Anda di halaman 1dari 3

lRAMESH KUMAR PATEL

Mobile: 09893410716/09981848696 ~ E-Mail: rameshpatel123@gmail.com Seeking mid-level assignments in the field of Maintenance/Project with an organization of repute; preferably in Chhattisgarh/Maharashtra/Odisha/MP. SNAPSHOT
A competent professional with Total 6years and 7months experience, 5years and 7months

of experience in Maintenance in 515MW combined cycle power plant, 4months experience in project in 1800MW super thermal power project and presently working in project execution in 1000MW thermal power plant since last 7month. Skilled in switchyard maintenance, transformer maintenance, switchgear maintenance Conversant in working on SAP (MM, WCM & PM Module). Efficiently functioned as a member of Plant Safety Committee and Plant Energy Conservation Team. Gained extensive exposure through various seminars, trainings and certification programmes. Ability to function in areas like Energy Management, Safety Systems, Electrical Maintenance. An effective communicator with strong interpersonal and leadership attributes.

CAREER SCAN BGR Energy System Ltd. - 2X500MW Thermal Power Project, CSEB Marwa Project Since 28.10.2011 Deputy Manager- Site Electrical Configuration of Plant: 2X500MW thermal power project of Chhattisgarh State Electricity Board The plant consists of 2nos of steam turbine of 500MW each manufactured and supplied by M/S BHEL. Balance of plant work by BGR energy system Ltd. Role: Erection and commissioning of 400KV and 220KV air insulated switchyard Erection and commissioning of HT/LT switchgear and drives Erection and commissioning of HT/LT power transformer Erection and commissioning of BoP area equipments ESSAR GROUP 3X600MW Super Thermal Power Project, Tori (Ranchi) From 01.07.2011 to 22.10.2011 Deputy Manager Electrical project and PMC Configuration of plant: 3X600MW Super Thermal Power Project The plant consists of 3no of Steam turbine of 600MW each manufactured and supplied by M/S Harbin Power, China. Electrical balance of plant will be supplied by M/S Areva T&D India. Role: Day to day planning, co-ordination with EPC contractor, daily report collection and documentation, record keeping Engineering review of electrical system Construction power supply erection ESSAR Group 515MW Power Generation, Hazira (Surat) From 14.11.2005 to 30.06.2011 Deputy Manager - Electrical Maintenance Engineer Configuration of the Plant: The Plant consists of 3 Nos GE frame 9E Gas Turbine 110MW Manufactured and supplied by M/s GE USA with Mark V control. The switchyard of the plant and total control and instrumentations are supplied by M/s. Siemens India Ltd, MCC and PCC are supplied by M/s. ABB, English electric ,Areva and Siemens. Heat recovery steam Generators (Boilers) was supplied by M/s. Korea Heavy Industries Ltd, Korea and other equipments are also purchased from reputed Indian vendors like KSB, Jyoti, CGL, Paharpur, Ion exchange having good performance and reliability.

Role: Overseeing activities involving working out requirements (resource utilization, spare management & manpower management) & monitoring overall project operations for ensuring timely completion. Monitoring the activity at sites and review of project schedule. Planning preventive & predictive maintenance schedules of various machinery and instruments to increase machine up time / equipment reliability. Handling AMC contract for electrical department. Monitoring and attending abnormality of Steam turbine auxiliaries, Heat Recovery, Steam Generator & Complete Water Cycle. Working as team member of H.R.S.G. shutdown, Gas Turbine C.I., H.G.P.I, M.I. / Steam Turbine M.I. Planning start-up, shutdown and normal operation of the unit with judicious load management to ensure optimum operational efficiency. Conducting failure investigation analysis to identifying gaps & taking corrective measures so as to reduce equipment downtime & maximize the availability. Monitoring and optimizing processes, troubleshooting problems in coordination with other departments and improving efficiency. Effectuating rollout activities along with the maintenance schedules to increase the uptime and reliability of the equipment. Ensuring completion of all project activities within the time & cost parameters and effective resource utilization to maximize the output. Notable Attainments Involved in: o Improvements in SAP PM o Replacement of lighting with LED o CM of 220KV switchyard and attending hot spot to save forced shutdown Handled project of 220KV switchyard expansion and transmission line. TECHNICAL PURVIEW
Maintenance:

220KV switchyard HVAC system Steam and Gas turbine auxiliaries Heat Recovery Steam Generator Softening Plant Pretreatment Plant pump Condensate extraction pump Vacuum pump Project: Project management 220KV and 400KV switchyard drives SCHOLASTICS 2009 2005 2004

PCC/MCC and drives D.M. Plant Boiler feed Generator and exciter HT/LT switchgear and

B. S (Power Engineering) from BITS, Pilani (DLP Programme) Post Diploma (Thermal Power Plant Engineering) from NPTI, Nagpur. Diploma in Electrical from Kirodimal Polytechnic, Raigarh.

TRAININGS AND CERTIFICATES Actively attended: Simulator training of 210 MW Thermal Power Plant in NPTI Nagpur. Simulator training of 328 MW Combined Cycle Power Plant Training in NTPC Kawas. Training of motor protection, AC and DC drives, Leadership Skill and Customer Focus from ESSAR Learning Centre, Hazira. Successfully completed Certifications in: Relay setting and co-ordination in ESSAR Learning Centre (Hazira) Surat. First AID in ESSAR Learning Centre (Hazira) Surat. Basic Managerial skill in ESSAR Learning Centre (Hazira) Surat. Attended seminar of Power System protection organized by DOBLE in Ahmedabad.

PERSONAL DETAILS Date of Birth: 18th June, 1985 Present Address: At/Post-Timarlaga, Dist-Raigarh, Chhattisgarh-496450 Permanent address: At/Post-Timarlaga, Dist-raigarh, Chhattisgarh-496450.

Anda mungkin juga menyukai