A heat number is an identification number that is stamped on a material plate after it is removed from the ladle and rolled at a steel mill. Industry quality standards require materials to be tested at the manufacturer and the results of these tests be submitted through a report, also called a Mill Sheet or Mill Certificate. The only way to trace a steel plate back to its Mill Sheet is the Heat Number. A heat number is similar to a lot number, which is used to identify production runs of any other product for quality control purposes.
[edit]Numerical

significance

Usually, but not universally, the numbers indicate:

the first digit corresponds to the furnace number the second digit indicates the year in which the material was melted the last three (and sometimes four) indicate the melt number.

What is the difference between pipe schedule and class?


In: Plumbing, Engineering, Mechanical Engineering [Edit categories]

Carbon Steel Pipe & Tubewww.fedsteel.comThick Wall for High Temp / Pressure Alloy & Carbon
in all major spec

ASME Code Pipe Supportswww.pipingtech.comPipe Support and Restraint Devices Made Per
ASME Codes and Standards
Ads

Answer:
There are various misunderstandings and misconceptions regarding the classification of piping and most of these originate primarily because some engineers simply don't employ their common sense. Some would like to pretend that there is an almighty, all-powerful agency somewhere that dictates what a pipe is, will be, and shall be by established and enforced "laws", codes, or "standards". No such animal exists.

You are being told the wrong information if you are told "pipe class refers to the maximum internal pressure a pipe can safely sustain". The important point to bear in mind here is that the pipe itself may not (& in most cases, doesn't) fix the maximum safe pressure allowable on the ENTIRE piping system involved. In most cases, the flanges are the weakest point - and this should be the guiding design factor with regards to allowable pressure in that specific piping class(ification). A pipe class is a document (normally prepared by an operating or engineering company) for use within its confines and which contains the definition of pipe and all related components that are to be used under a specific pressure, temperature condition including sometimes the service they are in. A typical definition contains the material specification, type, rating, and dimensional data. It serves as a CLASSIFICATION of piping systems and their application within the process design at hand. A certain pipe schedule is often established for certain services. This is dictated by the classification, based on the need and the application. A pipe schedule to be used and serves as the basic specification for the pipe thickness and dimensions. You should know that the hoop stress equation is what determines the pipe thickness, so you shouldn't be asking whether the pipe thickness determines the allowable working pressure. You SHOULD KNOW that it does and under what conditions. Industrial pipe thicknesses follow a set formula, expressed as the "schedule number" as established by the American Standards Association (ASA) now re-organized as ANSI - the American National Standards Institute. Eleven schedule numbers are available for use: 5, 10, 20, 30, 40, 60, 80, 100, 120, 140, & 160. The most popular schedule, by far, is 40. Schedules 5, 60, 100, 120, & 140 have rarely, if ever, been employed by myself in over 48 years as a practicing engineer. The schedule number is defined as the approximate value of the expression: Schedule Number = (1,000)(P/S)Where, P = the internal working pressure, psig S = the allowable stress (psi) for the material of construction at the conditions of use. For example, the schedule number of ordinary steel pipe having an allowable stress of 10,000 psi for use at a working pressure of 350 psig would be: Schedule Number = (1,000)(350/10,000) = 35 (approx. 40) I can understand your confusion and ignorance from a student's point of view. Students are never exposed to this methodology and are initiated into it when they go into the real world in their first job(s).

Read more: http://wiki.answers.com/Q/What_is_the_difference_between_pipe_schedule_and_class#ixzz1vfjCcC7U

Schedule is NOT directly a measure of thickness, it is a measure of the pressure a pipe can withstand without deflection or failure. When you are talking about pipes constructed of the same materials (i.e. PVC) a thicker pipe would be able to withstand higher pressures. As a result, many people have taken "schedule" to be synonymous with thickness. "For the purpose of standardizing pipe dimensions, the American National Standards Institute (ANSI) sponsored by the American Society for Testing Materials (ASTM) and the American Society of Mechanical Engineers (ASME), published ANSI B36.10. To broaden the range of wall thicknesses, schedule numbers from schedule 10 (S.10) thru schedule 160 (S.160) were adopted for steel pipe. These schedule numbers indicate approximate values for 1000 times pressure-stress ratios." From http://www.durovac.com/industrial-vacuum/tubing-fittings/stuff-about-pipe.htm
Read more: http://wiki.answers.com/Q/Why_Pipe_thickness_is_mentioned_by_schedule_what_does_it_mean#ixzz1vfln XB8U