Mechanical Maintenance cost For the Month of January 2012

Description Month

Stores and Cement Cost per ton Spares Production of Cement Consumption 328644.00 137832.22 140631.00 140631.00 2.336 0.98

Revenue Capital

Jan 2012 Jan 2012

Cost per ton of cement as per Budget 2012 Approved 3.92 1.82

Mechanical Maintenance cost For the Month of February 2012

Description Month

Stores and Cement Cost per ton Spares Production of Cement Consumption 577551.08 363992.83 122968.00 122968.00 4.69 2.96

Revenue Capital

Feb 2012 Feb 2012

Cost per ton of cement as per Budget 2012 Approved 3.92 1.82

Mechanical Maintenance cost For the Month of March 2012


Description Month Stores and Cement Cost per ton Spares Production of Cement Consumption 158387.19 10892.32 120541 120541 1.313 0.090 Cost per ton of cement as per Budget 2012 Approved 3.92 1.82

Revenue Capital

March 2012 March 2012

To The Personal Department,

Data: 07-02-2012,

Through: Maintenance Manager. Sub: Mechanical Fitter Mr Rajesh Flight ticket Postpone Request Rag... Sir, This has reference to the above subject We would like to bring yours kind notice that Mr Rajesh Kumar ( Fitter ) Emp No-545, has planned to go to his native place on annual leave for 60 days From 08-02-2012 onwards. The Flight is from Dubai to Lucknow on Jet airways. The Kiln Shut down works was planned from 14th to 18th February 2012. During this period we take up many works for that Mr Rajesh services are required. So please postpone his ticket from 08-02-2012 to 25-02-2012.

With Best Regards,

K.K.V Rama Krishna Dy.C.E (Mach)

1) WATER PUMP DETAILS: Make: PRISMA 1153M Q (l/min) 20-66 H (m) 30.5 H Max 34m T-Max-35 deg 0.8 HP input 230V1-50HZ P1-0.6 KW 2800 min, Made in SPAIN.

2) HAND PALLET TRUCK Make: JZX -25-550 Capacity: 2500kgs Maximum fork height 200 or 190mm Minimum fork height 85 or 75mm Fork length -1150 to 1220 Width Over all Forks -550mm Individual Fork Width -160mm www.gulf.jzxtools.com

Thanks for your interest in our hoists. What type of hoist suspension do you require top hook, push trolley, or motorized trolley? Push button control length? Also, what power supply do you want it to run on voltage, phase, and hertz?
Dear Sir, Power supply requirement stands as following: 3 phase ,415 Volts AC, 50 Hz frequency. Push button control length can be as per your requirement. Regards Y.Ravi kumar

Dear sir, we required Motorised trolley and push button control cable length should be 10 meters length and power supply 3phase,415 Volts AC,50 Hz frequency.

Mechanical Maintenance cost For the Month of MAY 2012

Description

Month

Stores and Spares Consumption 268786.60 83642.89

Cement Producti on 143646 143646

Cost per ton of Cement

Revenue Capital Dear Sir,

MAY 2012 MAY 2012

1.871 0.582

Cost per ton of cement as per Budget 2012 Approved 3.92 1.82

This has reference to the above subject I would like to bring yours kind notice that we have taken up the Thermal Insulation & Cladding for raw mill hot air duct ,Coal mill ducting and RABH inlet duct, to carry out this work we have given this job to M/s Phoenix Engineering & Marine Co. Sharjah against P.O No PCI/03-11/LPO/07V Dated 15-03-2011.In this P.O Scaffolding is our scope of work, Till date Coal mill area, raw mill hot air duct up to the Elevation 38Mts and P.H Fan out let duct up to 28 Mets level Elevation has been Completed. The balance raw mill hot air duct is another 18mts elevation and Pre-heater Fan out let duct balances 12 Mets, and complete RABH inlet duct. To complete the Balance works we need Scaffolding material and man power for above areas scaffolding. Please arrange the scaffolding material and man power for completion of the above said work and do the needful.

