Anda di halaman 1dari 4

SIMB.

I.U.

C. INC.
1

%
2

Ir ( Mes Valorizacion )
3
4 = (3) x ( 2 )

lo ( Mes Presupuesto )
5
6 = (5) x (2)

Ir / lo
7 = (4) / (6)

47.0000

0.3520

1.0000

258.9400

258.9400

258.9400

258.9400

1.0000

17.0000

0.0790

1.0000

271.4700

271.4700

285.9000

285.9000

0.9495

21.0000

0.2550

1.0000

294.3600

294.3600

277.5100

277.5100

1.0607

P/M

5.0000
43.0000

0.1130
0.1130
0.1130

0.7430
0.2570

173.8800
322.2400

129.1928
82.8157
212.0085

173.8800
320.8800

129.1928
82.4662
211.6590

1.0000
1.0042
1.0017

38.0000

0.0710

1.0000

253.2400

253.2400

235.7200

235.7200

1.0743

GGU

39.0000

0.1300

1.0000

238.6200

238.6200

263.3500

263.3500

0.9061

K
8 = (1) x (7)
0.3520
0.0750
0.2705

0.1132
0.0763
0.1178

FORMULA POLINOMICA
K =

Jr
Mr
+ 0.42
+
Jo
Mo

Er
Gur
Cr
Lr
+ 0.14
+ 0.08
+ 0.08
Eo
Guo
Co
Lo

COSTO TOTAL:
S/. 3090000.00

K = 0.21

Jr
Mr
Er
Gur
Cr
Lr
+ 0.42
+ 0.07
+ 0.14
+ 0.08
+ 0.08
Jo
Mo
Eo
Guo
Co
Lo

SI A = 3B
B = 3B
ENTONCES = B + 0.42 + 3B
4B = 0.28
B = 0.07

0.28
0.07

0.14 + 0.08 + 0.08

ENTONCES SI:
COSTO DE OBRA:
COSTO DE MANO DE OBRA:
COSTO DE MATERIALES:
COSTO EQUIPO Y HERRAMIENTAS:
COSTO G.G.U.:

SIN I.G.V.
3593023.256
754534.884
2083953.488
251511.628
503023.256

ST: 3593023.256
I.G.V. (18%): 646744.186
PRESUPUESTO DE OBRA: 4239767.442

CON I.G.V.
4239767.442
890351.1628
2459065.116
296783.7209
593567.4419