SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1 Page No CFA BC/S1/1 1.1 a b c d e f g 1.2 a b c a b c d 1.3 a b c d e 1.4 a b c d e Sub-structure Pilecap including excavation, formwork, concrete and rebar Excavation Backfill Lean concrete - 50mm thick G15 Concrete G40 Reinforcement Formwork Remove surplus off site Column stump Concrete G40 Reinforcement Formwork Lift pit wall Excavation Concrete G40 Reinforcement Formwork Ground beam Excavation Lean concrete - 50mm thick G15 Concrete G40 Reinforcement Formwork Ground slab Excavation Lean concrete - 50mm thick G15 Concrete G40 Reinforcement Formwork 150mm thick slab edge Plinth Concrete G40 Reinforcement Formwork Waterproofing system to sub-structure in contact with ground 25mm thick cement/sand protection screed to ground slab to ground beam to lift pit wall Waterproofing membrane to ground slab to ground beam to lift pit wall Damp proof membrane to ground slab to ground beam to lift pit wall Hydrotite CJ0720-2K swellable water stop to lift pit wall 1.7 1.8 Anti-termite treatment Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). m3 m3 kg m2 m3 m2 m3 kg m2 m3 m2 m3 kg m m3 kg m2 Description Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit m2 Qty Code Rate

m3 m3 m2 m3 kg m2 m3

exc Backfill G15 G40 Rebar Fwk Remove G40 Rebar Fwk exc G40 Rebar Fwk exc G15 G40 Rebar Fwk exc G15 G40 Rebar 150-fwk G40 Rebar Fwk

1.5 c d e 1.6

m2 m2 m2 m2 m2 m2 m2 m2 m2 m m2

waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf Anti-Termite

a b c

Carried Forward

Page 1 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/2 2.1 a b c d e f g h i j k l 2.2 a b c d e f g h i j k l 2.3 a b c d e f g h i Frame Concrete in column - G40 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Concrete in suspended/edge beam - G40 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Reinforcement in column 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey Carried Forward Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

G40 G40 G40 G40 G40 G40 G40 G40 G40 G40

kg kg kg kg kg kg kg kg kg

Rebar Rebar Rebar Rebar Rebar Rebar Rebar Rebar Rebar

Page 2 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/3 2.3 j k l 2.4 a b c d e f g h i j k l 2.5 a b c d e f g h i j k l Frame (Cont'd) Reinforcement in column (Cont'd) 10th storey 11th storey Roof level Reinforcement in suspended/edge beam 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Formwork to column 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

kg kg

Rebar Rebar

kg kg kg kg kg kg kg kg kg kg

Rebar Rebar Rebar Rebar Rebar Rebar Rebar Rebar Rebar Rebar

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

Fwk Fwk Fwk Fwk Fwk Fwk Fwk Fwk Fwk Fwk Fwk

Carried Forward

Page 3 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/4 2.6 a b c d e f g h i j k l 2.7 Frame (Cont'd) Formwork to suspended/edge beam 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

Fwk Fwk Fwk Fwk Fwk Fwk Fwk Fwk Fwk Fwk

a b c

Upper Floor 3.1 a b c d e f g h i j k l Concrete to suspended slab - G40 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Carried Forward

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

G40 G40 G40 G40 G40 G40 G40 G40 G40 G40

Page 4 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/5 3.2 a b c d e f g h i j k l 3.3 a b c d e f g h i j k l a b c d e f g h i j a b c d e f g h i j a b c d e f g h i j k 3.4 a b c d e f Upper Floor (Cont'd) Reinforcement to suspended slab 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Formwork to suspended slab 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level 50mm thick slab edge 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Ditto ,20mm thick slab edge 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Ditto ,30mm thick slab edge 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Waterproofing system to structural works as specified 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey Carried Forward Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

kg kg kg kg kg kg kg kg kg kg

rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk

m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m

50-fwk 50-fwk 50-fwk 50-fwk 50-fwk 50-fwk 50-fwk 50-fwk 50-fwk 50-fwk 20-fwk 20-fwk 20-fwk 20-fwk 20-fwk 20-fwk 20-fwk 20-fwk 20-fwk 20-fwk 30-fwk 30-fwk 30-fwk 30-fwk 30-fwk 30-fwk 30-fwk 30-fwk 30-fwk 30-fwk 30-fwk

Page 5 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/6 3.4 g h i j k l 3.5 Upper Floor (Cont'd) Waterproofing system to structural works as specified (Cont'd) 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

a b c

Structural Wall 4.1 a Concrete to structural wall - G40 1st storey to lift wall to staircase wall to internal rc wall 2nd storey to lift wall to staircase wall to internal rc wall 3rd storey to lift wall to staircase wall to internal rc wall 4th storey to lift wall to staircase wall to internal rc wall 5th storey to lift wall to staircase wall to internal rc wall 6th storey to lift wall to staircase wall to internal rc wall 7th storey to lift wall to staircase wall to internal rc wall 8th storey to lift wall to staircase wall to internal rc wall 9th storey to lift wall to staircase wall to internal rc wall 10th storey to lift wall to staircase wall to internal rc wall 11th storey to lift wall to staircase wall to internal rc wall Roof level to lift wall to staircase wall to internal rc wall Carried Forward

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40

Page 6 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/7 4.2 a Structural Wall (Cont'd) Reinforcement to structural wall 1st storey to lift wall to staircase wall to internal rc wall 2nd storey to lift wall to staircase wall to internal rc wall 3rd storey to lift wall to staircase wall to internal rc wall 4th storey to lift wall to staircase wall to internal rc wall 5th storey to lift wall to staircase wall to internal rc wall 6th storey to lift wall to staircase wall to internal rc wall 7th storey to lift wall to staircase wall to internal rc wall 8th storey to lift wall to staircase wall to internal rc wall 9th storey to lift wall to staircase wall to internal rc wall 10th storey to lift wall to staircase wall to internal rc wall 11th storey to lift wall to staircase wall to internal rc wall Roof level to lift wall to staircase wall to internal rc wall Formwork to structural wall 1st storey to lift wall to staircase wall to internal rc wall 2nd storey to lift wall to staircase wall to internal rc wall 3rd storey to lift wall to staircase wall to internal rc wall 4th storey to lift wall to staircase wall to internal rc wall 5th storey to lift wall to staircase wall to internal rc wall 6th storey to lift wall to staircase wall to internal rc wall 7th storey to lift wall to staircase wall to internal rc wall 8th storey to lift wall to staircase wall to internal rc wall 9th storey to lift wall to staircase wall to internal rc wall 10th storey to lift wall to staircase wall to internal rc wall 11th storey to lift wall to staircase wall to internal rc wall Roof level to lift wall to staircase wall to internal rc wall Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg

rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar

4.3 a

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk

4.4

a b c

Carried Forward

Page 7 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/8 5.1 a b c 5.2 a b c a b c 5.3 a b c 5.4 a b c RF Structural work to roof Concrete roof slab Concrete G40 Reinforcement Formwork Suspended roof beam Concrete G40 Reinforcement Formwork Roof plinth Concrete G40 Reinforcement Formwork Stump column at roof Concrete G40 Reinforcement Formwork Roof finishes Profile steel roofing- Roof over Pavilion, measured separately Insulation Waterproofing Wateproofing to RC Flat Roof consists of: min 25mm thk c/s screed to fall 2.2mm thk EVA/PVC fleece-backed waterproofing membrane bonded 6mm thk under-screed drainage sheet 1000 x 1000 x 50mm thk c/s panel roofing reinforced with BRC 3315 mesh polysulphide joints @ every 10m c/c Polysulphide sealant 50mm wide welded lap 54.79 RF1 RF2 Wateproofing to RC Flat Roof, non insulated RC Flat Roof over Incubation Pod 3; with 600 x 600 x 50mm thk PC panel 13.49 RFU Wateproofing to RC Flat Roof- upturn consists of: 1.2mm thk EVA/PVC waterproofing membrane bonded 25mm thk c/s protection screed with GI mesh membrane terminated into groove-line & sealed with polyurethane sealant 42.23 Waterproofing to Non-Insulated Deck consists of: min 25mm thk c/s screed to fall 2.2mm thk EVA/PVC fleece-backed waterproofing membrane bonded 6mm thk under-screed drainage sheet finishes and protection screed measured separately Waterproofing to Landscape Deck consists of: min 25mm thk c/s screed to fall 2.2mm thk EVA/PVC fleece-backed waterproofing membrane bonded 25mm thk c/s protection screed 100gsm geotextile separation layer 30mm thk interlocking sub-soil drainage modules 100gsm geotextile filter fabric 50mm thk coarse washed sand growth media to Landscape Architect's detail (Softscape is included in PC/Provisional Sums) Waterproofing works to planters- 30mm thk modular subsoil drainage with geotectile filter fabric Planter floor roof Planter walls 380.71 d Perforated aluminum trellis Roof Trellis/ Aluminium expanded mesh screen to roof consists of: 600 x 300 GS 200 x 100 x 8mm thk hot dipped GS RHS in paint finish 6mm thk hot dipped GS plate in paint finish Aluminium expanded mesh screen in powder coated finish 50 x 75 x 6mm thk hot dipped GS L-angle in paint finish 350.27 e Note Green roofing system Green roofing system by NSC as per Schedule of Finishes, Item 1.7.7 Planters at Sky Garden Plaster and paint to planter walls 380.71 380.71 m2 380.71 plaster 350.27 By Others 380.71 227.64 227.64 m2 380.71 waterprf m2 227.64 waterprf 42.23 m2 waterprf 13.49 m 42.23 waterprf 54.79 m2 m2 13.49 waterprf waterprf m2 54.79 waterprf Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

m3 kg m2 m3 kg m2 m3 kg m2

G40 rebar fwk G40 rebar fwk G40 rebar fwk

m2

waterprf

m2

350.27

metal-wk

Perimeter planter-wall Planter near timber seating Coping (w=200mm) 282.01 Turfing 118.60 f Roof drainage with accessories Scupper drain (w=100mm) at Incubation Pod 3 Roof IP3 150mm wide cement sand skirting with underscreed drainage mat (w=150mm) Scupper drain to Corridor near AC Ledges- 150mm wide x 50mm deep RC surface channel g Truss to support lights & fans Steel structure Painting M16 bolt 11.44 11.44 m m skirting scupper 118.60 LS m 11.44 siphonic scupper 282.01 m2 118.60 nil m 282.01 coping

kg m2 no.

steel steel steel

Page 8 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No M20(cast-in bolt) h Note Timber decking to Sky Terrace Timber flooring system (iron wood); Size: 150 x 1200 x30mm thk, Colour: natural stain, Finish: natural stain look alike as per Landscaping Materials and Finishes Legend Over drainage trench/ footpath 148.01 Reflection Deck SS handrail to ramp at Sky Garden 10.60 i EF13 Note Granite slab with stepping stone Granite slab with stepping stones to Laundry Drying Area at Roof Garden; external Laundry area is GC-granolithic finish as per Landscaping Drawing floor plan but WA- timber flooring system as Materials and Finishes Schedule of the same Landscaping Drawing Granite, grey, natural finish to hallway, ramp as per Landscaping Drawing 54.26 GC j k Note Granolitic, 3-5mm diam, dark grey/ black to hallway as per Landscaping Drawing Plinth 2 Roof Pavilion at Grid XC/X13-X15 75 x 150mm hardwood timber flooring Timber flooring system (iron wood); Size: 150 x 1200 x30mm thk, Colour: natural stain, Finish: natural stain look alike as per Landscaping Materials and Finishes Legend 45.13 MS expanded mesh screen in powder coated finish to Roof 40.72 MS expanded mesh screen in powder coated finish supported with 10mm thk hot dipped galv MS plate in paint finish and 50 x 50 x 10mm hot dipped MS Langle in paint finish to walls 2 Laminated glass barrier to wall (h=1.95m) 10.40 40mm diam SS balustrade and handrail (h=0.90m) 10.35 5.5 5.6 Built in Gondola system Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a b Water tap at Sky Terrace Rainscreen Steel structure Painting M16 bolt nos kg m2 no. others steel steel steel 10.35 Gondola 10.40 m 10.35 metal-wk 3.60 3.80 27.36 m 10.40 glazing 40.72 m2 27.36 metal-wk 45.13 m2 40.72 metal-wk 3.22 6.44 54.26 m2 m2 6.44 grano plinth 10.60 148.01 m2 m 10.60 tbr deck metal-wk Description Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit no. Qty Code steel Rate

m2

148.01

tbr deck

m2

59.06

granite

59.06

59.06

GR

m2

54.26

granite

m2 m2

tbr deck 45.13

c Carried Forward

Page 9 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward 6.1 a b Staircase flight Precast concrete staircase Reinforced Concrete topping/structure Concrete G40 Reinforcement Formwork Suspended landing slab Concrete G40 Reinforcement Formwork Suspended landing / raking / edge beam Concrete G40 Reinforcement Formwork Expended mesh screen staircase railing MS railing to Staircase (h=0.90m) to all blocks consists of: 40 x 100mm thk GS plate in enamel paint finish 40 x 10mm thk GS plate in enamel paint finish @ max 100mm c/c 50 x 150 x 6mm thk GS angle in enamel paint finish SS expansion bolt Aluminium expanded mesh screen/ railing in powder coated finish (h=1.675m) to Staircase Landing and Smoke Stop Lobby for Blks X1, Y1 and Z1 consists of: 10mm thk hot dipped GS plate in powder coated finish 10mm thk hot dipped GS folded plate in powder coated finish 40mm diam hot dipped GS CHS in powder coated finish 10mm thk hot dipped GS flat plate baluster in powder coated finish 10mm thk hot dipped GS L-angle pre-welded to aluminium expanded mesh with powder coated finish Aluminium expanded mesh with powder coated finish 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate pre-welded to upright balusters in paint finish 10mm thk hot dipped GS angle plate in powder coated finish Countersunk anchor bolt 20 x 20mm aluminium U-channel in powder coated finish 10mm thk hot dipped GS plate in powder coated finish Ditto h=1.2m as measured on elevaton Aluminium expanded mesh screen Staircases (h=1.36m) to all blocks to internal m m Railing Railing m Railing m3 kg m2 G40 rebar fwk Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

m3 kg m2

G40 rebar fwk

6.2 a b c 6.3 a b c 6.4 SR1 SR2

Railing

SR2A SR3

SR4 6.5

consists of: 40mm diam hot dipped GS CHS in powder coated finish 10mm thk hot dipped GS L-angle prewelded to aluminium expanded mesh with powder coated finish Aluminium expanded mesh screen in powder coated finish 10mm thk hot dipped GS angle plate in powder coated finish Countersunk anchor bolt 10mm thk hot dipped GS plate in powder coated finish GS wall mounted railing to internal staircase to Hall Fellow/ Hall Master consists of: 40mm diam x 3mm hot dipped GS handrail 10mm diam hot dipped GS rod 50mm diam x 6mm thk GS flat plate Timber stud wall to staircase railing Timber vertical strip to internal staircase for Hall Fellow and Hall Master Stair finishes Floor Finishes Self leveling screed to common staircases Landing Riser (175mm high) Treads (250mm wide) Nosing tiles 300mm x 600mm & 110mm x 600mm non-slip homogeneous tiles to Interaction Staircase Landing Riser (175mm high) Treads (250mm wide) Nosing tiles Floor finishes to Stairs to Hall Master and Hall Fellow, finishes not given, assuming similar to Living area, homogeneous tiles with cement and sand screed Landing Riser (167mm high) Treads (250mm wide) Tactile nosing m2 m m m m2 m2 F6 flr-tile-R flr-tile-T flr-tile-NT plaster plaster m Railing

m2

timber

6.6 SF1

m2 m m m

screed S-riser S-tread S-Nosing-T

SF2

m2 m m m

F6 flr-tile-R flr-tile-T flr-tile-NT

SF3

SW SC1 6.7

Wall Finishes Plaster and paint to staircase wall Ceiling Finishes Plaster and paint to staircase ceiling Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items).

a b c

External Wall and Finishes 7.1 a 1BRW100E 1BRW200E b 2BRW100E 2BRW200E Brickwall 1st storey 100mm thk brickwall; external 200mm thk brickwall; external 2nd storey 100mm thk brickwall; external 200mm thk brickwall; external

m2 m2

100-bwk 200-bwk

m2 m2

100-bwk 200-bwk

Page 10 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No c 3BRW100E 3BRW200E d 4BRW100E 4BRW200E e 5BRW100E 5BRW200E Description 3rd storey 100mm thk brickwall; external 200mm thk brickwall; external 4th storey 100mm thk brickwall; external 200mm thk brickwall; external 5th storey 100mm thk brickwall; external 200mm thk brickwall; external Carried Forward Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

m2 m2

100-bwk 200-bwk

m2 m2 m2 m2

100-bwk 200-bwk 100-bwk 200-bwk

Page 11 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/10 7.1 f 6BRW100E 6BRW200E g 7BRW100E 7BRW200E h 8BRW100E 8BRW200E i 9BRW100E 9BRW200E j 10BRW100E 10BRW200E k 11BRW100E 11BRW200E l RFBRW100E RFBRW200E 7.2 Note External Wall and Finishes (Cont'd) Brickwall (Cont'd) 6th storey 100mm thk brickwall; external 200mm thk brickwall; external 7th storey 100mm thk brickwall; external 200mm thk brickwall; external 8th storey 100mm thk brickwall; external 200mm thk brickwall; external 9th storey 100mm thk brickwall; external 200mm thk brickwall; external 10th storey 100mm thk brickwall; external 200mm thk brickwall; external 11th storey 100mm thk brickwall; external 200mm thk brickwall; external Roof level 100mm thk brickwall; external 200mm thk brickwall; external Glass wall panel complete with supporting frame For glass panel details, please refer to drawing For details, please refer to ID Drawings For Curtain wall/ glass panels to to Student Common Lounge, please refer to Facade Drawings a TGP/01 TGP/02 b TGP/15 TGP/16 TGP/17 TGP/18 1st storey Glass panel with double leaf door to Hall Admin Office (Blk X1) Glass panel to Hall Admin Office (Blk X1) 2nd storey Glass panel to Multi Purpose Room (Block X1) Glass panel to Multi Purpose Room (Block X1) Glass panel to Multi Use Room (Blk X1) Glass panel to Multi Use Room (Blk X1) Top hung window with fixed glass panel to Multi Use Room (Blk X1) Think Tank Rooms Fixed glass panel to Think Tank Room 1 (Blk X1), Think Tank Room 4 (Blk Z1) Fixed glass panel to Think Tank Room 1 (Blk X1) Fixed glass panel with top hung window to Think Tank Room 1,4 (Blk X1), Think Tank Room 6 (Blk Z1) c 3rd storey Incubation Pods Full tempered laminated glass with 200 x 75 x 4mm thk aluminium RHS in paint finish to Incubation Pods; external GL/14 TGP/22 d TTR/GP11 TTR/W7 e TTR/GP5 TTR/W1 GL/14 f Aluminium frame glass louvred window to Incubation Pod (P2/P3) Glass panel to Incubation Pod (P2, P3) 4th storey Think Tank Rooms Fixed glass panel to Think Tank Room 2,5,8,9 (Blk X1); 2 Sty high Fixed glass panel with top hung window to Think Tank Room 2,5,9 (Blk X1); 2 Sty high 5th storey Think Tank Rooms Fixed glass panel to Think Tank Room 3,4,6 (Blk X1), Think Tank Room 2 & 3 (Blk Y1), Think Tank Room 2,6,7 (Blk Z1) Fixed glass panel with top hung window to Think Tank Room 3 (Blk X1), Think Tank Room 4 (Blk Z1) Aluminium frame glass louvred window to Incubation Pod (P2/P3) 6th storey Incubation Pods Full tempered laminated glass with 200 x 75 x 4mm thk aluminium RHS in paint finish to Incubation Pods; external TTR/GP6 Think Tank Rooms Fixed glass panel to Think Tank Room 3,4,6 (Blk X1), Think Tank Room 2 & 3 (Blk Y1), Think Tank Room 2,6,7 (Blk Z1) Fixed glass panel to Think Tank Room 4 (Blk X1), Think Tank Room 2 (Blk Y1) Fixed glass panel to Think Tank Room 2,5,8,9 (Blk X1); 2 Sty high Fixed glass panel with top hung window to Think Tank Room 1,4 (Blk X1), Think Tank Room 6 (Blk Z1) Fixed glass panel with top hung window to Think Tank Room 2,5,9 (Blk X1); 2 Sty high g TTR/GP6 TTR/GP8 TTR/W3 h i 7th storey Think Tank Rooms Fixed glass panel to Think Tank Room 3,4,6 (Blk X1), Think Tank Room 2 & 3 (Blk Y1), Think Tank Room 2,6,7 (Blk Z1) Fixed glass panel to Think Tank Room 6 (Blk X1), Think Tank Room 7 (Blk Z1) Fixed glass panel with top hung window to Think Tank Room 6 (Blk X1), Think Tank Room 7 (Blk Z1) 8th storey 9th storey Incubation Pods Full tempered laminated glass with 200 x 75 x 4mm thk aluminium RHS in paint finish to Incubation Pods; external GL/14A TGP/21 Aluminium frame glass louvred window to Incubation Pod (P1) Glass panel to Incubation Pod (P1) Think Tank Rooms m2 nos nos nos 1 1 1 Na Na glazing glazing glazing glazing m2 glazing nos nos nos 1 1 glazing glazing glazing nos nos 1 1 glazing glazing m2 glazing nos nos nos nos nos nos 1 1 1 1 3 1 glazing glazing glazing glazing glazing glazing Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk

TTR/GP3 TTR/GP7 TTR/W5

nos nos nos

1 1 1

glazing glazing glazing

nos nos

1 1

glazing glazing

nos

glazing

TTR/GP9 TTR/GP11 TTR/W6 TTR/W7

nos nos nos nos

1 1 1 1

glazing glazing glazing glazing

nos nos

1 1

glazing glazing

Page 12 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No TTR/W2 Description Fixed glass panel with top hung window to Think Tank Room 7 (Blk X1), Think Tank Room 1,3,4 (Blk Y1), Think Tank Room 1,2,8 (Blk Z1) j 10th storey Think Tank Rooms Fixed glass panel to Think Tank Room 2,5,8,9 (Blk X1); 2 Sty high Fixed glass panel to Think Tank Room 2,5,8,9 (Blk X1); 2 Sty high Fixed glass panel with top hung window to Think Tank Room 2,5,9 (Blk X1); 2 Sty high Fixed glass panel with top hung window to Think Tank Room 8 (Blk X1), Think Tank Room 10 (Blk Z1); 2 Sty high k 7.3 Note 11th storey Perforated panel / Composite Panel /Mesh Steel support for rainscreens / sunshades measured separately, please refer to Item 5.6b are Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit nos Qty 1 Code glazing Rate

TTR/GP10 TTR/GP11 TTR/W7 TTR/W8

nos nos nos nos

1 1 1 1

glazing glazing glazing glazing

Page 13 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No a Description 1st storey Aluminium expanded mesh/ wall to Lift Lobby near Staircase 1 as shown on Elevation 2nd storey Aluminium expanded mesh screen in powder coated finish to Drying Closet, external; 2mm thk as per Tender Clarification 2, Item A51 9 2 Expanded mesh screen (h=1.0m) to Balcony and AC Ledge at Hall Fellow and Hall Master 1.20 3 Aluminium expanded mesh screen/ rain screen (slanted height=2.375m) to Blks X1, Y1 and Z1 consists of: 5mm thk hot dipped GS plate in paint finish Aluminium expanded mesh screen in powde coated finish 50 x 100 x 8mm thk hot dipped GS RHS in paint finish 8mm thk hot dipped GS folded plate in paint finish 75 x 150 x 8mm thk hot dipped GS RHS in paint finish 8mm thk hot dipped GS plate in paint finish 50 x 50 x 6mm thk hot dipped GS L-angle in paint finish 50 x 100 x 6mm thk hot dipped GS RHS in paint finish 1.2mm thk folded aluminium cladding panel with 6mm thk non-combustible calcium silicate backing 9 c 1 3rd storey Aluminium expanded mesh screen in powder coated finish to Drying Closet, external; 2mm thk as per Tender Clarification 2, Item A51 32 2 Aluminium expanded mesh screen/ rain screen (slanted height=2.375m) to Blks X1, Y1 and Z1 consists of: 5mm thk hot dipped GS plate in paint finish Aluminium expanded mesh screen in powde coated finish 50 x 100 x 8mm thk hot dipped GS RHS in paint finish 8mm thk hot dipped GS folded plate in paint finish 75 x 150 x 8mm thk hot dipped GS RHS in paint finish 8mm thk hot dipped GS plate in paint finish 50 x 50 x 6mm thk hot dipped GS L-angle in paint finish 50 x 100 x 6mm thk hot dipped GS RHS in paint finish 1.2mm thk folded aluminium cladding panel with 6mm thk non-combustible calcium silicate backing 5.44 d 1 4th storey Aluminium expanded mesh screen in powder coated finish to Drying Closet, external; 2mm thk as per Tender Clarification 2, Item A51 41 2 Expanded mesh screen (h=1.0m) to Balcony and AC Ledge at Hall Fellow and Hall Master 2.17 e 1 5th storey Aluminium expanded mesh screen in powder coated finish to Drying Closet, external; 2mm thk as per Tender Clarification 2, Item A51 37 f 1 6th storey Aluminium expanded mesh screen in powder coated finish to Drying Closet, external; 2mm thk as per Tender Clarification 2, Item A51 33 2 Expanded mesh screen (h=1.0m) to Balcony and AC Ledge at Hall Fellow and Hall Master 2.17 3 Aluminium expanded mesh screen/ rain screen (slanted height=2.375m) to Blks X1, Y1 and Z1 consists of: 5mm thk hot dipped GS plate in paint finish Aluminium expanded mesh screen in powde coated finish 50 x 100 x 8mm thk hot dipped GS RHS in paint finish 8mm thk hot dipped GS folded plate in paint finish 75 x 150 x 8mm thk hot dipped GS RHS in paint finish 8mm thk hot dipped GS plate in paint finish 50 x 50 x 6mm thk hot dipped GS L-angle in paint finish 50 x 100 x 6mm thk hot dipped GS RHS in paint finish 1.2mm thk folded aluminium cladding panel with 6mm thk non-combustible calcium silicate backing 5.13 4 MS expanded mesh screen in powder coated finish to Corridor near Incubation Pod 1 g 1 7th storey Aluminium expanded mesh screen in powder coated finish to Drying Closet, external; 2mm thk as per Tender Clarification 2, Item A51 33 2 Aluminium expanded mesh screen/ rain screen (slanted height=2.375m) to Blks X1, Y1 and Z1 consists of: 5mm thk hot dipped GS plate in paint finish Aluminium expanded mesh screen in powde coated finish 50 x 100 x 8mm thk hot dipped GS RHS in paint finish 8mm thk hot dipped GS folded plate in paint finish 75 x 150 x 8mm thk hot dipped GS RHS in paint finish 8mm thk hot dipped GS plate in paint finish 50 x 50 x 6mm thk hot dipped GS L-angle in paint finish 50 x 100 x 6mm thk hot dipped GS RHS in paint finish 1.2mm thk folded aluminium cladding panel with 6mm thk non-combustible calcium silicate backing 1.59 52.47 m 2.17 Alum-EM m2 52.47 Alum-EM 4.08 4.08 5.13 m2 4.08 Alum-EM 2.17 m 5.13 Alum-EM 1.59 52.47 m 2.17 Alum-EM m2 52.47 Alum-EM 1.59 58.83 m2 58.83 Alum-EM 2.17 1.59 65.19 m 2.17 Alum-EM m2 65.19 Alum-EM 5.44 1.59 50.88 m 5.44 Alum-EM m2 50.88 Alum-EM 5.13 46.17 1.20 m 46.17 Alum-EM 1.59 14.31 m 1.20 Alum-EM m2 14.31 Alum-EM Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit m2 Qty 46.17 Code Alum-EM Rate

b 1

Page 14 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type location ddt No. Side Area L 2.17 h 1 8th storey Aluminium expanded mesh screen in powder coated finish to Drying Closet, external; 2mm thk as per Tender Clarification 2, Item A51 39 2 Aluminium expanded mesh screen/ rain screen (slanted height=2.375m) to Blks X1, Y1 and Z1 consists of: 5mm thk hot dipped GS plate in paint finish Aluminium expanded mesh screen in powde coated finish 50 x 100 x 8mm thk hot dipped GS RHS in paint finish 8mm thk hot dipped GS folded plate in paint finish 75 x 150 x 8mm thk hot dipped GS RHS in paint finish 8mm thk hot dipped GS plate in paint finish 50 x 50 x 6mm thk hot dipped GS L-angle in paint finish 50 x 100 x 6mm thk hot dipped GS RHS in paint finish 1.2mm thk folded aluminium cladding panel with 6mm thk non-combustible calcium silicate backing 2 i 1 9th storey Aluminium expanded mesh screen in powder coated finish to Drying Closet, external; 2mm thk as per Tender Clarification 2, Item A51 38 j 1 10th storey Aluminium expanded mesh screen in powder coated finish to Drying Closet, external; 2mm thk as per Tender Clarification 2, Item A51 40 2 Aluminium expanded mesh screen/ rain screen (slanted height=2.375m) to Blks X1, Y1 and Z1 consists of: 5mm thk hot dipped GS plate in paint finish Aluminium expanded mesh screen in powde coated finish 50 x 100 x 8mm thk hot dipped GS RHS in paint finish 8mm thk hot dipped GS folded plate in paint finish 75 x 150 x 8mm thk hot dipped GS RHS in paint finish 8mm thk hot dipped GS plate in paint finish 50 x 50 x 6mm thk hot dipped GS L-angle in paint finish 50 x 100 x 6mm thk hot dipped GS RHS in paint finish 1.2mm thk folded aluminium cladding panel with 6mm thk non-combustible calcium silicate backing 2.5 k 1 11th storey Aluminium expanded mesh screen in powder coated finish to Drying Closet, external; 2mm thk as per Tender Clarification 2, Item A51 42 l Roof 1.59 66.78 m2 66.78 Alum-EM 2.50 1.59 63.60 m 2.50 Alum-EM m2 63.60 Alum-EM 1.59 60.42 m2 60.42 Alum-EM 2.5 5.00 1.59 62.01 m 5.00 Alum-EM m2 62.01 Alum-EM W D/H 1.00 Sub-Qty 2.17 Unit Qty Code Rate

Carried Forward

Page 15 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/11 7.4 a b External Wall and Finishes (Cont'd) RC parapet wall / low wall 1st storey 2nd storey Concrete G40 Formwork Rebar 3rd storey Concrete G40 Formwork Rebar 4th storey Concrete G40 Formwork Rebar 5th storey Concrete G40 Formwork Rebar 6th storey Concrete G40 Formwork Rebar 7th storey Concrete G40 Formwork Rebar 8th storey Concrete G40 Formwork Rebar 9th storey Concrete G40 Formwork Rebar 10th storey Concrete G40 Formwork Rebar 11th storey Concrete G40 Formwork Rebar Roof Concrete G40 Formwork Rebar Precast panel wall 160mm thk precast RC wall (some drawings shown 140mm thk, others 150mm thk); external a b c d e f g h i j k l 7.6 R1 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Perforated / Expanded mesh railing Aluminium expanded mesh screen/ railing in powder coated finish to Common Area/ Void Area (h=1.675m) for Blks X1, Y1 and Z1 consists of: 10mm thk hot dipped GS plate in powder coated finish 10mm thk hot dipped GS folded plate in powder coated finish 40mm diam hot dipped GS CHS in powder coated finish 10mm thk hot dipped GS flat plate baluster in powder coated finish 10mm thk hot dipped GS L-angle pre-welded to aluminium expanded mesh with powder coated finish Aluminium expanded mesh with powder coated finish 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate pre-welded to upright balusters in paint finish 10mm thk hot dipped GS angle plate in powder coated finish Countersunk anchor bolt 20 x 20mm aluminium U-channel in powder coated finish 10mm thk hot dipped GS plate in powder coated finish Aluminium expanded mesh screen/ railing in powder coated finish (h=1.50m) to AC Ledge for Blks X1, Y1 and Z1 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W m3 m2 kg m3 m2 kg m3 m2 kg m3 m2 kg m3 m2 kg m3 m2 kg G40 fwk rebar G40 fwk rebar G40 fwk rebar G40 fwk rebar G40 fwk rebar G40 fwk rebar Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

m3 m2 kg m3 m2 kg m3 m2 kg m3 m2 kg m3 m2 kg

G40 fwk rebar G40 fwk rebar G40 fwk rebar G40 fwk rebar G40 fwk rebar

7.5 PW

R2

R2b -

consists of: 10mm thk hot dipped GS plate in paint finish 10mm thk hot dipped GS L-angle pre-welded to aluminium expanded mesh with powder coated finish Aluminium expanded mesh screen in powder coated finish 10mm thk hot dipped GS angle plate in powder coated finish SS countersunk anchor bolt 10mm thk hot dipped GS plate in paint finish Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1 consists of: 10mm thk hot dipped GS plate in powder coated finish 10mm coated 40mm finish 10mm coated thk hot dipped GS folded plate in powder finish diam hot dipped GS CHS in powder coated thk hot dipped GS flat plate baluster in powder finish

Page 16 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No a b R1 Description 10mm thk hot dipped GS L-angle pre-welded to aluminium expanded mesh with powder coated finish Aluminium expanded mesh with powder coated finish 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate pre-welded to upright balusters in paint finish 10mm thk hot dipped GS angle plate in powder coated finish Countersunk anchor bolt 20 x 20mm aluminium U-channel in powder coated finish 10mm thk hot dipped GS plate in powder coated finish 1st storey 2nd storey Aluminium expanded mesh screen/ railing in powder coated finish to Common Area/ Void Area (h=1.675m) for Blks X1, Y1 and Z1 Aluminium expanded mesh screen/ railing in powder coated finish (h=1.50m) to AC Ledge for Blks X1, Y1 and Z1 Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks X1, Y1 and Z1 c R1 3rd storey Aluminium expanded mesh screen/ railing in powder coated finish to Common Area/ Void Area (h=1.675m) for Blks X1, Y1 and Z1 Aluminium expanded mesh screen/ railing in powder coated finish (h=1.50m) to AC Ledge for Blks X1, Y1 and Z1 Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks X1, Y1 and Z1 d R1 4th storey Aluminium expanded mesh screen/ railing in powder coated finish to Common Area/ Void Area (h=1.675m) for Blks X1, Y1 and Z1 Aluminium expanded mesh screen/ railing in powder coated finish (h=1.50m) to AC Ledge for Blks X1, Y1 and Z1 Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks X1, Y1 and Z1 e R1 5th storey Aluminium expanded mesh screen/ railing in powder coated finish to Common Area/ Void Area (h=1.675m) for Blks X1, Y1 and Z1 Aluminium expanded mesh screen/ railing in powder coated finish (h=1.50m) to AC Ledge for Blks X1, Y1 and Z1 Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks X1, Y1 and Z1 f R1 6th storey Aluminium expanded mesh screen/ railing in powder coated finish to Common Area/ Void Area (h=1.675m) for Blks X1, Y1 and Z1 Aluminium expanded mesh screen/ railing in powder coated finish (h=1.50m) to AC Ledge for Blks X1, Y1 and Z1 Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks X1, Y1 and Z1 g R1 7th storey Aluminium expanded mesh screen/ railing in powder coated finish to Common Area/ Void Area (h=1.675m) for Blks X1, Y1 and Z1 Aluminium expanded mesh screen/ railing in powder coated finish (h=1.50m) to AC Ledge for Blks X1, Y1 and Z1 Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks X1, Y1 and Z1 h R1 8th storey Aluminium expanded mesh screen/ railing in powder coated finish to Common Area/ Void Area (h=1.675m) for Blks X1, Y1 and Z1 Aluminium expanded mesh screen/ railing in powder coated finish (h=1.50m) to AC Ledge for Blks X1, Y1 and Z1 Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks X1, Y1 and Z1 i R1 9th storey Aluminium expanded mesh screen/ railing in powder coated finish to Common Area/ Void Area (h=1.675m) for Blks X1, Y1 and Z1 Aluminium expanded mesh screen/ railing in powder coated finish (h=1.50m) to AC Ledge for Blks X1, Y1 and Z1 Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks X1, Y1 and Z1 j R1 10th storey Aluminium expanded mesh screen/ railing in powder coated finish to Common Area/ Void Area (h=1.675m) for Blks X1, Y1 and Z1 Aluminium expanded mesh screen/ railing in powder coated finish (h=1.50m) to AC Ledge for Blks X1, Y1 and Z1 Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks X1, Y1 and Z1 k R2 11th storey Aluminium expanded mesh screen/ railing in powder coated finish (h=1.50m) to AC Ledge for Blks X1, Y1 and Z1 m 12.50 Railing m 11.50 Railing m 4.80 Railing m 22.30 Railing m 7.10 Railing m 12.10 Railing m 4.80 Railing m 12.68 Railing m Railing m 7.90 Railing Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