Dear Mr. Rama Krishna, The following are the consumption details Kiln, gear 550mm width (single pinion): Grafloscon C-SG 2000 Ultra (Viscosity 2000, graphite based TDS attached): = 66 to 88 gm/hr = 2.11 Kg / day = 85 days per drum (180 kg) consumption approx. & Kluberfluid C-F3 Ultra (Viscosity 16500, synthetic, transparent lubricant TDS attached): 0.8 to 1 gm per cm width per hour = 44 to 55 gm/hr = 1.32 kg / day = 136 days per drum (180 kg) approx.
1.

Coal Mill, gear 450mm width (single pinion): Grafloscon C-SG 2000 Ultra (Viscosity 2000, graphite based TDS attached): = 72 to 90 gm/hr = 2.16 kg / day = 83 days per drum (180 kg) approx. & Kluberfluid C-F3 Ultra (Viscosity 16500, synthetic, transparent lubricant TDS attached): 1 to 1.3 gm per cm width per hour = 45 to 58.5 gm/hr = 1.40 kg / day = 128 days per drum (180 kg) approx.
2.

Raw & Cement Mills, gear 660mm width (double pinion): Kluber Grafloscon C-SG 2000 Ultra (Viscosity 2000, graphite based TDS attached): = 158.4 to 184.8 gm/hr = 4.435 kg/day = 40 days per drum (180 kg) approx. & Kluberfluid C-F3 Ultra (Viscosity 16500, synthetic, transparent lubricant TDS attached): 1.5 to 1.8 gm per cm width per hour = 99 to 118.8 gm/hr = 2.85 kg / day (e.g. higher level of consumption) = 60 to 63 days per drum (180 kg) approx.
3.

Please let me know if you need further assistance. Thanks & Best Regards
Saad Riaz

From: KKV Rama Krishna <ramakrishna@pioneercements.ae> To: 'Hameed - pioneer' <hameed@pioneercements.ae>; mallikarjunbabu@yahoo.com Cc: 'Shaik Mahboob Basha' <smbasha@pioneercements.ae>; gareddy2007@yahoo.co.in Sent: Sunday, 4 March 2012 1:54 PM Subject: End less belts required Req-rag.

Dear sir, This has reference to the above subject I would like to bring yours kind notice that the PR nos-45 dt: 11-01-2012, 56 dt:16-01-2012 and 541 dt:16-07-2011 ,having the conveyor belts Used for Cement mills Clinker Weigh feeders, and Auto packer top and bottom timing belts respectively. At present we dont have the spare belts for the above applications if any exigency occurs it very difficult to handle, Please look in to the matter and do the need full in this regard. With Best regards,

K.K.V Rama Krishna Dy.C.E ( Mech )

To, The Plant Manager,

Sub: Mills Attendants attention request regards, Sir, This has reference to the above subject sir I would like to bring yours kind notice that Past few months we observe that The Raw mills and Cement mills where tripping due to the small problems that is o-sepa oil Low pressure alarm and Gear box lub oil low pressure alarms in this cases the Attenders could act in time we can Eliminate this type of trappings In this regard we need proper attention on the equipment and housekeeping while in operation and co-ordination with Mechanical department. Past one and half year back all the Attenders where working under mechanical Department at that time they are more attention on equipments and housekeeping in the respective sections after Shifting to the Production Department the concentration on equipment and Housekeeping is not in the mark as previous. As per the Mechanical Department Concern the Man power has come down nearly 20% with the previous history, and the day to day activities and routine maintenance, Development and modification works we planned with cost-effective manner and to improve the plant performance, MTBF & MTTR, we need the attenders attention and co-operation same thing is mentioned in our Group (Raysuit) Mill Arrenders job title and Responsibilities. In this Regard please advise the Concern to pass Standard Instructions to the above.

With Best Regards, K.K.V Rama Krishna Dy.C.E ( Mech )

K.K.V.Rama Krishna Rao.


Dy.Chief Engineer ( Mechanical). PIONEER CEMENT INDUSTRIES LLC. (A member of Raysut Cement Co. Group, Sultanate of Oman) Mobile: +971 503744101. |Fax: +971 7 2584 222 e-mail: ramakrishna@pioneercements.ae.

