
PDP context Activation succ rate > = 97% > = 97% > = 97% > = 97%
PS attach failure rate (PS drop call rate) (4)< = 3% < = 3% < = 3% < = 3%
UL Thpt for PS 64 @ 50km/ h Avg 51 kbps Avg 51 kbps Avg 51 kbps Avg 51 kbps
DL Thpt for PS 128 @ 50km/ h Avg 102 kbps Avg 102 kbps Avg 102 kbps Avg 102 kbps
DL Thpt for PS 384 @ 50km/ h Avg 307 kbps Avg 307 kbps
Round Trip Time for 64 kbps PS service < = 300ms @ 90% < = 300ms @ 90% < = 300ms @ 90% < = 300ms @ 90%
Round Trip Time for 128kbps PS service < = 200ms @ 90% < = 200ms @ 90% < = 200ms @ 90% < = 200ms @ 90%
Round Trip Time for 384 kbps PS service < = 150ms @ 90% < = 150ms @ 90% < = 150ms @ 90% < = 150ms @ 90%
inter RNC Soft HO Success rate (3) > = 95% > = 95% > = 95% > = 95%
intra RNC Softer HO Success rate (3) > = 95% > = 95% > = 95% > = 95%
Inter RAT HHO succ rate > = 95% > = 95% > = 95% > = 95%
All Rights Reserved Alcatel-Lucent 2008 28 | Optimization Process | Nov 2008
PLO Process - Late site Optimization
Definition:
Site planned but the site integration has been delayed
Cluster 90% readiness. Unwarranted delay
Objective:
Optimise these sites one by one without any
degradation of the existing network.
Drive Tests procedure:
Scanner + Mobile locked in 3G
AMR, Video and PS DL/UL service
Incar measurements
Acceptance Results:
Based on Full Acceptance Test Cases
Only for optimize site
All Rights Reserved Alcatel-Lucent 2008 29 | Optimization Process | Nov 2008
Post Launch Optimization
4
All Rights Reserved Alcatel-Lucent 2008 30 | Optimization Process | Nov 2008
Post-launch UTRAN Radio Optimization
QoS monitoring from OMC
Daily alerter
Weekly dashboards
Worst Cell List
QoS monitoring from Drive tests
Optimization activities
Antenna optimization: tilt and eventually azimuth, on site tuning
Neighbor tuning (adjacency addition and deletion on OMC)
Logical Parameters tuning and modification on OMC
Feature testing and implementations (with operation support)
New site and new BB QoS follow-up
(Site Optimization linked to site final acceptance)
Capacity Network Management
Capacity Network optimization (CEM reshuffling)
Traffic dimensioning for Code & Power
Iub capacity enhancement (IMA)
All Rights Reserved Alcatel-Lucent 2008 31 | Optimization Process | Nov 2008
Post-Launch - Periodical Drive Test
Periodical Drive Test campaigns.
Objective: Objective:Periodical Drive test call
statistics as seen by the end users on
specific roads (usually main roads).
Services:
Radio assessment :
Voice AMR Long call and Visio CS64
Long call
-> coverage, pilot pollution, etc.
Network performance :
Voice AMR Short calls, Visio CS64
short calls, PS DL 384, PS UL 64
-> CSSR, Call Drop Rate, average
throughput, etc.
Troubleshooting traces.
Objective: Objective: Identifying the cause of
network problem flag by RNE.
Collecting data on problem area found
in Drive test in order to complete the
analyse.
Services:
Vary according to the type of
problem.
->If radio problem: CS service.
If not sufficient combined with Iu/Iub
traces and spectrum measurement.
All Rights Reserved Alcatel-Lucent 2008 32 | Optimization Process | Nov 2008
Once traffic build-up, allows reliability of counter-based statistics
Each week and/or each day : KPI report (Dashbord) and worst cells lists per KPI are collected
through ALU NPO, on a per area basis and network . (->Trouble Ticket, Drive Test, Iu traces, Iub
traces).
