Alcatel-Lucent 2008 2 Optimization Process Nov 2008 Agenda 1. Introduction to optimization 2. Radio Network Planning 3. Pre Launch Optimization and Acceptance PLO - Single Site Verifications (SSV) PLO – Cluster and Network Optimizations / acceptance (LSO) 4. Post Launch Optimization 5. Radio Network Engineering Activities 6. Optimization Tools 7. APAC 3G Success Story x Methods may differ for : Pre-launch optimization (performed for acceptance, trials) Post-launch monitoring and optimization (E2E performance for in-service
Alcatel-Lucent 2008 2 Optimization Process Nov 2008 Agenda 1. Introduction to optimization 2. Radio Network Planning 3. Pre Launch Optimization and Acceptance PLO - Single Site Verifications (SSV) PLO – Cluster and Network Optimizations / acceptance (LSO) 4. Post Launch Optimization 5. Radio Network Engineering Activities 6. Optimization Tools 7. APAC 3G Success Story x Methods may differ for : Pre-launch optimization (performed for acceptance, trials) Post-launch monitoring and optimization (E2E performance for in-service
Hak Cipta:
Attribution Non-Commercial (BY-NC)
Format Tersedia
Unduh sebagai PDF, TXT atau baca online dari Scribd
Alcatel-Lucent 2008 2 Optimization Process Nov 2008 Agenda 1. Introduction to optimization 2. Radio Network Planning 3. Pre Launch Optimization and Acceptance PLO - Single Site Verifications (SSV) PLO – Cluster and Network Optimizations / acceptance (LSO) 4. Post Launch Optimization 5. Radio Network Engineering Activities 6. Optimization Tools 7. APAC 3G Success Story x Methods may differ for : Pre-launch optimization (performed for acceptance, trials) Post-launch monitoring and optimization (E2E performance for in-service
Hak Cipta:
Attribution Non-Commercial (BY-NC)
Format Tersedia
Unduh sebagai PDF, TXT atau baca online dari Scribd
- 3G Workshop Mohamed Arshad MoAD RNE SSEAI Kuala Lumpur November 2008 All Rights Reserved Alcatel-Lucent 2008 2 | Optimization Process | Nov 2008 Agenda 1. Introduction to Optimization 2. Radio Network Planning 3. Pre Launch Optimization & Acceptance PLO Single Site Verifications (SSV) PLO Cluster & Network Optimizations / Acceptance PLO Late Site Optimization (LSO) 4. Post Launch Optimization 5. Radio Network Engineering Activities 6. Optimization Tools 7. APAC 3G Success Story All Rights Reserved Alcatel-Lucent 2008 3 | Optimization Process | Nov 2008 Introduction to Optimization 1 All Rights Reserved Alcatel-Lucent 2008 4 | Optimization Process | Nov 2008 Optimization aims at improving the network performance and/or network capacity. To improve the system initial performance To enhance the subscriber satisfaction To increase the number of subscribers To cater varying traffic pattern & usage Methods may differ for : Pre-launch optimization (performed for acceptance, trials) Post-launch monitoring and optimization (E2E performance for in-service networks) Introduction : Why Optimize a Network?? All Rights Reserved Alcatel-Lucent 2008 5 | Optimization Process | Nov 2008 Radio Optimization Services Radio Optimization Services Pre Launch Single Site Verification Network Optimisation Network Acceptance Radio Network Planning Roll-out & integration Strategy Definition Network life Post Launch Cluster Optimisation Radio Network Optimization Radio Network Planning Pre-Launch Optimization -No network load (limited traffic) -Cluster optimization on drive test data -High optimization gains -OCNS (optional) Post-Launch Optimization -Significant network load (increasing) -Optimization based on statistical data (counters, traces) -Optimization gain less, but baseline performance higher -Periodic route drive test Network Optimization Phases All Rights Reserved Alcatel-Lucent 2008 6 | Optimization Process | Nov 2008 Radio Network Planning 2 All Rights Reserved Alcatel-Lucent 2008 7 | Optimization Process | Nov 2008 RNP - Design / Planning Assessment (Default) Deliverables Final report presenting all the agreed theoretical exclusion areas and detailed acceptance protocol Customer Benefits Check of Customers RNP allows early adaptations if necessary Clear and shared vision of future networks performances Activities In case Network Design & Planning is under Customers responsibility, assessment allows to : -Refine targeted KPIs -agree on detailed acceptance protocol (DT road definition, coverage holes exclusions) -propose initial design improvements (e.g. antenna tilts, CPICH Power, SC Reuse Plan) All Rights Reserved Alcatel-Lucent 2008 8 | Optimization Process | Nov 2008 RNP - Radio Network Planning (Alternative) Deliverables Final Radio Network Plan report, including final sites