Anda di halaman 1dari 4

Hyundai Heavy Industries Co., Ltd.

PTT Third Transmission Pipeline Project Vessel Inspection Checklist Vessel Name: Date Inspected: Inspector: Location: Project Reference Documents A) Specification for Safety, Health, Environmental, and Security (SHE&S) Onshore and Offshore Pipeline and Related Facilities, SP-X-0404.05-010-132. B) Specification for Environmental Compliance for Offshore Pipeline and Related Facilities, SP-X0404.05-010-142 C) Environmental Impact Assessment (EIA), Third Transmission Pipeline Project, Offshore Pipeline System, Volume 6.

CERTIFICATE VALIDITY

LOGBOOK/CREW

Certificate of Registry Certificate of Class Loadline Certificate Tonnage Certificate Safety Construction Cert Safety Equipt Cert Safety Radio Cert Cert of Insurance Deratting Cert I.O.P.P. Cert SMC /DOC ISPS Compliance Medical Chest PROCEDURES SMS SSP PTW SHE&S Docs. Crane Driver Signals Notices to Mariners Stability Data

Ships Log Book Training Validity Crew-list POB Total Complement RECORDS Drafts Load, Cargo, Passengers Weather conditions Mooring line inspection Anchor wire inspection Anchor pattern planning/approval Date last Abandon Ship Drill Date last Fire Drill Date last Emergency Drill Date last HSE Meeting

Third Transmission Pipeline Project Offshore Pipeline System Contract No. PTT/GAS/2/4/48

Hyundai Heavy Industries Co., Ltd. PTT Third Transmission Pipeline Project NAVIGATION BRIDGE

Radars (2 units) VHF Echo Sounder (2 units) GPS (2 units) Helm Indicator Magnetic compass, Deviation card Gyro Compass & repeaters Speedlog Navtex AIS (Automatic Identification System)

GMDSS Wind Indicator & other instruments Telephones, faxes Engine Indicators (RPM/TO/Pressure) Engine Control & Stops (fwd/aft) Bow Thruster Contl & Stops (fwd/aft) SSB Watch Receiver Portable Radios (8 units) SSAS (Ship Security Alert System) PPE Hard Hats Safety Shoes Coveralls/gloves Workvests Goggles/Earmuffs (ER) Eye wash station (deck, ER) PPE for welding/cutting PYROTECHNIC Parachute Flares Line Throwing apparatus Smoke Floats FIRE FIGHTING EQUIPTMENT Fire/Ballast Pump Fire Hoses & Nozzles Fire Ext - Accommodation Fire Ext - ER Fireman Outfits BA Sets Fire Axes Intrl Ship/Shore Connections Muster Station (IMO signs, instruct) Fire detection system Safety Poster Fire & Safety Plans Emerg. Fire pump & instructions ER total flooding system & alarm Fan Stops & alarm

Unobstructed visibility Clear View Screen/wiper BA charts, Publications (corrected) Topo charts Fire/General Alarm Horn Flags & Day signals Internal Communications (PA system-good) Navigation Lights & Backup Search Lights Aldis lamp & battery Battery recharging/ventilation/storage LIFE SAVING EQUIPMENT Life Buoys (SOLAS, retro-tape, light) Lifejackets (SOLAS, retro-tape, light) Lifejackets donning instructions Lifejackets (200%, distribution) Liferafts (200%, service due etc) HRU (weak link, service due etc) Rescue Boat (engine, search light) Launching davit EPIRBs First Aid Kit Exits (unobstructed, SOLAS signs) ACCOMMODATION H/keeping/Cleanliness/Sanitation Air Conditioning Drinking water condition/color Third Transmission Pipeline Project Offshore Pipeline System Contract No. PTT/GAS/2/4/48 2

Hyundai Heavy Industries Co., Ltd. PTT Third Transmission Pipeline Project Shower & Toilet facilities Galley (Fire blanket, extinguisher) Galley (hygiene, roaches etc) Galley (macerator, compactor) Cooking facilities Dry stores/Cold stores Mess room CONT ACCOMMODATION Cabin Laundry facilities Medical locker Recreational room TVs. DVD Prayer Room Designated Smoking area

DECK/HULL/SUPERSTRUCTURE

Fendering Plating (dents) Fairleads/Bollards Ventplugs Anchor (size/type) Anchor chain (length) Tension meters, wire counters Stern mooring arrg (access, bollards) Bulwarks Landing gates/area (non slip) Deck IMDG markings/Lighting ENGINE ROOM Housekeeping Main Engine (General condition) Generator (Generator condition) Switchboard (non conductive mat) Emergency lighting Pumps, Aux. gear (general condition) Machinery Guards Steering Gear (main/emergency) Bow thruster Acetylene/oxygen set Electric welding set

Paintwork Wood on aft deck WT Door/Hatches/Manholes Mooring Rope (size) Anchor winches A/Wire connection (closed steel socket) Pennant buoys (color, no suitcase) Pennant wire connection (closed steel socket) Shipside Railing/Chains Shackles/slings (color coded) Elect connections & socket (WT) FAST RESCUE CRAFT Speed VHF Search light Rapid launching crane (davit) FRC training for crew MOB exercise dates CONT ENGINE ROOM Tools

WORKBOAT EQUIPMENT Weather shelter Platform Fire Hoses 100m (2 pcs) Crane outreach Auxiliary crane Watermaker capacity Portable water onboard Third Transmission Pipeline Project Offshore Pipeline System Contract No. PTT/GAS/2/4/48 3 External Fire Fighting Pump Portable p/form lighting (2 pcs) Crane SWL Auxiliary crane SWL Industrial water onboard Gangway & rigging

Hyundai Heavy Industries Co., Ltd. PTT Third Transmission Pipeline Project Paint store/housekeeping Air compressors (2 pcs-120 psi) Paint store CO2 system Spare anchor Capstans (no. of pcs) Next survey Hoses (fuel/water) Welding cables & protective equipt Acetylene cutting equipment Workshop/housekeeping Welding set (2 sets) Deck space Tugger winch & wire Register of lifting gear Hoses (fuel/water) size & length High pressure water blast Tool/Benches

EIA COMPLIANCE

Environmental Policy Environmental Trainings IOPP Certificate Conditions of Main Engines SOPEP Equipt/Condition SOPEP Drill Conditions of fuel transfer hose Fuel Storage Facilities Lub Oil Storage Emergency Stop for Fuel Transfer Drip Pans Hazardous Goods Stowage Hazard Goods clearly labeled MSDS of Hazardous Material Planned Maintenance System

Garbage Management Plan Garbage Disposal Method Garbage Records Bunkering Procedure Dirty Oil Storage Dirty Oil Records Dirty Oil Disposal Oil record (Loading & Unloading) Bilge water disposal and records Condition of Bilges Bilge Separator/Oily water separator Food Macerator Noise Survey Report Bulk supply connections Daily Fuel Records

Third Transmission Pipeline Project Offshore Pipeline System Contract No. PTT/GAS/2/4/48

Anda mungkin juga menyukai