QoS Data (examples) :
Traffic
CSSR & Call drop
HHO success rate
SHO success rate
Congestion
RRC success rate
Post-Launch - Optimization based on statistics
All Rights Reserved Alcatel-Lucent 2008 33 | Optimization Process | Nov 2008
Counters
Applicability
Counters Applicability
Monitoring and troubleshooting
Issues & nw malfuctions detection
Failure identification and analysis
Report Executive level KPIs
Accessibility
Retainability
Network Quality
Network Traffic and Congestion
Network Reliability
Network expansion planning
Derive Call Models
Capacity Evaluation / Growth planning
Network architecture optimization
Transmission plan optimization
New services introduction
Network Optimization
Detailed Performance monitoring
Quality of Service Evaluation
Network Parameters Tuning
Cell level optimisation (RF & Cell
Parameters)
New features introduction
All Rights Reserved Alcatel-Lucent 2008 34 | Optimization Process | Nov 2008
Radio Network Engineering
Activities
5
All Rights Reserved Alcatel-Lucent 2008 35 | Optimization Process | Nov 2008
Optimization Activities - Overview
Drive tests Measurement Campaigns :
Brings information about the Network performance.
Possibility to Identify and Correct Network problems.
The following elements will be analyzed from all the data collected in order to
determine the overall quality of the Network performance :
- Coverage
- Quality
- Neighbor List
- Call Admission Failure
- Drop Calls
W
h
a
t

t
o
a
n
a
l
y
z
e
?
?
All Rights Reserved Alcatel-Lucent 2008 36 | Optimization Process | Nov 2008
3G Optimization vs. 2G Optimization
3G Optimization
Interference optimization
Key issue as only ONE frequency
Optimize adjacencies (3G,3G-2G)
Parameters optimization
Based on drive-tests measurements for the
moment. ( Pre-Launch Optimization)
2G Optimization
Interference optimization
Based on frequency plan
Optimize adjacencies (2G ONLY)
Parameters optimization
Based on statistic data (Metrica) & Drive
test
Optimization processes are similar to GSM experience
but to be slightly adapted to reflect 3G technical specificities
More attention on planning issue
Take into account 2G/3G interworking
Training Needed
UMTS fundamentals training
Optimization: On Job Training
All Rights Reserved Alcatel-Lucent 2008 37 | Optimization Process | Nov 2008
Optimization Activities Drive Test Route
The definition of the drive test road is a very import task and
should be done very carefully.
The definition of the drive test road is a very import task and The definition of the drive test road is a very import task and
should be done very carefully. should be done very carefully.
Recommendations:
Optimization routes are defined from primary
(e.g. highways) and secondary (e.g. Network
boulevards).The engineering team should
determine additional roads in traffic areas where
interference and soft handover are expected.
Depend of the Optimization phase:
For Cluster optimization = dense roads
For network optimization the road are less
dense but the area is bigger.
A route should adequately cover 4-6 hours
drive, depending on sites count.
Should be the same for the drive test BEFORE
and AFTER optimization..
Recommendations: Recommendations:
Optimization routes are defined from primary Optimization routes are defined from primary
(e.g. highways) and secondary (e.g. Network (e.g. highways) and secondary (e.g. Network
boulevards) boulevards). .The engineering team should The engineering team should
determine additional roads in traffic areas where determine additional roads in traffic areas where
interference and soft handover are expected. interference and soft handover are expected.
Depend of the Optimization phase: Depend of the Optimization phase:
For Cluster optimization = dense roads For Cluster optimization = dense roads
For network optimization the road are less For network optimization the road are less
dense but the area is bigger. dense but the area is bigger.
A route should adequately cover 4 A route should adequately cover 4- -6 hours 6 hours
drive, depending on sites count. drive, depending on sites count.