location, antennas, RF parameters, Coverage/Interferences plots of the final design Customer Benefits Complete Radio Network Plan based on Alcatel-Lucent 3G international expertise Optimized CAPEX by leveraging existing sites Risk sharing through higher Alcatel-Lucent commitments Activities Initial RNP : -Coverage -Service coverage -Interference predictions -Neighborhood Planning -areas Cell Planning : -Site Radio Survey / Ranking -Continuous RNP -Cell parameters planning -Coexistence / Cositing / Site optimization -HO / Scrambling code planning -Site Search Areas to acquisition team All Rights Reserved Alcatel-Lucent 2008 9 | Optimization Process | Nov 2008 Example: Clusterization & DriveTest Route Planning Cluster Site Status:- Total Sites : 26 (4 IBS Sites) On-Air : 26 Status as 4 th June 08 The length of this drive is around 80 Km. (~ 7 hours per test) Comments : The drive goes through each main road from this area and through each cell. Cluster Q1_KCH1 polygon Drive Route 3G Site All Rights Reserved Alcatel-Lucent 2008 10 | Optimization Process | Nov 2008 Timeline & Resources O Resources 1 Drive Test team 1 RNE + 1 Back Office Support 1 Rigger team Support from OMC and Technical Support team. Support from ROM team. During the Cluster Acceptance, one person from Operator to verify testing procedures and results O Timeline Week Wk N-1 Wk N+0 Wk N+1 Wk N+2 Wk N+3 Wk N+4 Wk N+5 Wk N+6 Wk N+7 Wk N+8 Wk N+9 Wk >> N+9 Site Database SSV PLO - Cluster Optimization PLO - Network Optimization PLO Acceptance PLO Report & Presentation Post Launch Optimization - E2E All Rights Reserved Alcatel-Lucent 2008 11 | Optimization Process | Nov 2008 Test Methodology Test Test name Fix/mob Mobile Trace mobile Samples Protocol 1 Voice 3G Mobile to PSTN Mobility Dual Mode MOC 200 90s,30s 2 PS DL 384 kbps Mobility Lock MOC Complete Route 5M 3 PS UL 128 kbps Mobility Lock MOC Complete Route 2M 4 Video 3G mobile to 3G Mobility Lock MOC 200 90s,30s 5 Voice 3G Mobile to 3G Mobile Mobility Dual Mode MOC 200 90s,30s 6 RTT 64/64; 64/128; 64/384 Fix Lock Static 100 for each Test (1 location) 7 PS attach + PDP activation Fix Lock Static 100 for each Test (1 location) - In-car measurements for the UEs and outdoor for the scanner - No attenuation chain - For MTM tests, the terminating mobile will be under good radio condition (Static) - In parallel Iu Iub traces will be taken. (CTb trace) All Rights Reserved Alcatel-Lucent 2008 12 | Optimization Process | Nov 2008 Pre Launch Optimization & Acceptance 3 All Rights Reserved Alcatel-Lucent 2008 13 | Optimization Process | Nov 2008 Pre-Launch Optimization Process View PLO Standard Process: Site Verification Site Implementation Audit Cluster Optimization Antenna/Parameters/Neighbour Network Optimization KPIs Assessment Acceptance phase KPIs Acceptance Based on drive-test measurements All Rights Reserved Alcatel-Lucent 2008 14 | Optimization Process | Nov 2008 PLO Process Single Site Verification (SSV) 1. Sites Verification Objectives: Checking the consistency between the planned parameters and the ones applied. SC, LAC, RAC, CID.. Drive Tests procedure: Scanner + Mobile unlocked AMR + CS64 + PS Call / HSxPA Incar measurements Optimisation tasks: Validate Softer HO for each sector. Validate Inter-RAT(3G2G) HO No cross sector. Reliability of site identifiers applied at OMC (LAC, RAC, SC, etc) Site report SSV Check list A site report embedded to the commissioning report in order to validate the site. All Rights Reserved Alcatel-Lucent 2008 15 | Optimization Process | Nov 2008 Single Site Verification Flow SDP List OMC Parameters and Site information Check DriveTest measurement Data Storage Close TT (if any) Site Validation Report & Update ready for Optimlist OK? Parameter, SC or Softer HO Problem Crossed Sectors / Hw Failures Call Test for investigation Data Storage Trouble Ticket Process TT resolution notification Validation Report (per site) includes: CPICH RSCP & EcN0 Plot Best SC Plot Ue TxPwr Plot CS, Video & Data Call Test SHO & HHO Test Detected Issues Yes No Problem Found? . No Yes RNO Team Leader Drive Test Technician O&M RNO Team Datafillers WO Creation NMS Operator WO Execution Data Storage Drive Test Route Plan OK? Yes No Network Change Request (NCR) Network Change Request (NCR) Off-line analysis All Rights Reserved Alcatel-Lucent 2008 16 | Optimization Process | Nov 2008 Single Site Verification Report All Rights Reserved Alcatel-Lucent 2008 17 | Optimization Process | Nov 2008 Split the network into smaller areas Cluster (~20sites) Objectives identifying coverage & quality problem spots recommend aerial and adjacency modifications