Anda di halaman 1dari 15

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE

DISEAR EL MURO DE CONTENCION

S/C
t1

1.00 m

h1

hp

h2

h3

hz

t2

B2

B1
B

DATOS
H1 (m)
H2 (m)
H3 (m)
N.F. (m) = h1
1 ()
2 ()
3 ()
1 (Tn/m3)
2 (Tn/m3)
3 (Tn/m3)
t (Tn/m2)
S/C (Tn/m2)
FSD
FSV
Contrafuertes
fc (Kg/cm3)
concreto (Kg/cm3)
fy (Kg/cm3)

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

CASO 05
1.5
3.5
3.5
1
28
22
20
1.7
1.8
1.9
30
0
1.5
1.75
SI
210
2400
4200

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE


CALCULO DE PRESIONES :

Coeficiente de empuje activo (Ka):


Ka =

1 sen
1 + sen

donde:
Ka1 = 0.361
Ka2 = 0.455
Ka3 = 0.490

hs/c = S/C/Y1
S/C = 0.000 m
h2O = 1.00 tn/m3
m = 0.7

P1 = Ka1*1*hS/C

P1 = 0.00 tn-m2

P2 = Ka1*1*(h`1+hS/C)

P2 = 0.92 tn-m2

1` = 1-m*H2O
1` = 1.00 tn/m3
he1= Wtotal/1`
he1 =(S/C+1*h1`)/1`
he1 = 1.700 m
P3 = Ka1*1`(he1+(h1-h1`))+h2O*(h1-h1`)

P3 = 1.29 tn-m2

2` = 2-m*H2O
2` = 1.10 tn/m3
he2= Wtotal/2`
he2 = (S/C+1*h1)/2`
he2 = 2.318 m
P4 = Ka2*2`(he2+h2)+h2O*h2

P4 = 6.41 tn-m2

3` = 3-m*H2O
3` = 1.20 tn/m3
he3= Wtotal/3`
he3 = (S/C+1*h1+2*h2)/3`
he3 = 7.375 m
P5 = Ka3*3`*(he3+h3)+h2O*h3

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

P5 = 9.89 tn-m2

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE

P1 =0.00tn-m

1
P2 =0.92 tn-m
P3 = 1.29 tn-m

0,5

3,5

P4 = 6.41 tn-m

3,5

P5 = 9.89 tn-m

EFECTO

Empuje
Activo

Total

FUERZA (Tn)
1/2*0.92*1
0.460 Tn
(0.92+1.29)/2*0.5
0.554 Tn
(1.29+6.41)/2*3.5
13.486 Tn
(6.41+7.60)/2*3.5
28.536 Tn
43.036 Tn

BRAZO PALANCA
1/3*1+7.5
7.833 m

MOMENTO
0.460*7.833
3.605 Tn-m
0.554*7.236
4.006 Tn-m
13.486*4.412
65.576 Tn-m
28.536*0.972
46.384 Tn-m
119.572 Tn-m

(0.92*0.5*0.5/2+(1.29-0.92)*0.5/2*0.5/3)/((0.92+1.29)/2*0.5)+7

7.236 m
(1.29*3.5^2/2+(6.41-1.29)*3.5^2/6)/((1.29+6.41)/2*3.5)+3.5

4.863 m
(6.41*3.5^2/2+(7.6-6.41)*3.5^2/6)/(6.41+7.6)/2*3.5)

1.625 m

M = 119.57 tn-m
Mu = 1.6*M
Mu = 191.315 Tn-m

C.G. = M/P =119.572/43.036


Yg = 2.778 m

DIMENSIONAMIENTO DE LA PANTALLA:
Calculo de t1:
t1 >= 0.25m
t1 = 0.300 m
Calculo de t2:
b = 1.000 m
= 0.004 m
= 0.900 m