To The Personal Department,

Data: 25-03-2012,

Through: Maintenance Manager. Sub: Turner Mr Ramesh Kumar Yadav Flight ticket Postpone Request Rag... Sir, This has reference to the above subject We would like to bring yours kind notice that Mr Ramesh Kumar Yadav ( Turner ) Emp No-539, has planned to go to his native place on annual leave for 60 days From 01-04-2012 onwards. The Flight is from Dubai to Lucknow on Indian Airlines. The Plant Project works, Development and maintenance works are under progress. The other Turner Mr Paswan is on Emergency Leave and he was supposed to arrive to site in 1St Week of April. In this condition we cannot send Mr Ramesh unless Mr Paswan arrives .So please advise the concern to postpone Mr Ramesh Ticket to 9th April 2012 From Dubai to Lucknow.

With Best Regards,

K.K.V Rama Krishna Dy.C.E (Mach)

To The Maintenance Manager,

25-03-2012,

Sub: 2Ply Paper Bags Supplied by DYPACK Performance. Sir, This has reference to the above subject we have received 100 Nos of 2 Ply Sample Paper bags (for Cement loading) From DYPACK ( blvd,Golfo de Baja Califorornia Sur#1200,Puerto industrial,Altamira,Tam.C.P.89603).The performance of the Bags are good there is no issues while loading, this is for yours information and do the need full. With Best Regards, K.K.V Rama Krishna Dy.C.E ( Mech )

Kind Attn: Mr M.V.Jayaram, Manager Sales and Logistics

FLSmidth Middle East.


Sub: Suitable Paint Requires for All the Equipment Foundations to prevent lube oil penetration in the Foundations. Dear Sir, This has reference to the above subject Please go through the Attested Photo and suggest us the Suitable Paint to safe guard our Equipment Civil Foundations of Cement mills, Raw mills,Kiln,Process fans and Coal mill foundations to avoid the Leakage oil from Oil seals and oil penetration in to the Foundations, in long run it may weaken the Foundations Strength so please suggest the Suitable paint and Procedure to apply the same.

Dear Sir, We are required the Mono rail Hoist ( Electric Wire rope ) capacity of 2Tons and Lifting Height is 35 Meters, required Motorised trolley and push button control, cable length should be 10 meters length and power supply 3phase,415 Volts AC,50 Hz frequency. For our Shredded tires feeding system .Please sent your competitive offer at the earliest. With Regards,

K.K.V.Rama Krishna Rao.


Dy.Chief Engineer ( Mechanical). PIONEER CEMENT INDUSTRIES LLC. (A member of Raysut Cement Co. Group, Sultanate of Oman) Mobile: +971 503744101. |Fax: +971 7 2584 222 e-mail: ramakrishna@pioneercements.ae.

Date: 26-04-2012 To, The Finance controller Pioneer Cement Industries L.L.C, Ras Al Khaimah.

Subject: Monthly salary transfer to CBI Bank Manar branch request -reg. Dear Sir, This is to bring to your kind notice that, I have taken personal loan in CBI (Commercial bank international) Manar Branch RAK.in this regard I have to pay monthly instalments to the said bank every month till Loan amount clear .So please transfer my April month salary to Commercial bank international psc (CBI) Manar Branch RAK my Account No: 100080238695. Hence give your kind approval and instruct the concerned to send my monthly salary to the above account no till the further request.

With Best Regards

K.K.V Rama Krishna Rao Dy.C.E ( Mechanical ) Emp No: 219

Dear sir, This has reference to the above subject We have received the paper bags for cement loading from Shuaiba Industrial Co. (K. S. C) on 24th April 2012 Against p.o no 883 dated 19th April 2012.in this consignment we noticed that some of the bags were not shooting properly because of over glue at the top valve and also bags sticking to each other due to over glue. Same has informed to the party and they replied us this type of problems will not occur in future. Recently we have received a consignment on 10th May against P.O no-883. We noticed that same problem has repeated, Because of this type of problems Bag loading will be effected we are here with attested the Photos for yours reference and need full action. The correspondence to the party as follows.

