Anda di halaman 1dari 4

Software Engineering and Project Management Part A 1. ______ is required for projects. a. Planning b. Non routine tasks c.

Objectives d. All the above

2. ________ is finding out in detail what the users require of the system that the project is to implement. a. Requirement analysis. b. Design c. Testing d. Maintenance 3. ________ may be a commonly experienced problem during the development of software projects. a. Good plans b. All requirements being met. c. Good resources d. Poor estimates and plans. 4. Ability of the product /service to fulfil its function, Conformance to its standards and fitness for purpose is _______. a. Flexibility. b. Quality. c. Interoperability.

d. Robustness. 5. ______ is a technique in integration testing. a. Debugging. b. Modifying. c. Top down integration d. Operating 6. ______manages evolving software systems and controls the cost involved in making changes to a system. a. Software quality b. Software product c. Software configuration management d. Schedule planning 7. The identification of hazards and possible problems, the evaluation of their importance and the drawing up plans to monitor and deal with those problems is known as _______. a. Projects b. Products c. Strategies management d. Risk management 8. Scheduling resources can create _______. a. New critical paths b. Roadmaps c. Products d. Process outputs 9. ______ plan is to decide what activities need to be carried out and in what order they are to be done.

a. Critical b. Development c. Product d. Activity 10.CCB stands for ________. a. Configuration Board b. Change Configure Board c. Change Control Board d. Change Change Board 11.What are the requirements of the project during requirements specification? 12.What are the costs identified during project development? 13.What are the stages in waterfall model? 14.State any 4 configuration items? 15.What is a baseline? Part B 16.Explain spiral model? 17.Explain requirement analysis. 18.Explain baseline management. 19.Explain importance of quality. 20.Explain cost schedules. Part C 21.A. Explain the steps involved in managing risks. Or B. Explain the five strategies of risk planning and control.

22. A. Explain the content of a project plan. Or B. Explain COCOMO model. 23. A. Explain the V process model. Or B. Explain waterfall model. 24. A. Explain the different types of testing during projects. Or B. Explain the Phase specific activities by Software Project Management. 25. A. Explain the SCM activities. Or B. What are the seven tools of quality? Explain each of them.

Anda mungkin juga menyukai