Anda di halaman 1dari 4

Curriculum Vitae

Name Place / Date of Birth Education / Degree Objective

: xxxxxx : Surabaya / Date, Month, Year : Surabaya, Sepuluh Nopember Institute of Technology Bachelor in Mechanical Engineering - 1989 : A position as Senior Rotating Machinery Engineer or Senior Project Engineer for a National or Multinational company.

Summary of Qualifications : Having more than 16 (sixteen) years as Machinery Engineer in Engineering and Construction Projects. The responsibility including prepare basic of engineering data for machinery, Front End Engineering Design (FEED), basic and detail engineering, construction for various projects such as Petrochemical, Oil Refinery and LNG Expansion projects. Having served as machinery (rotating & package equipment) engineer, machinery work group leader. and engineering coordinator. Work Experience : 1989 - Present PT. INTI KARYA PERSADA TEHNIK, JAKARTA

ENGINEERING MANAGER/ COORDINATOR

Jan. 2006 Present

KABALCO PROJECT PROPOSAL. Assigned as engineering coordinator for Kalimantan Bauxite and Alumina Project bidding. IKPT is in consortium with JGCJapan to perform the estimating Work Volume & Material Take Off for the phase of bidding. LIBYAN PROJECT PROPOSALS. Assigned as engineering manager for various Libyan project proposals, such as Municipality Sewage Treatment Plant, Water Supply Pipeline, Refinery Revamp & DCS Modernization. The main responsibility is to coordinate amongst engineering disciplines to get the accurate MTO & BQ, prepare Risk Assessment & Winning strategy, prepare Engineering Execution Plan during technical proposal stage. LUBE OIL BLENDING PLANT PERTAMINA PROPOSAL. Assigned as engineering coordinator / manager on this project proposal. The main responsibility is to coordinate amongst engineering disciplines, prepare Risk Assessment & Winning strategy, prepare Engineering Execution Plan during technical proposal stage and to coordinate among other division, such as construction, procurement, QC, Cost Control, Project Management.

SENIOR MACHINERY ENGINEER

Aug. 2004 Jan. 2006

Page 1 of 4

Curriculum Vitae
TUBAN AROMATIC PROJECT. Assigned as senior machinery engineer to assist machinery job leader with main responsibility as quality assurance to the technical deliverables, review equipment data sheets and to advise for any technical aspect during engineering, construction and commissioning stage.

SENIOR MACHINERY ENGINEER Aug. 2002 July 2004 IKPT HOME OFFICE PROJECTS. Assigned as technical advisor for various EPC Project Proposals situated in IKPT Office. Main responsibility is to advise for technical aspect including strategy development for design optimization.

MACHINERY LEAD ENGINEER

Nov. 2001 July. 2002

BONTANG LNG EXPANSION TRAIN I PROJECT PROPOSAL BONTANG EAST KALIMANTAN. Main responsibility is to review Client bid tender requirement; Prepare work hour (manning) and vendor serviceman forecasting for rotating and package equipment; Assist project control to develop master schedule; Review all machinery deliverables, including loading data & load list estimation, requisitions for pricing, technical bid evaluation; Assist procurement for commercial bid evaluation and assessment; Prepare machinery execution plan to be included in Technical Proposal; Issued Job Closed Out Report. MACHINERY WORK GROUP LEADER Mar. 1997 Aug.2001

BONTANG LNG EXPANSION TRAIN H PROJECT (EPC) - BONTANG EAST KALIMANTAN. Main responsibility is to review all machinery deliverables as quality assurance, such as data sheets, requisitions & engineering specifications, work hour requirement, technical bid evaluation & vendor recommendations; Coordinating & holding technical clarification meeting, precommitment meeting, vendor coordination meeting & pre-inspection meeting (VCM & PIM); Coordinating among engineering interdisciplines, QA/QC, procurement, construction; Expediting the engineering progress/ schedule; Witnessing mechanical & performance test of critical machinery equipments; Supporting site construction for technical engineering assistance; Issued Closed Job Closed Out Report; Technical support during warranty period.

SENIOR MACHINERY ENGINEER

Nov. 1996 - Mar. 1997

Pre-Engineering of BONTANG LNG EXPANSION TRAIN H PROJECT BONTANG, EAST KALIMANTAN. The duties were preparing all administrative (manning, etc.) & technical requirements prior to contract award, preparing the critical rotating/ package equipment need to be early purchased, those were Boilers & Refrigerant Compressors. May 1996- Nov. 1996

Proposal Stage of LNG BONTANG TRAIN H EXPANSION PROJECT, BONTANG EAST KALIMANTAN. By the same time with FEED TRAIN - H assisted TRAIN H PROPOSAL to evaluate/ review vendor quotations getting the best pricing for budgeting purpose, review the technical and commercial bid tabulation. Mar.1996- Aug. 1996

Front End Engineering Development (FEED) of LNG BONTANG TRAIN-H EXPANSION PROJECT, BONTANG EAST KALIMANTAN. Developing
Page 2 of 4

Curriculum Vitae
machinery engineering requirement based on client Statement of Requirement (SOR) prepared for EPC Contractor ITB of Train-H project. The responsibilities including study of various machinery engineering alternatives, such as evaluating the possibility to utilize Gas Turbine Generator instead of Steam Turbine Generator, Reviewing in pot LNG pump versus LNG intank pump, studying the critical rotating equipment at MWK Houston, i.e. Refrigerant Compressors, Steam Turbine Generator; Preparing data sheets of rotating & package equipments.

