Sr.QA/QC Mechanical Inspector Technical Qualification:


3-Year Diploma of associate engineering in welding and sheet metal technology. Certification Of ASNT Level-II In Penetration Tests Certification of ASNT Level-II in radiography tests. Certification of ASNT Level-II in magnetic particle test.

Computer Knowledge:

AutoCAD computer course from Swedish institute of technology Gujarat. Ms office computer course from Swedish institute of technology Gujrat

Safety Trainings:
Participated and successfully completed 2 week course in safety program held by merubeni corporation Japan Parco project qasba Gujrat. Participated and successfully completed a course in safety environment program held by lasmo oil and gas bhit project. Achieved safety award from bhp oil and gas dadu. Achieved safety award from client c p l project Saudi methanol project Saudi Arabia. Participated in hses supervision and leadership program j g c Middle East fze dolphin onshore facility project r l i c Qatar.

Experience: 13 years hands on experience in construction, quality control department of mechanical projects in various mulli national industries. The major projects executed and responsibilities are as follows.

Company Name Project Name Client Designiation Period Responsibilities

Velosi Certification uae. Teweeleha fajera project abu dhabi. Dolphin energy uae. qa/ac mechnical senior inspector 25-06-2009 to 19-09-2011. Inspection and supervisoion of fabraction and erection of steel structures. Visual inspection of pipe welding joints. Inspection of welder qualification test. Prepaired of punch lists of piping. Co ordination in radiography. Bolt torqing inspection of bolted flanges. Page 1 of 5

Hydero testing inspection of piping. Daily co-ordination meeting with dolphin client. Daily inspection report prepaired and submit to client.

Company Name Project Name Client Designiation Period Responsibilities

Moody International Engro Enven 1.3 Expansion Project engro chemical Pakistan ltd qa/ac mechnical inspector 20-9-2008 to 06-06-2009 Review qip for above ground and under ground piping And water storage and chemical storage Tanks as per project specification. Responsible for fabrication eraction of piping as Per ASME b31.3 Visual inspection of welding joints. Responsible punch list of piping and hydro testing. Responsible for eraction and welding inspection of Storage tank as per API 650. Punch lisiting of tanks and review the test pack and verifiey the readiography as per API 650. Hydero testing inspection of tanks. Responsible for grp piping limination joint, rubber Seal lock joint, adhasive bounded joints.

Company Name Project Name Client Designiation Period Responsibilities

Sicon CCC Oil & Gas Egds up grade works Dolphin energy and gasco abudhabi. piping inspector 25-09-2007 to 15-10-2008 Hands on experience of miscellaneous pipeline inspection activities including in surveying, row, and stringing, welding inspection as per standard code, sand blasting and heat shrink sleeves & lowering in of pipeline. Requirements also responsible for the inspection of test pack. Daily co-ordination meeting with area planner for work front. Supervision of welding and progress monitoring & co-ordination with inspection for nde. Verify consumable storage, backing and its issue/control etc. Punch list prepration and hy testing inspection. DESCON Engineering ltd Dolphin onshore facilities project raslafan Qatar JGC middle east fze piping inspector 19-12-2004 to 08-01-2007 Inspectoin of grp and gre piping matrial. Inspection of adhasive bonded joints. Inspection of dobble bel copling joints. Inspection of lamination joints Hydro testing of grp piping. Page 2 of 5

Company Name Project Name Client Designiation Period Responsibilities

Company Name Project Name Client Designiation Period Responsibilities

DESCON Engineering ltd Saudi Methonal Project jubail Saudi Arabia CPL piping inspector 28-9-2003 to 25-6-2004 Inspection of fabrication of piping and erection of piping Visual inspection of welding of piping. Prepaired of punch lists. Prepaired and checked weld summsry sheet. Inspection of hydero testing of piping Siemens Pakistan Engineerin co ltd. bhp exploration Pakistan gas field johi dadu. bhp Billiton. Sr.QA/QC inspector. 21-2-2003 to till to 20-9-2003 Inspection of fabrication of piping and erection. Visual inspection of welding of piping and pipe line/flow lines Inspection of hydero testing of piping.