Analysis Interference Quality & RF coverage SHO & HHO area Drop and Establishment Failures HSxPA Performance Typical problems Pilot overshooting Weak coverage Missing neighbor Corrective tasks performed Tilt and azimuth modification Neighbor declaration (inter system included) Parameter modification. Lessons learnt from customer roll-out Roll-out should be driven by cluster in order to ensure start the optimal optimization work ASAP AMR services only to be tested (Mobile 3G lock and unlock) The drive test routes To be defined by RNP study Shall starts with 90% cluster sites readiness PLO Process - Cluster Optimization / 1 All Rights Reserved Alcatel-Lucent 2008 18 | Optimization Process | Nov 2008 Cluster Optimization : Only voice services: 2 drives Drive 1:Voice lock + unlock (Before Optimisation work) Drive 2:Voice lock + unlock (After optimisation work) Analysis Interference / Pilot Pollution Quality & RF coverage SHO & HHO area Drop and Establishment Failures HSxPA Performance PLO Process - Cluster Optimization / 2 Drive Test Test name Fix/mob Mobile Trace mobile Protocole Before Optimisation 1 1 Voice 3G Mobile to Test Number Mobility Lock MOC 3600s, 45s 1 2 Voice 3G Mobile to Test Number Mobility Unlock MOC 90s, 45s After Optimisation 2 1 Voice 3G Mobile to Test Number Mobility Lock MOC 3600s, 45s 2 2 Voice 3G Mobile to Test Number Mobility Unlock MOC 90s, 45s All Rights Reserved Alcatel-Lucent 2008 19 | Optimization Process | Nov 2008 Cluster Optimization Analysis Plot All Rights Reserved Alcatel-Lucent 2008 20 | Optimization Process | Nov 2008 PLO Process - Network Optimization / 1 Network optimization Optimize a group of clusters covering a certain region or a complete Network. Same activities as in cluster optimization but on network (Network) wide, to ensure the homogeneous quality of the network Focus done in the inter-cluster areas Lessons learnt from customer roll-out Drive test roads should be defined thanks to a RNP study and the Cluster Optimization. AMR, Video, PS DL service will be tested (including HSxPA features) Mobile for voice service can be in dual mode (3G-2G) (to test mobility to 2G) Main routes only can be driven To be defined by RNP study All Rights Reserved Alcatel-Lucent 2008 21 | Optimization Process | Nov 2008 Network Optimization: Main roads Analysis Quality & RF coverage SHO & HHO area for each services Drop and Establishment Failures HSPA Performance Drive Test Test name Fix/mob Mobil e Trace mobile Protocole AMR Voice 1 1 Voice 3G Mobile to Test Number Mobility Unlock MOC 90s, 45s Video CS64 2 2 Video 3G Mobile to 3G Mobile Mobility Lock MTM 90s, 15s PS DL 3 3 PS DL384 kps Mobility Lock MOC 5 MB PLO Process - Network Optimization / 2 All Rights Reserved Alcatel-Lucent 2008 22 | Optimization Process | Nov 2008 Network Optimization Plots All Rights Reserved Alcatel-Lucent 2008 23 | Optimization Process | Nov 2008 Cluster & Network Optimization Readiness Cluster Definition DT Route Definition DT Planification (Reg. Manager + Team Leader) Ready for Optim List Cluster sites ready > 90% ? Yes No Drive Test DT Route Definition DT Planification (Reg. Manager + Team Leader) Optimised Cluster List Optimised Cluster = 100% ? Yes No Drive Test RNP Drive Test Technician RNO Team Regional Manager Cluster Optimization Network Optimization All Rights Reserved Alcatel-Lucent 2008 24 | Optimization Process | Nov 2008 Drive Test Troubleshooting Flow Drive Test Data Storage RNO Analysis (Pilot Pollution, coverage hole, HO Fail, missing neighb., etc) Perf. OK ? High Level Radio Support Network Modification (param, aerial, neighb.) Non identified Problem System Problem Validation Process with Operator Validation DT Planification Validation DT TT Closure No Yes Cluster Drive Test planned Network Drive Test planned Drive Test Technician Operator RNO Team Leader RNO Team Problem Identification Planned Operations Process Trouble Ticket Process O&M All Rights Reserved Alcatel-Lucent 2008 25 | Optimization Process | Nov 2008 Network Change Request Flow Problem Detected during Drive Test Aerial modification Cell Change Simulation Before / After 2G impact? Aerial Modification Proposal Operator sub-region validation Modification proposal ACCEPTED PLANNED OPERATIONS PROCESS Operator 2G validation Modification proposal REJECTED Issue Raised during weekly Optimization meetings Parameter or neighbours modification Parameter Modification Proposal Sub-region RNP Sub-region RNO Team Leader Sub-region RNO Team Operator Regional Manager Yes No Yes No Yes No Modification Rejected Cause 2G Modification request to O&M Co-ordinator All Rights Reserved Alcatel-Lucent 