Should be the same for the drive test Should be the same for the drive test BEFORE BEFORE
and AFTER optimization.. and AFTER optimization..
All Rights Reserved Alcatel-Lucent 2008 38 | Optimization Process | Nov 2008
Optimization Activities - Coverage
Coverage
Constraints:
A minimum RSCP level is required to maintain
and/or establish a call and a specific Service
-> is very important to understand the coverage
limitations and expectations of your network.
Optimization:
+Antenna Tilting
+Sector re-azimuth
+CPICH Power Optimisation
+Add new site in order to change the RSCP levels
allocation.
+Each individual sector should be dominant only on
his pre-defined area.
Definition: The CPICH RSCP (Received Signal Code Power) provides indication of the
availability of DL Pilot Channel, coverage, to meet services requirements.
All Rights Reserved Alcatel-Lucent 2008 39 | Optimization Process | Nov 2008
Optimization Activities - Quality
Quality
Definition:
The network radio quality indicator is the CPICH Ec/Io.
This indicator provides a clear vision of the level
of interference created by other cells over the
most likely server, in a certain area.
Constraints:
If a certain CPICH Ec/Io is not meet the UE will not
be able to communicate with the BS, not being able
to establish a call and possibly dropping it if already
connected.
A bad CPICH Ec/Io will correspond to a bad UE
Ec/No which is used to evaluate and execute
HO events and Active Set updates, indispensable
to maintain a connection.
Optimization:
The optimization action applied are the same as for
the coverage.
All Rights Reserved Alcatel-Lucent 2008 40 | Optimization Process | Nov 2008
Optimization Activities - Pilot Pollution
Scanner/Mobile analysis
Mobile analysis confirm:
The RF coverage for each cell inside the cluster
Insure the power settings
Neighbour list tuning.
No dominant server => Pilot pollution / wastage of radio resource
Coverage and Quality
EcIo GOOD EcIo BAD
RSCP GOOD OK
Interference
Insuffisant Overlap
RSCP BAD Coverage Problem Coverage Problem
All Rights Reserved Alcatel-Lucent 2008 41 | Optimization Process | Nov 2008
Optimization Activities - Neighbour Cell
Neighbour List (3G-3G; 3G-2G)
Definition: In order to perform the mobile measure:
EcIo of the neighbor cells for SHO
EcIo or RSCP (parameter) of the neighbor cells for HHO
Constraints:
The Uu not check cells that are not declared in the neighboring list even if it is the best cell.
Unwanted noise and the quality deteriorated.
Initial declaration:
Automatic With the planning tool
Manual: Mapinfo (macro) and/or with 2G counters statistic NPO (HO request)
Optimization:
Automatic: Post processing tool queries. Be careful only based on the drive test samples.
Manual: Compares both scanner and mobile maps. Mobile CPICH EcIo or RSCP and Scanner
CPICH EcIo or RSCP.( If the correct cell is not used in HO, the mobile will be degraded comparing
to scanner. )
All Rights Reserved Alcatel-Lucent 2008 42 | Optimization Process | Nov 2008
Optimization Activities Failure Events
Drop Calls/ Calls setup fail
Definition:
Those events are a reaction of the UE, or of the RNC, to a certain problem.
A Drop can be due to RADIO,UTRAN or CN problem (SYSTEM)
Optimization:
All the previous slides explained the causes
The of problem lead to those events, so its
imperative to control them.
+You should know the story of the call
+Ask you question:
What are the events before the drop?
Coverage?
Quality?
AS count?
Compress mode?