R2

8.50

Railing

R2a

1.20

Railing

R2

5.30

Railing

R2a

2.26

Railing

R2

2.50

Railing

R2a

4.60

Railing

R2

8.88

Railing

R2a

Railing

R2

7.70

Railing

R2a

Railing

R2

5.80

Railing

R2a

Railing

R2

5.00

Railing

R2a

Railing

R2

18.20

Railing

R2a

Railing

R2

2.60

Railing

R2a

Railing

Page 17 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No l Roof Carried Forward Description Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

Page 18 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/12 7.7 a PV/18 PV/30 b c PV/21 7.8 M&E louvre 1st storey Aluminium louvre vent Aluminium louvre vent 2nd storey Roof Aluminium louvre vent to Lift Motor Room Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a CWF/15 FG/30 GL/14 GL/28 GL/25 GL/34 GL/72 Windows Windows to Common Areas Top hung window to Hall Admin Office (Blk X1) Fixed glass window to Hall Admin Office (Blk X1) Aluminium frame glass louvred window to Communal Kitchenette Aluminium frame glass louvred window to Communal Kitchenette and Laundry Aluminium frame glass louvred window to Security Room (Blk X1); W/25 as per enlarged drawing (AR154) Aluminium frame glass louvred window to Communal Kitchenette Aluminium frame glass louvred window to Communal Laundry Top hung window to Wash Room, Handicap Toilet, Bath, Powder Room, Bath 1 & 2, Toilet Top hung window to Wash Room, Handicap Toilet, Bath, Powder Room, Bath 1 & 2, Toilet Top hung window to Hall Admin Office (Blk X1) Top hung window to Communal Toilet Windows to Service Apartments Undergraduate Single (UGS) Aluminium framed louvred window to Bedroom (Entrance door sides); Undergraduate Single (UGS) Casement window and top hung window to Bedroom; Undergraduate Single (UGS) Undergraduate Double (UGD) Aluminium framed louvred window to Bedroom (Entrance door sides); Undergraduate Double (UGD) Casement window and top hung window to Bedroom; Undergraduate Double (UGD) Graduate Single (GS) Aluminium framed louvred window to (Entrance door sides); Graduate Single (GS) Bedroom nos Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

nos nos

1 2 Na 2

window window

window

nos nos nos nos nos nos nos

1 1 3 2 1 2 1

window window window window window window window

TH/05 TH/10 TH/20 TH/42

nos nos nos nos

2 3 1 20

window window window window

GL/04 CW/15

nos nos

100 57

window window

GL/04

nos

380

window

CW/15

nos

264

window

GL/04A CW/15 TH/06 TH/06A SW/14A CW/15 TH/06 TH/06A

nos nos nos nos nos nos nos nos

20 16 16 20 6 6 6 12

window window window window window window window window

Casement window and top hung window to Bedroom; Graduate Single (GS) Top hung window to Toilet; Graduate Single (GS) Top hung window to Toilet; Graduate Single (GS) Graduate Married (GM) Top hung window to Kitchen; Graduate Married (GM) Casement window and top hung window to Bedroom; Graduate Married (GM) Top hung window to Toilet; Graduate Married (GM) Top hung window to Toilet; Graduate Single (GM)

Undergraduate Hall Master (UGH-M) Lower Level CWF/28 LL Casement window with fixed tempered glass panel to Living; Undergraduate Hall Master (UGH-M) SW/12 TH/06 LL Top hung window to Kitchen; Undergraduate Hall Master (UGH-M) LL Top hung window to Toilet; Undergraduate Hall Master (UGH-M)

nos nos nos

4 2 2

window window window

Upper Level CW/21 UL Casement window and top hung window to Bedroom 2; Undergraduate Hall Master (UGH-M) CW/21A UL Casement window and top hung window to Bedroom 2; Undergraduate Hall Master (UGH-M) TH/06 UL Top hung window to Bath 1; Undergraduate Hall Master (UGH-M) Undergraduate Hall Fellows (UGH-F) Lower Level LL Top hung window to Kitchen; Undergraduate Hall Fellows (UGH-F) LL Casement window and top hung window to Living ; Undergraduate Hall Fellows (UGH-F) LL Top hung window to Toilet; Fellows (UGH-F) Undergraduate Hall

nos

Na 2

window

nos

window

SW/14 CW/28 TH/06

nos nos nos

1 1 1

window window window

CW/21 TH/06

Upper Level UL Casement window and top hung window to Bedroom 2, Master Bedroom ; Undergraduate Hall Fellows (UGHF) UL Top hung window to Toilet; Undergraduate Hall Fellows (UGH-F) b c Security grilles Aluminum ledges inside Closets 3mm thk aluminium powder coated ledge supported with hollow rectangular section (L=0.85m, w=0.60m) 10mm thk aluminium plate in powder coated finish (w=0.30m) 3mm thk aluminium cladding in powde coated finish Brickwall excluding wall finishes 1st storey 100mm thk blockwall; internal 200mm thk blockwall; internal 100mm thk brickwall; internal 200mm thk brickwall; internal 2nd storey 100mm thk 200mm thk 100mm thk 200mm thk blockwall; internal blockwall; internal brickwall; internal brickwall; internal

nos nos m2 nos

1 1

window window metal-wk

m m2

cladding cladding

8.1 a 1BLW100 1BLW200 1BRW100 1BRW200 b 2BLW100 2BLW200 2BRW100 2BRW200 c 3BLW100

m2 m2 m2 m2 m2 m2 m2 m2

100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk

3rd storey 100mm thk blockwall; internal

m2

100-blk

Page 19 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No 3BLW200 3BRW100 3BRW200 d 4BLW100 4BLW200 4BRW100 4BRW200 e 5BLW100 5BLW200 5BRW100 5BRW200 f 6BLW100 6BLW200 6BRW100 6BRW200 g 7BLW100 7BLW200 7BRW100 7BRW200 h 8BLW100 8BLW200 8BRW100 8BRW200 i 9BLW100 9BLW200 9BRW100 9BRW200 j 10BLW100 10BLW200 10BRW100 10BRW200 k 11BLW100 11BLW200 11BRW100 11BRW200 l RFBLW100 RFBLW200 RFBRW100 RFBRW200 8.2 HCW Description 200mm thk blockwall; internal 100mm thk brickwall; internal 200mm thk brickwall; internal 4th storey 100mm thk 200mm thk 100mm thk 200mm thk 5th storey 100mm thk 200mm thk 100mm thk 200mm thk 6th storey 100mm thk 200mm thk 100mm thk 200mm thk 7th storey 100mm thk 200mm thk 100mm thk 200mm thk 8th storey 100mm thk 200mm thk 100mm thk 200mm thk 9th storey 100mm thk 200mm thk 100mm thk 200mm thk 10th storey 100mm thk 200mm thk 100mm thk 200mm thk 11th storey 100mm thk 200mm thk 100mm thk 200mm thk Roof 100mm 200mm 100mm 200mm thk thk thk thk Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit m2 m2 m2 Qty Code 200-blk 100-bwk 200-bwk Rate

blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk

Hollow core light weight wall system excluding wall finishes Hollow core with C-glass continous monofilament fibres tissue for joint to Hostel and Service Apartments as per Schedule of Finishes, 110mm thk hollow core precast wall as per enlarged detail; internal a b c d e f g h i j k l 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Carried Forward m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C

Page 20 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/13 8.3 Note a Internal Wall and Partition (Cont'd) Glass wall panel complete with supporting frame Included in item 7.2 1st storey 10mm thk tempered glass panel with stainless steel frame at sides and top to Security Room (1.50mL x 1.45mH) 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Acoustic wall panel lining including fabric wall covering system Wall finishes for Incubation Pods, Think Tanks and Multi-purpose Hall as per Schedule of Finishes a 7W9 1W9 2W9 3W9 4W9 5W9 6W9 8W9 9W9 10W9 11W9 RFW9 8.5 a b c d e f g h i j k l 8.6 7th storey Fixed acoustic wall panel on non glazed walls Others Fixed acoustic Fixed acoustic Fixed acoustic Fixed acoustic Fixed acoustic Fixed acoustic Fixed acoustic Fixed acoustic Fixed acoustic Fixed acoustic Fixed acoustic wall wall wall wall wall wall wall wall wall wall wall panel panel panel panel panel panel panel panel panel panel panel on on on on on on on on on on on non non non non non non non non non non non glazed glazed glazed glazed glazed glazed glazed glazed glazed glazed glazed walls walls walls walls walls walls walls walls walls walls walls m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 Partition Partition Partition Partition Partition Partition Partition Partition Partition Partition Partition Partition nos glazing Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

b c d e f g h i j k l 8.4 Note

Steel/concrete lintols to brickwall/drywall 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Timber vertical strip to internal staircase for Hall Fellow and Hall Master

a b c

m2

Carried Forward

Page 21 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/14 Note Door and Ironmongery All 6mm thk wired clear glass panel are 100mm x 600mm unless noted Fire rated steel door in powder coated impact resistant satin coating finished c/w exposed/concealed door frame, mullion, ironmongery etc including fixing accessories 1st storey Two hour fire rated steel door (double leaf) and frame (powder coated impact resistant satin coating finish) to Bin Centre, PABX, LV Switchroom, LT S/W Room (Emergency), Low Level Transfer Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool Filtraction Room, Ejector Pump Room, Generator Room, Newater Tank Riinm Storage, Irrigation Pump Room Two hour fire rated steel door (double leaf) and frame (powder coated impact resistant satin coating finish) to Bin Centre, PABX, LV Switchroom, LT S/W Room (Emergency), Low Level Transfer Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool Filtraction Room, Ejector Pump Room, Generator Room, Newater Tank Riinm Storage, Irrigation Pump Room Two hour fire rated steel door and frame (powder coated impact resistant satin coating finish) to Refuse Chute Chamber b c d e f g h i j k l 9.2 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Fire rated steel door in powder coated finished c/w exposed/concealed door frame, mullion, ironmongery etc including fixing accessories a b c d e f g h i j k l 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Carried Forward Brought Forward BC/S1/15 9.3 Door and Ironmongery (Cont'd) Non fire rated steel door in powder coated finished c/w exposed/concealed door frame, mullion, ironmongery etc including fixing accessories 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Fire rated solid timber door in laminate finished c/w door frame, mullion, push/kick plate, viewing panel, ironmongery, etc including fixing accessories 1st storey Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and selfclosing device to Protected Staircase, Lift Lobby, Exit Door 2 hour fire rated timber door with HPMR laminate with 6mm thk aired clear glass panel (2 nos) and self closing device to Lift Lobby, Exit Door Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST Half hour fire rated solid core door with HPMR laminates to to TEL near Staircase 2nd storey Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and selfclosing device to Protected Staircase, Lift Lobby, Exit Door Half hour fire rated solid core door (one and half leaf) with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Staircase 1,2,3 & 4, Multi-use Room, SSL (Smoke Stop Lobby), Exit Door Half hour fire rated solid core door (one and half leaf) with HPMR laminates and self-closing device to Staircase 1,2,3 & 4, Multi-use Room, SSL (Smoke Stop Lobby), Exit Door Half hour fire rated solid core door (one and a half leaf) with HPMR laminates, 6mm thk wired clear glass panel and door held in the open position by Electromagnetic device linked to the Building's Fire Alarm System to Access Corridor Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Handicap Toilet Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Communal Toilet Hostel and Faculty Service Apartments Half hour fire rated solid core door with HPMR laminates to Main Entrance; Graduate Single (GS) Na Na Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

9.1

a FD2/12

nos

Metal-Dr

FD2/18

nos

Metal-Dr

FD2/RC12

nos

Metal-Dr

a b c d e f g h i j k l 9.4

a FD.5/10

nos

tbr-dr

FD.5/20 FD.5/S06 FD.5/S08 b FD.5/10

nos nos nos nos

1 4 Na 3

tbr-dr tbr-dr tbr-dr tbr-dr

FD.5/15

nos

tbr-dr

FD.5/15A

nos

tbr-dr

FD.5/EM15

nos

tbr-dr

FD.5/HT10

nos

tbr-dr

FD.5/S06 FD.5/S10

nos nos

4 3

tbr-dr tbr-dr

FD.5/S12

nos

tbr-dr

FD.5/T10

nos

tbr-dr

FD.5/HM10

nos

tbr-dr

Page 22 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No c FD.5/10 Description 3rd storey Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and selfclosing device to Protected Staircase, Lift Lobby, Exit Door Half hour fire rated solid core door (one and half leaf) with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Staircase 1,2,3 & 4, Multi-use Room, SSL (Smoke Stop Lobby), Exit Door Half hour fire rated solid core door (one and a half leaf) with HPMR laminates, 6mm thk wired clear glass panel and door held in the open position by Electromagnetic device linked to the Building's Fire Alarm System to Access Corridor Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Handicap Toilet Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Communal Toilet Hostel and Faculty Service Apartments Half hour fire rated solid core door with HPMR laminates to Main Entrance ; Undergraduate Single (UGS) Half hour fire rated solid core door with HPMR laminates to Main Entrance; Undergraduate Double (UGD) Half hour fire rated solid core door with HPMR laminates to Main Entrance; Graduate Single (GS) d FD.5/10 4th storey Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and selfclosing device to Protected Staircase, Lift Lobby, Exit Door Half hour fire rated solid core door (one and a half leaf) with HPMR laminates, 6mm thk wired clear glass panel and door held in the open position by Electromagnetic device linked to the Building's Fire Alarm System to Access Corridor Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Handicap Toilet Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Communal Toilet Hostel and Faculty Service Apartments Half hour fire rated solid core door with HPMR laminates to Main Entrance; Undergraduate Double (UGD) Half hour fire rated solid core door with HPMR laminates to Main Entrance; Graduate Single (GS) e FD.5/10 5th storey Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and selfclosing device to Protected Staircase, Lift Lobby, Exit Door Half hour fire rated solid core door (one and half leaf) with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Staircase 1,2,3 & 4, Multi-use Room, SSL (Smoke Stop Lobby), Exit Door Half hour fire rated solid core door (one and a half leaf) with HPMR laminates, 6mm thk wired clear glass panel and door held in the open position by Electromagnetic device linked to the Building's Fire Alarm System to Access Corridor Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Handicap Toilet Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Communal Toilet Hostel and Faculty Service Apartments Half hour fire rated solid core door with HPMR laminates to Main Entrance; Undergraduate Double (UGD) Half hour fire rated solid core door with HPMR laminates to Main Entrance; Graduate Single (GS) f FD.5/10 6th storey Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and selfclosing device to Protected Staircase, Lift Lobby, Exit Door Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

nos

tbr-dr

FD.5/15

nos

tbr-dr

FD.5/EM15

nos

tbr-dr

FD.5/HT10

nos

tbr-dr

FD.5/S06 FD.5/S10

nos nos

4 3

tbr-dr tbr-dr

FD.5/S12

nos

tbr-dr

FD.5/T10

nos

tbr-dr

FD.5/HM10

nos

tbr-dr

FD.5/HM10

nos

tbr-dr

FD.5/HM10

nos

tbr-dr

nos

tbr-dr

FD.5/EM15

nos

tbr-dr

FD.5/HT10

nos

tbr-dr

FD.5/S06 FD.5/S10

nos nos

4 3

tbr-dr tbr-dr

FD.5/S12

nos

tbr-dr

FD.5/T10

nos

tbr-dr

FD.5/HM10

nos

tbr-dr

FD.5/HM10

nos

tbr-dr

nos

tbr-dr

FD.5/15

nos

tbr-dr

FD.5/EM15

nos

tbr-dr

FD.5/HT10

nos

tbr-dr

FD.5/S06 FD.5/S10

nos nos

4 3

tbr-dr tbr-dr

FD.5/S12

nos

tbr-dr

FD.5/T10

nos

tbr-dr

FD.5/HM10

nos

tbr-dr

FD.5/HM10

nos

tbr-dr

nos

tbr-dr

Page 23 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No FD.5/EM15 Description Half hour fire rated solid core door (one and a half leaf) with HPMR laminates, 6mm thk wired clear glass panel and door held in the open position by Electromagnetic device linked to the Building's Fire Alarm System to Access Corridor Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Handicap Toilet Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Communal Toilet Hostel and Faculty Service Apartments Half hour fire rated solid core door with HPMR laminates to Main Entrance ; Undergraduate Single (UGS) Half hour fire rated solid core door with HPMR laminates to Main Entrance; Undergraduate Double (UGD) Half hour fire rated solid core door with HPMR laminates to Main Entrance; Graduate Single (GS) g FD.5/10 7th storey Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and selfclosing device to Protected Staircase, Lift Lobby, Exit Door Half hour fire rated solid core door (one and a half leaf) with HPMR laminates, 6mm thk wired clear glass panel and door held in the open position by Electromagnetic device linked to the Building's Fire Alarm System to Access Corridor Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Handicap Toilet Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Communal Toilet Hostel and Faculty Service Apartments Half hour fire rated solid core door with HPMR laminates to Main Entrance ; Undergraduate Single (UGS) Half hour fire rated solid core door with HPMR laminates to Main Entrance; Undergraduate Double (UGD) Half hour fire rated solid core door with HPMR laminates to Main Entrance; Graduate Single (GS) h FD.5/10 8th storey Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and selfclosing device to Protected Staircase, Lift Lobby, Exit Door Half hour fire rated solid core door (one and a half leaf) with HPMR laminates, 6mm thk wired clear glass panel and door held in the open position by Electromagnetic device linked to the Building's Fire Alarm System to Access Corridor Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Handicap Toilet Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated HPMR laminates to HR/FE/DR/SFH Half hour fire rated HPMR laminates to HR/FE/DR/SFH solid core door (double leaf) with HR/FE, ELV, ELECT, DR/SFH, PW, solid core door (double leaf) with HR/FE, ELV, ELECT, DR/SFH, PW, nos Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit nos Qty 4 Code tbr-dr Rate

FD.5/HT10

nos

tbr-dr

FD.5/S06 FD.5/S10

nos nos

4 3

tbr-dr tbr-dr

FD.5/S12

nos

tbr-dr

FD.5/T10

nos

tbr-dr

FD.5/HM10 FD.5/HM10

nos nos

1 2

tbr-dr tbr-dr

FD.5/HM10

nos

tbr-dr

nos

tbr-dr

FD.5/EM15

nos

tbr-dr

FD.5/HT10

nos

tbr-dr

FD.5/S06 FD.5/S10

nos nos

4 3

tbr-dr tbr-dr

FD.5/S12

nos

tbr-dr

FD.5/T10

nos

tbr-dr

FD.5/HM10

nos

tbr-dr

FD.5/HM10

nos

tbr-dr

FD.5/HM10

nos

Na

tbr-dr

nos

tbr-dr

FD.5/EM15

nos

tbr-dr

FD.5/HT10

nos

tbr-dr

FD.5/S06 FD.5/S10

nos nos

tbr-dr tbr-dr

3 1 tbr-dr

FD.5/S12

FD.5/T10

Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Communal Toilet Hostel and Faculty Service Apartments Half hour fire rated solid core door with HPMR laminates to Main Entrance ; Undergraduate Single (UGS) Half hour fire rated solid core door with HPMR laminates to Main Entrance; Undergraduate Double (UGD) i 9th storey Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and selfclosing device to Protected Staircase, Lift Lobby, Exit Door Half hour fire rated solid core door (one and a half leaf) with HPMR laminates, 6mm thk wired clear glass panel and door held in the open position by Electromagnetic device linked to the Building's Fire Alarm System to Access Corridor Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Handicap Toilet Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST

nos

tbr-dr

FD.5/HM10 FD.5/HM10

nos nos

1 1

tbr-dr tbr-dr

FD.5/10

nos

tbr-dr

FD.5/EM15

nos

tbr-dr

FD.5/HT10

nos

tbr-dr

FD.5/S06

nos

tbr-dr

Page 24 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No FD.5/S10 Description Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Hostel and Faculty Service Apartments Half hour fire rated solid core door with HPMR laminates to Main Entrance ; Undergraduate Single (UGS) Half hour fire rated solid core door with HPMR laminates to Main Entrance; Undergraduate Double (UGD) j FD.5/10 10th storey Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and selfclosing device to Protected Staircase, Lift Lobby, Exit Door Half hour fire rated solid core door (one and a half leaf) with HPMR laminates, 6mm thk wired clear glass panel and door held in the open position by Electromagnetic device linked to the Building's Fire Alarm System to Access Corridor Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Handicap Toilet Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Communal Toilet Hostel and Faculty Service Apartments Half hour fire rated solid core door with HPMR laminates to Main Entrance ; Undergraduate Single (UGS) Half hour fire rated solid core door with HPMR laminates to Main Entrance; Undergraduate Double (UGD) k FD.5/10 11th storey Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and selfclosing device to Protected Staircase, Lift Lobby, Exit Door Half hour fire rated solid core door (one and a half leaf) with HPMR laminates, 6mm thk wired clear glass panel and door held in the open position by Electromagnetic device linked to the Building's Fire Alarm System to Access Corridor Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Handicap Toilet Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Communal Toilet Hostel and Faculty Service Apartments Half hour fire rated solid core door with HPMR laminates to Main Entrance ; Undergraduate Single (UGS) Half hour fire rated solid core door with HPMR laminates to Main Entrance; Undergraduate Double (UGD) l FD.5/10 Roof Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and selfclosing device to Protected Staircase, Lift Lobby, Exit Door Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Non fire rated / Timber door in laminate finished c/w door frame, mullion, finger/push/kick plate, viewing panel, louvred panel, ironmongery, etc includinq fixinq accessories a D/08 1st storey Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Head Officer, Store, Storage, Photo Copy , Office , Meeting Room, Service Yard, Cafe, Security Room Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Head Officer, Store, Storage, Photo Copy , Office , Meeting Room, Service Yard, Cafe, Security Room Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Head Officer, Store, Storage, Photo Copy , Office , Meeting Room, Service Yard, Cafe, Security Room Laminated semi-solid timber door with timber louvred below to Handicap Toilet Timber door with HPMR laminate to Communal Laundry, Communal Kitchen Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE nos Na tbr-dr Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit nos Qty 3 Code tbr-dr Rate

FD.5/S12

nos

tbr-dr

FD.5/HM10 FD.5/HM10

nos nos

1 1

tbr-dr tbr-dr

nos

tbr-dr

FD.5/EM15

nos

tbr-dr

FD.5/HT10

nos

tbr-dr

FD.5/S06 FD.5/S10

nos nos

4 3

tbr-dr tbr-dr

FD.5/S12

nos

tbr-dr

FD.5/T10

nos

tbr-dr

FD.5/HM10 FD.5/HM10

nos nos

1 1

tbr-dr tbr-dr

nos

tbr-dr

FD.5/EM15

nos

tbr-dr

FD.5/HT10

nos

tbr-dr

FD.5/S06

nos

tbr-dr

FD.5/S10

nos

tbr-dr

FD.5/S12

nos

tbr-dr

FD.5/T10

nos

tbr-dr

FD.5/HM10 FD.5/HM10

nos nos

1 1

tbr-dr tbr-dr

nos

tbr-dr

FD.5/S10

nos

tbr-dr

9.5

D/09

nos

tbr-dr

D/10

nos

tbr-dr

DHT/10 DK/10 DS/03 DS/04 DS/06 DS/07

nos nos nos nos nos nos

1 1 3 2 5 2

tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr

Page 25 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No DS/08 DS/10 Description Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Timber door (double leaf) to SFAP, CWR Timber door (double leaf) with 400mmW x 500mmH 6mm thk wired clear glass panel (2 nos) to SFAP Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Laminated semi-solid timber door with timber louvre below and 3mm thk SS finger push and kick plates to Washroom b D/10 2nd storey Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Head Officer, Store, Storage, Photo Copy , Office , Meeting Room, Service Yard, Cafe, Security Room Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to SFAP, CWR Timber door (double leaf) with 400mmW x 500mmH 6mm thk wired clear glass panel (2 nos) to SFAP Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Hostel and Faculty Service Apartments Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Single (UGS) Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Double (UGD) Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit nos nos Qty Na 2 tbr-dr Code Rate

DS/10 DS/10A DS/12 DT/08

nos nos nos nos

1 2 2

tbr-dr tbr-dr tbr-dr

nos

tbr-dr

DS/03 DS/06 DS/08 DS/10 DS/10A DS/12

nos nos nos nos nos nos

1 2 Na

tbr-dr tbr-dr tbr-dr

Na 1

tbr-dr tbr-dr

DHM/10 DHM/10 DHM/10

nos nos nos nos nos nos nos nos nos nos

4 4 1 1 1 3 2 1 1 1

tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr

Semi solid door with timber veneer to Main Entrance (with louvres); Graduate Single (GS) DHM/10 LL Semi solid door with timber veneer to Main Entrance; Undergraduate Apartment Hall Fellows (UGH-F) DHM/10 UL Semi solid door with timber veneer to Main Entrance; Undergraduate Apartment Hall Fellows (UGH-F) DT/08A Laminated semi-solid timber door to Bath; Graduate Single (GS) DT/08A LL Laminated semi-solid timber door to Powder Room; Undergraduate Apartment Hall Fellows (UGH-F) DT/08A UL Laminated semi-solid timber door to Bath 1; Undergraduate Apartment Hall Fellows (UGH-F) DB/10 UL Semi solid door with timber veneer to Master Bedroom, Bedroom 1; Undergraduate Apartment Hall Fellows (UGH-F) D/S08 LL Timber door with HPMR laminate to Store; Undergraduate Apartment Hall Fellows (UGH-F) c DS/03 DS/04 3rd storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to SFAP, CWR Timber door (double leaf) with 400mmW x 500mmH 6mm thk wired clear glass panel (2 nos) to SFAP Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Hostel and Faculty Service Apartments Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Single (UGS) Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Double (UGD) Semi solid door with timber veneer to Main Entrance (with louvres); Graduate Single (GS) Laminated semi-solid timber door to Bath; Graduate Single (GS) d DS/03 DS/04 4th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to SFAP, CWR Timber door (double leaf) with 400mmW x 500mmH 6mm thk wired clear glass panel (2 nos) to SFAP Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Hostel and Faculty Service Apartments Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Single (UGS) Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Double (UGD)

nos nos

1 Na

tbr-dr tbr-dr

DS/06 DS/08 DS/10 DS/10A DS/12

nos nos nos nos nos

2 1

tbr-dr tbr-dr

1 1

tbr-dr tbr-dr

DHM/10 DHM/10 DHM/10 DT/08A

nos nos nos nos

3 16 1 2

tbr-dr tbr-dr tbr-dr tbr-dr

nos nos

1 Na

tbr-dr tbr-dr

DS/06 DS/08 DS/10 DS/10A DS/12

nos nos nos nos nos

3 1

tbr-dr tbr-dr

1 1

tbr-dr tbr-dr

DHM/10 DHM/10 DHM/10

nos nos nos nos nos nos nos

7 16 2 1 1 3 1

tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr

Semi solid door with timber veneer to Main Entrance (with louvres); Graduate Single (GS) DHM/10 LL Semi solid door with timber veneer to Main Entrance; Undergraduate Apartment Hall Master (UGH-M) DHM/10 UL Semi solid door with timber veneer to Main Entrance; Undergraduate Apartment Hall Master (UGH-M) DT/08A Laminated semi-solid timber door to Bath; Graduate Single (GS) DT/08A LL Laminated semi-solid timber door to Bath; Undergraduate Apartment Hall Master (UGH-M)

Page 26 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description DT/08A UL Laminated semi-solid timber door to Master Bath, Bath 2; Undergraduate Apartment Hall Master (UGH-M) DB/10 DB/10 D/S08 DS/06 DS/06 LL Semi solid door with timber veneer to Bedroom 1 ; Undergraduate Apartment Hall Master (UGH-M) UL Semi solid door with timber veneer to Master Bedroom, Bedroom 2 ; Undergraduate Apartment Hall Master (UGH-M) LL Timber door with HPMR laminate to Store; Undergraduate Apartment Hall Master (UGH-M) LL Timber dor with HPMR laminates to PW/NW; Undergraduate Apartment Hall Master (UGH-M) UL Timber dor with HPMR laminates to PW/NW; Undergraduate Apartment Hall Master (UGH-M) e DS/03 DS/06 DS/08 DS/10 DS/10A DS/12 5th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to SFAP, CWR Timber door (double leaf) with 400mmW x 500mmH 6mm thk wired clear glass panel (2 nos) to SFAP Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Hostel and Faculty Service Apartments Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Single (UGS) Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Double (UGD) Semi solid door with timber veneer to Main Entrance (with louvres); Graduate Single (GS) Laminated semi-solid timber door to Bath; Graduate Single (GS) f DS/03 DS/04 DS/06 DS/08 DS/10 DS/10A DS/12 6th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to SFAP, CWR Timber door (double leaf) with 400mmW x 500mmH 6mm thk wired clear glass panel (2 nos) to SFAP Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Hostel and Faculty Service Apartments Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Single (UGS) Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Double (UGD) Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit nos nos nos nos nos nos Qty 2 1 2 1 1 1 Code tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr Rate

nos nos nos nos nos nos

1 2 1

tbr-dr tbr-dr tbr-dr

1 1

tbr-dr tbr-dr

DHM/10 DHM/10

nos nos

6 15

tbr-dr tbr-dr

DHM/10 DT/08A

nos nos

2 3

tbr-dr tbr-dr

nos nos nos nos nos nos nos

1 Na 2 1

tbr-dr tbr-dr tbr-dr tbr-dr

1 1

tbr-dr tbr-dr

DHM/10 DHM/10

nos nos

6 11

tbr-dr tbr-dr

DHM/10

Semi solid door with timber veneer to Main Entrance (with louvres); Graduate Single (GS) DHM/10 LL Semi solid door with timber veneer to Main Entrance; Undergraduate Apartment Hall Master (UGH-M) DHM/10 UL Semi solid door with timber veneer to Main Entrance; Undergraduate Apartment Hall Master (UGH-M) DT/08A Laminated semi-solid timber door to Bath; Graduate Single (GS) DT/08A LL Laminated semi-solid timber door to Bath; Undergraduate Apartment Hall Master (UGH-M) DT/08A UL Laminated semi-solid timber door to Master Bath, Bath 2; Undergraduate Apartment Hall Master (UGH-M) DB/10 DB/10 D/S08 DS/06 DS/06 LL Semi solid door with timber veneer to Bedroom 1 ; Undergraduate Apartment Hall Master (UGH-M) UL Semi solid door with timber veneer to Master Bedroom, Bedroom 2 ; Undergraduate Apartment Hall Master (UGH-M) LL Timber door with HPMR laminate to Store; Undergraduate Apartment Hall Master (UGH-M) LL Timber dor with HPMR laminates to PW/NW; Undergraduate Apartment Hall Master (UGH-M) UL Timber dor with HPMR laminates to PW/NW; Undergraduate Apartment Hall Master (UGH-M) Carried Forward

nos nos nos nos nos nos nos nos nos nos nos

2 1 1 3 1 2 1 2 1 1 1

tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr

Page 27 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/16 9.5 Door and Ironmongery (Cont'd) Non fire rated / Timber door in laminate finished c/w door frame, mullion, finger/push/kick plate, viewing panel, louvred panel, ironmongery, etc including fixing accessories (Cont'd) g DS/03 DS/06 DS/08 DS/10 DS/10A DS/12 7th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to SFAP, CWR Timber door (double leaf) with 400mmW x 500mmH 6mm thk wired clear glass panel (2 nos) to SFAP Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Hostel and Faculty Service Apartments Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Single (UGS) Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Double (UGD) Semi solid door with timber veneer to Main Entrance (with louvres); Graduate Single (GS) Laminated semi-solid timber door to Bath; Graduate Single (GS) h DS/03 DS/06 DS/08 DS/10 DS/10A DS/12 8th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to SFAP, CWR Timber door (double leaf) with 400mmW x 500mmH 6mm thk wired clear glass panel (2 nos) to SFAP Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Hostel and Faculty Service Apartments Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Single (UGS) Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Double (UGD) Semi solid door with timber veneer to Main Entrance; Graduate Married (GM) Laminated semi-solid timber door to Bath; Graduate Married (GM) Semi solid door with timber veneer to Bedroom ; Graduate Married (GM) i DS/03 DS/04 DS/06 DS/08 DS/10 DS/10A DS/12 9th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to SFAP, CWR Timber door (double leaf) with 400mmW x 500mmH 6mm thk wired clear glass panel (2 nos) to SFAP Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Hostel and Faculty Service Apartments Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Single (UGS) Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Double (UGD) Semi solid door with timber veneer to Main Entrance; Graduate Married (GM) Laminated semi-solid timber door to Bath; Graduate Married (GM) Semi solid door with timber veneer to Bedroom ; Graduate Married (GM) j DS/03 DS/06 DS/08 DS/10 DS/10A DS/12 10th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to SFAP, CWR Timber door (double leaf) with 400mmW x 500mmH 6mm thk wired clear glass panel (2 nos) to SFAP Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Hostel and Faculty Service Apartments Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Single (UGS) Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Double (UGD) Semi solid door with timber veneer to Main Entrance; Graduate Married (GM) Laminated semi-solid timber door to Bath; Graduate Married (GM) Semi solid door with timber veneer to Bedroom ; Graduate Married (GM) k 11th storey nos nos nos nos nos nos 1 2 1 tbr-dr tbr-dr tbr-dr Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