2008 26 | Optimization Process | Nov 2008 PLO Process - Network Acceptance Network Acceptance Report: Include drive tests plots and KPIs results Drive Tests protocol: Drive1: Test 1 and Test 3 (Voice 3G -> PSTN + Video MTM) Drive2: Test 2 and 6 (Voice MTM + PS UL) Drive3: Test 5 (PS DL) Drive4: Test 4 (PS attach+ PDP+RTT) Drive 5: Test 7 (Intra RAT HO AMR & PS) Drive Test Test name Fix/mob Mobil e Trace mobile Protocole Samples 1 1 Voice 3G Mobile to PSTN Mobility Unlock MOC 90s, 45s 200 or Complete DT routes 2 2 Voice 3G Mobile to 3G Mobile Mobility Unlock MTM 90s, 45s 200 or Complete DT routes 1 3 Video 3G Mobile to 3G Mobile Mobility Lock MTM 90s, 15s 200 or Complete DT routes 4 4 PS attach + PDP activation + RTT 64/64; 64/128; 64/384 Fix Lock Payload 32 Bytes 100 or Complete DT routes 3 5 PS DL384 kps Mobility Lock MOC 5 MB 5 or Complete DT routes 2 6 PS UL 128kps Mobility Lock MOC 2 MB 5 or Complete DT routes 5 7 Intra RAT Handover AMR and PS 2/3 roads Border Unlock MOC As soon HHO to 2G + 20s All Rights Reserved Alcatel-Lucent 2008 27 | Optimization Process | Nov 2008 PLO Process Example of Network Acceptance KPI KPI CBD/ DU Polygon Urban Polygon SubUrban Polygon Rural/ Highway Polygon CS CS AMR12,2 kps VOICE CALL CPICH RSCP > = -80dBm @ 95%> = -87dBm @ 95%> = -93dBm @ 95%> = -95dBm @ 95% CPICH EcIo > = -10 dB @ 95% > = -10 dB @ 95% > = -12 dB @ 95% > = -14 dB @ 95% Call Setup Time 3G mob to 3G mob < = 8 sec @ 80% < = 8 sec @ 80% < = 8 sec @ 80% < = 8 sec @ 80% 3G mob to PSTN < = 6 sec @ 80% < = 6 sec @ 80% < = 6 sec @ 80% < = 6 sec @ 80% Call Setup Success 3G mob to 3G mob > = 98% > = 98% > = 98% > = 98% 3G mob to PSTN > = 98% > = 98% > = 98% > = 98% Call Quality Call Drop Rate < = 2% < = 2% < = 2% < = 2% BLER% (2) < = 2% < = 2% < = 2% < = 2% Inter RAT HHO succ rate > = 95% > = 95% > = 95% > = 95% inter RNC Soft HO Success rate (3) > = 95% > = 95% > = 95% > = 95% intra RNC Softer HO Success rate (3) > = 95% > = 95% > = 95% > = 95% CS 64 VIDEO CALL VT Call: 3G mob to 3G mob setup delay < = 12 sec @ 80% < = 12 sec @ 80% < = 12 sec @ 80% < = 12 sec @ 80% VT callSetup success rate > = 98% > = 98% > = 98% > = 98% VT call drop rate < = 3% < = 3% < = 3% < = 3% BLER% (2) < = 2% < = 2% < = 2% < = 2% PS PDP context Activation succ rate > = 97% > = 97% > = 97% > = 97% PS attach failure rate (PS drop call rate) (4)< = 3% < = 3% < = 3% < = 3% UL Thpt for PS 64 @ 50km/ h Avg 51 kbps Avg 51 kbps Avg 51 kbps Avg 51 kbps DL Thpt for PS 128 @ 50km/ h Avg 102 kbps Avg 102 kbps Avg 102 kbps Avg 102 kbps DL Thpt for PS 384 @ 50km/ h Avg 307 kbps Avg 307 kbps Round Trip Time for 64 kbps PS service < = 300ms @ 90% < = 300ms @ 90% < = 300ms @ 90% < = 300ms @ 90% Round Trip Time for 128kbps PS service < = 200ms @ 90% < = 200ms @ 90% < = 200ms @ 90% < = 200ms @ 90% Round Trip Time for 384 kbps PS service < = 150ms @ 90% < = 150ms @ 90% < = 150ms @ 90% < = 150ms @ 90% inter RNC Soft HO Success rate (3) > = 95% > = 95% > = 95% > = 95% intra RNC Softer HO Success rate (3) > = 95% > = 95% > = 95% > = 95% Inter RAT HHO succ rate > = 95% > = 95% > = 95% > = 95% All Rights Reserved Alcatel-Lucent 2008 28 | Optimization Process | Nov 2008 PLO Process - Late site Optimization Definition: Site planned but the site integration has been delayed Cluster 90% readiness. Unwarranted delay Objective: Optimise these sites one by one without any degradation of the existing network. Drive Tests procedure: Scanner + Mobile locked in 3G AMR, Video and PS DL/UL service Incar measurements Acceptance Results: Based on Full Acceptance Test Cases Only for optimize site All Rights Reserved Alcatel-Lucent 2008 29 | Optimization Process | Nov 2008 Post Launch Optimization 4 All Rights Reserved Alcatel-Lucent 2008 30 | Optimization Process | Nov 2008 Post-launch UTRAN Radio Optimization QoS monitoring from OMC Daily alerter Weekly dashboards Worst Cell List QoS monitoring from Drive tests Optimization activities Antenna optimization: tilt and eventually azimuth, on site tuning Neighbor tuning (adjacency addition and deletion on OMC) Logical Parameters tuning and modification on OMC Feature testing and implementations (with operation support) New site and new BB QoS follow-up (Site Optimization linked to site final acceptance) Capacity Network Management Capacity Network optimization (CEM reshuffling) Traffic dimensioning for Code & Power Iub capacity enhancement (IMA) All Rights Reserved Alcatel-Lucent 2008 31 | Optimization Process | Nov 2008 Post-Launch - Periodical Drive Test Periodical Drive Test campaigns. Objective: Objective:Periodical Drive test call statistics as seen by the end users on