Anda di halaman 1dari 3

MUHAMAD NIZAR

Phone: +622177826973 Mobile: +628170891531 Address: Pesona Khayangan Blok FM No. 6 Depok 16411, Indonesia Email: nizarmuhamad@yahoo.co.id

DATE OF BIRTH NATIONALITY GENDER FIELDS OF EXPERTISE


9 November 1983 Indonesian Male

Environmental Impact Assessment; Simulation of chemical processing using HYSYS or ChemCAD; Air quality impact prediction using SCREEN3, AERMOD, CALPUFF and WATER9 MODEL from USEPA; Noise impact prediction. Master Degree in Environmental Study from University of Indonesia, Jakarta-Indonesia, Feb 2010 ongoing; Bachelor Degree in Chemical Engineering from Sriwijaya University, Palembang-Indonesia, 2002-2007.

QUALIFICATIONS

TRAININGS

ISO 14001 E-MS and OHSAS 18001 OHS-MS (Computer Based); by PT Rhuekamp Sistem Manajemen Terpadu Mutu, Lingkungan, Keselamatan dan Kesehatan Kerja (SMTMLK3) Berbasis Komputer by PT Rhuekamp Carbon School, held by ERM, from 16 to 17 January 2009 ; Training of Quality Management System ISO 9001:2000, held by Sinergis, from 19 to 20 September, 2007 Awareness & Interpretation Training of OHSAS 18001:2007, held by PT. Phitagoras Global Duta, from 24 to 25 November, 2007, in PII Office, Jakarta. Indonesia Bahasa Indonesia Mother Tongue English Fluent

COUNTRIES OF WORK EXPERIENCE LANGUAGES AND DEGREE OF PROFICIENCY

-1-

Professional Experiences
November 2011 Present/EHS Environmental Specialist Contract Basis/ PT. HESS (Indonesia Pangkah) Ltd Technical Support on EHS Compliance and Permitting. June October 2011/Environmental Engineer - Contract Basis/ PT. Weda Bay Nickel Technical Support on Environmental Compliance and Permitting.

December 2010/Environmental Consultant Freelance/ PT. Karya Utama Citramandiri Air Dispersion Modelling of Emission from Flare in Natural Gas Exploitation Field, Energy Equity Epic (Sengkang) Pty. Ltd, Regency of Wajo, Province of South Sulawesi. November 2010 April 2011/Solid Waste Management Engineering & Environmental Assistant Expert/Fichtner GmBH & Co. KG Feasibility Study for the Urban Climate Protection Programme (Emission Reduction in Cities solid waste management) Stage 2, ongoing. Main Role: to support the international experts for the preparation of the design for 5 new landfills, closure of existing 5 landfills, design of 5 new composting plants for green waste and 5 sorting plants for mixed wastes, and site selection study in Semarang, Pekalongan and Sidoarjo. June October 2010/Environmental Scientist/PT GHD Environmental Impact Assessment and Environmental Management Plans for Padang Pariaman Health Facilities Reconstruction Program, Coffey International Development, 2010. Main Role: To prepare EIAs and EMPs for reconstruction of six Community Health Cares (Puskesmas) in Padang Pariaman District.

Air Quality Monitoring Services, PT INCO, 2010. Main Role: To conduct air monitoring services to determine both ambient air quality and stack emissions quality at the Companys site in Sorowako.

June 2009 May 2010/Environmental Consultant /Freelance Environmental Impact Assessment of Development of Gas and Steam Power Plant, PT Dalle Energy Batam, 2010. Main Role: To prepare air quality analysis, make air dispersion modelling, predict project impact to the ambient air quality, and prepare management and monitoring plans.

Environmental Impact Assessment of PT Lontar Papyrus Pulp & Paper Industry, 2010. Main Role: To prepare air quality analysis, make air dispersion modelling, predict project impact to the ambient air quality, and prepare management and monitoring plans.

Feb 2008 May 2009/Environmental Consultant /PT ERM Indonesia Air Quality Modeling for the AFR usage at Holcim Narogong Plant, Bogor, 2009. Main Role: To prepare air dispersion modeling from existing stack emissions in Holcim Narogong Plant before and after using AFR (Alternative Fuel and Raw Materials).

Environmental Impact Assessment of Pomala Nickel High Pressure Acid Leaching Plant, PT INCO, 2009. Main Role: Prepare air quality analysis, make air dispersion and noise modeling, predict project impact to the ambient air quality, predict noise impact and prepare management and monitoring plans. Environmental Impact Assessment of Bahodopi Nickel Refinery Plant, PT INCO, 2009. Main Role: Prepare air quality analysis, make air dispersion and noise modeling, predict project impact to the ambient air quality, predict noise impact and prepare management and monitoring plans. E&E Solutions Wind Energy, 2008. Main Role: Provide wind data for proposed sites in Indonesia (Karawang and Sunter). Tayan Bauxite Mining and Alumina Refinery, PT. Indonesia Chemical Alumina, 2008. Main Role: Prepare air dispersion modeling report. Sarulla Geothermal Field and 330 MW Power Plant AMDAL Revision, Indonesia, 2008- 2009. Main Role: Prepare air quality analysis, make air dispersion modeling, predict impact to the ambient air quality and prepare its management and monitoring plans.
-2-

Environmental Management and Monitoring Efforts, (UKL and UPL) 2-D Seismic Survey at Sunda Platform for PT. Marathon Petroleum Indonesia, West Java, 2008. Main Role: To review final Environmental Management and Monitoring Efforts (UKL and UPL) reports both in Bahasa Indonesia and English and to prepare presentation materials. AMDAL Document Translation from Indonesia to English and Vice Versa. Documents translated include:
1. 2.

3. 4.

Term of Reference (KA) of Nickel and Cobalt Mining Project of PT Weda Bay Nickel (Eng Ind) Term of Reference (KA), Environmental Management and Monitoring (RKL and RPL) of The Increase and The Optimization of Nickel Ore Production and Processing of PT INCO Up To 225 Million Pounds Nickel in Matte Per Year (Ind Eng) Environmental Feasibility to Protected Forest Area, Lead and Zinc Mining Project of PT. Dairi Prima Mineral (Ind Eng) Environmental Impact Analysis (ANDAL) of Martabe Gold Mining Project of PT Agincourt Resources (Ind-Eng)

AVAILABILITY For Employee Position For Freelancing Opportunity Certification


"I, Muhammad Nizar, certify that the information provided in this CV is accurate. I have not been convicted of an offence of, or relating to, bribery of a public official, nor am I subject to any proceedings which could lead to such a conviction Signature: Updated on: 04 May 2012 1 (one) month notice Anytime for deskjob only (work done from home) For example: air dispersion modeling