1 1

tbr-dr tbr-dr

DHM/10 DHM/10 DHM/10 DT/08A

nos nos nos nos

6 12 2 3

tbr-dr tbr-dr tbr-dr tbr-dr

nos nos nos nos nos nos

1 1 Na

tbr-dr tbr-dr tbr-dr

1 1

tbr-dr tbr-dr

DHM/10 DHM/10 DHM/10 DT/08A DB/09

nos nos nos nos nos

8 16 2 2 2

Tbr-dr Tbr-dr Tbr-dr Tbr-dr Tbr-dr

nos nos nos nos nos nos nos

1 Na 2 1

Tbr-dr Tbr-dr Tbr-dr Tbr-dr

1 1

tbr-dr Tbr-dr

DHM/10 DHM/10 DHM/10 DT/08A DB/09

nos nos nos nos nos

6 15 2 2 2

Tbr-dr Tbr-dr Tbr-dr Tbr-dr Tbr-dr

nos nos nos nos nos nos

1 2 1

Tbr-dr Tbr-dr Tbr-dr

1 1

tbr-dr Tbr-dr

DHM/10 DHM/10 DHM/10 DT/08A DB/09

nos nos nos nos nos

10 14 2 2 2

Tbr-dr Tbr-dr Tbr-dr Tbr-dr Tbr-dr

Page 28 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No DS/03 DS/06 Description Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to SFAP, CWR Timber door (double leaf) with 400mmW x 500mmH 6mm thk wired clear glass panel (2 nos) to SFAP Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Hostel and Faculty Service Apartments Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Single (UGS) Semi solid door with timber veneer to Main Entrance (with louvres); Undergraduate Double (UGD) l DS/06 DS/10 DS/12 Roof level Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to SFAP, CWR Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Frameless glass door c/w ironmongery, etc including fixing accessories 1st storey Tempered sliding glass door, frameless to Meeting Room Tempered sliding glass door, frameless to Hall Officer, Pantry, Toilet 2nd storey Tempered glass door, frameless to Think Tank Room 3rd storey Tempered glass door, Cleared full tempered laminated glass door, frameless c/w ironmongery as per enlarged detail to Incubation POD 4th storey Tempered glass door, frameless to Think Tank Room 5th storey Tempered glass door, frameless to Think Tank Room 6th storey Tempered glass door, Cleared full tempered laminated glass door c/w ironmongery as per enlarged detail to Incubation POD Tempered glass door, frameless to Think Tank Room 7th storey Tempered glass door, frameless to Think Tank Room 8th storey 9th storey Tempered glass door, Cleared full tempered laminated glass door c/w ironmongery as per enlarged detail to Incubation POD Tempered glass door, frameless to Think Tank Room 10th storey Tempered glass door, frameless to Think Tank Room 11th storey Roof level Aluminium framed glass door c/w frame, ironmongery, etc including fixing accessories 1st storey nos nos 1 1 Glass-dr Glass-dr Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit nos nos Qty Na 2 Code Tbr-dr Tbr-dr Rate

DS/08 DS/10 DS/10A DS/12

nos nos nos nos

Na

Tbr-dr

1 1

tbr-dr Tbr-dr

DHM/10 DHM/10

nos nos

6 19

Tbr-dr Tbr-dr

nos nos nos

Tbr-dr

Tbr-dr

9.6 a SGD/10 SGD/12 b GD/10 c GD/09

nos nos

2 3

Glass-dr Glass-dr

nos

Glass-dr

nos

Glass-dr

d GD/10 e GD/10 f GD/09 GD/10 g GD/10 h i GD/09 GD/10 j GD/10 k l 9.7 a GD/7

nos

Glass-dr

nos

Glass-dr

nos nos 3

Glass-dr Glass-dr

nos

Glass-dr Nil

nos nos

1 1

Glass-dr Glass-dr

nos

Glass-dr

b 2nd storey LL Tempered glass door to Balcony / AC Ledge; Undergraduate Apartment Hall Fellows (UGH-F)

SGD/18 UL Sliding glass door, double leaf to Bedroom 1; Undergraduate Apartment Hall Fellows (UGH-F) c 3rd storey

d 4th storey SGD/18 LL Sliding glass door, double leaf to Bedroom 1; Undergraduate Apartment Hall Master (UGH-M) SGD/27 UL Sliding glass door, double leaf to Master Bedroom; Undergraduate Apartment Hall Master (UGH-M) e 5th storey

nos nos

1 1

Glass-dr Glass-dr

f 6th storey SGD/18 LL Sliding glass door, double leaf to Bedroom 1; Undergraduate Apartment Hall Master (UGH-M) SGD/27 UL Sliding glass door, double leaf to Master Bedroom; Undergraduate Apartment Hall Master (UGH-M) g h i j k l 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Carried Forward

nos nos

1 1

Glass-dr Glass-dr

Page 29 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/17 9.8 a MG/16A Door and Ironmongery (Cont'd) Metal gate c/w frame, ironmongery etc including fixing accessories Roof level Metal gate, double leaf to Lift Lobby near Refuse Chute 6th storey Metal gate, double leaf to Roof Access Fire rated motorised roller shutter in powder coated finished c/o ironmongery, shutter box cover/hood, side guides, bottom rail, locking system, barrel, removable centre mullion where necessary, ventilation holes, etc. including fixing accessories 1st storey 2nd storey Non fire rated motorised roller shutter in powder coated finished c/o ironmongery, shutter box cover/hood, side guides, bottom rail, locking system, barrel, removable centre mullion where necessary, ventilation holes, etc. including fixing accessories 1st storey 2nd storey Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Closet 30mm thk solid timber door c/w 1mm thk high pressure laminatef finish on both sides for door to Closet Stack Duct Doors 40mm thk flush timber door c/w 1mm thk high pressured laminate finish on both sides and 2mm thk aluminium L-angle in powder coat finssihs frame to Stack Duct at Access Corridor 40mm thk flush timber door c/w 1mm thk high pressured laminate finish on both sides and 2mm thk aluminium L-angle in powder coat finssihs frame to Stack Duct at Access Corridor near Think Tank Rooms Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

nos

metal-wk

MG/16 9.9

nos

metal-wk

a b 9.10

a b 9.11

NIL NIL

a Closet

nos

b SD/05

nos

189

others

SD/07

nos

others

c SGD/07 Other to bedroom (Hall Master) nos 2

Wall Finishes 10.1 W1a a b c d e f g h i j k l Plastering painting and vinyl co-polymer emulsion

Plaster and paint to wall 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Carried Forward Brought Forward m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 plaster plaster plaster plaster plaster plaster plaster plaster plaster plaster plaster

BC/S1/18 10.2 W1 Note a b c d e f g h i j k l 10.3

Wall Finishes (cont'd) Skim coating and vinyl co-polymer emulsion 5mm skim coated and paint finished to walls Plaster and paint as per Schedule of Finishes, finishes above as per enlarged drawing 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Homogeneous wall tile including cement sand backing screed 300mm x 600mm homogeneous wall tiles with backing screed a b c d e f g h i j k l 10.4 a RCCW b c d e f g 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Glazed ceramic wall tile including cement sand backing screed with adhesive 1st storey Glazed wall tiles with backing screed to Refuse Chute Chamber 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey Carried Forward m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 wall wall wall wall wall wall wall wall wall wall wall wall tile tile tile tile tile tile tile tile tile tile tile tile m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 Skim Skim Skim Skim Skim Skim Skim Skim Skim Skim Skim Skim Coat Coat Coat Coat Coat Coat Coat Coat Coat Coat Coat Coat

W2

m2

Page 30 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/19 10.4 h i j k l 10.5 a b c d e f g h i j k l 10.6 Wall Finishes (cont'd) Glazed ceramic wall tile including cement sand backing screed with adhesive (Cont'd) 8th storey 9th storey 10th storey 11th storey Roof Granite tile including cement sand backing screed 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Other wall finishes Stud wall with insulation (self adhesive polyurethene sheet vapour barrier and 50mm thk rockwool insulation complete with 12mm thk non-combustible calcium silicate baord) to LAN Room / ELVS Room Skim coat and smooth textured paint finish; external c Groovelines 10mm wide 50mm wide Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

a W8

m2

partition

EWF

m2

Skim Coat

m m

others others

11.1 a

Floor Finishes Cement and sand screed with adhesive 1st storey

AR-101 wash rm (m) wash rm (f) handicap toilet communal laundry kitchenette letter box toilet pantry rm meeting rm store rm reception hall officer head office refuse chutte security rm lift lobby corridor 2.48 3.09 4.86 39.22 49.37 23.55 3.91 7.34 9.42 4.07 17.96 40.24 10.99 1.90 7.83 10.20 274.75 2.48 3.09 4.86 39.22 49.37 23.55 3.91 7.34 9.42 4.07 17.96 40.24 10.99 1.90 7.83 10.20 274.75 511.18

m2

511.18

screed

hall admin office hall admin office hall admin office hall admin office hall admin office hall admin office hall admin office

2nd storey GS-L GS-L GS-L GS GS GS UGD-DL (2) UGS-L (2) communical toilet communical toilet communical toilet communical toilet hall fellow level 1 hall fellow level 1 hall fellow level 1 hall fellow level 1 lift lobby bed rm bath shower bed rm bath shower bed rm bed rm toilet janitor HT store dining/living kitchen store powder room multi use rm think tank rm 1 corridor 2 2 2 1 1 1 2 2 10.20 9.02 2.27 1.10 9.01 2.32 0.84 17.59 8.81 27.04 1.50 4.85 36.75 29.47 5.22 3.81 2.38 24.61 30.00 248.81 10.20 18.04 4.54 2.20 9.01 2.32 0.84 35.18 17.62 27.04 1.50 4.85 36.75 29.47 5.22 3.81 2.38 24.61 30.00 248.81 514.39

m2

514.39

screed

3rd storey GS-L GS-L GS-L GS GS GS UGD-DL (2) UGD-DL (1) UGD-SL UGS UGS-L (1) UGD UGS-L (2) communical toilet communical toilet communical toilet Incubation pod hall fellow level 2 hall fellow level 2 hall fellow level 2 hall fellow level 2 hall fellow level 2 lift lobby bed rm bath shower bed rm bath shower bed rm bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT IP3 hall bed rm bath 1 shower master bed rm corridor 2 2 2 1 1 1 5 4 2 1 1 2 1 10.20 9.02 2.27 1.10 9.01 2.32 0.84 17.59 17.62 17.55 8.68 8.63 17.59 8.81 36.58 1.50 4.85 14.82 6.67 7.71 2.29 1.01 11.87 171.13 10.20 18.04 4.54 2.20 9.01 2.32 0.84 87.95 70.48 35.10 8.68 8.63 35.18 8.81 36.58 1.50 4.85 14.82 6.67 7.71 2.29 1.01 11.87 171.13 560.41

m2

560.41

screed

4th storey GS-L GS-L GS-L GS GS GS UGD UGD-SL UGS-L (2) UGS-L (1) lift lobby bed rm bath shower bed rm bath shower bed rm bed rm bed rm bed rm 2 2 2 1 1 1 2 2 5 1 10.20 9.02 2.27 1.10 9.01 2.32 0.84 17.59 17.55 8.81 8.63 10.20 18.04 4.54 2.20 9.01 2.32 0.84 35.18 35.10 44.05 8.63

m2

650.73

screed

Page 31 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type UGD-DL (1) UGD-DL (2) communical toilet communical toilet communical toilet hall master level 1 hall master level 1 hall master level 1 hall master level 1 hall master level 1 hall master level 1 location bed rm bed rm toilet janitor HT dining/living kitchen store bath 1 shower bed rm 1 think tank rm 2 corridor ddt No. 10 2 Side Area 17.62 17.59 36.58 1.50 4.85 26.92 5.71 3.72 2.56 1.21 11.49 25.10 149.60 L W D/H 1.00 Sub-Qty 176.20 35.18 36.58 1.50 4.85 26.92 5.71 3.72 2.56 1.21 11.49 25.10 149.60 650.73 e 5th storey GS-L GS-L GS-L GS GS GS UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) communical toilet communical toilet communical toilet hall master level 2 hall master level 2 hall master level 2 hall master level 2 hall master level 2 hall master level 2 hall master level 2 hall master level 2 lift lobby bed rm bath shower bed rm bath shower bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT hall study master bed rm master bath shower bed rm 2 shower bath 2 think tank rm 3 corridor 2 2 2 1 1 1 2 4 5 5 1 3 10.20 9.02 2.27 1.10 9.01 2.32 0.84 17.59 17.55 8.81 17.62 8.63 17.59 36.58 1.50 4.85 6.56 4.04 16.19 2.52 1.21 10.86 0.95 2.51 14.00 149.45 10.20 18.04 4.54 2.20 9.01 2.32 0.84 35.18 70.20 44.05 88.10 8.63 52.77 36.58 1.50 4.85 6.56 4.04 16.19 2.52 1.21 10.86 0.95 2.51 14.00 149.45 597.30 m2 597.30 screed Unit Qty Code Rate

Carried Forward Brought Forward BC/S1/20 11.1 f Floor Finishes (Cont'd) Cement and sand screed with adhesive (Cont'd) 6th storey GS-L GS-L GS-L GS GS GS UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) UGS-L (1) communical toilet communical toilet communical toilet hall master level 1 hall master level 1 hall master level 1 hall master level 1 hall master level 1 hall master level 1 lift lobby bed rm bath shower bed rm bath shower bed rm bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT dining/living kitchen store bath 1 shower bed rm 1 think tank rm 4 think tank rm 5 IP2 corridor 2 2 2 1 1 1 4 3 4 1 3 2 1 10.20 9.02 2.27 1.10 9.01 2.32 0.84 8.81 17.59 17.55 8.68 17.62 17.59 8.63 36.58 1.50 4.85 26.92 5.71 3.72 2.56 1.21 11.49 30.32 25.41 15.76 149.99 10.20 18.04 4.54 2.20 9.01 2.32 0.84 35.24 52.77 70.20 8.68 52.86 35.18 8.63 36.58 1.50 4.85 26.92 5.71 3.72 2.56 1.21 11.49 30.32 25.41 15.76 149.99 626.73 g 7th storey GS-L GS-L GS-L GS GS GS UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) UGS communical toilet communical toilet communical toilet hall master level 2 hall master level 2 hall master level 2 hall master level 2 hall master level 2 hall master level 2 hall master level 2 hall master level 2 lift lobby bed rm bath shower bed rm bath shower bed rm bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT hall study master bed rm master bath shower bed rm 2 bath 2 shower think tank rm corridor 2 2 2 1 1 1 1 7 4 3 1 1 1 10.20 9.02 2.27 1.10 9.01 2.32 0.84 17.59 17.55 8.81 17.62 8.63 17.59 8.68 36.58 1.50 4.85 6.56 4.04 16.19 2.52 1.21 10.86 2.51 0.95 33.82 148.71 10.20 18.04 4.54 2.20 9.01 2.32 0.84 17.59 122.85 35.24 52.86 8.63 17.59 8.68 36.58 1.50 4.85 6.56 4.04 16.19 2.52 1.21 10.86 2.51 0.95 33.82 148.71 580.89 h 8th storey GM GM GM GM UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) communical toilet communical toilet communical toilet lift lobby living/dining/kitchen bed rm bath shower bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT corridor 2 2 2 2 7 2 7 1 3 3 10.20 12.42 10.27 2.15 1.10 8.81 17.59 17.55 8.68 17.62 17.59 36.58 1.50 4.85 148.71 10.20 24.84 20.54 4.30 2.20 61.67 35.18 122.85 8.68 52.86 52.77 36.58 1.50 4.85 148.71 587.73 i 9th storey GM lift lobby living/dining/kitchen 2 10.20 12.42 10.20 24.84 m2 589.93 screed m2 587.73 screed m2 580.89 screed m2 626.73 screed

Incubation pod

Page 32 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type GM GM GM UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) communical toilet communical toilet communical toilet location bed rm bath shower bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT think tank rm 7 corridor ddt No. 2 2 2 5 2 5 1 6 2 Side Area 10.27 2.15 1.10 8.81 17.59 17.55 8.68 17.62 17.59 36.58 1.50 4.85 19.65 148.71 L W D/H 1.00 Sub-Qty 20.54 4.30 2.20 44.05 35.18 87.75 8.68 105.72 35.18 36.58 1.50 4.85 19.65 148.71 589.93 j 10th storey GM GM GM GM UGD-DL (1) UGD UGD-SL UGS UGS-L (2) UGD-DL (2) UGS-L (1) communical toilet communical toilet communical toilet lift lobby living/dining/kitchen bed rm bath shower bed rm bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT think tank rm 8 think tank rm 9 corridor 2 2 2 2 8 2 4 1 6 1 1 10.20 12.42 10.27 2.15 1.10 17.62 17.59 17.55 8.68 8.81 17.59 8.63 36.58 1.50 4.85 14.30 25.10 148.71 10.20 24.84 20.54 4.30 2.20 140.96 35.18 70.20 8.68 52.86 17.59 8.63 36.58 1.50 4.85 14.30 25.10 148.71 627.22 k 11th storey UGD-DL (2) UGS UGD UGD-DL (1) UGD-SL UGS-L (2) UGS-L (1) communical toilet communical toilet communical toilet lift lobby bed rm bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT corridor 3 1 2 10 3 4 1 10.20 17.59 8.68 17.59 17.62 17.55 8.81 8.63 36.58 1.50 4.85 137.67 10.20 52.77 8.68 35.18 176.20 52.65 35.24 8.63 36.58 1.50 4.85 137.67 560.15 l Roof lift lobby 10.20 10.20 10.20 m2 10.20 screed m2 560.15 screed m2 627.22 screed Unit Qty Code Rate

11.2 a

Cement and sand screed with floor hardener 1st storey lv switch rm low level transfer tank rm elv system rm common area tow truck route 7.67 73.17 31.48 11.92 75.76 7.67 73.17 31.48 11.92 75.76 200.00 b 2nd storey GS-L GS UGD-DL (2) UGS-L (2) hall fellow level 1 common area drying closet drying closet drying closet drying closet ac ledge 2 1 2 2 47.00 0.48 0.48 0.88 0.46 1.10 47.00 0.96 0.48 1.76 0.92 1.10 52.22 c 3rd storey GS-L GS UGD-DL (2) UGD-DL (1) UGD-SL UGS UGS-L (1) UGD UGS-L (2) hall fellow level 2 hall fellow level 2 common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet ac ledge balcony 2 1 5 4 2 1 1 2 1 28.72 0.48 0.48 0.88 0.92 0.92 0.46 0.46 0.88 0.46 1.98 2.77 28.72 0.96 0.48 4.40 3.68 1.84 0.46 0.46 1.76 0.46 1.98 2.77 47.97 d 4th storey GS-L GS UGD UGD-SL UGS-L (2) UGS-L (1) UGD-DL (1) UGD-DL (2) hall master common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet balcony/ac ledge 2 1 2 2 5 1 10 2 68.07 0.48 0.48 0.88 0.92 0.46 0.46 0.92 0.88 2.17 68.07 0.96 0.48 1.76 1.84 2.30 0.46 9.20 1.76 2.17 89.00 e 5th storey GS-L GS UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) hall master level 2 common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet balcony/ac ledge 2 1 2 4 5 5 1 3 48.39 0.48 0.48 0.88 0.92 0.46 0.92 0.46 0.88 3.07 48.39 0.96 0.48 1.76 3.68 2.30 4.60 0.46 2.64 3.07 68.34 f 6th storey GS-L GS UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) UGS-L (1) common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet 2 1 4 3 4 1 3 2 1 60.41 0.48 0.48 0.46 0.88 0.92 0.46 0.92 0.88 0.46 60.41 0.96 0.48 1.84 2.64 3.68 0.46 2.76 1.76 0.46 m2 77.62 flr hard m2 68.34 flr hard m2 89.00 flr hard m2 47.97 flr hard m2 52.22 flr hard m2 200.00 flr hard

Page 33 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type hall master level 1 location balcony/ac ledge ddt No. Side Area 2.17 L W D/H 1.00 Sub-Qty 2.17 77.62 g 7th storey GS-L GS UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) UGS hall master level 2 common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet balcony/ac ledge LAN rm 2 1 1 7 4 3 1 1 1 38.44 0.48 0.48 0.88 0.92 0.46 0.92 0.46 0.88 0.46 3.07 10.20 38.44 0.96 0.48 0.88 6.44 1.84 2.76 0.46 0.88 0.46 3.07 10.20 66.87 h 8th storey GM UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet 2 7 2 7 1 3 3 132.05 0.46 0.46 0.88 0.92 0.46 0.92 0.88 132.05 0.92 3.22 1.76 6.44 0.46 2.76 2.64 150.25 i 9th storey GM UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet 2 5 2 5 1 6 2 44.21 0.46 0.46 0.88 0.92 0.46 0.92 0.88 44.21 0.92 2.30 1.76 4.60 0.46 5.52 1.76 61.53 j 10th storey GM UGD-DL (1) UGD UGD-SL UGS UGS-L (2) UGD-DL (2) UGS-L (1) common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet 2 8 2 4 1 6 1 1 55.97 0.46 0.92 0.88 0.92 0.46 0.46 0.88 0.46 55.97 0.92 7.36 1.76 3.68 0.46 2.76 0.88 0.46 74.25 k 11th storey common area heat pump rm drying closet drying closet drying closet drying closet drying closet drying closet drying closet 18.93 76.14 0.88 0.46 0.88 0.92 0.92 0.46 0.46 18.93 76.14 2.64 0.46 1.76 9.20 2.76 1.84 0.46 114.19 l Roof common area water tank 22.83 119.23 22.83 119.23 142.06 m2 142.06 flr hard m2 114.19 flr hard m2 74.25 flr hard m2 61.53 flr hard m2 150.25 flr hard m2 66.87 flr hard Unit Qty Code Rate

UGD-DL (2) UGS UGD UGD-DL (1) UGD-SL UGS-L (2) UGS-L (1)

3 1 2 10 3 4 1

11.3 a WF1

Liquid -applied waterproofing membrane 1st storey Wateproofing to wet areas to floor Flexible cementitous waterproof coating; rc slab surface minimum wood trowelled smooth to receive waterproofing coating, finishes and 25mm thk c/s protection screed measured separately wash rm (m) wash rm (f) handicap toilet communal laundry kitchenette toilet pantry rm refuse chutte corridor 2.48 3.09 4.86 39.22 49.37 3.91 7.34 1.90 274.75 2.48 3.09 4.86 39.22 49.37 3.91 7.34 1.90 274.75 386.92 m2 386.92 waterprf

hall admin office hall admin office

WF1

Wateproofing to wet areas to wall upturn (h=300mm) Flexible cementitous waterproof coating; rc slab surface minimum wood trowelled smooth to receive waterproofing coating, finishes and 20mm thk c/s protection screed measured separately wash rm (m) DT-08 wash rm (f) DT-08 handicap toilet DHT-10 communal laundry DL-10 kitchenette DK-10 hall admin office hall admin office toilet SGD-12 pantry rm SGD-12 refuse chutte FD2-RC12 corridor DL-10 DK-10 DT-08 DHT-10 DS-10 FD.5-S06 FD.5-S10 FD2-12 FD2-18 D-10 FD.5-20 SGD-12 (1) (1) (2) (1) (2) (5) (3) (1) (2) (1) (1) (1) (1) 105.91 1.00 1.00 0.80 1.00 1.00 0.60 1.00 1.20 1.80 1.00 2.00 1.20 (1) 5.54 1.20 (1) 11.10 1.20 (1) 7.92 1.20 (1) 36.25 1.00 (1) 27.82 1.00 (1) 8.69 1.00 (1) 7.26 0.80 6.92 0.80 6.92 (0.80) 7.26 (0.80) 8.69 (1.00) 27.82 (1.00) 36.25 (1.00) 7.92 (1.20) 11.10 (1.20) 5.54 (1.20) 105.91 (1.00) (1.00) (1.60) (1.00) (2.00) (3.00) (3.00) (1.20) (3.60) (1.00) (2.00) (1.20) 187.61

187.61

waterprf

Page 34 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No WF1 Description Wateproofing to wet areas to shower wall (h=1.80m) Flexible cementitous waterproof coating on c/s leveling render, finishes and 20mm thk c/s protection screed measured separately Wateproofing to Sump Pit Flexible cementitous waterproof coating with 25mm thk c/s protection screed Floor Wall Wateproofing to Water Tank Flexible cementitous waterproof coating with 25mm thk c/s protection screed; rc slab surface minimum wood trowelled smooth to receive waterproofing coating Floor low level transfer tank rm Wall WFL WFL Wateproofing to Lift Pit - floor lift Wateproofing to Lift Pit - wall lift opening 2 (2) 12 8.80 1.70 39.90 2.20 702.24 (89.76) 612.48 b WF2 2nd storey Wateproofing to wet areas to floor GS-L GS-L GS GS communical toilet communical toilet communical toilet hall fellow level 1 hall fellow level 1 GS-L GS UGD-DL (2) UGS-L (2) hall fellow level 1 common area common area common area bath shower bath shower toilet janitor HT kitchen powder room think tank rm 1 drying closet drying closet drying closet drying closet ac ledge ac ledge ac space rc slab corridor 2 2 1 1 2.27 1.10 2.32 0.84 27.04 1.50 4.85 5.22 2.38 30.00 0.48 0.48 0.88 0.46 1.10 14.58 2.47 22.68 248.81 4.54 2.20 2.32 0.84 27.04 1.50 4.85 5.22 2.38 30.00 0.96 0.48 1.76 0.92 1.10 14.58 2.47 22.68 248.81 374.65 2 4.84 9.68 m2 612.48 waterprf 73.17 73.17 m2 m2 9.68 NIL waterprf m2 73.17 NIL m2 m2 NIL NIL Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit m Qty Na Code waterprf Rate

m2

374.65

waterprf

2 1 2 2

WF2

Wateproofing to wet areas to wall upturn (h=300mm) GS-L GS communical toilet communical toilet communical toilet hall fellow level 1 hall fellow level 1 bath DT-08A bath DT-08A toilet FD.5-T10 janitor opening HT FD.5-HT10 kitchen powder room DT-08A think tank rm 1 GD-10 GS-L GS UGD-DL (2) UGS-L (2) hall fellow level 1 drying closet opening drying closet opening drying closet opening drying closet opening ac ledge corridor DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 FD.5-15A FD.5-S06 FD.5-S10 FD.5-10 opening (7) (1) (1) (1) (1) (1) (5) (3) (2) (1) (1) 2 (2) 1 (1) 2 (2) 2 (2) (1) 25.70 1.00 2.93 0.85 2.93 0.85 5.50 1.70 3.00 0.85 4.03 194.07 1.00 1.00 1.05 1.05 1.00 1.50 0.60 1.00 1.05 8.29 (1) 7.54 6.19 0.80 (1) 8.79 1.05 (1) 5.50 0.70 2 (2) 1 (1) 6.05 0.80 6.29 0.80 33.53 1.05 12.10 (1.60) 6.29 (0.80) 33.53 (1.05) 5.50 (0.70) 8.79 (1.05) 7.54 6.19 (0.80) 25.70 (1.00) 5.86 (1.70) 2.93 (0.85) 11.00 (3.40) 6.00 (1.70) 4.03 194.07 (7.00) (1.00) (1.05) (1.05) (1.00) (1.50) (3.00) (3.00) (2.10) (8.29) 285.89

285.89

waterprf

WF2

Wateproofing to wet areas to shower wall (h=1.80m) GS-L GS shower shower 2 1 3.35 3.13 6.70 3.13 9.83

9.83

waterprf

c WF3

3rd storey Wateproofing to wet areas to floor GS-L GS-L GS GS communical toilet communical toilet communical toilet hall fellow level 2 hall fellow level 2 GS-L GS UGD-DL (2) UGD-DL (1) UGD-SL UGS UGS-L (1) UGD UGS-L (2) hall fellow level 2 hall fellow level 2 common area common area common area bath shower bath shower toilet janitor HT bath 1 shower drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet ac ledge balcony ac ledge ac space rc slab corridor 2 2 1 1 2.27 1.10 2.32 0.84 36.58 1.50 4.85 2.29 1.01 0.48 0.48 0.88 0.92 0.92 0.46 0.46 0.88 0.46 1.98 2.77 11.52 2.26 7.53 171.13 4.54 2.20 2.32 0.84 36.58 1.50 4.85 2.29 1.01 0.96 0.48 4.40 3.68 1.84 0.46 0.46 1.76 0.46 1.98 2.77 11.52 2.26 7.53 171.13 267.82

m2

267.82

waterprf

2 1 5 4 2 1 1 2 1

WF3

Wateproofing to wet areas to wall upturn (h=300mm) GS-L bath 2 5.39 10.78

305.97

waterprf

Page 35 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type location ddt DT-08A GS communical toilet communical toilet communical toilet hall fellow level 2 GS-L GS UGD-DL (2) UGD-DL (1) UGD-SL UGS UGS-L (1) UGD UGS-L (2) hall fellow level 2 hall fellow level 2 bath DT-08A toilet FD.5-T10 janitor opening HT FD.5-HT10 bath 1 DT-08A drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening ac ledge balcony corridor FD.5-S06 FD.5-S10 FD.5-10 FD.5-12 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-09 (5) (3) (2) (1) (1) (21) (4) (1) (1) (1) (1) 2 (2) 1 (1) 5 (5) 4 (4) 2 (2) 1 (1) 1 (1) 2 (2) 1 (1) (1) 4.63 0.80 2.93 0.85 2.93 0.85 5.50 1.70 6.00 1.70 6.00 1.70 3.00 0.85 3.00 1.70 5.50 1.70 3.00 0.85 6.76 8.92 197.62 0.60 1.00 1.05 1.20 0.80 1.00 1.00 1.05 1.05 0.90 (1) 8.82 1.05 (1) 5.41 0.70 No. (2) 1 (1) Side Area L W 0.80 5.52 0.80 37.37 1.05 D/H 1.00 Sub-Qty (1.60) 5.52 (0.80) 37.37 (1.05) 5.41 (0.70) 8.82 (1.05) 4.63 (0.80) 5.86 (1.70) 2.93 (0.85) 27.50 (8.50) 24.00 (6.80) 12.00 (3.40) 3.00 (0.85) 3.00 (1.70) 11.00 (3.40) 3.00 (0.85) 6.76 8.92 197.62 (3.00) (3.00) (2.10) (1.20) (0.80) (21.00) (4.00) (1.05) (1.05) (0.90) 305.97 WF3 Wateproofing to wet areas to shower wall (h=1.80m) GS-L GS hall fellow level 2 shower shower shower 2 1 3.35 3.13 3.25 6.70 3.13 3.25 13.08 m 13.08 waterprf Unit Qty Code Rate

d WF4

4th storey Wateproofing to wet areas to floor GS-L GS-L GS GS communical toilet communical toilet communical toilet hall master level 1 hall master level 1 hall master level 1 GS-L GS UGD UGD-SL UGS-L (2) UGS-L (1) UGD-DL (1) UGD-DL (2) hall master common area common area common area bath shower bath shower toilet janitor HT kitchen bath 1 shower think tank rm 2 drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet balcony/ac ledge ac ledge ac space rc slab corridor 2 2 1 1 2.27 1.10 2.32 0.84 36.58 1.50 4.85 5.71 2.56 1.21 25.10 0.48 0.48 0.88 0.92 0.46 0.46 0.92 0.88 2.17 7.37 11.97 41.11 149.60 4.54 2.20 2.32 0.84 36.58 1.50 4.85 5.71 2.56 1.21 25.10 0.96 0.48 1.76 1.84 2.30 0.46 9.20 1.76 2.17 7.37 11.97 41.11 149.60 318.39

m2

318.39

waterprf

2 1 2 2 5 1 10 2

WF4

Wateproofing to wet areas to wall upturn (h=300mm) GS-L GS communical toilet communical toilet communical toilet hall master level 1 hall master level 1 bath DT-08A bath DT-08A toilet FD.5-T10 janitor opening HT FD.5-HT10 kitchen opening bath 1 DT-08A think tank rm 2 GD-10 GS-L GS UGD UGD-SL UGS-L (2) UGS-L (1) UGD-DL (1) UGD-DL (2) hall master drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening balcony/ac ledge corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 (5) (3) (2) (1) (25) (3) (1) (1) (1) (1) 2 (2) 1 (1) 2 (2) 2 (2) 5 (5) 1 (1) 10 (10) 2 (2) 1.00 2.93 0.85 2.93 0.85 5.50 1.70 6.00 1.70 3.00 0.85 3.00 0.85 6.00 1.70 5.50 1.70 6.40 197.62 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.00 (1) (1) 5.35 0.80 (1) 12.10 0.85 (1) 8.82 1.05 (1) 5.41 0.70 2 (2) 1 (1) 5.39 0.80 5.52 0.80 37.37 1.05 10.78 (1.60) 5.52 (0.80) 37.37 (1.05) 5.41 (0.70) 8.82 (1.05) 12.10 (0.85) 5.35 (0.80) 1.00 (1.00) 5.86 (1.70) 2.93 (0.85) 11.00 (3.40) 12.00 (3.40) 15.00 (4.25) 3.00 (0.85) 60.00 (17.00) 11.00 (3.40) 6.40 197.62 (3.00) (3.00) (2.10) (0.80) (25.00) (3.00) (1.05) (1.05) (1.00) 328.46

328.46

waterprf

WF4

Wateproofing to wet areas to shower wall (h=1.80m) GS-L GS hall master level 1 shower shower shower 2 1 3.35 3.13 3.46 6.70 3.13 3.46 13.29

13.29

waterprf

Page 36 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No e WF5 Description 5th storey Wateproofing to wet areas to floor GS-L GS-L GS GS communical toilet communical toilet communical toilet hall master level 2 hall master level 2 hall master level 2 hall master level 2 GS-L GS UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) hall master level 2 common area common area common area bath shower bath shower toilet janitor HT master bath shower bath 2 shower think tank rm 3 drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet balcony/ac ledge ac ledge ac space rc slab corridor 2 2 1 1 2.27 1.10 2.32 0.84 36.58 1.50 4.85 2.52 1.21 2.51 0.95 14.00 0.48 0.48 0.88 0.92 0.46 0.92 0.46 0.88 3.07 9.01 5.01 26.75 149.45 4.54 2.20 2.32 0.84 36.58 1.50 4.85 2.52 1.21 2.51 0.95 14.00 0.96 0.48 1.76 3.68 2.30 4.60 0.46 2.64 3.07 9.01 5.01 26.75 149.45 284.19 WF5 Wateproofing to wet areas to wall upturn (h=300mm) GS-L GS communical toilet communical toilet communical toilet hall master level 2 hall master level 2 bath DT-08A bath DT-08A toilet FD.5-T10 janitor opening HT FD.5-HT10 master bath DT-08A bath 2 DB-10 think tank rm 3 GD-10 GS-L GS UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) hall master level 2 drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening balcony/ac ledge corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 (5) (3) (2) (1) (26) (1) (1) (1) (1) (1) 2 (2) 1 (1) 2 (2) 4 (4) 5 (5) 5 (5) 1 (1) 3 (3) (1) 14.96 1.00 2.93 0.85 2.93 0.85 5.50 1.70 6.00 1.70 3.00 0.85 6.00 1.70 3.00 0.85 5.50 1.70 6.40 192.04 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.00 (1) 5.16 1.00 14.96 (1.00) 5.86 (1.70) 2.93 (0.85) 11.00 (3.40) 24.00 (6.80) 15.00 (4.25) 30.00 (8.50) 3.00 (0.85) 16.50 (5.10) 6.40 192.04 (3.00) (3.00) (2.10) (0.80) (26.00) (1.00) (1.05) (1.05) (1.00) 322.65 WF5 Wateproofing to wet areas to shower wall (h=1.80m) GS-L GS hall master level 2 hall master level 2 shower shower shower shower 2 1 3.35 3.13 3.46 2.84 6.70 3.13 3.46 2.84 16.13 m 16.13 waterprf (1) 5.35 0.80 (1) 8.82 1.05 (1) 5.41 0.70 2 (2) 1 (1) 5.39 0.80 5.52 0.80 37.37 1.05 10.78 (1.60) 5.52 (0.80) 37.37 (1.05) 5.41 (0.70) 8.82 (1.05) 5.35 (0.80) 5.16 m 322.65 waterprf Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

m2

284.19

waterprf

2 1 2 4 5 5 1 3

f WF6

6th storey Wateproofing to wet areas to floor GS-L GS-L GS GS communical toilet communical toilet communical toilet hall master level 1 hall master level 1 hall master level 1 bath shower bath shower toilet janitor HT kitchen bath 1 shower think tank rm 4 think tank rm 5 drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet balcony/ac ledge ac ledge ac space rc slab corridor 2 2 1 1 2.27 1.10 2.32 0.84 36.58 1.50 4.85 5.71 2.56 1.21 30.32 25.41 0.48 0.48 0.46 0.88 0.92 0.46 0.92 0.88 0.46 2.17 5.92 12.31 34.49 149.99 4.54 2.20 2.32 0.84 36.58 1.50 4.85 5.71 2.56 1.21 30.32 25.41 0.96 0.48 1.84 2.64 3.68 0.46 2.76 1.76 0.46 2.17 5.92 12.31 34.49 149.99 337.96

m2

337.96

waterprf

GS-L GS UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) UGS-L (1) hall master level 1 common area common area common area