---------- Forwarded message ---------From: Rafat Khan <Rafat.Khan@sic-kwt.com> Date: Thu, Apr 26, 2012 at 12:33 PM Subject: RE: Faulty Paper Bags - Regarding To: Hameed - pioneer <hameed@pioneercements.ae> Cc: "smbasha@pioneercements.ae" <smbasha@pioneercements.ae>, Pioneer Stores <pioneerstores@gmail.com>, "kiran4u@gmail.com" <kiran4u@gmail.com>, 0 - SIC Marketing Dept <0-SICMarketingDept@sic-kwt.com>

Dear Mr. Sahul Hameed,

We have received your complaint regarding sticking problem in the bags due to over gluing.

Although the quantity of bags having this problem is not specified, we strongly believe that this may have been evident on a small quantity of bags because we have checked the bag samples in our records, and did not find the same problem in them. Nevertheless, we take full responsibility of this manufacturing deficiency, and assure you that we are taking this complaint very seriously. In future supplies, we shall take even more care with vigilant checking of the bags while producing these bags.

It is our commitment to you that this type of problem not occur in the future production.

In case of any further comments / quality issues, please feel free to contact us immediately.

Best regards, Mohamed Rafat M. Khan Executive V. P.

Item Code 1503020010

Description
Connecting Hose.

1503020080 1503020085 1503020099 4207060002

Repair kit for bag holding cylinder. Repair kit for 3-position Cylinder Suction Cup V-Belt

P.R Current Monthly PR. PR Dated Supplier Status Stock Required No. 15-20 Quotations 35nos 051 14.01.2012 Haver Nos Received Quotations 5nos 051 14.01.2012 Haver Received Quotations Received No Action Quotations Received

0 80nos 0 30-35 Nos

051 14.01.2012 444 11.04.2012 27 08.01.2012

Haver Haver Haver

Nylon Tube 5014040008 1503020050 1501010095 Hub Cylinder Silencer9.938.0002.01

9mtrs 0 0 0

586 06.08.2011 444 11.04.2012 451 14.04.2012 886 17.12.2011

Local Party Haver Haver

Quotations Received No Action No Action

Quotations Haver Received

1503020096

Item Code 1504010126

Description RUBBER SPONGE CONE PVC- BLUE ENDLESS B/C TOOTHED BELT

P.O No 201 297

PO.Dated 22-03-2012 17-04-2012

Delivery date.

Remarks

12-042012 15-052012 24-042012 24-042012 18-052012

Not Received Not Received

4209030002 1202210005

179

20-03-2012

Not Received

1202210008

TOOTHED BELT ENDLESS BELT, WIDTH: 180MMX3480mmlong

179

20-03-2012

Not Received

1202010001

379

15-05-2012

Not Received

To The Plant Manager, Dt: 04-06-2012,

Through: Maintenance Manager,

Sub: Reimbursement of Utensils bills reg

Sir, This has reference to the above subject I have purchased utensils for daily uses and spent an amount Of AED 650/- for the same Bills are enclosed. Hence give your approval and advise the concern to do the Need full.

With Regards,

K.K.V Rama Krishna Rao. Dy.C.E ( Mech ) EMP No-219

To The Plant Manager, Through: Maintenance Manager, Sub: Pits construction for Water pipeline Valves Req-Reg Sir, This has reference to the above subject I would like to bring yours kind notice that the plant water circulation pipe line is laid in underground and it is having Valves for regulating the water flow and easy operation to carry out the Maintenance works. The Valve areas are filled with sand because of that it is very difficult to operate the Valves hence we required to construct the Brick wall pits. Please kindly give yours approve and instruct the concern to do the need full. The sizes of the Pits are given below.
Measurements of the man holes which are to be made Location Area Main Gate (Sewage Line) 4400 X 1000 X 800 Admin Round about(Fire Fighting) 1000 X 1000 X 1000 Coal Crusher (Fire Fighting) 1500 X 1500 X 1000 Coal mill ( Fire Fighting) 2000 X 2000 X 1000 4000 X 2500 X 1000 Clinker Silo( Fewa and Fire Fighting) 2500 X2000 X 1000 Cement Mill ( Fewa water ) 2500 X 2500 X 1000

S.NO 1 2 3 4 5 6

Nos 1 1 1 1 1 1 1