Applies to:
ERP 4.6C (or) later Version to ECC Quality Management (QM) and Material Management (MM) Goods Receipt Inspection Vs Source Inspection in Procurement
Summary
Source inspections are performed upon request and with the participation of the customer generally in suppliers place. A source inspection can be executed by the receiver of the goods, the supplier in the presence of the receiver or by third party. Goods receipt inspections are performed after receiving the goods at customers place. Till the inspection process completes the goods will be under inspection stock. Once the inspection process completes and approves, the goods is moved to unrestricted stock. The system can automatically create an inspection lot when a goods receipt is posted in the system. A goods receipt can be posted internally (for example, from production to the warehouse) or from an external source (for example, from a vendor). In SAP Quality Management, Goods Receipt Inspection and Source Inspection for procurement have the below features: Inspection Lots are created either before goods receipt or after goods receipt. While processing the inspection lots the material will be in Quality inspection stock. After inspection lots accepted, the material is posted to unrestricted use Source inspection lots can be created using batch jobs Author: Venkata Duvvuri
Author Bio
Venkata Duvvuri has over 8 years of SAP experience in MM/PP//QM/WM. He is a Senior Business Consultant with experience in Implementations / Upgrades and technical Support. He has delivered on many complex projects in High Tech, Pharmaceuticals and Consumer Products Industries.
Page 2 of 17
Table of Contents
Introduction to Quality Inspection ....................................................................................................................... 3 Basic Configurations for Quality Inspection in Procurement: ............................................................................. 4 Goods Receipt Inspection Scenarios demonstration: ........................................................................................ 7 Source Inspection Scenarios demonstration: ................................................................................................... 12 Related Content ................................................................................................................................................ 16 Disclaimer and Liability Notice .......................................................................................................................... 17
Page 3 of 17
Page 4 of 17
At plant level we maintain control functions, Basic Data like Master inspection characteristics with history, Insp lot creation, Results recording, Inspection lot completion, and general settings
Define control key in procurement: Manu Path: SPRO > Quality Management>QM in Logistics>QM in procurement>Define control keys
Page 5 of 17
This control key is used to maintain different conditions in procurement (ex: vendor release required, quality certificate required along with the goods, document control etc.)
In this example we are using the control key for vendor release. It means the supply relationship must be released. (Supply relationship in procurement is Vendor Master record and quality info record) Maintain Inspection Types Manu Path: SPRO > Quality Management>Quality Inspection>Inspection Lot Creation>Maintain Inspection Types
Page 6 of 17
Inspection type 01 is for Goods receipt for Purchase orders which is predefined. An Inspection type is assigned to an inspection lot origin. We can assign more than one inspection type to a single inspection lot origin.
Page 7 of 17
In Inspection Setup, enter inspection type 01 and select active Maintain inspection percentage (Since we are not using Inspection with Task list or material specification). Here we have 3 options, select sampling procedure or select 100% inspection or maintain inspection percentage.
Page 8 of 17
Maintain Quality Info record: Quality Management---Quality planningLogistics Master DataQuality Info record procurement Create. TCode: QI01
Enter release until date; this date is the latest date on which the material for the plant can be ordered from the vendor
Page 9 of 17
Select release quantity active check box, Enter Release quantity. Inspection Control Tab, Select Inspection active, If vendor is not certified for Insp control and Save
Goods Receipt for a Purchase Order: MIGO_GR. Once goods receipt is posted, inspection lot is created.
Display Inspection Lot: Quality Management Quality InspectionInspection LotProcessingDisplay. TCode: QA03
Page 10 of 17
The sample size is calculated based on the % which maintained in Material Master, Quality Management View. Stock Overview: MMBE
The stock is in Quality inspection. Record Usage Decision: Quality Management Quality InspectionInspection LotUsage Decision Record. TCode: QA11 Select the usage decision, save.
Page 11 of 17
The inspection lot is accepted and the stock is posted from inspection stock to unrestricted stock. Go to Stock Overview: MMBE
Page 12 of 17
Work List of Source Inspection: QI07 Enter Vendor, Material, Plant, Delivery date and opening period then execute
Page 13 of 17
Displays the purchase orders which are ready for source inspection. Select the line item, press create inspection lot and save. The line disappears, the inspection lot is created.
Page 14 of 17
The stock is in on order-stock Record Usage Decision: Quality Management Quality InspectionInspection LotUsage Decision Record. TCode: QA11 Select the usage decision, Save.
Page 15 of 17
Record Usage Decision: Quality Management Quality InspectionInspection LotUsage Decision Record. TCode: QA11