2 1 4 3 4 1 3 2 1

WF6

Wateproofing to wet areas to wall upturn (h=300mm) GS-L GS communical toilet communical toilet communical toilet hall master level 1 hall master level 1 bath DT-08A bath DT-08A toilet FD.5-T10 janitor opening HT FD.5-HT10 kitchen opening bath 1 DT-08A think tank rm 4 GD-10 think tank rm 5 GD-10 (1) (1) 22.32 1.00 (1) 26.78 1.00 (1) 5.35 0.80 (1) 12.10 0.85 (1) 8.82 1.05 (1) 5.41 0.70 2 (2) 1 (1) 5.39 0.80 5.52 0.80 37.37 1.05 10.78 (1.60) 5.52 (0.80) 37.37 (1.05) 5.41 (0.70) 8.82 (1.05) 12.10 (0.85) 5.35 (0.80) 26.78 (1.00) 22.32 (1.00)

357.26

waterprf

Page 37 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type GS-L GS UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) UGS-L (1) hall master level 1 location drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening balcony/ac ledge corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 GD-09 (5) (3) (2) (1) (22) (3) (1) (1) (2) (1) ddt No. 2 (2) 1 (1) 4 (4) 3 (3) 4 (4) 1 (1) 3 (3) 2 (2) 1 (1) Side Area L 2.93 0.85 2.93 0.85 3.00 0.85 5.50 1.70 6.00 1.70 3.00 0.85 6.00 1.70 5.50 1.70 3.00 0.85 6.40 195.92 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.00 0.90 W D/H 1.00 Sub-Qty 5.86 (1.70) 2.93 (0.85) 12.00 (3.40) 16.50 (5.10) 24.00 (6.80) 3.00 (0.85) 18.00 (5.10) 11.00 (3.40) 3.00 (0.85) 6.40 195.92 (3.00) (3.00) (2.10) (0.80) (22.00) (3.00) (1.05) (1.05) (2.00) (0.90) 357.26 WF6 Wateproofing to wet areas to shower wall (h=1.80m) GS-L GS hall master level 1 shower shower shower 2 1 3.35 3.13 3.46 6.70 3.13 3.46 13.29 m 13.29 waterprf Unit Qty Code Rate

g WF7

7th storey Wateproofing to wet areas to floor GS-L GS-L GS GS communical toilet communical toilet communical toilet hall master level 2 hall master level 2 hall master level 2 hall master level 2 bath shower bath shower toilet janitor HT master bath shower bath 2 shower think tank rm corridor drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet balcony/ac ledge ac ledge ac space rc slab 2 2 1 1 2.27 1.10 2.32 0.84 36.58 1.50 4.85 2.52 1.21 2.51 0.95 33.82 148.71 0.48 0.48 0.88 0.92 0.46 0.92 0.46 0.88 0.46 3.07 2.29 6.85 21.61 4.54 2.20 2.32 0.84 36.58 1.50 4.85 2.52 1.21 2.51 0.95 33.82 148.71 0.96 0.48 0.88 6.44 1.84 2.76 0.46 0.88 0.46 3.07 2.29 6.85 21.61 291.53

m2

291.53

waterprf

GS-L GS UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) UGS hall master level 2 common area common area common area

2 1 1 7 4 3 1 1 1

WF7

Wateproofing to wet areas to wall upturn (h=300mm) GS-L GS communical toilet communical toilet communical toilet hall master level 2 hall master level 2 bath DT-08A bath DT-08A toilet FD.5-T10 janitor opening HT FD.5-HT10 master bath DT-08A bath 2 DB-10 think tank rm GD-10 GS-L GS UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) UGS hall master level 2 drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening balcony/ac ledge corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 FD2-10 (5) (3) (2) (1) (19) (3) (1) (1) (1) (1) (1) 2 (2) 1 (1) 1 (1) 7 (7) 4 (4) 3 (3) 1 (1) 1 (1) 1 (1) (1) 28.87 1.00 2.93 0.85 2.93 0.85 5.50 1.70 6.00 1.70 3.00 0.85 6.00 1.70 3.00 0.85 5.50 1.70 3.00 0.85 8.34 192.02 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.00 1.00 (1) 5.16 1.00 (1) 5.35 0.80 (1) 8.82 1.05 (1) 5.41 0.70 2 (2) 1 (1) 5.39 0.80 5.52 0.80 37.37 1.05 10.78 (1.60) 5.52 (0.80) 37.37 (1.05) 5.41 (0.70) 8.82 (1.05) 5.35 (0.80) 5.16 (1.00) 28.87 (1.00) 5.86 (1.70) 2.93 (0.85) 5.50 (1.70) 42.00 (11.90) 12.00 (3.40) 18.00 (5.10) 3.00 (0.85) 5.50 (1.70) 3.00 (0.85) 8.34 192.02 (3.00) (3.00) (2.10) (0.80) (19.00) (3.00) (1.05) (1.05) (1.00) (1.00) 334.38

334.38

waterprf

WF7

Wateproofing to wet areas to shower wall (h=1.80m) GS-L GS hall master level 2 hall master level 2 shower shower shower shower 2 1 3.35 3.13 3.46 2.84 6.70 3.13 3.46 2.84 16.13

16.13

waterprf

h WF8

8th storey Wateproofing to wet areas to floor GM GM communical toilet bath shower toilet 2 2 2.15 1.10 36.58 4.30 2.20 36.58

m2

340.63

waterprf

Page 38 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type communical toilet communical toilet GM UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) common area common area common area location janitor HT corridor drying closet drying closet drying closet drying closet drying closet drying closet drying closet ac ledge ac space rc slab ddt No. Side Area 1.50 4.85 148.71 0.46 0.46 0.88 0.92 0.46 0.92 0.88 4.58 20.99 98.72 L W D/H 1.00 Sub-Qty 1.50 4.85 148.71 0.92 3.22 1.76 6.44 0.46 2.76 2.64 4.58 20.99 98.72 340.63 WF8 Wateproofing to wet areas to wall upturn (h=300mm) GM communical toilet communical toilet communical toilet GM UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) bath DT-08A toilet FD.5-T10 janitor opening HT FD.5-HT10 drying closet opening drying closet drying closet drying closet drying closet drying closet drying closet corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 (5) (3) (2) (1) (22) (3) (1) (1) (1) 2 (2) 7 (7) 2 (2) 7 (7) 1 (1) 3 (3) 3 (3) (1) 8.82 1.05 2.80 0.85 3.00 0.85 5.50 1.70 6.00 1.70 3.00 0.85 6.00 1.70 5.50 1.70 192.28 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 (1) 5.41 0.70 2 (2) 5.24 0.80 37.37 1.05 10.48 (1.60) 37.37 (1.05) 5.41 (0.70) 8.82 (1.05) 5.60 (1.70) 21.00 (5.95) 11.00 (3.40) 42.00 (11.90) 3.00 (0.85) 18.00 (5.10) 16.50 (5.10) 192.28 (3.00) (3.00) (2.10) (0.80) (22.00) (3.00) (1.05) (1.05) 297.06 WF8 Wateproofing to wet areas to shower wall (h=1.80m) GM shower 2 3.35 6.70 6.70 m 6.70 waterprf m 297.06 waterprf Unit Qty Code Rate

2 7 2 7 1 3 3

i WF9

9th storey Wateproofing to wet areas to floor GM GM communical toilet communical toilet communical toilet bath shower toilet janitor HT think tank rm 7 corridor drying closet drying closet drying closet drying closet drying closet drying closet drying closet ac ledge ac space rc slab 2 2 2.15 1.10 36.58 1.50 4.85 19.65 148.71 0.46 0.46 0.88 0.92 0.46 0.92 0.88 18.69 4.58 13.38 4.30 2.20 36.58 1.50 4.85 19.65 148.71 0.92 2.30 1.76 4.60 0.46 5.52 1.76 18.69 4.58 13.38 271.76

m2

271.76

waterprf

GM UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) common area common area common area

2 5 2 5 1 6 2

WF9

Wateproofing to wet areas to wall upturn (h=300mm) GM communical toilet communical toilet communical toilet bath DT-08A toilet FD.5-T10 janitor opening HT FD.5-HT10 think tank rm 7 GD-10 GM UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 (5) (3) (2) (1) (20) (3) (1) (1) (1) (1) 2 (2) 5 (5) 2 (2) 5 (5) 1 (1) 6 (6) 2 (2) (1) 18.51 1.00 2.80 0.85 3.00 0.85 5.50 5.50 6.00 5.50 3.00 0.85 6.00 5.50 5.50 5.50 192.28 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.00 (1) 8.82 1.05 (1) 5.41 0.70 2 (2) 37.37 1.05 2.00 (1.60) 37.37 (1.05) 5.41 (0.70) 8.82 (1.05) 18.51 (1.00) 5.60 (1.70) 15.00 (4.25) 11.00 (11.00) 30.00 (27.50) 3.00 (0.85) 36.00 (33.00) 11.00 (11.00) 192.28 (3.00) (3.00) (2.10) (0.80) (20.00) (3.00) (1.05) (1.05) (1.00) 246.29

246.29

waterprf

0.80

WF9

Wateproofing to wet areas to shower wall (h=1.80m) GM shower 2 3.35 6.70 6.70

6.70

waterprf

j WF10

10th storey Wateproofing to wet areas to floor GM GM communical toilet communical toilet communical toilet bath shower toilet janitor HT think tank rm 8 think tank rm 9 corridor drying closet drying closet 2 2 2.15 1.10 36.58 1.50 4.85 14.30 25.10 148.71 0.46 0.92 4.30 2.20 36.58 1.50 4.85 14.30 25.10 148.71 0.92 7.36

m2

304.09

waterprf

GM UGD-DL (1)

2 8

Page 39 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type UGD UGD-SL UGS UGS-L (2) UGD-DL (2) UGS-L (1) common area common area common area location drying closet drying closet drying closet drying closet drying closet drying closet ac ledge ac space rc slab ddt No. 2 4 1 6 1 1 Side Area 0.88 0.92 0.46 0.46 0.88 0.46 2.29 11.77 34.21 L W D/H 1.00 Sub-Qty 1.76 3.68 0.46 2.76 0.88 0.46 2.29 11.77 34.21 304.09 WF10 Wateproofing to wet areas to wall upturn (h=300mm) GM communical toilet communical toilet communical toilet bath DT-08A toilet FD.5-T10 janitor opening HT FD.5-HT10 think tank rm 8 GD-10 think tank rm 9 GD-10 GM UGD-DL (1) UGD UGD-SL UGS UGS-L (2) UGD-DL (2) UGS-L (1) drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening drying closet opening corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 (5) (3) (2) (1) (22) (3) (1) (1) (2) (1) 2 (2) 8 (8) 2 (2) 4 (4) 1 (1) 6 (6) 1 (1) 1 (1) (1) 20.76 1.00 2.80 0.85 6.00 1.70 5.50 1.70 6.00 1.70 3.00 0.85 3.00 1.70 5.50 1.70 3.00 0.85 192.28 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.00 (1) 15.05 1.00 (1) 8.82 1.05 (1) 5.41 0.70 2 (2) 5.24 0.80 37.37 1.05 10.48 (1.60) 37.37 (1.05) 5.41 (0.70) 8.82 (1.05) 15.05 (1.00) 20.76 (1.00) 5.60 (1.70) 48.00 (13.60) 11.00 (3.40) 24.00 (6.80) 3.00 (0.85) 18.00 (10.20) 5.50 (1.70) 3.00 (0.85) 192.28 (3.00) (3.00) (2.10) (0.80) (22.00) (3.00) (1.05) (1.05) (2.00) 324.77 WF10 Wateproofing to wet areas to shower wall (h=1.80m) GM shower 2 3.35 6.70 6.70 m 6.70 waterprf m 324.77 waterprf Unit Qty Code Rate

k WF11

11th storey Wateproofing to wet areas to floor communical toilet communical toilet communical toilet toilet janitor HT corridor heat pump rm drying closet drying closet drying closet drying closet drying closet drying closet drying closet ac ledge 36.58 1.50 4.85 137.67 76.14 0.88 0.46 0.88 0.92 0.92 0.46 0.46 11.77 36.58 1.50 4.85 137.67 76.14 2.64 0.46 1.76 9.20 2.76 1.84 0.46 11.77 287.63

m2

287.63

waterprf

UGD-DL (2) UGS UGD UGD-DL (1) UGD-SL UGS-L (2) UGS-L (1) common area

3 1 2 10 3 4 1

WF11

Wateproofing to wet areas to wall upturn (h=300mm) communical toilet communical toilet communical toilet toilet FD.5-T10 janitor opening HT FD.5-HT10 heat pump rm gril UGD-DL (2) UGS UGD UGD-DL (1) UGD-SL UGS-L (2) UGS-L (1) drying closet drying closet drying closet drying closet drying closet drying closet drying closet corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 heat pump (5) (3) (2) (1) (20) (2) (1) (1) (1) (1) 3 1 2 10 3 4 1 (1) 26.90 1.38 5.50 5.50 3.00 0.85 5.50 1.70 6.00 1.70 6.00 1.70 3.00 0.85 3.00 0.85 178.16 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.38 (1) 8.82 1.05 (1) 5.41 0.70 37.37 1.05 37.37 (1.05) 5.41 (0.70) 8.82 (1.05) 26.90 (1.38) 16.50 5.50 3.00 0.85 11.00 1.70 60.00 1.70 18.00 1.70 12.00 0.85 3.00 0.85 178.16 (3.00) (3.00) (2.10) (0.80) (20.00) (2.00) (1.05) (1.05) (1.38) 354.75

354.75

waterprf

WF11 11.4 a

Wateproofing to wet areas to shower wall (h=1.80m) Heavy duty epoxy polyurenthane floor coating system 1st storey Carried Forward

Na

waterprf

Page 40 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/21 11.5 a 11.6 a 1F1 1F2 Floor Finishes (Cont'd) Heavy duty epoxy polyurenthane coating system to skirting 1st storey floor Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

Homogeneous tile 1st storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed wash rm (m) wash rm (f) handicap toilet 2.48 3.09 4.86 2.48 3.09 4.86 10.43

m2 m2 10.43

F1 F2

1F3 1F4 1F6 1F7

600mm x 600mm non-slip homogenous floor tiles with cement and sand screed 450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Homogenous floor tiles with cement and sand screed letter box security rm lift lobby 23.55 7.83 10.20 23.55 7.83 10.20 41.58 Non-slip homogenous floor tiles with cement and sand screed communal laundry kitchenette toilet pantry rm corridor 39.22 49.37 3.91 7.34 274.75 39.22 49.37 3.91 7.34 274.75 374.59

m2 m2 m2 m2 m2 41.58

F3 F4 F6 F7

m2

374.59

hall admin office hall admin office

RCCF

Ceramic floor tiles with cement and sand screed to Refuse Chute Chamber refuse chutte b 2nd storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed GS-L GS-L GS GS communical toilet communical toilet communical toilet hall fellow level 1 bath shower bath shower toilet janitor HT powder room 2 2 1 1 2.27 1.10 2.32 0.84 27.04 1.50 4.85 2.38 4.54 2.20 2.32 0.84 27.04 1.50 4.85 2.38 45.67 1.90 1.90

m2

1.90

2F1 2F2

m2 m2 45.67

F1 F2

2F4 2F6 2F7

450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Homogenous floor tiles with cement and sand screed lift lobby bed rm bed rm store dining/living store multi use rm 10.20 9.02 9.01 36.75 29.47 3.81 24.61 10.20 18.04 9.01 36.75 29.47 3.81 24.61 131.89 250mm x 250mm Homogenous floor tiles with cement and sand screed UGD-DL (2) UGS-L (2) bed rm bed rm 2 2 17.59 8.81 35.18 17.62 52.80 Non-slip homogenous floor tiles with cement and sand screed hall fellow level 1 kitchen corridor 5.22 248.81 5.22 248.81 254.03

m2 m2 m2 m2 131.89

F4 F6 F7

GS-L GS communical toilet hall fellow level 1 hall fellow level 1

2 1

m2

52.80

m2

254.03

c 3F1 3F2

3rd storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed GS-L GS-L GS GS GS communical toilet communical toilet communical toilet hall fellow level 2 hall fellow level 2 bath shower bed rm bath shower toilet janitor HT bath 1 shower 2 2 1 1 1 2.27 1.10 9.01 2.32 0.84 36.58 1.50 4.85 2.29 1.01 4.54 2.20 9.01 2.32 0.84 36.58 1.50 4.85 2.29 1.01 65.14

m2 m2 65.14

F1 F2

3F4 3F6 3F7

450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Homogenous floor tiles with cement and sand screed lift lobby bed rm hall bed rm master bed rm 10.20 9.02 6.67 7.71 11.87 10.20 18.04 6.67 7.71 11.87 54.49

m2 m2 m2 m2 54.49

F4 F6 F7

GS-L hall fellow level 2 hall fellow level 2 hall fellow level 2

Page 41 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

250mm x 250mm Homogenous floor tiles with cement and sand screed UGD-DL (2) UGD-DL (1) UGD-SL UGS UGS-L (1) UGD UGS-L (2) bed rm bed rm bed rm bed rm bed rm bed rm bed rm 5 4 2 1 1 2 1 17.59 17.62 17.55 8.68 8.63 17.59 8.81 87.95 70.48 35.10 8.68 8.63 35.18 8.81 254.83

m2

254.83

Non-slip homogenous floor tiles with cement and sand screed corridor 171.13 171.13 171.13

m2

171.13

d 4F1 4F2

4th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed GS-L GS-L GS GS communical toilet communical toilet communical toilet hall master level 1 hall master level 1 hall master level 1 bath shower bath shower toilet janitor HT kitchen bath 1 shower 2 2 1 1 2.27 1.10 2.32 0.84 36.58 1.50 4.85 5.71 2.56 1.21 4.54 2.20 2.32 0.84 36.58 1.50 4.85 5.71 2.56 1.21 62.31

m2 m2 62.31

F1 F2

4F4 4F6 4F7

450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Homogenous floor tiles with cement and sand screed lift lobby bed rm bed rm dining/living store bed rm 1 10.20 9.02 9.01 26.92 3.72 11.49 10.20 18.04 9.01 26.92 3.72 11.49 79.38

m2 m2 m2 m2 79.38

F4 F6 F7

GS-L GS hall master level 1 hall master level 1 hall master level 1

2 1

250mm x 250mm Homogenous floor tiles with cement and sand screed UGD UGD-SL UGS-L (2) UGS-L (1) UGD-DL (1) UGD-DL (2) bed rm bed rm bed rm bed rm bed rm bed rm 2 2 5 1 10 2 17.59 17.55 8.81 8.63 17.62 17.59 35.18 35.10 44.05 8.63 176.20 35.18 334.34

m2

334.34

Non-slip homogenous floor tiles with cement and sand screed corridor 149.60 149.60 149.60

m2

149.60

e 5F1 5F2

5th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed GS-L GS-L GS GS communical toilet communical toilet communical toilet hall master level 2 hall master level 2 hall master level 2 hall master level 2 bath shower bath shower toilet janitor HT shower shower master bath bath 2 2 2 1 1 2.27 1.10 2.32 0.84 36.58 1.50 4.85 1.21 0.95 2.52 2.51 4.54 2.20 2.32 0.84 36.58 1.50 4.85 1.21 0.95 2.52 2.51 60.02

m2 m2 60.02

F1 F2

5F4 5F6 5F7

450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Homogenous floor tiles with cement and sand screed lift lobby bed rm bed rm bath shower hall study master bed rm bed rm 2 10.20 9.02 9.01 2.32 0.84 6.56 4.04 16.19 10.86 10.20 18.04 9.01 2.32 0.84 6.56 4.04 16.19 10.86 78.06 250mm x 250mm Homogenous floor tiles with cement and sand screed UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) bed rm bed rm bed rm bed rm bed rm bed rm 2 4 5 5 1 3 17.59 17.55 8.81 17.62 8.63 17.59 35.18 70.20 44.05 88.10 8.63 52.77 298.93

m2 m2 m2

F4 F6 F7

m2

78.06

GS-L GS GS GS hall master level 2 hall master level 2 hall master level 2 hall master level 2

2 1 1 1

m2

298.93

Non-slip homogenous floor tiles with cement and sand screed corridor 149.45 149.45 149.45

m2

149.45

Page 42 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No f 6F1 6F2 Description 6th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed GS-L GS-L communical toilet communical toilet communical toilet hall master level 1 hall master level 1 hall master level 1 bath shower toilet janitor HT bath 1 shower kitchen 2 2 2.27 1.10 36.58 1.50 4.85 2.56 1.21 5.71 4.54 2.20 36.58 1.50 4.85 2.56 1.21 5.71 59.15 6F4 6F6 6F7 450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Homogenous floor tiles with cement and sand screed lift lobby bed rm bed rm dining/living store bed rm 1 10.20 9.02 9.01 26.92 3.72 11.49 10.20 18.04 9.01 26.92 3.72 11.49 79.38 m2 m2 m2 m2 79.38 F4 F6 F7 Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

m2 m2 59.15

F1 F2

GS-L GS hall master level 1 hall master level 1 hall master level 1

2 1

250mm x 250mm Homogenous floor tiles with cement and sand screed UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) UGS-L (1) bed rm bed rm bed rm bed rm bed rm bed rm bed rm 4 3 4 1 3 2 1 8.81 17.59 17.55 8.68 17.62 17.59 8.63 35.24 52.77 70.20 8.68 52.86 35.18 8.63 263.56

m2

263.56

Non-slip homogenous floor tiles with cement and sand screed corridor 149.99 149.99 149.99

m2

149.99

g 7F1 7F2

7th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed GS-L GS-L GS GS communical toilet communical toilet communical toilet hall master level 2 hall master level 2 hall master level 2 hall master level 2 bath shower bath shower toilet janitor HT master bath shower shower bath 2 2 2 1 1 2.27 1.10 2.32 0.84 36.58 1.50 4.85 2.52 1.21 0.95 2.51 4.54 2.20 2.32 0.84 36.58 1.50 4.85 2.52 1.21 0.95 2.51 60.02

m2 m2 60.02

F1 F2

7F4 7F6 7F7

450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Homogenous floor tiles with cement and sand screed lift lobby bed rm bed rm hall study master bed rm bed rm 2 10.20 9.02 9.01 6.56 4.04 16.19 10.86 10.20 18.04 9.01 6.56 4.04 16.19 10.86 74.90 250mm x 250mm Homogenous floor tiles with cement and sand screed UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) UGS bed rm bed rm bed rm bed rm bed rm bed rm bed rm 1 7 4 3 1 1 1 17.59 17.55 8.81 17.62 8.63 17.59 8.68 17.59 122.85 35.24 52.86 8.63 17.59 8.68 263.44

m2 m2 m2 m2 74.90

F4 F6 F7

GS-L GS hall master level 2 hall master level 2 hall master level 2 hall master level 2

2 1

m2

263.44

Non-slip homogenous floor tiles with cement and sand screed corridor 148.71 148.71 148.71

m2

148.71

h 8F1 8F2

8th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed GM GM communical toilet communical toilet communical toilet bath shower toilet janitor HT 2 2 2.15 1.10 36.58 1.50 4.85 4.30 2.20 36.58 1.50 4.85 49.43

m2 m2 49.43

F1 F2

8F4 8F6 8F7

450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Homogenous floor tiles with cement and sand screed lift lobby 10.20 10.20

m2 m2 m2 m2 55.58

F4 F6 F7

Page 43 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type GM GM location living/dining/kitchen bed rm ddt No. 2 2 Side Area 12.42 10.27 L W D/H 1.00 Sub-Qty 24.84 20.54 55.58 250mm x 250mm Homogenous floor tiles with cement and sand screed UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) bed rm bed rm bed rm bed rm bed rm bed rm 7 2 7 1 3 3 8.81 17.59 17.55 8.68 17.62 17.59 61.67 35.18 122.85 8.68 52.86 52.77 334.01 Non-slip homogenous floor tiles with cement and sand screed corridor 148.71 148.71 148.71 m2 148.71 m2 334.01 Unit Qty Code Rate

i 9F1 9F2

9th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed GM GM communical toilet communical toilet communical toilet bath shower toilet janitor HT 2 2 2.15 1.10 36.58 1.50 4.85 4.30 2.20 36.58 1.50 4.85 49.43

m2 m2 49.43

F1 F2

9F4 9F6 9F7

450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Homogenous floor tiles with cement and sand screed lift lobby living/dining/kitchen bed rm 10.20 12.42 10.27 10.20 24.84 20.54 55.58 250mm x 250mm Homogenous floor tiles with cement and sand screed UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) bed rm bed rm bed rm bed rm bed rm bed rm 5 2 5 1 6 2 8.81 17.59 17.55 8.68 17.62 17.59 44.05 35.18 87.75 8.68 105.72 35.18 316.56

m2 m2 m2 m2 55.58

F4 F6 F7

GM GM

2 2

m2

316.56

Non-slip homogenous floor tiles with cement and sand screed corridor 148.71 148.71 148.71

m2

148.71

j 10F1 10F2

10th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed GM GM communical toilet communical toilet communical toilet bath shower toilet janitor HT 2 2 2.15 1.10 36.58 1.50 4.85 4.30 2.20 36.58 1.50 4.85 49.43

m2 m2 49.43

F1 F2

10F4 10F6 10F7

450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Homogenous floor tiles with cement and sand screed lift lobby living/dining/kitchen bed rm 10.20 12.42 10.27 10.20 24.84 20.54 55.58 250mm x 250mm Homogenous floor tiles with cement and sand screed UGD-DL (1) UGD UGD-SL UGS UGS-L (2) UGD-DL (2) UGS-L (1) bed rm bed rm bed rm bed rm bed rm bed rm bed rm 8 2 4 1 6 1 1 17.62 17.59 17.55 8.68 8.81 17.59 8.63 140.96 35.18 70.20 8.68 52.86 17.59 8.63 334.10

m2 m2 m2 m2 55.58

F4 F6 F7

GM GM

2 2

m2

334.10

Non-slip homogenous floor tiles with cement and sand screed corridor 148.71 148.71 148.71

m2

148.71

k 11F1 11F2

11th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed communical toilet communical toilet communical toilet toilet janitor HT 36.58 1.50 4.85 36.58 1.50 4.85 42.93

m2 m2 42.93

F1 F2

11F4 11F6 11F7

450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Homogenous floor tiles with cement and sand screed

m2 m2 m2 m2 10.20

F4 F6 F7

Page 44 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type location lift lobby ddt No. Side Area 10.20 L W D/H 1.00 Sub-Qty 10.20 10.20 250mm x 250mm Homogenous floor tiles with cement and sand screed UGD-DL (2) UGS UGD UGD-DL (1) UGD-SL UGS-L (2) UGS-L (1) bed rm bed rm bed rm bed rm bed rm bed rm bed rm 3 1 2 10 3 4 1 17.59 8.68 17.59 17.62 17.55 8.81 8.63 52.77 8.68 35.18 176.20 52.65 35.24 8.63 369.35 Non-slip homogenous floor tiles with cement and sand screed corridor 137.67 137.67 137.67 m2 137.67 m2 369.35 Unit Qty Code Rate

l RFF1 RFF2 RFF4 RFF6 RFF7

Roof level 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Homogenous floor tiles with cement and sand screed lift lobby 10.20 10.20 10.20

m2 m2 m2 m2 m2 m2 10.20

F1 F2 F4 F6 F7

11.7 a b 2F16 11.8 S1 a

Heavy duty homogeneous tile 1st storey 2nd storey 300mm x 300mm heavy duty non-slip homogenous floor tiles with cement and sand screed Homogeneous tile skirting 100mm high homogenous skirting tile to the following levels 1st storey m 100.96 frl-sktg m2 F1-H

lift lobby opening DS-10A DS-12 security rm D-10 corridor DL-10 DK-10 DT-08 DHT-10 DS-10 FD.5-S06 FD.5-S10 FD2-12 FD2-18 D-10 FD.5-20 SGD-12 (1) (1) (2) (1) (2) (5) (3) (1) (2) (1) (1) (1) (1) (2) (1) (1)

12.26 1.70 1.00 1.20 10.99 1.00 105.91 1.00 1.00 0.80 1.00 1.00 0.60 1.00 1.20 1.80 1.00 2.00 1.20

12.26 (3.40) (1.00) (1.20) 10.99 (1.00) 105.91 (1.00) (1.00) (1.60) (1.00) (2.00) (3.00) (3.00) (1.20) (3.60) (1.00) (2.00) (1.20) 100.96

2nd storey

301.15

frl-sktg

lift lobby opening DS-06 DS-10A DS-12 FD.5-10 GS-L bed rm DHM-10 opening GS bed rm FD.5-HM10 opening communical toilet hall fellow level 1 store D-10 dining/living DHM-10 GD-07 D-S08 DT-08A hall fellow level 1 UGD-DL (2) store D-S08 bed rm DHM-10 opening UGS-L (2) bed rm DHM-10 opening hall fellow level 1 kitchen corridor DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 FD.5-15A FD.5-S06 FD.5-S10 FD.5-10 opening (7) (1) (1) (1) (1) (1) (5) (3) (2) (1) (1) 2 (2) (2) 2 (2) (2) (1) (1) (1) (1) (1) (2) (1) (1) (1) (1) 2 (2) (2) 1 (1) (1)

12.26 1.70 0.60 1.00 1.20 1.05 12.63 1.00 0.85 12.71 1.00 0.85 14.49 1.00 21.54 1.00 0.70 0.80 0.80 7.07 0.80 19.60 2.00 1.70 12.50 1.00 0.85 7.54 194.07 1.00 1.00 1.05 1.05 1.00 1.50 0.60 1.00 1.05 8.29

12.26 (3.40) (0.60) (1.00) (1.20) (1.05) 25.26 (2.00) (1.70) 12.71 (1.00) (0.85) 14.49 (1.00) 21.54 (1.00) (0.70) (0.80) (0.80) 7.07 (0.80) 39.20 (4.00) (3.40) 25.00 (2.00) (1.70) 7.54 194.07 (7.00) (1.00) (1.05) (1.05) (1.00) (1.50) (3.00) (3.00) (2.10) (8.29) 301.15

3rd storey

437.18

frl-sktg

GS

bed rm FD.5-HM10 opening lift lobby opening DS-06

1 (1) (1) (2) (1)

12.71 1.00 0.85 12.26 1.70 0.60

12.71 (1.00) (0.85) 12.26 (3.40) (0.60)

Page 45 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type location ddt DS-10A DS-12 FD.5-10 GS-L bed rm DHM-10 opening hall fellow level 2 hall DB-10 DT-08A DHM-10 hall fellow level 2 hall fellow level 2 UGD-DL (2) bed rm DB-10 master bed rm DB-10 bed rm DHM-10 opening UGD-DL (1) bed rm DHM-10 opening UGD-SL bed rm DHM-10 opening UGS bed rm FD.5-HM10 opening UGS-L (1) bed rm DHM-10 opening UGD bed rm FD.5-HM10 opening UGS-L (2) bed rm DHM-10 opening corridor FD.5-S06 FD.5-S10 FD.5-10 FD.5-12 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-09 (5) (3) (2) (1) (1) (21) (4) (1) (1) (1) (1) 5 (5) (5) 4 (4) (4) 2 (2) (2) 1 (1) (1) 1 (1) (1) 2 (2) (2) 1 (1) (1) (1) 14.72 1.00 19.60 2.00 1.70 19.60 1.00 1.70 19.67 1.00 1.70 12.41 1.00 0.85 12.50 1.00 0.85 1.60 1.00 1.70 12.50 1.00 0.85 197.62 0.60 1.00 1.05 1.20 0.80 1.00 1.00 1.05 1.05 0.90 (2) (1) (1) 12.01 1.00 No. (1) (1) (1) 2 (2) (2) Side Area L W 1.00 1.20 1.05 12.63 1.00 0.85 8.60 1.00 0.80 1.00 D/H 1.00 Sub-Qty (1.00) (1.20) (1.05) 25.26 (2.00) (1.70) 8.60 (2.00) (0.80) (1.00) 12.01 (1.00) 14.72 (1.00) 98.00 (10.00) (8.50) 78.40 (4.00) (6.80) 39.34 (2.00) (3.40) 12.41 (1.00) (0.85) 12.50 (1.00) (0.85) 3.20 (2.00) (3.40) 12.50 (1.00) (0.85) 197.62 (3.00) (3.00) (2.10) (1.20) (0.80) (21.00) (4.00) (1.05) (1.05) (0.90) 437.18 d 4th storey m 581.68 frl-sktg Unit Qty Code Rate

hall master level 1

kitchen opening lift lobby opening DS-06 DS-10A DS-12 FD.5-10 (2) (1) (1) (1) (1) 2 (2) (2) 1 (1) (1) (1) (1) (1)

12.10 0.85 12.26 1.70 0.60 1.00 1.20 1.05 12.63 1.00 0.85 12.71 1.00 0.85 27.10 DHM-10 D-S08 1.00 0.80 6.84 D-S08 (1) 14.40 DB-10 SGD-07 (1) (1) 2 (2) (2) 2 (2) (2) 5 (5) (5) 1 (1) (1) 10 (10) (10) 2 (2) (2) (5) (3) (2) (1) (25) (3) (1) (1) (1) 1.00 1.80 19.60 1.00 1.70 19.67 1.00 1.70 12.50 1.00 0.85 12.50 1.00 0.85 19.60 1.00 1.70 19.60 2.00 1.70 197.62 FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.00 0.80