43.036 tn-m2

Yg = 2.778 m

w = *fy/fc
w = 0.08
Mu = *b*d^2*f`c*w(1-0.59w)
191.315*10^5 = 0.9*100*d^2*210*0.08*(1-0.59*0.08)
d = 115.239 cm
t2 = d +rec +b/2
t2 = 1.200 m
Usar:

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

asumiendo: N3 = 1.590 cm

t2 = 1.30 m

d = 1.25 m

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE


Verificacin por Corte:
9.89 Tn/m2

8.848 Tn/m2
6.41 Tn/m2

43.036Tn
43.036Tn

1,05

2,45

3,5

P..(1.05) = (9.89-6.41)/3.5*2.45+6.41
P..(1.05) = 8.649 Tn/m2
Y = 43.036- (8.848+9.89)/2*1.05
Y = 31.428 Tn/m

Vud = 1.6*Vd
Vud = 50.284 Tn/m

Vc = 0.53*fc^1/2*b*d
Vc = 96.163 Tn/m

Vc = 0.85*80.802
Vc = 81.738 Tn/m
ok cumple

Vc >= Vud
DIMENSIONAMIENTO DE LA ZAPATA:
hz = t2 +5cm
hz = 1.35 m
h = hz + hp
h = 9.85 m
Dimensionamiento por estabilidad al deslizamiento:
P = (9.89-6.41)/3.5*4.65+6.41
P = 11.24 tn-m2
P1 =0.00tn-m
1
0,5

P2 =0.92 tn-m
P3 = 1.29 tn-m

3,5

P4 = 6.41 tn-m

3,5

P5 = 9.89 tn-m
1.35

P6 = 11.24 tn-m

EFECTO

Empuje
Activo

Total

FUERZA (Tn)
1/2*0.92*1
0.460 Tn
(0.92+1.29)/2*0.5
0.554 Tn
(1.29+6.41)/2*3.5
13.486 Tn
(6.41+7.60)/2*3.5
28.536 Tn
(9.89+11.24)/2*1.35
14.264 Tn
57.300 Tn

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

BRAZO PALANCA
1/3*1+8.85

9.183 m
(0.92*0.5^2/2+(1.29-0.92)*0.5^2/6)/((0.92+1.29)/2*0.5)+8.35

8.586 m
(1.29*3.5^2/2+(6.41-1.29)*3.5^2/6)/((1.29+6.41)/2*3.5)+4.85

6.213 m
(6.41*3.5^2/2+(7.6-6.41)*3.5^2/6)/((6.41+7.6)/2*3.5)+1.35

2.975 m
(9.89*1.35^2/2+(11.24-9.89)*1.35^2/6)/((9.89+11.24)/2*1.35)

0.661 m

MOMENTO
0.460*7.833
4.227 Tn-m
0.554*7.236
4.754 Tn-m
13.486*4.412
83.782 Tn-m
28.536*0.972
84.908 Tn-m
14.264*0.661
9.424 Tn-m
187.095 Tn-m

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE

Yg = 3.265 m

Ha = P = 57.300 Tn
M = 187.095 Tn-m
DATOS:
m =
f=
Ka =
s =
FSD =
FSV =

2.00 tn-m3
0.6
0.490
1900 kg/m3
1.5
1.75

Dimensionamiento por estabilidad al Deslizamiento:


Hr = f*Pm
Hr = f*m*B1*H
Ha = 57.3 T/m

Pm

9.85 m

Ha = 57.30 Tn/m

Hr / Ha >= FSD = 1.5


B1 >= 57.3*1.5/(0.6*2*9.85)
B1 >= 7.27 m

3.265 m

Hr

Usar :

B1 =

B1

7.30 m

Dimensionamiento por estabilidad al Volteo:


Aplicando M en "A"
Mo = Ha*Yg
Mo = 57.3*3.625
Mo = 187.095 Tn-m

9.85 m

Mr = Pm*(B2+B1/2)
Mr = m*B1*H*(B2+B1/2

Ha = 57.30 Tn/m
Pm`

3.265 m

Mr / Mo >= FSV = 1.75


(2.0*7.3*9.85*(B2+7.3/2))/187.095 >= 1.75
B2 >= -1.37 m

B2

pero: B2mn = H/10 = 0.99 m


Usar :