specific roads (usually main roads). Services: Radio assessment : Voice AMR Long call and Visio CS64 Long call -> coverage, pilot pollution, etc. Network performance : Voice AMR Short calls, Visio CS64 short calls, PS DL 384, PS UL 64 -> CSSR, Call Drop Rate, average throughput, etc. Troubleshooting traces. Objective: Objective: Identifying the cause of network problem flag by RNE. Collecting data on problem area found in Drive test in order to complete the analyse. Services: Vary according to the type of problem. ->If radio problem: CS service. If not sufficient combined with Iu/Iub traces and spectrum measurement. All Rights Reserved Alcatel-Lucent 2008 32 | Optimization Process | Nov 2008 Once traffic build-up, allows reliability of counter-based statistics Each week and/or each day : KPI report (Dashbord) and worst cells lists per KPI are collected through ALU NPO, on a per area basis and network . (->Trouble Ticket, Drive Test, Iu traces, Iub traces). QoS Data (examples) : Traffic CSSR & Call drop HHO success rate SHO success rate Congestion RRC success rate Post-Launch - Optimization based on statistics All Rights Reserved Alcatel-Lucent 2008 33 | Optimization Process | Nov 2008 Counters Applicability Counters Applicability Monitoring and troubleshooting Issues & nw malfuctions detection Failure identification and analysis Report Executive level KPIs Accessibility Retainability Network Quality Network Traffic and Congestion Network Reliability Network expansion planning Derive Call Models Capacity Evaluation / Growth planning Network architecture optimization Transmission plan optimization New services introduction Network Optimization Detailed Performance monitoring Quality of Service Evaluation Network Parameters Tuning Cell level optimisation (RF & Cell Parameters) New features introduction All Rights Reserved Alcatel-Lucent 2008 34 | Optimization Process | Nov 2008 Radio Network Engineering Activities 5 All Rights Reserved Alcatel-Lucent 2008 35 | Optimization Process | Nov 2008 Optimization Activities - Overview Drive tests Measurement Campaigns : Brings information about the Network performance. Possibility to Identify and Correct Network problems. The following elements will be analyzed from all the data collected in order to determine the overall quality of the Network performance : - Coverage - Quality - Neighbor List - Call Admission Failure - Drop Calls W h a t
t o a n a l y z e ? ? All Rights Reserved Alcatel-Lucent 2008 36 | Optimization Process | Nov 2008 3G Optimization vs. 2G Optimization 3G Optimization Interference optimization Key issue as only ONE frequency Optimize adjacencies (3G,3G-2G) Parameters optimization Based on drive-tests measurements for the moment. ( Pre-Launch Optimization) 2G Optimization Interference optimization Based on frequency plan Optimize adjacencies (2G ONLY) Parameters optimization Based on statistic data (Metrica) & Drive test Optimization processes are similar to GSM experience but to be slightly adapted to reflect 3G technical specificities More attention on planning issue Take into account 2G/3G interworking Training Needed UMTS fundamentals training Optimization: On Job Training All Rights Reserved Alcatel-Lucent 2008 37 | Optimization Process | Nov 2008 Optimization Activities Drive Test Route The definition of the drive test road is a very import task and should be done very carefully. The definition of the drive test road is a very import task and The definition of the drive test road is a very import task and should be done very carefully. should be done very carefully. Recommendations: Optimization routes are defined from primary (e.g. highways) and secondary (e.g. Network boulevards).The engineering team should determine additional roads in traffic areas where interference and soft handover are expected. Depend of the Optimization phase: For Cluster optimization = dense roads For network optimization the road are less dense but the area is bigger. A route should adequately cover 4-6 hours drive, depending on sites count. Should be the same for the drive test BEFORE and AFTER optimization.. Recommendations: Recommendations: Optimization routes are defined from primary Optimization routes are defined from primary (e.g. highways) and secondary (e.g. Network (e.g. highways) and secondary (e.g. Network boulevards) boulevards). .The engineering team should The engineering team should determine additional roads in traffic areas where determine additional roads in traffic areas where interference and soft handover are expected. interference and soft handover are expected. Depend of the Optimization