All Rights Reserved Alcatel-Lucent 2008 43 | Optimization Process | Nov 2008
Optimization Tools
6
All Rights Reserved Alcatel-Lucent 2008 44 | Optimization Process | Nov 2008
Tools Objectives
Enhance Network Performance
Parameter Optimisation
System debugging / On-the-field Feature Validation
Audit the network for smart introduction of new features
Network Performance Monitoring
KPI Reporting / Performance Benchmark
Complement Counters view
Early System Testing
Be ready before commercial launch
Assessing the impact of new features / risk control
Generate Services revenues
Added value services based on system expertise and early knowledge
New technology introduction strategy / Customer guidance
Enhance Product Portfolio
New OAM products
Ideas for feature enhancements
All Rights Reserved Alcatel-Lucent 2008 45 | Optimization Process | Nov 2008
RNC
Iub
NodeB
Iu
RF
Scanner
XCAL
O&M
IP
Counters
Nethawk -
Radcom
PrOptima
NodeB Logs
Call
Tracing
Internal
RFO -
BORIS
XCAP
UE
Qualcomm 6275/6280/7200
Datacard Option
Engineering Tools
All Rights Reserved Alcatel-Lucent 2008 46 | Optimization Process | Nov 2008
Tools Mapping
PrOptima
Internal
RFO -
BORIS
RNC
Iub
NodeB
Iu
O&M
IP
RF Scanner
XCAL
UE
Internal
RFO -
BORIS
XCAP
Nethawk -
Radcom
CTb
NodeB Logs
counters
CTg
Drive Test
Optimisation
Troubleshooting
Benchmarking
Reporting
Troubleshooting
Monitoring
Reporting
Remote
Troubleshooting
& Optimisation
Pre-launch optimisation
(Deployment)
On-going optimisation
(Live Network)
OPTIMISATION COMPLEXITY
T
O
O
L
S

U
S
A
G
E
All Rights Reserved Alcatel-Lucent 2008 47 | Optimization Process | Nov 2008
ALU Internal
RF Tools
All Rights Reserved Alcatel-Lucent 2008 48 | Optimization Process | Nov 2008
Call Trace
Applicability
Call Trace Applicability
Detailed troubleshooting
Reduced need for external probes
Over the air message flows
Over the air message content
Internal network messaging on all
external interfaces
Internal Network events
Error message analysis
Remote Optimization
Avoid Unecessary & Costly Drive Tests
Scrambling Code Analysis
Detailed Handover Statistics
Neighbouring List Tuning
RF Coverage Control
RF Coverage Improvement
Network Validation & IOT
Inter-operability testing with
mobile vendors
Inter-operability with Core
Network
NW Acceptance and New
Services indroduction
Advanced Optimization
Detailed Performance monitoring
Quality of Service Evaluation
Detailed Parameter Optimisation
(Power Control, BLER targets, ...)
New features introduction
Dropped Call and Access Failues
root-cause analysis
Detailed KPIs
Possibility to Merge Call Trace data
with Drive Tests logs
Detailed per RNC, Cell & Service
Statistics
All Rights Reserved Alcatel-Lucent 2008 49 | Optimization Process | Nov 2008
Call Tracing Types
CTa
Trace all calls of specific UE(s)
Activated from Core Network
CTb
Trace all calls of specific UE(s)
Activated from Access Network (UTRAN)
CTg
Trace a % of calls over the NW on a specific cell or group of
cells.
Activated from Access Network
Object
Tracing
Trace data related to all elements (events) handled by an
object of the network :
A cell or group of cells
Iu CS interface
Iu PS interface
Neighbor RNC (an Iur) or a group of neighbor RNC
One RNC
Activated from Access Network
CTn
Trace a % of calls (only neighbouring optimisation related
messages) over the NW on a specific cell or group of cells.
Activated from Access Network
Post-Processing with WQA Tool (UA5)
UA5
All Rights Reserved Alcatel-Lucent 2008 50 | Optimization Process | Nov 2008
Powerful feature to trace all calls in a certain
area.
RFO capable to post-process Call Traces files.
Employed for:
Trouble-shooting
Features Optimisation
Network KPIs computation
Traffic Distribution
Remote Troubleshooting & Optimisation
Minimum Drive Tests
Performance Management with Geographical Call Traces (CTg)
All Rights Reserved Alcatel-Lucent 2008 51 | Optimization Process | Nov 2008
ALU - RFO
Used by R&D & Core WNE. Early Readiness &
Product Phased tool.
