9 0 0 0 7 0 1 1 0 0 : Total points Credit 1 Credit 2 Credit 3 Credit 4 Credit 5 Credit 6 Credit 7.1 Credit 7.2 Credit 8 Possible points : LEED Certified Design and Construction Building Exterior and Hardscape Management Plan Integrated Pest Management, Erosion control and landscape Alternative Commuting Transportation Site development - Protect or restore Open Habitat Stormwater Quantity Control Heat Island Reduction, Non-Roof Heat Island Reduction, Roof Light Pollution Reduction 26 4 1 1 15 1 1 1 1 1
0 1 0 10 0 0 0 0 0
$ $ $
Water Efficiency
9 Yes 2 3 3 1 0 : Total points Pre-requisite 1 Credit 1 Credit 2 Credit 3 Credit 4.1 Credit 4.2 Possible points : Minimum Indoor Plumbing Fixture and Fitting Efficiency Water Performance Measurement Additional Indoor Plumbing Fixture and Fitting Efficiency Water Efficient Landscaping Cooling Tower Water Management - Chemical Management Cooling Tower Water Manag. - Nonpotable Water Source Use 14 Yes 0 0 0 0 0
2 5 5 1 1
$ $ $ $
18 2 2 2 1 2 6 1 1
$ $ $ $ $ $ $ $ $
1 1 1 1 1 1 1 1 1 1
$ $ $
Ojo 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
$ $ $ $ $ $ $ $
$ $
1 1 1
Innovation in Operations LEED Accredited Professional Documenting Sustainable Building Cost Impacts
4 1 1
0 0 0
$ $ $
30,000.00 5,000.00
Regional Priority
0 0 : Total points Credit 1 Regional Priority Possible points : 4 4 0 Total Cost ($) 25 $ 503,000.00
to consider
2 2 2 same as CI 3 same as CI 1 1
1 1 same as CI 0 1 1 1 1 1
1 1 0
1 1 check LEED CI 1 1 1
1 1 1
36 61
Technical
Type - High-Rise Designation - Government [1], and Office [1] Status - Complete Floors - 20 [1]
References
1. 2008-06-23: Onsite Observations
1 Yonge - South Structure, Opera Place I, Murano - North, Peregrine Cooperative, Simon Apartments, and The Gallery on Grenville