I.U.
C. INC.
1
%
2
Ir ( Mes Valorizacion )
3
4 = (3) x ( 2 )
lo ( Mes Presupuesto )
5
6 = (5) x (2)
Ir / lo
7 = (4) / (6)
47.0000
0.3520
1.0000
258.9400
258.9400
258.9400
258.9400
1.0000
17.0000
0.0790
1.0000
271.4700
271.4700
285.9000
285.9000
0.9495
21.0000
0.2550
1.0000
294.3600
294.3600
277.5100
277.5100
1.0607
P/M
5.0000
43.0000
0.1130
0.1130
0.1130
0.7430
0.2570
173.8800
322.2400
129.1928
82.8157
212.0085
173.8800
320.8800
129.1928
82.4662
211.6590
1.0000
1.0042
1.0017
38.0000
0.0710
1.0000
253.2400
253.2400
235.7200
235.7200
1.0743
GGU
39.0000
0.1300
1.0000
238.6200
238.6200
263.3500
263.3500
0.9061
K
8 = (1) x (7)
0.3520
0.0750
0.2705
0.1132
0.0763
0.1178
FORMULA POLINOMICA
K =
Jr
Mr
+ 0.42
+
Jo
Mo
Er
Gur
Cr
Lr
+ 0.14
+ 0.08
+ 0.08
Eo
Guo
Co
Lo
COSTO TOTAL:
S/. 3090000.00
K = 0.21
Jr
Mr
Er
Gur
Cr
Lr
+ 0.42
+ 0.07
+ 0.14
+ 0.08
+ 0.08
Jo
Mo
Eo
Guo
Co
Lo
SI A = 3B
B = 3B
ENTONCES = B + 0.42 + 3B
4B = 0.28
B = 0.07
0.28
0.07
ENTONCES SI:
COSTO DE OBRA:
COSTO DE MANO DE OBRA:
COSTO DE MATERIALES:
COSTO EQUIPO Y HERRAMIENTAS:
COSTO G.G.U.:
SIN I.G.V.
3593023.256
754534.884
2083953.488
251511.628
503023.256
ST: 3593023.256
I.G.V. (18%): 646744.186
PRESUPUESTO DE OBRA: 4239767.442
CON I.G.V.
4239767.442
890351.1628
2459065.116
296783.7209
593567.4419