Post-processing Tool to analyse data log files
from UE acquisition tools, Call Trace and
NodeB logger.
Advanced post-processing solution for HSDPA
and HSUPA.
Supports traces from: XCAL, QXDM and Opera
(Alcatel-Lucent).
Mapping capabilities.
Synchronised multi-window MMI.
Synchronises Call Tracing and NodeB Logger
files with UE files.
All Rights Reserved Alcatel-Lucent 2008 52 | Optimization Process | Nov 2008
RFO GUI
All Rights Reserved Alcatel-Lucent 2008 53 | Optimization Process | Nov 2008
Features of Alcatel-Lucents Call Trace Function
UE traces processing: Couei / Nemo / TOM files / TEMS (UE & Scanner)
RNC Call Trace processing capabilities: CTa / CTb (IMSI) / CTg / OT-Cell (GEO)
Full Protocol decoding capabilities: RRC / QCT / NBAP / RNSAP / RANAP
Sync capabilities across all traces
N-KPIs calculation (based on UE & CT traces)
Call Log summary with Alarms and message pairing
Call Model / State machine aligned with product features (based on message
information element content)
Built-in diagnosis (based on all types of traces)
HSxPA ready
Graphical and Mapping MMI
All Rights Reserved Alcatel-Lucent 2008 54 | Optimization Process | Nov 2008
Commercial
RF Tools
All Rights Reserved Alcatel-Lucent 2008 55 | Optimization Process | Nov 2008
Drive Test - Equipment Configuration
All Rights Reserved Alcatel-Lucent 2008 56 | Optimization Process | Nov 2008
Drive Test Tools Chain
Incar measurements for the UE and outdoor
for the scanner
No attenuation
Trace mobile
Uu trace analysis
Uu trace tool
Off-line post-processing
Real-time trace capture
Nemo
Ranopt
Scanner
Nokia
All Rights Reserved Alcatel-Lucent 2008 57 | Optimization Process | Nov 2008
RF Scanner.
Used to evaluate the radio propagation
characteristics of a wireless network.
4MHz band wide band.
Models 8720 can be used for indoor testing.
High accuracy by high speed sampling.
Measures EcNo, RSCP, SIR in the CPICH and
EcNo, RSCP in the SCH.
Can be blocked to specific SC.
Spectrum monitor mode.
Can measure simultaneously 2 FDD carriers
ANRITSU ML8720B-C / ML8740-1
All Rights Reserved Alcatel-Lucent 2008 58 | Optimization Process | Nov 2008
Drive Test Data Acquisition Tool.
Supports different UEs: Qualcomm, Nokia,
Sanyo, Samsung, LG, Novatel Data card
Multi-UE testing available.
Real time RRC/PPP/FTP layers message
displayed.
AutoCall Function.
Real time mapping function with
positioning information and general
call related parameters.
WCDMA Scanner (Anritsu, Panasonic,
PCTEL) and GPS logged with UE data.
NEMO Outdoor
All Rights Reserved Alcatel-Lucent 2008 59 | Optimization Process | Nov 2008
PP Tools : NEMO Analyzer @ RANOPT
Post-processing Tool to analyse the data log files
from Nemo Outdoor
WCDMA, EDGE, GPRS and GSM.
Multi-display of traced data: Messages, Graphs,
Maps and Tables.
Synchronisation between views.
Automatic generation of customized reports in
PowerPoint and Excel format.
Graphical Analysis: drag & drop, multiple graphs
per window.
All collected messages are decoded, filtering
capabilities.
Statistics available: KPI indication, setup events,
time between messages, message count.
All Rights Reserved Alcatel-Lucent 2008 60 | Optimization Process | Nov 2008
NPO (Network Performance Optimizer)
ALUs Performance Management Solution.
