MECHANICAL

COMMISSIONING

STATION : NTPC / RSTPS 1 X 500 MW PLANT ITEM : OIL TANK PLANT NOMENCLATURE: UNIT : 7 SL. NO. 1

STANDARD CHECK LIST

SHEET 1 OF 2

LOCATION: SYSTEM : STATUS YES / NO

ACTIVITY / CHECKS

REMARKS

General conditions satisfy the site standing instructions as listed in the plant item commissioning essential prerequisites. The Name plate legend agrees with the approved NTPC Plant Nomenclature, is clearly visible, securely fixed, is durable and correlates with remote labels ( if applicable ). Safe working pressure is also displayed. Check that installation and construction is correct to the latest drawings and specifications. Check that internal and external access is safe and adequate. Check that provision for maintenance, repairs and adjustments to fixtures and fittings is adequate.

Check that all internal items, grills, trays, filter elements etc., are complete and secure. Check that float valve , if fitted , are correctly installed and operating freely. Check that tank is internally clean, free from debris and that the internal and external prote- ctive coating is to specification and undamaged. Check that all external fittings, gauges and indicators are correct to specifications and securely fitted and supported.Unused bosses to be plugged and blanked off. Check that all pipe work systems connected to the tank are complete atleast to isolating valve local to tank and that joints are correctly made.

10

MECHANICAL STATION : NTPC / RSTPS 1 X 500 MW PLANT ITEM : OIL TANK PLANT NOMENCLATURE: UNIT : 7 SL. NO. 11

COMMISSIONING STANDARD CHECK LIST SHEET 2 OF 2

LOCATION: SYSTEM : STATUS YES / NO

ACTIVITY / CHECKS

REMARKS

Check that filling, overflow, vent and tank empty- ing arrangements are complete atleast to the isolating valve local to tank and that joints are correctly made.

12 13

Check that all joints are tight. Check that the bunds are complete and surface drainage arrangements are satisfactory. Hydraulically test tank as appropriate and check for leaks. Record if settlements is made. Check that heating arrangements ( steam heating or electrical heating ) , if fitted, is to specification and complete. Check that support structure, ladders and hand rails are satisfactory. Check that lagging and cladding ( if required ) is complete to specifications. Check access doors, if fitted. Check that painting of approved colour has been done.

14

15

16

17

18 19

NTPC Comg.

NTPC Erec.

Agency Elect. Mech. C&I

Name

Signature

Date

Elect. Mech. C&I BHEL Erec. BHEL Comg.