phase: Depend of the Optimization phase: For Cluster optimization = dense roads For Cluster optimization = dense roads For network optimization the road are less For network optimization the road are less dense but the area is bigger. dense but the area is bigger. A route should adequately cover 4 A route should adequately cover 4- -6 hours 6 hours drive, depending on sites count. drive, depending on sites count. Should be the same for the drive test Should be the same for the drive test BEFORE BEFORE and AFTER optimization.. and AFTER optimization.. All Rights Reserved Alcatel-Lucent 2008 38 | Optimization Process | Nov 2008 Optimization Activities - Coverage Coverage Constraints: A minimum RSCP level is required to maintain and/or establish a call and a specific Service -> is very important to understand the coverage limitations and expectations of your network. Optimization: +Antenna Tilting +Sector re-azimuth +CPICH Power Optimisation +Add new site in order to change the RSCP levels allocation. +Each individual sector should be dominant only on his pre-defined area. Definition: The CPICH RSCP (Received Signal Code Power) provides indication of the availability of DL Pilot Channel, coverage, to meet services requirements. All Rights Reserved Alcatel-Lucent 2008 39 | Optimization Process | Nov 2008 Optimization Activities - Quality Quality Definition: The network radio quality indicator is the CPICH Ec/Io. This indicator provides a clear vision of the level of interference created by other cells over the most likely server, in a certain area. Constraints: If a certain CPICH Ec/Io is not meet the UE will not be able to communicate with the BS, not being able to establish a call and possibly dropping it if already connected. A bad CPICH Ec/Io will correspond to a bad UE Ec/No which is used to evaluate and execute HO events and Active Set updates, indispensable to maintain a connection. Optimization: The optimization action applied are the same as for the coverage. All Rights Reserved Alcatel-Lucent 2008 40 | Optimization Process | Nov 2008 Optimization Activities - Pilot Pollution Scanner/Mobile analysis Mobile analysis confirm: The RF coverage for each cell inside the cluster Insure the power settings Neighbour list tuning. No dominant server => Pilot pollution / wastage of radio resource Coverage and Quality EcIo GOOD EcIo BAD RSCP GOOD OK Interference Insuffisant Overlap RSCP BAD Coverage Problem Coverage Problem All Rights Reserved Alcatel-Lucent 2008 41 | Optimization Process | Nov 2008 Optimization Activities - Neighbour Cell Neighbour List (3G-3G; 3G-2G) Definition: In order to perform the mobile measure: EcIo of the neighbor cells for SHO EcIo or RSCP (parameter) of the neighbor cells for HHO Constraints: The Uu not check cells that are not declared in the neighboring list even if it is the best cell. Unwanted noise and the quality deteriorated. Initial declaration: Automatic With the planning tool Manual: Mapinfo (macro) and/or with 2G counters statistic NPO (HO request) Optimization: Automatic: Post processing tool queries. Be careful only based on the drive test samples. Manual: Compares both scanner and mobile maps. Mobile CPICH EcIo or RSCP and Scanner CPICH EcIo or RSCP.( If the correct cell is not used in HO, the mobile will be degraded comparing to scanner. ) All Rights Reserved Alcatel-Lucent 2008 42 | Optimization Process | Nov 2008 Optimization Activities Failure Events Drop Calls/ Calls setup fail Definition: Those events are a reaction of the UE, or of the RNC, to a certain problem. A Drop can be due to RADIO,UTRAN or CN problem (SYSTEM) Optimization: All the previous slides explained the causes The of problem lead to those events, so its imperative to control them. +You should know the story of the call +Ask you question: What are the events before the drop? Coverage? Quality? AS count? Compress mode? All Rights Reserved Alcatel-Lucent 2008 43 | Optimization Process | Nov 2008 Optimization Tools 6 All Rights Reserved Alcatel-Lucent 2008 44 | Optimization Process | Nov 2008 Tools Objectives Enhance Network Performance Parameter Optimisation System debugging / On-the-field Feature Validation Audit the network for smart introduction of new features Network Performance Monitoring KPI Reporting / Performance Benchmark Complement Counters view Early System Testing Be ready before commercial launch Assessing the impact of new features / risk control Generate Services revenues Added value services based on system expertise and early knowledge New technology introduction strategy / Customer guidance Enhance Product Portfolio New OAM products