Nama : Heri Wahyudi Kelas : 1 TE 2 Group : D

Training Program Template Training program Name : 2 MCB service four switch and four lamp Program Goals : - student is knowing how to make the single line - student is knowing how to make the layout of the electrical circuit - student is knowing how to make the pipe line - the student be able to analyze the work principle of the circuit - the student is knowing to mix three circuit Under Pinning Know ledge and skill : In electronic laboratory No Competency Performance Kriteria Time Allocation Assament Evident By Required

1.

2 MCB service four switch and four lamp

1.1 Safety 1.2 preparing tools and materials , 1.3 Set the multimeter for testing the circuit at
position ohmmeter 1.4 Dont touch the source of voltage 1.5 Make sure all of the tools is ready to use

2.

Make the circuit

2.1 Make the single line first

2 minutes

2.2 After that make the layout suitable the single line

2 minutes

GAMBAR 2

2.3 After make the layout, make the pipe line,

GAMBAR 3
2.4 After the pipe line is already finish, make the circuit on the board for the experiment, 2.5 Check back the condition of the electrical circuit by use the multimeter before the circuit will be operated 2.6 Check the condition of MCB first like this picture 2.7 Direct the selectore of analog multimeter, for ohmmeter measuring, connect the red probe to the output of MCB and the Black probe to the input of MCB, turn on the MCB, if the pin of multimeter is move, it mean the MCB is at good condition 2.8 After cecking the MCB condition , ceck about the stripe condition of the cicrcuit, 2.9 Direct the selectore of analog multimeter for ohmmeter measuring, connect the red probe to the output of MCB and the Black probe to the terminal 1 of lamp 1 and turn on the switch, then turn on the MCB ( without voltage source), if the pin of multimeter is move , so then the circuit is ready to be operated. And others circuit is same, just how to operate is not same. 2.10 Principle work of the circuit, if the phase is connected to terminal 1 switch 1 then phase is connected to terminal 1 switch 2 and then terminal 2 of switch 1 connected to terminal 1 of lamp 1, and terminal 2 switch 2 connected to terminal 2 of switch 3 and terminal 3 switch 2 connected to terminal 3 switch 3 and then terminal 1 connected to terminal 1 lamp 2. The neutral is connected to terminal 2 of lamp 1 and 2. 3. Finishing 3.1 after completion of the experiment, trim back 5 minutes

20 minutes

2 minutes

5 minutes

45 minutes

7 minutes

all the tools and the materials that have been used 3.2 trim back all the tools and materials that have been used completed and return to the each places. 5 minutes

Competent Not yet Competen

Balikpapan, 14 Maret 2012 Student Lecture

Romadhani

Hilmansyah,ST

Gambar 1
- Singel Line

S1

L1

L2

S3 S2 L3

L4 S4

Gambar 2
- Layout Suitable Single Line

L1 MCB S1

L2

S2

L3

L4

S3

S4

Gambar 3
- Pipe Line

L3 L1 L2 MCB S1 S2 S3

L4

S4