B2 = 1.00 m

Entonces:
B = B1+B2
B = 8.30 m
condicin:

0.5H <= B <= 0.7H


4.825 <= B <= 6.775

no cumple

Como es un predimensionamiento, se puede asumir como vlido para el diseo

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE

Verificacin de estabilidad:
t1=0.30m

1.00m

0.50m

5
3

3.50m

9.85m

P Tn/m
3.50m

Yg m
t2=1.30m
1.35m
1
B2=1.00m

Pi
P-1
P-2
P-3
P-4
P-5
P-6
P-7
TOTAL

FUERZA (Tn)
1.35*8.3*2.4
26.892 Tn
1.0*8.5/2*2.4
10.200 Tn
0.3*8.5*2.4
6.120 Tn
6.0*1.0*1.7
11.900 Tn
6.0*0.5*1.7
5.950 Tn
6.0*3.5*1.8
44.100 Tn
6.0*3.5*1.9
46.550 Tn
151.712 Tn

B1=7.30m
B=8.30m

BRAZO PALANCA

MOMENTO
26.892*4.15
111.602 Tn-m
10.2*1.2
12.240 Tn-m
6.12*2.15
13.158 Tn-m
11.9*5.3
63.070 Tn-m
5.95*5.3
31.535 Tn-m
44.1*5.3
233.730 Tn-m
46.55*5.3
246.715 Tn-m
712.050 Tn-m

8.3/2

4.150 m
2/3*(1.3-1.0)+1.0

1.200 m
0.3/2+(1.30-0.3)+1.0

2.150 m
(7.3-1.3)/2+1.3+1.0

5.300 m
(7.3-1.3)/2+1.3+1.0

5.300 m
(7.3-1.3)/2+1.3+1.0

5.300 m
(7.3-1.3)/2+1.3+1.0

5.300 m

P = 151.712 Tn
M = 712.050 Tn-m

Yg = 4.693 m

Condiciones:
FSD = Hr/Ha = u*P/Ha
FSD = 1.59 m
FSD > 1.5

ok cumple

FSV > 1.75

ok cumple

FSV = Mr/Ma
FSV = 3.81 m

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE


PRESIONES EN EL TERRENO :
Xo = (Mr-Ma)/P
Xo = (712.05-185.095)/151.712
Xo = 3.46 m

e = B/2-Xo
e = 8.30/2-3.46
e = 0.690 m
e < B/6 = 1.38 m

Luego:

q1 = P/B*(1+6e/B)
q1 = 27.39 tn/m2

ok conforme

q2 = P/B*(1-6e/B)
q2 = 9.16 tn/m2

1;2 < t

ok conforme

q2 = 9.16 Tn/m2
q1 = 27.39 Tn/m2

DIMENSIONAMIENTO DEL CONTRAFUERTE:


Espaciamiento: H/3 a 2H/3
3.28 a 6.60m

L = 3.50 m

Espesor : >= 20 cm

e = 0.20 m
.

L=3.50m
L=3.50m

e=0.25m
e=0.25m
e=0.25m

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE

DISEO DE LA ZAPATA:

Ws

Wpp

q2 = 9.16 Tn/m2
q1 = 27.39 Tn/m2

qd

qs

1.27 m 4.73 m
6.00 m
8.30 m

q1 = 27.39 tn/m2
q2 = 9.16 tn/m2
wpp = Hz*1.00*2.4
wpp = 3.24 tn/m2
Ws = 1.5*1.7+3.5*1.8+3.5*1.9
Ws = 15.50 tn/m2
Zapata Anterior:
Wumx = q1*1.6-Wpp*0.9
Wumx = 40.91 tn/m
conservadoramente:
Mu = Wu*hz^2/2
Mu = 37.28 tn-m
= 0.9
fy = 4200 Kg/cm2
fc = 210 Kg/cm2
d = hz -(rec-b/2) =
d = 126.230 cm
b = 100.000 cm
8.682 cm2
N8 = 2.540 cm
7.877 cm2
A N8 = 5.070 cm2
7.871 cm2
7.871 cm2
donde:

As = Mu/(*fy*(d-a/2))
a = As*fy/(0.85*fc*b)
a = d/5 =
a=
a=
a=

25.246 cm
2.043 cm
1.853 cm
1.852 cm

As =
As =
As =
As =

As = 7.871 cm2
As mn = 0.0018*b*d
As mn = 22.721 cm2
s = 22.314 cm
usar: N8 @ 0.22m

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE


Zapata Posterior:
qs = (27.39-9.16)/8.3*(8.3-6.0)
q`s = 13.18 tn/m2
qs = qs + q2 = 22.34 tn/m2
Wm = Wu = (3.24+15.50)*1.4
Wu = 26.24 tn/m
M a la distancia 6.00m a partir de la derecha:
Mu = (Wu-1.2*q2)*((B1-t2)^2)/2-1.2*q`s*((B1-t2)^2)/6
Mu = 179.43 tn-m
= 0.9
fy = 4200 Kg/cm2
fc = 210 Kg/cm2
d = hz -(rec-b/2) =
d = 126.230 cm
b = 100.000 cm
41.782 cm2
N8 = 2.540 cm
39.127 cm2
A N8 = 5.070 cm2
39.027 cm2
39.023 cm2
donde:

As = Mu/(*fy*(d-a/2))
a = As*fy/(0.85*fc*b)
a = d/5 =
a=
a=
a=

25.246 cm
9.831 cm
9.206 cm
9.183 cm

As =
As =
As =
As =

As = 39.027 cm2
As mn = 0.0018*b*d
As mn = 22.721 cm2
s = 22.314 cm
usar: N8 @ 0.22m
Verificacin por corte:
Wu = 26.24 tn/m
q`d = ((q1-q2)/B)*(B1-t2-d)
q`d = 10.41 tn/m2
qd = q`d + q2 = 19.57 tn/m2
Vud = (Wu-q2*1.2)*(B1-t1-d)-1/2*q`d*(B1-t2-d)
Vud = 47.55 tn
Vc = 0.53*(fc^(0.5))*b*d
Vc = 96.95 tn
Vc = 0.85*Vc = 82.41 tn
Vc >= Vud

ok conforme

Refuerzo Transversal:
As temp. = 0.0018*b*t
As temp. = 24.300 cm2

N8 =
A N8 =

s = 20.864 cm
As montaje = 36*( b)
As montaje = 57.240 cm2

2.540 cm
5.070 cm2
usar: N8 @ 0.20m

N5 =
A N5 =

1.590 cm
1.980 cm2
usar: N5 @ 0.50m

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE

DISEO DE LA PANTALLA:
Contrafuerte

-As

Franjas Horizontales
L/3

L`

L/3

+As

L = 3.20m

P
-As

3L/8

P` = 57.300 Tn
L = 3.500 m
P = P`/L*(L-3L/8)
P = 35.813 Tn
Acero Horizontal:
Momentos para el diseo:
(+)M = PL^2/16
(+)M = 27.42 tn-m

(-)M = PL^2/12
(-)M = 36.56 tn-m

Para (+)M :
(+)M = 27.42 tn-m
donde:
As = Mu/(*fy*(d-a/2))
a = As*fy/(0.85*fc*b)
a = d/5 =
a=
a=
a=

25.041 cm
1.515 cm
1.371 cm
1.371 cm

As =
As =
As =
As =

6.437 cm2
5.829 cm2
5.825 cm2
5.825 cm2

= 0.9
fy = 4200 Kg/cm2
fc = 210 Kg/cm2
d = 125.205 cm
b = 100.000 cm
N8 = 2.540 cm
A N8 = 5.070 cm2