Ideas for feature enhancements All Rights Reserved Alcatel-Lucent 2008 45 | Optimization Process | Nov 2008 RNC Iub NodeB Iu RF Scanner XCAL O&M IP Counters Nethawk - Radcom PrOptima NodeB Logs Call Tracing Internal RFO - BORIS XCAP UE Qualcomm 6275/6280/7200 Datacard Option Engineering Tools All Rights Reserved Alcatel-Lucent 2008 46 | Optimization Process | Nov 2008 Tools Mapping PrOptima Internal RFO - BORIS RNC Iub NodeB Iu O&M IP RF Scanner XCAL UE Internal RFO - BORIS XCAP Nethawk - Radcom CTb NodeB Logs counters CTg Drive Test Optimisation Troubleshooting Benchmarking Reporting Troubleshooting Monitoring Reporting Remote Troubleshooting & Optimisation Pre-launch optimisation (Deployment) On-going optimisation (Live Network) OPTIMISATION COMPLEXITY T O O L S
U S A G E All Rights Reserved Alcatel-Lucent 2008 47 | Optimization Process | Nov 2008 ALU Internal RF Tools All Rights Reserved Alcatel-Lucent 2008 48 | Optimization Process | Nov 2008 Call Trace Applicability Call Trace Applicability Detailed troubleshooting Reduced need for external probes Over the air message flows Over the air message content Internal network messaging on all external interfaces Internal Network events Error message analysis Remote Optimization Avoid Unecessary & Costly Drive Tests Scrambling Code Analysis Detailed Handover Statistics Neighbouring List Tuning RF Coverage Control RF Coverage Improvement Network Validation & IOT Inter-operability testing with mobile vendors Inter-operability with Core Network NW Acceptance and New Services indroduction Advanced Optimization Detailed Performance monitoring Quality of Service Evaluation Detailed Parameter Optimisation (Power Control, BLER targets, ...) New features introduction Dropped Call and Access Failues root-cause analysis Detailed KPIs Possibility to Merge Call Trace data with Drive Tests logs Detailed per RNC, Cell & Service Statistics All Rights Reserved Alcatel-Lucent 2008 49 | Optimization Process | Nov 2008 Call Tracing Types CTa Trace all calls of specific UE(s) Activated from Core Network CTb Trace all calls of specific UE(s) Activated from Access Network (UTRAN) CTg Trace a % of calls over the NW on a specific cell or group of cells. Activated from Access Network Object Tracing Trace data related to all elements (events) handled by an object of the network : A cell or group of cells Iu CS interface Iu PS interface Neighbor RNC (an Iur) or a group of neighbor RNC One RNC Activated from Access Network CTn Trace a % of calls (only neighbouring optimisation related messages) over the NW on a specific cell or group of cells. Activated from Access Network Post-Processing with WQA Tool (UA5) UA5 All Rights Reserved Alcatel-Lucent 2008 50 | Optimization Process | Nov 2008 Powerful feature to trace all calls in a certain area. RFO capable to post-process Call Traces files. Employed for: Trouble-shooting Features Optimisation Network KPIs computation Traffic Distribution Remote Troubleshooting & Optimisation Minimum Drive Tests Performance Management with Geographical Call Traces (CTg) All Rights Reserved Alcatel-Lucent 2008 51 | Optimization Process | Nov 2008 ALU - RFO Used by R&D & Core WNE. Early Readiness & Product Phased tool. Post-processing Tool to analyse data log files from UE acquisition tools, Call Trace and NodeB logger. Advanced post-processing solution for HSDPA and HSUPA. Supports traces from: XCAL, QXDM and Opera (Alcatel-Lucent). Mapping capabilities. Synchronised multi-window MMI. Synchronises Call Tracing and NodeB Logger files with UE files. All Rights Reserved Alcatel-Lucent 2008 52 | Optimization Process | Nov 2008 RFO GUI All Rights Reserved Alcatel-Lucent 2008 53 | Optimization Process | Nov 2008 Features of Alcatel-Lucents Call Trace Function UE traces processing: Couei / Nemo / TOM files / TEMS (UE & Scanner) RNC Call Trace processing capabilities: CTa / CTb (IMSI) / CTg / OT-Cell (GEO) Full Protocol decoding capabilities: RRC / QCT / NBAP / RNSAP / RANAP Sync capabilities across all traces N-KPIs calculation (based on UE & CT traces) Call Log summary with Alarms and message pairing Call Model / State machine aligned with product features (based on message information element content) Built-in diagnosis (based on all types of traces) HSxPA ready Graphical and Mapping MMI All Rights Reserved Alcatel-Lucent 2008 54 | Optimization Process | Nov 2008 Commercial RF Tools All Rights Reserved Alcatel-Lucent 2008 55 | Optimization Process | Nov 2008 Drive Test - Equipment Configuration All Rights Reserved Alcatel-Lucent 2008 56 | Optimization Process | Nov 2008 Drive Test Tools Chain Incar measurements for the UE and outdoor for the scanner No attenuation Trace mobile Uu trace analysis Uu trace tool Off-line post-processing Real-time trace capture Nemo Ranopt Scanner Nokia All Rights Reserved Alcatel-Lucent 2008 57 | Optimization Process | Nov 2008 RF Scanner. Used to evaluate the radio propagation characteristics of a wireless network. 