GS-L

bed rm DHM-10 opening

GS

bed rm FD.5-HM10 opening

hall master level 1

dining/living

hall master level 1 hall master level 1

store bed rm 1

UGD

bed rm FD.5-HM10 opening

UGD-SL

bed rm DHM-10 opening

UGS-L (2)

bed rm DHM-10 opening

UGS-L (1)

bed rm DHM-10 opening

UGD-DL (1)

bed rm DHM-10 opening

UGD-DL (2)

bed rm DHM-10 opening corridor

12.10 (0.85) 12.26 (3.40) (0.60) (1.00) (1.20) (1.05) 25.26 (2.00) (1.70) 12.71 (1.00) (0.85) 27.10 (1.00) (0.80) 6.84 (0.80) 14.40 (1.00) (1.80) 39.20 (2.00) (3.40) 39.34 (2.00) (3.40) 62.50 (5.00) (4.25) 12.50 (1.00) (0.85) 196.00 (10.00) (17.00) 39.20 (4.00) (3.40) 197.62 (3.00) (3.00) (2.10) (0.80) (25.00) (3.00) (1.05) (1.05) (1.00) 581.68

5th storey

530.36

frl-sktg

lift lobby opening DS-06 DS-10A DS-12 FD.5-10 GS-L bed rm DHM-10 opening GS bed rm FD.5-HM10 opening hall master level 2 hall DB-10 DHM-10 hall master level 2 hall master level 2 study opening master bed rm DB-10 SGD-27 DT-08A hall master level 2 bed rm 2 DB-10 DT-08A UGD bed rm FD.5-HM10 opening UGD-SL bed rm DHM-10 opening (1) (1) 2 (2) (2) 4 (4) (4) (1) (1) (1) (2) (1) (2) (1) (1) (1) (1) 2 (2) (2) 1 (1) (1)

12.26 1.70 0.60 1.00 1.20 1.05 12.63 1.00 0.85 12.71 1.00 0.85 8.45 1.00 1.00 8.34 1.35 19.77 1.00 2.70 0.80 13.50 1.00 0.80 19.60 1.00 1.70 19.67 1.00 1.70

12.26 (3.40) (0.60) (1.00) (1.20) (1.05) 25.26 (2.00) (1.70) 12.71 (1.00) (0.85) 8.45 (2.00) (1.00) 8.34 1.35 19.77 (1.00) (2.70) (0.80) 13.50 (1.00) (0.80) 39.20 (2.00) (3.40) 78.68 (4.00) (6.80)

Page 46 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type UGS-L (2) location bed rm DHM-10 opening UGD-DL (1) bed rm DHM-10 opening UGS-L (1) bed rm DHM-10 opening UGD-DL (2) bed rm DHM-10 opening corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 (5) (3) (2) (1) (26) (1) (1) (1) (1) ddt No. 5 (5) (5) 5 (5) (5) 1 (1) (1) 3 (3) (3) Side Area L 12.50 1.00 0.85 19.60 1.00 1.70 12.50 1.00 0.85 19.60 2.00 1.70 192.04 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.00 W D/H 1.00 Sub-Qty 62.50 (5.00) (4.25) 98.00 (5.00) (8.50) 12.50 (1.00) (0.85) 58.80 (6.00) (5.10) 192.04 (3.00) (3.00) (2.10) (0.80) (26.00) (1.00) (1.05) (1.05) (1.00) 530.36 f 6th storey m 513.53 frl-sktg Unit Qty Code Rate

hall master level 1

kitchen opening lift lobby opening DS-06 DS-10A DS-12 FD.5-10 (2) (1) (1) (1) (1) 2 (2) (2) 1 (1) (1) (1) (1) (1)

12.10 0.85 12.26 1.70 0.60 1.00 1.20 1.05 12.63 1.00 0.85 12.71 1.00 0.85 27.10 DHM-10 D-S08 1.00 0.80 6.84 D-S08 (1) 14.40 DB-10 SGD-07 (1) (1) 4 (4) (4) 3 (3) (3) 4 (4) (4) 1 (1) (1) 3 (3) (3) 2 (2) (2) 1 (1) (1) (5) (3) (2) (1) (22) (3) (1) (1) (2) (1) 1.00 1.80 12.50 1.00 0.85 19.60 1.00 1.70 19.67 1.00 1.70 12.41 1.00 0.85 19.60 1.00 1.70 19.60 2.00 1.70 12.50 1.00 0.85 195.92 FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 GD-09 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.00 0.90 0.80

GS-L

bed rm DHM-10 opening

GS

bed rm FD.5-HM10 opening

hall master level 1

dining/living

hall master level 1 hall master level 1

store bed rm 1

UGS-L (2)

bed rm DHM-10 opening

UGD

bed rm FD.5-HM10 opening

UGD-SL

bed rm DHM-10 opening

UGS

bed rm FD.5-HM10 opening

UGD-DL (1)

bed rm DHM-10 opening

UGD-DL (2)

bed rm DHM-10 opening

UGS-L (1)

bed rm DHM-10 opening corridor

12.10 (0.85) 12.26 (3.40) (0.60) (1.00) (1.20) (1.05) 25.26 (2.00) (1.70) 12.71 (1.00) (0.85) 27.10 (1.00) (0.80) 6.84 (0.80) 14.40 (1.00) (1.80) 50.00 (4.00) (3.40) 58.80 (3.00) (5.10) 78.68 (4.00) (6.80) 12.41 (1.00) (0.85) 58.80 (3.00) (5.10) 39.20 (4.00) (3.40) 12.50 (1.00) (0.85) 195.92 (3.00) (3.00) (2.10) (0.80) (22.00) (3.00) (1.05) (1.05) (2.00) (0.90) 513.53

7th storey

491.41

frl-sktg

lift lobby opening DS-06 DS-10A DS-12 FD.5-10 GS-L bed rm DHM-10 opening GS bed rm FD.5-HM10 opening hall master level 2 hall DB-10 DHM-10 hall master level 2 hall master level 2 study opening master bed rm DB-10 SGD-27 DT-08A hall master level 2 bed rm 2 DB-10 DT-08A UGD bed rm FD.5-HM10 opening UGD-SL bed rm DHM-10 opening UGS-L (2) bed rm DHM-10 opening UGD-DL (1) bed rm DHM-10 opening UGS-L (1) bed rm DHM-10 opening UGD-DL (2) bed rm DHM-10 opening UGS bed rm FD.5-HM10 opening corridor FD.5-S06 FD.5-S10 FD.5-10 (5) (3) (2) (1) (1) 1 (1) (1) 7 (4) (4) 4 (4) (4) 3 (4) (4) 1 (4) (4) 1 (4) (4) 1 (1) (1) (1) (1) (1) (2) (1) (2) (1) (1) (1) (1) 2 (2) (2) 1 (1) (1)

12.26 1.70 0.60 1.00 1.20 1.05 12.63 1.00 0.85 12.71 1.00 0.85 8.45 1.00 1.00 8.34 1.35 19.77 1.00 2.70 0.80 13.50 1.00 0.80 19.60 1.00 1.70 19.67 1.00 1.70 12.50 1.00 0.85 19.60 1.00 1.70 12.50 1.00 0.85 19.60 2.00 1.70 12.41 1.00 0.85 192.02 0.60 1.00 1.05

12.26 (3.40) (0.60) (1.00) (1.20) (1.05) 25.26 (2.00) (1.70) 12.71 (1.00) (0.85) 8.45 (2.00) (1.00) 8.34 1.35 19.77 (1.00) (2.70) (0.80) 13.50 (1.00) (0.80) 19.60 (1.00) (1.70) 137.69 (4.00) (6.80) 50.00 (4.00) (3.40) 58.80 (4.00) (6.80) 12.50 (4.00) (3.40) 19.60 (8.00) (6.80) 12.41 (1.00) (0.85) 192.02 (3.00) (3.00) (2.10)

Page 47 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type location ddt DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 FD2-10 No. (1) (19) (3) (1) (1) (1) (1) Side Area L W 0.80 1.00 1.00 1.05 1.05 1.00 1.00 D/H 1.00 Sub-Qty (0.80) (19.00) (3.00) (1.05) (1.05) (1.00) (1.00) 491.41 h 8th storey m 547.47 frl-sktg Unit Qty Code Rate

lift lobby opening DS-06 DS-10A DS-12 FD.5-10 GM living/dining/kitchen DHM-10 DB-09 GM bed rm DB-09 DT-08A opening UGS-L (2) bed rm DHM-10 opening UGD bed rm FD.5-HM10 opening UGD-SL bed rm DHM-10 opening UGS bed rm FD.5-HM10 opening UGD-DL (1) bed rm DHM-10 opening UGD-DL (2) bed rm DHM-10 opening corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 (5) (3) (2) (1) (22) (3) (1) (1) (2) (1) (1) (1) (1) 2 (2) (2) 2 (2) (2) (2) 7 (7) (7) 2 (2) (2) 7 (7) (7) 1 (1) (1) 3 (3) (3) 3 (3) (3)

12.26 1.70 0.60 1.00 1.20 1.05 15.82 1.00 0.90 13.67 0.90 0.80 0.85 12.50 1.00 0.85 19.60 1.00 1.70 19.67 1.00 1.70 12.41 1.00 0.85 19.60 1.00 1.70 19.60 2.00 1.70 192.28 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05

12.26 (3.40) (0.60) (1.00) (1.20) (1.05) 31.64 (2.00) (1.80) 27.34 (1.80) (1.60) (1.70) 87.50 (7.00) (5.95) 39.20 (2.00) (3.40) 137.69 (7.00) (11.90) 12.41 (1.00) (0.85) 58.80 (3.00) (5.10) 58.80 (6.00) (5.10) 192.28 (3.00) (3.00) (2.10) (0.80) (22.00) (3.00) (1.05) (1.05) 547.47

9th storey

528.03

frl-sktg

lift lobby opening DS-06 DS-10A DS-12 FD.5-10 GM living/dining/kitchen DHM-10 DB-09 GM bed rm DB-09 DT-08A opening UGS-L (2) bed rm DHM-10 opening UGD bed rm FD.5-HM10 opening UGD-SL bed rm DHM-10 opening UGS bed rm FD.5-HM10 opening UGD-DL (1) bed rm DHM-10 opening UGD-DL (2) bed rm DHM-10 opening corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 (5) (3) (2) (1) (20) (3) (1) (1) (1) (2) (1) (1) (1) (1) 2 (2) (2) 2 (2) (2) (2) 5 (5) (5) 2 (2) (2) 5 (5) (5) 1 (1) (1) 6 (6) (6) 2 (2) (2)

12.26 1.70 0.60 1.00 1.20 1.05 15.82 1.00 0.90 13.67 0.90 0.80 0.85 12.50 1.00 0.85 19.60 1.00 1.70 19.67 1.00 1.70 12.41 1.00 0.85 19.60 1.00 1.70 19.60 2.00 1.70 192.28 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.00

12.26 (3.40) (0.60) (1.00) (1.20) (1.05) 31.64 (2.00) (1.80) 27.34 (1.80) (1.60) (1.70) 62.50 (5.00) (4.25) 39.20 (2.00) (3.40) 98.35 (5.00) (8.50) 12.41 (1.00) (0.85) 117.60 (6.00) (10.20) 39.20 (4.00) (3.40) 192.28 (3.00) (3.00) (2.10) (0.80) (20.00) (3.00) (1.05) (1.05) (1.00) 528.03

10th storey

541.31

frl-sktg

lift lobby opening DS-06 DS-10A DS-12 FD.5-10 GM living/dining/kitchen DHM-10 DB-09 GM bed rm DB-09 DT-08A opening UGD-DL (1) bed rm DHM-10 opening UGD bed rm FD.5-HM10 opening UGD-SL bed rm DHM-10 opening UGS bed rm FD.5-HM10 opening UGS-L (2) bed rm DHM-10 opening UGD-DL (2) bed rm DHM-10 (2) (1) (1) (1) (1) 2 (2) (2) 2 (2) (2) (2) 8 (8) (8) 2 (2) (2) 4 (4) (4) 1 (1) (1) 6 (6) (6) 1 (1)

12.26 1.70 0.60 1.00 1.20 1.05 15.82 1.00 0.90 13.67 0.90 0.80 0.85 19.60 1.00 1.70 19.60 1.00 1.70 19.67 1.00 1.70 12.41 1.00 0.85 12.50 1.00 1.70 19.60 2.00

12.26 (3.40) (0.60) (1.00) (1.20) (1.05) 31.64 (2.00) (1.80) 27.34 (1.80) (1.60) (1.70) 156.80 (8.00) (13.60) 39.20 (2.00) (3.40) 78.68 (4.00) (6.80) 12.41 (1.00) (0.85) 75.00 (6.00) (10.20) 19.60 (2.00)

Page 48 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type location ddt opening UGS-L (1) bed rm DHM-10 opening corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 GD-10 (5) (3) (2) (1) (22) (3) (1) (1) (2) No. (1) 1 (1) (1) Side Area L W 1.70 12.50 1.00 1.70 192.28 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.00 D/H 1.00 Sub-Qty (1.70) 12.50 (1.00) (1.70) 192.28 (3.00) (3.00) (2.10) (0.80) (22.00) (3.00) (1.05) (1.05) (2.00) 541.31 k 11th storey m 509.76 frl-sktg Unit Qty Code Rate

lift lobby opening DS-06 DS-10A DS-12 FD.5-10 UGD-DL (2) bed rm DHM-10 opening UGS bed rm FD.5-HM10 opening UGD bed rm FD.5-HM10 opening UGD-DL (1) bed rm DHM-10 opening UGD-SL bed rm DHM-10 opening UGS-L (2) bed rm DHM-10 opening UGS-L (1) bed rm DHM-10 opening corridor FD.5-S06 FD.5-S10 FD.5-10 DS-08 DHM-10 FD.5-HM10 FD.5-T10 FD.5-HT10 heat pump (5) (3) (2) (1) (20) (2) (1) (1) (1) (2) (1) (1) (1) (1) 3 (3) (3) 1 (1) (1) 2 (2) (2) 10 (10) (10) 3 (3) (3) 4 (4) (4) 1 (1) (1)

12.26 1.70 0.60 1.00 1.20 1.05 19.60 2.00 1.70 12.41 1.00 0.85 19.60 1.00 1.70 19.60 1.00 1.70 19.67 1.00 1.70 12.50 1.00 1.70 12.50 1.00 1.70 178.16 0.60 1.00 1.05 0.80 1.00 1.00 1.05 1.05 1.38

12.26 (3.40) (0.60) (1.00) (1.20) (1.05) 58.80 (6.00) (5.10) 12.41 (1.00) (0.85) 39.20 (2.00) (3.40) 196.00 (10.00) (17.00) 59.01 (3.00) (5.10) 50.00 (4.00) (6.80) 12.50 (1.00) (1.70) 178.16 (3.00) (3.00) (2.10) (0.80) (20.00) (2.00) (1.05) (1.05) (1.38) 509.76

Roof level

5.01

frl-sktg

lift lobby opening DS-06 DS-10A DS-12 FD.5-10 (2) (1) (1) (1) (1)

12.26 1.70 0.60 1.00 1.20 1.05

12.26 (3.40) (0.60) (1.00) (1.20) (1.05) 5.01

Carried Forward

Page 49 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/22 11.9 a b c d e f g h i j k l 11.10 a b c d e f g h l 11.11 a 1F5 Floor Finishes (Cont'd) Granite tile 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Vinyl floor tile 2nd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey Roof Carpet tile 1st storey Carpet tile floor with cement and sand screed hall admin office hall admin office hall admin office hall admin office hall admin office meeting rm store rm reception hall officer head office 9.42 4.07 17.96 40.24 10.99 9.42 4.07 17.96 40.24 10.99 82.68 2F5 Carpet tile floor with cement and sand screed 2nd storey think tank rm 24.61 24.61 24.61 3F5 Carpet tile floor with cement and sand screed 3rd storey Incubation pod IP3 14.82 14.82 14.82 4F5 Carpet tile floor with cement and sand screed 4th storey think tank rm 2 25.10 25.10 25.10 5F5 Carpet tile floor with cement and sand screed 5th storey think tank rm 3 14.00 14.00 14.00 6F5 Carpet tile floor with cement and sand screed 6th storey think tank rm 4 think tank rm 5 IP2 30.32 25.41 15.76 30.32 25.41 15.76 71.49 7F5 Carpet tile floor with cement and sand screed 7th storey think tank rm 6 33.82 33.82 33.82 8F5 9F5 Carpet tile floor with cement and sand screed Carpet tile floor with cement and sand screed 9th storey think tank rm 7 19.65 19.65 19.65 10F5 Carpet tile floor with cement and sand screed 10th storey think tank rm 8 think tank rm 9 14.30 25.10 14.30 25.10 39.40 11F5 11.12 a 1F11 Carpet tile floor with cement and sand screed Insulated raised floor system 7th storey Raised floor (insulated) to LAN Room / ELVS Room LAN rm 10.20 10.20 10.20 m2 carpet m2 39.40 carpet m2 m2 Na 19.65 carpet carpet m2 33.82 carpet m2 71.49 carpet m2 14.00 carpet m2 25.10 carpet m2 14.82 carpet m2 24.61 carpet Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

m2

82.68

carpet

Incubation pod

m2

10.20

raised flr

7F11 11.13

Raised floor (insulated) to LAN Room / ELVS Room Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Scupper drain with MS grating (w=150mm) to Refuse Chute Chamber; L=1.30m Other skirting 30mm x 15mm recessed powder coated aluminium channel (2mm thk) skirting

m2

Na

raised flr

a b S2 c

nos

scupper

Alum-sktg

Carried Forward

Page 50 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/23 12.1 a Ceiling Finishes Skim coating and vinyl co-polymer emulsion painting 1st storey wash rm (m) wash rm (f) handicap toilet letter box refuse chutte security rm corridor lv switch rm low level transfer tank rm elv system rm 2.48 3.09 4.86 23.55 1.90 7.83 274.75 7.67 73.17 31.48 2.48 3.09 4.86 23.55 1.90 7.83 274.75 7.67 73.17 31.48 430.78 b 2nd storey GS-L GS UGD-DL (2) UGS-L (2) communical toilet communical toilet communical toilet communical toilet hall fellow level 1 hall fellow level 1 hall fellow level 1 bed rm bed rm bed rm bed rm toilet janitor HT store dining/living kitchen store corridor common area drying closet drying closet drying closet drying closet ac ledge 2 1 2 2 9.02 9.01 17.59 8.81 27.04 1.50 4.85 36.75 29.47 5.22 3.81 248.81 47.00 0.48 0.48 0.88 0.46 1.10 18.04 9.01 35.18 17.62 27.04 1.50 4.85 36.75 29.47 5.22 3.81 248.81 47.00 0.96 0.48 1.76 0.92 1.10 489.52 c 3rd storey GS-L GS UGD-DL (2) UGD-DL (1) UGD-SL UGS UGS-L (1) UGD UGS-L (2) communical toilet communical toilet communical toilet hall fellow level 2 hall fellow level 2 hall fellow level 2 bed rm bed rm bed rm bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT hall bed rm master bed rm corridor common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet ac ledge balcony 2 1 5 4 2 1 1 2 1 9.02 9.01 17.59 17.62 17.55 8.68 8.63 17.59 8.81 36.58 1.50 4.85 6.67 7.71 11.87 171.13 28.72 0.48 0.48 0.88 0.92 0.92 0.46 0.46 0.88 0.46 1.98 2.77 18.04 9.01 87.95 70.48 35.10 8.68 8.63 35.18 8.81 36.58 1.50 4.85 6.67 7.71 11.87 171.13 28.72 0.96 0.48 4.40 3.68 1.84 0.46 0.46 1.76 0.46 1.98 2.77 570.16 d 4th storey GS-L GS UGD UGD-SL UGS-L (2) UGS-L (1) UGD-DL (1) UGD-DL (2) communical toilet communical toilet communical toilet hall master level 1 hall master level 1 hall master level 1 hall master level 1 bed rm bed rm bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT dining/living kitchen store bed rm 1 corridor common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet balcony/ac ledge 2 1 2 2 5 1 10 2 9.02 9.01 17.59 17.55 8.81 8.63 17.62 17.59 36.58 1.50 4.85 26.92 5.71 3.72 11.49 149.60 68.07 0.48 0.48 0.88 0.92 0.46 0.46 0.92 0.88 2.17 18.04 9.01 35.18 35.10 44.05 8.63 176.20 35.18 36.58 1.50 4.85 26.92 5.71 3.72 11.49 149.60 68.07 0.96 0.48 1.76 1.84 2.30 0.46 9.20 1.76 2.17 690.76 e 5th storey GS-L GS UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) communical toilet communical toilet communical toilet hall master level 2 hall master level 2 hall master level 2 hall master level 2 bed rm bed rm bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT hall study master bed rm bed rm 2 corridor common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet balcony/ac ledge 2 1 2 4 5 5 1 3 9.02 9.01 17.59 17.55 8.81 17.62 8.63 17.59 36.58 1.50 4.85 6.56 4.04 16.19 10.86 149.45 48.39 0.48 0.48 0.88 0.92 0.46 0.92 0.46 0.88 3.07 18.04 9.01 35.18 70.20 44.05 88.10 8.63 52.77 36.58 1.50 4.85 6.56 4.04 16.19 10.86 149.45 48.39 0.96 0.48 1.76 3.68 2.30 4.60 0.46 2.64 3.07 624.35 f 6th storey GS-L GS UGS-L (2) bed rm bed rm bed rm 2 1 4 9.02 9.01 8.81 18.04 9.01 35.24 m2 608.99 Skim Coat m2 624.35 Skim Coat m2 690.76 Skim Coat m2 570.16 Skim Coat m2 489.52 Skim Coat Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

m2

430.78

Skim Coat

GS-L GS UGD-DL (2) UGS-L (2) hall fellow level 1

2 1 2 2

GS-L GS UGD-DL (2) UGD-DL (1) UGD-SL UGS UGS-L (1) UGD UGS-L (2) hall fellow level 2 hall fellow level 2

2 1 5 4 2 1 1 2 1

GS-L GS UGD UGD-SL UGS-L (2) UGS-L (1) UGD-DL (1) UGD-DL (2) hall master

2 1 2 2 5 1 10 2

GS-L GS UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) hall master level 2

2 1 2 4 5 5 1 3

Page 51 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) UGS-L (1) communical toilet communical toilet communical toilet hall master level 1 hall master level 1 hall master level 1 hall master level 1 location bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT dining/living kitchen store bed rm 1 corridor common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet balcony/ac ledge ddt No. 3 4 1 3 2 1 Side Area 17.59 17.55 8.68 17.62 17.59 8.63 36.58 1.50 4.85 26.92 5.71 3.72 11.49 149.99 60.41 0.48 0.48 0.46 0.88 0.92 0.46 0.92 0.88 0.46 2.17 L W D/H 1.00 Sub-Qty 52.77 70.20 8.68 52.86 35.18 8.63 36.58 1.50 4.85 26.92 5.71 3.72 11.49 149.99 60.41 0.96 0.48 1.84 2.64 3.68 0.46 2.76 1.76 0.46 2.17 608.99 g 7th storey GS-L GS UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) UGS communical toilet communical toilet communical toilet hall master level 2 hall master level 2 hall master level 2 hall master level 2 bed rm bed rm bed rm bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT hall study master bed rm bed rm 2 corridor common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet balcony/ac ledge 2 1 1 7 4 3 1 1 1 9.02 9.01 17.59 17.55 8.81 17.62 8.63 17.59 8.68 36.58 1.50 4.85 6.56 4.04 16.19 10.86 148.71 38.44 0.48 0.48 0.88 0.92 0.46 0.92 0.46 0.88 0.46 3.07 18.04 9.01 17.59 122.85 35.24 52.86 8.63 17.59 8.68 36.58 1.50 4.85 6.56 4.04 16.19 10.86 148.71 38.44 0.96 0.48 0.88 6.44 1.84 2.76 0.46 0.88 0.46 3.07 576.45 h 8th storey GM GM UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) communical toilet communical toilet communical toilet living/dining/kitchen bed rm bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT corridor common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet 2 2 7 2 7 1 3 3 12.42 10.27 8.81 17.59 17.55 8.68 17.62 17.59 36.58 1.50 4.85 148.71 132.05 0.46 0.46 0.88 0.92 0.46 0.92 0.88 24.84 20.54 61.67 35.18 122.85 8.68 52.86 52.77 36.58 1.50 4.85 148.71 132.05 0.92 3.22 1.76 6.44 0.46 2.76 2.64 721.28 i 9th storey GM GM UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) communical toilet communical toilet communical toilet living/dining/kitchen bed rm bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT corridor common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet 2 2 5 2 5 1 6 2 12.42 10.27 8.81 17.59 17.55 8.68 17.62 17.59 36.58 1.50 4.85 148.71 44.21 0.46 0.46 0.88 0.92 0.46 0.92 0.88 24.84 20.54 44.05 35.18 87.75 8.68 105.72 35.18 36.58 1.50 4.85 148.71 44.21 0.92 2.30 1.76 4.60 0.46 5.52 1.76 615.11 j 10th storey GM GM UGD-DL (1) UGD UGD-SL UGS UGS-L (2) UGD-DL (2) UGS-L (1) communical toilet communical toilet communical toilet living/dining/kitchen bed rm bed rm bed rm bed rm bed rm bed rm bed rm bed rm toilet janitor HT corridor common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet drying closet 2 2 8 2 4 1 6 1 1 12.42 10.27 17.62 17.59 17.55 8.68 8.81 17.59 8.63 36.58 1.50 4.85 148.71 55.97 0.46 0.92 0.88 0.92 0.46 0.46 0.88 0.46 24.84 20.54 140.96 35.18 70.20 8.68 52.86 17.59 8.63 36.58 1.50 4.85 148.71 55.97 0.92 7.36 1.76 3.68 0.46 2.76 0.88 0.46 645.37 k 11th storey UGD-DL (2) UGS UGD UGD-DL (1) bed rm bed rm bed rm bed rm 3 1 2 10 17.59 8.68 17.59 17.62 52.77 8.68 35.18 176.20 m2 588.00 Skim Coat m2 645.37 Skim Coat m2 615.11 Skim Coat m2 721.28 Skim Coat m2 576.45 Skim Coat Unit Qty Code Rate

GS-L GS UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2) UGS-L (1) hall master level 1

2 1 4 3 4 1 3 2 1

GS-L GS UGD UGD-SL UGS-L (2) UGD-DL (1) UGS-L (1) UGD-DL (2) UGS hall master level 2

2 1 1 7 4 3 1 1 1

GM UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2)

2 7 2 7 1 3 3

GM UGS-L (2) UGD UGD-SL UGS UGD-DL (1) UGD-DL (2)

2 5 2 5 1 6 2

GM UGD-DL (1) UGD UGD-SL UGS UGS-L (2) UGD-DL (2) UGS-L (1)

2 8 2 4 1 6 1 1

Page 52 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type UGD-SL UGS-L (2) UGS-L (1) communical toilet communical toilet communical toilet location bed rm bed rm bed rm toilet janitor HT corridor common area drying closet drying closet drying closet drying closet drying closet drying closet drying closet ddt No. 3 4 1 Side Area 17.55 8.81 8.63 36.58 1.50 4.85 137.67 18.93 0.88 0.46 0.88 0.92 0.92 0.46 0.46 L W D/H 1.00 Sub-Qty 52.65 35.24 8.63 36.58 1.50 4.85 137.67 18.93 2.64 0.46 1.76 9.20 2.76 1.84 0.46 588.00 l Roof level common area 22.83 22.83 22.83 m2 22.83 Skim Coat Unit Qty Code Rate

UGD-DL (2) UGS UGD UGD-DL (1) UGD-SL UGS-L (2) UGS-L (1)

3 1 2 10 3 4 1

12.2 C1 a b c d e f g h i j k l 12.3 a 1C2

Plastering and painting Plaster and paint to ceiling 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Moisture resistance gypsum plaster suspended ceiling board 1st storey 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex hall admin office hall admin office lift lobby toilet pantry rm 10.20 3.91 7.34 10.20 3.91 7.34 21.45 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 plaster plaster plaster plaster plaster plaster plaster plaster plaster plaster plaster plaster

m2

21.45

ceiling

1C4

12mm thk perforated gypsum board (with fleece & rockwool insulation) with paint finish to Common Kitchenette, Big Common Lounge, Cafe Lounge, Collaborative spaces- Incubation Pods/ Think Tank, Mutipurpose Hall communal laundry kitchenette

m2

48.41

ceiling

23.09 25.32

23.09 25.32 48.41

b 2C2

2nd storey 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex hall fellow level 1 GS-L GS-L GS GS lift lobby powder room bath shower bath shower 10.20 2.38 2.27 1.10 2.32 0.84 10.20 2.38 4.54 2.20 2.32 0.84 22.48

m2

22.48

ceiling

2 2 1 1

12mm thk perforated gypsum board ceiling with acoustic insulation and paint finish think tank rm 1 15.35 15.35 15.35

m2

15.35

12mm tnk perforated gypsum board multi use rm 24.61 24.61 24.61 c 3C2 3rd storey 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex GS-L GS-L GS GS hall fellow level 2 hall fellow level 2 lift lobby bath shower bath shower bath 1 shower 2 2 1 1 10.20 2.27 1.10 2.32 0.84 2.29 1.01 10.20 4.54 2.20 2.32 0.84 2.29 1.01 23.40

m2

24.61

m2

23.40

ceiling

d 4C2

4th storey 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex GS-L GS-L GS GS hall master level 1 hall master level 1 lift lobby bath shower bath shower bath 1 shower 2 2 1 1 10.20 2.27 1.10 2.32 0.84 2.56 1.21 10.20 4.54 2.20 2.32 0.84 2.56 1.21 23.87

m2

23.87

ceiling

12mm thk perforated gypsum board ceiling with acoustic insulation and paint finish think tank rm 2 13.28 13.28 13.28

m2

13.28

e 5C2

5th storey 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex GS-L GS-L GS GS lift lobby bath shower bath shower 2 2 1 1 10.20 2.27 1.10 2.32 0.84 10.20 4.54 2.20 2.32 0.84

m2

27.29

ceiling

Page 53 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Drw No. type hall master level 2 hall master level 2 hall master level 2 hall master level 2 location master bath shower shower bath 2 ddt No. Side Area 2.52 1.21 0.95 2.51 L W D/H 1.00 Sub-Qty 2.52 1.21 0.95 2.51 27.29 Unit Qty Code Rate

12mm thk perforated gypsum board ceiling with acoustic insulation and paint finish think tank rm 3 7.33 7.33 7.33

m2

7.33

f 6C2

6th storey 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex GS-L GS-L GS GS hall master level 1 hall master level 1 lift lobby bath shower bath shower bath 1 shower 2 2 1 1 10.20 2.27 1.10 2.32 0.84 2.56 1.21 10.20 4.54 2.20 2.32 0.84 2.56 1.21

m2

ceiling

12mm thk perforated gypsum board ceiling with acoustic insulation and paint finish think tank rm 4 think tank rm 5 16.17 13.28 16.17 13.28 29.45

m2

29.45

g 7C2

7th storey 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex GS-L GS-L GS GS hall master level 2 hall master level 2 hall master level 2 hall master level 2 lift lobby bath shower bath shower master bath shower bath 2 shower 2 2 1 1 10.20 2.27 1.10 2.32 0.84 2.52 1.21 2.51 0.95 10.20 4.54 2.20 2.32 0.84 2.52 1.21 2.51 0.95 27.29

m2

27.29

ceiling

12mm thk perforated gypsum board ceiling with acoustic insulation and paint finish think tank rm 18.30 18.30 18.30 h 8th storey

m2

18.30

Page 54 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No 8C2 Description 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex GM GM lift lobby bath shower 2 2 10.20 2.15 1.10 10.20 4.30 2.20 16.70 Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit m2 Qty 16.70 Code ceiling Rate

i 9C2

9th storey 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex GM GM lift lobby bath shower 2 2 10.20 2.15 1.10 10.20 4.30 2.20 16.70

m2

16.70

ceiling

12mm thk perforated gypsum board ceiling with acoustic insulation and paint finish think tank rm 7 10.15 10.15 10.15 j 10C2 10th storey 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex GM GM lift lobby bath shower 2 2 10.20 2.15 1.10 10.20 4.30 2.20 16.70

m2

10.15

m2

16.70

ceiling

12mm thk perforated gypsum board ceiling with acoustic insulation and paint finish think tank rm 8 think tank rm 9 7.39 13.32 7.39 13.32 20.71 k 11C2 11th storey 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex lift lobby heat pump rm 10.20 76.14 10.20 76.14 86.34

m2

20.71

m2

86.34

ceiling

l RFC2

Roof level 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex lift lobby water tank 10.20 119.23 10.20 119.23 129.43

m2

129.43

ceiling

Carried Forward

Page 55 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/24 12.4 a b c d e f g h i j k l 12.5 C3a Ceiling Finishes (Cont'd) Moisture resistance gypsum plasterboard for box -up area 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Moisture resistance mineral fibre suspended ceiling board 9mm thk fibrous plasterboard with paint finish combined with 12mm thk perforated gypsum board (with fleece & rockwool insulation) with paint finish to Incubation Pods/ Think Tank Rooms; Aluminium ceiling panel strip metal of 300mm width profile as per Tender Clarification 2, Architectural Item A60 a 1st storey communal laundry kitchenette 16.13 24.05 16.13 24.05 40.18 b 2nd storey think tank rm 1 14.65 14.65 14.65 m2 14.65 ceiling m2 40.18 ceiling Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

3rd storey Incubation pod think tank rm 2 IP3 11.82 14.82 11.82 14.82 26.64

m2

26.64

ceiling

d e

4th storey 5th storey think tank rm 3 6.67 6.67 6.67

m2 m2

Na 6.67

ceiling ceiling

6th storey think tank rm 4 think tank rm 5 IP2 14.15 12.13 15.76 14.15 12.13 15.76 42.04

m2

42.04

ceiling

Incubation pod

7th storey think tank rm 6 15.52 15.52 15.52

m2

15.52

ceiling

h i

8th storey 9th storey think tank rm 7 9.50 9.50 9.50

m2 m2

Na 9.50

ceiling ceiling

10th storey think tank rm 8 think tank rm 9 6.91 11.78 6.91 11.78 18.69

m2

18.69

ceiling

k l 12.6 a 12.7 a b c d

11th storey Roof level Moisture resistance mineral fibre board for boxup area 1st storey Thermally insulated ceiling panel with fibrous plaster board on concealed suspension system 1st storey 2nd storey 3rd storey 4th storey Carried Forward

m2 m2

Na Na

ceiling ceiling

m2

Page 56 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/25 12.7 Ceiling Finishes (Cont'd) Thermally insulated ceiling panel with fibrous plaster board on concealed suspension system (Cont'd) 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Mineral fibre insulated suspended ceiling board a 1C8 7th storey Mineral fibreboard with insulation batts above to LAN Room / ELVS Room LAN rm 10.20 10.20 10.20 7C8 Mineral fibreboard with insulation batts above to LAN Room / ELVS Room Acoustically absorptive mineral fibre suspended ceiling board 1st storey Acoustically absorptive mineral fibre board to Common Laundry, Hall Admin, SC Admin hall admin office hall admin office hall admin office hall admin office hall admin office meeting rm store rm reception hall officer head office 9.42 4.07 17.96 40.24 10.99 9.42 4.07 17.96 40.24 10.99 82.68 m2 Na ceiling m2 10.20 ceiling Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

e f g h i j k 12.8

12.9 a 1C5

m2

82.68

ceiling

b c d e f g h i j k l 12.10 Note

2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Acoustic glasswool suspended ceiling board Acoustic ceiling as per Schedule of Finishes is 75mm thk acoustic cell spray treatment, quantities are included in Others, Item 12.11

a b c d e f g h i j k l

1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Carried Forward

Page 57 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/26-A 12.11 Ceiling Finishes (Cont'd) Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Access panels to ceiling (600mm x 600mm) 1st sty 2nd sty 3rd sty 4th sty 5th sty 6th sty 7th sty 8th sty 9th sty 10th sty 11th sty 1 4 5 5 6 5 6 3 3 1 1 1.00 4.00 5.00 5.00 6.00 5.00 6.00 3.00 3.00 1.00 1.00 40.00 Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

nos

40

ceiling

b C7

C7a

Other ceiling finishes 75mm thk acoustic cell spray treatment to Corridor; Sprayed acoustic treatment to soffit of slab to Corridors as per Tender Clarification 2, Architectural Item A64 75mm thk acoustic cell spray treatment to Kitchen, Dishwash & Potwash areas, Indoor Sports Hall, Toilet, Lockers, Family Room GS mesh with GS supports over opening to FA, SPR, TEL, DT, PW/NW Duct

m2

ceiling

m2

ceiling

GSM

m2

ceiling

13.1 a Note

Fitting and Furnishing Cabinet Kitchen hood & hob As per Tender Clarification 2, Architectural Item A15, cooker and hob are by NSC As per Tender Clarification 2, Architectural Item A58, 4 burner induction hob burners and 3 speed telescopic pull hood are by NSC Cat ladder Catladder to Water Tank SS access door panel to Water Tank Grab bar near access panel to Water Tank Catladder with cage guard Sliding access trap door (1150mm x 1150mm) Aluminium handrail (2 nos) Catladder to Lift Pit (h=1.80~3.0m) 300mmW x 300mmD x 300mmH sump pit with GS grating to Lift Pit nos nos nos nos nos sets nos nos

