Electrical Systems
Friends,Here I am committed to make the materials as simple as possible. I promise you to minimize the use of school maths so that both Technocrats and students w ill benefit from the articles. Here the main aim is to develop clear concept. friday, september 30, 2011

Substation Bus Schemes

Electric Troubleshooting
Fluke Analyzers For Load Studies & Predictive Maintenance. Free Demo!
Fluke.com/Electric_Troubleshooting search this blog

Search
blog archive

Introduction: We already mentioned the different types of substations. Before more in-depth discussion about each type of substation it is better to know few common essential features of a substation. Here we discuss about the bus schemes commonly implemented in an electrical substation. The Bus scheme is the arrangement of overhead bus bar and associated switching equipments in a substation. The operational flexibility and reliability of the substation greatly depends upon the bus scheme. Here I reiterate that the electric substation is a junction point where usually more than two transmission lines terminate. Actually in most of EHV and HV substations more than half a dozen of lines terminate. In many large transmission substations the total numbers of lines terminating exceeds one or two dozens. In this scenario obviously the first requirement is avoidance of total shutdown of the substation for the purpose of maintenance of some equipment(s) or due to fault somewhere. Total shutdown of substation means complete shutdown of all the lines connected to this particular substation. So the switching scheme is adopted depending upon the importance of the substation, reliability requirement, flexibility and future expansion etc.. Of course substation construction and operational cost is also to be considered. C learly a EHV or UHV transmission substation where large numbers of important lines terminate is extremely important and the substation should be designed to avoid total failure and interruption of minimum numbers of circuits. There are mainly six bus schemes. these are: Single Bus Main Bus and Transfer Bus Double Bus Double Breaker Double Bus Single Breaker Ring Bus Breaker and Half Before we proceed further I would like to discuss in brief about the C ircuit Breaker and Isolator. It will be helpful for

2012 (4) 2011 (17) December (1) November (1) October (1) September (1) Substation Bus Schemes August (1) July (1) June (2) May (1) April (3) March (2) February (2) January (1) 2010 (15)

followers

novices. See the figure below where two buses are connected by circuit breakers and isolators as shown. A circuit breaker is a device whose main purpose is to break the circuit carrying load current or fault current. As the breaker is opened then current is interrupted in the circuit. But it is not safe to work with opened breaker as one or both sides of the breaker terminals may be still energised. The breaker is then isolated from the rest of the circuit by opening the isolators on both sides of breaker. The isolators are used to isolate the breaker or circuit. It should be remembered that the isolators are never opened or closed to interrupt or make the circuit. That means when the circuit is to be made on, first the isolators on both sides of a breaker are closed then breaker is closed to allow current flow. When the circuit is to be made off or interrupted, first the breaker is opened(tripped), hence load current is interrupted. Then to isolate the breaker, isolators are opened. Isolators are designed to interrupt small current. Breakers are designed to interrupt large load current and heavy fault current. Both breaker and isolator carry load current in normal state.

Join this site


w ith Google Friend Connect

www.skm-eleksys.com/2011/09/substation-bus-schemes.html

1/6

5/21/12
electrical maintenance-Flir

Electrical Systems: Substation Bus Schemes

Leading Thermal Cameras for Electrical & Mechanical Application


www.flir.com /thg

High Voltage Fuse

wide range of hrc and semiconductor fuses pcb and panel mounted relays
www.k udam m corp.com

relay devices

RelayProtection test device used in measuring relay and fault recorder.


www.hvhipot.com

Single Bus
As the name indicate the substation with this configuration has a single bus (Fig-B). All the circuits are connected to this bus. A fault on the bus or between the bus and a breaker results in the outage of the entire bus or substation. Failure of any breaker also results in outage of the entire bus. Maintenance of any circuit breaker requires shutdown of the corresponding circuit/line and maintenance of bus requires complete shutdown of the bus. A bypass switch across the breaker should be used for maintenance of the corresponding breaker. This case the protection system is disabled. Single Bus configuration is the simplest and least cost of all configurations. The system can be easily expanded. This configuration requires less area. The reliability of this system being low, it is not to be implemented in the substation where high reliability is expected. Large substations usually do not utilize this scheme. By sectionalising of the bus the reliability and availability of the single bus system can be improved.

vacuum circuit breaker

Air type Vacuum type

www.Panick k e r.com /vcb.h

Motor Protection Relay

Multifunction Motor & Genset Protection Relays with Wide Range

www.ge nuine autom ation.c

Powered by Blogger.

Privacy Information

pages

Home

Main Bus and Transfer Bus


In this scheme one more bus is added. See Figure-C how the equipments are arranged and circuits are connected between main and transfer bus. In this arrangement one more breaker may be used, known as tie circuit breaker. No circuit is associated with this tie breaker. When the tie C B is not present, for maintenance of a circuit breaker, the transfer bus is energized by closing the isolator switches to transfer bus. Then the breaker to undergo maintenance is opened and isolated (opening isolators on both sides of C B) for maintenance. In this arrangement there is no protection for the circuits. The circuits can be protected from outside the substation.

www.skm-eleksys.com/2011/09/substation-bus-schemes.html

2/6

5/21/12

Electrical Systems: Substation Bus Schemes

When the tie breaker is present, for maintenance of a breaker the transfer bus is energised by closing the tie breaker. Then the isolator near the transfer bus of the breaker of circuit to be maintained is closed. Now the breaker to be maintained is opened. Then corresponding isolators on both sides of breaker are opened. The breaker is removed for maintenance. The circuit is transferred to transfer bus. Remember that the isolator to the transfer bus corresponding to the breaker not to be maintained remain open. Here the tie breaker protects the circuit in place of removed breaker. In this scheme the relay setting is quite complex due to the requirement of the tie breaker to handle each situation for maintenance of any of the other breakers. This scheme is somewhat more costly than the single bus scheme but is more reliable. The scheme can be easily expanded. The switching procedure is complicated for maintenance of any circuit breaker. Failure of a breaker or fault on the bus results in outage of complete substation.

