Team
City of Aiken Pearson Russell Design Associates (PR.DA), Landscape Architecture Tetra Tech, Environmental Engineering Clemson University Institute of Applied Ecology, Restoration Design
A i k e n D o g P a r k &
S P C A
Aiken Landfill Park
design opportunities:
Aiken Landfill Park
design opportunities
Aiken Landfill Park
Sport Fields
Program Area
Parking
design opportunities
Aiken Landfill Park
Alle
Mowed Pathway
Wind Rows
Reforestation
Tall Grass Meadow
Hedgerow
Pavilion
Pavilion
Viewing Tower
cut
mine
fill
drain
cover
vent monitor
make it safe
Aiken Landfill Park
cut
mine
fill
drain
cover
vent monitor
make it safe
Aiken Landfill Park
cut
mine
fill
drain
cover
vent monitor
make it safe
Aiken Landfill Park
cut
mine
fill
drain
cover
vent monitor
make it safe
Aiken Landfill Park
cut
mine
fill
drain
cover
vent monitor
make it safe
Aiken Landfill Park
cut
mine
fill
drain
cover
vent monitor
make it safe
Aiken Landfill Park
cut
mine
fill
drain
cover
vent monitor
make it safe
Aiken Landfill Park
cut
mine
fill
drain
cover
vent monitor
make it safe
Aiken Landfill Park
cut
mine
fill
drain
cover
vent monitor
make it safe
Aiken Landfill Park
cut
mine
fill
drain
cover
vent monitor
make it safe
Aiken Landfill Park
cut
mine
fill
drain
cover
vent monitor
make it safe
Aiken Landfill Park
cut
mine
fill
drain
cover
vent monitor
make it safe
Aiken Landfill Park
recommendations
Initial Begin discussions with regulators and surrounding property owners Install landfill gas (LFG) probes between the refuse and proposed developments Perform a grid pattern sweep for surface emissions of LFG (include adjacent structures and crawl spaces)
make it safe
Aiken Landfill Park
recommendations
Secondary Determine groundwater status Confirm the property lines by survey Perform investigations for limits of refuse by test pits or borings Post warning signs around perimeter Place temporary cover on exposed waste Evaluate the need (both from regulations and practical health and safety) for a landfill gas collection and/or treatment
make it safe
Aiken Landfill Park
recommendations
Following Clear trees and brush from waste areas Delineate wetlands Establish positive drainage and sediment and erosion control All structures existing or proposed on or within 1000 feet of the landfill should have building protection systems installed. These can be designed into the building with little impact.
make it safe
Aiken Landfill Park
path forward
Assemble Design Team Public Input / Program Refinement Design Development Construction Documents Construction of Park
Charlotte, NC