As = 5.825 cm2
As mn = 0.0018*b*d
As mn = 22.537 cm2
s = 22.496 cm
usar: N8 @ 0.22m

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE


Para (+)M :
(-)M = 36.56 tn-m
donde:
As = Mu/(*fy*(d-a/2))
a = As*fy/(0.85*fc*b)
a = d/5 =
a=
a=
a=

25.041 cm
2.020 cm
1.832 cm
1.831 cm

As =
As =
As =
As =

8.583 cm2
7.787 cm2
7.782 cm2
7.782 cm2

= 0.9
fy = 4200 Kg/cm2
fc = 210 Kg/cm2
d = 125.205 cm
b = 100.000 cm
N8 = 2.540 cm
A N8 = 5.070 cm2

As = 7.782 cm2
As mn = 0.0018*b*d
As mn = 22.537 cm2
s = 22.496 cm
usar: N8 @ 0.22m
Acero Vertical:

+M
+As

-M
L /3

-A s

Momentos para el diseo:


(-)M = 0.06*P`*L
(-)M = 12.03 tn-m

(+)M = (-)M/4
(+)M = 3.01 tn-m

Para (-)M :
(-)M = 12.03 tn-m
donde:
As = Mu/(*fy*(d-a/2))
a = As*fy/(0.85*fc*b)
a = d/5 =
a=
a=
a=

25.041 cm
0.665 cm
0.030 cm
0.018 cm

As =
As =
As =
As =

2.825 cm2
2.549 cm2
2.543 cm2
2.543 cm2

= 0.9
fy = 4200 Kg/cm2
fc = 210 Kg/cm2
d = 125.205 cm
b = 100.000 cm
N8 = 2.540 cm
A N8 = 5.070 cm2

As = 2.543 cm2
As mn = 0.0018*b*d
As mn = 22.537 cm2
s = 22.496 cm

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

usar: N8 @ 0.22m

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE


Para (+)M :
(+)M = 3.01 tn-m
donde:
As = Mu/(*fy*(d-a/2))
a = As*fy/(0.85*fc*b)
As = 0.706 cm2
As = 0.636 cm2
As = 0.636 cm2

a = d/5 = 25.041 cm
a = 0.166 cm
a = 0.150 cm

= 0.9
fy = 4200 Kg/cm2
fc = 210 Kg/cm2
d = 125.205 cm
b = 100.000 cm
N8 = 2.540 cm
A N8 = 5.070 cm2

As = 0.636 cm2
As mn = 0.0018*b*d
As mn = 22.537 cm2
s = 22.496 cm
usar: N8 @ 0.22m

DISEO DE LOS CONTRAFUERTES:


Por Flexin:

Mu

hp

As

PhpL

t2/2
jd

Tu
Tu Cos?
d

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE


TOMANDO DATOS ANTERIOERES:
P1 =0.00tn-m

1
P2 =0.92 tn-m
P3 = 1.29 tn-m

0,5

3,5

P4 = 6.41 tn-m

3,5

P5 = 9.89 tn-m

FUERZA (Tn)
1/2*0.92*1
0.460 Tn
(0.92+1.29)/2*0.5
0.554 Tn
(1.29+6.41)/2*3.5
13.486 Tn
(6.41+7.60)/2*3.5
28.536 Tn
43.036 Tn

EFECTO

Empuje
Activo

Total

BRAZO PALANCA
1/3*1+7.5
7.833 m
(0.92*0.5*0.5/2+(1.29-0.92)*0.5/2*0.5/3)/((0.92+1.29)/2*0.5)+7

7.236 m
(1.29*3.5^2/2+(6.41-1.29)*3.5^2/6)/((1.29+6.41)/2*3.5)+3.5

4.863 m
(6.41*3.5^2/2+(7.6-6.41)*3.5^2/6)/(6.41+7.6)/2*3.5)