Double Bus Double Breaker


In this scheme there are two buses and two circuit breakers per circuit are used (See Fig-D). In normal state both the buses are energised. Any circuit breaker can be removed for maintenance without interruption of the corresponding circuit. Also the failure of one of the two buses does not interrupt any circuit as all the circuits can be fed from the remaining bus and isolating the failed bus. By shifting circuit from one bus to other the loading on the buses can be balanced. The substation with this configuration requires twice as much equipments as single bus scheme. This scheme has high reliability. But due to more equipments this scheme is costly and requires more space. This scheme is usually used at EHV transmission substation or generating station where high reliability is required.

Double Bus Single Breaker


This scheme is shown in Fig-E. This scheme has two buses. Each circuit has one breaker and connected to both buses by isolators as shown. There is one tie breaker between two buses. The tie breaker is normally closed. For the tie breaker in closed position the circuit can be connected to either of the buses by closing the corresponding switch. It is clear that fault on one bus requires isolation of the bus and the circuits are fed from the other bus.

www.skm-eleksys.com/2011/09/substation-bus-schemes.html

3/6

5/21/12

Electrical Systems: Substation Bus Schemes

From the figure you can guess that the configuration has some improvement over the single bus system. This arrangement has more flexibility in operation than the single bus scheme. This scheme is costlier and requires more space than the single bus scheme. Many EHV transmission substations use this scheme with an additional transfer bus.

Ring Bus
The Ring Bus configuration is shown in Fig-F. The breakers are so connected and forms a ring. There are isolators on both sides of each breaker. C ircuits terminate between the breakers. The number of breakers is same as the numbers of circuits. Each of the circuits in ring bus system is fed from both sides. Any of the breaker can be opened and isolated for maintenance without interrupting any of the circuits. A fault on any of the circuit is isolated by tripping of two breakers on both sides of the circuit. By tripping the two breakers only the faulted circuit is isolated and all other circuits continue to operate in open ring state. This scheme has good operational flexibility and high reliability. The main disadvantage is that when a fault happens and the ring is split and may result into two isolated sections. Each of these two sections may not have the proper combination of source and load circuits. To avoid this as far as possible the source and load circuits should be connected side by side (see figure). The ring bus scheme can be expanded to accommodate more circuits. The ring bus scheme is not suitable for more than 6 circuits (although possible). When expansion of the substation is required to accommodate more circuits, the ring bus scheme can be easily expanded to One and Half Breaker(See below and compare) scheme. The scheme is required to be planned properly to avoid difficulties in future expansion.

Breaker and Half


The Breaker and Half scheme has two main buses (Fig G). Both the buses are normally energised. Three breakers are connected between the buses. The circuits are terminated between the breakers as shown. In this bus configuration for two circuits three numbers of breakers are required. Hence it is called one and half scheme. It is something like, for controlling one circuit we require one full and a half breakers. The middle breaker is shared by both the circuits. Like the ring bus scheme here also each circuit is fed from both the buses. Any of the breakers can be opened and removed for maintenance purposes without interrupting supply to any of the circuits. Also one of the two buses can be removed for maintenance without interruption of the service to any of the circuits. If fault happens on a bus it is isolated without interruption of supply to any of the circuits. If the middle circuit breaker fails then the breakers adjacent to the buses are tripped so interrupting both the circuits. But if a breaker adjacent to the bus fails then the tripping of middle breaker does not interrupt power supply to circuit associated with healthy breaker. Only the circuit associated with failed breaker is interrupted.

www.skm-eleksys.com/2011/09/substation-bus-schemes.html

4/6

5/21/12

Electrical Systems: Substation Bus Schemes

This configuration is very flexible and highly reliable. The relaying of the scheme is complicated as the middle breaker is associated with both the circuits. This scheme is economical in comparison to Double Bus Double Breaker scheme. This scheme also require more space in comparison to other schemes to accommodate more equipments. In one substation you can find two or more schemes implemented as per the requirement. In most of the modern substations it is usual to add one transfer bus in most of the schemes above. Which enhances the availability and maintainability of the system and operational flexibility

Automatic Transfer Switch www.juanizaindustrial.com ASCO Power - Authorized Distributor Best Prices, Fast Delivery New Earth-Leakage Relays www.littelfuse.com Littelfuse Ground-Fault Protection. Detect and Protect with Littelfuse. Surge Protection www.protec-power.com Provide total power solution Lightning protection system Get Smart Grid Standards ansidotorg.blogspot.com Download Smart Grid Standards Interoperability and Cyber Security
at 6:49 PM

1 comment s:
Anonymous said... excellent April 15, 2012 11:47 AM

Post a Comment

Links t o t his post


C reate a Link Newer Post Home Older Post

www.skm-eleksys.com/2011/09/substation-bus-schemes.html

5/6

5/21/12

Electrical Systems: Substation Bus Schemes


Subscribe to: Post C omments (Atom)

Extreme Tracker

www.skm-eleksys.com/2011/09/substation-bus-schemes.html

6/6

Anda mungkin juga menyukai