Loan Varieties
House Building Loan Personal Loan Long Term Loan Intermediate Loan Short Term Loan Special Loan Festival Loan/Seasonal Advance Emergency Loan Educational Loan Medical Loan General Loan Etc.
Page 1 of 2 1
Page 2 of 2 1
Page 3 of 2 1
Page 4 of 2 1
Page 5 of 2 1
Page 6 of 2 1
Page 7 of 2 1
Page 8 of 2 1
Policy Register:
Page 9 of 2 1
Page 10 of 21
Page 11 of 21
Page 12 of 21
Page 13 of 21
Page 14 of 21
Page 15 of 21
Page 16 of 21
Page 17 of 21
Page 18 of 21
Page 19 of 21
Page 20 of 21
Implementation Chart:
Stage No. 1. 2. 3. 4. 5. 6. 7. 8. Stage Description On-site detail study of the existing system Preparation of the Document for Software Require Specification (SRS) Settlement of SRS and agreement on the same Software Development & Coding based on SRS Installation of Software On-Site Training of Users on the Developed Software Providing O n-site Guidance on Parallel Run of the software Providing O n-site Administrator Training Duration 5 days 2 weeks 7 days 1-2 Months 1 day 5 days 1 Month 2 days
Development Tool:
Back End Front End : Oracle 9i or higher (RDBMS) : Oracle IDS or higher (Forms & Reports)
Page 21 of 21