Anda di halaman 1dari 2

Pacific Gas and Electric Company

James R. Becker Site Vice President

Diablo Canyon Power Plant Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 805.545.3462 Internal: 691.3462 Fax: 805.545.6445

April 30, 2012 PG&E Letter DCL-12-047

u.s. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

10 CFR 50.90

Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Proposed Implementation Schedule for License Amendment Request 11-06, Revision to Technical Specification 3.3.5, "Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation" Dear Commissioners and Staff: Pursuant to 10 CFR 50.90, Pacific Gas and Electric Company (PG&E) submitted an application for amendment to Facility Operating License Nos. DPR-80 and DPR-82 by PG&E Letter DCL-11-072, "License Amendment Request 11-06, Revision to Technical Specification 3.3.5, 'Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation,'" dated October 24,2011. PG&E Letter DCL-11-072 submitted for Nuclear Regulatory Commission (NRC) review and approval proposed to revise Technical Specification (TS) 3.3.5, "Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation," revise Final Safety Analysis Report Update (FSARU) Appendix 6.20 and Sections 6.3, 15.3, and 15.4, revise the loss-of-coolant accident control room operator and offsite do~e analysis of record described in the FSARU, and provide a new process for revising input values to this analysis. In PG&E letter DCL-11-072, PG&E requested that the license amendments be made effective upon NRC issuance, to be implemented during Unit 2 Refueling Outage 17 and Unit 1 Refueling Outage 18. To facilitate the actions required to implement the license amendments, PG&E requests that the implementation schedule be changed to "during Unit 1 Refueling Outage 18 and Unit 2 Refueling Outage 18." If you have any questions or require additional information, please contact Mr. Tom Baldwin at (805) 545-4720. Sincerely,

A Callaway

member

of

the

STARS

(Strategic

Teaming

and

Resource

Sharing)

Alliance Wolf Creek

Comanche Peak

Diablo Canyon

Palo Verde

San Onofre

South Texas Project

Document Control Desk April 30, 2012 Page 2

PG&E Letter DCL-12-047

d ngd/4955/5030 1167 cc: Gary W. Butner, Branch Chief, California Department of Public Health Elmo E. Collins, NRC Region IV Michael S. Peck, NRC, Senior Resident Inspector Joseph M. Sebrosky, NRR Project Manager Diablo Distribution

A Callaway

member

of

the

STARS

(Strategic

Teaming

and

Resource

Sharing)

Alliance Wolf Creek

Comanche Peak

Diablo Canyon

Palo Verde

San Onofre

South Texas Project

Anda mungkin juga menyukai