Included in PC Sums

13.2

metal-wk metal-wk metal-wk metal-wk metal-wk metal-wk metal-wk metal-wk

13.3

Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a b c Sanitary Appliances For sanitary wares specifications, please refer to Tender Corrigendum No 1 Pedestal water closet Pedestal water closet with flush valves Ditto, to Handicap Toilet with flush valves Squatting pan WC conceal cistern Urinal Urinal sensor flush valve Soap dispenser Carried Forward nos 40 nos sets sets 87 11 S-wares S-wares S-wares S-wares S-wares S-wares S-wares

Note 14.1

14.2 14.3 14.4 14.5 14.6

Page 58 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/27-A 14.7 14.8 14.9 14.10 14.11 14.12 14.13 14.14 14.15 14.16 14.17 14.18 Sanitary Appliances (Cont'd) Waste receptacle Hand dryer Toilet paper holder Hook on back of door Sanitary bin Bidet spray Bib tap Janitor sink Tap for janitor sink Shower head Shower mixer Mirror Communal Toilet Handicap Toilet Washrooms Graduate Single Graduate Married Hall - Fellow Hall- Master 14.19 14.20 Hot water dispenser Flip-up s/s grab bar / shower seat Shower seat to Handicap Toilet Handicap grab bar S/s horizontal bar fixed to door nos nos nos nos set nos nos nos nos nos nos nos LS 10 11 2 18 6 2 6 10 10 73 nos nos nos nos nos 98 10 98 124 S-wares S-wares S-wares S-wares S-wares S-wares S-wares S-wares S-wares S-wares S-wares mirror mirror mirror mirror mirror mirror mirror others Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

nos sets nos

10 11 11

S-wares S-wares S-wares

14.21

14.22

Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Other works in relation with Toilets Wash basin c/w tap Ditto, to Handicap Toilet Kitchen single sink c/w tap (L=0.90m) Kitchen single sink c/w tap (L=1.70m) to Think Tank Room 7 Kitchen single sink c/w tap to Pantry Kitchen double sink c/w tap to Communal Laundry Kitchen double sink c/w tap to Communal Kitchenette Floor trap with UPVc grating Floor waste Scupper drain to toilets (w=150mm) Toilet cubicles- solid compact laminated panel & door Cubicle for Janitor with door 3 shower cubicles with 3 doors and 2 common partitions 3 toilet cubicles with 3 doors and 2 common partitions 6 toilet cubicles with 6 doors and 5 common partitions Vanity top c/w bracket- Solid polyester Communal Toilet (L=3.425m, w=0.60mm) Pantry (L=1.50m, w=0.60m)

sets sets sets sets sets sets sets nos nos m

75 11

S-wares S-wares S-wares S-wares S-wares S-wares S-wares

1 10

163 135 scupper

sets sets sets sets

10 19 1 9

Toilet-Cub Toilet-Cub Toilet-Cub Toilet-Cub

nos nos LS

10 10

V-top V-top others

b c GS, GM HF, HM

Laundry troughs to Common Laundry - required as per Schedule of Finishes, Item No 1.4.3 Shower screens Shower / glass screen with sliding door to Graduate Single, Graduate Married Shower / glass screen with sliding door to Hall Fellow and Hall Master Carried Forward

sets sets

24 7

Shower-S Shower-S

Page 59 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 1 - BLOCK X1 Page No Description Brought Forward BC/S1/28-A 15.1 15.2 15.3 15.4 15.5 15.6 15.7 Sundries Earthing work Lightning protection work Builders work in connection with M&E work Fire extinguisher Ditto, to Think Tank Rooms Letter box Aluminium letter boxes Fire extinguishers with compartment Hose reel compartments & access panel Breeching inlet compartments & access panel; door measured separately Fencing Fencing for Tank Room (h=3.90m including RC kerb) to Blks X1, Y1 & Z1 consists of: 100 x 500mm hot dipped GS RHS in paint finish GS expanded mesh screen in powder coated finish 10mm thk hot dipped GS plate in paint finish prewelded to expanded metal mesh 200 x 100 x 12mm thk hot dipped GS T-bar in paint finish 32.00 Ditto on top of parapet wall (h=2.90m) consists of: 100 x 500mm hot dipped GS RHS in paint finish GS expanded mesh screen in powder coated finish 10mm thk hot dipped GS plate in paint finish prewelded to expanded metal mesh 200 x 100 x 12mm thk hot dipped GS T-bar in paint finish 18.00 Extra over for double leaf gate Expanded mesh screen fencing to Heat Pump Room, 11th Sty (h=1.10m as per Elevation) 11th Sty Double leaf gate 15.9 15.10 Galvanised T-pole laundry hanging line (w=1.20m) Timber seating to Sky Garden (w=0.50m, h=0.50m) 24.3 15.11 15.10 Tactile tiles warning indicator (300mm x 300mm) Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Refuse Chute Refuse hopper (2nd Sty to Roof Level) for Blks X1, Y1 and Z1 and (3rd to 11 Sty) for Blks X2 and Z2 Aluminium inspection cover over Refuse Chute Roof (1.0m x 1.0m) Safety mesh below roof (600mm x 700mm) Wiremesh to cover ventilation opening at Roof (700mm x 200mm) Insect screen to Housing Units Fan hook Timber table and bench at 1st Sty, near Letter Boxes Refuse chute compactor Total Carried to Summary of Tender Page ST/1 Item 3.1 opposite to letter box & security room nos nos nos nos 1 1 1 1 Precast-RC metal-wk metal-wk metal-wk 24.30 nos 4 Tactile Heat Pump Room, 25.60 25.60 nos m m 24.30 1 metal-wk metal-wk timber 18.00 nos m 1 25.60 metal-wk metal-wk 32.00 m 18.00 metal-wk LS LS LS nos nos nos LS LS nos 51 9 360 23 33 earthing lightning Builder Fire-Ext Fire-Ext others Fire-Ext Fire-Ext others Drw No. type location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate

15.8

32.00

metal-wk

b c d e

m2 nos nos nos 347 3 1

metal-wk metal-wk timber

Page 60 of 110

S1-Blk X1

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No Item CFA BC/S4/1 1 1.1 a b c d e f Sub-structure Pilecap including excavation, formwork, concrete and rebar Excavation Backfill Lean concrete - 50mm thick G15 Concrete G40 Reinforcement Formwork m3 m3 m2 m3 kg m2 m3 m3 m3 m3 m3 kg m2 m3 m3 kg m2 m3 kg m2 m3 m2 m3 kg m2 exc Backfill G15 G40 Rebar Fwk exc exc Backfill Remove G40 Rebar Fwk exc G40 Rebar Fwk G40 Rebar Fwk exc G15 G40 Rebar Fwk Description Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit m2 Qty Code Rate Sub-Amount Sub-Amount Total Amount

g Excavation to basement 0-2m 2m-4m h Backfill to working area i Remove surplus off site 1.2 Column stump a Concrete G40 b Reinforcement c Formwork a b c d Lift pit wall Excavation Concrete G40 Reinforcement Formwork

Basement wall a Concrete G40 b Reinforcement c Formwork 1.3 a b c d e 1.4 Ground beam - 1st sty Excavation Lean concrete - 50mm thick G15 Concrete G40 Reinforcement Formwork

Ground slab a Excavation to basement level to 1st sty b Lean concrete - 50mm thick G15 to basement level to 1st sty c Concrete G40 to basement level to 1st sty d Reinforcement to basement level to 1st sty e Formwork 150mm thick slab edge Plinth Waterproofing system to sub-structure in contact with ground 25mm thick cement/sand protection screed to ground slab to ground beam to lift pit wall to basement wall Waterproofing membrane to ground slab to ground beam to lift pit wall to basement wall Damp proof membrane to ground slab to ground beam to lift pit wall to basement wall Hydrotite CJ0720-2K swellable water stop to lift pit wall Hydrotite CJ0720-2K swellable water stop to basement wall

m3 m3 m2 m2 m3 m3 kg kg m

exc exc G15 G15 G40 G40 Rebar Rebar 150-fwk

1.5 1.6

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m m m2

waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf Anti-Termite

1.7 1.8

Anti-termite treatment Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items).

a b c

Carried Forward

Page 61 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/2 Item 2 2.1 a b c d e f g h i j k l 2.2 a b c d e f g h i j k l 2.3 a b c d e f g h i Frame Concrete in column - G40 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Concrete in suspended/edge beam - G40 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Reinforcement in column 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 Description Brought Forward Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40

kg kg kg kg kg kg kg kg kg

rebar rebar rebar rebar rebar rebar rebar rebar rebar

Carried Forward

Page 62 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/3 Item 2 2.3 Frame (Cont'd) Reinforcement in column (Cont'd) j 10th storey k 11th storey l Roof level a b c d e f g h i j k l 2.5 a b c d e f g h i j k l Reinforcement in suspended/edge beam 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Formwork to column 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level kg kg rebar rebar Description Brought Forward Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

2.4

kg kg kg kg kg kg kg kg kg kg kg

rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk

Carried Forward

Page 63 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/4 Item 2 2.6 a b c d e f g h i j k l 2.7 Frame (Cont'd) Formwork to suspended/edge beam 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk Description Brought Forward Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

a b c

3 3.1 a b c d e f g h i j k l a b c d e f g h i j k

Upper Floor Concrete to suspended slab - G40 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Concrete to RC ledge - G40 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Carried Forward m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40

Page 64 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/5 Item 3 3.2 a b c d e f g h i j k l a b c d e f g h i j k 3.3 a b c d e f g h i j k l b c d e f g h i j b c d e f g h i j a b c d e f g h i j k a b c d e f g h i j k 3.4 a b c d e f Description Brought Forward Upper Floor (Cont'd) Reinforcement to suspended slab 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Reinforcement to RC ledge 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Formwork to suspended slab 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level 20mm thick slab edge 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey 50mm thick slab edge 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Formwork to RC ledge 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Ditto , 150mm thick slab edge to RC ledge 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Waterproofing system to structural works as specified 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey kg kg kg kg kg kg kg kg kg kg kg rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

kg kg kg kg kg kg kg kg kg kg kg m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk

m m m m m m m m m m m m m m m m m m m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m m m m m m m m m m m

20-fwk 20-fwk 20-fwk 20-fwk 20-fwk 20-fwk 20-fwk 20-fwk 20-fwk 50-fwk 50-fwk 50-fwk 50-fwk 50-fwk 50-fwk 50-fwk 50-fwk 50-fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk 150-fwk 150-fwk 150-fwk 150-fwk 150-fwk 150-fwk 150-fwk 150-fwk 150-fwk 150-fwk 150-fwk

Carried Forward

Page 65 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/6 Item 3 3.4 g h i j k l 3.5 Description Brought Forward Upper Floor (Cont'd) nil Waterproofing system to structural works as specified (Cont'd) 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

a b c

4 4.1

Structural Wall Concrete to structural wall - G40 a 1st storey to lift wall to staircase wall to internal rc wall b 2nd storey to lift wall to staircase wall to internal rc wall c 3rd storey to lift wall to staircase wall to internal rc wall d 4th storey to lift wall to staircase wall to internal rc wall e 5th storey to lift wall to staircase wall to internal rc wall f 6th storey to lift wall to staircase wall to internal rc wall g 7th storey to lift wall to staircase wall to internal rc wall h 8th storey to lift wall to staircase wall to internal rc wall i 9th storey to lift wall to staircase wall to internal rc wall j 10th storey to lift wall to staircase wall to internal rc wall k 11th storey to lift wall to staircase wall to internal rc wall l Roof level to lift wall to staircase wall

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40 G40

Carried Forward

Page 66 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/7 Item 4 4.2 Description Brought Forward Structural Wall (Cont'd) Reinforcement to structural wall a 1st storey to lift wall to staircase wall to internal rc wall b 2nd storey to lift wall to staircase wall to internal rc wall c 3rd storey to lift wall to staircase wall to internal rc wall d 4th storey to lift wall to staircase wall to internal rc wall e 5th storey to lift wall to staircase wall to internal rc wall f 6th storey to lift wall to staircase wall to internal rc wall g 7th storey to lift wall to staircase wall to internal rc wall h 8th storey to lift wall to staircase wall to internal rc wall i 9th storey to lift wall to staircase wall to internal rc wall j 10th storey to lift wall to staircase wall to internal rc wall k 11th storey to lift wall to staircase wall to internal rc wall l Roof level to lift wall to staircase wall Formwork to structural wall a 1st storey to lift wall to staircase wall to internal rc wall b 2nd storey to lift wall to staircase wall to internal rc wall c 3rd storey to lift wall to staircase wall to internal rc wall d 4th storey to lift wall to staircase wall to internal rc wall e 5th storey to lift wall to staircase wall to internal rc wall f 6th storey to lift wall to staircase wall to internal rc wall g 7th storey to lift wall to staircase wall to internal rc wall h 8th storey to lift wall to staircase wall to internal rc wall i 9th storey to lift wall to staircase wall to internal rc wall j 10th storey to lift wall to staircase wall to internal rc wall k 11th storey to lift wall to staircase wall to internal rc wall l Roof level to lift wall to staircase wall Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg

rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar rebar

4.3

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk fwk

4.4

a b c

Carried Forward

Page 67 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/8 Item 5 5.1 Description Brought Forward Structural work to roof Concrete roof slab a Concrete G40 b Reinforcement c Formwork Suspended roof beam a Concrete G40 b Reinforcement c Formwork Stump column at roof a Concrete G40 b Reinforcement c Formwork Roof finishes a Profile steel roofing Metal deck standing seam with insulation & reflective foil b Insulation c Waterproofing Note RF Detail 1 There are 2 details for waterproofing to RC Flat Roof, please use whichever is applicable Wateproofing to RC Flat Roof consists of: - min 25mm thk c/s screed to fall - 2.2mm thk EVA/PVC fleece-backed waterproofing membrane bonded - 6mm thk under-screed drainage sheet - 1000 x 1000 x 50mm thk c/s panel roofing reinforced with BRC 3315 mesh polysulphide joints @ every 10m c/c - Polysulphide sealant - 50mm wide welded lap Wateproofing to RC Flat Roof consists of: cement and sand screed to fall wateproofing membrane under-screed drainage mat Extruded polystyrene insulation Separation layer 600 x 600 x 50mm thk PC panel Wateproofing to RC Flat Roof, non insulated Wateproofing to RC Flat Roof- upturn consists of: - 1.2mm thk EVA/PVC waterproofing membrane bonded - 25mm thk c/s protection screed with GI mesh - membrane terminated into groove-line & sealed polyurethane sealant m2 m waterprf waterprf m2 waterprf m3 kg m2 m3 kg m2 G40 rebar fwk G40 rebar fwk Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

5.2

5.3

5.4 MDS

m2

roof

Detail 2 RF1 RFU

with m2 waterprf

WFST

Waterproofing to Non-Insulated Deck consists of: min 25mm thk c/s screed to fall 2.2mm thk EVA/PVC fleece-backed waterproofing membrane bonded 6mm thk under-screed drainage sheet finishes and protection screed measured separately

Waterproofing to Landscape Deck/ to Sky Terrace, 6th Sty consists of: - min 25mm thk c/s screed to fall - 2.2mm thk EVA/PVC fleece-backed waterproofing membrane bonded - 25mm thk c/s protection screed - 100gsm geotextile separation layer - 30mm thk interlocking sub-soil drainage modules - 100gsm geotextile filter fabric - 50mm thk coarse washed sand - growth media to Landscape Architect's detail (Softscape is included in PC/Provisional Sums) Waterproofing works to planters- 30mm thk modular subsoil drainage with geotectile filter fabric Planter floor Planter walls d Perforated aluminum trellis Roof Trellis/ Aluminium expanded mesh screen to roof Area measured is not only mesh area but including the metal framing all around consists of: 600 x 300 GS 200 x 100 x 8mm thk hot dipped GS RHS in paint finish 6mm thk hot dipped GS plate in paint finish Aluminium expanded mesh screen in powder coated finish 50 x 75 x 6mm thk hot dipped GS L-angle in paint finish

m2

waterprf

m2 m2 m2

waterprf waterprf metal-wk

Note

Note

e Green roofing system Green roofing system by NSC as per Schedule of Finishes, Item 1.7.7 f Roof drainage with accessories Siphonic rainwater outlet, diam not given RWDp, diam not given Roof scipper drain with grating (w=0.50m) Scupper drain to Corridor near AC Ledges- 150mm wide x 50mm deep RC surface channel g Truss to support lights & fans Steel structure Painting M16 bolt M20(cast-in bolt) nos m m m

By Others

included

included

included

siphonic drainage drainage scupper

kg m2 no. no. m2

steel steel steel steel tbr deck

EF9 Note

h Timber decking Seasoned ironwood for timber decking to Communal Sky Terrace and Roof Garden (Hostel Block); external WT-Timber flooring system (iron wood); Size: 150 x50mm thk, Colour: dark mahogany, Finish: natural stain look alike as per Landscaping Materials and Finishes Legend Timber finish to seats/ bench at Communal Sky Terrace and Roof Garden (Hostel Block); external, irregular shaped, total area was measured i Granite slab with stepping stone j Plinth k Roof pavilion

EF9a

m2

timber

5.5 5.6

Built in Gondola system Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Planters at Sky Terrace Cut to size x 20mm thk granite with backing scree to planter walls; internal Plaster and paint to planter walls; external 200 x 300 x 30mm thk granite coping to planters b Sunshade Steel structure Painting M16 bolt c Carried Forward m2 m2 m kg m2 no.

Gondola

granite plaster granite steel steel steel

Page 68 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/9 Item 6 6.1 Staircase Staircase flight a Precast concrete staircase b Reinforced Concrete topping/structure Concrete G40 Reinforcement Formwork Suspended landing slab a Concrete G40 b Reinforcement c Formwork Suspended landing / raking / edge beam a Concrete G40 b Reinforcement c Formwork Expended mesh screen staircase railing MS railing to Staircase (h=0.90m) to all blocks consists of: 40 x 100mm thk MS plate in enamel paint finish 40 x 10mm thk MS plate in enamel paint finish @ max 100mm c/c 50 x 150 x 6mm thk MS angle in enamel paint finish SS expansion bolt GS expanded mesh screen/ railing in powder coated finish (h=1.675m) to Staircase Landing for Blks X2 and Y2 As per drawing title, Blks X2 and Z2 are not included, assuming similar railing are to be used for Blks X2 and Z2 consists of: - 10mm thk hot dipped GS plate in powder coated finish - 50 x 30mm thk hot dipped GS RHS in powder coated finish - 10mm thk hot dipped GS folded plate in powder coated finish - 10mm thk hot dipped GS flat plate baluster in powder coated finish - 10mm thk hot dipped GS L-angle pre-welded to G/S expanded mesh with powder coated finish - GS expanded mesh screen in powder coated finish - 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate pre-welded to upright balusters in paint finish - 10mm thk hot dipped GS plate in powder coated finish - Countersunk anchor bolt - 20 x 20mm aluminium U-channel in powder coated finish - 10mm thk hot dipped GS plate in powder coated finish SR2c 6.5 6.6 SF1 Ditto, h=1.20m as measured on elevation Timber stud wall to staircase railing Stair finishes Floor Finishes Self leveling screed to common staircases Landing Riser (167.7mm high) Treads (250mm wide) Nosing tiles Wall Finishes Plaster and paint to staircase wall Ceiling Finishes Plaster and paint to staircase ceiling Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). m railing m Railing m3 kg m2 G40 rebar fwk Description Brought Forward Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

m3 kg m2

G40 rebar fwk

6.2

6.3

6.4 SR1 SR2b Note

Railing

m2 m m m m2 m2

screed S-riser S-tread S-Nosing-T plaster plaster

SW SC1 6.7

a b c

7 7.1

External Wall and Finishes Brickwall a 1st storey 1BRW100E 100mm thk brickwall; external 1BRW200E 200mm thk brickwall; external b 2nd storey 2BRW100E 100mm thk brickwall; external 2BRW200E 200mm thk brickwall; external c 3rd storey 3BRW100E 100mm thk brickwall; external 3BRW200E 200mm thk brickwall; external d 4th storey 4BRW100E 100mm thk brickwall; external 4BRW200E 200mm thk brickwall; external e 5th storey 5BRW100E 100mm thk brickwall; external 5BRW200E 200mm thk brickwall; external Carried Forward

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk -

Page 69 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/10 Item 7 7.1 Description Brought Forward External Wall and Finishes (Cont'd) Brickwall (Cont'd) f 6th storey 6BRW100E 100mm thk brickwall; external 6BRW200E 200mm thk brickwall; external g 7th storey 7BRW100E 100mm thk brickwall; external 7BRW200E 200mm thk brickwall; external h 8th storey 8BRW100E 100mm thk brickwall; external 8BRW200E 200mm thk brickwall; external i 9th storey 9BRW100E 100mm thk brickwall; external 9BRW200E 200mm thk brickwall; external j 10th storey 10BRW100E 100mm thk brickwall; external 10BRW200E 200mm thk brickwall; external k 11th storey 11BRW100E 100mm thk brickwall; external 11BRW200E 200mm thk brickwall; external l Roof level RFBRW100E 100mm thk brickwall; external RFBRW200E 200mm thk brickwall; external 7.2 a b c d e f g h i j k 7.3 Note Glass wall panel complete with supporting frame 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk 100-bwk 200-bwk Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

Perforated panel / Composite Panel /Mesh Steel support for rainscreens / sunshades are measured separately, please refer to Item 5.6b a 1st storey b 2nd storey Aluminium expanded mesh sunshade/ sunshade window fin (w=600mm) GS expanded mesh screen in powder coated finish (w=0.60m)vertical fins near windows c 3rd storey Aluminium expanded mesh sunshade/ sunshade window fin (w=600mm) GS expanded mesh screen in powder coated finish (w=0.60m)vertical fins near windows d 4th storey Aluminium expanded mesh sunshade/ sunshade window fin (w=600mm) GS expanded mesh screen in powder coated finish (w=0.60m)vertical fins near windows e 5th storey Aluminium expanded mesh sunshade/ sunshade window fin (w=600mm) GS expanded mesh screen in powder coated finish (w=0.60m)vertical fins near windows f 6th storey Aluminium expanded mesh sunshade/ sunshade window fin (w=600mm) GS expanded mesh screen in powder coated finish (w=0.60m)vertical fins near windows g 7th storey Aluminium expanded mesh sunshade/ sunshade window fin (w=600mm) GS expanded mesh screen in powder coated finish (w=0.60m)vertical fins near windows h 8th storey Aluminium expanded mesh sunshade/ sunshade window fin (w=600mm) GS expanded mesh screen in powder coated finish (w=0.60m)vertical fins near windows i 9th storey Aluminium expanded mesh sunshade/ sunshade window fin (w=600mm) GS expanded mesh screen in powder coated finish (w=0.60m)vertical fins near windows j 10th storey Aluminium expanded mesh sunshade/ sunshade window fin (w=600mm) GS expanded mesh screen in powder coated finish (w=0.60m)vertical fins near windows k 11th storey Aluminium expanded mesh sunshade/ sunshade window fin (w=600mm) GS expanded mesh screen in powder coated finish (w=0.60m)vertical fins near windows l Roof Carried Forward m GS-mesh

railing

railing

railing

railing

railing

railing

railing

railing

railing

Page 70 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/11 Item 7 7.4 Description Brought Forward External Wall and Finishes (Cont'd) RC parapet wall / low wall a 1st storey b 2nd storey c 3rd storey Concrete G40 Formwork Rebar d 4th storey Concrete G40 Formwork Rebar e 5th storey Concrete G40 Formwork Rebar f 6th storey Concrete G40 Formwork Rebar g 7th storey Concrete G40 Formwork Rebar h 8th storey Concrete G40 Formwork Rebar i 9th storey Concrete G40 Formwork Rebar j 10th storey Concrete G40 Formwork Rebar k 11th storey Concrete G40 Formwork Rebar l Roof Concrete G40 Formwork Rebar 7.5 PW a b c d e f g h i j k l 7.6 Note R2b Precast panel wall 160mm thk precast RC wall (some drawings shown 140mm thk, others 150mm thk); external 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Perforated / Expanded mesh railing For all railings below, please follow detail descriptions as follows: Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1 consists of: - 10mm thk hot dipped GS plate in powder coated finish - 10mm thk hot dipped GS folded plate in powder coated finish - 40mm diam hot dipped GS CHS in powder coated finish - 10mm thk hot dipped GS flat plate baluster in powder coated finish - 10mm thk hot dipped GS L-angle pre-welded to aluminium expanded mesh with powder coated finish - Aluminium expanded mesh with powder coated finish - 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate pre-welded to upright balusters in paint finish - 10mm thk hot dipped GS angle plate in powder coated finish - Countersunk anchor bolt - 20 x 20mm aluminium U-channel in powder coated finish - 10mm thk hot dipped GS plate in powder coated finish R3 Aluminium expanded mesh screen (h=1.675m) to Balcony for Blks X2 & Z2 consists of: - 10mm thk hot dipped GS plate in powder coated finish - 10mm thk hot dipped GS folded plate in powder coated finish - 40mm diam hot dipped GS CHS in powder coated finish - 10mm thk hot dipped GS flat plate baluster in powder coated finish - 10mm thk hot dipped GS L-angle pre-welded to aluminium expanded mesh with powder coated finish - Aluminium expanded mesh with powder coated finish - 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate pre-welded to upright balusters in paint finish - 10mm thk hot dipped GS angle plate in powder coated finish - Countersunk anchor bolt - 20 x 20mm aluminium U-channel in powder coated finish - 10mm thk hot dipped GS plate in powder coated finish a 1st storey b 2nd storey c 3rd storey R2b R3 Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1 Aluminium expanded mesh screen (h=1.675m) to Balcony for Blks X2 & Z2 d 4th storey Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1 Aluminium expanded mesh screen (h=1.675m) to Balcony for Blks X2 & Z2 e 5th storey Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1 Aluminium expanded mesh screen (h=1.675m) to Balcony for Blks X2 & Z2 f 6th storey Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1 Aluminium expanded mesh screen (h=1.675m) to Balcony for Blks X2 & Z2 Glass railing (h=0.90m) to Sky Terrace for Blks X2 & Z2 Glass railing (h=1.10m) to Sky Terrace for Blks X2 & Z2 consists of: - 25 x 25 x 2mm ss capping - 10mm thk hot dipped GS T-bar in powder coated finish - 20mm thk full tempered laminated glass - 10mm thk hot dipped GS L-angle prewelded to channeleed frame in powder coated finish g 7th storey Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1 Aluminium expanded mesh screen (h=1.675m) to Balcony for Blks X2 & Z2 h 8th storey Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1 Aluminium expanded mesh screen (h=1.675m) to Balcony for Blks X2 & Z2 i 9th storey Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1 Aluminium expanded mesh screen (h=1.675m) to Balcony for Blks X2 & Z2 j 10th storey Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1 Aluminium expanded mesh screen (h=1.675m) to Balcony for Blks X2 & Z2 k 11th storey m m railing railing m m railing railing m m railing railing m m m railing railing railing m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W Precast-W m3 m2 kg m3 m2 kg m3 m2 kg m3 m2 kg m3 m2 kg m3 m2 kg m3 m2 kg m3 m2 kg m3 m2 kg m3 m2 kg G40 Fwk Rebar G40 Fwk Rebar G40 Fwk Rebar G40 Fwk Rebar G40 Fwk Rebar G40 Fwk Rebar G40 Fwk Rebar G40 Fwk Rebar G40 Fwk Rebar G40 Fwk Rebar Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

R2b R3

R2b R3

R2b R3 R4 R4

m m railing railing m m railing railing m m railing railing m m railing railing -

R2b R3

R2b R3

R2b R3

R2b R3

Page 71 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No Item R2b R3 Description Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1 Aluminium expanded mesh screen (h=1.675m) to Balcony for Blks X2 & Z2 l Roof Carried Forward Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit m m Qty Code railing railing Rate Sub-Amount Sub-Amount Total Amount

Page 72 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/12 Item 7.7 PV/12 PV/15 Description Brought Forward M&E louvre a 1st storey Aluminium louvre vent Aluminium louvre vent b 2nd storey PV/21 7.8 c Roof Aluminium louvre vent to Lift Motor Room Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Precast refuse chute wall Refuse chut roof rc wall Concrete G40 Formwork Rebar Refuse chut roof slab Concrete G40 Formwork Rebar b Windows Windows to Service Apartments Faculty Service Apartments 1-Bedroom AV/06 Glass louvres vents to Utility Room & Bath/WC; 1-Bedroom Service Apartments CWF/06 Casement window with fixed tempered glass panel to Living/ Dining; 1-Bedroom Service Apartments CWF/37 Casement window with fixed tempered glass panel to Master Bedroom, Bedroom; 1-Bedroom Service Apartments 2-Bedroom Casement window with fixed tempered glass panel to Master Bathroom; 2-Bedroom Service Apartments Casement window with fixed tempered glass panel to Bedroom 1; 2-Bedroom Service Apartments Casement window with fixed tempered glass panel to Master Bedroom & Living ; 2-Bedroom Service Apartments Glass louvres vents to Utility Room & Bath/WC; 2-Bedroom Service Apartments 3-Bedroom Casement window with fixed tempered glass panel to Living/ Dining; 3-Bedroom Service Apartments Casement window with fixed tempered glass panel to Master Bathroom; 3-Bedroom Service Apartments Casement window with fixed tempered glass panel to Master Bedroom & Living ; 3-Bedroom Service Apartments Glass louvres vents to Utility Room & Bath/WC ; 3-Bedroom Service Apartments Adjustable glass louvred window to Kitchen; 3-Bedroom Service Apartments b c nos window Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

nos nos

window window

m3 m3 m2 kg m3 m2 kg

Precast-RC G40 Fwk Rebar G40 Fwk Rebar

nos nos nos

window window window

CWF/06A CWF/12 CWF/30 AV/03

nos nos nos nos

window window window window

CWF/06 CWF/06A CWF/30 AV/06 GL/06

nos nos nos nos nos

window window window window window

8 8.1 a 1BLW100 1BLW200 1BRW100 1BRW200 b 2BLW100 2BLW200 2BRW100 2BRW200 c 3BLW100 3BLW200 3BRW100 3BRW200 d 4BLW100 4BLW200 4BRW100 4BRW200 e 5BLW100 5BLW200 5BRW100 5BRW200 f 6BLW100 6BLW200 6BRW100 6BRW200 g 7BLW100 7BLW200 7BRW100 7BRW200 h 8BLW100 8BLW200 8BRW100 8BRW200 i 9BLW100 9BLW200 9BRW100 9BRW200 j 10BLW100 10BLW200 10BRW100 10BRW200 k 11BLW100 11BLW200 11BRW100 11BRW200 l RFBLW100 RFBLW200 RFBRW100 RFBRW200 8.2 HCW

Internal Wall and Partition Brickwall excluding wall finishes 1st storey 100mm thk blockwall; internal 200mm thk blockwall; internal 100mm thk brickwall; internal 100mm thk brickwall; internal 2nd storey 100mm thk 200mm thk 100mm thk 100mm thk 3rd storey 100mm thk 200mm thk 100mm thk 200mm thk 4th storey 100mm thk 200mm thk 100mm thk 200mm thk 5th storey 100mm thk 200mm thk 100mm thk 200mm thk 6th storey 100mm thk 200mm thk 100mm thk 200mm thk 7th storey 100mm thk 200mm thk 100mm thk 200mm thk 8th storey 100mm thk 200mm thk 100mm thk 200mm thk 9th storey 100mm thk 200mm thk 100mm thk 200mm thk 10th storey 100mm thk 200mm thk 100mm thk 200mm thk 11th storey 100mm thk 200mm thk 100mm thk 200mm thk Roof 100mm 200mm 100mm 200mm thk thk thk thk blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal blockwall; internal blockwall; internal brickwall; internal brickwall; internal m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk 100-blk 200-blk 100-bwk 200-bwk -

Hollow core light weight wall system excluding wall finishes Hollow core with C-glass continous monofilament fibres tissue for joint to Hostel and Service Apartments as per Schedule of Finishes, 110mm thk hollow core precast wall as per enlarged detail; internal a b c d e f g h i j k l 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C Hollow-C -

Carried Forward

Page 73 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/13 Item 8 8.3 Note a b c d e f g h i j k l 8.4 Description Brought Forward Internal Wall and Partition (Cont'd) Glass wall panel complete with supporting frame Included in item 7.2 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Acoustic wall panel lining including fabric wall covering system a 1st storey b 7th storey 8.5 a b c d e f g h i j k l 8.6 Steel/concrete lintols to brickwall/drywall 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Other railings 40mm diam GS handrail to be provided all round where to BioPond adjacent and Ramp Ditto, wall mounted to Ramp 50.8mm diam (OD) x 2mm thk SS pipe railing with SS support not more than 1000c/c to Irrigation Pump Room, 1st Sty b c m m m metal-wk metal-wk metal-wk Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

Carried Forward

Page 74 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/14 Item 9 Note Description Brought Forward Door and Ironmongery All 6mm thk wired clear glass panel are 100mm x 600mm unless noted No given ironmongery schedule, only Specifications, please include supply and installation of ironmongery to the door pricing Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