4MHz band wide band. Models 8720 can be used for indoor testing. High accuracy by high speed sampling. Measures EcNo, RSCP, SIR in the CPICH and EcNo, RSCP in the SCH. Can be blocked to specific SC. Spectrum monitor mode. Can measure simultaneously 2 FDD carriers ANRITSU ML8720B-C / ML8740-1 All Rights Reserved Alcatel-Lucent 2008 58 | Optimization Process | Nov 2008 Drive Test Data Acquisition Tool. Supports different UEs: Qualcomm, Nokia, Sanyo, Samsung, LG, Novatel Data card Multi-UE testing available. Real time RRC/PPP/FTP layers message displayed. AutoCall Function. Real time mapping function with positioning information and general call related parameters. WCDMA Scanner (Anritsu, Panasonic, PCTEL) and GPS logged with UE data. NEMO Outdoor All Rights Reserved Alcatel-Lucent 2008 59 | Optimization Process | Nov 2008 PP Tools : NEMO Analyzer @ RANOPT Post-processing Tool to analyse the data log files from Nemo Outdoor WCDMA, EDGE, GPRS and GSM. Multi-display of traced data: Messages, Graphs, Maps and Tables. Synchronisation between views. Automatic generation of customized reports in PowerPoint and Excel format. Graphical Analysis: drag & drop, multiple graphs per window. All collected messages are decoded, filtering capabilities. Statistics available: KPI indication, setup events, time between messages, message count. All Rights Reserved Alcatel-Lucent 2008 60 | Optimization Process | Nov 2008 NPO (Network Performance Optimizer) ALUs Performance Management Solution. Allows to monitor the network performance, detect network issues and troubleshoot them through the counters. Collects and stores for long periods of time all the UTRAN counters. Includes metrics (indicator based on several counters) defined by Alcatel-Lucent. The counters are available at RNC level and/or at FDDCell level. Easy report generation (drag & drop). Pre-defined reports available. Intersystem Cell Reselection 0 200000 400000 600000 800000 1000000 1200000 15-mar-06 22-mar-06 29-mar-06 80.00% 82.00% 84.00% 86.00% 88.00% 90.00% 92.00% 94.00% 96.00% 98.00% 100.00% Attempts Success Success Rate All Rights Reserved Alcatel-Lucent 2008 61 | Optimization Process | Nov 2008 APAC 3G Success Story 8 All Rights Reserved Alcatel-Lucent 2008 62 | Optimization Process | Nov 2008 APAC 3G Success Story Operator C + 7 RNCs, more than 800 sites in 4 regions. + PLO Completed for 87 clusters, with UTRAN network fine-tuned + PLO Acceptance Drive Test with 23 KPIs per cluster >> all meet + Handled 23.5 million calls a week, 65% of it PS traffic >> Unlimited Broadband Data package All Rights Reserved Alcatel-Lucent 2008 63 | Optimization Process | Nov 2008 APAC 3G Success Story Operator C ** Weekly Statistics Network Statistical Performance for major QoS KPI All Rights Reserved Alcatel-Lucent 2008 64 | Optimization Process | Nov 2008 www.alcatel-lucent.com www.alcatel-lucent.com All Rights Reserved Alcatel-Lucent 2008 65 | Optimization Process | Nov 2008 Backup Slides All Rights Reserved Alcatel-Lucent 2008 66 | Optimization Process | Nov 2008 Principle It creates artificial interference in downlink It is used to simulate downlink load and perform tests with one or several UE, providing that RAC is passed Downlink load simulation with OCNS* * OCNS : Orthogonal Channel Noise Simulation Node B Common channels OCNS channels Dedicated channels All Rights Reserved Alcatel-Lucent 2008 67 | Optimization Process | Nov 2008 NodeB Emission Power Impact Emission Max Power 43 dBm 19952,6 Emission Max Power 43 dBm 19952,6 dBm CPICH Reference Activity Factor (% time) mW dBm CPICH Reference Activity Factor (% time) mW OCNS 0 100% 1,0 OCNS 37,8 100% 6025,6 CPICH 33 1995,3 CPICH 33 1995,3 P-SCH 28 -5 5% 31,5 P-SCH 28 -5 5% 31,5 S-SCH 28 -5 5% 31,5 S-SCH 28 -5 5% 31,5 SCCPCH (FACH+PCH) 29 -4 0% 0,0 SCCPCH (FACH+PCH) 29 -4 0% 0,0 PCCPCH (BCH) 31 -2 90% 1133,0 PCCPCH (BCH) 31 -2 90% 1133,0 AICH 24 -9 80% 201,0 AICH 24 -9 80% 201,0 PICH 28 -5 96% 605,7 PICH 28 -5 96% 605,7 DCH 100% 0,0 DCH 100% 0,0 P totale 36,0 3999,1 P totale 40,0 10023,7 % Load (common channels + OCNS) 20% % Load (common channels + OCNS) 50% % Load (OCNS) compared to max power 0,0% % Load (OCNS) compared to max power 30,2% % Load (OCNS) compared to traffic 0,0% % Load (OCNS) compared to traffic 30,2% C o m m o n