1.625 m

M = 119.572 Tn-m
V = 31.428 Tn/m
? = 35.22

Yg =
tp/2 =
cos ? =
tg ? =

MOMENTO
0.460*7.833
3.605 Tn-m
0.554*7.236
4.006 Tn-m
13.486*4.412
65.576 Tn-m
28.536*0.972
46.384 Tn-m
119.572 Tn-m

2.78 m
65.00cm
0.817
0.706

Tu = Mu / (cos?(d-tp/2))
As = Tu/(0.9*fy)

SECCION ANALIZADA
Mu (Tn-m)
Vu (Tn/m)
d (cm)
Tu (Tn)
As (cm2)
N varillas

A UN TERCIO DE LA ALTURA
121.936 Tn-m
32.049 Tn-m
7*567/850+30-6
490.67 cm
35.062 Tn
9.28 cm2
2 N8

EN LA BASE
119.572 Tn-m
31.428 Tn/m
730-6
724.00 cm
22.209 Tn
5.88 cm2
3 N5

AL CENTRO
182.904 Tn-m
48.074 Tn-m
7*425/850+30-6
374.00 cm
72.451 Tn
19.17 cm2
4 N8

En un contrafuerte no puede haber espaciamiento de 20cm, por lo que se le aumenta a 35cm


El refuerzo transversal se calcula de acuerdo a las reacciones que esta ejerce sobre la pantalla vertical:
Tu = 3/2*M
h = 35

donde M = 12.03 tn-m


Tu = 2.235 Tn
As = 0.59 cm2
s=

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

0.18 cm

Asmn = 0.002*100*35
Asmin= 7.00 cm2
Usar N4 @ 0 .18cm

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE


Por Cortante:
t1

d
t2

Tu

La distacia critica para un contrafuerte se ubica a 0.15Ln:


d = 52.50 cm
SECCION ANALIZADA
Mu (Tn-m)
Vui (Tn/m)

EN LA BASE
119.572 Tn-m
31.428 Tn/m
730-6
724.00 cm
31.171 Tn/m
30.242 Tn/m
no cumple

d (cm)
Vu (Tn/m)
0.75*Vc (Tn/m)
0.75*Vc > Vu
Avmin
Vs
b
s

A UN TERCIO DE LA ALTURA
121.936 Tn-m
32.049 Tn-m
7*567/850+30-6
490.67 cm
31.643 Tn-m
30.242 Tn-m
no cumple

AL CENTRO
182.904 Tn-m
48.074 Tn-m
7*425/850+30-6
374.00 cm
47.235 Tn-m
30.242 Tn-m
no cumple

9.45 cm2
20.051 Tn-m
1/2"
13.97 cm

9.45 cm2
41.417 Tn-m

Entonces calculamos el acero por cortante:


9.45 cm2
18.880 Tn/m
14.83 cm

6.76 cm

Por Traccin de la pantalla(refuerzo horizontal)


Contrafuerte

-As

Contrafuerte
L

Datos:
Tu = 1.6*PL
Tu = 241.003 Tn
As = Tu/(*fy)

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

P = 43.036 Tn
L = 3.50 m
= 0.9
As = 63.76 cm2

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611

DISEO DE MURO DE CONTENCION CON CONTRAFUERTE

Por Traccin de la zapata (refuerzo vertical):


Contrafuerte
L

-As

-As

Zapata Posterior

Datos:
Wu = 26.24 tn/m
Tu = Wu*L
Tu = 91.826 Tn
As = Tu/(*fy)
s = 20.87 cm2

As = 24.29 cm2
b N8 = 5.07 cm2
Usar N8 @.20

CONSTRUCTORA CGR INGENIERIA CONSTRUCCION SAC


TACNA - PERU

ELIZABEHT G. ZEBALLOS HUAMANI


ING. CIVIL
CIP 124611