Company Name Project Name Client Designiation Period Responsibilities

Company Name Project Name Client Designiation Period Responsibilities

Siemens Pakistan engineering co ltd. Bobi LPG plant distric sangar. OGDCL Pakistan ltd. QA/QC Assistant Engineer. 1-8-2002 to 20-2-2002. Inspection of fabrication of piping and erection of piping according to asmi b31.3 Visual inspection of welding of piping. Inspection of welder qualification test. Inspection of fabrication and erection of storage tank according to API 650. Visual inspection of welding of tanks. Inspection on painting. Siemens Pakistan Engineering Co Ltd. lasmo oil and gas bhit project. Aquater. QA-QC inspector. 21-10-2001 to 28-7-2002 Inspection of fabrication of piping and erection of piping according to asmi b31.3 Visual inspection of welding of piping. Inspection of erection of oil storage tank according to API 650. Prepaired of punch lists of piping. Inspection of hyderotesting of piping. Co-ordination with client aquater persons. Siemens Pakistan Engineering Co Ltd. Gularchi gas field. British Petrolum QA-QC inspector. 15-7-2001 to 18-10-2001 Inspection of fabrication of piping and erection of piping according to asmi b31.3 Visual inspection of welding of piping. Page 3 of 5

Company name Project name Client Designiation Period Responsibilities

Company Name Project name Client Designiation Period Responsibilities

Daily inspection report. Prepaired of punch lists of piping. Inspection of hyderotesting of piping. Co-ordination with client aquater persons. Company name Project name Client Designiation Period Responsibilities Al-Tariq (pvt) ltd. Chack perina oil deptu kherina. Pakistan State Oil. Mechanical Supervisor. 20-12-1999 to 15-8-2000 Inspection of fabrication of piping and erection of piping according to asmi b31.3 Visual inspection of welding of piping. Daily inspection report. Prepaired of punch lists of piping. Inspection of hyderotesting of piping. Co-ordination with client aquater persons. Siemens Pakistan Engineering co ltd. Parco mid country refinery project qasba gujrat distric muzafarghar. Merubeni QC inspector. 21-7-1999 to 13-12-1999. Inspection of erection of piping according to asmi b31.3 Visual inspection of welding of piping. Daily inspection report. Prepaired of punch lists of piping. Inspection of hyderotesting of piping. Co-ordination with client merubeni persons. Habib Rafiq (Pvt) Ltd. PARCO mid country refinery project qasba gujrat distric muzafarghar. Merubeni QA-QC inspector. 1-8-1998 to 19-7-1999. Inspection of fabrication of structure. Visual inspection of welding of structure. Daily inspection report. Erection & Construction ltd. Roush power plant abdul hakeem. QA-QC inspector. 15-51996 to 20-3-1998. Inspection of erection of piping. Visual inspection of welding of piping. Daily inspection report. Jiacco Pakistan (pvt) ltd. Ibrahim Fiber Plant shahkot. Zimmer Jeran NDT inspector. 15-9-1995 to 28-4-1996. Radiography and DPT test. Co-ordination with client zimmer persons (german).

Company Name Project Name Client Designiation Period Responsibilities

Company name Project name Client Designiation Period Responsibilities

Company name Project name Designiation Period Responsibilities

Company name Project name Client Designiation Period Responsibilities

Page 4 of 5

Personal Information
Fathers Name Date of birth Passport no. Nationality E-mail Permanent address Contact Ph. no. Muhammad Iqbal. 5-8-1974 A3566289 Pakistani. mubashir1974eng@yahoo.com Jalal Cheema Colony Qamar Sialvi Road Gujrat +92-345-6936753