Fire rated steel door in powder coated impact resistant satin coating finished c/w exposed/concealed door frame, mullion, ironmongery etc including fixing accessories a 1st storey FD2/12 Two hour fire rated steel door (double leaf) and frame (powder coated impact resistant satin coating finish) to Bin Centre, PABX, LV Switchroom, LT S/W Room (Emergency), Low Level Transfer Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool Filtraction Room, Ejector Pump Room, Generator Room, Newater Tank Riinm Storage, Irrigation Pump Room FD2/18 Two hour fire rated steel door (double leaf) and frame (powder coated impact resistant satin coating finish) to Bin Centre, PABX, LV Switchroom, LT S/W Room (Emergency), Low Level Transfer Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool Filtraction Room, Ejector Pump Room, Generator Room, Newater Tank Riinm Storage, Irrigation Pump Room FD2/18 Two hour fire rated steel door (double leaf) and frame (powder coated impact resistant satin coating finish) to MDF Room, Pool Filtration Room, Ejector Pump Roon, Generator Room, Newater Transfer Tank Room/ Hosereel Tank Pump Room, Storage FD2/RC14 Two hour fire rated steel door and frame (powder coated impact resistant satin coating finish) to Refuse Chute Chamber b c d e f FD2/10 2nd storey 3rd storey 4th storey 5th storey 6th storey

9.1

nos

Metal-Dr

nos

Metal-Dr

nos

Metal-Dr

nos

Metal-Dr

g 7th storey Two hour fire rated steel door and frame (powder coated impact resistant satin coating finish) to LAN Roon, PABX Room, AHU, Sprinkler Tank Pump Room h i j k l 8th storey 9th storey 10th storey 11th storey Roof level Fire rated steel door in powder coated finished c/w exposed/concealed door frame, mullion, ironmongery etc including fixing accessories 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Carried Forward

nos

Metal-Dr

9.2 a b c d e f g h i j k l

Page 75 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/15 Item 9 9.3 a b c d e f g h i j k l 9.4 Description Brought Forward Door and Ironmongery (Cont'd) Non fire rated steel door in powder coated finished c/w exposed/concealed door frame, mullion, ironmongery etc including fixing accessories 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

Fire rated solid timber door in laminate finished c/w door frame, mullion, push/kick plate, viewing panel, ironmongery, etc including fixing accessories a 1st storey FD.5/S06 Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH One hour fire rated timber door with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase b 2nd storey c 3rd storey FD.5/S08 Door to TEL near Staircase, single leaf Half hour fire rated solid core door with HPMR laminates to to TEL near Staircase FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH One hour fire rated timber door with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase

nos nos

tbr-dr tbr-dr

nos

tbr-dr

FD1/10

nos

tbr-dr

nos nos

tbr-dr tbr-dr

nos

tbr-dr

FD1/10

nos

tbr-dr

Hostel and Faculty Service Apartments FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance; 1-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 2-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 3-Bedroom Service Apartment d 4th storey FD.5/S08 Door to TEL near Staircase, single leaf Half hour fire rated solid core door with HPMR laminates to to TEL near Staircase FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH One hour fire rated timber door with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase

nos nos nos

tbr-dr tbr-dr tbr-dr

nos nos

tbr-dr tbr-dr

nos

tbr-dr

FD1/10

nos

tbr-dr

Hostel and Faculty Service Apartments FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance; 1-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 2-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 3-Bedroom Service Apartment e 5th storey FD.5/S08 Door to TEL near Staircase, single leaf Half hour fire rated solid core door with HPMR laminates to to TEL near Staircase FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH One hour fire rated timber door with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase

nos nos nos

tbr-dr tbr-dr tbr-dr

nos nos

tbr-dr tbr-dr

nos

tbr-dr

FD1/10

nos

tbr-dr

Hostel and Faculty Service Apartments FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance; 1-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 2-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 3-Bedroom Service Apartment f 6th storey FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH FD1/10 One hour fire rated timber door with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase

nos nos nos

tbr-dr tbr-dr tbr-dr

nos

tbr-dr

nos nos

tbr-dr

Hostel and Faculty Service Apartments FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 3-Bedroom Service Apartment g 7th storey FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW FD1/10 One hour fire rated timber door with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase Hostel and Faculty Service Apartments FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 3-Bedroom Service Apartment h 8th storey FD.5/S08 Door to TEL near Staircase, single leaf Half hour fire rated solid core door with HPMR laminates to to TEL near Staircase FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH One hour fire rated timber door with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase

tbr-dr nos tbr-dr nos nos nos tbr-dr tbr-dr

nos nos

tbr-dr tbr-dr

nos

tbr-dr

FD1/10

nos

tbr-dr

Hostel and Faculty Service Apartments FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance; 1-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 2-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 3-Bedroom Service Apartment i 9th storey FD.5/S08 Door to TEL near Staircase, single leaf Half hour fire rated solid core door with HPMR laminates to to TEL near Staircase

nos nos nos

tbr-dr tbr-dr tbr-dr

nos

tbr-dr

Page 76 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No Item FD.5/S10 Description Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH One hour fire rated timber door with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit nos Qty Code tbr-dr Rate Sub-Amount Sub-Amount Total Amount

FD.5/S12

nos

tbr-dr

FD1/10

nos

tbr-dr

Hostel and Faculty Service Apartments FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance; 1-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 2-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 3-Bedroom Service Apartment j 10th storey FD.5/S08 Door to TEL near Staircase, single leaf Half hour fire rated solid core door with HPMR laminates to to TEL near Staircase FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH One hour fire rated timber door with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase

nos nos nos

tbr-dr tbr-dr tbr-dr

nos nos

tbr-dr tbr-dr

nos

tbr-dr

FD1/10

nos

tbr-dr

Hostel and Faculty Service Apartments FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance; 1-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 2-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 3-Bedroom Service Apartment k 11th storey FD.5/S08 Door to TEL near Staircase, single leaf Half hour fire rated solid core door with HPMR laminates to to TEL near Staircase FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH One hour fire rated timber door with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase

nos nos nos

tbr-dr tbr-dr tbr-dr

nos nos

tbr-dr tbr-dr

nos

tbr-dr

FD1/10

nos

tbr-dr

Hostel and Faculty Service Apartments FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance; 1-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 2-Bedroom Service Apartment FD1/AM10 One hour fire rated solid core door with HPMR laminates to Main Entrance ; 3-Bedroom Service Apartment l Roof FD1/10 One hour fire rated timber door with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase Non fire rated / Timber door in laminate finished c/w door frame, mullion, finger/push/kick plate, viewing panel, louvred panel, ironmongery, etc includinq fixinq accessories a 1st storey DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser b 2nd storey c 3rd storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser DS/04 DS/06 D/08 D/08 D/08 DAL/10 Hostel and Faculty Service Apartments Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard; 1-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 2-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 3-Bedroom Service Apartment Solid core door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Timber door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Bi-folding door with veneer laminated to Utility Room ; 3Bedroom Service Apartment Laminated semi-solid timber door to Bath/WC; 1-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 2-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 3-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 ; 2-Bedroom Service Apartment Sliding timber door with HPMR laminate to Bedroom; 1Bedroom Service Apartment Sliding timber door with HPMR laminate to Bedroom; 1Bedroom Service Apartment Sliding timber door with HPMR laminate, top hung sliding track to Bedroom; 1-Bedroom Service Apartment 9.5

nos nos nos

tbr-dr tbr-dr tbr-dr

nos

tbr-dr

nos nos nos

tbr-dr tbr-dr tbr-dr

nos nos nos

tbr-dr tbr-dr tbr-dr

nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr

DAU/10 DT/08A DT/08A DT/08A DB/10 DB/10A DB/10A

nos nos nos nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr

d 4th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser DS/04 DS/06 D/08 D/08 D/08 DAL/10 Hostel and Faculty Service Apartments Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard; 1-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 2-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 3-Bedroom Service Apartment Solid core door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Timber door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Bi-folding door with veneer laminated to Utility Room ; 3Bedroom Service Apartment Laminated semi-solid timber door to Bath/WC; 1-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 2-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 3-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 ; 2-Bedroom Service Apartment Sliding timber door with HPMR laminate to Bedroom; 1Bedroom Service Apartment Sliding timber door with HPMR laminate, top hung sliding track to Bedroom; 1-Bedroom Service Apartment e 5th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos nos nos

tbr-dr tbr-dr tbr-dr

nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr

DAU/10 DT/08A DT/08A DT/08A DB/10 DB/10A

nos nos nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr

DS/04

nos

tbr-dr

Page 77 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No Item DS/06 DS/12 Description Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Hostel and Faculty Service Apartments Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard; 1-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 2-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 3-Bedroom Service Apartment Solid core door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Timber door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Bi-folding door with veneer laminated to Utility Room ; 3Bedroom Service Apartment Laminated semi-solid timber door to Bath/WC; 1-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 2-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 3-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 ; 2-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 & 2 ; 3-Bedroom Service Apartment Sliding timber door with HPMR laminate to Bedroom; 1Bedroom Service Apartment Sliding timber door with HPMR laminate, top hung sliding track to Bedroom; 1-Bedroom Service Apartment Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit nos nos Qty Code tbr-dr tbr-dr Rate Sub-Amount Sub-Amount Total Amount

D/08 D/08 D/08 DAL/10

nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr

DAU/10 DT/08A DT/08A DT/08A DB/10 DB/10 DB/10A

nos nos nos nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr

f 6th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser DS/04 DS/06 D/08 DAL/10 Hostel and Faculty Service Apartments Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 3-Bedroom Service Apartment Solid core door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Timber door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Bi-folding door with veneer laminated to Utility Room ; 3Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 3-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 & 2 ; 3-Bedroom Service Apartment Carried Forward

nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr

nos nos

tbr-dr tbr-dr

DAU/10 DT/08A DB/10

nos nos nos

tbr-dr tbr-dr tbr-dr

Page 78 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/16 Item 9 9.5 Description Brought Forward Door and Ironmongery (Cont'd) Non fire rated / Timber door in laminate finished c/w door frame, mullion, finger/push/kick plate, viewing panel, louvred panel, ironmongery, etc including fixing accessories (Cont'd) g 7th storey DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser D/08 DAL/10 Hostel and Faculty Service Apartments Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 3-Bedroom Service Apartment Solid core door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Timber door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Bi-folding door with veneer laminated to Utility Room ; 3Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 3-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 & 2 ; 3-Bedroom Service Apartment Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr

nos nos

tbr-dr tbr-dr

DAU/10 DT/08A DB/10

nos nos nos

tbr-dr tbr-dr tbr-dr

h 8th storey DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser D/08 D/08 D/08 DAL/10 Hostel and Faculty Service Apartments Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard; 1-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 2-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 3-Bedroom Service Apartment Solid core door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Timber door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Bi-folding door with veneer laminated to Utility Room ; 3Bedroom Service Apartment Laminated semi-solid timber door to Bath/WC; 1-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 2-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 3-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 ; 2-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 & 2 ; 3-Bedroom Service Apartment Sliding timber door with HPMR laminate to Bedroom; 1Bedroom Service Apartment Sliding timber door with HPMR laminate, top hung sliding track to Bedroom; 1-Bedroom Service Apartment

nos nos nos

tbr-dr tbr-dr tbr-dr

nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr

DAU/10 DT/08A DT/08A DT/08A DB/10 DB/10 DB/10A

nos nos nos nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr

i 9th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser DS/04 DS/06 D/08 D/08 D/08 DAL/10 Hostel and Faculty Service Apartments Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard; 1-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 2-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 3-Bedroom Service Apartment Solid core door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Timber door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Bi-folding door with veneer laminated to Utility Room ; 3Bedroom Service Apartment Laminated semi-solid timber door to Bath/WC; 1-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 2-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 3-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 ; 2-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 & 2 ; 3-Bedroom Service Apartment Sliding timber door with HPMR laminate to Bedroom; 1Bedroom Service Apartment Sliding timber door with HPMR laminate, top hung sliding track to Bedroom; 1-Bedroom Service Apartment

nos nos nos

tbr-dr tbr-dr tbr-dr

nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr

DAU/10 DT/08A DT/08A DT/08A DB/10 DB/10 DB/10A

nos nos nos nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr

j 10th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser DS/04 DS/06 D/08 D/08 D/08 DAL/10 Hostel and Faculty Service Apartments Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard; 1-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 2-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 3-Bedroom Service Apartment Solid core door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Timber door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Bi-folding door with veneer laminated to Utility Room ; 3Bedroom Service Apartment Laminated semi-solid timber door to Bath/WC; 1-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 2-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 3-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 ; 2-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 & 2 ; 3-Bedroom Service Apartment Sliding timber door with HPMR laminate to Bedroom; 1Bedroom Service Apartment Sliding timber door with HPMR laminate, top hung sliding track to Bedroom; 1-Bedroom Service Apartment

nos nos nos

tbr-dr tbr-dr tbr-dr

nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr

DAU/10 DT/08A DT/08A DT/08A DB/10 DB/10 DB/10A

nos nos nos nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr

k 11th storey Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser DS/04 DS/06 D/08 D/08 D/08 DAL/10 Hostel and Faculty Service Apartments Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard; 1-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 2-Bedroom Service Apartment Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Service Yard ; 3-Bedroom Service Apartment Solid core door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment

nos nos nos

tbr-dr tbr-dr tbr-dr

nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr

Page 79 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No Item DAU/10 DT/08A DT/08A DT/08A DB/10 DB/10 DB/10A Description Timber door (double leaf) with HPMR laminate to Closet ; 3Bedroom Service Apartment Bi-folding door with veneer laminated to Utility Room ; 3Bedroom Service Apartment Laminated semi-solid timber door to Bath/WC; 1-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 2-Bedroom Service Apartment Laminated semi-solid timber door to Master Bath, Bath/WC ; 3-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 ; 2-Bedroom Service Apartment Semi solid door with timber veneer to Master Bedroom, Bedroom 1 & 2 ; 3-Bedroom Service Apartment Sliding timber door with HPMR laminate to Bedroom; 1Bedroom Service Apartment Sliding timber door with HPMR laminate, top hung sliding track to Bedroom; 1-Bedroom Service Apartment l Roof level 9.6 a b c d e f g h i j k l 9.7 Frameless glass door c/w ironmongery, etc including fixing accessories 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit nos nos nos nos nos nos nos Qty Code tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr Rate Sub-Amount Sub-Amount Total Amount

Aluminium framed glass door c/w frame, ironmongery, etc including fixing accessories a 1st storey b 2nd storey c 3rd storey Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr

SGD/38

d 4th storey SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment e 5th storey SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment f 6th storey Sliding glass door to Balcony ; 3-Bedroom Service Apartment

nos

Glass-dr

nos

Glass-dr

SGD/38

nos

Glass-dr

g 7th storey SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment h 8th storey SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment i 9th storey SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment j 10th storey SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment k 11th storey SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment l Roof level

nos

Glass-dr

nos

Glass-dr

nos

Glass-dr

nos

Glass-dr

nos

Glass-dr

Carried Forward

Page 80 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/17 Item 9 9.8 Description Brought Forward Door and Ironmongery (Cont'd) Metal gate c/w frame, ironmongery etc including fixing accessories a Roof level Fire rated motorised roller shutter in powder coated finished c/o ironmongery, shutter box cover/hood, side guides, bottom rail, locking system, barrel, removable centre mullion where necessary, ventilation holes, etc. including fixing accessories a 1st storey b 2nd storey 9.10 Non fire rated motorised roller shutter in powder coated finished c/o ironmongery, shutter box cover/hood, side guides, bottom rail, locking system, barrel, removable centre mullion where necessary, ventilation holes, etc. including fixing accessories a 1st storey b 2nd storey Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

9.9

9.11

a b c

10 10.1 W1a a b c d e f g h i j k l

Wall Finishes Plastering and vinyl co-polymer emulsion painting Plaster and paint to wall 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Carried Forward m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 plaster plaster plaster plaster plaster plaster plaster plaster plaster plaster plaster plaster -

Page 81 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/18 Item 10 10.2 W1 Note a b c d e f g h i j k l 10.3 W2 a b c d e f g h i j k l 10.4 RCCW Description Brought Forward Wall Finishes (cont'd) Skim coating and vinyl co-polymer emulsion 5mm skim coated and paint finished to walls Plaster and paint as per Schedule of Finishes, finishes above as per enlarged drawing 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Homogeneous wall tile including cement sand backing screed 300mm x 600mm homogeneous wall tiles with backing screed 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 wall wall wall wall wall wall wall wall wall wall wall wall tile tile tile tile tile tile tile tile tile tile tile tile m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 skim skim skim skim skim skim skim skim skim skim skim skim coat coat coat coat coat coat coat coat coat coat coat coat Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

Glazed ceramic wall tile including cement sand backing screed with adhesive a 1st storey Glazed wall tiles with backing screed to Refuse Chute Chamber b c d e f g 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey Carried Forward

m2

GWT

Page 82 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/19 Item 10 10.4 h i j k l 10.5 a b c d e f g h i j k l 10.6 Description Brought Forward Wall Finishes (cont'd) Glazed ceramic wall tile including backing screed with adhesive (Cont'd) 8th storey 9th storey 10th storey 11th storey Roof cement sand Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

Granite tile including cement sand backing screed 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items).

a Green Feature Wall to Sky Terrace, 6th to 7th Sty External Facade to Riser at Sky Terrace, 6th to 7th Sty, irregular shaped/ surface W8 b Other wall finishes Stud wall with insulation (self adhesive polyurethene sheet vapour barrier and 50mm thk rockwool insulation complete with 12mm thk non-combustible calcium silicate baord) to LAN Room / ELVS Room Skim coat and smooth textured paint finish; external Grooveline (w=20mm) 11 11.1 a b c d e Floor Finishes Cement and sand screed with adhesive 1st storey 2nd storey 3rd storey 4th storey 5th storey

m2 m2

others others

m2

partition

EWF

m2 m

skim coat others -

m2 m2 m2 m2 m2

screed screed screed screed screed

Carried Forward

Page 83 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/20 Item 11 11.1 f g h i j k l 11.2 a b c d e f g h i j k l 11.3 Description Brought Forward Floor Finishes (Cont'd) Cement and sand screed with adhesive (Cont'd) 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Cement and sand screed with floor hardener 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 screed screed screed screed screed screed screed flr flr flr flr flr flr flr flr flr flr flr flr hard hard hard hard hard hard hard hard hard hard hard hard Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

Liquid -applied waterproofing membrane a 1st storey Wateproofing to wet areas to floor Flexible cementitous waterproof coating; rc slab surface minimum wood trowelled smooth to receive waterproofing coating, finishes and 25mm thk c/s protection screed measured separately Wateproofing to wet areas to wall upturn (h=300mm) Flexible cementitous waterproof coating; rc slab surface minimum wood trowelled smooth to receive waterproofing coating, finishes and 20mm thk c/s protection screed measured separately Wateproofing to wet areas to shower wall (h=1.80m) Flexible cementitous waterproof coating on c/s leveling render, finishes and 20mm thk c/s protection screed measured separately Wateproofing to Sump Pit Flexible cementitous waterproof coating with 25mm thk c/s protection screed Floor Wall Wateproofing to Water Tank Flexible cementitous waterproof coating with 25mm thk c/s protection screed; rc slab surface minimum wood trowelled smooth to receive waterproofing coating Floor Wall m2 m2 m2 m2 m2 m m m2 m m m2 m m m2 m m m2 m m m2 m m m2 m m m2 m m m2 m m m2 m m waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf m2 m2 waterprf waterprf m2 waterprf

waterprf

waterprf

WFL WFL WF2 WF2 WF2 WF3 WF3 WF3 WF4 WF4 WF4 WF5 WF5 WF5 WF6 WF6 WF6 WF7 WF7 WF7 WF8 WF8 WF8 WF9 WF9 WF9 WF10 WF10 WF10 WF11 WF11 WF11 11.4

Wateproofing to Lift Pit - floor Wateproofing to Lift Pit - wall b 2nd storey Wateproofing to wet areas to floor Wateproofing to wet areas to wall upturn (h=300mm) Wateproofing to wet areas to shower wall (h=1.80m) c 3rd storey Wateproofing to wet areas to floor Wateproofing to wet areas to wall upturn (h=300mm) Wateproofing to wet areas to shower wall (h=1.80m) d 4th storey Wateproofing to wet areas to floor Wateproofing to wet areas to wall upturn (h=300mm) Wateproofing to wet areas to shower wall (h=1.80m) e 5th storey Wateproofing to wet areas to floor Wateproofing to wet areas to wall upturn (h=300mm) Wateproofing to wet areas to shower wall (h=1.80m) f 6th storey Wateproofing to wet areas to floor Wateproofing to wet areas to wall upturn (h=300mm) Wateproofing to wet areas to shower wall (h=1.80m) g 7th storey Wateproofing to wet areas to floor Wateproofing to wet areas to wall upturn (h=300mm) Wateproofing to wet areas to shower wall (h=1.80m) h 8th storey Wateproofing to wet areas to floor Wateproofing to wet areas to wall upturn (h=300mm) Wateproofing to wet areas to shower wall (h=1.80m) i 9th storey Wateproofing to wet areas to floor Wateproofing to wet areas to wall upturn (h=300mm) Wateproofing to wet areas to shower wall (h=1.80m) j 10th storey Wateproofing to wet areas to floor Wateproofing to wet areas to wall upturn (h=300mm) Wateproofing to wet areas to shower wall (h=1.80m) k 11th storey Wateproofing to wet areas to floor Wateproofing to wet areas to wall upturn (h=300mm) Wateproofing to wet areas to shower wall (h=1.80m) Heavy duty epoxy polyurenthane floor coating system a 1st storey

Carried Forward

Page 84 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/21 Item 11 11.5 Description Brought Forward Floor Finishes (Cont'd) Heavy duty epoxy system to skirting a 1st storey polyurenthane floor coating Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

11.6 1F1 1F2 1F3 1F3a 1F3a 1F4 1F6 1F7

Homogeneous tile a 1st storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed to Balcony as per Floor Finishes Plan 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed to Balcony as per Floor Finishes Plan 450mm x 900mm homogeneous tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal b 2nd storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed to Balcony as per Floor Finishes Plan 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal c 3rd storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed to Balcony as per Floor Finishes Plan 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal d 4th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed to Balcony as per Floor Finishes Plan 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal e 5th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed to Balcony as per Floor Finishes Plan 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal f 6th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed to Balcony as per Floor Finishes Plan 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal g 7th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed to Balcony as per Floor Finishes Plan 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal h 8th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed to Balcony as per Floor Finishes Plan 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal i 9th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed to Balcony as per Floor Finishes Plan 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal

m2 m2 m2 m2 m2 m2 m2 m2 F1 F2 F3 F3A F3A F4 F6 F7 m2 m2 m2 m2 m2 F1 F2 F3A F6 F7 m2 m2 m2 m2 m2 F1 F2 F3A F6 F7 m2 m2 m2 m2 m2 F1 F2 F3A F6 F7 m2 m2 m2 m2 m2 F1 F2 F3A F6 F7 m2 m2 m2 m2 m2 F1 F2 F3A F6 F7 m2 m2 m2 m2 m2 F1 F2 F3A F6 F7 m2 m2 m2 m2 m2 F1 F2 F3A F6 F7 m2 m2 m2 m2 m2 F1 F2 F3A F6 F7 m2 m2 m2 m2 m2 F1 F2 F3A F6 F7 m2 m2 m2 m2 m2 F1 F2 F3A F6 F7 m2 m2 m2 m2 F1 F2 F6 F7 -

2F1 2F2 2F3a 2F6 2F7

3F1 3F2 3F3a 3F6 3F7

4F1 4F2 4F3a 4F6 4F7

5F1 5F2 5F3a 5F6 5F7

6F1 6F2 6F3a 6F6 6F7

7F1 7F2 7F3a 7F6 7F7

8F1 8F2 8F3a 8F6 8F7

9F1 9F2 9F3a 9F6 9F7

j 10th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 11F3a 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed to Balcony as per Floor Finishes Plan 11F1 11F2 11F6 11F7 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal

k 11th storey 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 10F3a 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed to Balcony as per Floor Finishes Plan 10F1 10F2 10F6 10F7 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal l Roof 600mm x 600mm homogenous floor tiles with cement and sand screed 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 300mm x 600mm & 100mm x 600mm non-slip homogeneous tiles; internal 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Heavy duty homogeneous tile a 1st storey b 2nd storey Homogeneous tile skirting

RFF1 RFF2 RFF6 RFF7 11.7

11.8

Page 85 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No Item S1 a b c d e f g h i j k l Description 100mm high homogenous skirting tile to the following levels 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof Carried Forward Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

m m m m m m m m m m m m

frl-sktg frl-sktg frl-sktg frl-sktg frl-sktg frl-sktg frl-sktg frl-sktg frl-sktg frl-sktg frl-sktg frl-sktg

Page 86 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/22 Item 11 11.9 a b c d e f g h i j k l 11.10 Description Brought Forward Floor Finishes (Cont'd) Granite tile 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

Carpet tile a 1st storey b 2nd storey Insulated raised floor system a 7th storey Raised floor (insulated) to LAN Room / ELVS Room Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Scupper drain with MS grating (w=150mm) to Refuse Chute Chamber; L=1.45m b Other floor finishes Concrete imprint (timber look) at 1st Sty

11.11 F11 11.12

raised flr

nos

scupper

m2 m2

Conc-Imp

RCCF

Ceramic floor tiles with cement and sand screed to Refuse Chute Chamber c Other skirting 30mm x 15mm recessed powder coated aluminium channel (2mm thk) skirting Ceiling Finishes

S2

Alum-sktg

12.1 a b c d e f

Skim coating and vinyl co-polymer emulsion painting 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey Carried Forward

m2 m2 m2 m2 m2 m2 Skim Skim Skim Skim Skim Skim Coat Coat Coat Coat Coat Coat -

Page 87 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/23 Item 12 12.1 g h i j k l 12.2 C1 a b c d e f g h i j k l 12.3 C2 Description Brought Forward Ceiling Finishes (Cont'd) Skim coating and vinyl co-polymer emulsion painting (Cont'd) 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Plastering and painting Plaster and paint to ceiling 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Moisture resistance gypsum plaster suspended ceiling board 9mm thk moisture resistant calcium silicate board to Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports Complex a b c d e f g h i j k l 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Carried Forward m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 plaster plaster plaster plaster plaster plaster plaster plaster plaster plaster plaster plaster Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

m2 m2 m2 m2 m2 m2

Skim Skim Skim Skim Skim Skim

Coat Coat Coat Coat Coat Coat

Page 88 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/24 Item 12 12.4 a b c d e f g h i j k l 12.5 C3 Description Brought Forward Ceiling Finishes (Cont'd) Moisture resistance gypsum plasterboard for box -up area 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Moisture resistance mineral fibre suspended ceiling board 9mm thk fibrous plasterboard with paint finish to Bedrooms at Faculty Service Apartment (Blks X2 and Z2) as per Tender Clarification 2, Architectural Item A33 and A62 a b c d e f g h i j k l 12.6 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

Included Included Included Included Included Included Included Included Included Included Included Included -

Moisture resistance mineral fibre board for box-up area a 1st storey Thermally insulated ceiling panel with fibrous plaster board on concealed suspension system 1st storey 2nd storey 3rd storey 4th storey Carried Forward

m2

12.7 a b c d

Page 89 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/25 Item 12 12.7 e f g h i j k 12.8 C8 12.9 a b c d e f g h i j k l 12.10 Note Description Brought Forward Ceiling Finishes (Cont'd) Thermally insulated ceiling panel with fibrous plaster board on concealed suspension system (Cont'd) 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

Mineral fibre insulated suspended ceiling board a 7th storey Mineral fibreboard with insulation batts above to LAN Room / ELVS Room Acoustically absorptive mineral fibre suspended ceiling board 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Acoustic glasswool suspended ceiling board Acoustic ceiling as per Schedule of Finishes is 75mm thk acoustic cell spray treatment, quantities are included in Others, Item 12.11 a b c d e f g h i j k l 1st storey 2nd storey 3rd storey 4th storey 5th storey 6th storey 7th storey 8th storey 9th storey 10th storey 11th storey Roof level Carried Forward

m2

ceiling

Page 90 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/26-A Item 12 12.11 Description Brought Forward Ceiling Finishes (Cont'd) Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Access panels to ceiling (600mm x 600mm) b Other ceiling finishes 75mm thk acoustic cell spray treatment to Corridor; Sprayed acoustic treatment to soffit of slab to Corridors as per Tender Clarification 2, Architectural Item A64 75mm thk acoustic cell spray treatment to Kitchen, Dishwash & Potwash areas, Indoor Sports Hall, Toilet, Lockers, Family Room Aluminium expanded metal mesh ceiling in powder coated finish (ceiling height=5.40m) as per Schedule of Finishes but concealed ceiling as per Reflected Ceiling Plan to Sky Terrace (Blks X2 and Z2) No ceiling to Balcony (Blks X2 and Z2) as per Tender Clarification 2, Architectural Item A34; assuming skim coat with paint GS mesh with GS supports over opening to FA, SPR, TEL, DT, PW/NW Duct 9mm thk fibrous plasterboard with paint finish (ceiling height=5.0m ~5.11m) to Sky Terrace; flat area was measured as per Reflected Ceiling Plan b c Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

nos m2 m2 m2

ceiling ceiling ceiling ceiling

C7 C7a 6C14

C15

m2

ceiling

GSM 6C3b

m2 m2

ceiling ceiling

13 13.1 Note

Fitting and Furnishing Cabinet a Kitchen hood & hob As per Tender Clarification 2, Architectural Item A15, cooker and hob are by NSC As per Tender Clarification 2, Architectural Item A58, 4 burner induction hob burners and 3 speed telescopic pull hood are by NSC Cat ladder Catladder with cage guard Sliding access trap door (1150mm x 1150mm) Aluminium handrail (2 nos) Catladder to Lift Pit (h=1.80~3.0m) 300mmW x 300mmD x 300mmH sump pit with GS grating to Lift Pit nos nos sets nos nos

Included in PC Sums

13.2

metal-wk metal-wk metal-wk metal-wk metal-wk

13.3

Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a b c

14 Note 14.1 14.2 14.3 14.4 14.5 14.6

Sanitary Appliances For sanitary wares specifications, please refer to Tender Corrigendum No 1 Pedestal water closet Master water closet to Staff Apartment Squatting pan WC conceal cistern Urinal Urinal sensor flush valve Soap dispenser Carried Forward nos sets S-wares S-wares S-wares S-wares S-wares S-wares

Page 91 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/27-A Item 14 14.7 14.8 14.9 14.10 14.11 14.12 14.13 14.14 14.15 14.16 Description Brought Forward Sanitary Appliances (Cont'd) Waste receptacle Hand dryer Toilet paper holder Hook on back of door Sanitary bin Bidet spray Bib tap Janitor sink Tap for janitor sink Shower head Master Shower to Staff Apartment Common Shower to Staff Apartment Shower mixer Towel rail to Staff Apartment Mirror Faculty Apartment- 1 Bedroom Faculty Apartment- 2 Bedroom Faculty Apartment- 3 Bedroom Hot water dispenser Flip-up s/s grab bar / shower seat Shower seat S/s horizontal bar fixed to door Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Other works in relation with Toilets Master Basin to Staff Apartment Common Basin to Staff Apartment Kitchen single sink c/w tap (L=0.50m) to Staff Apartment Floor trap with UPVc grating Floor waste 1BR 2BR 3BR b Shower screens Shower / glass screen with sliding door to 1-Bedroom Faculty Apartment Shower / glass screen with sliding door to 2-Bedroom Faculty Apartment, L-shaped Shower / glass screen with sliding door to 3-Bedroom Faculty Apartment Carried Forward nos sets sets nos nos nos nos nos nos nos S-wares S-wares S-wares S-wares S-wares S-wares S-wares S-wares S-wares S-wares S-wares S-wares S-wares mirror mirror mirror S-wares S-wares S-wares Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

14.17 14.18

14.19 14.20 14.21 14.22

sets sets sets nos nos sets sets sets

S-wares S-wares S-wares S-wares S-wares Shower-S Shower-S Shower-S

Page 92 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 4 - BLOCK X2 Page No BC/S4/28-A Item 15 15.1 15.2 15.3 15.4 15.5 15.6 15.7 Sundries Earthing work Lightning protection work Builders work in connection with M&E work Fire extinguisher Letter box Aluminium letter boxes Fire extinguishers with compartment Hose reel compartments & access panel Breeching inlet compartments & access panel; door measured separately Tactile tiles warning indicator (300mm x 300mm) Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Refuse Chute Refuse hopper (2nd Sty to Roof Level) for Blks X1, Y1 and Z1 and (3rd to 11 Sty) for Blks X2 and Z2 Aluminium inspection cover over Refuse Chute Roof (1.0m x 1.0m) Safety mesh below roof (600mm x 700mm) Wiremesh to cover ventilation opening at Roof (700mm x 200mm) b 2mm thk aluminium capping (w=210mm) to Blks X2 & Z2 c Insect screen to Housing Units d Refuse chute compactor Total Carried to Summary of Tender Page ST/1 Item 3.4 nos nos nos nos m m2 precast metal-wk metal-wk metal-wk metal-wk metal-wk LS LS LS nos nos LS LS nos nos earthing lightning Builder Fire-Ext metal-wk Fire-Ext Fire-Ext others flr-tile Description Brought Forward Drw No. Level / Grid location ddt No. Side Area L W D/H 1.00 Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

15.8 15.9

Page 93 of 110

S4-Blk X2

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item CFA BC/S7/1 1 1.1 Sub-structure Basement excavation and backfilling Excavation 0m-2m 2m-4m 4m-6m Excavation to lift pit wall Backfilling Remove surplus off site 1.2 a b c d e f 1.3 Pilecap including excavation, formwork, concrete and rebar Excavation Backfill Lean concrete - 50mm thick G15 Concrete G40 Reinforcement Formwork Description Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit m2 Qty Code Rate Sub-Amount Sub-Amount Total Amount

m3 m3 m3 m3 m3 m3 m3 m3 m2 m3 kg m2

exc exc exc exc backfill remove exc backfill G15 G40 rebar fwk

Basement wall/ column a Concrete G40 to basement retaining wall to lift pit wall to staircase wall stump to basement column to Storm water tank wall to Ejector pump room wall to column stump b Reinforcement to basement retaining wall to lift pit wall to staircase wall stump to basement column to Storm water tank wall to Ejector pump room wall to column stump c Formwork to basement retaining wall to lift pit wall to staircase wall stump to basement column to Storm water tank wall to Ejector pump room wall to column stump Ditto, but curved on plan to basement column

m3 m3 m3 m3 m3 m3 m3 kg kg kg kg kg kg kg m2 m2 m2 m2 m2 m2 m2 m2 m3 m2 m3 kg m2 m3 m2 m3 kg

G40 G40 G40 G40 G40 G40 G40 rebar rebar rebar rebar rebar rebar rebar fwk fwk fwk fwk fwk fwk fwk fwk-cop exc G15 G40 rebar fwk exc G15 G40 rebar nil

1.4 a b c d e 1.5 a b c d e 1.6

Basement beam/ Ground beam Excavation Lean concrete - 50mm thick G15 Concrete G40 Reinforcement Formwork Ground slab (Included basement slab) Excavation Lean concrete - 50mm thick G15 Concrete G40 Reinforcement Formwork Waterproofing system to sub-structure in contact with ground 25mm thick cement/sand protection screed to basement beam/ground beam to basement slab/ground slab to basement retaining wall to lift pit wall Waterproofing membrane to basement beam/ground beam to basement slab/ground slab to basement retaining wall to lift pit wall Damp proof membrane to basement beam/ground beam to basement slab/ground slab to basement retaining wall to lift pit wall Hydrotite CJ0720-2K swellable water stop to basement retaining wall Hydrotite CJ0720-2K swellable water stop to lift pit wall

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m m m2 Item

waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf Anti-Termite

1.7 1.8

Anti-termite treatment Dewatering and other necessary water table monitoring for deep excavation as directed by the S.O.