Allows to monitor the network performance,
detect network issues and troubleshoot them
through the counters.
Collects and stores for long periods of time all
the UTRAN counters.
Includes metrics (indicator based on several
counters) defined by Alcatel-Lucent.
The counters are available at RNC level and/or
at FDDCell level.
Easy report generation (drag & drop).
Pre-defined reports available.
Intersystem Cell Reselection
0
200000
400000
600000
800000
1000000
1200000
15-mar-06 22-mar-06 29-mar-06
80.00%
82.00%
84.00%
86.00%
88.00%
90.00%
92.00%
94.00%
96.00%
98.00%
100.00%
Attempts Success Success Rate
All Rights Reserved Alcatel-Lucent 2008 61 | Optimization Process | Nov 2008
APAC 3G Success Story
8
All Rights Reserved Alcatel-Lucent 2008 62 | Optimization Process | Nov 2008
APAC 3G Success Story Operator C
+ 7 RNCs, more than 800 sites in 4 regions.
+ PLO Completed for 87 clusters, with UTRAN network fine-tuned
+ PLO Acceptance Drive Test with 23 KPIs per cluster >> all meet
+ Handled 23.5 million calls a week, 65% of it PS traffic >> Unlimited
Broadband Data package
All Rights Reserved Alcatel-Lucent 2008 63 | Optimization Process | Nov 2008
APAC 3G Success Story Operator C
** Weekly Statistics
Network Statistical
Performance for
major QoS KPI
All Rights Reserved Alcatel-Lucent 2008 64 | Optimization Process | Nov 2008
www.alcatel-lucent.com
www.alcatel-lucent.com
All Rights Reserved Alcatel-Lucent 2008 65 | Optimization Process | Nov 2008
Backup Slides
All Rights Reserved Alcatel-Lucent 2008 66 | Optimization Process | Nov 2008
Principle
It creates artificial interference in downlink
It is used to simulate downlink load and perform tests with one or several
UE, providing that RAC is passed
Downlink load simulation with OCNS*
* OCNS : Orthogonal Channel Noise Simulation
Node
B
Common channels
OCNS channels
Dedicated channels
All Rights Reserved Alcatel-Lucent 2008 67 | Optimization Process | Nov 2008
NodeB Emission Power Impact
Emission Max Power 43 dBm 19952,6 Emission Max Power 43 dBm 19952,6
dBm
CPICH
Reference
Activity
Factor
(% time) mW dBm
CPICH
Reference
Activity
Factor
(% time) mW
OCNS 0 100% 1,0 OCNS 37,8 100% 6025,6
CPICH 33 1995,3 CPICH 33 1995,3
P-SCH 28 -5 5% 31,5 P-SCH 28 -5 5% 31,5
S-SCH 28 -5 5% 31,5 S-SCH 28 -5 5% 31,5
SCCPCH (FACH+PCH) 29 -4 0% 0,0 SCCPCH (FACH+PCH) 29 -4 0% 0,0
PCCPCH (BCH) 31 -2 90% 1133,0 PCCPCH (BCH) 31 -2 90% 1133,0
AICH 24 -9 80% 201,0 AICH 24 -9 80% 201,0
PICH 28 -5 96% 605,7 PICH 28 -5 96% 605,7
DCH 100% 0,0 DCH 100% 0,0
P totale 36,0 3999,1 P totale 40,0 10023,7
% Load (common channels + OCNS) 20% % Load (common channels + OCNS) 50%
% Load (OCNS) compared to max power 0,0% % Load (OCNS) compared to max power 30,2%
% Load (OCNS) compared to traffic 0,0% % Load (OCNS) compared to traffic 30,2%
C
o
m
m
o
n

c
h
a
n
n
e
l
s
C
o
m
m
o
n

c
h
a
n
n
e
l
s
Without
OCNS
OCNS
for 50% Load

Anda mungkin juga menyukai