ROTATING MACHINERY ENGINEER

Nov.1994- Feb. 1996

BONTANG LNG TRAIN G EXPANSION PROJECT (EPC) - BONTANG, EAST KALIMANTAN. Main responsibility is preparing the requisition & data sheet of Fuel Gas Comp. and Refrigerant Compressor, Reviewing the vendor prints, Holding & coordinating the technical clarification meeting, kick off meeting, vendor coordination & Preinspection meeting with compressor vendor & client. Witnessing the comp. performance test.

Feb.1991- Nov. 1994 AMMONIA & UREA PROJECT (EPC) - PT. PETROKIMIA - GRESIK - EAST JAVA. The duties were preparing data sheets, job specification & requisitions of pumps & drivers, compressors, steam turbine, gas turbines, preparing technical bid tabulation for rotating equipments, reviewing pumps & compressor vendor prints, supervising construction activities of equipment erection and installation. Involved in the precommisioning, commissioning and start-up.

Nov. 1990 - Feb. 1991 PEDP (PROCESS ENGINEERING DESIGN PACKAGE) for AMMONIA & UREA PROJECT AT TOYO ENGINEERING CO. - CHIBA - JAPAN. Responsible for study design basis of rotating equipment on the Urea Plant, preparing requisition, data sheet and specification for pumps, compressors and steam turbines.

Jan. 1990 - Nov. 1990 HEAVY OIL UPGRADING PROJECT - YUKONG LIMITED - SOUTH KOREA. (ON THE JOB TRAINING AT CHIYODA CORPORATION - YOKOHAMA JAPAN) The duties were Performance calculation of pumps; Construction Features of pumps; Model selection of pump; Preparation of pump requisitions; Technical evaluation of vendors data for pumps; P&ID around pumps, centrifugal pumps, overall engineering; Basic engineering of centrifugal and reciprocating compressor.

Professional Courses / Trainings

PEDP Program at Toyo Engineering Co. Chiba Japan (Nov. 1990 ~ Feb. 1991) On the Job Training at Chiyoda Co. Yokohama Japan (Jan. 1990 ~ Nov. 1990) Study of critical equipment (Refrigerant Compressors, Steam Turbine Generators) during Train-H Front End Engineering Design (FEED) at MW. Kellogg Houston, Texas (July 1996)

International Exposure

Factory Acceptance Test (FAT) for GE Frame 6 Gas Turbine Performance & Mechanical Running Test at South Carolina, USA, 1992 (Ammonia Urea Project)
Page 3 of 4

Curriculum Vitae
FAT for Fire Water Pump Perf. Test at Worthington Pump Singapore, 1992 (Ammonia Urea Project) Vendor Coordination Meeting (VCM) for Refrigerant Compressor at DresserRand, Olean, N.Y., USA in July 1995 (Train-G Project) VCM for Surface Condenser at OEM Graham, Batavia, N.Y., continued to VCM for Steam Turbine Generator at Dresser-Rand, Wellsville, USA and VCM for Sea Water Cooling Water Pumps, at OEM, Halberg, Ludwigshaven, Germany (Train-H Project, Nov 1997) FAT of Propane Compressor Mech. Run & Performance Test at Dresser-Rand, Olean, N.Y.-USA (Train-H Project) FAT of Mechanical Run Test for MHI Steam Turbine & Performance Test of MHI Fuel Gas Compressor at Mitsubishi Heavy Industry, Hiroshima, Japan (Train-H, July 1998) FAT of Mechanical Run Test for GT35C Gas Turbine Generator at ABB-Alstom, Sweden (Train-H Project, August 1998) Pre-Inspection Meeting (PIM) at Nijhuis Pump OEM, Netherland for Fire Water & Jockey Pumps (Tuban Aromatic Project, November 2004) Site Visit to Flotech Recip. Compressor at Southampton and continued to FAT of Flowserve Pump Performance Test at Lincolnshire, UK (Tuban Aromatic Project, January 2005) FAT for Mech. Run & Perf. Test of Elliott Air Compressor and Function Test of Comp. Panel at Elliott, Jeannette, PA, USA ( Tuban Aromatic Project, February 2005) FAT of Centrifugal Pumps Performance Tests at Flowserve, Brunn, ViennaAustria (Tuban Aromatic Project, March 2005) FAT of Power Management System (PMS) Control Panel at Brush Electric Machines, Loughborough, UK (Tuban Aromatic Project, May 2005) FAT of Flare Tip and Front Flame Generator (FFG) Function Test at Flare OEM, John Zink, Tulsa, OK,USA (Tuban Aromatic Project, July 2005) Plant Site Survey for Refinery Revamping & DCS Modernization Project at Azzawiya Refinery Co. and Site Survey for Rajma Water Supply Project Proposal at Benghazy, Libya (Libyan Project Proposals, June 2006) Prebid Meeting and Site Survey at existing Alumina Plant, Showa Denko, Yokohama, Japan (Kabalco Project Bidding, March 2007) Computer Skill Personal Achievement Microsoft Windows Applications I have been implemented my technical knowledge and strength during my period in current Company to develop and maintain the project design criteria and specification until project execution is accomplished. : Have sense of responsibility to build safe, reliable and cost effective Plants, dynamic team player and high inquisitve.

Strength

Languages Sign

Indonesian, Fluent in English, little bit in Arabic and Japanese xxxxxxxx Senior Rotating Machinery Engineer Residence : Jalan Pesona Florence blok H-10 / 12 Kota Wisata, Ciangsana, Gunung Putri, Bogor 16968 - INDONESIA e-mail : xxxxxx@oilcompany.com cellular phone # +62-812 100 2947 home ph. # +62-21-8493 0315 July 06, 2010

Date

Page 4 of 4

Anda mungkin juga menyukai