Page 94 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item 1.9 Description Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

a b c

Carried Forward

Page 95 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Frame 2.1 a b c d 2.2 Column Concrete G40 Reinforcement Formwork Ditto, but curved on plan Description Brought Forward Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

BC/S7/2

m3 kg m2 m2 m3 kg m2 m3 kg m2

G40 rebar fwk fwk-cop G40 rebar fwk

Cast-in-situ suspended beam a Concrete G40 b Reinforcement c Formwork a b c d Reinforcement in column Concrete G40 Reinforcement Formwork Post-tension tendons Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items).

2.3

2.4

a b c 3 3.1

Upper Floor Cast-in-situ slab a Concrete G40 b Reinforcement c Formwork Carried Forward

m3 kg m2

G40 rebar fwk

Page 96 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Description Brought Forward Frame (Cont'd) 3.2 a b c d 3.3 3.4 Post tension slab Concrete G40 Reinforcement Formwork Post-tension tendons Waterproofing to all wet area Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). nil nil nil Included in Floor Finishes Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

BC/S7/3

a b c

4 4.1

Structural Wall Structural wall a Concrete G40 to internal rc wall to staircase wall to lift wall b Reinforcement to internal rc wall to staircase wall to lift wall c Formwork to internal rc wall to staircase wall to lift wall 4.2 Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items).

m3 m3 m3 kg kg kg m2 m2 m2

G40 G40 G40 rebar rebar rebar fwk fwk fwk

a b c

Carried Forward

Page 97 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Description Brought Forward Structural work to roof 5.1 Suspended roof beam a Concrete G40 b Reinforcement c Formwork a b c d 5.3 Post-tensioned roof beam Concrete G40 Reinforcement Formwork Post-tensioning Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

BC/S7/4

m3 kg m2 m3 kg m2 Item m3 kg m2 m3 kg m2 Item

G40 rebar fwk G40 rebar fwk Post-Ten G40 rebar fwk G40 rebar fwk

5.2

Concrete roof slab a Concrete G40 b Reinforcement c Formwork a b c d Post-tensioned roof slab Concrete G40 Reinforcement Formwork Post-tensioning

5.4

5.5

Roof finishes a Profile steel roofing Roof cladding to Sports Complex Aluminum standing seam roofing with SS cables for creepers Flashing + Gutter etc Approximate areas were measured, roof and ceiling are irregular/ curved shaped. For accurate areas, please check with the Specialist Aluminium composite faceted soffit cladding (ceiling) Perforated aluminium composite panels with 12mm x 12mm perforations and min 50% ventilation openings (ceiling) m2 sum roof roof roof

Note

m2

others

Note

Approximate areas were measured, roof and ceiling are irregular/ curved shaped. For accurate areas, please check with the Specialist b Insulation c Waterproofing system

RF

Wateproofing to RC Flat Roof consists of: - min 25mm thk c/s screed to fall - 2.2mm thk EVA/PVC fleece-backed waterproofing membrane bonded - 6mm thk under-screed drainage sheet - 1000 x 1000 x 50mm thk c/s panel roofing reinforced with BRC 3315 mesh polysulphide joints @ every 10m c/c - Polysulphide sealant - 50mm wide welded lap Wateproofing to RC Flat Roof, non insulated (to Roof over Stairs and LMR) Wateproofing to RC Flat Roof- upturn consists of: - 1.2mm thk EVA/PVC waterproofing membrane bonded - 25mm thk c/s protection screed with GI mesh - membrane terminated into groove-line & sealed polyurethane sealant

m2

NIL

RF1 RFU

m2 m

waterprf

with

Waterproofing to Non-Insulated Deck consists of: min 25mm thk c/s screed to fall 2.2mm thk EVA/PVC fleece-backed waterproofing membrane bonded 6mm thk under-screed drainage sheet finishes and protection screed measured separately

m2

Waterproofing to Landscape Deck consists of: - min 25mm thk c/s screed to fall - 2.2mm thk EVA/PVC fleece-backed waterproofing membrane bonded - 25mm thk c/s protection screed - 100gsm geotextile separation layer - 30mm thk interlocking sub-soil drainage modules - 100gsm geotextile filter fabric - 50mm thk coarse washed sand - growth media to Landscape Architect's detail (Softscape is included in PC/Provisional Sums) d Roof tennis court Waterproofing to Tennis Court (Insulated) consists of: - min 25mm thk c/s screed to fall - 2.2mm thk EVA/PVC fleece-backed waterproofing membrane bonded - 6mm thk under-screed drainage sheet - 50mm thk extruded polystyrene insulation board - 100gsm geotextile separation layer Ditto, to access from Staircases/Ramp, assuming similar to Tennis Court Wateproofing system Finishes to Tennis Court as per enlarged detail consists of: - 50mm thk RC protection RC topping - 50mm thk w1 asphalt premix - acrylic coating Tennis Post e Green roofing system with fencing Green roofing system by NSC as per Schedule of Finishes, Item 1.7.7 Tennis Court Fencing (h=4.0m) consists of: 10mmthk hot dipped GS plate in paint finish Galv "U" clip holding roll top panel 5mm thk hot dipped GS L-angle in paint finish 75 x 25x 5mm diam polyester powder-coated welded wire mesh roll-top fencing - 150 x 50 x 12mm thk hot dipped GS T-bar in paint finish - 12mm thk hot dipped GS base plate in paint finish - 150mm ht RC kerb with plaster and paint finish Extra over for double leaf gate (1.50mW x 2.20mH) Siphonic drainage outlet (450mm x 450mm) Drain with reinforced stone grating (w=400mm) to Landscape Deck Scupper drain with GS grating f Roof drainage with accessories g Truss to support lights & fans Steel structure Painting M10 bolt M12 bolt M20(cast-in bolt) M24(cast-in bolt/bolt) DROP-OFF POINT Steel structure Painting M16 bolt 2ND STOREY INTERMEDIATE STEEL STRUCTURE Steel structure Painting M12 bolt h Creeper on cable i Fall Arrester j Timber deckingto access from Staircases/Ramp, as partly shown on Lift Lobby enlarged drawing 40 x 9 x 1200mm thk natural timber grouped in modular panel sixe (630mm x 1200mm) k Smoke vent (include testing, PE endorsement, testing and commissioning and 12 months DLP maintenance) Carried Forward

m2

waterprf

m2

waterprf

m2 m2

waterprf sports

F18

no

sports

Note

sports

nos nos m m LS kg m2 no. no. no. no. kg m2 no. kg m2 no.

sports siphonic others scupper drainage steel steel steel steel steel steel steel steel steel steel steel steel

LS m2

fall-A tbr deck

nos

others

Page 98 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Description Brought Forward Structural work to roof (Cont'd) 5.6 Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

BC/S7/5

a b c 6 6.1

Staircase Structural works to staircase a Precast concrete staircase b Reinforced Concrete topping/structure Concrete G40 Reinforcement Formwork Staircase handrail and balustrade MS railing to Staircase (h=0.90m) to Sports Complex consists of: 40 x 100mm thk MS plate in enamel paint finish 40 x 10mm thk MS plate in enamel paint finish @ max 100mm c/c x 150 x 6mm thk MS angle in enamel paint finish 50 SS expansion bolt Ditto, (h=1.10m) to Sports Complex GS handrail (wall mounted) at Staircase and Ramp to Sports Complex description, stainless steel as per details Galv as per consists of: - 40mm diam CHS SS handrail (Grade 43) welded to GS supports - 45mm diam SS supports at not more than 1000 c/c SR8 SR9 SR10 Tempered laminated glass railing to Staircase (h=1.675m) Sports Complex consists of: 25 x 25 x 2mm thk SS capping 10mm thk hot dipped GS folded plate in powder coated finish 30 x 50mm thk hot dipped GS RHS in powder coated finish 10mm thk hot dipped GS T-bar in powder coated finish 10mm thk hot dipped GS L-angle in paint finish Countersunk anchor bolt 20x 20mm aluminium U-channel in powder coated finish 50mm diam GS handrail, (h=0.90m) to Pool Area GS railing measured from FFL, (h=1.0m) to Stairs near Squash Court thk hot dipped GS plate in powder coated finish with 6mm handrail (h=1.0m) to Stairs near Squash Court Guardrail below Staircase- 45mm wide x 9mm thk SS flat bar (h=0.55m) Stair finishes Floor Finishes Cement and sand screed finish with dustproofer as per enlarged drawing while self leveling screed as per Schedule of Finishes Landing Riser (142.86~172.92mm high) Treads (250~300mm wide) Tactile nosing Steps to Squash Court, no given finishes Riser (166.67mm high) Treads (300mm wide) Steps to Entrance Foyer, assuming similar finishes 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal Riser (143.75mm high) Treads (450mm wide) Wall Finishes Plaster and paint to staircase wall Ceiling Finishes Plaster and paint to staircase ceiling Sunscreen/ shading Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). to m railing m railing

m3 kg m2

G40 rebar fwk

6.2 SR6 SR6a SR7 Note

m m

railing railing

m m

railing railing

SR11 6.3 SF5

railing

m2 m m m m m

screed S-riser S-tread S-Nosing-T flr-tile-R flr-tile-T

F7

m m m2 m2

flr-tile-R flr-tile-T plaster plaster

SW SC1 6.4 6.5

a b c

Carried Forward

Page 99 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Description Brought Forward External Wall and Finishes Brickwall 7.1 a 1st storey 1BRW200E 200mm thk brickwall; external b 2nd storey 2BRW100E 110mm thk brickwall; external c Roof 7.2 Glass Front Wall a 1st storey b 2nd storey M&E louvre a 1st storey b 2nd storey Aluminium louvre vent Louvred window to Generator Room at 2nd Sty Aluminium louvre vent c Roof Aluminium louvre vent to Lift Motor Room Expanded MS mesh a 1st storey GS expanded mesh screen railing (h=1.675m) to Sports Complex Aluminium expanded mesh screen railing (h=1.675m) to Sports Complex consists of: 10mm thk hot dipped GS plate in powder coated finish 10mm thk hot dipped GS folded plate in powder coated finish 40mm diam hot dipped GS CHS in powder coated finish 10mm thk hot dipped GS flat plate baluster in powder coated finish 10mm thk hot dipped GS L-angle pre-welded to aluminium expanded mesh with powder coated finish Aluminium expanded mesh with powder coated finish 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate prewelded to upright balusters in paint finish 10mm thk hot dipped GS angle plate in powder coated finish Countersunk anchor bolt 20 x 20mm aluminium U-channel in powder coated finish 10mm thk hot dipped GS plate in powder coated finish Faceted facade (wall) to Sports Complex Approximate areas were measured, walls are irregular/ curved shaped. For accurate areas, please check with the Specialist 1.5mm thk expanded mesh in powder coated finish to wall (aluminium as per Tender Clarification 2, Architectural Item A8) b 2nd storey R5 GS expanded mesh screen railing (h=1.675m) to Sports Complex Aluminium expanded mesh screen railing (h=1.675m) to Sports Complex consists of: 10mm thk hot dipped GS plate in powder coated finish 10mm thk hot dipped GS folded plate in powder coated finish 40mm diam hot dipped GS CHS in powder coated finish 10mm thk hot dipped GS flat plate baluster in powder coated finish 10mm thk hot dipped GS L-angle pre-welded to aluminium expanded mesh with powder coated finish Aluminium expanded mesh with powder coated finish 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate prewelded to upright balusters in paint finish 10mm thk hot dipped GS angle plate in powder coated finish Countersunk anchor bolt 20 x 20mm aluminium U-channel in powder coated finish 10mm thk hot dipped GS plate in powder coated finish m railing m2 railing m railing nos nos nos nos window window window window Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

BC/S7/6

m2 m2

200-bwk 100-bwk

7.3

PV/30 PV1/15 PV/15B PV/21 7.4 R5

Note

c Roof 7.5 PVDF Aluminium Cladding a 1st storey b 2nd storey Aluminium composite panels to parapet, Grid SC-G/SC-6 to SC-7 (total girth wall until ceiling below as per detail drawing was used for measurement of area) Aluminium composite panels to walls/ columns Aluminium composite panels at Grid SC-A/SC-7 to SC-10 as shon 2nd Sty Plan c Roof Aluminium composite panels to roof over Viewing Gallery as shown on Sections A, B and C, Grid SC-G/SC-1 to SC-11 Ditto, to beam, Grid SC-G/SC-6 to SC-7 Aluminium composite panels to beam, Grid SC-G/SC-6 to SC-7 Insitu parapet wall a 1st storey b 2nd storey c Roof (planter walls) Concrete G40 Formwork Rebar Railing Other railings are included in Staircases a 1st storey b 2nd storey Tempered laminated glass railing (h=1.675m) to Sports Complex Aluminium expanded mesh parapet (h=1.10m) as shown on floor plan to Corridor GS flat railing (h=1.10m) to void near Lifeguard Room, 1st Sty Tempered laminated clear glass parapet to VIP seating Tempered laminated clear glass parapet to VIP seating (h=1.10m) c Roof Carried Forward m2 Cladding

m2 m2

Cladding Cladding

m2 m2

Cladding Cladding

7.6

m3 m2 kg

G40 fwk rebar

7.7 Note R6

Railing

R7

Railing railing

Page 100 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Description Brought Forward External Wall and Finishes 7.8 Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

BC/S7/7

a b c 8 8.1 1BRW200 2BRW100

Internal Wall and Partition 100mm thk brickwall excluding wall finishes a 1st storey 200mm thk brickwall; internal b 2nd storey 100mm thk brickwall; internal

m2 m2 m2

200-bwk 100-bwk 100-bwk

c Roof RFBRW100 100mm thk brickwall; internal 8.2 200mm thk brickwall excluding wall finishes a 1st storey b 2nd storey c Roof Fibreglass panel on hot-dipped galvanised SHS steel frame (Rock climbin wall, non-climbable) a 1st storey Climbing Rock Wall, Bouldering Wall & Abseiling Station (w=15.0m), Grid SC-F/SC-2 to SC-4, 1st Sty b 2nd storey c Roof 8.4 Note Glass wall panel complete with window frame, mullion, hardware, etc For glass panel details, please refer to drawing For details, please refer to ID Drawings For Curtain wall/ glass panels to to Student Common Lounge, please refer to Facade Drawings a 1st storey Glass panel with vertical glass fins to Aerobics 1 at 1st Sty Glass panel with vertical glass fins to Fitness Centre 1 at 1st Sty Glass panel with vertical glass fins to Fitness Centre 1 at 1st Sty Glass panel to Indoor Sports Hall at 1st Sty Glass panel with single leaf door to Squash Court at 1st Sty b 2nd storey Glass panel with vertical glass fins to Multi Purpose Room 1, Aerobics 2 at 2nd Sty Glass panel to Aerobics 2 at 2nd Sty Glass panel to Control Room at 2nd Sty Glass panel to Control Room at 2nd Sty Glass panel to Control Room at 2nd Sty Glass panel to Indoor Sports Hall 1 & 2 at 2nd Sty Glass panel to Indoor Sports Hall 2 at 2nd Sty Glass panel to Administration Room at 2nd Sty Glass panel to Administration Room at 2nd Sty Glass panel to Administration Room at 2nd Sty h=2.85m as per floor plan, h=3.0m as per enlarged detail, assuming h=2.85m as per Corrigendum 1 Double glazed Low E glass panels with 900mm high motorised glazed top hung window to Indoor Sports Hall 2 (as shown on Elevation 4) Double glazed Low E glass panels with 900mm high motorised glazed top hung window to Indoor Sports Hall 1 c Roof 8.5 Corridor composite locker wall c/w timber doors and shelved, hardwares, glossy/ matt paint finish to all exposed surfaces a 1st storey 4 tierred matt laminate finish lockers c/w all accessories in number lock system b 2nd storey 4 tierred matt laminate finish lockers c/w all accessories in number lock system Basement Locker outside wash room at Basement (4 tier to each column as per Tender Clarification 2, Architectural Item A22), quantities are measured no of columns x 4 Carried Forward

8.3

sets

Rock wall

TGP/25 TGP/26 TGP/27 TGP/33 TGP/34 TGP/35 TGP/36 TGP/37 TGP/38 TGP/39 TGP/40 TGP/41 TGP/42 TGP/44 TGP/45 Note

nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos

glazing glazing glazing glazing glazing glazing glazing glazing glazing glazing glazing glazing glazing glazing glazing

nos nos

glazing glazing

sets

locker

sets

locker

nos

locker

Page 101 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Description Brought Forward External Wall and Finishes (Cont'd) 8.6 Note Operable wall a 1st storey Operable sliding panel at Indoor Sports Hall 1 & 2 Total height including the top wall of sliding door b 2nd storey Relocation from existing dover campus to new sports compex 8.7 Toilet partition/ cubicles c/w toilet door, cubicle a 1st storey b 2nd storey Steel/concrete lintols to brickwall/drywall a 1st storey b 2nd storey Concrete G40 Reinforcement Formwork c Roof Concrete G40 Reinforcement Formwork 8.9 Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Windows Windows to Common Areas Sliding window to Lifeguard Room Sliding window to Lifeguard Room Sliding window to Lifeguard Room Sliding window to Administration Room, 2nd Sty b Fencing and gate As per 1st Sty floor plan, fencing is broken line, not sure if to be provided BRC fencing near Transformer Room, Grid SC-G/SC-2 to SC-4, 1st Sty Extra over for double leaf gate c Drywall partition to Admin Office, 2nd storey Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

BC/S7/8

nos

Oper-wall -

8.8

nil m3 kg m2 m3 kg m2 G40 rebar fwk G40 rebar fwk

SW/23 SW/36 SW/44 SW/72 Note

nos nos nos nos

window window window window

m nos m2

metal-wk metal-wk partition

9 Note

Door and Ironmongery All 6mm thk wired clear glass panel are 100mm x 600mm unless noted No given ironmongery schedule, only Specifications, please include supply and installation of ironmongery to the door pricing

Metal door c/e exposed/ concealed door frame a 1st storey Two hour fire rated steel door and frame (powder coated impact resistant satin coating finish) to LAN Roon, PABX Room, AHU, Sprinkler Tank Pump Room Two hour fire rated steel door (double leaf) and frame (powder FD2/18 coated impact resistant satin coating finish) to Bin Centre, PABX, LV Switchroom, LT S/W Room (Emergency), Low Level Transfer Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool Filtraction Room, Ejector Pump Room, Generator Room, Newater Tank Riinm Storage, Irrigation Pump Room 9.1 FD2/10 FD2/20 Two hour fire rated steel door (double leaf) and frame (powder coated impact resistant satin coating finish) to Bin Centre, PABX, LV Switchroom, LT S/W Room (Emergency), Low Level Transfer Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool Filtraction Room, Ejector Pump Room, Generator Room, Newater Tank Riinm Storage, Irrigation Pump Room Two hour fire rated steel door (double leaf) and frame (powder coated impact resistant satin coating finish) to Bin Centre, PABX, LV Switchroom, LT S/W Room (Emergency), Low Level Transfer Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool Filtraction Room, Ejector Pump Room, Generator Room, Newater Tank Riinm Storage, Irrigation Pump Room Two hour fire rated Transformer Room, LT Two hour fire rated Transformer Room, LT steel & HT steel & HT door (double leaf) and frame to Switchroom door (double leaf) and frame to Switchroom

nos nos

metal-dr metal-dr

nos

metal-dr

FD2/22

nos

metal-dr

FD2/LT20 FD2/TR29

nos nos

metal-dr metal-dr

FD2/10 FD2/18

Basement Two hour fire rated steel door and frame (powder coated impact resistant satin coating finish) to LAN Roon, PABX Room, AHU, Sprinkler Tank Pump Room Two hour fire rated steel door (double leaf) and frame (powder coated impact resistant satin coating finish) to Bin Centre, PABX, LV Switchroom, LT S/W Room (Emergency), Low Level Transfer Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool Filtraction Room, Ejector Pump Room, Generator Room, Newater Tank Riinm Storage, Irrigation Pump Room Two hour fire rated steel door (double leaf) and frame (powder coated impact resistant satin coating finish) to Bin Centre, PABX, LV Switchroom, LT S/W Room (Emergency), Low Level Transfer Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool Filtraction Room, Ejector Pump Room, Generator Room, Newater Tank Riinm Storage, Irrigation Pump Room

nos nos

metal-dr metal-dr

FD2/20

nos

metal-dr

Page 102 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Description b 2nd storey Two hour fire rated steel door and frame (powder coated impact FD2/10 resistant satin coating finish) to LAN Roon, PABX Room, AHU, Sprinkler Tank Pump Room Two hour fire rated steel door (double leaf) and frame (powder FD2/22 coated impact resistant satin coating finish) to Bin Centre, PABX, LV Switchroom, LT S/W Room (Emergency), Low Level Transfer Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool Filtraction Room, Ejector Pump Room, Generator Room, Newater Tank Riinm Storage, Irrigation Pump Room c Roof 9.2 Acoustic door c/w door frame, mullion a 1st storey b 2nd storey c Roof Carried Forward Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

nos nos

metal-dr metal-dr

Page 103 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Description Brought Forward Door and Ironmongery (Cont'd) 9.3 ADB/08 Anodies aluminium louvred door type LD1 to LD3 c/w door framed, mullion, ironmongeries, etc a 1st storey Aluminium panel door with 2 coats powder coat (red) to Breeching Inlet b 2nd storey c Roof 9.4 GD/10 GD/10 9.5 Glass door c/w door frame, mullion, ironmongeries, etc a 1st storey Tempered glass door, frameless to Life Guard Room b 2nd storey Tempered glass door, frameless to Admin Room 2 hours fire-rated, motorised roller shutter a 1st storey b 2nd storey Non fire-rated, motorised roller shutter a 1st storey Roller shutter to Cafe as shown on plan (w=1.80m) Roller shutter to Cafe as shown on plan (w=2.60m) b 2nd storey 9.7 Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Other doors/ gates shown on plan but not included in the schedule Metal gate near Staircase 4, double leaf Timber doors Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase, Lift Lobby, Exit Door Half hour fire rated solid core door with HPMR laminates to Store Room, Control Room, Air Lock Half hour fire rated solid core door (one and half leaf) with HPMR laminates, 6mm thk wired clear glass panel and self-closing device to Staircase 1,2,3 & 4, Multi-use Room, SSL (Smoke Stop Lobby), Exit Door 2 hour fire rated timber door with HPMR laminate with 6mm thk aired clear glass panel (2 nos) and self closing device to Lift Lobby, Exit Door Half hour fire rated solid core door (double leaf) with HPMR laminates, 6mm thk wired clear glass panel (2 nos) and 3mm thk SS finger push and kick plates to Multi Purpose Room 1 & 2 at 2nd Storey, Fitness Centre, Aerobics 1 & 2 Half hour fire rated solid core door (double leaf, automatic) with 3mm thk SS finger plates, 6mm thk wired clear glass panel (2 nos), automatically opens to let in fressh air when smokes detectors are activated to Indoor Sports Hall 1 & 2 Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST Half hour fire rated solid core door with HPMR laminates to DT, TEL, SPR, FA, HR/FE, SP, ST Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door (double leaf) with HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH Half hour fire rated solid core door with HPMR laminate with 3mm thk SS finger and kick plates to Communal Toilet Timber door with HPMR laminate and 3mm thk SS finger push and kick plates to Head Officer, Store, Storage, Photo Copy , Office , Meeting Room, Service Yard, Cafe, Security Room Laminated semi-solid timber door with timber louvred below to Handicap Toilet Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber dor with HPMR laminates to Stack Duct, Refuse Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser Timber door (double leaf) to SFAP, CWR Timber door (double leaf) to PW/NW, PW, DR/SFH, HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Riser b Security grilles gate (next to Cafe) c d 10 10.1 W1a Wall Finishes Cement plaster and painting to brick/ concrete Plaster and paint to wall a 1st storey b 2nd storey c Roof 10.2 Painting to drywall a 1st storey b 2nd storey Carried Forward plaster plaster plaster Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

BC/S7/9

nos

others

nos nos

Glass-dr Glass-dr

9.6

nos nos

Roller-S Roller-S

MG22 FD.5/10

nos nos

metal-wk tbr-dr

FD.5/10A FD.5/15

nos nos

tbr-dr tbr-dr

FD.5/20 FD.5/22

nos nos

tbr-dr tbr-dr

FD.5/EM22

nos

tbr-dr

FD.5/S06 FD.5/S09 FD.5/S12 FD.5/S15 FD.5/S20 FD.5/T10

nos nos nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr

D/10

nos

tbr-dr

DHT/10 DS/03 DS/06 DS/10 DS/10 DS/15

nos nos nos nos nos nos

tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr tbr-dr

nos

Metal-wk

m2 m2

painting

Page 104 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Description Brought Forward Wall Finishes (Cont'd) 10.3 1W2 1W5 2W2 2W5 2W12 10.4 1W8 Ceramic wall tiles including cement sand backing screed a 1st storey 300mm x 600mm homogeneous wall tiles with backing screed 450mm x 900mm homogenous wall tiles with backing screed b 2nd storey 300mm x 600mm homogeneous wall tiles with backing screed 450mm x 900mm homogenous wall tiles with backing screed 200mm x 200mm matt homogeneous wall tiles with backing screed Impack Resistant Acoustic Panel a 1st storey Stud wall with insulation (self adhesive polyurethene sheet vapour barrier and 50mm thk rockwool insulation complete with 12mm thk non-combustible calcium silicate baord) to LAN Room / ELVS Room Acoustic perforated gypsum board (12.5mm thk) with rockwool insulation to non-glazed walls to Indoor Sports Hall b 2nd storey Stud wall with insulation (self adhesive polyurethene sheet vapour barrier and 50mm thk rockwool insulation complete with 12mm thk non-combustible calcium silicate baord) to LAN Room / ELVS Room Anti-static epoxy finish a 1st storey b 2nd storey c Roof Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Other wall finishes Skim coat and smooth textured paint finish; external b c 11 11.1 1F20 2F20 RFF20 11.2 Floor Finishes Cement and sand screed a 1st storey Cement and sand screed to M&E Rooms at Sport Complex b 2nd storey Cement and sand screed to M&E Rooms at Sport Complex c Roof Cement and sand screed to M&E Rooms at Sport Complex Liquid -applied waterproofing membrane a 1st storey Wateproofing to wet areas to floor Flexible cementitous waterproof coating; rc slab surface minimum wood trowelled smooth to receive waterproofing coating, finishes and 25mm thk c/s protection screed measured separately Wateproofing to wet areas to wall upturn (h=300mm) Flexible cementitous waterproof coating; rc slab surface minimum wood trowelled smooth to receive waterproofing coating, finishes and 20mm thk c/s protection screed measured separately Wateproofing to wet areas to shower wall (h=1.80m) Flexible cementitous waterproof coating on c/s leveling render, finishes and 20mm thk c/s protection screed measured separately Wateproofing to Sump Pit Flexible cementitous waterproof coating with 25mm thk c/s protection screed Floor Wall Wateproofing to Water Tank Flexible cementitous waterproof coating with 25mm thk c/s protection screed; rc slab surface minimum wood trowelled smooth to receive waterproofing coating Floor Wall WFL WFL Wateproofing to Lift Pit - floor Wateproofing to Lift Pit - wall b 2nd storey Wateproofing to wet areas to floor Wateproofing to wet areas to wall upturn (h=300mm) Wateproofing to wet areas to shower wall (h=1.80m) c Roof Carried Forward m2 m2 m2 m2 m2 m m waterprf waterprf waterprf waterprf waterprf waterprf waterprf waterprf m2 m2 waterprf waterprf m2 waterprf Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

BC/S7/10

10

m2 m2 m2 m2 m2

wall tile wall tile wall tile wall tile wall tile

m2

partition

1W11

m2

partition

2W8

m2

partition

10.5

10.6

EWF

m2

skim coat

m2 m2 m2

screed screed screed

waterprf

waterprf

Page 105 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Description Brought Forward Floor Finishes (Cont'd) 11.3 Cement and sand screed with floor hardener a 1st storey b 2nd storey c Roof Heavy duty anti-slip polyurenthane screed a 1st storey b 2nd storey c Roof Vinyl flooring a 1st storey b 2nd storey Foam backing sports flooring a 1st storey b 2nd storey Floating sports floor system a 1st storey Floating sports timber floor b 2nd storey Floating sports timber floor c Roof 11.8 1F1 300 x 300mm heavy duty homogeneous tile a 1st storey 600mm x 600mm homogenous floor tiles with cement and sand screed b 2nd storey 200mm x 200mm heavy duty non-slip homogenous floor tiles with cement and sand screed to BOH c Roof 11.9 1F2 1F3 1F7 1F16 300 x 300mm heavy duty non-slip homogeneous tile a 1st storey 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 600mm x 600mm non-slip homogenous floor tiles with cement and sand screed 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal 300mm x 300mm heavy duty non-slip homogenous floor tiles with cement and sand screed b 2nd storey 300mm x 300mm non-slip homogenous floor tiles with cement and sand screed 450mm x 900mm non-slip homogenous floor tiles with cement and sand screed; internal 300mm x 300mm heavy duty non-slip homogenous floor tiles with cement and sand screed c Roof 11.10 1S1 85mm high homogeneous tile skirting a 1st storey 110mm high homogenous skirting tile b 2nd storey 110mm high homogenous skirting tile c Roof Carried Forward Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

BC/S7/11

11

11.4

11.5

11.6

11.7 1F15

m2

Float-flr

2F15

m2

Float-flr

m2

F1

2F14

m2

F14

m2 m2 m2 m2

F2 F3 F7 F1-H

2F2 2F7 2F16

m2 m2 m2

F2 F7 F1-H NIL

frl-sktg

2S1

frl-sktg NIL

Page 106 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Description Brought Forward Floor Finishes (Cont'd) 11.11 85mm high anti-slip polyurethane recessed skirting a 1st storey b 2nd storey 30mm x 15mm recessed powder coated aluminium channel (2mm thk) skirting c Roof 11.14 Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Other floor finishes Carpet tile floor with cement and sand screed Raised floor (insulated) to LAN Room / ELVS Room Raised floor (insulated) to LAN Room / ELVS Room m2 m2 m2 carpet raised flr raised flr m Alum-sktg Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

BC/S7/12

12

S2

2F5 1F11 2F11

b c Ceiling Finishes 12.1 1C4a Perforated Gypsum board on suspension system a 1st storey 12mm thk perforated gypsum board (with fleece & rockwool insulation) with paint finish with semi-concealed suspension grid to SC Fitness Centre, Aerobics, Multi-purpose Room b 2nd storey 12mm thk perforated gypsum board (with fleece & rockwool insulation) with paint finish with semi-concealed suspension grid to SC Fitness Centre, Aerobics, Multi-purpose Room Acoustic Panel System a 1st storey b 2nd storey Aluminium composite ceiling with non-staining silicon to all cladding joints to Hall of Fame, 2nd Sty Aluminium baffle ceiling to Indoor Sports Hall; 2 Sty high Impact resistant Acoustic panel system a 1st storey Acoustically absorptive mineral fibre board to Common Laundry, Hall Admin, SC Admin b 2nd storey Acoustically absorptive mineral fibre board to SC Admin Fibrous plasterboard ceiling on suspension system a 1st storey b 2nd storey Thermally insulated ceiling panel with fibrous plaster board on concealed suspension system a 1st storey b 2nd storey Carried Forward m2 m2 ceiling ceiling

m2

ceiling

2C4a

m2

ceiling

12.2

2C12 C10 12.3 1C5

m2

ceiling

2C5 12.4

m2

ceiling

12.5

Page 107 of 108

S7-Sports Complex

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)


SECTION 7- SPORTS COMPLEX 1.00 Page No Item Description Brought Forward Ceiling Finishes (Cont'd) 12.6 1C1 2C1 2C1a Skim coat with emulsion paint a 1st storey Plaster and paint to ceiling b 2nd storey Plaster and paint to ceiling Plaster and paint (vinyl co-polymer emulsion paint) finish to ceiling c Roof Plaster and paint to ceiling Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the above items). a Other ceiling finishes GS mesh with GS supports over opening to FA, SPR, TEL, DT, PW/NW Duct 9mm thk Bathrooms, Complex 9mm thk Bathrooms, Complex moisture resistant calcium silicate board to Toilets, Lockers, Family Room, Lift Lobby at Sports moisture resistant calcium silicate board to Toilets, Lockers, Family Room, Lift Lobby at Sports Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty Unit Qty Code Rate Sub-Amount Sub-Amount Total Amount

BC/S7/13-A

12

m2 m2 m2

Skim Coat plaster plaster

RFC1 12.7

m2

plaster

GSM 1C2 2C2

m2 m2 m2

ceiling ceiling ceiling

1C7 2C7

75mm thk acoustic cell spray treatment to Corridor; Sprayed acoustic treatment to soffit of slab to Corridors as per Tender Clarification 2, Architectural Item A64 75mm thk acoustic cell spray treatment to Corridor; Sprayed acoustic treatment to soffit of slab to Corridors as per Tender Clarification 2, Architectural Item A64 75mm thk acoustic cell spray treatment to MPH, Indoor Sports Hall, Toilet, Lockers, Family Room Mineral fibreboard with insulation batts above to LAN Room / ELVS Room Mineral fibreboard with insulation batts above to LAN Room / ELVS Room 9mm thk calcium silicate board F&B Cafe 9mm thk calcium silicate board F&B Cafe to to Entrance Foyer, 1st Sty, Entrance Foyer, 1st Sty,

m2 m2

ceiling ceiling

1C7a 1C8 2C8 1C11 2C11 C11a b c 13 13.1

m2 m2 m2 m2 m2 m2

ceiling ceiling ceiling ceiling ceiling ceiling

15mm thk calcium silicate board to Squash Courts

Fitting and Furnishing Cabinet a Locker White board/ Pin-up board Retractable screen Motorised projection screen Hose reel compartment & access panel Catladder Catladder to Lift Pit (h=1.80~3.0m) 300mmW x 300mmD x 300mmH sump pit with GS grating to Lift Pit Catladder to Sprinkler Tank Room (h=1.85m)- aluminium alloy Watertight access panel (1.20m x 0.60m) to Sprinkler Tank Room Catladder to Balancing Tank at Basement Access panel (10.0m x 1.0m) Aluminium chequered plate with pull handle to Ejector Pump (2.0m x 2.0m) Aluminium catladder (h=3.50m) Handrail Metal platform/ Catwalk behind expanded mesh, Grid SC-A/SC-1 to SC-7 Railing to catwalk Catladder 13.5 13.6 Drop panel Retractable basketball post Retractable ceiling mounted basketball net Multi-sports electronic scoreboard c/w 2 nos of 24 seconds shot clock 13.7 13.8 Portable volleyball, netball & badminton post Cast-in sleeves Squash court Carried Forward nos nos LS LS LS sports sports sports sports LS nos nos nos nos nos nos nos nos nos m m sets LS by NSC by NSC by NSC fire-ext metal-wk metal-wk metal-wk metal-wk metal-wk metal-wk metal-wk metal-wk others metal-wk metal-wk metal-wk

13.2 13.3 13.4 13.3 13.4

Page 108 of 108

S7-Sports Complex

Anda mungkin juga menyukai